Reinforcement frame and underground beam construction method

Info

Publication number
JPH0699938B2
JPH0699938B2 JP41213890A JP41213890A JPH0699938B2 JP H0699938 B2 JPH0699938 B2 JP H0699938B2 JP 41213890 A JP41213890 A JP 41213890A JP 41213890 A JP41213890 A JP 41213890A JP H0699938 B2 JPH0699938 B2 JP H0699938B2
Authority
JP
Japan
Prior art keywords
underground beam
rebar
frame
reinforcing
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP41213890A
Other languages
Japanese (ja)
Other versions
JPH04216719A (en
Inventor
建十 鳥居
Original Assignee
株式会社鳥居建設
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社鳥居建設 filed Critical 株式会社鳥居建設
Priority to JP41213890A priority Critical patent/JPH0699938B2/en
Publication of JPH04216719A publication Critical patent/JPH04216719A/en
Publication of JPH0699938B2 publication Critical patent/JPH0699938B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、土木及び建設工事現場
において地中梁を形成する際に使用する配筋枠及び地中
梁打設工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a reinforcing frame and an underground beam driving method used for forming an underground beam in a civil engineering and construction site.

【0002】[0002]

【従来の技術】従来の地中梁打設工法は以下のような工
程であった。 床掘り (余堀りを必要とする) 残土処分 (余堀り分の残土処分も必要である) 栗石地業 (余堀り部分にも栗石地業が必要であ
る) 鉄筋足場組立 (柱筋固定のため必要である) 鉄筋組立 型枠組立 コンクリート打設 鉄筋足場外し 型枠外し (コンクリートの出隅が欠けやすい) 埋戻し (客土で埋戻す)
2. Description of the Related Art A conventional underground beam driving method has the following steps. Floor excavation (requires overburden) Disposal of residual soil (requires disposal of surplus soil for residual excavation) Kuriishi Geotechnical (requires Kuriishi geotechnical to be included in the dugout) Reinforced scaffolding assembly (column reinforcement) (Required for fixing) Reinforcing bar assembly Formwork assembly Concrete placing Removing reinforcing bar scaffolding Removing formwork (prone to break out of concrete) Backfilling (refilling with soil)

【0003】従来の地中梁打設工法においては以下のよ
うな欠点があった。 工程が長く複雑である。 残土処分が多く、客土を必要とする。 型枠工事、鉄筋工事にかなりの時間を要する。 地表面より下で作業するため土で鉄筋材が汚れやすい。 人間の手作業が多いので作業効率が悪く、人件費も多く
かかる。 各種土木作業機械を使用するときの作業性が悪い。 全体的な工期が非常に長くかかる。
The conventional underground beam driving method has the following drawbacks. The process is long and complicated. Most of the remaining soil is disposed of, and the soil is required. A considerable amount of time is required for formwork and reinforcing bar work. Since the work is done below the surface of the ground, the reinforcing steel is easily soiled with soil. Since there are many human manual tasks, work efficiency is poor and labor costs are high. Poor workability when using various civil engineering work machines. The overall construction period is very long.

【0004】[0004]

【発明が解決しようとする課題】本発明が解決しようと
する課題は、シンプルな工程で、工期が極めて短く、各
種土木作業機械の多用が可能で作業性が良く、残土処分
が少なく客土も不要で、型枠工事も不要で、品質低下の
恐れもない、配筋枠及び地中梁打設工法を提供すること
にある。
The problems to be solved by the present invention include a simple process, a very short construction period, various civil engineering work machines can be used extensively, and workability is good. It is an object to provide a method of placing a rebar frame and an underground beam, which is unnecessary and requires no formwork construction, and there is no fear of quality deterioration.

【0005】[0005]

【課題を解決するための手段】かかる課題を解決した本
発明の要旨は、断面がU字形状をした所定長さのコンク
リート製ブロックの内周面から少し離れた位置に沿って
U字形状に折曲した鉄筋材を、同コンクリート製ブロッ
クの長手方向に所定間隔ごとに複数配置し、それぞれの
同鉄筋材を同内周面に係止したことを特徴とする配筋
枠、地表面を掘削して設けた地中梁用溝の底面に所定の
基礎工事を施した後、同地中梁用溝の長手方向に沿って
請求項1記載の配筋枠を直列に配列して載置し、次に同
配筋枠の外側を土砂等で埋め戻し、同配筋枠内の鉄筋材
に他の鉄筋材を係止して所定の配筋工事を行ない、そし
て同配筋枠の内部空間にコンクリートを打設した後、固
化させて地中梁を形成することを特徴とする地中梁打設
工法にある。
Means for Solving the Problems The gist of the present invention, which has solved the above problems, is to provide a U-shaped section along a position slightly away from the inner peripheral surface of a concrete block having a U-shaped cross section and having a predetermined length. A plurality of bent reinforcing bars are arranged at predetermined intervals in the longitudinal direction of the concrete block, and each reinforcing bar is locked to the inner peripheral surface. After performing a predetermined foundation work on the bottom surface of the groove for the underground beam, the bar arrangement frames according to claim 1 are arranged in series along the longitudinal direction of the groove for the underground beam. , Next, backfill the outside of the same reinforcement frame with earth and sand, etc., fix other reinforcements to the reinforcements in the reinforcement frame, and perform the required reinforcement work, and the internal space of the reinforcement frame It is a method of placing underground beams, which is characterized by forming concrete beams after placing concrete on them and then solidifying them.

【0006】[0006]

【作用】本発明の配筋枠は、断面がU字形状をした所定
長さのコンクリート製ブロックであり、地中梁を形成し
ようとする場所の長さに応じて適当な個数だけ直列に配
列して使用するものである。同コンクリート製ブロック
の内周面から少し離れた位置には、U字形状に折曲した
複数の鉄筋材を所定間隔ごとに配置して係止しており、
同鉄筋材に他の鉄筋材を係止することにより配筋工事を
するようになっている。
The reinforcing frame of the present invention is a concrete block having a U-shaped cross section and having a predetermined length, and an appropriate number of the blocks are arranged in series according to the length of the place where the underground beam is to be formed. To use. At a position slightly distant from the inner peripheral surface of the concrete block, a plurality of reinforcing bars bent in a U shape are arranged and locked at predetermined intervals,
Reinforcing work is performed by locking other reinforcing bars to the same reinforcing bar.

【0007】同コンクリート製ブロックの内部空間はコ
ンクリートを打設するための空間であり、地中梁の主要
部となる部分である。また同コンクリート製ブロックは
土木工事において、道路横断を必要とするガス・水道・
汚水等配管工事の配管保護梁としても使用することがで
きる。
The internal space of the concrete block is a space for placing concrete and is a main part of the underground beam. In addition, the concrete block is used for civil works such as gas, water,
It can also be used as a pipe protection beam for plumbing works such as dirty water.

【0008】本発明の地中梁打設工法では、予め製作し
た前出の配筋枠を、基礎工事施工後の地中梁用溝の底面
に直列に配列して載置する。次に同配筋枠の外側を土砂
等で埋め戻し、同配筋枠内の鉄筋材に他の鉄筋材を係止
して配筋工事を行う。同配筋枠はコンクリート型枠とし
ての役目を果たし、同配筋枠の内周面に予め係止してい
る鉄筋材は配筋工事をする際に他の鉄筋材を保持する役
目を果たしている。同配筋枠内の配筋工事が終了した
ら、同配筋枠の内部空間にコンクリートを打設した後、
固化させて地中梁を形成する。
In the underground beam driving method of the present invention, the previously-arranged rebar frames are arranged in series on the bottom surface of the underground beam groove after the foundation work is placed. Next, the outside of the same reinforcement frame is backfilled with earth and sand, etc., and another reinforcement material is locked to the reinforcement material in the reinforcement frame to perform reinforcement work. The rebar frame serves as a concrete formwork, and the rebar material pre-locked on the inner surface of the rebar frame plays a role of holding other rebar materials during the rebar construction work. . After finishing the reinforcement work in the same reinforcement frame, after placing concrete in the internal space of the same reinforcement frame,
Solidify to form an underground beam.

【0009】[0009]

【実施例】以下、本発明の実施例を図面に基づいて説明
する。図1は配筋枠の実施例を示す一部切欠断面図、図
2は同一部切欠側面図、図3は地中梁打設工法の実施例
を示す工程説明図、図4は施工状態を示す一部切欠断面
図、図5は同一部切欠平面図、図6は同一部切欠断面
図、図7は他の実施例を示す一部切欠縦断面図である。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a partially cutaway sectional view showing an embodiment of a reinforcing bar, FIG. 2 is a cutaway side view of the same portion, FIG. 3 is a process explanatory view showing an embodiment of an underground beam driving method, and FIG. 5 is a partially cutaway sectional view showing the same part, FIG. 5 is a partially cutaway sectional view showing the same part, and FIG. 7 is a partially cutaway vertical sectional view showing another embodiment.

【0010】本実施例の配筋枠1では、断面がU字形状
をした所定長さのコンクリート製ブロック2の内周面3
から少し離れた位置に沿ってU字形状に折曲した鉄筋材
4を、コンクリート製ブロック2の長手方向に所定間隔
ごとに複数配置し、それぞれの鉄筋材4を内周面3に係
止している。本実施例の地中梁打設工法においては、地
表面5を掘削して設けた地中梁用溝6の底面7に栗石8
を入れて捨コンクリート9を打設した後、地中梁用溝6
の長手方向に沿って前出の配筋枠1を直列に配列して載
置する。
In the reinforcing bar frame 1 of this embodiment, the inner peripheral surface 3 of a concrete block 2 having a U-shaped cross section and having a predetermined length.
A plurality of reinforcing bars 4 bent in a U shape along a position slightly apart from are arranged at predetermined intervals in the longitudinal direction of the concrete block 2, and each reinforcing bar 4 is locked to the inner peripheral surface 3. ing. In the underground beam driving method of the present embodiment, the stones 8 are provided on the bottom surface 7 of the trench 6 for the underground beam provided by excavating the ground surface 5.
After placing the waste concrete 9 into the
The above-mentioned bar arrangement frames 1 are arranged in series along the longitudinal direction of the.

【0011】次に、配筋枠1の外側10を土砂等で埋め
戻し、配筋枠1内の鉄筋材4に主筋11,補強筋12,
巾止筋13等の他の鉄筋材を係止して、所定の配筋工事
を行う。このとき水道管14,ガス管15等の配管工事
を行うこともできる。配管の方向は配筋枠1に対して直
角に行う。鉄筋材同士の結束にはクリップを用いて作業
を簡略化することもある。そして、配筋枠1の内部空間
16にコンクリート17を打設した後、固化させて地中
梁18を形成する。
Next, the outer side 10 of the reinforcing bar 1 is backfilled with earth and sand or the like, and the reinforcing bar 4 in the reinforcing bar 1 is provided with main bars 11, reinforcing bars 12,
A predetermined reinforcing work is performed by locking another reinforcing bar material such as the purse bar 13. At this time, plumbing work for the water pipe 14, the gas pipe 15 and the like can be performed. The direction of piping is perpendicular to the reinforcing frame 1. A clip may be used to bind the reinforcing bars together to simplify the work. Then, concrete 17 is poured into the internal space 16 of the reinforcing bar 1 and then solidified to form an underground beam 18.

【0012】本実施例の配筋枠1を使用した地中梁打設
工法は、従来の工法に比較して多くの改良点を備えてい
る。地中梁用溝6は最小限の大きさですむので、境界ぎ
りぎりの作業が可能であり、残土処分も少なく客土は不
要である。鉄筋足場工事、型枠工事が一切不要なので工
程はシンプルであり、工期を大幅に短縮することができ
る。各種土木作業機械を多く使用できるので作業効率が
良く、人件費を低減することができる。地表面5より上
での作業が多いので高品質を保つことができると共に、
安全性も高い。コンクリートの養生は土中養生であるた
め、完全な養生を行うことができる。型枠工事が不要な
ので、型枠取外し時のコンクリートの損失がない。鉄筋
材が土と直接当たらないので高品質が得られる。地中梁
18と土間19とを同時に打設することも可能であり、
別々に打設することも可能なので便利である。
The underground beam driving construction method using the reinforcing bar frame 1 of this embodiment has many improvements as compared with the conventional construction method. Since the trench 6 for the underground beam is of a minimum size, it is possible to perform work just near the boundary, and there is little disposal of residual soil, so no soil is required. Since there is no need for rebar scaffolding or formwork, the process is simple and the construction period can be greatly shortened. Since various civil engineering machines can be used, work efficiency is good and labor costs can be reduced. Since there are many operations above the ground surface 5, high quality can be maintained and
Highly safe. Since the curing of concrete is curing in the soil, it can be completely cured. Since no formwork is required, there is no concrete loss when removing the formwork. High quality can be obtained because the rebar does not directly contact the soil. It is also possible to place the underground beam 18 and the soil floor 19 at the same time,
It is convenient because it can be set separately.

【0013】図7は他の実施例を示している。アスファ
ルト舗装道路20を横断する配管21の配管保護梁とし
て配筋枠1を使用した例である。ガス・水道・汚水等の
配管工事の分野で広く応用することのできるものであ
る。
FIG. 7 shows another embodiment. In this example, the reinforcing bar frame 1 is used as a pipe protection beam for a pipe 21 that crosses the asphalt pavement 20. It can be widely applied in the field of plumbing such as gas, water and sewage.

【0014】[0014]

【発明の効果】本発明により、シンプルな工程で、工期
が極めて短く、各種土木作業機械の多用が可能で作業性
が良く、残土処分が少なく客土も不要で、型枠工事も不
要で、品質低下の恐れもない、配筋枠及び地中梁打設工
法を提供することができる。
EFFECTS OF THE INVENTION According to the present invention, with a simple process, the construction period is extremely short, various civil engineering work machines can be used extensively, workability is good, less waste soil is disposed of, less soil is required, and formwork is not required. It is possible to provide a method for placing a reinforcing bar and an underground beam without fear of quality deterioration.

【図面の簡単な説明】[Brief description of drawings]

【図1】配筋枠の実施例を示す一部切欠断面である。FIG. 1 is a partially cutaway cross section showing an embodiment of a reinforcing bar frame.

【図2】配筋枠の実施例を示す一部切欠側面図である。FIG. 2 is a partially cutaway side view showing an embodiment of a reinforcing bar frame.

【図3】地中梁打設工法の実施例を示す工程説明図であ
る。
FIG. 3 is a process explanatory view showing an example of an underground beam driving method.

【図4】施工状態を示す一部切欠断面図である。FIG. 4 is a partially cutaway sectional view showing a construction state.

【図5】施工状態を示す一部切欠断面図である。FIG. 5 is a partially cutaway sectional view showing a construction state.

【図6】施工状態を示す一部切欠平面図である。FIG. 6 is a partially cutaway plan view showing a construction state.

【図7】他の実施例を示す一部切欠縦断面図である。FIG. 7 is a partially cutaway vertical sectional view showing another embodiment.

【符号の説明】[Explanation of symbols]

1 配筋枠 2 コンクリート製ブロック 3 内周面 4 鉄筋材 5 地表面 6 地中梁用溝 7 底面 8 栗石 9 捨コンクリート 10 外側 11 主筋 12 補強筋 13 巾止筋 14 水道管 15 ガス管 16 内部空間 17 コンクリート 18 地中梁 19 土間 20 アスファルト舗装道路 21 配管 1 Reinforcing Frame 2 Concrete Block 3 Inner Surface 4 Reinforcing Bar Material 5 Ground Surface 6 Groove for Underground Beam 7 Bottom 8 Kuriishi 9 Waste Concrete 10 Outside 11 Main Bar 12 Reinforcing Bar 13 Purse Bar 14 Water Pipe 15 Gas Pipe 16 Internal Space 17 Concrete 18 Underground beam 19 Dirt 20 Asphalt pavement 21 Piping

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 断面がU字形状をした所定長さのコンク
リート製ブロックの内周面から少し離れた位置に沿って
U字形状に折曲した鉄筋材を、同コンクリート製ブロッ
クの長手方向に所定間隔ごとに複数配置し、それぞれの
同鉄筋材を同内周面に係止したことを特徴とする配筋
枠。
1. A reinforcing bar material bent in a U shape along a position slightly away from an inner peripheral surface of a concrete block having a U-shaped cross section and having a predetermined length is provided in the longitudinal direction of the concrete block. A rebar frame characterized in that a plurality of bar bars are arranged at predetermined intervals, and the same rebar members are locked to the same inner peripheral surface.
【請求項2】 地表面を掘削して設けた地中梁用溝の底
面に所定の基礎工事を施した後、同地中梁用溝の長手方
向に沿って請求項1記載の配筋枠を直列に配列して載置
し、次に同配筋枠の外側を土砂等で埋め戻し、同配筋枠
内の鉄筋材に他の鉄筋材を係止して所定の配筋工事を行
ない、そして同配筋枠の内部空間にコンクリートを打設
した後、固化させて地中梁を形成することを特徴とする
地中梁打設工法。
2. The reinforcing frame according to claim 1, wherein after a predetermined foundation work is performed on the bottom surface of the trench for underground beam provided by excavating the ground surface, the trench is laid along the longitudinal direction of the trench for underground beam. Are placed in series and then placed back on the outside of the same rebar frame with earth and sand, etc., and other rebar members are locked to the rebar members in the rebar frame to perform the required rebar construction work. Then, a method of placing an underground beam, which comprises placing concrete in the inner space of the reinforcing frame and then solidifying it to form an underground beam.
JP41213890A 1990-12-18 1990-12-18 Reinforcement frame and underground beam construction method Expired - Lifetime JPH0699938B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP41213890A JPH0699938B2 (en) 1990-12-18 1990-12-18 Reinforcement frame and underground beam construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP41213890A JPH0699938B2 (en) 1990-12-18 1990-12-18 Reinforcement frame and underground beam construction method

Publications (2)

Publication Number Publication Date
JPH04216719A JPH04216719A (en) 1992-08-06
JPH0699938B2 true JPH0699938B2 (en) 1994-12-12

Family

ID=18521016

Family Applications (1)

Application Number Title Priority Date Filing Date
JP41213890A Expired - Lifetime JPH0699938B2 (en) 1990-12-18 1990-12-18 Reinforcement frame and underground beam construction method

Country Status (1)

Country Link
JP (1) JPH0699938B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2804422B2 (en) * 1993-06-03 1998-09-24 高伸建設 株式会社 Foundation construction method

Also Published As

Publication number Publication date
JPH04216719A (en) 1992-08-06

Similar Documents

Publication Publication Date Title
US3195312A (en) Method for erecting precast retaining wall
US4055927A (en) Concrete walls and reinforcement cage therefor
JP2004232328A (en) Structure of semi-precast arch culvert and its construction method
JP3893056B2 (en) Construction method of underground structure
JP2769936B2 (en) Construction method of beams and slabs in underground skeleton construction
JPH05230845A (en) L-shaped block retaining wall structure and construction method thereof
JPH0699938B2 (en) Reinforcement frame and underground beam construction method
JP7854181B2 (en) Method of pouring concrete for tunnel lining
KR100784201B1 (en) Tunnel construction method using steel pipe loop structure in rock section
JP2004285613A (en) Construction method for building foundation
JP4020858B2 (en) Manufacturing method for underground structures
JPH07243269A (en) How to build an underground parking lot
JPH0517955A (en) Execution method for direct foundation and form panel for direct foundation
JP3713117B2 (en) How to build the foundation
JPH0477764B2 (en)
JP2663087B2 (en) How to build underground structures
KR200291370Y1 (en) Concrete caisson structure for earth and sand guard of pier's basis
JP3674439B2 (en) Composite type underground continuous wall and construction method of the same wall
JP2660802B2 (en) Construction method of culvert in embankment and culvert in embankment
JPS63537A (en) Construction work of underground structure
JP2565452B2 (en) Construction method of self-supporting retaining wall
JPH04185816A (en) Construction of beam in underground wall
JPS6059233A (en) Construction of retaining wall by drain side-ditch
JPH1088567A (en) Building ground improvement method and building foundation construction method
JP3171716B2 (en) Foundation construction method on inclined surface