JPH0689595B2 - Joint structure of working plate for working passage - Google Patents
[go: Go Back, main page]

JPH0689595B2 - Joint structure of working plate for working passage - Google Patents

Joint structure of working plate for working passage

Info

Publication number
JPH0689595B2
JPH0689595B2 JP1186529A JP18652989A JPH0689595B2 JP H0689595 B2 JPH0689595 B2 JP H0689595B2 JP 1186529 A JP1186529 A JP 1186529A JP 18652989 A JP18652989 A JP 18652989A JP H0689595 B2 JPH0689595 B2 JP H0689595B2
Authority
JP
Japan
Prior art keywords
plate
sleeper
working
clip
joint structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1186529A
Other languages
Japanese (ja)
Other versions
JPH0351478A (en
Inventor
誠 井上
道夫 田邊
Original Assignee
株式会社森組
日伸工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社森組, 日伸工業株式会社 filed Critical 株式会社森組
Priority to JP1186529A priority Critical patent/JPH0689595B2/en
Publication of JPH0351478A publication Critical patent/JPH0351478A/en
Publication of JPH0689595B2 publication Critical patent/JPH0689595B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、シールド工事現場等において作業通路用と
して用いられるあゆみ板のジョイント構造に関するもの
である。
Description: TECHNICAL FIELD The present invention relates to a joint structure of an itching plate used for a work passage at a shield construction site or the like.

〔従来の技術〕[Conventional technology]

都市の地下空間に建設される地下鉄、上・下水道、電力
・電信施設を構築する際にシールド工法が採用され、シ
ールドは主として鋼製の殻鋼板(スキンプレート)およ
び内蔵する推進ジャッキ等より成っており、このシール
ドを土中に押し込んでシールド前面に当る切羽の土砂を
セグメント長掘削した後、セグメント1リングを組立て
このセグメントに反力をとってシールド推進ジャッキに
よってシールドをつぎの1リング分だけ推進させ、再び
セグメントを組立てるという作業を行ない、この間にシ
ールドのスキンプレートとセグメントのすき間に裏込め
材の注入を行ってセグメント背面の空げきを埋めてトン
ネルを完成させて行く。
The shield method is used when constructing subways, water / sewerage systems, and electric power / telegraph facilities to be built in the underground space of the city. The shield mainly consists of steel shell plate (skin plate) and built-in propulsion jack. After pushing the shield into the soil and excavating the sand of the face that hits the front of the shield for a segment length, assemble the segment 1 ring and take the reaction force to this segment to propel the shield by the next ring by the shield propulsion jack. Then, the segment is assembled again. During this time, backfill material is injected into the skin plate of the shield and the gap of the segment to fill the void on the back of the segment to complete the tunnel.

ところで、このようなシールド工事現場においては、掘
削土を排出するためにバッテリーカーおよびズリトロが
使用されており、このバッテリーカーおよびズリトロが
走行する一対の軌道の間には、作業員が歩行及び作業し
易いように多数のあゆみ板が連接して布設されている。
By the way, at such a shield construction site, a battery car and a zlitro are used to discharge excavated soil, and a worker walks and works between a pair of tracks on which the battery car and the zlitro run. For ease of operation, a large number of Ayumi plates are connected and laid.

従来、上記あゆみ板として、木製、鋼製及び合成樹脂製
のものが存在しており、木製のあゆみ板は端部を重ね合
わせてラップすることにより連接し、また、鋼製及び合
成樹脂製のあゆみ板は端部を挿し込みにより連接してい
る。
Conventionally, there are wood, steel and synthetic resin as the above-mentioned itching board, and the wood itching board is connected by overlapping and wrapping the ends, and also made of steel and synthetic resin. The ayumi plate is connected by inserting the ends.

〔発明が解決しようとする課題〕[Problems to be Solved by the Invention]

ところで、従来のあゆみ板は、シールド工事におけるセ
グメント長(枕木ピッチ)が考慮されておらず、しかも
長尺(3〜4m)であるため、製品長以上掘り進まなけれ
ば坑内先端部にあゆみ板を布設することができず布設作
業効率が悪く、それに加えて坑内先端部の足場の安全が
確保できないという問題があった。また、木製のあゆみ
板は、端部を重ね合わせてラップすることにより連接し
て布設しているため、ラップ箇所にあゆみ板の厚み相当
分(21〜40mm)の段差が生じて歩行時の転倒事故につな
がるとともに、ラップ箇所を枕木上に設定しなければ天
秤事故の原因となるため、製品長に対して布設有効長に
ロスが生じて布設効率が悪く、しかも、滑り止めを施す
ことが困難であるため、水を含んだ土砂等が付着すると
滑りによる転倒事故の虞れがあった。次に、鋼製及び合
成樹脂製のあゆみ板は、端部を挿し込みにより連接して
いるため、木製のあゆみ板のような段差による転倒事故
や製品長に対する布設有効長のロス等をなくすることが
できるが、坑内途中での清掃・測量用ポイントの確認時
に途中のものを一時取外すことが困難であり、清掃に手
間が掛り、測量用ポイント設置箇所については布設が困
難であるとともに、それぞれ滑り止めの工夫がなされて
いるが充分な効果が得られるまでに到っていない。更
に、合成樹脂製のあゆみ板は、転用時のジョイント部の
補修が困難であり、転用効率が悪くて製品価格が高く現
場コストが上がる。
By the way, the conventional sluice board does not consider the segment length (sleeper pitch) in the shield work and is long (3 to 4 m). There was a problem that it could not be laid and the work efficiency of the laying was poor, and in addition, the safety of the scaffolding at the tip of the mine could not be secured. In addition, since the wooden itching boards are laid by connecting them by overlapping and wrapping the ends, there is a level difference (21 to 40 mm) corresponding to the thickness of the itching board at the wrapping point, and falls during walking. Not only will it lead to an accident, but it will cause a balance accident if the wrap location is not set on the sleeper, resulting in a loss of the effective length of the laying for the product length, resulting in poor laying efficiency, and it is difficult to prevent slipping. Therefore, there is a risk of falling accidents due to slippage when soil and sand containing water adhere. Next, since the end portions of the steel and synthetic resin adjoining plates are connected to each other by inserting them, there is no fall accident due to steps such as wooden adjoining plates and loss of the effective length of installation for the product length. However, it is difficult to temporarily remove the intermediate part during cleaning and confirmation of the surveying point in the mine, it takes time to clean, and it is difficult to lay the surveying point installation location. The device has been devised to prevent slippage, but it has not come to the full effect. Further, it is difficult to repair the joint portion of the synthetic resin eddy plate at the time of diversion, the diversion efficiency is poor, the product price is high, and the site cost is high.

尚、鋼製のあゆみ板でステップ面にエキスパンドメタル
を張設したものが存在しており、これは土砂等が下方に
落下してステップ面に堆積されないため、高い滑り止め
効果が得られて滑りによる転倒事故を防止することがで
きるが、端部を挿し込みにより連接しているため、これ
を順次に接続すると、前述したようにその途中のあゆみ
板を取外すことが非常に困難である。
In addition, there is a steel itinerating plate with expanded metal stretched on the step surface.Since earth and sand etc. do not fall downward and are not deposited on the step surface, a high anti-slip effect is obtained and slippage is prevented. Although it is possible to prevent a fall accident due to the above, since the end portions are connected by being inserted, it is very difficult to remove the swaying plate in the middle when connecting these sequentially.

この発明は上記問題に鑑みてなされたもので、その目的
とするところは、より高い安全性が得られ、かつ、狭い
坑内での作業効率の向上も図れる作業通路用あゆみ板及
びそのジョイント構造を提供することにある。
The present invention has been made in view of the above problems, and an object thereof is to provide a working passage sway plate and a joint structure thereof that can achieve higher safety and that can also improve work efficiency in a narrow mine. To provide.

〔課題を解決する手段〕[Means for solving the problem]

この発明は上記目的を達成するため、鋼製の支持枠内に
エキスパンドメタルを張設固着して構成された作業通路
用あゆみ板のジョイント構造において、上記作業通路用
あゆみ板の長さをシールド工法のセグメント長(枕木ピ
ッチ)の整数倍に形成し、このあゆみ板の一端側端部下
面にL字状止め金具を設け、かつ、他端側端部両側面に
当該側面に固着したパイプに丸棒をU字状に屈曲形成し
たクリップをスライド自在に嵌挿してなるスライドクリ
ップを設け、上記L字状止め金具を枕木のフランジ部を
挿し込んで係止するとともに、上記スライドクリップの
クリップを別の枕木のフランジ部に打ち込んで当該フラ
ンジ部を挟持することにより歩み板を枕木に固定してジ
ョイントするようにしたものである。
In order to achieve the above-mentioned object, the present invention provides a joint structure for an aisle plate for a working passage, which is constructed by stretching and fixing expanded metal in a support frame made of steel. The length of each segment (sleeper pitch) is set to an integral multiple, and an L-shaped stopper is provided on the lower surface of the end of one end of this sluice board, and the pipe fixed to the side is rounded on both sides of the other end. A slide clip is provided by slidably inserting a clip formed by bending a rod into a U-shape, and the L-shaped stop fitting is inserted and locked by the flange portion of the sleeper, and the clip of the slide clip is separated. The step board is fixed to the sleeper so as to be jointed by being driven into the flange of the sleeper and sandwiching the flange portion.

〔作用〕[Action]

この発明は作業通路用あゆみ板の長さをシールド工法の
セグメント長(枕木ピッチ)の整数倍に形成したから、
あゆみ板の端部が必ず枕木上に位置する。
According to the present invention, the length of the working path aisle plate is formed to be an integral multiple of the segment length (sleeper pitch) of the shield construction method,
The edge of the ayumi board is always on the sleeper.

また、あゆみ板同士を直接ジョイントせずにスライドク
リップで枕木に固定させてジョイントしているため、布
設途中のあゆみ板でも容易に一時取外しが可能であると
ともに、あゆみ板の側方が狭い場合でも取付け・取外し
が可能である。
Also, instead of directly joining the adjoining plates to each other, the adjoining plates are fixed to the sleepers with a slide clip so that the adjoining plates can be easily removed temporarily even during installation, and even when the adjoining plates are narrow on the sides. It can be installed and removed.

〔実施例〕〔Example〕

以下この発明の一実施例を図面に基づいて説明する。 An embodiment of the present invention will be described below with reference to the drawings.

第1図乃至第3図において、(1)はこの発明に係る作
業通路用あゆみ板であって、鋼製の支持枠(2)内にエ
キスパンドメタル(3)を張設固着して構成され、セグ
メント2リング分に相当する長さを有している。エキス
パンドメタル(3)は厚さ1mm以上の薄板に細かい切目
を交互に入れたものを引っ張ってひし形または亀甲形の
網目状に展伸したもので、製品のどの部分にも溶接や締
付けなどによる交錯組合せがないので頑丈である。支持
枠(2)の先端側(図中左端側)下面には2箇所にL字
状の止め金具(4)(4)が溶接等により固着して設け
てあり、また、支持枠(2)の後端側(図中右端側)両
側面にはそれぞれスライドクリップ(5)(5)が設け
られてある。スライドクリップ(5)は、第3図に示す
ように、円筒状のパイプ(6)と、丸棒をU字状に屈曲
して形成され、一方の直棒部(7a)の端部にかしめ加工
等により形成した抜け止め(7a′)を有し、他方の直棒
部(7b)の端部にテーパー(7b′)を有するクリップ
(7)とからなり、パイプ(6)を支持枠(2)の側面
に溶接等により固着するとともに、Uクリップ(7)の
直棒部(7a)をパイプ(6)にスライド自在に嵌挿して
ある。
1 to 3, (1) is a working passage edit plate according to the present invention, which is constructed by stretching and fixing an expanded metal (3) in a steel support frame (2), It has a length corresponding to two segments of the ring. Expanded metal (3) is a thin plate with a thickness of 1 mm or more in which fine cuts are alternately inserted and stretched to form a rhombus or hexagonal mesh, and any part of the product is intersected by welding or tightening. It is sturdy because there is no combination. L-shaped fasteners (4) and (4) are fixedly attached to the lower surface of the support frame (2) on the tip side (the left end side in the figure) by welding or the like at two locations, and the support frame (2) Slide clips (5) and (5) are provided on both side surfaces of the rear end side (the right end side in the figure) of the rear side. As shown in FIG. 3, the slide clip (5) is formed by bending a cylindrical pipe (6) and a round bar into a U-shape, and caulking the end of one straight bar (7a). A clip (7) having a retainer (7a ') formed by processing or the like, and a taper (7b') at the end of the other straight rod portion (7b), and a pipe (6) supporting frame (7). It is fixed to the side surface of 2) by welding or the like, and the straight rod portion (7a) of the U clip (7) is slidably fitted into the pipe (6).

以上のように構成されるあゆみ板(1)を、シールド工
事現場のバッテリーカーおよびズリトロを走行させるた
めに布設される一対の軌道の間に、該一対の軌道を支持
するH鋼製の枕木(8)に次のように固定することによ
り作業通路を形成させる。即ち、シールド工法では枕木
(8)はセグメント長と同一ピッチで配設されているか
ら、あゆみ板(1)を支持枠(2)の先端側下面2箇所
に設けた止め金具(4)(4)を枕木(8)の上側フラ
ンジ部(8a)に挿し込んで係止して枕木(8)(8)…
上に載架した後、支持枠(2)の後端部両側面に設けた
スライドクリップ(5)(5)のクリップ(7)(7)
を上述した止め金具(4)(4)が係止される枕木
(8)から一つ飛ばした枕木(8)の上側フランジ部
(8a)に打ち込んで当該上側フランジ部(8a)を挟持す
ることによりあゆみ板(1)を固定する。
The sway plate (1) configured as described above is provided between a pair of tracks installed to run the battery car and Zuritro at the shield construction site, and an H steel sleeper (for supporting the pair of tracks ( A work passage is formed by fixing the above to 8) as follows. That is, in the shield construction method, since the sleepers (8) are arranged at the same pitch as the segment length, the fasteners (4) (4) (4) (4) (4) provided with the slack plate (1) on the lower surface of the support frame (2) on the distal end side are provided. ) Is inserted into the upper flange portion (8a) of the sleeper (8) and locked, and the sleeper (8) (8) ...
Clips (7) (7) of slide clips (5) (5) provided on both sides of the rear end of the support frame (2) after being mounted on the support frame (2)
Driving the above-mentioned fasteners (4) (4) to the upper flange portion (8a) of the sleeper (8) that has been skipped one from the sleeper (8) to clamp the upper flange portion (8a). And fix the Ayumi plate (1).

この発明によれば、あゆみ板(1)をセグメント2リン
グ分に相当する長さとしたから、あゆみ板(1)の端部
を必ず枕木(8)上に位置することができて坑内の足場
のより高い安全が確保できる。また、この発明はあゆみ
板(1)をスライドクリップ(5)(5)で枕木(8)
に固定させてジョイントするようにしているから、布設
途中のあゆみ板(1)でも容易に一時取外すことがで
き、清掃および測量ポイントの確認時に便利であるとと
もに、あゆみ板(1)の側方が狭くても容易に取付け・
取外しすることができるから、一対の軌道の間にあゆみ
板(1)を布設する場合に便利である。
According to this invention, since the length of the sluice board (1) is equivalent to the length of two segments, the end portion of the sluice board (1) can be located on the sleeper (8) without fail, and the scaffolding in the mine Higher safety can be secured. Further, according to the present invention, the ayumi board (1) is attached to the sleeper (8) by the slide clips (5) and (5).
Since it is fixed to and jointed with it, it can be easily removed temporarily even if it is in the middle of laying, and it is convenient for cleaning and checking survey points, and the side of the itching plate (1) is convenient. Easy installation even if narrow
Since it can be removed, it is convenient when the baffle plate (1) is installed between a pair of tracks.

尚、上記実施例ではあゆみ板(1)の長さをセグメント
2リング分としているが、この発明ではこれに限定され
るものではなく、セグメント長の倍数であれば良い。
Although the length of the slackening plate (1) is equal to the length of two segment rings in the above embodiment, the present invention is not limited to this and may be a multiple of the segment length.

〔発明の効果〕〔The invention's effect〕

この発明は作業通路用あゆみ板をセグメント長を加味し
た長さに形成しているから、あゆみ板の端部を必ず枕木
上に位置することができ、坑内の足場のより高い安全が
確保することができる。また、あゆみ板の一端側端部下
面にL字状止め金具を設け、かつ、他端側端部両側面に
当該側面に固着したパイプに丸棒をU字状に屈曲形成し
たクリップをスライド自在に嵌挿してなるスライドクリ
ップを設け、上記L字状止め金具を枕木のフランジ部に
挿し込んで係止するとともに、上記スライドクリップの
クリップを別の枕木のフランジ部に打ち込んで当該フラ
ンジ部を挟持することによりあゆみ板を枕木に固定して
ジョイントするようにしているため、布設途中のあゆみ
板でも容易に一時取り外すことができ、清掃時および測
量用ポイントの確認時に非常に便利であるとともに、あ
ゆみ板の側方が狭くても容易に取付け・取外しすること
ができ、一対の軌道の間にあゆみ板を布設する場合に便
利である。従って、この発明に係る作業通路用あゆみ板
のジョイント構造によれば、より高い安全性が得られ、
かつ、狭い坑内での作業効率の向上も図れる。
According to this invention, since the aisle plate for the work passage is formed to have a length considering the segment length, the end of the aisle plate can be always located on the sleeper, and higher safety of the scaffold in the mine can be secured. You can In addition, an L-shaped stopper is provided on the lower surface of one end of the adjoining plate, and a clip formed by bending a round bar into a U-shape is slidable on both sides of the other end on both sides of the pipe. A slide clip formed by inserting the L-shaped stop fitting into the flange portion of the sleeper to lock the slide clip, and the clip portion of the slide clip is driven into another flange portion of the sleeper to clamp the flange portion. By doing so, the Ayumi board is fixed to the sleepers and jointed, so even if the Ayay board is being installed, it can be easily removed temporarily, which is very convenient for cleaning and checking the survey points. Even if the side of the plate is narrow, it can be easily installed and removed, which is convenient when laying the flexible plate between a pair of tracks. Therefore, according to the joint structure of the working path sway plate according to the present invention, higher safety is obtained,
In addition, it is possible to improve work efficiency in a narrow mine.

【図面の簡単な説明】[Brief description of drawings]

第1図はこの発明に係る作業通路用あゆみ板の底面図、
第2図はこの発明に係る作業通路用あゆみ板のジョイン
ト構造を示す側面図、第3図はスライドクリップの詳細
図である。 (1)…あゆみ板、(2)…支持枠、 (3)…エキスパンドメタル、 (4)…止め金具、 (5)…スライドクリップ、 (8)…枕木。
FIG. 1 is a bottom view of an aisle plate for a work passage according to the present invention,
FIG. 2 is a side view showing the joint structure of the working channel sway plate according to the present invention, and FIG. 3 is a detailed view of the slide clip. (1) ... Ayumi plate, (2) ... Support frame, (3) ... Expanded metal, (4) ... Fastener, (5) ... Slide clip, (8) ... Sleepers.

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 実公 昭46−741(JP,Y1) 実願 昭51−167046号(実開 昭53− 84920号)の願書に添付した明細書及び図 面の内容を撮影したマイクロフィルム(J P,U) ─────────────────────────────────────────────────── ───Continued from the front page (56) Bibliographic references Shoko 46-741 (JP, Y1) Actual application No. 51-167046 (Actual development No. 53-84920) Micro film (JP, U) of the contents

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】鋼製の支持枠内にエキスパンドメタルを張
設固着して構成された作業通路用あゆみ板のジョイント
構造において、上記作業通路用あゆみ板の長さをシール
ド工法のセグメント長(枕木ピッチ)の整数倍に形成
し、このあゆみ板の一端側端部下面にL字状止め金具を
設け、かつ、他端側端部両側面に当該側面に固着したパ
イプに丸棒をU字状に屈曲形成したクリップをスライド
自在に嵌挿してなるスライドクリップを設け、上記L字
状止め金具を枕木のフランジ部に挿し込んで係止すると
ともに、上記スライドクリップのクリップを別の枕木の
フランジ部に打ち込んで当該フランジ部を挟持すること
によりあゆみ板を枕木に固定してジョイントするように
したことを特徴とする作業通路用あゆみ板のジョイント
構造。
1. In a joint structure of a working-path aisle plate, which is constructed by stretching and fixing expanded metal in a steel support frame, the length of the working-path ayumi plate is determined by the length of a shield construction segment (sleepers). Pitch), an L-shaped stopper is provided on the lower surface of one end of this slack plate, and a round bar is U-shaped on the pipe fixed to the side on both ends of the other end. A slide clip formed by slidably inserting a bent clip is provided, and the L-shaped stopper is inserted into the flange portion of the sleeper to be locked, and the clip of the slide clip is attached to another sleeper flange portion. A joint structure for an aisle plate for a work passage, characterized in that the aisle plate is fixed to a sleeper and is jointed by driving it into the sleeper and sandwiching the flange portion.
JP1186529A 1989-07-18 1989-07-18 Joint structure of working plate for working passage Expired - Lifetime JPH0689595B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1186529A JPH0689595B2 (en) 1989-07-18 1989-07-18 Joint structure of working plate for working passage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1186529A JPH0689595B2 (en) 1989-07-18 1989-07-18 Joint structure of working plate for working passage

Publications (2)

Publication Number Publication Date
JPH0351478A JPH0351478A (en) 1991-03-05
JPH0689595B2 true JPH0689595B2 (en) 1994-11-09

Family

ID=16190092

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1186529A Expired - Lifetime JPH0689595B2 (en) 1989-07-18 1989-07-18 Joint structure of working plate for working passage

Country Status (1)

Country Link
JP (1) JPH0689595B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0616406D0 (en) 2006-08-17 2006-09-27 Airbus Uk Ltd A platform

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5384920U (en) * 1976-12-15 1978-07-13

Also Published As

Publication number Publication date
JPH0351478A (en) 1991-03-05

Similar Documents

Publication Publication Date Title
WO2018176088A1 (en) Apparatus for arranging steel reinforcement prior to a concrete pour
JP3840331B2 (en) Retaining wall using corrosion-resistant structural anchor
CN110230238A (en) Rail track protective device and means of defence
JPH0689595B2 (en) Joint structure of working plate for working passage
GB2057034A (en) Underground roadway support
KR20130010494A (en) Tire georeinforcing system
JP4243418B2 (en) Invert segment for tunnel and shield tunnel lining structure using the segment
CN111206602B (en) Partially collapsed high slope lattice beam formwork system and construction method
CN208486272U (en) A kind of constructing structure of two-tube diagonal brace deep basal pit
CN217840048U (en) Rock slope net fixing structure
JP6441842B2 (en) Box roof cylinder
CN105274997A (en) Rib type brackets and method for constructing top way steel pipe support and top plate through brackets
JP3466768B2 (en) Bridge structure and construction method
JP2775668B2 (en) Wide-area slope protection method
JP2004156336A (en) Rockfall protection temporary construction method and components
JP2566162B2 (en) Method for cutting and expanding between parallel tunnels and supporting device used therefor
CN209780746U (en) Detachable and reusable ladder stand
JPS63261099A (en) Method of constructing tunnel and member for constructing tunnel
JP3359145B2 (en) How to install the water stop plate
JP2774066B2 (en) Floor slab made of PC version
CN208578062U (en) A kind of rigid protection earth-retaining device
RU2099539C1 (en) Device for reinforcing the fill mass
JPH0627402B2 (en) Revetment retaining wall block with road plate and road widening method using it
JP4793695B2 (en) Self-supporting water head and installation method
KR100404128B1 (en) Placementing Method of Reinforcing Strips for Constructing Precast Concrete Facing Panel and Pulling-up Device of Reinforcing Strips