Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH07107330B2 - Construction method of steel reinforced concrete columns - Google Patents
[go: Go Back, main page]

JPH07107330B2 - Construction method of steel reinforced concrete columns - Google Patents

Construction method of steel reinforced concrete columns

Info

Publication number
JPH07107330B2
JPH07107330B2 JP25706789A JP25706789A JPH07107330B2 JP H07107330 B2 JPH07107330 B2 JP H07107330B2 JP 25706789 A JP25706789 A JP 25706789A JP 25706789 A JP25706789 A JP 25706789A JP H07107330 B2 JPH07107330 B2 JP H07107330B2
Authority
JP
Japan
Prior art keywords
tube
steel
column
reinforced concrete
band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP25706789A
Other languages
Japanese (ja)
Other versions
JPH03119258A (en
Inventor
正明 菊地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP25706789A priority Critical patent/JPH07107330B2/en
Publication of JPH03119258A publication Critical patent/JPH03119258A/en
Publication of JPH07107330B2 publication Critical patent/JPH07107330B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は鉄骨鉄筋コンクリート柱の施工法に係るもので
ある。
DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a method for constructing a steel-framed reinforced concrete column.

(従来の技術) 従来この種の施工においては、柱鉄骨の建方、柱鉄筋の
配筋完了後、柱外郭にベニヤ合板等よりなる堰板と、棧
木、端太材、型枠締付金具等によって柱型枠を組立て
て、コンクリートを打設していた。
(Prior art) Conventionally, in this type of construction, after the construction of the pillar steel frame and the reinforcement of the pillar rebar have been completed, a dam plate made of veneer plywood, etc., on the outer shell of the pillar, and a cauldron, timber, mold clamping The pillar formwork was assembled with metal fittings and the concrete was placed.

(発明が解決しようとする課題) 前記柱型枠は専門職の型枠大工によって組立てられてい
たが近年、型枠大工が激減し、これがコストアツプと工
期遅延の一つの大きな要素となっている。
(Problems to be Solved by the Invention) The column formwork was assembled by a professional formwork carpenter, but in recent years, the number of formwork carpenters has drastically decreased, which is one of the major factors of cost up and construction period delay.

本発明はこのような実情に鑑みて提案されたもので、専
門職でなくても容易に型枠が組立てられ、工費が節減さ
れ、工期の遅延が防止される鉄骨鉄筋コンクリート柱の
施工法を提供する点にある。
The present invention has been proposed in view of such circumstances, and provides a method for constructing a steel-framed reinforced concrete column in which the mold can be easily assembled even by a non-professional person, the construction cost is reduced, and the construction period is prevented from being delayed. There is a point to do.

(課題を解決するための手段) 前記の目的を達成するため、本発明に係る鉄骨鉄筋コン
クリート柱の施工法は、鉄骨鉄筋コンクリート柱におけ
る柱鉄骨の建方及び柱鉄筋の配筋完了後、柱外郭部に高
さ方向に亘って所定間隔毎に帯枠を配置し、次いで同各
帯枠外周に、気密性を有する可撓性チユーブフオームを
囲繞して着脱自在に取付け、同チユーブフオームに空気
を圧入して型枠を成型したのち、前記チユーブフオーム
内にコンクリートを打設するように構成されている。
(Means for Solving the Problem) In order to achieve the above-mentioned object, a construction method of a steel-framed reinforced concrete column according to the present invention is a method of constructing a column steel frame in a steel-framed reinforced concrete column A band frame is arranged at predetermined intervals in the height direction, and then a flexible tube foam having airtightness is attached to the outer circumference of each band frame so as to be detachably attached, and air is press-fitted into the tube foam. Then, the mold is molded, and then concrete is placed in the tube foam.

前記鉄骨鉄筋コンクリート柱の施工法に使用されるチユ
ーブフオームは、シート基板にかまぼこ型の弾性袋体を
縦横に配設し、相隣る同袋体間に流通管が接続するとと
もに、同袋体に圧縮空気供給弁が配設して構成されると
よい。
Chubufoam used in the construction method of the steel-framed reinforced concrete column, the kamaboko type elastic bag body is arranged vertically and horizontally on the sheet substrate, and the distribution pipe is connected between the adjacent bag bodies, and in the same bag body. A compressed air supply valve may be provided and configured.

また本発明において、前記鉄骨柱外郭部に取付けられた
帯枠に、可撓性チユーブフオームを取付ける際、左右一
双のチユーブフオームで抱着し、同各チユーブフオーム
の対向端に設けた舌片間をフアスナーで接合して、セメ
ントペーストの廻り込みを防止するものである。
Further, in the present invention, when the flexible tube form is attached to the band frame attached to the outer portion of the steel column, the tube pieces are attached to the tube frame between the tongue pieces provided at opposite ends of the tube pieces. Is bonded with fasteners to prevent the cement paste from wrapping around.

(作用) 本発明によれば前記したように、柱鉄骨の建方及び柱鉄
筋の配筋完了後、柱外郭部に高さ方向に亘って所定間隔
毎に配置した帯枠を型枠支持部材として、同帯枠に可撓
性チユーブフオームを囲繞して着脱自在に取付け、同チ
ユーブフオームに圧縮空気を圧入することによって膨脹
せしめて型枠を成型し、かくして前記チユーブフオーム
によって構成された柱型枠内に柱コンクリートを打設す
るものである。
(Operation) According to the present invention, as described above, after the erection of the column steel frame and the reinforcement of the column reinforcing bars are completed, the band supporting frames arranged at predetermined intervals in the height direction in the column outer peripheral portion are formed into the form supporting member. As a flexible type, the flexible tube surrounds the strip frame and is detachably attached to the tube frame. The tube frame is expanded by pressurizing compressed air into the tube frame to form a mold, thus forming a columnar shape formed by the tube foam. The pillar concrete is placed in the frame.

而して打設コンクリートの硬化後、前記チユーブフオー
ムの空気を抜いて前記帯枠より取外し、脱型するもので
ある。
Thus, after the cast concrete is hardened, the air in the tube form is evacuated, removed from the strip frame, and demolded.

(実施例) 以下本発明を図示の実施例について説明する。(Examples) The present invention will be described below with reference to illustrated examples.

柱鉄骨(1)の建方、柱鉄筋(2)の配筋完了後、柱外
郭部に高さ方向に亘って所定間隔毎に帯枠(3)を配設
し、帯枠支持材(4)及び帯枠支持斜材(5)を介して
柱鉄骨(1)に取付ける。
After the erection of the pillar steel frame (1) and the reinforcement of the pillar reinforcing bars (2) are completed, the band frames (3) are arranged at predetermined intervals in the height direction in the column outer portion, and the band frame supporting members (4 ) And a belt-frame supporting diagonal member (5), and is attached to a pillar steel frame (1).

次いで左右一双のチユーブフオーム(6)によって前記
帯枠(3)を抱着し、ボルト(7)によって同帯枠
(3)に着脱自在に固着する。
Then, the band frame (3) is embraced by the left and right tube tubes (6) and detachably fixed to the band frame (3) by the bolts (7).

前記チユーブフオーム(6)は、高分子系シート基板
(6a)にかまぼこ型の袋体(6b)が横方向に配設された
条片を縦方向に連設し、縦横に隣る前記袋体(6b)間に
流通管(6c)を接続するとともに、同袋体(6b)に圧縮
空気供給弁(6d)を配設して構成されている。更に、左
右のチユーブフオーム(6)の接合端縁には夫々舌片
(8)を取付けて、同各舌片(8)をフアスナー(9)
によって接合し、チユーブフオーム(6)の接合部から
のセメントペーストの廻り込みを防止する。
The tube form (6) is a polymer sheet substrate (6a) in which a kamaboko-shaped bag (6b) is arranged in a horizontal direction, and the strips are arranged in a vertical direction. A flow pipe (6c) is connected between (6b) and a compressed air supply valve (6d) is arranged in the bag body (6b). Further, tongue pieces (8) are attached to the joint edges of the left and right tube hoods (6), and the tongue pieces (8) are attached to the fastener (9).
To prevent the cement paste from flowing around from the joint portion of the tube foam (6).

なお最上段のチユーブフオーム(6′)は柱型枠の高さ
調整用である。
The uppermost tube form (6 ') is for adjusting the height of the pillar formwork.

次いで柱脚部に開き止め棧(10)を取付け、前記チユー
ブフオーム(6)における圧縮空気供給弁(6d)より圧
縮空気を圧入し、流通管(6c)を介して各袋体(6b)に
圧縮空気を封入して膨脹せしめ、型枠を成型するととも
に、前記圧縮空気供給弁(6d)を閉塞する。
Next, an opening stopper (10) is attached to the column base, compressed air is press-fitted from the compressed air supply valve (6d) in the tube form (6), and each bag (6b) is inserted into each bag (6b) through the flow pipe (6c). Compressed air is enclosed and expanded to form a mold, and the compressed air supply valve (6d) is closed.

次いで前記チユーブフオーム(6)によって構成された
柱型枠内にコンクリートを打設する。
Next, concrete is poured into the pillar formwork constituted by the tube form (6).

コンクリート打設1〜2時間後、前記フアスナー(9)
部分のセメントペーストを洗い流し、コンクリート硬化
後、前記チユーブフオーム(6)より空気を抜き、フア
スナー(9)部分を開き、ボルト(7)を抜取ってチユ
ーブフオームを解体する。
1 to 2 hours after concrete is placed, the Fusner (9)
After the portion of the cement paste is washed away and the concrete is hardened, air is removed from the tube foam (6), the fastener (9) is opened, and the bolt (7) is removed to disassemble the tube foam.

解体したチユーブフオーム(6)は他の施工部分に転用
される。
The dismantled tube cube (6) is diverted to other construction parts.

なお図中(11)は梁である。The beam (11) in the figure is a beam.

(発明の効果) 本発明によれば前記したように、柱鉄骨の建方及び柱鉄
筋の配筋完了後、柱外郭部に高さ方向に亘って所定間隔
毎に帯枠を設置し、気密性を有する可撓性チユーブフオ
ームを前記帯枠の外周に囲繞せしめて同帯枠に着脱自在
に取付け、しかるのち前記チユーブフオームに空気を圧
入して型枠を成型せしめることによって柱型枠が組立て
られるものである。
(Effect of the invention) According to the present invention, as described above, after completing the erection of the column steel frame and the reinforcement of the column reinforcement, band frames are installed at predetermined intervals over the height direction in the column outer portion, and the airtightness is obtained. A flexible tube tube is attached around the outer circumference of the band frame so that it can be detachably attached to the band box, and then the tube tube is assembled by pressurizing air into the tube tube to form the box frame. It is what is done.

また同柱型枠に対する打設コンクリートの硬化後、前記
チユーブフオームより空気を抜き、帯枠より取外すこと
によって、柱型枠の脱型が行なわれる。
Further, after the cast concrete for the pillar form is hardened, the column form is demolded by removing air from the tube form and removing it from the band form.

このように本発明によれば柱型枠の組立、解体が専門職
でなくとも簡単に行なわれ、工費を節減し、工期を短縮
しうるものである。
As described above, according to the present invention, the pillar formwork can be easily assembled and disassembled even by a non-professional person, and the construction cost can be reduced and the construction period can be shortened.

また前記可撓性チユーブフオームは任意断面形の鉄骨鉄
筋コンクリート柱の施工に適用され、転用が可能であ
り、更にまた軽量で折畳み可能なため、運搬、取扱いが
容易である。
Further, the flexible tube form is applied to the construction of a steel-framed reinforced concrete column having an arbitrary cross section, can be diverted, and is lightweight and foldable, so that it can be easily transported and handled.

更にまた前記チユーブフオームを透明材料より構成する
ことによって、コンクリート打設管理が容易にできる。
Furthermore, by constructing the tube form from a transparent material, concrete pouring management can be facilitated.

請求項2の発明は、シート基板にかまぼこ型の弾性袋体
を縦横に配設し、相隣る袋体間に流通管を接続するとと
もに、前記袋体に圧縮空気供給弁を配設して前記チユー
ブフオームを構成したことによって、同チユーブフオー
ムを前記帯枠に取付けたのち、前記圧縮空気供給弁より
圧縮空気を圧入し、前記流通管を介して前記各袋体に圧
縮空気を封入して膨脹せしめ、柱型枠を成型するように
したものであり、この際圧縮空気が圧入された前記袋体
及び流通管が、前記チユーブフオームの補剛材としての
機能を果すものである。
According to a second aspect of the present invention, elastic sheet bodies of the kamaboko type are arranged vertically and horizontally on a sheet substrate, a flow pipe is connected between adjacent bag bodies, and a compressed air supply valve is provided in the bag bodies. By configuring the tube form, the tube form is attached to the band frame, compressed air is press-fitted from the compressed air supply valve, and compressed air is sealed in each bag through the flow pipe. It is inflated to form a pillar form, and the bag body and the flow pipe into which compressed air is press-fitted at this time function as a stiffening material for the tube form.

請求項3の発明は、前記鉄骨柱の外郭部に取付けられた
帯枠を、左右一双の前記チユーブフオームで抱着し、同
両チユーブフオームの対向端に設けた舌片間をフアスナ
ーで接合することによって、前記チユーブフオームの接
合部におけるセメントペーストの廻り込みを防止するも
のである。
According to a third aspect of the present invention, the band frame attached to the outer shell of the steel column is hugged by the left and right tube tubes, and the tongues provided at the opposite ends of the tube tubes are joined by fasteners. This prevents the cement paste from wrapping around at the joint portion of the tube form.

【図面の簡単な説明】[Brief description of drawings]

第1図及び第2図は本発明に係る鉄骨鉄筋コンクリート
柱の施工法の一実施例の実施状況を示す正面図並に横断
平面図、第3図はチユーブフオームの部分正面図、第4
図はその部分横断平面図、第5図はその帯枠に対する取
付部を示す横断平面図、第6図はチユーブフオームの接
合部を示す横断平面図である。 (1)……柱鉄骨、(2)……柱鉄筋、(3)……帯
枠、(6)……チユーブフオーム、(6b)……袋体、
(6c)……流通管、(6d)……圧縮空気供給弁、(7)
……ボルト、(8)……舌片、(9)……フアスナー。
1 and 2 are a front view and a cross-sectional plan view showing an implementation state of an embodiment of a method for constructing a steel-framed reinforced concrete column according to the present invention, and FIG. 3 is a partial front view of a chew hood, and FIG.
The drawing is a partial cross-sectional plan view thereof, FIG. 5 is a cross-sectional plan view showing an attachment portion to the band frame, and FIG. 6 is a cross-sectional plan view showing a joint portion of a tube form. (1) …… Column steel frame, (2) …… Column steel bar, (3) …… Band frame, (6) …… Chubu form, (6b) …… Bag,
(6c) …… Flow pipe, (6d) …… Compressed air supply valve, (7)
... Bolt, (8) ... tongue, (9) ... Fuassner.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】鉄骨鉄筋コンクリート柱における柱鉄骨の
建方及び柱鉄筋の配筋完了後、柱外郭部に高さ方向に亘
って所定間隔毎に帯枠を配置し、次いで同各帯枠外周
に、気密性を有する可撓性チユーブフオームを囲繞して
着脱自在に取付け、同チユーブフオームに空気を圧入し
て型枠を成型したのち、前記チユーブフオーム内にコン
クリートを打設することを特徴とする鉄骨鉄筋コンクリ
ート柱の施工法。
1. After completion of erection of column steel frames and arrangement of column reinforcing bars in steel reinforced concrete columns, band frames are arranged at predetermined intervals in the height direction on the column outer portion, and then on the outer periphery of each band frame. Characterized in that the flexible tube having airtightness is surrounded and removably attached, air is pressed into the tube to form a mold, and then concrete is placed in the tube. Construction method of steel-framed reinforced concrete columns.
【請求項2】前記チユーブフオームはシート基板にかま
ぼこ型の弾性袋体が縦横に配設され、相隣る同袋体間に
流通管が接続されるとともに、前記袋体に圧縮空気供給
弁が配設された請求項1記載の鉄骨鉄筋コンクリート柱
の施工法。
2. In the tube form, a kamaboko-shaped elastic bag body is vertically and horizontally arranged on a sheet substrate, a flow pipe is connected between the adjacent bag bodies, and a compressed air supply valve is provided in the bag body. The method for constructing a steel-framed reinforced concrete column according to claim 1, which is arranged.
【請求項3】前記鉄骨柱の外郭部に取付けられた帯枠
を、左右一双の前記チユーブフオームで抱着し、同両チ
ユーブフオームの対向端に設けた舌片間をフアスナーで
接合する請求項1記載の鉄骨鉄筋コンクリート柱の施工
法。
3. A band frame attached to the outer portion of the steel column is embraced by the left and right tube tubes, and the tongue pieces provided at opposite ends of the tube tubes are joined by fasteners. The method for constructing a steel-framed reinforced concrete column according to 1.
JP25706789A 1989-10-03 1989-10-03 Construction method of steel reinforced concrete columns Expired - Fee Related JPH07107330B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25706789A JPH07107330B2 (en) 1989-10-03 1989-10-03 Construction method of steel reinforced concrete columns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25706789A JPH07107330B2 (en) 1989-10-03 1989-10-03 Construction method of steel reinforced concrete columns

Publications (2)

Publication Number Publication Date
JPH03119258A JPH03119258A (en) 1991-05-21
JPH07107330B2 true JPH07107330B2 (en) 1995-11-15

Family

ID=17301284

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25706789A Expired - Fee Related JPH07107330B2 (en) 1989-10-03 1989-10-03 Construction method of steel reinforced concrete columns

Country Status (1)

Country Link
JP (1) JPH07107330B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100718264B1 (en) * 2005-06-22 2007-05-15 한승구 Form using air pressure
KR100643527B1 (en) * 2006-05-22 2006-11-10 (주)건축사사무소서희건축 Building wall temporary installation structure

Also Published As

Publication number Publication date
JPH03119258A (en) 1991-05-21

Similar Documents

Publication Publication Date Title
JPH07107330B2 (en) Construction method of steel reinforced concrete columns
JPH0747535A (en) Production of precast concrete member
JPH06228915A (en) Posts such as viaducts and construction methods
CN101148910B (en) Construction method for reinforced composite non-dismantling building
JP2004270313A (en) Bridge, bridge structure, and construction method of bridge
JPH0571163A (en) Formwork method
JPS5849375B2 (en) PC concrete plate sliding forming equipment
JPS61290137A (en) Construction of columnar pillar
JP2000027438A (en) Vertical joining method of concrete horizontal member
JPS6115084Y2 (en)
JPH0673786A (en) Junction of precast concrete column
CN208830598U (en) A kind of architectural engineering built pile
JPH0115685Y2 (en)
JPH06155431A (en) Production of form object made of precast concrete
JP2671754B2 (en) Construction method of steel reinforced concrete structure
JPS58195630A (en) Concrete placement method
JP2970285B2 (en) Diversion method of column formwork
JPH0794769B2 (en) Formwork device
CN118493606A (en) A UHPC formwork construction process for prefabricated concrete SW columns
JPH0882095A (en) Form for sump pit
JPH08333828A (en) Method for constructing concrete structure
JP2001200518A (en) Retaining wall constructing method
CN118438541A (en) UHPC formwork construction process for prefabricated SW column of fabricated concrete
JP2002013109A (en) Floor slab, floor slab structural body and construction method of floor slab
JPS6254945B2 (en)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees