JPH07103552B2 - Joint between improved ground and Yamadome wall and its construction method - Google Patents
Joint between improved ground and Yamadome wall and its construction methodInfo
- Publication number
- JPH07103552B2 JPH07103552B2 JP20606892A JP20606892A JPH07103552B2 JP H07103552 B2 JPH07103552 B2 JP H07103552B2 JP 20606892 A JP20606892 A JP 20606892A JP 20606892 A JP20606892 A JP 20606892A JP H07103552 B2 JPH07103552 B2 JP H07103552B2
- Authority
- JP
- Japan
- Prior art keywords
- retaining wall
- ground
- improved ground
- soil cement
- improved
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims description 12
- 239000002689 soil Substances 0.000 claims description 27
- 239000004568 cement Substances 0.000 claims description 24
- 238000000034 method Methods 0.000 claims description 8
- 239000011435 rock Substances 0.000 claims description 4
- 239000000463 material Substances 0.000 description 7
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000009835 boiling Methods 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000003756 stirring Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 239000008267 milk Substances 0.000 description 2
- 210000004080 milk Anatomy 0.000 description 2
- 235000013336 milk Nutrition 0.000 description 2
- 229910000278 bentonite Inorganic materials 0.000 description 1
- 239000000440 bentonite Substances 0.000 description 1
- SVPXDRXYRYOSEX-UHFFFAOYSA-N bentoquatam Chemical compound O.O=[Si]=O.O=[Al]O[Al]=O SVPXDRXYRYOSEX-UHFFFAOYSA-N 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000004898 kneading Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、建築物の地下室部分や
独立した地下構造物を施工するのに適する改良地盤と山
留壁の接合部およびその施工法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a joint between an improved ground and a mountain retaining wall suitable for constructing a basement portion of a building or an independent underground structure, and a construction method thereof.
【0002】[0002]
【従来の技術】従来、根切りを行う部分に対して、山留
め壁を施工することや地盤改良を施すことは行われてい
る。しかし、図7に示すように地盤改良1を施した部分
は硬質地盤となるので、根切りに備えて山留め壁2を造
成するにはこの地盤改良1から少し離れた位置に鋼矢板
を打設したりしている。また、この反対の施工手順でも
同様な状態となり、山留め壁2はこれが所定深度まで到
達すれば、山留めの目的が達成されるので、地盤改良1
との関係を考慮する必要はなかった。2. Description of the Related Art Conventionally, it has been practiced to construct a mountain retaining wall or to improve the ground for a portion to be root-cut. However, as shown in FIG. 7, the portion where the ground improvement 1 is applied becomes a hard ground, so in order to prepare the mountain retaining wall 2 in preparation for root cutting, a steel sheet pile is placed at a position slightly away from the ground improvement 1. I am doing it. In addition, the reverse construction procedure also brings about a similar state, and if the earth retaining wall 2 reaches the predetermined depth, the purpose of the earth retaining wall is achieved.
It was not necessary to consider the relationship with.
【0003】[0003]
【発明が解決しようとする課題】このように地盤改良1
の部分と山留め壁2との間に未改良地盤での間隔3があ
ると、この部分でボイリングやヒービング等、もしくは
山留壁の変位を生じる原因となり、また、地盤改良1の
改良地盤を盛替梁の代わりとして使用する場合にも対処
できないことになる。As described above, the ground improvement 1
If there is a gap 3 on the unimproved ground between the part of the ground and the retaining wall 2, it will cause boiling, heaving, etc., or displacement of the retaining wall at this part. Even if it is used as a substitute for a replacement beam, it cannot be dealt with.
【0004】かかる事態に対応するため、前記間隔3に
グラウトを施して地盤改良1の部分と山留め壁2との一
体性を図ったり、山留め壁2にアースアンカー等を施し
たりすることが考えられるが、工程がその分だけ増加
し、面倒な作業が要求され、工費も高騰する。また、信
頼性に問題が残る。In order to deal with such a situation, it is conceivable to grout the space 3 so as to make the ground improvement 1 and the earth retaining wall 2 integral with each other, or to provide the earth retaining wall 2 with an earth anchor or the like. However, the number of processes increases by that amount, laborious work is required, and the construction cost rises. Also, reliability remains a problem.
【0005】本発明の目的は前記従来例の不都合を解消
し、ボイリングやヒービング等を生じるおそれがなく、
また、改良地盤を盛替梁の代わりとして使用する場合で
も支障をきたすことがなく、信頼性に富む改良地盤と山
留壁の接合部およびその施工法を提供することにある。The object of the present invention is to eliminate the disadvantages of the above-mentioned conventional examples and to eliminate the risk of boiling, heaving, etc.
Another object of the present invention is to provide a highly reliable joint between an improved ground and a mountain retaining wall and a construction method thereof, which does not cause any trouble even when the improved ground is used as a substitute beam for replacement.
【0006】[0006]
【課題を解決するための手段】本発明は前記目的を達成
するため、深層混合により改良した改良地盤エリアの端
部で、このエリア内にソイルセメント山留め壁を該改良
地盤とすきま無く施工したこと、および、深層混合地盤
改良を、ソイルセメント山留め壁の施工予定部分まで行
い、このソイルセメント山留め壁の施工予定部分をロッ
クオーガーで先行掘削し、該掘削部分に多軸オーガー等
でソイルセメント山留め壁を施工することを要旨とする
ものである。[Means for Solving the Problems] In order to achieve the above object, the present invention is to construct a soil cement pile retaining wall at the end of an improved ground area improved by deep mixing without any gap between the improved ground and the improved ground. , And deep mixed ground improvement is performed up to the planned construction part of the soil cement retaining wall, and the planned construction part of this soil cement retaining wall is pre-excavated with a rock auger, and the excavated portion is soil cement retaining wall with a multi-axis auger etc The main point is to construct the.
【0007】[0007]
【作用】本発明によれば、深層混合により改良した地盤
エリアとソイルセメント山留め壁との間には隙間がなく
完全に接合しているので、ボイリングやヒービングを生
じることはない。また、深層混合により改良した地盤と
ソイルセメント山留め壁面とは馴染みがよく、高い止水
性が得られる。According to the present invention, since there is no gap between the soil area improved by deep mixing and the soil cement pile retaining wall, there is no voiding or heaving. Further, the ground improved by deep mixing and the soil cement pile retaining wall surface are well compatible with each other, and high water stopping performance can be obtained.
【0008】[0008]
【実施例】以下、図面について本発明の実施例を詳細に
説明する。図1は本発明の改良地盤の1実施例を示す平
面図、図2は同上根切り後の側面図である。Embodiments of the present invention will now be described in detail with reference to the drawings. FIG. 1 is a plan view showing an embodiment of the improved ground of the present invention, and FIG. 2 is a side view of the same as above, after root cutting.
【0009】図中4は前記従来例とおなじく粘性地盤を
改良した改良地盤であるが、この改良地盤4は、強力な
攪拌能力を有する攪拌翼を使用し、粘性土層に現位置で
モルタル、セメントミルクなどの処理材を混練し、粘性
土と処理剤との化学的固結作用を利用して処理を行う深
層混合処理工法で改良したものである。Reference numeral 4 in the figure is an improved ground which is an improvement of the viscous ground similar to the above-mentioned conventional example. The improved ground 4 uses a stirring blade having a strong stirring ability, and the mortar at the present position in the viscous soil layer, This is an improvement by the deep-layer mixing method in which a treatment material such as cement milk is kneaded and the treatment is performed by utilizing the chemical consolidation action of the cohesive soil and the treatment agent.
【0010】深層混合処理工法には種々の工法がある
が、図4にその一例を示すと、深層混合処理機5を使用
して、この深層混合処理機5で硬化材プラント7からの
硬化材6を地盤に混合、攪拌しながら改良した柱状体8
を地盤中に造成していく。この柱状体8は間隔を存して
施工し、後でこの間隔部分にさらに同様の柱状体8をラ
ップさせて施工する。There are various methods for the deep layer mixing treatment method. As an example thereof is shown in FIG. 4, a deep layer mixing treatment machine 5 is used, and the hardening material from the hardening material plant 7 is used in this deep layer mixing treatment machine 5. Columnar body 8 improved by mixing 6 with the ground and stirring
Will be created in the ground. The columnar bodies 8 are constructed at intervals, and later, the columnar bodies 8 are constructed by further wrapping the columnar bodies 8 in a similar manner.
【0011】そして、前記深層混合により改良した改良
地盤4はその端部が後述のソイルセメント山留め壁9の
施工予定部分まで行うものとする。The improved ground 4 improved by the deep layer mixing has an end portion up to a planned construction portion of a soil cement pile retaining wall 9 described later.
【0012】次いで、この改良地盤4内で前記このソイ
ルセメント山留め壁9の施工予定部分を掘削刃付きの掘
削ケーシングとこの掘削ケーシング内部のオーガ掘削機
との組合せで、掘削ケーシングで地盤をコア状に縁切り
し、その内部をオーガ掘削機で切削するというロックオ
ーガーで先行掘削する。また、場合によってはケーシン
グなしのオーガ掘削機で先行掘削してもよい。 Next, in the improved ground 4, a portion of the soil cement pile retaining wall 9 to be constructed is combined with an excavating casing having an excavating blade and an auger excavator inside the excavating casing to form a core of the soil in the excavating casing. The rock auger is used to excavate the inside of the machine and cut the inside with an auger excavator. Also, in some cases
Pre-drilling may be performed with an auger excavator that is not equipped with a plug.
【0013】このようにロックオーガーもしくはケーシ
ングなしのオーガ掘削機で先行掘削した部分は、図3に
示すように孔が柱列した状態で柔らかくなる。なお、こ
の孔は改良地盤4の強度により、1本置きに削孔したも
のや、連続的に削孔したものなど適宜に選択できる。In this way, a rock auger or a case
The portion previously excavated by the auger excavator without a ring becomes soft in a state in which holes are lined up as shown in FIG. It should be noted that this hole can be appropriately selected depending on the strength of the improved ground 4, such as holes drilled every other hole or holes drilled continuously.
【0014】そして、この柔らかい掘削部分10に図5、
図6に示すような多軸オーガー11等でソイルセメント山
留め壁9を施工する。このソイルセメント山留め壁9の
施工はいわゆるソイルセメント連続壁工法で行い、柔ら
かい掘削部分10を多軸オーガー11で柱列状に削孔して、
混練軸先端よりセメントミルク、ベントナイト等の混合
液を吐出させて地盤中において原位置土と混合してソイ
ルセメントによる柱状体を連続して造成する。Then, in this soft excavation portion 10, FIG.
The soil cement mountain retaining wall 9 is constructed with a multi-axis auger 11 as shown in FIG. This soil cement pile retaining wall 9 is constructed by the so-called soil cement continuous wall construction method, and the soft excavated portion 10 is drilled in a column shape with a multi-axis auger 11,
A mixture of cement milk, bentonite, etc. is discharged from the tip of the kneading shaft and mixed with in-situ soil in the ground to continuously form pillars made of soil cement.
【0015】このソイルセメントが完全に硬化する前
に、応力負担材としてのH型鋼12を適宜間隔で配置す
る。Before the soil cement is completely hardened, H-shaped steel 12 as a stress bearing material is arranged at appropriate intervals.
【0016】このようにして、深層混合により改良した
改良地盤4のエリアとソイルセメント山留め壁2とは、
間に隙間がなく完全に接合した状態とすることができ、
図2に示すように、改良地盤4を根切りし、切梁等を掛
け渡しても、改良地盤4の孔面とソイルセメント山留め
壁9の面とは同等の材質で馴染みがよく、止水性も高い
ものとなる。In this way, the area of the improved ground 4 improved by deep mixing and the soil cement pile retaining wall 2 are
There is no gap between them and it can be completely joined,
As shown in FIG. 2, even when the improved ground 4 is root-cut and spanned with beams and the like, the hole surface of the improved ground 4 and the surface of the soil cement pile retaining wall 9 are made of the same material and are well-known to each other Will also be expensive.
【0017】[0017]
【発明の効果】以上述べたように本発明の改良地盤と山
留壁の接合部およびその施工法は、改良した地盤エリア
と山留め壁との間には隙間がなく完全に接合しているの
で、ボイリングやヒービング等を生じるおそれがなく、
また、改良地盤を盛替梁の代わりとして使用する場合で
も支障をきたすことがない信頼性に富むものである。As described above, in the joint between the improved ground and the mountain retaining wall of the present invention and the construction method thereof, there is no gap between the improved ground area and the mountain retaining wall, and the joint is complete. , There is no risk of boiling or heaving,
In addition, even when the improved ground is used as a substitute beam, it does not cause any trouble and is highly reliable.
【図1】本発明の改良地盤と山留壁の接合部の1実施例
を示す平面図である。FIG. 1 is a plan view showing an embodiment of a joint between an improved ground and a mountain retaining wall according to the present invention.
【図2】本発明の改良地盤と山留壁の接合部の1実施例
を示す根切り後の側面図である。FIG. 2 is a side view after root cutting showing one embodiment of the joint between the improved ground and the mountain retaining wall of the present invention.
【図3】本発明の改良地盤と山留壁の接合部の施工法の
1実施例を示す途中の工程の平面図である。FIG. 3 is a plan view of a process in the middle showing an embodiment of a method of constructing the joint between the improved ground and the mountain retaining wall of the present invention.
【図4】深層混合処理工法を示す側面図である。FIG. 4 is a side view showing a deep layer mixing processing method.
【図5】ソイルセメント山留め壁を施工する多軸オーガ
ーの要部の正面図である。FIG. 5 is a front view of a main part of a multi-axis auger for constructing a soil cement retaining wall.
【図6】ソイルセメント山留め壁を施工する多軸オーガ
ーの全体の側面図である。FIG. 6 is an overall side view of a multi-axis auger for constructing a soil cement retaining wall.
【図7】従来例を示す平面図である。FIG. 7 is a plan view showing a conventional example.
1…地盤改良 2…山留め壁 3…間隔 4…改良地盤 5…深層混合処理機 6…硬化材 7…硬化材プラント 8…柱状体 9…ソイルセメント山留め壁 10…掘削部分 11…多軸オーガー 12…H型鋼 1 ... Ground improvement 2 ... Mountain retaining wall 3 ... Spacing 4 ... Improved ground 5 ... Deep mixing processor 6 ... Hardening material 7 ... Hardening material plant 8 ... Columnar body 9 ... Soil cement earth retaining wall 10 ... Excavation part 11 ... Multi-axis auger 12 … H-shaped steel
Claims (2)
の端部で、このエリア内にソイルセメント山留め壁を該
改良地盤とすきま無く施工したことを特徴とする改良地
盤と山留壁の接合部。1. A joint between an improved ground and a mountain retaining wall, characterized in that at the end of the improved ground area improved by deep mixing, a soil cement mountain retaining wall is constructed in this area without any clearance with the improved ground.
留め壁の施工予定部分まで行い、このソイルセメント山
留め壁の施工予定部分をロックオーガーで先行掘削し、
該掘削部分に多軸オーガー等でソイルセメント山留め壁
を施工することを特徴とした改良地盤と山留壁の接合部
の施工法。2. The deep-mixed ground improvement is performed up to the construction planned portion of the soil cement earth retaining wall, and the construction planned portion of the soil cement earth retaining wall is previously excavated by a rock auger,
A method for constructing a joint between an improved ground and a mountain retaining wall, which comprises constructing a soil cement mountain retaining wall with a multi-axis auger or the like at the excavated portion.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP20606892A JPH07103552B2 (en) | 1992-07-08 | 1992-07-08 | Joint between improved ground and Yamadome wall and its construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP20606892A JPH07103552B2 (en) | 1992-07-08 | 1992-07-08 | Joint between improved ground and Yamadome wall and its construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0657739A JPH0657739A (en) | 1994-03-01 |
| JPH07103552B2 true JPH07103552B2 (en) | 1995-11-08 |
Family
ID=16517311
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP20606892A Expired - Fee Related JPH07103552B2 (en) | 1992-07-08 | 1992-07-08 | Joint between improved ground and Yamadome wall and its construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH07103552B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4313070B2 (en) * | 2002-03-29 | 2009-08-12 | 太平洋セメント株式会社 | Sludge treatment method in ready-made pile construction and ground reinforcement structure obtained by the treatment method |
-
1992
- 1992-07-08 JP JP20606892A patent/JPH07103552B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0657739A (en) | 1994-03-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20020071725A1 (en) | Earth support and permanent structural foundation wall | |
| JPH08311864A (en) | Earth retaining wall and construction method | |
| JP7509679B2 (en) | Structure and method for preventing subsidence of adjacent buildings | |
| JPH0953237A (en) | How to build a pit and a basement using it | |
| JPH0542524B2 (en) | ||
| JP3306527B2 (en) | Open cut method of soft ground by deep mixing method | |
| JPH07103552B2 (en) | Joint between improved ground and Yamadome wall and its construction method | |
| JPH10131175A (en) | Earth retaining wall and construction method thereof | |
| JP3072403B2 (en) | Buttress type retaining digging method | |
| JPS6325130B2 (en) | ||
| JPH0485413A (en) | Earth retaining method | |
| JPS6018769B2 (en) | Construction method of underground structure | |
| JPH07197450A (en) | Earth retaining wall in soft ground and soil improvement method by use thereof | |
| JPH0626042A (en) | Process of rotationally driving h-shape steel bar and h-shape steel bar used therefor | |
| JP3012896B2 (en) | Reverse cutting method combined with advance cutting | |
| JP2007046343A (en) | Method for preventing liquefaction of direct foundation board of existing building | |
| JPH062329A (en) | Shoring and cut-off method by underground continuous wall | |
| JP2573113B2 (en) | Large diameter hard ground improvement device | |
| JP2675858B2 (en) | Vertical shaft excavation method | |
| JP2659612B2 (en) | Column type continuous underground wall construction method | |
| JP2005207144A (en) | Continuous wall forming method | |
| JPH0259889B2 (en) | ||
| JPH04336117A (en) | Landslide protection stabilizing construction method | |
| JPH0734449A (en) | Independent mountain retaining wall method | |
| JPH0860650A (en) | Excavation method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |