Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0691709B2 - Accident facility determination method - Google Patents
[go: Go Back, main page]

JPH0691709B2 - Accident facility determination method - Google Patents

Accident facility determination method

Info

Publication number
JPH0691709B2
JPH0691709B2 JP62151216A JP15121687A JPH0691709B2 JP H0691709 B2 JPH0691709 B2 JP H0691709B2 JP 62151216 A JP62151216 A JP 62151216A JP 15121687 A JP15121687 A JP 15121687A JP H0691709 B2 JPH0691709 B2 JP H0691709B2
Authority
JP
Japan
Prior art keywords
equipment
power
group
accident
protection relay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP62151216A
Other languages
Japanese (ja)
Other versions
JPS63316619A (en
Inventor
守好 長浜
博 椛沢
守 方
進 渡辺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Hitachi Ltd
Mitsubishi Electric Corp
Tokyo Electric Power Co Holdings Inc
Original Assignee
Toshiba Corp
Tokyo Electric Power Co Inc
Hitachi Ltd
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Tokyo Electric Power Co Inc, Hitachi Ltd, Mitsubishi Electric Corp filed Critical Toshiba Corp
Priority to JP62151216A priority Critical patent/JPH0691709B2/en
Publication of JPS63316619A publication Critical patent/JPS63316619A/en
Publication of JPH0691709B2 publication Critical patent/JPH0691709B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は電力系統制御用計算機による電力系統事故設備
の自動判定方式に関する。
DETAILED DESCRIPTION OF THE INVENTION [Industrial field of use] The present invention relates to an automatic determination system for a power system fault facility by a power system control computer.

〔従来の技術〕[Conventional technology]

従来、電力系統事故における事故の原因となつた設備
(以下事故設備)の判定は、管轄系統における動作した
保護リレーの保護範囲データおよびしや断器のトリツプ
情報を用いて行つている。しかし動作した保護リレーの
保護範囲は、動作した保護リレーの保護範囲内の開閉器
(しや断器,断路器)の開閉状態により異なつてくるの
で、事故設備の判定に長時間を要していた。更に、同時
刻に事故による停電が管轄系統の複数箇所で発生した場
合には、事故設備の判定が複雑になりその判定に高度な
熟練を要する。
Conventionally, the equipment that causes an accident in a power system accident (hereinafter referred to as an accident equipment) is determined by using the protection range data of the activated protection relay in the jurisdiction system and the trip information of the breaker. However, the protection range of the activated protection relay depends on the open / close state of the switches (gates, disconnectors, disconnectors) within the protection range of the activated protection relay, so it takes a long time to judge the accident equipment. It was Furthermore, when a power failure due to an accident occurs at a plurality of locations in the jurisdiction system at the same time, the judgment of the accident equipment becomes complicated and a high degree of skill is required for the judgment.

〔発明が解決しようとする問題点〕[Problems to be solved by the invention]

本発明は、従来の上述の問題点と、電力系統設備の巨大
化,複雑化にに伴う電力の一層の安定供給を図るために
事故時の復旧操作も高速化,高信頼化が望まれている点
に鑑みて、その復旧操作の判断根拠となる管轄系統内の
事故設備の判定を高速度,高信頼度をもつて達成する方
式を提供することを目的とする。
In the present invention, in order to achieve more stable supply of electric power due to the above-mentioned conventional problems and the enormous size and complexity of electric power system equipment, it is desired to speed up recovery operation at the time of an accident and improve reliability. In view of the above, it is an object of the present invention to provide a method for achieving a high-speed and high-reliability determination of an accidental facility in a jurisdiction system which is the basis for determining the restoration operation.

〔問題点を解決するための手段〕[Means for solving problems]

上記目的は、系統事故発生前の系統状態(停電設備グル
ープ,開閉器状態,保護リレー動作情報等)と系統事故
発生直後の系統状態(停電設備グループ,開閉器状態,
保護リレー動作情報等)を蓄積し、事故発生直前の充電
系統にあって事故時トリップした開閉器が所属する系統
の各電力設備について電気的に接続関係のある単位設備
の集合(停電設備グループ)を作成し、更にトリツプCB
を介して隣接する停電設備グループを結合し、1つの停
電設備グループ群とし、またこの停電設備グループ群以
外の停電設備を1つの停電設備グループ群とし、その停
電設備グループ群毎に、同じく取込んだ動作した保護リ
レーの動作情報を含めて、更には、その動作保護リレー
の動作特性を考慮に入れて編集することにより、達成さ
れる。
The purpose of the above is the system status before the system accident (power failure equipment group, switch status, protection relay operation information, etc.) and the system status immediately after the system failure (power failure equipment group, switch status,
A collection of unit equipment (electric power failure equipment group) that is electrically connected to each power equipment of the system to which the switch that tripped at the time of the accident in the charging system immediately before the accident occurred Create and further trip CB
Adjacent power outage equipment groups are connected via one to form one power outage equipment group group, and power outage equipment other than this power outage equipment group group is made to be one power outage equipment group group, and each power outage equipment group group is also imported. This is achieved by including the operation information of the protection relay that has operated, and further by editing the operation protection relay in consideration of the operation characteristics.

〔作用〕[Action]

電力系統を構成する各設備は、保護リレーにより保護し
事故の拡大を防ぐようになつている。保護リレーは、種
々の方式にて設備を保護するため、異常を検出(電流の
大小,方向,電圧の大小変化等)した場合、その保護す
べき設備の開閉器を開放し、事故電流の流れをしや断す
るようになつている。すなわち、保護リレーによつて
は、保護範囲からその動作方向(異常の発生した方向)
を知ることができるものがある。また動作方向の不明な
保護リレーもあるが、保護リレーの持つ前述の機能か
ら、開閉器の開放情報と組合せることによりその異常方
向を定めることが可能である。計算機が取込む保護リレ
ーの動作情報および開閉器の動作情報を時系列的に蓄積
し、一定の時間内の情報を先に述べた停電設備グループ
群毎に編集し、上述の保護リレーの特性を適用すること
により、事故設備を確定することが可能となる。
Each equipment that constitutes the power system is protected by a protection relay to prevent the spread of accidents. The protection relay protects the equipment by various methods. Therefore, when an abnormality is detected (current magnitude, direction, voltage magnitude change, etc.), the switch of the equipment to be protected is opened and the fault current flows. It is designed to turn down. In other words, depending on the protection relay, the operating direction from the protection range (direction in which an abnormality has occurred)
There are things you can know. Although there is a protection relay whose operation direction is unknown, it is possible to determine the abnormal direction by combining it with the switch opening information from the above-mentioned function of the protection relay. The protection relay operation information and switch operation information captured by the computer are accumulated in time series, and the information within a fixed time is edited for each power outage equipment group group described above, and the characteristics of the protection relay described above are By applying it, it is possible to determine the accident equipment.

〔実施例〕〔Example〕

以下、本発明の一実施例を添付された図面と共に説明す
る。
Hereinafter, an embodiment of the present invention will be described with reference to the accompanying drawings.

第1図は、本発明の電力系統計算制御システム構成を示
すブロツク図である。1は管轄系統、2はオンライン情
報入力装置、3は電子計算機、4は現在系統状態保存
部、5は事故直後系統状態保存部、6は事故設備判定処
理部、7は表示部である。
FIG. 1 is a block diagram showing the configuration of a power system calculation control system of the present invention. Reference numeral 1 is a jurisdiction system, 2 is an online information input device, 3 is an electronic computer, 4 is a current system state storage unit, 5 is a system state storage unit immediately after an accident, 6 is an accident equipment determination processing unit, and 7 is a display unit.

オンライン情報入力装置2により電子計算機3内の現在
系統保存部4に管轄系統1の開閉器の状態情報,保護リ
レーの動作情報が一定周期で保存されている。管轄系統
1において事故が発生し、保護リレーが動作した場合に
は、現在系統状態保存部4の内容を事故直後系統状態保
存部5に転送し、この事故直後状態保存部5に保存され
ている電力系統に対して、本発明方式を用いた事故設備
判定処理部6にて事故設備を判定し、結果を表示部7に
より運用者に通知する。
The online information input device 2 stores the state information of the switches of the jurisdiction system 1 and the operation information of the protection relay in the current system storage unit 4 in the electronic computer 3 at a constant cycle. When an accident occurs in the jurisdiction system 1 and the protection relay operates, the contents of the current system state storage unit 4 are transferred to the system state storage unit 5 immediately after the accident and stored in the state storage unit 5 immediately after the accident. With respect to the power system, the accident equipment determination processing unit 6 using the method of the present invention determines the accident equipment, and the display unit 7 notifies the operator of the result.

第2図は、本発明方式の処理順序をS1〜S5の処理ステツ
プにより表わしたものである。以下、個々の処理につい
て説明する。まず、ステツプS1は、事故時に発生する管
轄系統からの一定時間(例えば10秒)の状変、すなわ
ち、保護リレーおよびしや断器無電圧検出リレーの動作
情報の変化を蓄積する。
FIG. 2 shows the processing sequence of the method of the present invention by the processing steps S1 to S5. The individual processes will be described below. First, the step S1 accumulates a change in the status of a certain time (for example, 10 seconds) from the jurisdiction system that occurs at the time of an accident, that is, a change in the operation information of the protection relay and the breaker non-voltage detection relay.

次に、ステツプS2では次のような2つの手順により停電
設備グループを作成する。
Next, in step S2, a power failure equipment group is created by the following two procedures.

まず、蓄積状変の中のトリツプしや断器の動作情報を用
いて、“閉”の開閉器を介して電気的に接続のある電力
系統を構成する単位設備(母線,送電線,変圧器)の集
合である設備グループを再編成する。次に蓄積状変の中
の無電圧検出リレーの動作情報を用いて、停電状態にあ
る設備グループを決定し、当該設備グループを停電設備
グループとする。
First, the unit equipment (bus, transmission line, transformer, etc.) that constitutes an electric power system that is electrically connected via a "closed" switch using the operation information of trips and disconnectors in the storage condition. ) Reorganize the equipment group that is a set. Next, the operation information of the no-voltage detection relay in the accumulated state is used to determine the equipment group in the power failure state, and the equipment group is set as the power failure equipment group.

次に、ステツプS3で上記で作成した停電設備グループを
トリツプした開閉器を介して隣接する停電設備グループ
を結合し、1つの停電設備グループ群とする。また、そ
れ以外の停電設備グループを1つにまとめ、停電設備グ
ループ群とする。
Next, in step S3, the power failure equipment groups created above are combined with each other through a switch that trips to combine adjacent power failure equipment groups into one power failure equipment group group. In addition, the other power outage facility groups are grouped together to form a power outage facility group group.

第3図は、停電設備グループと停電設備グループ群との
関係を示す例である。図中の(1)〜(10)は送電線お
よび変圧器の単位設備ごとに与えられたブランチ番号、
〜は母線の単位設備ごとに与えられたノード番号で
あり、G1,G2は外部電源である。
FIG. 3 is an example showing a relationship between a power outage facility group and a power outage facility group. (1) to (10) in the figure are branch numbers assigned to each unit of equipment of the transmission line and transformer,
~ Are node numbers given to each unit of equipment on the bus, and G1 and G2 are external power supplies.

第3図のようにブランチ(1),(2)の事故(送電線
ルート事故に相当する)によりブランチの両端の開閉器
がトリツプしたと想定すれば、図中の設備はノード
を除いて停電となる。本実施例では、停電設備グループ
は下記第1表(a)に示すように4つのグループとな
り、停電設備グループ群は下記第1表(b)に示すよう
に2つのグループとなる。このようにトリツプ開閉器情
報により停電設備グループを結合することにより、以下
の説明する事故設備判定処理が容易になると共に処理時
間の短縮が図られる。
Assuming that the switches at both ends of the branch trip due to the accidents of the branches (1) and (2) (corresponding to the transmission line route accident) as shown in Fig. 3, the equipment in the diagram excludes the nodes. Becomes In this embodiment, the power outage facility group is four groups as shown in Table 1 (a) below, and the power outage facility group group is two groups as shown in Table 1 (b) below. By thus connecting the power failure equipment groups by the trip switch information, the accident equipment determination processing described below can be facilitated and the processing time can be shortened.

次に、ステツプS4で蓄積状変の中から保護リレーの動作
情報を抽出し、停電設備グループ群単位に編集する。す
なわち、まず保護リレーの動作情報を主保護リレーと後
備保護リレーの動作情報に分類し、次に、当該保護リレ
ーの電力系統上での動作箇所と、停電設備グループ群と
を対比させることにより、当該保護リレーの動作情報を
停電設備グループ群単位に編集する。なお、停電設備グ
ループ群の境界上での保護リレーの動作情報のうち、主
保護リレーの動作情報は当該保護リレーの保護設備の属
する停電設備グループ群側に編集し、後備保護リレーの
動作情報は当該後備保護リレー動作によりトリツプした
開閉器が属する停電設備グループ群側に編集する。
Next, in step S4, the operation information of the protection relay is extracted from the accumulated state changes and edited for each power outage group group. That is, first, by classifying the operation information of the protection relay into the operation information of the main protection relay and the backup protection relay, then by comparing the operation location on the power system of the protection relay and the power failure equipment group group, Edit the operation information of the protection relay for each power outage group group. Of the protection relay operation information on the boundary of the power failure equipment group group, the operation information of the main protection relay is edited on the power failure equipment group group side to which the protection equipment of the protection relay belongs, and the operation information of the backup equipment protection relay is Edit it on the side of the power failure equipment group to which the switch tripped by the protection relay operation belongs.

また、後備保護リレーについては、そのリレーの特性に
より保護方向特性を有するものと、保護方向特性のない
ものに分類する。すなわち、後備保護用の第2段以降の
距離リレー(DZ2,DZ3)等は、その保護区間が単位設備
のみでなく当該単位設備に接続する複数設備を含んでお
り、保護方向特性有りと称する。一方、過電流リレー
(OC)等のように、複数の単位設備の論理和として動作
する保護リレーは、保護方向特性なしと称する。
In addition, backup protection relays are classified into those with protection direction characteristics and those without protection direction characteristics, depending on the characteristics of the relay. In other words, the distance relays (DZ 2 , DZ 3 ) etc. for the second and subsequent stages for the protection of back-up equipment include not only the unit equipment but also a plurality of equipment connected to the unit equipment, and have a protection direction characteristic. To call. On the other hand, a protection relay such as an overcurrent relay (OC) that operates as a logical sum of a plurality of unit equipments is referred to as having no protection direction characteristic.

下記第2表に、主保護リレーと後備保護リレーとの分類
の1例を示す。
Table 2 below shows an example of the classification of the main protection relay and the backup protection relay.

最後に、ステツプS5で停電設備グループ群単位に編集さ
れた保護リレーの動作情報を用いて、事故設備および事
故候補設備の判定を行う。
Lastly, the accident equipment and the accident candidate equipment are determined by using the operation information of the protection relay edited for each power outage equipment group group in step S5.

次に、事故設備判定処理の詳細について説明する。Next, details of the accident facility determination process will be described.

電力系統に各種事故が発生した場合の判定方式を停電設
備グループ群の境界上および内部の保護リレーの動作形
態を抽出した結果、保護リレーの動作情報を事故設備判
定処理との関係で第4図に示す。
As a result of extracting the operation mode of the protection relay on the boundary of the power outage equipment group group and the operation mode of the protection relay as the determination method when various accidents occur in the power system, the operation information of the protection relay is shown in relation to the accident equipment determination processing. Shown in.

主保護リレー(以下、M.Ryと略す)は、1設備を保護範
囲とし、後備保護リレー(以下、B.Ryと略す)は、2設
備以上を保護範囲とする。例えば、送電線の保護リレー
として用いられている距離リレーの第2段と称されるも
のは、保護リレーが設置されている送電線を保護範囲と
するのみでなく、送電線の相手端の電気所(発変電所)
に接続している他の送電線の全恒長の約半分の距離まで
を保護範囲としている。
The main protection relay (hereinafter abbreviated as M.Ry) covers one facility and the backup protection relay (hereinafter abbreviated as B.Ry) covers two or more facilities. For example, a so-called second stage of a distance relay used as a protection relay for a power transmission line not only sets the transmission line in which the protection relay is installed as a protection range, but also the electric power of the other end of the transmission line. Station (departure substation)
The protection range is up to about half the total length of the other transmission lines connected to.

第4図中の「概念図」において、101は停電同一電圧設
備グループを表わし、102は事故設備、103は推定事故設
備を表わす。また、111は主保護リレー動作かつしや断
器トリツプ情報、112は後備保護リレー(方向特性あ
り)動作かつしや断器トリツプ情報、113は後備保護リ
レー(方向特性なし)動作かつしや断器トリツプ情報を
示す。
In the “conceptual diagram” in FIG. 4, 101 represents a power failure same-voltage equipment group, 102 represents an accidental equipment, and 103 represents an estimated accidental equipment. Also, 111 is the main protection relay operation skipping breaker trip information, 112 is the backup protection relay (with direction characteristic) operation skipping and disconnection trip information, 113 is the backup protection relay (without direction characteristic) operation skipping and disconnection. Indicates instrument trip information.

以下、第4図に示した事故設備判定方式について説明す
る。
The accident facility determination method shown in FIG. 4 will be described below.

(1)M.Ryの動作がある場合 停電設備グループ群内にM.Ry動作がある場合は当該M.Ry
の保護範囲の設備を事故設備と判定する。また、M.Ry動
作の他にB.Ry動作がある場合もB.Ry動作を無視して当該
M.Ryの保護範囲の設備を事故設備と判定する。
(1) When there is M.Ry operation When there is M.Ry operation within the power outage facility group, the M.Ry
Equipment within the scope of protection is judged to be accident equipment. Also, if there is B.Ry operation in addition to M.Ry operation, B.Ry operation is ignored and
Equipment within the protection range of M.Ry is judged as accident equipment.

(2)B.Ryの動作のみの場合 停電設備グループ群内の動作リレーがB.Ryのみの場合
は、保護方向特性ありのB.Ry動作,保護方向特性なしの
B.Ry動作、および保護方向特性あり,なし混在したB.Ry
動作の場合に分類される。
(2) For B.Ry operation only When the operation relay in the power failure equipment group group is B.Ry only, B.Ry operation with protection direction characteristic and no protection direction characteristic
Mixed B.Ry with and without B.Ry operation and protection direction characteristics
Classified as behavioral.

まず、保護方向特性ありのB.Ry動作の場合は、動作した
B.Ryの全てが停電設備グループ群の内側を向いているか
否かにより次のように判定する。すなわち、動作したB.
Ryの全てがグループ群の内側を向いていればグループ群
内の全ての設備を推定事故設備とする。一方、動作した
B.Ryのうち1つでもグループ群の外側を向いていれば当
該グループ群内には事故設備も推定事故設備も存在しな
いと判定する。
First, in the case of B.Ry operation with the protection direction characteristic, it operated
It is judged as follows depending on whether or not all of B.Ry face the inside of the power outage equipment group. That is, B.
If all of Ry faces the inside of the group group, all the equipment in the group group are assumed to be accidental equipment. Meanwhile, it worked
If even one of B.Ry faces the outside of the group, it is determined that there is no accident equipment or estimated accident equipment in the group.

次に、保護方向特性なしのB.Ry動作の場合は、グループ
群内の全ての設備を推定事故設備とする。また、保護方
向特性ありとなしのB.Ry動作が混在する場合は、保護方
向特性ありのB.Ryの全てが停電設備グループ群の内側を
向いているか否かにより、上記の保護方向特性ありのB.
Ry動作の場合と同様な判定を行う。
Next, in the case of B.Ry operation without protection direction characteristics, all equipment in the group group is assumed to be accident equipment. When B.Ry operations with and without protection direction characteristics coexist, the above protection direction characteristics exist depending on whether all B.Ry with protection direction characteristics face the inside of the power failure equipment group group. B.
The same judgment as in Ry operation is performed.

第5図は、同時刻に管轄系統の複数箇所で事故による停
電が発生した場合の一例である。図中の(1)〜(15)
は送電線および変圧器の単位設備ごとに与えられたブラ
ンチ番号、〜は母線の単位設備ごとに与えられたノ
ード番号であり、G1,G2,G3は外部電源である。図のよう
にブランチ(5)と(13)の両方で事故が発生したと想
定すれば、図中の斜線で囲まれた部分(R1,R2…)が停
電となり、停電設備グループはR1,R2,R3,R4,R5,R6の6
つとなる。ここで停電設備グループ群は{R1,R3},{R
5,R6},{R2,R4}の3つとなる。{ }は停電設備グ
ループの集合、すなわち停電設備グループ群を表わす。
事故を想定したフランチの主保護リレーが正常に動作し
たとすれば、停電設備グループR1とR5の両方の境界上に
主保護リレーが編集され、停電設備グループ群単位{R
1,R3},{R5,R6}に編集された保護リレーの動作情報
を用いて事故設備判定が行われる。停電設備グループ群
{R1,R3},{R5,R6}以外は保護リレーの動作情報が編
集されていないために事故設備判定処理の対象とする必
要はない。停電設備グループ群{R1,R3}に対しては、
ブランチ(5)を保護設備とする主保護リレー情報
M11,M12を用いて事故設備がブランチ(5)であると判
定する。停電設備グループ群{R5,R6}に対しては、ブ
ランチ(13)を保護設備とする主保護リレー情報M51,M
52を用いて事故設備がブランチ(13)であると判定す
る。
FIG. 5 is an example of a case where a power failure due to an accident occurs at multiple points in the jurisdiction system at the same time. (1) to (15) in the figure
Is a branch number given to each unit equipment of transmission lines and transformers, is a node number given to each unit equipment of bus lines, and G1, G2, G3 are external power sources. Assuming that an accident has occurred in both branches (5) and (13) as shown in the figure, the shaded area (R1, R2 ...) in the figure causes a power outage, and the power outage group is R1, R2. , R3, R4, R5, R6 6
It becomes one. Here, the power outage equipment group group is {R1, R3}, {R
There are three, 5, R6} and {R2, R4}. {} Represents a set of power failure equipment groups, that is, a power failure equipment group group.
Assuming that the main protection relay of Franch, which assumed an accident, operated normally, the main protection relay was edited on both boundaries of the power outage facility groups R1 and R5, and the power outage facility group unit {R
Accident facility determination is performed using the operation information of the protection relay edited in 1, R3}, {R5, R6}. Since the protection relay operation information is not edited except for the power outage equipment group group {R1, R3}, {R5, R6}, it is not necessary to be the target of the accident equipment determination processing. For the power outage group group {R1, R3},
Main protection relay information with branch (5) as protection equipment
Using M 11 and M 12 , it is determined that the faulty facility is branch (5). For the power failure equipment group group {R5, R6}, main protection relay information M 51 , M whose branch (13) is the protection equipment
52 is used to determine that the faulty facility is branch (13).

本例では、尚保護リレー動作のみの場合しか述べていな
いが、後備保護リレー動作がある場合も、停電設備グル
ープ群単位に第4図の判定方式に従つて判定されること
は明らかである。
Although only the protection relay operation is described in this example, it is clear that even in the case of the backup protection relay operation, the determination is made according to the determination method of FIG.

〔発明の効果〕〔The invention's effect〕

以上説明したように、本発明に係る電力系統設備の事故
設備判定方式は、事故時に発生する管轄系統からの一定
時間の状変を蓄積し、事故による停電設備の集合をグル
ープとして認識し、さらにこの停電設備グループをトリ
ツプした開閉器により結合し停電設備グループ群を作成
し、停電設備グループ群の境界および内部の主保護リレ
ー動作情報,後備保護リレー動作情報を編集し、この停
電設備グループ群単位に事故設備を判定するため、判定
の信頼性が向上するとともに、広域的な系統における事
故設備の判定を高速に行うことができる。また、同時刻
に複数箇所で発生した事故による停電設備に対しても容
易に確実な事故設備の判定が可能となる。
As described above, the accident equipment determination method of the power system equipment according to the present invention accumulates a change in a certain time from the jurisdiction system that occurs at the time of an accident, recognizes a set of power outage equipment due to an accident as a group, and further This power outage equipment group is connected by a trip switch to create a power outage equipment group group, and the main protection relay operation information and backup protection relay operation information at the boundary and inside of the power outage equipment group group are edited, and this power outage equipment group unit Since the accident equipment is judged, the reliability of the judgment is improved, and the judgment of the accident equipment in a wide area system can be performed at high speed. In addition, it is possible to easily and surely determine a faulty facility even if there is a power outage facility due to an accident that has occurred at multiple locations at the same time.

【図面の簡単な説明】[Brief description of drawings]

第1図は、本発明の一実施例のシステム構成図、第2図
は、本発明の原理を示すフローチャート図、第3図は本
発明の特徴である停電設備グループと停電設備グループ
群との関係例を示す図、第4図は事故設備判定方式の基
本的考え方を示す図、第5図は本発明の適用例を示す図
である。 1…管轄系統、2…オンライン情報入力装置、3…電子
計算機、7…表示部。
FIG. 1 is a system configuration diagram of an embodiment of the present invention, FIG. 2 is a flow chart diagram showing the principle of the present invention, and FIG. 3 is a diagram showing a power outage facility group and a power outage facility group group which are features of the present invention. FIG. 4 is a diagram showing a relationship example, FIG. 4 is a diagram showing a basic concept of the accident facility determination method, and FIG. 5 is a diagram showing an application example of the present invention. 1 ... Jurisdiction system, 2 ... Online information input device, 3 ... Computer, 7 ... Display unit.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 長浜 守好 東京都千代田区内幸町1丁目1番3号 東 京電力株式会社内 (72)発明者 椛沢 博 東京都府中市東芝町1番地 株式会社東芝 府中工場内 (72)発明者 方 守 茨城県日立市大みか町5丁目2番1号 株 式会社日立製作所大みか工場内 (72)発明者 渡辺 進 兵庫県神戸市兵庫区和田崎町1丁目1番2 号 三菱電機株式会社制御製作所内 (56)参考文献 特開 昭57−71225(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Moriyoshi Nagahama 1-3-3 Uchisaiwaicho, Chiyoda-ku, Tokyo Within Tokyo Electric Power Company (72) Inventor Hiroshi Kabazawa 1st Toshiba Town, Fuchu, Tokyo Toshiba Corporation Inside the Fuchu Factory (72) Inventor Mamoru 5-2-1 Omika-cho, Hitachi City, Ibaraki Hitachi Ltd. Omika-Factory, Ltd. (72) Inventor Susumu Watanabe 1-1 1-1 Wadazaki-cho, Hyogo-Kobe, Hyogo Prefecture No. 2 Mitsubishi Electric Corporation Control Works (56) Reference JP-A-57-71225 (JP, A)

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】電力系統内の保護リレーおよび開閉器の動
作情報を電力系統計算制御システムに周期的に取り込ん
で系統状態を蓄積しながら事故発生時の事故設備の判定
をおこなう電力系統の事故設備判定方式において、事故
時トリップした開閉器が所属する系統の各電力設備につ
いて電気的接続関係にある電力設備を前記トリップした
開閉器の動作情報を用いて判定して電力設備グループを
作成し、前記電力設備グループごとにその所属設備の無
電圧検出リレーの状態情報から停電している停電設備グ
ループを判定し、停電設備グループが複数あるとき前記
トリップした開閉器を介して隣接される停電設備グルー
プ同士は一つの停電設備グループと判定し、これら停電
設備グループ単位に主保護リレーおよび後備保護リレー
の動作情報に基づいて停電設備グループ内の事故設備を
判定するようにしたことを特徴とする電力系統の事故設
備判定方式。
1. A faulty facility of a power system for periodically determining the faulty facility at the time of an accident while accumulating the system state by periodically incorporating the operation information of the protection relays and switches in the power system into the power system calculation control system. In the determination method, for each power equipment of the system to which the switch tripped at the time of an accident, the power equipment in an electrical connection relationship is determined using the operation information of the tripped switch to create a power equipment group, and For each power equipment group, determine the power failure equipment group that is out of power from the status information of the non-voltage detection relay of the equipment to which it belongs, and when there are multiple power failure equipment groups, the power failure equipment groups that are adjacent to each other via the tripped switch Is determined as one power outage equipment group, and based on the operation information of the main protection relay and the backup protection relay for each power outage equipment group. Fault facility determination method of the power system, characterized in that so as to determine the fault facility outage equipment in the group Te.
【請求項2】特許請求の範囲第1項において、前記主保
護リレーが動作したときは当該リレーの保護設備を事故
設備とし、前記後備保護リレーのみ動作しその保護特性
が外向きのときは当該停電グループ内には事故設備が無
いと判定するようにしたことを特徴とする電力系統の事
故設備判定方式。
2. In claim 1, when the main protection relay operates, the protection equipment of the relay is regarded as an accident equipment, and only the backup protection relay is operated and the protection characteristic is outward. A power system accident equipment determination method characterized by determining that there is no accident equipment in the power outage group.
JP62151216A 1987-06-19 1987-06-19 Accident facility determination method Expired - Lifetime JPH0691709B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62151216A JPH0691709B2 (en) 1987-06-19 1987-06-19 Accident facility determination method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62151216A JPH0691709B2 (en) 1987-06-19 1987-06-19 Accident facility determination method

Publications (2)

Publication Number Publication Date
JPS63316619A JPS63316619A (en) 1988-12-23
JPH0691709B2 true JPH0691709B2 (en) 1994-11-14

Family

ID=15513779

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62151216A Expired - Lifetime JPH0691709B2 (en) 1987-06-19 1987-06-19 Accident facility determination method

Country Status (1)

Country Link
JP (1) JPH0691709B2 (en)

Also Published As

Publication number Publication date
JPS63316619A (en) 1988-12-23

Similar Documents

Publication Publication Date Title
US6411865B1 (en) System for protection zone selection in microprocessor-based relays in an electric power system
McDonald et al. Alarm processing and fault diagnosis using knowledge based systems for transmission and distribution network control
EP2262074A1 (en) Protection lockout in substation automation
CN112421761B (en) Relay protection reconstruction self-healing method for hub traction power supply system
CN111835082B (en) An intelligent control method for realizing fault self-healing of subway DC traction power supply system
CN112448375B (en) Power supply automatic switching method, monitoring system and track medium-voltage ring network system
KR20030035014A (en) A fault section detection equipment and method considering both fault indicator and fault currents
Jeyasurya et al. Fault diagnosis using substation computer
JPH0691709B2 (en) Accident facility determination method
Kopainsky et al. Topology-based interlocking of electrical substations
JP3484270B2 (en) Distribution line protection method
JPH0691708B2 (en) Accident facility determination method
Sachdev et al. Topology detection for adaptive protection of distribution networks
JP2577394B2 (en) Power system accident equipment judgment device
JPS6367416B2 (en)
CN115954838A (en) Method, device and equipment for discriminating busbar interconnection
CN119994895B (en) Load splitting and power recovering method, system, equipment and medium
Meeuwsen et al. The influence of protective relay schemes on the reliability indices of load points in meshed operated MV networks
JP2921034B2 (en) System failure section judgment device
JPH0341005B2 (en)
CN118920419A (en) Power distribution network line control method based on protection algorithm
JP2577392B2 (en) Pre-accident grid status creation method for automatic recovery in the event of a power grid accident
JP2645013B2 (en) Power system accident recovery system
JPH0612928B2 (en) Accident recovery system creation method
CN115656705A (en) A simulation test system and method for self-healing function of power distribution master station