JPH0699933B2 - Slope prevention layer greening method - Google Patents
Slope prevention layer greening methodInfo
- Publication number
- JPH0699933B2 JPH0699933B2 JP30008092A JP30008092A JPH0699933B2 JP H0699933 B2 JPH0699933 B2 JP H0699933B2 JP 30008092 A JP30008092 A JP 30008092A JP 30008092 A JP30008092 A JP 30008092A JP H0699933 B2 JPH0699933 B2 JP H0699933B2
- Authority
- JP
- Japan
- Prior art keywords
- prevention layer
- soil
- collapse prevention
- slope
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Description
【0001】[0001]
【産業上の利用分野】この発明は、法面崩落防止層の緑
化工法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a greening method for a slope failure prevention layer.
【0002】[0002]
【従来の技術】山を削ったり盛土をして道路を設けた場
合、道路の片側または両側の法面を裸地のままにしてお
くと崩壊するおそれがある。このような崩壊を防ぐた
め、従来より法面にモルタルまたはコンクリートを吹き
付けて法面上に法面崩落防止層を形成する方法が知られ
ている。2. Description of the Related Art When a road is constructed by cutting mountains or embankment, leaving one or both sides of the road as bare ground may cause collapse. In order to prevent such collapse, conventionally known is a method of spraying mortar or concrete onto the slope to form a slope collapse prevention layer on the slope.
【0003】[0003]
【発明が解決しようとする課題】法面の安定化のために
は、上記崩落防止層を形成するのが適しているが、その
層肌が周辺環境と調和せず、景色を損ねる原因となって
いる。It is suitable to form the above-mentioned collapse prevention layer for stabilizing the slope, but the skin of the layer does not harmonize with the surrounding environment and causes damage to the scenery. ing.
【0004】この発明の目的は、崩落防止層の表面を植
物で覆い、周辺環境と調和させることのできる法面崩落
防止層の緑化工法を提供することにある。An object of the present invention is to provide a greening method for a slope prevention layer, which can cover the surface of the collapse prevention layer with plants and can be harmonized with the surrounding environment.
【0005】[0005]
【課題を解決するための手段】この発明による法面崩落
防止層の緑化工法は、上記の目的を達成するために、モ
ルタルまたはコンクリートの吹き付けによって法面上に
形成された崩落防止層に、その下の地山に達する多数の
貫通孔を全面的にあける工程と、孔あけ後の崩落防止層
上にネットを張り止める工程と、各貫通孔内およびネッ
ト張り崩落防止層面に植物の種子を混入した客土を吹き
付けて客土層を形成する工程とを含むことを特徴とする
ものである。In order to achieve the above-mentioned object, a method for greening a slope collapse prevention layer according to the present invention is characterized in that a collapse prevention layer formed on a slope surface by spraying mortar or concrete A process of completely opening a large number of through holes reaching the ground below, a process of sticking a net on the collapse prevention layer after drilling, and mixing plant seeds in each through hole and the surface of the net collapse prevention layer And a step of spraying the formed soil to form a soil layer.
【0006】緑化工法の対象となる法面崩落防止層は、
既設のものであってもよいし、新設のものであってもよ
い。なお、既設で老化がはげしく、クラックの多い部分
は削りとっておく方がよい。The slope failure prevention layer which is the target of the greening method is
It may be an existing one or a new one. In addition, it is better to scrape off existing parts that are aging and have many cracks.
【0007】崩落防止層にあけられる貫通孔は、直径4
0〜70mmの丸穴で、4〜10箇所/m2 散在してい
るのが好ましい。そして、法面の高い位置の方が低い位
置に較べて地下水および表面水の量が少ないので、客土
層全体に対する貫通孔を通じての地下水の供給を均等化
するためには、貫通孔の直径を後者より前者の方が大き
くなるようにするか、1m2 当たりの数を後者より前者
の方が多くなるようにすることが望ましい。孔あけに
は、削岩機が用いられる。また、貫通孔内には、客土吹
き付け前、植物の発育を促すために、肥料と保水材を入
れておくのが好ましい。The through hole formed in the collapse prevention layer has a diameter of 4 mm.
It is preferable that the holes are 0 to 70 mm and scattered at 4 to 10 points / m 2 . Since the amount of groundwater and surface water is smaller in the higher slopes than in the lower slopes, in order to equalize the groundwater supply through the throughholes to the entire soil layer, the diameter of the throughholes should be changed. It is desirable that the former be larger than the latter or that the number per 1 m 2 be larger than the latter. A rock drill is used for drilling. In addition, it is preferable to put a fertilizer and a water retaining material in the through holes before spraying the soil with soil in order to promote the growth of plants.
【0008】ネットは、客土を厚く吹き付けるために
は、厚ネットが適当であるが、ラスも使用できる。ネッ
トの崩落防止層への固定はアンカー等を用い適宜の手段
で行なわれるが、たとえば特公昭64−542号公報に
示されているように、崩落防止層の表面に複数の縦ロー
プと、複数の横ロープとを渡して固定し、これらのロー
プの上にネットを張ってこれをロープに連結してもよい
し、先に崩落防止層の表面にネットを張ってその上から
複数の縦ロープと、複数の縦ロープを渡しこれらのロー
プを崩落防止層に固定してネットを押さえ、そしてネッ
トをロープに連結してもよい。さらに、吹き付けられた
客土が、その位置を確保しうるように、崩落防止層と客
土層との間に、縦方向に所定間隔をおいて横方向にのび
る可撓性客土保持部材を複数介在させることが望まし
い。横方向では、複数の客土保持部材をほぼ一直線状に
配置するが、隣り合うものどうしが交互にずれていても
差支えない。客土保持部材としては、金属撚線を芯と
し、これから緑色に着色した合成樹脂繊維が放射状にの
びている所定長さのブラシ状のものが適している。A thick net is suitable for spraying the soil thickly, but a lath can also be used. The net is fixed to the collapse prevention layer by an appropriate means using an anchor or the like. For example, as shown in Japanese Patent Publication No. 64-542, a plurality of vertical ropes and a plurality of vertical ropes are formed on the surface of the collapse prevention layer. It may be fixed by passing with the horizontal ropes of the above, and the nets may be stretched over these ropes to connect them to the ropes. Then, a plurality of vertical ropes may be passed and the ropes may be fixed to the collapse prevention layer to press the net, and then the net may be connected to the rope. Further, in order to ensure the position of the sprayed soil, a flexible soil-holding member extending laterally at a predetermined interval in the longitudinal direction is provided between the collapse prevention layer and the soil layer. It is desirable to interpose a plurality. In the lateral direction, the plurality of soil-holding members are arranged in a substantially straight line, but it does not matter if the adjacent members are displaced from each other. As the soil-holding member, a brush-shaped member having a predetermined length, in which a stranded metal wire is used as a core, and synthetic resin fibers colored green from the core are radially extended, is suitable.
【0009】客土に混入される植物の種子には通常の植
生工に用いられるものと同様のものが使用せられ、たと
えばケンタッキー31フエスク、ケンタッキーブルー
G、オーチャードグラス、クリーピングレッドフエス
ク、めどはぎ、よもぎの外草花などの種子をあげること
ができる。また、客土に堆肥を混ぜておくのが望まし
い。客土層の厚さは、雨水などによって流出しないよう
に、その表面がネット表面とほぼ同一にするのがよく、
ネット表面が客土で僅かにかくれる程度に吹付ける。[0009] soil dressing is the use the same ones used in conventional vegetation Engineering the seeds of plants to be mixed in, for example, Kentucky 31 Fuesuku, Kentucky Blue G, orchardgrass, creeping red Hue disk, prospect The seeds such as flowers and flowers of wormwood can be raised. It is also desirable to mix compost with the soil. The thickness of the soil layer should be approximately the same as the surface of the net so that it does not flow out due to rainwater.
Spray the surface of the net slightly to cover the surface.
【0010】[0010]
【作用】この発明による法面崩落防止層の緑化工法は、
モルタルまたはコンクリートの吹き付けによって法面上
に形成された崩落防止層に、その下の地山に達する多数
の貫通孔を全面的にあけ、孔あけ後の崩落防止層上にネ
ットを張り止め、各貫通孔内およびネット張り崩落防止
層面に植物の種子を混入した客土を吹き付けて客土層を
形成するものであるから、客土層の一部がその裏面にお
いて多数の貫通孔に入り込んでいることと、崩落防止層
に張り止められたネットが客土層に埋入された状態に存
在することにより、客土層は崩落防止層面に定着する。The function of revegetation for the slope failure prevention layer according to the present invention is as follows.
In the collapse prevention layer formed on the slope by spraying mortar or concrete, a large number of through holes reaching the ground below are completely opened, and nets are attached on the collapse prevention layer after drilling, Since the soil containing the seeds of plants is sprayed onto the inside of the through hole and the surface of the net collapse prevention layer to form the soil layer, part of the soil layer has entered many through holes on its back surface. In addition, the presence of the net tied to the collapse prevention layer in the state of being embedded in the soil layer allows the soil layer to settle on the surface of the collapse prevention layer.
【0011】そして、多数の貫通孔を通じて崩落防止層
裏側の地山から客土層に地下水が供給されることによ
り、客土に混入された植物の種子が順調に発芽し、各貫
通孔を通じて地山に根を張る。[0011] By supplying groundwater to the soil layer from the ground behind the collapse prevention layer through a large number of through holes, the seeds of the plant mixed in the soil will germinate smoothly, and the ground through each through hole. Root in the mountains.
【0012】[0012]
【実施例】この発明を、以下図面を参照して説明する。DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the drawings.
【0013】図1は、山が削られて道路(1) が設けら
れ、削られた法面(2) にモルタルが吹き付けられて既に
形成せられた崩落防止層(3) が存在する状態を示す。FIG. 1 shows a state in which a mountain (1) is cut and a road (1) is provided, and the cut slope (2) is sprayed with mortar to form a collapse prevention layer (3) already formed. Show.
【0014】まず、図2に示すように、厚さ約70mm
の既設崩落防止層(3) 全体に多数の円形貫通孔(4A)(4B)
を千鳥配置になるように、削岩機(図示略)を用いて1
m2当たり4個あける。このさい、上位部分の貫通孔(4
A)の直径を70mmとし、これらより下方の貫通孔(4B)
の直径を50mmとした。First, as shown in FIG. 2, the thickness is about 70 mm.
The existing collapse prevention layer (3) has a large number of circular through holes (4A) (4B)
1 using a rock drill (not shown) so that
Open 4 per m 2 . At this time, the through hole (4
The diameter of A) is 70 mm, and the through holes (4B) below these are
The diameter was 50 mm.
【0015】つぎに、図3に示すように、孔あけ後の崩
落防止層(3) の表面に複数の縦ロープ(5) と、複数の横
ロープ(6) とを渡して固定する。このさい、縦ロープ
(5) どうしの間隔は狭く、横ロープ(6) どうしの間隔は
広くした。Next, as shown in FIG. 3, a plurality of vertical ropes (5) and a plurality of horizontal ropes (6) are passed over and fixed to the surface of the collapsing prevention layer (3) after drilling. This time, the vertical rope
(5) The space between the ropes is narrow, and the space between the horizontal ropes (6) is wide.
【0016】つぎに、図4に示すように、金属撚線を芯
とし、これから緑色に着色した合成樹脂繊維が放射状に
のびているブラシ状の横長客土保持部材(7) を複数ずつ
隣り合う縦ロープ(5) の間に、縦方向に所定間隔をおい
て配置し、各客土保持部材(7) の両端を隣り合う縦ロー
プ(5) に固定した後、その上から厚ネット(8) を被せか
つ縦横ロープ(5)(6)に連結し、崩落防止層(3) 上に張り
止める。Next, as shown in FIG. 4, a plurality of horizontally long brush-like horizontal soil holding members (7) each having a metallic twisted wire as a core and synthetic resin fibers colored in green extending radially from the core are adjacent to each other. After arranging the ropes (5) at a predetermined interval in the vertical direction and fixing both ends of each soil holding member (7) to the adjacent ropes (5), the thick net (8) is placed over the rope. Cover and connect to the vertical and horizontal ropes (5) and (6) and secure them on the collapse prevention layer (3).
【0017】最後に、図5に示すように、各貫通孔(4A)
(4B)内およびネット張り崩落防止層(3) 面に植物の種子
を混入した客土を吹付機(図示略)で吹き付けて客土層
(9)を形成する。Finally, as shown in FIG. 5, each through hole (4A)
The soil containing the seeds of plants is sprayed with a spraying machine (not shown) on the inside of (4B) and on the surface of the net collapse prevention layer (3) to form the soil layer.
Form (9).
【0018】植物の種子としてケンタッキー31フエス
ク、クリーピングレッドフエスク、ケンタッキーブルー
G、めどはぎ、よもぎを用いたところ、約3週間で発芽
し、3カ月後に植物(10)は完全に生長し、図6ないし図
8に示すように、法面崩落防止層(3) を緑化することが
できた。このさい地山(11)の地下水は貫通孔(4A)(4B)を
通じて客土層(9) に供給され、また植物(10)の根(10a)
は地山(11) に張っている状態が認められた。[0018] Kentucky 31 Fuesuku as a seed of the plant, creeping red Hue disk, Kentucky blue G, Medohagi, was using the mugwort, germinate in about three weeks, the plant (10) after 3 months to completely grow, As shown in FIGS. 6 to 8, the slope collapse prevention layer (3) could be greened. Groundwater from this mine (11) is supplied to the soil layer (9) through the through holes (4A) (4B) and the roots (10a) of the plants (10).
It was confirmed that the mountain was stretched over the natural ground (11).
【0019】図9は貫通孔の分布変形例を示すもので、
図2の上位の貫通孔(4A)の直径をその下方の貫通孔(4B)
より大きくした代わりに、ここでは上位の貫通孔(4C)の
1m2 当たりの数を9個とし、その下方の貫通孔(4B)の
1m2 当たりの数より多くしたものである。FIG. 9 shows a modification of the distribution of through holes.
The diameter of the upper through hole (4A) in FIG.
Instead of making it larger, the number of upper through-holes (4C) per m 2 is set to 9 and is larger than the number of lower through-holes (4B) per 1 m 2 .
【0020】[0020]
【発明の効果】この発明の法面崩落防止層の緑化工法に
よれば、客土層の一部がその裏面において多数の貫通孔
に入り込んでいることと、崩落防止層に張り止められた
ネットが客土層に埋入された状態に存在することによ
り、客土層が崩落防止層面に定着するから、勾配が大き
い法面でも客土層が安定した状態に保たれる。EFFECTS OF THE INVENTION According to the greening method for slope slope prevention layer of the present invention, a part of the soil layer enters into a large number of through holes on the back surface thereof, and the net fixed to the slope prevention layer is used. Since the soil is embedded in the soil layer, the soil layer is fixed on the collapse prevention layer surface, so that the soil layer can be kept stable even on slopes with a large slope.
【0021】また、多数の貫通孔を通じて崩落防止層裏
側の地山から客土層に地下水が供給されることにより、
客土に混入された植物の種子が順調に発芽し、各貫通孔
を通じて地山に根を張るので、地山の植物と異なること
なく生長する客土の植物で崩落防止層の表面を覆い周辺
環境と調和させることができる。とくに、崩落防止層が
既設で、クラックの発生しているような場合、これを隠
してしまうことができる利点もある。In addition, groundwater is supplied to the customer soil layer from the ground behind the collapse prevention layer through a large number of through holes,
Since seeds of plants mixed in the soil germinate smoothly and roots in the ground through each through hole, the surface of the collapse prevention layer is covered with the plants of the soil that grow without being different from the ground plants. Can be in harmony with the environment. In particular, there is an advantage that the collapse prevention layer can be hidden if it already exists and cracks are generated.
【図1】崩落防止層が形成された法面の斜視断面図であ
る。FIG. 1 is a perspective cross-sectional view of a slope with a collapse prevention layer formed thereon.
【図2】崩落防止層に多数の貫通孔をあけた状態を示す
法面の斜視断面図である。FIG. 2 is a perspective sectional view of a slope showing a state in which a large number of through holes are formed in the collapse prevention layer.
【図3】孔あけ後の崩落防止層の表面に縦横のロープを
渡して固定した状態を示す法面の斜視断面図である。FIG. 3 is a perspective cross-sectional view of a slope showing a state in which vertical and horizontal ropes are passed and fixed on the surface of the collapse prevention layer after drilling.
【図4】ロープ固定後の崩落防止層上に、横長客土保持
部材を介してネットを張り止めた状態を示す法面の斜視
断面図である。FIG. 4 is a perspective cross-sectional view of a slope showing a state in which a net is attached to a collapse prevention layer after fixing a rope via a horizontal oblong soil retaining member.
【図5】各貫通孔内およびネット張り崩落防止層面に植
物の種子を混入した客土を吹き付けて客土層を形成した
状態の法面の斜視断面図である。FIG. 5 is a perspective cross-sectional view of a slope in a state in which a soil containing a plant seed is sprayed to form a soil layer in each through hole and on the surface of the net collapse prevention layer.
【図6】崩落防止層緑化後の状態を示す法面斜視断面図
である。FIG. 6 is a front perspective sectional view showing a state after the fall prevention layer has been greened.
【図7】崩落防止層の表面が露出するまで順次切り欠い
た図6に示す法面の部分拡大斜視断面図である。FIG. 7 is a partially enlarged perspective sectional view of the slope shown in FIG. 6 which is sequentially cut out until the surface of the collapse prevention layer is exposed.
【図8】図7にそうVIII−VIII線の拡大断面図である。FIG. 8 is an enlarged sectional view taken along line VIII-VIII of FIG.
【図9】貫通孔の分布変形例を示す図2相当の斜視断面
図である。FIG. 9 is a perspective cross-sectional view corresponding to FIG. 2 showing a modified distribution of through holes.
(2) :法面 (3) :崩落防止層 (4A)(4B)(4C):貫通孔 (8) :ネット (9) :客土層 (2): Slope (3): Fall prevention layer (4A) (4B) (4C): Through hole (8): Net (9): Soil layer
Claims (1)
によって法面上に形成された崩落防止層に、その下の地
山に達する多数の貫通孔を全面的にあける工程と、孔あ
け後の崩落防止層上にネットを張り止める工程と、各貫
通孔内およびネット張り崩落防止層面に植物の種子を混
入した客土を吹き付けて客土層を形成する工程とを含む
ことを特徴とする法面崩落防止層の緑化工法。1. A step of completely forming a large number of through holes reaching the ground below the collapse prevention layer formed on the slope by spraying mortar or concrete, and on the collapse prevention layer after drilling. A slope collapse prevention layer characterized by including a step of attaching a net to each of the through holes and a step of forming a soil layer by spraying a soil containing plant seeds in each through hole and on the surface of the net collapse prevention layer. Greening method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP30008092A JPH0699933B2 (en) | 1992-11-10 | 1992-11-10 | Slope prevention layer greening method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP30008092A JPH0699933B2 (en) | 1992-11-10 | 1992-11-10 | Slope prevention layer greening method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH06146294A JPH06146294A (en) | 1994-05-27 |
| JPH0699933B2 true JPH0699933B2 (en) | 1994-12-12 |
Family
ID=17880466
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP30008092A Expired - Fee Related JPH0699933B2 (en) | 1992-11-10 | 1992-11-10 | Slope prevention layer greening method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0699933B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103222376A (en) * | 2013-04-03 | 2013-07-31 | 葛加君 | Maintenance method for green slope of concrete matrix |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7637961B2 (en) * | 2019-07-17 | 2025-03-03 | 北陽建設株式会社 | Repair method for existing sprayed slopes |
-
1992
- 1992-11-10 JP JP30008092A patent/JPH0699933B2/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103222376A (en) * | 2013-04-03 | 2013-07-31 | 葛加君 | Maintenance method for green slope of concrete matrix |
| CN103222376B (en) * | 2013-04-03 | 2014-06-25 | 葛加君 | Maintenance method for green slope of concrete matrix |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH06146294A (en) | 1994-05-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104314087B (en) | A kind of side-slope greening and protection structure and construction method thereof | |
| CN214460496U (en) | Highway rock matter side slope protective structure | |
| JPH0699933B2 (en) | Slope prevention layer greening method | |
| KR100860241B1 (en) | Slope recording method | |
| KR100346053B1 (en) | Method for revegetation of a shotcrete construction area using tree-planting sandbags | |
| EP0529024A1 (en) | Seed retaining net for grassing and stabilising sloping surfaces. | |
| KR100352889B1 (en) | Method for landscape planting of rock slope using pots | |
| JP3300934B2 (en) | Hard slope vegetation method | |
| JP3880673B2 (en) | Greening equipment and greening method for cut slope | |
| JPH10338934A (en) | Method of greening construction of soilless slope face | |
| JP2000120072A (en) | Device for greening slope | |
| JPS5813826A (en) | Greens-planting work using net along undulatory surface of slope | |
| JPH06207413A (en) | Tree planting method for construction on slope | |
| JPH1037217A (en) | Greening method and greening device for steep face of cut slope | |
| JP3300935B2 (en) | Slope vegetation method | |
| JPH09125400A (en) | Partial planting method for hard rock slope and concrete mortar retaining wall | |
| JP5827938B2 (en) | Vegetation guidance method | |
| JP3170480B2 (en) | Greening method of slope | |
| JPS62220613A (en) | Vegetating and protecting work for slope | |
| JPS62182316A (en) | Log-laying work for slope protection work by vegetation | |
| JP2004027574A (en) | Greening construction method for slope | |
| KR100648181B1 (en) | Rapid slope recording method with excellent moisturizing ability | |
| JP3088907U (en) | Palm mat for greening method on hillside | |
| JP2699268B2 (en) | Greening structure such as retaining wall and method of greening retaining wall | |
| JP2002088764A (en) | Slope vegetation method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19960227 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313113 |
|
| R360 | Written notification for declining of transfer of rights |
Free format text: JAPANESE INTERMEDIATE CODE: R360 |
|
| R360 | Written notification for declining of transfer of rights |
Free format text: JAPANESE INTERMEDIATE CODE: R360 |
|
| R371 | Transfer withdrawn |
Free format text: JAPANESE INTERMEDIATE CODE: R371 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313113 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20071212 Year of fee payment: 13 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081212 Year of fee payment: 14 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091212 Year of fee payment: 15 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101212 Year of fee payment: 16 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101212 Year of fee payment: 16 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101212 Year of fee payment: 16 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111212 Year of fee payment: 17 |
|
| LAPS | Cancellation because of no payment of annual fees |