Construction method of rubble mound

Info

Publication number
JPH0694666B2
JPH0694666B2 JP20507690A JP20507690A JPH0694666B2 JP H0694666 B2 JPH0694666 B2 JP H0694666B2 JP 20507690 A JP20507690 A JP 20507690A JP 20507690 A JP20507690 A JP 20507690A JP H0694666 B2 JPH0694666 B2 JP H0694666B2
Authority
JP
Japan
Prior art keywords
caisson
rubble
rubble mound
mound
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP20507690A
Other languages
Japanese (ja)
Other versions
JPH0489917A (en
Inventor
順一 浜砂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toa Corp
Original Assignee
Toa Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toa Corp filed Critical Toa Corp
Priority to JP20507690A priority Critical patent/JPH0694666B2/en
Publication of JPH0489917A publication Critical patent/JPH0489917A/en
Publication of JPH0694666B2 publication Critical patent/JPH0694666B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)

Description

【発明の詳細な説明】 〔産業の利用分野〕 本発明は、沖合の波浪が大きい場所でも施工可能な捨石
マウンドの施工方法に関するものである。
TECHNICAL FIELD The present invention relates to a method of constructing a rubble mound that can be constructed even in an offshore location where the sea waves are large.

〔従来の技術〕[Conventional technology]

従来、防波堤などの海上構造物を築造するためには、そ
の設置位置の海底に、捨石マウンドを作ることになる
が、その捨石マウンドを施工するには、捨石マウンド造
成区域に、ガット船で捨石を投入した後、その上にさら
に表層仕上用捨石を投入し、さらに、クレーン船に重錘
を取付け、その重錘を落下させて捨石マウンドの均しを
行なっていた。
Conventionally, in order to build offshore structures such as breakwaters, a rubble mound is made on the seabed at the installation position, but to construct the rubble mound, a rubble mound is to be built in the rubble mound creation area with a gut ship. After throwing in, the rubble stone for surface finishing was thrown in further, the weight was further attached to the crane ship, and the weight was dropped to level the rubble mound.

しかしながら、波浪が大きい場所では、波浪によりクレ
ーン船の船体が動揺して、重錘を所定の捨石上の位置に
落下できず、作業が容易でないばかりでなく、作業能率
も悪く、しかも正確な捨石均し作業が行なわれないとい
う問題点があった。
However, in places with large waves, the hull of a crane ship sways due to the waves, and the weight cannot fall to a position on a specified rubble. There was a problem that leveling work was not performed.

〔発明の解決しようとする課題〕[Problems to be Solved by the Invention]

本発明は、前記従来の問題点を解決するためになされた
ものであり、波浪が大きい場所でも、正確な捨石マウン
ドの施工が容易に、かつ能率良く行ないうる捨石マウン
ドの施工方法を提供することを解決課題としたものであ
る。
The present invention has been made in order to solve the above conventional problems, and even in a place where the waves are large, an accurate rubble mound can be easily constructed, and a rubble mound construction method that can be efficiently performed is provided. Is the problem to be solved.

〔課題を解決するための手段〕[Means for Solving the Problems]

上記の課題を解決するための手段として、本発明の捨石
マウンドの施工方法は、捨石マウンド造成区域の先端
に、沈設及び浮上が可能なケーソンを沈設の後、その捨
石マウンド造成区域上に捨石を投入した上に、そのケー
ソンの上部ステージに設置したクローラクレーンにより
表層仕上げ用捨石を投入し、そしてクローラクレーンに
取付けた重錘で捨石マウンドの均しを行なった後、この
ケーソンを浮上させて適宜な位置に移動して沈設させ、
上記の手順を繰り返し行なうことを特徴としたものであ
り、表層仕上用捨石の投入及び重錘による捨石マウンド
の均しが、海底上に固定されたケーソン上のクローラク
レーンによって安定した状態のもとで行なわれる。
As a means for solving the above problems, the method of constructing a rubble mound of the present invention is, at the tip of a rubble mound formation area, after laying a caisson that can be settled and floated, and then put a rubble stone on the rubble mound formation area. After throwing in, throw a rubble for surface finishing with a crawler crane installed on the upper stage of the caisson, and after leveling the rubble mound with a weight attached to the crawler crane, raise this caisson and appropriately Move it to a different position and sunk it,
It is characterized by repeating the above-mentioned procedure, and the loading of rubble for surface finishing and the leveling of the rubble mound by the weight are stable under the condition of a crawler crane on a caisson fixed on the seabed. Done in.

また、上記の施工時に用いられる沈設及び浮上が可能な
ケーソンとして、注排水可能な下部ケーソン及び上部鋼
管構造部とからなるケーソンを用いることが、波浪を上
部鋼管構造部で通過させ、波浪の影響を小さくするので
好ましい。
In addition, as a caisson that can be sunk and floated used during the above construction, using a caisson consisting of a lower caisson that can be poured and drained and an upper steel pipe structure makes it possible for waves to pass through the upper steel pipe structure and the effects of waves. Is preferred, which is preferable.

〔実施例〕〔Example〕

以下図面を参照して本発明の施工方法により捨石マウン
ドを施工する実施例について説明するが、第1図はその
一実施例における施工例を示す捨石均し時の状況説明用
側面図、第2図から第5図までは、その捨石マウンドの
施工手順を示す一連の側面図である。
An example of constructing a rubble mound by the construction method of the present invention will be described below with reference to the drawings. FIG. 1 is a side view for explaining a situation at the time of averaging rubble stones showing an example of construction in one embodiment, and FIG. FIG. 5 to FIG. 5 are a series of side views showing the construction procedure of the rubble mound.

まず、この施工例に使用しているケーソン1は、第1図
に示すごとく、内部に注排水が可能な下部ケーソン3及
びその下部ケーソン3上に立ち上がった等間隔の鋼管2A
からなる上部鋼管構造部2からなっており、各鋼管2Aは
筋違2B、水平筋違2Cで強固に補強されており、このケー
ソン1を最終的に防波堤などの本体構造物として使用す
る時に、内部に中詰材を充填するための仕切用コンクリ
ート版を挿入するための挿入溝5が各側端部の各鋼管2A
に設けられ、また水面W付近には防舷材4が取付けられ
ている。
First, the caisson 1 used in this construction example is, as shown in FIG. 1, a lower caisson 3 capable of pouring and draining inside and steel pipes 2A at equal intervals standing on the lower caisson 3.
It consists of the upper steel pipe structure part 2 consisting of, and each steel pipe 2A is strongly reinforced by braces 2B and horizontal braces 2C, and when this caisson 1 is finally used as a main body structure such as a breakwater, Each of the steel pipes 2A has an insertion groove 5 for inserting a concrete slab for partitioning to fill the inside with filling material.
The fender 4 is attached near the water surface W.

なお、下部ケーソン3の注排水は、上部鋼管構造部2の
複数の鋼管2A内を利用して行うようになっており、その
鋼管2Aの上端には開閉自在な蓋を設け、その下端はケー
ソン3内へ開口している。
The lower caisson 3 is poured and drained in the plurality of steel pipes 2A of the upper steel pipe structure 2. The upper end of the steel pipe 2A is provided with a lid that can be opened and closed, and the lower end thereof is a caisson. It opens into 3.

また、このケーソン1の上には、上部ステージ6が水面
Wの上になるように設けられており、この上部ステージ
6上には、表層仕上げ用捨石7が載置されると共に、ク
ローラクレーン8が設置されている。
Further, an upper stage 6 is provided on the caisson 1 so as to be above the water surface W, and a rubble 7 for finishing the surface layer is placed on the upper stage 6 and a crawler crane 8 is provided. Is installed.

次に、上記のケーソン1を用いて捨石マウンドの施工を
行なう手順について第2図から第5図の順に説明する。
Next, a procedure for constructing a rubble mound using the caisson 1 will be described in the order of FIGS. 2 to 5.

まず、上記ケーソン1を第2図のごとく、捨石マウンド
造成区域の先端の海底B上に、下部ケーソン3内に注水
することで沈設した後、ガット船10などにより捨石11を
その捨石マウンド造成区域の海底B上に投入する。
First, as shown in Fig. 2, the caisson 1 is sunk by pouring water into the lower caisson 3 on the seabed B at the tip of the rubble mound formation area, and then the rubble 11 is laid by the gut ship 10 or the like. It is put on the seabed B.

この場合のケーソン1の移動、沈設は、下部ケーソン3
内を排水して、ケーソン1を浮上させ、アンカーにより
所定位置まで移動させ、下部ケーソン3内へ注水して行
なうものである。
In this case, the caisson 1 must be moved and sunk in the lower caisson 3
The inside is drained, the caisson 1 is floated, moved to a predetermined position by an anchor, and water is poured into the lower caisson 3.

次に、ケーソン1の上部ステージ6に運搬して載置され
た表層仕上用捨石7を、第3図のごとく、上部ステージ
6上に設置されたクローラクレーン8により、第2図で
投入の捨石11上の所定の位置に投入する。
Next, as shown in FIG. 3, the rubble 7 for finishing the surface which is transported to and placed on the upper stage 6 of the caisson 1 is loaded by the crawler crane 8 installed on the upper stage 6 as shown in FIG. 11 Put in the specified position.

その後、上記クローラクレーン8に重錘13を取付け、第
4図のごとく、投入された表層仕上用捨石7の上から捨
石マウンドの均しを行なう。
After that, the weight 13 is attached to the crawler crane 8 and, as shown in FIG. 4, the rubble mound is leveled from the top surface rubble 7 for finishing the surface.

以上のごとく、所定の捨石マウンド造成区域の均しが終
了したら、下部ケーソン3内を排水してケーソン1を浮
上させ、第5図のごとく、適宜な位置に移動し沈設させ
た上で、第2図以降の手順を繰り返し行なうことで捨石
マウンドの施工が行なわれる。
As described above, when the leveling of the prescribed rubble mound formation area is completed, the inside of the lower caisson 3 is drained and the caisson 1 is levitated, moved to an appropriate position and laid down as shown in FIG. The rubble mound is constructed by repeating the procedure from Figure 2.

さらに、すべての均し作業が終了した後に、ケーソン1
を捨石マウンド上に据え付け、下部ケーソン内に複数の
鋼管2A内を通じて中詰砂をスラリー輸送により注入し、
上部鋼管構造部2の各側端部の各鋼管に設けられた挿入
溝5に仕切用コンクリート版を挿入して、鋼管の間の隙
間を塞ぎ、中詰材を充填してケーソン1を防波堤などの
本体構造物として使用することも可能である。
Furthermore, after all leveling work is completed, caisson 1
Is installed on the rubble mound, and the filled sand is poured by slurry transportation through the steel pipes 2A in the lower caisson.
A concrete plate for partitioning is inserted into the insertion groove 5 provided in each steel pipe at each side end of the upper steel pipe structure part 2 to close the gap between the steel pipes and fill the filling material with caisson 1 to form a breakwater. It is also possible to use it as a body structure of.

なお、上記の施工例では、上方に上部鋼管構造部2を、
そして下方に注排水可能な下部ケーソン3を有するケー
ソン1を使用することで、上方で波浪が通過しやすい構
造として、波浪に対する抵抗を小さくするようにしてい
るが、勿論上記実施例のケーソン1に限定するものでは
なく、そのケーソン本体内部の注排水により沈設及び浮
上が可能な、上下一体のケーソンなど、どのようなケー
ソンを用いても本発明の捨石マウンド施工方法を適用す
ることができる。
In addition, in the above-mentioned construction example, the upper steel pipe structure portion 2 is provided above.
By using the caisson 1 having the lower caisson 3 capable of pouring and draining downward, the structure is made so that waves can easily pass therethrough so that the resistance to waves is reduced. The rubble mound construction method of the present invention can be applied to any caisson such as an upper and lower caisson that is not limited to the above and can be set and floated by pouring and draining the inside of the caisson body.

〔発明の効果〕〔The invention's effect〕

以上に説明したごとく、本発明の施工方法によれば、捨
石上に投入される表層仕上用捨石の投入作業及び均し作
業を、海底上に固定されたケーソンの上部ステージから
行なうので、波浪が大きい場所でも正確に、かつ能率良
く行なうことができるという効果がある。
As explained above, according to the construction method of the present invention, the loading work and the leveling work of the surface finishing rubble to be put on the rubble are performed from the upper stage of the caisson fixed on the seabed, so that the waves The effect is that it can be performed accurately and efficiently even in a large place.

また、上部鋼管構造部のごとく波浪が通過する構造を有
するケーソン1を用いれば、ケーソンの波浪に対する抵
抗が少なくなり、それだけケーソンの構造を小さくでき
て経済的であるとともに、この場合、ケーソンの沈設及
び浮上のための注排水に、上部鋼管構造部の鋼管を利用
できるので、注排水の作業が容易になるという利点があ
る。
Further, if the caisson 1 having a structure through which waves pass like the upper steel pipe structure portion is used, the resistance of the caisson to waves is reduced, and the structure of the caisson can be reduced accordingly, which is economical, and in this case Further, since the steel pipe of the upper steel pipe structure can be used for pouring and draining for floating, there is an advantage that the work of pouring and draining becomes easy.

さらに、ケーソンを均し作業が終了した後に本体構造物
として使用すれば、捨石マウンド施工用の設備を本体構
造物に転用することになり、経済的である。
Furthermore, if the caisson is used as the main body structure after the leveling work is completed, the rubble mound construction equipment is diverted to the main body structure, which is economical.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の捨石マウンド施工方法により捨石マウ
ンドを施工する一実施例による捨石均し時の状況説明用
側面図、第2図から第5図までは、第1図による施工手
順を示す一連の側面図である。 1……ケーソン、2……上部鋼管構造部、3……下部ケ
ーソン、6……上部ステージ、7……表層仕上用捨石、
8……クローラクレーン、11……捨石、13……重錘。
FIG. 1 is a side view for explaining the situation at the time of averaging rubble stones according to an embodiment in which a rubble mound construction method of the present invention is used, and FIGS. 2 to 5 show the construction procedure according to FIG. It is a series of side views. 1 ... Caisson, 2 ... Upper steel pipe structure part, 3 ... Lower caisson, 6 ... Upper stage, 7 ... Surface finishing stone,
8 ... crawler crane, 11 ... rubble, 13 ... dead weight.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】捨石マウンド造成区域の先端に、沈設及び
浮上が可能なケーソンを沈設の後、その捨石マウンド造
成区域上に捨石を投入した上に、該ケーソンの上部ステ
ージに設置したクローラクレーンにより表層仕上用捨石
を投入し、そしてクローラクレーンに取付けた重錘で捨
石マウンドの均しを行なった後、該ケーソンを浮上させ
適宜な位置に移動して沈設させて上記の手順を繰り返し
行なう捨石マウンドの施工方法。
1. A caisson capable of being settled and floated at the tip of a rubble mound formation area, and after throwing rubble into the rubble mound formation area, by a crawler crane installed on the upper stage of the caisson. After throwing in the rubble for surface finishing, and leveling the rubble mound with the weight attached to the crawler crane, float the caisson and move it to an appropriate position to sunk it, and repeat the above procedure. Construction method.
【請求項2】沈設及び浮上が可能なケーソンに、注排水
可能な下部ケーソン及び上部鋼管構造部とからなるケー
ソンを使用する請求項1記載の捨石マウンドの施工方
法。
2. The method of constructing a rubble mound according to claim 1, wherein the caisson which can be settled and floated is a caisson composed of a lower caisson capable of pouring and draining and an upper steel pipe structure.
JP20507690A 1990-08-03 1990-08-03 Construction method of rubble mound Expired - Lifetime JPH0694666B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20507690A JPH0694666B2 (en) 1990-08-03 1990-08-03 Construction method of rubble mound

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20507690A JPH0694666B2 (en) 1990-08-03 1990-08-03 Construction method of rubble mound

Publications (2)

Publication Number Publication Date
JPH0489917A JPH0489917A (en) 1992-03-24
JPH0694666B2 true JPH0694666B2 (en) 1994-11-24

Family

ID=16501029

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20507690A Expired - Lifetime JPH0694666B2 (en) 1990-08-03 1990-08-03 Construction method of rubble mound

Country Status (1)

Country Link
JP (1) JPH0694666B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108149690A (en) * 2018-01-02 2018-06-12 中铁广州工程局集团有限公司 A kind of microtidal range marine site breakwater jackstone auxiliary device

Also Published As

Publication number Publication date
JPH0489917A (en) 1992-03-24

Similar Documents

Publication Publication Date Title
CA1043581A (en) Quay structure
Rasmussen Concrete immersed tunnels—Forty years of experience
KR102097580B1 (en) A Method for the Construction of Offshore Structures Using General Concrete
CN106192880B (en) The box harbour of L-type and its method of construction
CN107938594A (en) Deep water mixing dike construction method
US3906734A (en) Fixed marine platform with dispersed base
JPH0694666B2 (en) Construction method of rubble mound
CN208472649U (en) A kind of Gravity Type Casisson Berth structure setting friction pile in foundation
US3955372A (en) Method of installing a fixed marine platform with dispersed base
JP3288137B2 (en) Artificial island construction method
US5118222A (en) Method and apparatus for constructing seawalls and docks
JPS622081B2 (en)
JPS5934331A (en) How to build a sewage treatment facility
Tsinker Gravity-Type Quay Walls
JP3926027B2 (en) Caisson construction method
JPS6134534B2 (en)
JPS5947765B2 (en) Construction method of simple vertical self-supporting wall for seawall
CA1213740A (en) Ice berm for use as a foundation for an arctic offshore structure
JPS5953406B2 (en) Concrete coating method for the bottom of hull caissons or steel caissons
Singh 'STABIT'–A New Armour Block
Gray et al. Verrazano-Narrow Bridge: construction of tower foundations and anchorages
BLYTH et al. DISCUSSION. THE NEW HARBOUR-WORKS AND DOCKYARD AT GIBRALTAR.
JPH0258631A (en) Execution of caisson
JPS60175611A (en) Reclaiming method
JPH0161126B2 (en)