JPH0696858B2 - Ground anchor construction method - Google Patents
Ground anchor construction methodInfo
- Publication number
- JPH0696858B2 JPH0696858B2 JP9379192A JP9379192A JPH0696858B2 JP H0696858 B2 JPH0696858 B2 JP H0696858B2 JP 9379192 A JP9379192 A JP 9379192A JP 9379192 A JP9379192 A JP 9379192A JP H0696858 B2 JPH0696858 B2 JP H0696858B2
- Authority
- JP
- Japan
- Prior art keywords
- sheath
- ground
- embankment
- anchor
- ground anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 title description 9
- 239000000463 material Substances 0.000 claims description 5
- 238000000034 method Methods 0.000 claims description 4
- 230000035882 stress Effects 0.000 description 15
- 238000009412 basement excavation Methods 0.000 description 5
- 239000011800 void material Substances 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 239000004698 Polyethylene Substances 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- -1 polyethylene Polymers 0.000 description 1
- 229920000573 polyethylene Polymers 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Piles And Underground Anchors (AREA)
Description
【0001】[0001]
【産業上の利用分野】この発明は地中に埋設して定着
し、連結した構造物に作用する力を負担するグラウンド
アンカーに関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a ground anchor which is buried in the ground and fixed to bear a force acting on a connected structure.
【0002】[0002]
【従来の技術】法面や道路の谷側斜面などに盛土をし
て、地山から張り出る平な敷地や新たな道路部分を形成
することがある。このような盛土部分が崩れないように
支える手段として、図3に示すような方法が採用されて
いる。すなわち、既存の地山aに掘削した掘削孔bの中
に、シースdの中に複数本の引張材cを内側に配したグ
ラウンドアンカーGの一部を挿入して定着し、残りの一
部を盛土eの中に埋設して、盛土eの谷側に配したパネ
ルなどの構造物fと連結するものである。盛土eに作用
した荷重は、谷側の構造物fを地山から引き離そうとす
る力となって作用するが、この力をグラウンドアンカー
Gによって支えるものである。2. Description of the Related Art In some cases, embankment is formed on a slope or a valley slope of a road to form a flat site or a new road portion protruding from the natural ground. As a means for supporting such an embankment portion so as not to collapse, a method as shown in FIG. 3 is adopted. That is, a part of the ground anchor G in which a plurality of tension members c are arranged inside the sheath d is inserted and fixed in the excavation hole b excavated in the existing natural ground a, and the remaining part is fixed. Is embedded in the embankment e and connected to a structure f such as a panel arranged on the valley side of the embankment e. The load acting on the embankment e acts as a force to separate the structure f on the valley side from the ground, and this force is supported by the ground anchor G.
【0003】[0003]
【この発明が解決しようとする課題】このような施工で
問題となるのは、経年変化によって盛土eが沈下するこ
とである。つまり施工後時間が経過するにつれて、盛土
eが締め固まるなどの理由によって沈下していくもので
あり、この盛土eの中に一部を埋めたグラウンドアンカ
ーGもそれに従って押し下げられることになる。既存の
地山aには沈下等の変化がなく、盛土e部分が相対的に
下がるため、既存の地山aの中のグラウンドアンカーG
の一部に対して、盛土eの中の部分のみ下がることにな
る。これは結局アンカーGの盛土eと既存の地山aの境
界の近傍部分に大きな応力が作用することになる。A problem in this construction is that the embankment e sinks due to aging. That is, as the time after construction elapses, the embankment e sinks due to reasons such as compaction, and the ground anchor G partially filled in the embankment e is also pushed down accordingly. Since there is no change such as subsidence in the existing ground a and the e portion of the embankment is relatively lowered, the ground anchor G in the existing ground a
Therefore, only a part in the embankment e is lowered with respect to a part of. As a result, a large stress acts on a portion near the boundary between the embankment e of the anchor G and the existing ground a.
【0004】この応力は、アンカーGの境界の近傍部分
を折り曲げるように作用する。アンカーGが曲がると、
シースdと内部の引張材cとが接触して、両者の間に生
じるフリクションが極めて大きなものとなってしまう。
アンカーGの自由長部部分では引張材cの自由な伸びが
保証されることが必要で、このようにシースdと引張材
c間に摩擦が生じることによって、設計通りの引張材c
の伸びが得られないことになってしまう。また、さらに
大きな局所応力が作用した場合には、アンカーGの境界
部分のシースdに割裂が生じてしまうことがあり、この
部分から水が浸入して引張材cを錆び付かせ、結果引張
材cが破断してしまうことがあった。This stress acts to bend the portion near the boundary of the anchor G. When the anchor G bends,
The sheath d comes into contact with the tension member c inside, and the friction generated between the two becomes extremely large.
In the free length portion of the anchor G, it is necessary to guarantee the free elongation of the tension member c. Thus, the friction between the sheath d and the tension member c causes the tension member c as designed.
Will not be obtained. Further, when a larger local stress is applied, the sheath d at the boundary portion of the anchor G may be split, and water may infiltrate from this portion to cause the tensile member c to rust, resulting in the tensile member. There was a case where c was broken.
【0005】盛土eが沈下すると、細いアンカーGのシ
ースdによって盛土eが切れて、シースdの直下に空隙
が出来ることがある。この空隙にアンカーGがたるん
で、構造物fに荷重が作用したとき、たるみが伸びて、
構造物fにズレが生じることがあった。When the embankment e sinks, the embankment e may be cut by the sheath d of the thin anchor G, and a void may be formed immediately below the sheath d. The anchor G sags in this space, and when a load is applied to the structure f, the sag extends,
The structure f may be displaced.
【0006】この発明は以上のような課題を解決するた
めになされたもので、局部応力が作用してもアンカーの
自由長部の伸びを保証することができ、シースの破損も
防ぐことができ、またアンカーのたるみも生じさせない
グラウンドアンカーの施工法を提供することを目的とす
る。The present invention has been made in order to solve the above problems, and it is possible to guarantee the extension of the free length portion of the anchor even when a local stress acts, and to prevent the damage of the sheath. It is also an object of the present invention to provide a ground anchor construction method that does not cause slack in the anchor.
【0007】[0007]
【課題を解決するための手段】この発明にかかるグラウ
ンドアンカーの施工法は、局部応力が作用するアンカー
の一部を多重にして、この部分を補強するものである。
多重にするのは地山と盛土の境界の近傍のシースの一部
である。境界の近傍とは、盛土部分と地山部分の双方に
跨る所望長さという意である。多重にする手段として、
このシースの周りに管体を被せることが考えられる。シ
ースの内側に管体を配することも考えられる。この管体
として様々な部材が採用できるが、例えばシースの周り
に更にシースを配して多重することができ、シースとし
てポリエチレンなどの合成樹脂製シース,周面に凹凸を
有するステンレス製のスパイラルシース,ワインディン
グシースなど、公知の部材が広く採用できる。またシー
スに限らず、鋼管,コンクリート管なども同様に採用で
きる。これら管体によって二重,三重等々にして、補強
するものである。The construction method of the ground anchor according to the present invention is to reinforce this part by making a part of the anchor on which the local stress acts multiple.
It is a part of the sheath near the boundary between the ground and the embankment that is to be duplicated. The vicinity of the boundary means a desired length extending over both the embankment portion and the ground portion. As a means to multiplex
It is conceivable to cover the sheath with a tubular body. It is also conceivable to arrange the tube inside the sheath. Although various members can be adopted as this tubular body, for example, a sheath can be further arranged around the sheath to be multiplexed, and as the sheath, a synthetic resin sheath such as polyethylene, or a stainless steel spiral sheath having irregularities on the circumferential surface. Well-known members such as a winding sheath can be widely adopted. Further, not only the sheath but also steel pipes, concrete pipes and the like can be similarly adopted. These pipes are reinforced by making them double, triple, etc.
【0008】[0008]
【作用】盛土が沈下してアンカーの境界近傍に局部応力
が作用する。この応力に対し、多重にして補強したシー
スによってアンカーの折れ曲がりを防ぐ。またシースが
応力によって割裂するのが防止される。周囲に管体を配
して多重にした場合は、その分シースの径が太くなると
いうことになり、盛土が切れてシースの直下に空隙が生
じるようなことがなくなる。[Operation] The embankment sinks and local stress acts near the boundary of the anchor. Against this stress, the bending of the anchor is prevented by the sheath reinforced in multiple layers. Also, the sheath is prevented from being split by stress. When multiple pipes are arranged around the periphery, the diameter of the sheath becomes thicker by that amount, so that the embankment is not cut and a void is not formed immediately below the sheath.
【0009】[0009]
【実施例】以下、図に示す一実施例に基づきこの発明を
詳細に説明する。図において1は法面の地山であって、
この地山1に掘削した掘削孔2内にグラウンドアンカー
3の一部が挿入されている。グラウンドアンカー3はシ
ース4の中に複数本の鋼より線などからなる引張材が配
されており、シース4の掘削孔2の底部側はスパイラル
シースなどの定着部シースとなっている。この掘削孔2
内にモルタルなどの硬化材5を注入して、アンカー3が
定着されている。DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below based on an embodiment shown in the drawings. In the figure, 1 is the ground of the slope,
A part of the ground anchor 3 is inserted into the excavation hole 2 excavated in the natural ground 1. The ground anchor 3 has a tensile member made of a plurality of steel strands arranged in a sheath 4, and the bottom side of the excavation hole 2 of the sheath 4 serves as a fixing portion sheath such as a spiral sheath. This drill hole 2
The anchor 3 is fixed by injecting a hardening material 5 such as mortar.
【0010】アンカー3のシース4の一部であって、地
山1の掘削孔2に若干入った部分と地山1から突出した
部分の所望長さに跨って、管体6を周囲に被せる。管体
6としては鋼管が使用されている。この管体6によって
シース4の境界近傍部分が二重となって補強される。ア
ンカー3の先端には、基礎部7上に積み上げた土留めパ
ネル8を連結する。連結には、引張材をナットなどによ
って固定するなどが採用できる。またパネル8は、中間
部が円弧状に屈曲した剛性の高いものを使用している。
このパネル8と地山6との間に盛土9を詰める。[0010] A part of the sheath 4 of the anchor 3 is covered with a tubular body 6 over the desired length of a portion of the ground 1 slightly entering the excavation hole 2 and a portion of the ground 1 protruding from the ground 1. . A steel pipe is used as the pipe body 6. The tubular body 6 doubles and reinforces the portion near the boundary of the sheath 4. An earth retaining panel 8 stacked on the foundation portion 7 is connected to the tip of the anchor 3. For the connection, a tension member may be fixed with a nut or the like. The panel 8 is made of a material having a high rigidity with the middle part bent in an arc shape.
The embankment 9 is filled between the panel 8 and the ground 6.
【0011】以上のような施工において、盛土9が沈下
して地山1に対して相対的に下がりアンカー3の盛土9
と地山1の境界近傍に局部応力が作用しても、補強され
たシース4は容易に折れ曲がることがなく、シース4と
内部の引張材との間に摩擦が生じない。従って、引張材
の自由な伸びを妨げることがない。またシース4が割裂
するようなこともない。さらに周囲に管体6を配して径
が太くなったシース4によっては盛土9が切れず、シー
ス4直下に空隙が生じない。In the above-mentioned construction, the embankment 9 sinks and falls relatively to the ground 1, and the embankment 9 of the anchor 3
Even if a local stress is applied to the vicinity of the boundary between the ground and the ground 1, the reinforced sheath 4 does not easily bend, and friction does not occur between the sheath 4 and the tensile member inside. Therefore, the free elongation of the tensile member is not hindered. Further, the sheath 4 will not be split. Further, the embankment 9 is not cut off by the sheath 4 having a larger diameter by arranging the tubular body 6 in the periphery, and no void is formed immediately below the sheath 4.
【0012】この発明は以上のような実施例に限らず、
管体6を被せるのは、地山1の掘削孔2の中所望長さ
と、地表面から構造物までの全長に連続して被せること
もできる。これによりアンカー3の地山からの突出部分
の全長に作用する応力の影響を低減することができる。
また構造物としてはパネル8に限らず、法面保護用のブ
ロックや、現場打ちの構造物などの施工に実施できる。The present invention is not limited to the above embodiment,
The pipe 6 may be continuously covered over the desired length of the excavation hole 2 of the natural ground 1 and the entire length from the ground surface to the structure. This can reduce the influence of the stress acting on the entire length of the protruding portion of the anchor 3 from the natural ground.
Further, the structure is not limited to the panel 8, but can be applied to construction of a slope protection block, a structure cast on site, or the like.
【0013】[0013]
【発明の効果】この発明は以上のような構成を有し、以
下のような効果を得ることができる。 盛土の沈下によって局部応力が作用するシースの盛土
と地山の近傍部分を多重にして補強したため、この応力
によってシースが折れ曲がって引張材の自由な伸びを妨
げるようなことがなく、グラウンドアンカーとしての機
能を損なわない。 局部応力によってシースが割裂することもなく、引張
材を錆付かせる水のシース内への浸入も生じない。 シースの周囲に管体を被せることによりシースの径が
実質的に太くなり、シースによって盛土が切れてシース
の直下に空隙が生じず、アンカーのたるみも生じること
がない。 太くなった径によって盛土の沈下応力を受けてこれを
支えるため、地山への支圧応力を分散させ、地山の地崩
れや沈下を生じさせない。The present invention has the above-mentioned structure and can obtain the following effects. Since the embankment of the sheath, where local stress acts due to the settlement of the embankment, and the area near the natural ground were multiplexed and reinforced, there was no bending of the sheath due to this stress that hinders the free extension of the tensile member. Does not impair function. The local stress does not cause the sheath to split, and the penetration of water to rust the tensile material into the sheath does not occur. By covering the sheath with a tubular body, the diameter of the sheath is substantially increased, the embankment is not cut by the sheath, a void is not formed immediately below the sheath, and the slack of the anchor does not occur. The thickened diameter receives the subsidence stress of the embankment and supports it, so that the bearing stress to the ground is dispersed and the ground collapse and subsidence do not occur.
【図1】この発明にかかるグラウンドアンカーの施工法
の一実施例の斜視図である。FIG. 1 is a perspective view of an embodiment of a method of constructing a ground anchor according to the present invention.
【図2】施工状態の断面図である。FIG. 2 is a sectional view of a construction state.
【図3】従来の施工状態の一部断面図である。FIG. 3 is a partial cross-sectional view of a conventional construction state.
1 地山 2 掘削孔 3 グラウンドアンカー 4 シース 5 硬化材 6 管体 7 基礎部 8 土留めパネル 9 盛土 1 Ground 2 Drilling hole 3 Ground anchor 4 Sheath 5 Hardened material 6 Tubular body 7 Foundation 8 Earth retaining panel 9 Embankment
Claims (2)
ンドアンカーの一部を地山に掘削した掘削孔内に挿入し
て定着し、地表側の一部は地山の掘削孔から突出させて
盛土の中に埋める場合において、前記シースのうちの一
部である地山と盛土の境界の近傍部分を多重にして補強
したことを特徴とするグラウンドアンカーの施工法。1. A part of a ground anchor, in which a tensile material is arranged in a sheath, is inserted into a hole excavated in the ground and fixed therein, and a part of the ground side protrudes from the hole in the ground. A method of constructing a ground anchor, characterized in that, when the ground anchor is buried in the embankment, a portion near the boundary between the ground and the embankment, which is a part of the sheath, is reinforced in multiple layers.
外周に管体を被せて多重にしたことを特徴とする請求項
1記載のグラウンドアンカーの施工法。2. The method for constructing a ground anchor according to claim 1, wherein the outer circumference of a portion near the boundary between the ground and the embankment of the sheath is covered with a tube to make it multiple.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9379192A JPH0696858B2 (en) | 1992-03-19 | 1992-03-19 | Ground anchor construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9379192A JPH0696858B2 (en) | 1992-03-19 | 1992-03-19 | Ground anchor construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH05272139A JPH05272139A (en) | 1993-10-19 |
| JPH0696858B2 true JPH0696858B2 (en) | 1994-11-30 |
Family
ID=14092242
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP9379192A Expired - Lifetime JPH0696858B2 (en) | 1992-03-19 | 1992-03-19 | Ground anchor construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0696858B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002129556A (en) * | 2000-10-26 | 2002-05-09 | Okabe Co Ltd | Method for installing slope stabilizing anchor, and the slope stabilizing anchor |
| JP4599423B2 (en) * | 2008-03-18 | 2010-12-15 | 西日本エス・ピー・シー株式会社 | Embankment structure and construction method thereof |
-
1992
- 1992-03-19 JP JP9379192A patent/JPH0696858B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH05272139A (en) | 1993-10-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2245121C (en) | Injection-anchor | |
| JP3756385B2 (en) | Composite pile and its construction method | |
| KR100534603B1 (en) | Apparatus for Retaining Wall Using a Ground Anchor And the Method Using the Same | |
| JP4017766B2 (en) | Hollow cylindrical body and its construction method | |
| JPH0696858B2 (en) | Ground anchor construction method | |
| JP3347866B2 (en) | How to lay the tunnel footstep | |
| KR102108410B1 (en) | Ground reinforcing method using compressive ground pressure type ground anchor | |
| JP3586839B2 (en) | In-situ formed concrete pile and its forming method | |
| KR20080039020A (en) | P, H, Mr File | |
| KR101024373B1 (en) | Construction method of steel pipe propulsion structure using prestress and steel pipe propulsion structure using same | |
| KR101935544B1 (en) | Compressive ground pressure type ground anchor | |
| JPH10102487A (en) | Method of introducing prestress into diaphragam wall | |
| JPH0355612B2 (en) | ||
| JP4705468B2 (en) | Drainage pipe with deterrent function | |
| JP3018877B2 (en) | Underground structure and method of constructing underground structure | |
| JP3116095B2 (en) | Construction method of new material ground anchor | |
| JPH09302653A (en) | Steel pipe reinforced pile method | |
| KR200370707Y1 (en) | Ground anchor | |
| JP2007255101A (en) | Retaining wall construction method, tunnel structure construction method | |
| JP3561824B2 (en) | Ground anchor and its construction method | |
| KR100601793B1 (en) | Extension road and road extension construction method | |
| JP3186942B2 (en) | Reinforced soil retaining wall structure | |
| KR20060029404A (en) | Ground anchor | |
| JP3430073B2 (en) | Construction method of embankment anchor | |
| JPH05195529A (en) | Construction method of double anticorrosion anchor |