JPH07100543B2 - Component control device for blended raw materials - Google Patents
Component control device for blended raw materialsInfo
- Publication number
- JPH07100543B2 JPH07100543B2 JP40948890A JP40948890A JPH07100543B2 JP H07100543 B2 JPH07100543 B2 JP H07100543B2 JP 40948890 A JP40948890 A JP 40948890A JP 40948890 A JP40948890 A JP 40948890A JP H07100543 B2 JPH07100543 B2 JP H07100543B2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- amount
- stacker
- component
- brand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- General Factory Administration (AREA)
- Manufacture And Refinement Of Metals (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
【0001】[0001]
【産業上の利用分野】この発明は、多数の銘柄を積付け
て作るパイルの長手方向の成分分布を均一に制御し、下
工程での成品成分の安定を図る配合原料の成分制御装置
に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a component control device for compounding raw materials for uniformly controlling the component distribution in the longitudinal direction of a pile made by stacking a large number of brands to stabilize the product components in the lower step.
【0002】[0002]
【従来の技術】粗鉱ヤ−ドに仮置きされた鉄鉱石は、パ
イルの積付け計画にしたがってロ−ダで粗鉱ヤ−ドから
切り出され、搬送途中で破砕、篩分け分級され、塊鉱と
粉鉱に分けてサ−ジホッパ−に一時貯留した後、定量切
出し装置(CFWと略称)で定量切出しされ、ベッディ
ングヤ−ドに搬送されスタッカ−で層状に積付けられ
る。2. Description of the Related Art Iron ore temporarily placed in a crude ore yard is cut out from the coarse ore yard by a loader according to a pile loading plan, crushed and sieved in the course of transportation, and agglomerated. It is divided into ore and powder ore and temporarily stored in a sarge hopper, and then quantitatively cut out by a fixed amount cutting device (abbreviated as CFW), conveyed to a bedding yard, and stacked in layers by a stacker.
【0003】この山をパイルといい、パイルの積付けが
完了すると下工程の操業に合わせて、パイルの長手方向
の一方端面からリクレ−マ−で切出される。図2はパイ
ルの断面形状(長手方向に直交する断面)を、図3はパ
イルの側面形状を示し、図4はパイルとリクレ−マ−お
よびスタッカ−の関係を示す図である。These piles are called piles, and when pile stacking is completed, the piles are cut out by a reclaimer from one end face in the longitudinal direction of the pile in accordance with the operation of the lower step. 2 is a cross-sectional shape of the pile (a cross section orthogonal to the longitudinal direction), FIG. 3 is a side view of the pile, and FIG. 4 is a view showing the relationship among the pile, the reclaimer, and the stacker.
【0004】図4において、パイル21を積むヤ−ドの
側部にレ−ル24が敷設され、レ−ル24の上をスタッ
カ−6が走行しつつパイルを積付け、一方ヤ−ドに敷設
された広幅のレ−ル22の上をリクレ−マ−7が走行し
て、積付けられたパイル21を払出す。スタッカ−6が
パイル21の端にある時にある銘柄の積付けを開始し、
パイル21の端にきた時にその銘柄の積付けが終了する
ようにできれば、パイル21の長手方向の成分分布が均
一になるが、現実ではこのようなことは有り得ない。In FIG. 4, a rail 24 is laid on the side of the pile for stacking the pile 21, and a stacker 6 runs on the rail 24 while stacking the pile, while one pile is piled up. The reclaimer 7 runs on the laid wide rails 22 to discharge the piles 21 piled up. When the stacker 6 is at the edge of the pile 21, it starts to load a certain brand,
If the stacking of the brand can be completed when the pile 21 comes to the end, the distribution of the components in the longitudinal direction of the pile 21 becomes uniform, but in reality this is not possible.
【0005】現実には、スタッカ−の機内コンベヤ上に
原料があればスタッカ−を一定速度で走らせ、また、原
料が無くなればスタッカ−を停止させるというように原
料の積付けを行っている。そして、1つのパイルの積付
け作業中にスタッカ−はパイルの長手方向に数百回往復
する。また、銘柄の積付け順序は、パイルの積付け計画
により決定され、1回当たりの積付け量は500〜30
00トンであり、その間銘柄は200〜300回変わり
パイルの断面は成分の異なる数十種類の銘柄が200〜
300層に層状に積まれた状態になっている。In reality, the stacking of raw materials is carried out by running the stacker at a constant speed if there is raw material on the in-machine conveyor of the stacker, and stopping the stacker when there is no more raw material. Then, during the stacking operation of one pile, the stacker reciprocates several hundred times in the longitudinal direction of the pile. In addition, the stowage order of the brands is determined by the pile stowage plan, and the stowage amount per time is 500 to 30.
The brand changes 200 to 300 times during that period, and the cross section of the pile has 200 to 300 kinds of different brands.
It is in a state of being layered in 300 layers.
【0006】このため、パイルの長手方向に、銘柄の変
更点が数多く存在し、長手方向の原料成分が変動する原
因となっている。このような問題点を解決しようとした
ものに、特開昭56−141236号公報がある。これ
はスタッカ−の位置を検出する装置を設けると共に、ス
タッカ−により積み付ける各種原料の貯留槽からの原料
の切出し開始および切出し停止の予約を指示する手段を
設け、切出し予約が指示された場合には、指示後におけ
る最初のスタッカ−折り返し時点以後における該当原料
積付け量に相当する該当貯留槽からの切出し量を算出
し、算出値が貯留槽からスタッカ−に至る搬送系の搬送
能力以内にあるときは、該算出値に基づく貯留槽からの
原料切出しを、この切出しに係る原料の積付けが前記折
り返し時点に同期して開始すべきタイミングより開始さ
せ、また前記算出値が前記搬送能力を越えるときは、こ
れを搬送能力以内の値に補正しこの補正値に基づく貯留
槽からの原料切出しを、前記タイミングより開始させる
かまたはこの原料切出し開始を禁じる一方、切出し予約
が指示された場合は、前記折り返し時点に同期してスタ
ッカ−の荷切れを生じさせるべく該貯留槽からの原料切
出しを停止させるものである。Therefore, there are many brand changes in the longitudinal direction of the pile, which causes fluctuations in the raw material components in the longitudinal direction. Japanese Patent Application Laid-Open No. 56-141236 discloses an attempt to solve such a problem. This is provided with a device for detecting the position of the stacker, and means for instructing reservations for starting and stopping cutting of raw materials from a storage tank for various raw materials to be stacked by the stacker. Is the amount of cut-out from the corresponding storage tank that corresponds to the amount of the corresponding raw material loading after the first stacker turnaround time after the instruction, and the calculated value is within the transfer capacity of the transfer system from the storage tank to the stacker. In this case, the cutting of the raw material from the storage tank based on the calculated value is started at the timing at which the stacking of the raw material for the cutting should be started in synchronization with the turning point, and the calculated value exceeds the carrying capacity. In this case, correct this to a value within the carrying capacity and start the raw material cutting from the storage tank based on this corrected value from the above timing or While prohibiting cutout start, if the cutout reserved is instructed, in synchronization with the turn-back point stacker - in which to stop the material cut from 該貯 Tomeso to produce a load breakage.
【0007】[0007]
【発明が解決しようとする課題】特開昭56−1412
36号公報のものは、パイルの長手方向途中で荷切れが
生じないように予め銘柄およびその切出し量を制御して
行うものであるが、1パイルの間に銘柄の延べ切換数は
200〜300回にもなる関係上、単位時間当たりに少
ない原料を搬送することが多くなり、積付けに要する時
間が長くなることおよび搬送効率が低下するから、電力
コストが高くなるという問題点がある。本発明は、パイ
ルの途中に荷切れ点(あるいは、銘柄切換点と称する)
に生じても、パイル長手方向の成分を均一にできる装置
を提供することを目的とするものである。Problems to be Solved by the Invention JP-A-56-1412
The one disclosed in Japanese Patent No. 36 is carried out by controlling the brand and the amount of cutting in advance so that the load will not run out in the middle of the pile in the longitudinal direction. Since the number of raw materials is often reduced, the raw materials are often transported per unit time, the time required for stowage is increased, and the transportation efficiency is reduced, resulting in an increase in power cost. In the present invention, a load dead point (or a brand switching point) is set in the middle of a pile.
It is an object of the present invention to provide a device capable of making the component in the longitudinal direction of the pile uniform even if the above occurs.
【0008】[0008]
【課題を解決するための手段】本発明は上記のような目
的を達成しようとするもので、積付けスタッカ−の位置
と走行方向、銘柄の搬送量および銘柄成分の情報に基づ
いて積付け中のパイルの長手方向の成分分布を算出する
第1の手段と、該手段から得られるパイルの成分分布に
基づいてその成分分布が均一となるように今後積付ける
銘柄とその量を制御する第2の手段と、パイルの積付け
量および成分の実績値とリクレ−マ−の位置情報を下工
程に送る送信手段からなる配合原料の成分制御装置であ
る。DISCLOSURE OF THE INVENTION The present invention is intended to achieve the above-mentioned object, and is based on the information on the position and traveling direction of the stacking stacker, the transport amount of the brand and the component of the brand during stacking. Means for calculating the component distribution of the pile in the longitudinal direction, and second means for controlling the brand to be loaded and its amount in the future so that the component distribution becomes uniform based on the component distribution of the pile obtained from the means. And a means for transmitting the pile stacking amount, the actual value of the component and the position information of the reclaimer to the lower process, and the component control device for the blended raw material.
【0009】[0009]
【作用】計算機は、積付けスタッカ−の位置と走行方向
および搬送量をリアルタイムに収集し、既に入力された
積付け銘柄に関する情報(パイル積付け計画等)と照合
しながら予めパイル長手方向に分割した各ゾ−ン毎に積
付け量を積算し、搬送作業が完了する(換言すると、そ
のときの積付け銘柄の積付け作業が完了)毎に、各ゾ−
ンの総積付け量と平均成分を計算してファイルに格納す
る。この結果は任意にCRT画面に表示できる。計算機
は前記の演算結果(総積付け量と平均成分)と目標の積
付け量およびその平均成分とを比較して、各ゾ−ンの積
付け残量とその平均成分を計算し、CRT画面に表示し
てオペレ−タに知らせる。[Function] The computer collects the position of stacking stacker, the traveling direction, and the transport amount in real time, and divides it in the longitudinal direction of the pile in advance while collating it with the already input information about the stacking brand (pile stacking plan etc.). The loading amount is added up for each zone, and each zone is completed every time the transportation work is completed (in other words, the loading work for the loading brand at that time is completed).
Calculate the total stowage amount and the average component of the data and store it in the file. This result can be arbitrarily displayed on the CRT screen. The computer compares the above calculation results (total loading amount and average component) with the target loading amount and its average component, calculates the loading remaining amount of each zone and its average component, and displays the CRT screen. Is displayed on the screen to inform the operator.
【0010】パイルの積付けが完了すると、下工程でこ
のパイルを使用するときは、下工程の要求により、その
パイルの各ゾ−ンの積付け量とその平均成分を下工程に
伝送する。下工程では、これらの情報とそれまでの原料
使用実績から現在使用しているゾ−ンを計算し、それま
でに使用した原料の成分、配合アクション量および成品
成分の実績推移を参考にして使用原料に対する適切な配
合アクション量を知ることができる。When the stacking of piles is completed, when the piles are used in the lower process, the stacking amount of each zone of the pile and its average component are transmitted to the lower process according to the request of the lower process. In the lower process, the zone currently used is calculated from these information and the past record of raw material use, and it is used by referring to the actual transition of raw material components, blending action amounts and product components used up to that point. It is possible to know the appropriate compounding action amount for the raw material.
【0011】[0011]
【実施例】本発明の実施例を以下に詳細に説明する。図
1は本発明装置のブロック図である。原料ヤ−ド計算機
1は、スタッカ−6およびリクレ−マ−7の移動機械制
御装置3を介してスタッカ−6およびリクレ−マ−7の
位置および走行方向に関する情報、原料分析装置2から
各銘柄の成分に関する情報、サ−ジホッパ−の定量切出
し装置(Constant Feed Weigher CFWと略称されてい
る)8の制御装置4を介して定量切出し装置8から各銘
柄の切出し量(スタッカ−の積付け量)に関する情報お
よびベルトコンベヤ制御装置5を介してベルトコンベヤ
9のベルト速度等の情報を受信している。EXAMPLES Examples of the present invention will be described in detail below. FIG. 1 is a block diagram of the device of the present invention. The raw material yard computer 1 has information about the positions and traveling directions of the stacker 6 and the reclaimer 7 via the moving machine control device 3 of the stacker 6 and the reclaimer 7, and the brands from the raw material analyzer 2. Information on the components of the fixed quantity cutting device 8 (abbreviated as Constant Feed Weigher CFW) of the surge hopper 8 Information regarding the belt speed of the belt conveyor 9 and the like is received via the belt conveyor control device 5.
【0012】そして、原料ヤ−ド計算機1は、前記情報
から積付け中の長手方向の成分分布を算出する演算部と
長手方向の成分分布に基づいてその成分分布が均一とな
るように今後積み付ける銘柄とその積付け量を演算し、
制御する演算部を有している。Then, the raw material yard calculator 1 calculates the component distribution in the longitudinal direction during the loading from the above information and the component distribution in the longitudinal direction based on the component distribution in the longitudinal direction so that the component distribution will be uniform in the future. Calculate the brand to be attached and the amount to be loaded,
It has a computing unit for controlling.
【0013】また、計算機1は送信手段15を介して焼
結工場で使用するパイルの長手方向の各分割ゾ−ン毎の
積付け量とその成分の実績値およびリクレ−マ−7の位
置情報等を焼結工場計算機11に送信する。焼結工場計
算機11は、原料ヤ−ド計算機1からの前記情報に基づ
いて、配合原料中の石灰粉の配合%を演算し、石灰粉の
定量切出し装置の制御装置12を介して定量切出し装置
(CFW)14の切出し量を制御するようになってい
る。Further, the computer 1 sends the amount of loading for each divided zone in the longitudinal direction of the pile used in the sintering plant through the transmitting means 15, the actual value of the component and the position information of the reclaimer 7. Etc. to the sintering plant computer 11. The sintering plant computer 11 calculates the blending percentage of the lime powder in the blended raw material based on the information from the raw material yard computer 1, and the quantitative cutting device via the controller 12 of the lime powder quantitative cutting device. The amount of (CFW) 14 cut out is controlled.
【0014】また、焼結工場計算機11でファイルして
いる焼結鉱の成分や品質(成品分析装置13からの情報
に基づき焼結工場計算機11が演算)や配合情報を原料
ヤ−ド計算機1が受信して、CRT画面16に表示する
ことができる。Further, the raw material computer 1 calculates the composition and quality of the sintered ore (calculated by the computer 11 for the sintering plant based on the information from the product analysis device 13) and the compounding information stored in the computer 11 for the sintering plant. Can be received and displayed on the CRT screen 16.
【0015】次に原料ヤ−ド計算機1で実施される原料
ヤ−ド(ベッデイングヤ−ド)の積付け原料の成分制御
やヤ−ド移動機械の作業判断等について説明する。Next, a description will be given of the control of the components of the material to be loaded in the material yarn (bedded yard) performed by the material yard computer 1, the work determination of the yard moving machine, and the like.
【0016】1)積付け原料の成分制御 図5において、積付ける銘柄は粗鉱ヤ−ドからサイジン
グプラントを経由してサ−ジホッパ−31に運ばれ、C
FW8で切り出される。切り出された銘柄はベルトコン
ベヤ32、33を乗り継ぎスタッカ−6のブ−ムコンベ
ヤ34のヘッドからベッデイングヤ−ドに積み込まれパ
イル21となる。ベルトコンベヤのベルト速度およびス
タッカ−の移動速度は一定であるが、スタッカ−の位置
によって原料の搬送距離が異なる。1) Component control of stowage raw material In FIG. 5, the stowage brand is carried from the crude ore yard to the sarge hopper 31 through the sizing plant, and C
It is cut out with FW8. The cut-out brands are piled on the belt conveyors 32 and 33 from the head of the boom conveyor 34 of the transfer stacker 6 to the bed yard and become the pile 21. The belt speed of the belt conveyor and the moving speed of the stacker are constant, but the feed distance of the raw material differs depending on the position of the stacker.
【0017】従って、原料がCFW8で切り出されてパ
イル21に積み込まれる迄の時間が異なる。今、CFW
8の切出し量をAt/min 、CFW8からヤ−ドコンベヤ
33のテ−ルまでの距離をx1m、ヤ−ドコンベヤ33の
テ−ルからスタッカ−6までの距離をx、スタッカ−の
ブ−ムコンベヤ34の機長をx2m、ベルト速度をy1m/mi
n およびスタッカ−の移動速度(走行速度)をy2m/min
とし、積付け開始前にスタッカ−6の停止位置を2y2m
とし、(x1+x2+ 2y2)/y1=2分とすれば、時刻−2
分(2分前)に切り出された原料C1 は、時刻0分にパ
イルの始点より2y1mの位置に積付けられる。また、時刻
0分に切り出された原料c3は、時刻2分にパイルの始点
より4y1mの位置に積付けられる。図6はこの関係を示し
たものである。Therefore, the time until the raw material is cut out by the CFW 8 and loaded on the pile 21 is different. CFW now
The cutting amount of 8 is At / min, the distance from the CFW 8 to the tail of the yaw conveyor 33 is x 1 m, the distance from the tail of the yaw conveyor 33 to the stacker 6 is x, and the stacker is Mu conveyor 34 length x 2 m, belt speed y 1 m / mi
n and the stacker movement speed (travel speed) is y 2 m / min
The stacker 6 stop position is set to 2y 2 m before the start of stacking.
And (x 1 + x 2 + 2y 2 ) / y 1 = 2 minutes, time −2
The raw material C 1 cut into minutes (2 minutes before) is loaded at a position 2y 1 m from the starting point of the pile at time 0 minutes. Further, the raw material c 3 cut out at time 0 minutes is stacked at a position 4y 1 m from the starting point of the pile at time 2 minutes. FIG. 6 shows this relationship.
【0018】(1) 切出し量とスタッカ−の位置情報収集 スタッカ−6およびリクレ−マ−7の制御装置3からス
タッカ−およびリクレ−マ−の位置と走行方向に関する
情報が、CFW8の制御装置4から銘柄の切出し量に関
する情報が1分間隔でヤ−ド計算機1に送信される。(1) Gathering amount and stacker position information collection Information from the control device 3 of the stacker 6 and reclaimer 7 to the position and running direction of the stacker and reclaimer is transferred to the control device 4 of the CFW 8. The information about the cut-out amount of the brand is transmitted to the yad calculator 1 at 1-minute intervals.
【0019】(2) 作業状況判断 制御装置3からスタッカ−およびリクレ−マ−の位置と
走行方向に関する情報および制御装置4から銘柄の切出
し量に関する情報に基づいて計算機1は次のような判断
を行う。なおこの際、スタッカ−の移動速度は一定値y2
m/min とする。(2) Judgment of work status The computer 1 makes the following judgment based on the information about the positions and traveling directions of the stacker and the reclaimer from the control device 3 and the information about the cutting amount of the brand from the control device 4. To do. At this time, the moving speed of the stacker is a constant value y 2
m / min
【0020】a スタッカ−の位置に変化がなければ停
止中とする。 b スタッカ−の位置が前回よりy2m だけ変化していれ
ば作業中とする。なお、スタッカ−がパイルの端にある
ときは、その走行方向も判断する。 c スタッカ−がパイルの端に無く、且つ前回位置から
の変化がy2m より少ないときは、作業開始または作業終
了とする。If there is no change in the position of the stacker, it is considered to be stopped. b If the position of the stacker has changed by y 2 m from the previous time, it is considered as working. When the stacker is at the edge of the pile, the traveling direction of the stacker is also determined. c If the stacker is not on the edge of the pile and the change from the previous position is less than y 2 m, start or end the work.
【0021】 作業開始 前々回位置と前回位置が同じであれば作業開始とする。
そして、このときの作業開始時刻は、現在のデ−タ収集
時刻−|スタッカ−の今回位置−前回位置|/y2 とな
る。Work start If the two-previous position and the previous position are the same, the work is started.
Then, work start time of this time, the current de - data collection time - | stacker - of this position - the last position | becomes a / y 2.
【0022】 作業終了 前々回位置と前回位置が異なれば作業終了とする。そし
て、このときの作業終了時刻は、前回のデ−タ収集時刻
+|スタッカ−の今回位置−前回位置|/y2となる。When the position before the work is different from the position before the work is ended, the work is ended. Then, work end time of this time, the last of the de - data collection time + | stacker - of this position - the last position | becomes a / y 2.
【0023】図8は以上の判断作業のフロ−チャ−トを
示したものである。FIG. 8 shows a flow chart of the above judgment work.
【0024】(3) 切出し量と積付け位置および積付け量
の関係計算 作業状況判断の後に切出し量と積付け位置および積付け
量の関係計算を行う。図9において、CFWで切出され
た原料はある時間((x1+x2+ 2y2)/y1)遅れてスタ
ッカ−に到着し積付けられる。スタッカ−は走行してい
るので、積付け量Bt/min は、切出し量At/min に対
し、A×y1/(y1±y2)となる。ここに、+はパイルの
始点から遠ざかる場合、−は始点に近ずく場合である。
図は時刻t−nに秤量された切出し量At-n がZT(t-1)
〜ZTtの間に積付けられることを示している。ここで、
単位距離当たりの積付け量Bt は、Bt =At-n /|Z
T(t- 1)−ZTt|(ton/m) となる。ここにt−nは時刻
tのn分前を意味する。(3) Calculation of relation between cutting amount, stowage position and stowage amount After the work situation is determined, the relational calculation of the cutout amount, stowage position and stowage amount is performed. 9, cut raw material is time CFW ((x 1 + x 2 + 2y 2) / y 1) stacker late - attached product arrived. Since the stacker is running, the stacking amount Bt / min is A × y 1 / (y 1 ± y 2 ) with respect to the cutting amount At / min. Here, “+” indicates that the pile is moving away from the starting point, and “−” indicates that the pile is approaching the starting point.
Figure cut amount was weighed at time tn is A tn is Z T (t-1)
It is shown that they are stacked between Z Tt and Z Tt . here,
The loading amount B t per unit distance is B t = A tn / | Z
T (t- 1) -Z Tt | (ton / m). Here, t-n means n minutes before the time t.
【0025】例えば、パイルの長さ方向に1m単位にゾ
−ンを分割して管理するとすれば、この値がゾ−ンZ
T(t-1)−ZTtまでの積付け量Cjtとして定期的に加算さ
れる。For example, if the zone is divided and managed in units of 1 m in the length direction of the pile, this value is the zone Z.
It is periodically added as a stowage amount C jt up to T (t-1) -Z Tt .
【0026】すなわち、 Cjt=Cjt-1+Bt j=ZT(t-1)〜ZT t:今回、t−1:前回That is, C jt = C jt-1 + B t j = Z T (t-1) to Z T t: this time, t-1: previous time
【0027】(4) 総積付け量と成分計算 (3) の計算の後に総積付け量と成分計算をする。 一つの銘柄の積付けが終了したとき、各ゾ−ンでの積付
け量Cj と成分hをこれまでの各ゾ−ンでの総積付け量
Dj と平均成分Hj で加重平均し、その値を新たに総積
付け量と平均成分とする。(4) Total stowage amount and component calculation After the calculation of (3), the total stowage amount and component are calculated. When the loading of one brand is completed, the loading amount C j in each zone and the component h are weighted averaged by the total loading amount D j in each zone so far and the average component H j. , That value is newly used as the total stowed amount and the average component.
【0028】 Djt=Djt-1+Cjt Hjt={Djt-1×Hjt-1+Cjt×h}/Djt D jt = D jt-1 + C jt H jt = {D jt-1 × H jt-1 + C jt × h} / D jt
【0029】図10は今後の積付け銘柄と量に関する計
算のフロ−チャ−トを示すものである。以下にこれを説
明する。FIG. 10 shows a flow chart of the calculation regarding the brand and the quantity to be stowed in the future. This will be explained below.
【0030】(5) パイル積付け量と成分の計算 パイルの積付け量Dt と成分Ht は各ゾ−ンの積付け量
の総和と成分の加重平均として計算する。(5) Pile stowage amount and component calculation The pile stowage amount D t and the component H t are calculated as the sum of the stowage amount of each zone and the weighted average of the components.
【0031】[0031]
【数1】 [Equation 1]
【0032】(6) 積付け残量と成分の計算 パイルの配合計画で決まる目標積付け量D0 と目標成分
H0 、およびパイルの総積付け量Dt と平均成分を基に
今後の積付け量Dt ' と平均成分Ht ' を計算する。(6) Calculation of the remaining amount to be stowed and the components The future stowage amount is calculated based on the target stowage amount D 0 and the target component H 0 determined by the pile combination plan, and the total pile stowage amount D t and the average component. The weighting amount D t ' and the average component H t ' are calculated.
【0033】 Dt ' =D0 −Dt Ht ' ={D0 ×H0 −Dt ×Ht }/Dt D t ′ = D 0 −D t H t ′ = {D 0 × H 0 −D t × H t } / D t
【0034】この値をもとにパイル配合計画の調整を行
い、実際に積付ける銘柄と量を決定する。その後、各ゾ
−ンの積付け量と各ゾ−ンの成分のバラツキを減少させ
るために必要な各ゾ−ンの積付け量を計算し、スタッカ
−の走行速度をゾ−ン毎に変えることも可能である。Based on this value, the pile composition plan is adjusted to determine the brand and quantity to be actually loaded. After that, the stacking amount of each zone and the stacking amount of each zone required to reduce the variation in the components of each zone are calculated, and the traveling speed of the stacker is changed for each zone. It is also possible.
【0035】図11は下工程(焼結工場)での成品成分
制御のフロ−チャ−トで、以下にこれを説明する。FIG. 11 is a flowchart for controlling product components in the lower process (sintering plant), which will be described below.
【0036】(7) パイルの積付けが完了すると、各ゾ−
ンのパイル積付け量Djtとその成分Hjtが決まり、この
値が焼結工場の計算機に送信され成品制御計算が開始さ
れる。リクレ−マ−の位置はパイルの切出し量をもとに
計算できるが、別にヤ−ド計算機1が常時リクレ−マ−
の位置を収集しているので、この位置をもとに計算され
る。(7) After the piles are loaded, each zone
Pile pile amount D jt and its component H jt are determined, and this value is sent to the computer of the sintering plant to start the product control calculation. The position of the reclaimer can be calculated based on the amount of pile cut-out, but the separate recalculator is always used by the yaw computer 1.
Since the position of is collected, it is calculated based on this position.
【0037】(8) 制御量の計算 パイルの成分分布、焼結工場の石灰粉の配合量制御の実
績、および焼結鉱の品位実績をもとに時間遅れを加味し
て今後の制御量が計算される。この結果は石灰粉配合槽
のCFWの制御装置に送信され、石灰粉の配合制御に繋
げられる。(8) Calculation of controlled variable Based on the distribution of pile components, the actual amount of lime powder in the sintering plant, and the quality of the sintered ore, the future controlled variable will be calculated based on the time delay. Calculated. This result is transmitted to the CFW control device of the lime powder blending tank and linked to the lime powder blending control.
【0038】[0038]
【数2】 [Equation 2]
【0039】図12は積付け途中のパイル長さ方向の積
付け量とSiO2 %の分布を画面表示させた例を、図1
3はパイルの総積付け量とSiO2 の平均%の日間推移
を画面表示させた例を示したものである。FIG. 12 shows an example in which the stacking amount and the distribution of SiO 2 % in the pile length direction during stacking are displayed on the screen.
3 shows an example in which the total piled amount and the daily change of the average% of SiO 2 are displayed on the screen.
【0040】以上、焼結原料のパイルについて説明した
が、石炭等の配合パイルについても適用できることは言
うまでもない。Although the pile of the sintering raw material has been described above, it goes without saying that the pile of coal and the like can also be applied.
【0041】[0041]
【発明の効果】本発明は以上のように構成されているか
ら次のような効果が得られる。Since the present invention is constructed as described above, the following effects can be obtained.
【0042】(1) パイルの長さ方向の成分管理が容易に
できる。(1) It is possible to easily manage the components in the pile length direction.
【0043】(2) パイルの積付け時の情報(ゾ−ン別の
成分分布等)を下工程に送信するようにしたから、下工
程の配合制御および成品の品質管理を精度良く行うこと
ができる。(2) Since the pile stacking information (component distribution for each zone, etc.) is transmitted to the lower process, it is possible to accurately control the composition of the lower process and the quality control of the product. it can.
【0044】(3) パイルの途中で荷切れしてもパイル長
手方向の成分分布を均一になるよう調整することができ
る。(3) It is possible to adjust the component distribution in the longitudinal direction of the pile to be uniform even if the load is exhausted in the middle of the pile.
【0045】(4) (3) により銘柄の積付け量(CFWで
の切出し量)を比較的多くすることができるので、搬送
効率が向上し電力費の節減になる。また、積付け時間の
短縮ができ、作業負荷の軽減に繋がる。(4) By (3), it is possible to relatively increase the stocking amount of the brand (amount cut out by CFW), so that the transportation efficiency is improved and the electric power cost is reduced. Moreover, the loading time can be shortened, which leads to a reduction of the work load.
【図1】本発明装置のブロック図である。FIG. 1 is a block diagram of a device of the present invention.
【図2】パイルの断面形状を示す図である。FIG. 2 is a diagram showing a cross-sectional shape of a pile.
【図3】パイルの側面形状を示す図である。FIG. 3 is a view showing a side surface shape of a pile.
【図4】パイル、リクレ−マ−、およびスタッカ−の関
係を示す図である。FIG. 4 is a diagram showing a relationship between a pile, a reclaimer, and a stacker.
【図5】CFWとスタッカ−の積付け位置の関係を示す
図である。FIG. 5 is a diagram showing a relationship between stacking positions of a CFW and a stacker.
【図6】CFWで切出した銘柄の積付け位置、切出し時
刻と積付け時刻の関係を表した線図である。FIG. 6 is a diagram showing a stacking position of a brand cut out by CFW, a relationship between a cutting out time and a stacking time.
【図7】総積付け量と平均成分の計算フロ−チャ−トで
ある。FIG. 7 is a calculation flowchart of a total stowage amount and an average component.
【図8】スタッカ−の作業開始、作業中等を判断する判
断作業のフロ−チャ−トである。FIG. 8 is a flowchart of a judgment work for judging the start of work of the stacker, work in progress, and the like.
【図9】ある時間範囲に切出された銘柄の積付け位置を
説明する線図である。FIG. 9 is a diagram illustrating a stacking position of a brand cut out in a certain time range.
【図10】次に積付ける銘柄と積付け量および各ゾ−ン
でのスタッカ−の走行速度の計算フロ−チャ−トであ
る。FIG. 10 is a calculation flowchart of a brand to be loaded next, a loading amount, and a traveling speed of the stacker in each zone.
【図11】下工程での配合制御のフロ−チャ−トであ
る。FIG. 11 is a flowchart of compounding control in the lower step.
【図12】積付け途中のパイル長さ方向の積付け量とS
iO2 の平均%を画面表示させた例を示す図である。FIG. 12: Sucking amount and S in the pile length direction during stacking
Average% of iO 2 is a diagram showing an example in which the screen display.
【図13】パイルの総積付け量とSiO2 の平均%の日
間推移を画面表示させた例を示す図である。FIG. 13 is a diagram showing an example in which the daily change of the total piled amount of piles and the average% of SiO 2 is displayed on the screen.
1 原料ヤ−ド計算機 2 原料分析装置 3 移動機械制御装置 4 CFW制御装置 5 ベルトコンベヤ制御装置 6 スタッカ− 7 リクレ−マ− 8 定量切出し装置(CFW) 9 ベルトコンベヤ 11 焼結工場計算機 12 CFW制御装置 1 Raw Material Yard Calculator 2 Raw Material Analyzing Device 3 Mobile Machine Control Device 4 CFW Control Device 5 Belt Conveyor Control Device 6 Stacker 7 Reclaimer 8 Quantitative Cutting Device (CFW) 9 Belt Conveyor 11 Sintering Plant Computer 12 CFW Control apparatus
───────────────────────────────────────────────────── フロントページの続き (72)発明者 菊地 和弘 東京都千代田区丸の内一丁目1番2号 日 本鋼管株式会社内 審査官 砂川 克 (56)参考文献 特公 昭62−15617(JP,B2) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Kazuhiro Kikuchi 1-2-1, Marunouchi, Chiyoda-ku, Tokyo Katsuko Sunagawa, Examiner, Nihon Kokan Co., Ltd. (56) References JP 62-15617 )
Claims (1)
柄の搬送量および銘柄成分の情報に基づいて積付け中の
パイルの長手方向の成分分布を算出する第1の手段と、
該手段から得られるパイルの成分分布に基づいてその成
分分布が均一となるように今後積付ける銘柄とその量を
制御する第2の手段と、パイルの積付け量および成分の
実績値とリクレ−マ−の位置情報を下工程に送る送信手
段からなる配合原料の成分制御装置。1. A first means for calculating a component distribution in a longitudinal direction of a pile being stowed on the basis of information on a position and a traveling direction of a stacking stacker, a transport amount of a brand, and a brand component.
Second means for controlling the brand and the amount to be loaded in the future so that the component distribution becomes uniform based on the component distribution of the pile obtained from the means, the pile loading amount and the actual value of the component, and the recovery. A component control device for blended raw materials, comprising a transmitting means for transmitting the position information of the marker to the lower process.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP40948890A JPH07100543B2 (en) | 1990-12-28 | 1990-12-28 | Component control device for blended raw materials |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP40948890A JPH07100543B2 (en) | 1990-12-28 | 1990-12-28 | Component control device for blended raw materials |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH04251034A JPH04251034A (en) | 1992-09-07 |
| JPH07100543B2 true JPH07100543B2 (en) | 1995-11-01 |
Family
ID=18518818
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP40948890A Expired - Fee Related JPH07100543B2 (en) | 1990-12-28 | 1990-12-28 | Component control device for blended raw materials |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH07100543B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20100054336A (en) * | 2008-11-14 | 2010-05-25 | 주식회사 포스코 | Method for filing blending ore |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115323167B (en) * | 2022-08-12 | 2024-02-20 | 江苏沙钢钢铁有限公司 | A method for adjusting the proportion of solid fuel in the sintering process |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6215617B2 (en) | 2013-08-14 | 2017-10-18 | 有限会社牛方商会 | Optical system device, LED module |
-
1990
- 1990-12-28 JP JP40948890A patent/JPH07100543B2/en not_active Expired - Fee Related
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6215617B2 (en) | 2013-08-14 | 2017-10-18 | 有限会社牛方商会 | Optical system device, LED module |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20100054336A (en) * | 2008-11-14 | 2010-05-25 | 주식회사 포스코 | Method for filing blending ore |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH04251034A (en) | 1992-09-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113291844B (en) | Unloading control method of fixed-point unloading trolley | |
| CN106125554B (en) | A method for automatic adjustment of feeding operation delay in continuous batching silo | |
| EP4077175A1 (en) | Energy-efficient control of a device for continuously conveying material | |
| JPH07100543B2 (en) | Component control device for blended raw materials | |
| CN109321698B (en) | Batching method capable of effectively improving mixing and stacking efficiency | |
| CN117383283B (en) | A method for using a railway container bulk loading system | |
| CN116987881B (en) | Method for improving distribution uniformity of pellet reciprocating distribution trolley | |
| JP4092102B2 (en) | Automatic withdrawal method of initial mountain by reclaimer | |
| JP4445402B2 (en) | Yard stacking method for sintered raw materials | |
| CN210884305U (en) | Storage yard distributing system | |
| DE4222331C2 (en) | Method and device for regulating the horizontal mass distribution of bulk material | |
| JP2626202B2 (en) | Optimal transfer control device for raw material yard | |
| JPH01271327A (en) | Quality regulating method in shipment of stratified material stacked on material yard bed | |
| CN219525633U (en) | Mixing material field | |
| JP2011208214A (en) | Stacking method of ore bedding | |
| CN120829069A (en) | Reclaiming control method, control system and storage medium of bridge-type scraper reclaimer | |
| JPH0815948B2 (en) | Loading method for multi-brand sintering raw material powder ore | |
| UA160957U (en) | METHOD OF AVERAGING COMPONENTS OF AGGLOMERATION BATCH | |
| CN118025840A (en) | Control method and system for stacking and retrieving materials | |
| DE4222329C2 (en) | Method and device for regulating the vertical mass distribution of bulk material | |
| DD226032A1 (en) | METHOD FOR PROMOTING AND COMPARING THE MACHINE | |
| CN115520680A (en) | Precise stacking and taking method based on unmanned material machine | |
| JPS58148127A (en) | Stowage method for raw material in raw-material yard | |
| CN117719897A (en) | A fully automatic material retrieval control method for C-shaped material yard | |
| CN2679614Y (en) | Additional stock guider of bucket wheel machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |