Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH07113170B2 - Replacement method and device for spinning machine - Google Patents
[go: Go Back, main page]

JPH07113170B2 - Replacement method and device for spinning machine - Google Patents

Replacement method and device for spinning machine

Info

Publication number
JPH07113170B2
JPH07113170B2 JP10954087A JP10954087A JPH07113170B2 JP H07113170 B2 JPH07113170 B2 JP H07113170B2 JP 10954087 A JP10954087 A JP 10954087A JP 10954087 A JP10954087 A JP 10954087A JP H07113170 B2 JPH07113170 B2 JP H07113170B2
Authority
JP
Japan
Prior art keywords
bobbin
spindle
peg
peg tray
tray
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP10954087A
Other languages
Japanese (ja)
Other versions
JPS63275725A (en
Inventor
義雄 川崎
達丈 堀部
森  光男
憲吾 大橋
隆征 森田
晴佳 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nisshinbo Holdings Inc
Original Assignee
Nisshinbo Industries Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nisshinbo Industries Inc filed Critical Nisshinbo Industries Inc
Priority to JP10954087A priority Critical patent/JPH07113170B2/en
Publication of JPS63275725A publication Critical patent/JPS63275725A/en
Publication of JPH07113170B2 publication Critical patent/JPH07113170B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/02Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for removing completed take-up packages and replacing by bobbins, cores, or receptacles at take-up stations; Transferring material between adjacent full and empty take-up elements
    • D01H9/08Doffing arrangements independent of spinning or twisting machines
    • D01H9/10Doffing carriages ; Loading carriages with cores

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Description

【発明の詳細な説明】 発明の目的 (産業上の利用分野) この発明はリング精紡機、リング撚糸機等の紡機のスピ
ンドル列の下方にスピンドルレールと平行に配設された
ペッグコンベア上に空ボビンが挿入されたペッグトレイ
を予め準備し、紡機機台の満管停止後、機台の一端から
管替機をスピンドルレールに沿って走行させ、スピンド
ル上の満ボビンとペッグコンベア上の空ボビンとを順次
交換する紡機における管替方法及びその装置に関するも
のである。
DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention is designed to provide an empty space on a peg conveyor arranged parallel to a spindle rail below a spindle row of a spinning machine such as a ring spinning machine and a ring twisting machine. Prepare the peg tray with the bobbin inserted in advance, after the spinning machine stand is completely stopped, run the pipe changer along the spindle rail from one end of the machine stand, and then move the full bobbin on the spindle and the empty bobbin on the peg conveyor in order. The present invention relates to a tube replacement method and apparatus for a spinning machine to be replaced.

(従来の技術) リング精紡機、リング撚糸機等の紡機において機台の満
管停止後にスピンドル上の満ボビンと空ボビンとを自動
的に交換する管替装置として、紡機機台に沿って移動す
る型の管替装置が使用されている。この種の管替装置と
して特公昭56−8136号公報には第14図(a)〜(c)に
示すように、スピンドルレール201の下方位置にスピン
ドル202と対応するピッチでペッグ203を備えたコンベア
204を配設するとともに該ペッグ203上に予め空ボビンE
を準備し、紡機に沿って間欠的に移動する管替機205に
は複数個の把持具を備えたドッフィング装置206と同じ
く複数個の把持具を備えたドンニング装置207とを装備
し、管替え作業時には機台の一端から管替機205がスピ
ンドルレール201に沿って間欠的に移動して複数錘ずつ
スピンドル202上の満ボビンFと、ペッグ203上の空ボビ
ンEとを自動交換するものが提案されている。
(Prior art) In a spinning machine such as a ring spinning machine and a ring twisting machine, it moves along the spinning machine stand as a tube changing device that automatically replaces the full bobbin and the empty bobbin on the spindle after the machine stand is completely stopped. A type of pipe changer is used. As a pipe changing device of this type, Japanese Patent Publication No. 56-8136 discloses that a peg 203 is provided below the spindle rail 201 at a pitch corresponding to the spindle 202, as shown in FIGS. 14 (a) to 14 (c). Conveyor
204 is provided and an empty bobbin E is previously placed on the peg 203.
The pipe changer 205, which moves intermittently along the spinning machine, is equipped with a doffing device 206 having a plurality of gripping tools and a donning device 207 having a plurality of gripping tools. At the time of work, a pipe changer 205 intermittently moves from one end of the machine base along the spindle rail 201 to automatically exchange the full bobbin F on the spindle 202 and the empty bobbin E on the peg 203 by a plurality of weights. ing.

又、特開昭60−246828号公報には第15図に示すように、
満ボビン抜上装置208、空ボビン抜上装置209、満ボビン
挿入装置210、空ボビン挿入装置211、満ボビン移送装置
212及び空ボビン移送装置213を装備し、満管停止に伴う
管替え時にスピンドルレール201に沿って連続的に走行
し、スピンドル202上の満ボビンFを一本ずつ抜上げる
とともにペッグ203から空ボビンEを抜上げ、スピンド
ル202から抜上げた満ボビンFを満ボビン移送装置212に
より満ボビン挿入装置210へ移送し、該挿入装置210によ
り満ボビンFを空ボビン抜上げ後のペッグ203に一体ず
つ挿入するとともにペッグ203から抜上げられた空ボビ
ンEを空ボビン移送装置213により空ボビン挿入装置211
まで移送し、該挿入装置211により満ボビン抜上げ後の
スピンドル202に挿入する管替機205が開示されている。
Further, as shown in FIG. 15 in JP-A-60-246828,
Full bobbin removal device 208, empty bobbin removal device 209, full bobbin insertion device 210, empty bobbin insertion device 211, full bobbin transfer device
Equipped with 212 and an empty bobbin transfer device 213, it continuously runs along the spindle rail 201 at the time of pipe change due to a full pipe stop, and pulls out the full bobbins F on the spindle 202 one by one and the empty bobbin from the peg 203. E is pulled out, and the full bobbin F pulled out from the spindle 202 is transferred to the full bobbin insertion device 210 by the full bobbin transfer device 212, and the full bobbin F is integrally attached to the peg 203 after the empty bobbin is pulled out by the insertion device 210. The empty bobbin E that is inserted and pulled out from the peg 203 is moved by the empty bobbin transfer device 213 to the empty bobbin insertion device 211.
There is disclosed a pipe changer 205 that is transferred to the spindle device 202 and is inserted into the spindle 202 after the full bobbin is pulled up by the insertion device 211.

一方、近年紡績工場においては各工程ごとの自動化から
一歩進んで複数の工程を自動搬送手段で連結することに
より、より省力化を図ることが考えられている。そし
て、精紡工程とワインダー工程とを搬送路で連結し複数
の精紡機で玉揚げされた満ボビンをワインダー工程へ搬
送し、ワインダー工程で使用された後の空ボビンを精紡
工程へ搬送して再使用する方法が提案され、又実施され
ている。このように精紡工程とワインダー工程とを搬送
路により直接連結して満ボビン及び空ボビンの搬送を行
う場合には、例えば特開昭60−5247号公報に開示されて
いるように表面にペッグが突設されたペッグトレイを使
用した搬送方法がコンベアを使する方式に比較して機構
が簡単であることから注目されている。
On the other hand, in recent years, in a spinning factory, it is considered to further reduce the labor by going one step further from the automation of each process and connecting a plurality of processes with an automatic conveying means. Then, the spinning process and the winder process are connected by a transport path, the full bobbin fried by a plurality of spinning machines is transported to the winder process, and the empty bobbin used in the winder process is transported to the spinning process. A method of reusing the same has been proposed and implemented. In this way, when carrying out the full bobbin and empty bobbin by directly connecting the spinning process and the winder process with the transportation path, for example, as disclosed in JP-A-60-5247, pegs are formed on the surface. Attention has been paid to the method of transportation using a peg tray projecting from the above because its mechanism is simpler than the method using a conveyor.

(発明が解決しようとする問題点) ところが、ペッグトレイを使用してボビンの搬送を行う
コンベアをスピンドルレールの下方に設け、前記従来の
管替装置を使用して管替作業を自動的に行うには問題が
ある。すなわち、従来の自動管替機が円滑に管替作業を
行うためには、スピンドルレール下方に予め準備された
空ボビンはスピンドルピッチと同一の所定間隔で配置さ
れる必要がある。しかし、近年精紡機、撚糸機等の紡機
は多数錘化が進み、片側400錘の紡績もめずらしくない
ため、ペッグトレイを使用して空ボビンをスピンドルの
ピッチと対応してスピンドルレール下方に配置するには
ペッグトレイのピッチを極めて厳密に製造するとともに
ペッグトレイを所定のピッチで配置する手段が必要とな
るという問題がある。又、従来の管替機の構成ではいず
れも空ボビンと満ボビンとの交換作業時におけるコンベ
ア上のペッグとスピンドル間の空ボビンあるいは満ボビ
ンの移送時間が管替え時間全体に占める割合が大きくな
り、結果的に管替装置時間が長びき、機台の停止時間が
長くなり紡機機台の稼動効率が低下するという問題があ
る。
(Problems to be solved by the invention) However, a conveyor for carrying a bobbin using a peg tray is provided below the spindle rail, and the pipe changing work is automatically performed by using the conventional pipe changing device. Has a problem. That is, in order for the conventional automatic pipe changer to smoothly perform the pipe change work, the empty bobbins prepared in advance below the spindle rail must be arranged at the same predetermined interval as the spindle pitch. However, in recent years, spinning machines such as spinning machines and twisting machines have become more and more spindles, and it is not difficult to spin 400 spindles on one side.Therefore, use a peg tray to place an empty bobbin below the spindle rail in accordance with the spindle pitch. Has a problem in that the pitch of the peg tray is very strictly manufactured and a means for arranging the peg tray at a predetermined pitch is required. In addition, in the configuration of the conventional tube changer, the transfer time of the empty bobbin or the full bobbin between the peg and the spindle on the conveyor during the replacement work of the empty bobbin and the full bobbin becomes a large proportion of the entire tube change time. As a result, there is a problem that the pipe changing device time becomes long, the machine standstill time becomes long, and the operating efficiency of the spinning machine stand deteriorates.

又、従来の管替装置ではスピンドルレール下方に配設さ
れたペッグトレイ上から空ボビンを抜上げ、抜上げたペ
ッグトレイのペッグに満ボビンを挿入する構成のため、
抜上あるいは挿入のためにペッグトレイのペッグの長さ
より長いストロークを確保する空間が必要となり既設精
紡機の機高の低いものに対しては対応できないという不
都合もある。
Further, in the conventional pipe changing device, since the empty bobbin is pulled out from above the peg tray arranged below the spindle rail, and the full bobbin is inserted into the peg of the pulled peg tray,
A space for securing a stroke longer than the peg length of the peg tray is required for pulling out or inserting, and there is also a disadvantage that it cannot be applied to an existing spinning machine having a low height.

発明の構成 (問題点を解決するための手段) 前記の問題点を解決するため第1発明においては、紡機
のスピンドル列の下方にスピンドルレールと平行に配設
されたコンベア上に空ボビンが挿入されたペッグトレイ
を予め準備し、紡機機台の満管停止後、機台の一端から
管替機をスピンドルレールに沿って走行させ、前記コン
ベア上から空ボビンをペッグトレイとともに管替機内に
取入れ、該空ボビンをペッグトレイに装着された状態で
スピンドル上に挿入されている満ボビンより上方に搬送
するとともに該満ボビンと対応する位置に配置し、その
位置で空ボビンをペッグから抜取り、満ボビンをスピン
ドルから抜上げ、満ボビンが抜上げられたスピンドルに
空ボビンを挿入し、スピンドルから抜上げた満ボビンを
スピンドル下部とほぼ同じ高さに配置されたペッグトレ
イのペッグに挿入し、その後満ボビンが挿入されたペッ
グトレイを前記コンベアに返送するという方法を採用し
た。
Configuration of the Invention (Means for Solving the Problems) In order to solve the above problems, in the first invention, an empty bobbin is inserted on a conveyor arranged parallel to a spindle rail below a spindle row of a spinning machine. The prepared peg tray is prepared in advance, and after the spinning machine is fully stopped, the pipe changer is made to travel along the spindle rail from one end of the machine stand, and an empty bobbin is taken into the pipe changer together with the peg tray from the conveyor. While the empty bobbin is mounted on the peg tray, it is conveyed above the full bobbin inserted on the spindle and is placed at a position corresponding to the full bobbin.At that position, the empty bobbin is removed from the peg, and the full bobbin is moved to the spindle. The empty bobbin from the spindle, and the empty bobbin is inserted into the spindle from which the full bobbin has been lifted. Insert the peg peg trays which are arranged to, after which full peg trays which bobbins are inserted is adopted a method that returns to the conveyor.

又、第2発明においては前記の管替え方法を実施するの
に好適な装置として、紡機機台の満管停止後、機台の一
端からスピンドルレールに沿って走行する管替機に、空
ボビンが挿入されたペッグトレイを載置した状態でスピ
ンドル列の下方にスピンドルレールと平行に配設された
コンベア上に載置された空ボビン付きペッグトレイを管
替機内に取入れるペッグトレイ取入装置と、該ペッグト
レイ取入装置によりペッグトレイとともに取入れられた
空ボビンをペッグトレイに装着された状態で、スピンド
ル上に挿入されている満ボビンより上方でかつ満ボビン
と対応する位置へ搬送する搬送装置と、前記満ボビンよ
り上方に搬送された空ボビンをペッグから抜取り、満ボ
ビンが抜上げられたスピンドルに該空ボビンを挿入する
空ボビン抜取挿入装置と、空ボビンが抜取られたペッグ
トレイをスピンドル下部とほぼ同じ高さ位置まで搬送す
る搬送装置と、スピンドルから満ボビンを抜上げ、前記
ペッグトレイのペッグに挿入する満ボビン抜上挿入装置
と、満ボビンが挿入されたペッグトレイを前記コンベア
近傍まで搬送する搬送装置と、該搬送装置により搬送さ
れてきたペッグトレイをコンベア上に受渡すペッグトレ
イ受渡装置とを設けた。
Further, in the second invention, as an apparatus suitable for carrying out the above-mentioned pipe changing method, an empty bobbin is used as a pipe changing machine which runs along one of the spindle rails from one end of the machine frame after the spinning machine stand is fully filled. A peg tray loading device for loading a peg tray with an empty bobbin placed on a conveyor arranged parallel to the spindle rail below the spindle row with the inserted peg tray mounted in the pipe changer, A transport device for transporting an empty bobbin taken in together with the peg tray by the peg tray take-in device to a position corresponding to the full bobbin above the full bobbin inserted on the spindle in a state of being mounted on the peg tray, and the full bobbin. Remove the empty bobbin that has been conveyed further upward from the peg, and insert the empty bobbin into the spindle where the full bobbin has been lifted. And a full-bobbin removing / inserting device that lifts the full bobbin from the spindle and inserts it into the peg of the peg tray, and a transport device that transports the peg tray from which the empty bobbin has been removed to a position almost at the same height as the lower part of the spindle. A transport device for transporting the peg tray with the bobbin inserted therein to the vicinity of the conveyor, and a peg tray delivery device for delivering the peg tray transported by the transport device onto the conveyor.

(作用) 前記の構成によりこの発明においては、スピンドルレー
ルの下方に配設されたコンベア上から空ボビンがペッグ
トレイとともに管替機内に取り入れられ、ペッグトレイ
に装着された状態で満ボビンより上方に搬送されるとと
もに満ボビンと対応する位置に配置され、その位置で空
ボビンがペッグから抜取られ、満ボビンがスピンドルか
ら抜上げられる。そして、満ボビンが抜上げられたスピ
ンドルに空ボビンが挿入され、スピンドルから抜上げら
れた満ボビンはスピンドル下部とほぼ同じ高さに配置さ
れたペッグトレイのペッグに挿入される。その後満ボビ
ンが挿入されたペッグトレイがスピンドルレールの下方
に配設されたコンベア上に返送される。すなわち、ペッ
グトレイに装着された空ボビンとスピンドル上の満ボビ
ンとの位置関係は管替機内に取入れられた後に調整され
るため、スピンドルレールの下方に配設されたコンベア
上に空ボビン付きのペッグトレイを予め準備する場合、
空ボビンの配置間隔をスピンドルピッチと厳密に合わせ
るように調整する必要がない。
(Operation) According to the present invention, the empty bobbin is taken into the pipe changer together with the peg tray from above the conveyor arranged below the spindle rail, and is conveyed above the full bobbin while being mounted on the peg tray. At the same time, the empty bobbin is pulled out from the peg and the full bobbin is pulled out from the spindle. Then, the empty bobbin is inserted into the spindle from which the full bobbin has been pulled out, and the full bobbin pulled out from the spindle is inserted into the peg of the peg tray arranged at substantially the same height as the lower part of the spindle. After that, the peg tray in which the full bobbin is inserted is returned to the conveyor arranged below the spindle rail. That is, since the positional relationship between the empty bobbin mounted on the peg tray and the full bobbin on the spindle is adjusted after being taken into the pipe changer, the peg tray with an empty bobbin is placed on the conveyor arranged below the spindle rail. When preparing in advance,
It is not necessary to adjust the arrangement interval of the empty bobbins so as to closely match the spindle pitch.

(実施例) 以下この発明を精紡機機台に沿って連続的に走行し複数
錘ずつ間欠的に管替え作業を行う管替装置に具体化した
一実施例を第1〜12図に従って説明する。第1〜3図に
示すように、管替機1は精紡機機台に固設されたレール
2及びガイドレール3に係合するガイドローラ4,5を介
して精紡機機台に沿って走行可能に支承され、レール2
に所定間隔で突設されたピン6と係合するスクリューロ
ーラ7の作用により、レール2に沿って走行するように
なっている。すなわち、スクリューローラ7は駆動モー
タ8の駆動軸8aに嵌着された歯付きプーリ9と、スクリ
ューローラ7の回転軸10に嵌着された歯付きプーリ11間
に巻掛けられた歯付きベルト12とを介して駆動モータ8
の駆動に伴い回転され、その周面に形成された溝7aが順
次ピン6に係合することによって管替機1がレールに沿
って走行するようになっている。
(Embodiment) An embodiment in which the present invention is embodied in a pipe changing device that continuously runs along a spinning machine base and intermittently performs pipe changing work by a plurality of weights will be described with reference to FIGS. . As shown in FIGS. 1 to 3, the pipe changer 1 travels along the spinning frame by means of guide rollers 4 and 5 that engage with rails 2 and guide rails 3 fixed to the spinning frame. Possible to support, rail 2
By the action of the screw roller 7 which engages with the pins 6 protruding at predetermined intervals, the rail 6 travels along the rail 2. That is, the screw roller 7 has a toothed belt 12 wound around a toothed pulley 9 fitted on a drive shaft 8a of a drive motor 8 and a toothed pulley 11 fitted on a rotation shaft 10 of the screw roller 7. Drive motor 8 via
The pipe changer 1 travels along the rails by being rotated by the driving of No. 1 and the grooves 7a formed on the peripheral surface thereof being successively engaged with the pins 6.

下方に配設された前記ガイドレール3の上面にはスピン
ドルレール13と平行にトレイガイド14が延設され、該ト
レイガイド14内をベルトコンベアのベルト15が走行する
ように配設されている。そして、前記ベルト15上にはス
ピンドル16のピッチとほぼ等しい直径を有しかつ上面に
ペッグ17aが突設されたペッグトレイ17が、ベルト15の
移動とともに一体的に移動可能に載置されている。そし
て、管替え作業に先立ってベルト15上には、ペッグ17a
に空ボビンEが挿入されたペッグトレイ17がスピンドル
とほぼ対応する状態で配置されるようになっている。
又、トレイガイド14はペッグトレイ17を側方から出し入
れ可能とするため管替機1側の側縁部14aが低く形成さ
れている。
On the upper surface of the guide rail 3 arranged below, a tray guide 14 is extended in parallel with the spindle rail 13, and a belt 15 of a belt conveyor is arranged to run in the tray guide 14. A peg tray 17 having a diameter substantially equal to the pitch of the spindle 16 and having a peg 17a protruding from the upper surface is placed on the belt 15 so as to move integrally with the movement of the belt 15. Then, the peg 17a is placed on the belt 15 prior to the pipe replacement work.
The peg tray 17 having the empty bobbin E inserted therein is arranged so as to substantially correspond to the spindle.
Further, the tray guide 14 has a lower side edge 14a on the pipe changer 1 side so that the peg tray 17 can be taken in and out from the side.

管替機1の下部には前記コンベア上に載置された空ボビ
ン付きペッグトレイ17を管替機1内に取入れるペッグト
レイ取入装置18と、満ボビンFが挿入されたペッグトレ
イ17をコンベア上に受渡すペッグトレイ受渡装置19とが
管替機1の管替え作業時進行方向に対して前後に配設さ
れている。管替機1の前側(精紡機と対向する側)には
前記ペッグトレイ取入装置18によりペッグトレイ17とと
もに取入れられた空ボビンEをペッグトレイ17に挿着さ
れた状態で、スピンドル16上に挿入されている満ボビン
Fより上方でかつ満ボビンFと対応する位置へ搬送する
搬送装置と、空ボビンEが抜取られたペッグトレイ17を
スピンドル16下部とほぼ同じ高さ位置まで搬送する搬送
装置と、該位置において満ボビンFが挿入されたペッグ
トレイ17を前記ペッグトレイ受渡装置19まで搬送する搬
送装置としての役割を兼ねた捩り搬送装置20が配設され
ている。又、管替機1の中央部には前記満ボビンFより
上方に搬送された空ボビンEをペッグ17aから抜取り、
満ボビンFが抜上げられたスピンドル16に該空ボビンE
を挿入する空ボビン抜取挿入装置21と、スピンドル16か
ら満ボビンFを抜上げ、前記ペッグトレイ17のペッグ17
aに挿入する満ボビン抜上挿入装置22とが配設されてい
る。
In the lower part of the pipe changer 1, a peg tray take-in device 18 for taking the peg tray 17 with an empty bobbin placed on the conveyor into the pipe changer 1 and a peg tray 17 in which a full bobbin F is inserted are placed on the conveyer. A delivery peg tray delivery device 19 is provided in front of and behind the moving direction of the pipe changer 1 during the pipe changing operation. On the front side of the pipe changer 1 (the side facing the spinning machine), the empty bobbin E taken in together with the peg tray 17 by the peg tray taking-in device 18 is inserted into the peg tray 17 and is inserted into the spindle 16. A transporting device for transporting to a position above the full bobbin F and corresponding to the full bobbin F, and a transporting device for transporting the peg tray 17 from which the empty bobbin E has been pulled to a position almost at the same height as the lower part of the spindle 16, and the position. In the above, a twisting and conveying device 20 which also serves as a conveying device for conveying the peg tray 17 in which the full bobbin F is inserted to the peg tray delivery device 19 is provided. In addition, the empty bobbin E conveyed above the full bobbin F is removed from the peg 17a at the center of the pipe changer 1,
The empty bobbin E is attached to the spindle 16 from which the full bobbin F has been lifted.
Empty bobbin removing / inserting device 21 for inserting the full bobbin F from the spindle 16, and the peg 17 of the peg tray 17 is removed.
A full bobbin removing / inserting device 22 to be inserted into a is provided.

前記捩り搬送装置20は第1,2図に示すように、ペッグト
レイ17を移送するベルト23の移動経路がトレイガイド14
とほぼ同一高さで平行に走行する部分と、スピンドル16
の下部と同じ高さ位置で平行に走行する部分と、スピン
ドル16上に挿入された満ボビンより上方においてスピン
ドルレールと平行に走行する部分とを有するように多数
のガイドプーリ24間に巻掛けられるとともに、機台の下
部中央に配設されたモータ25の駆動軸に嵌着された駆動
プーリ26に巻掛けられ、トレイガイド14と平行に走行す
る部分が管替機1の管替え時走行方向と同一となるよう
に駆動される。又、ベルト23の走行経路に沿って一対の
線状のガイド部材27がペッグトレイ17のペッグ17aを挾
むように、かつペッグトレイ17をベルト23側に押圧付勢
するように配設されている。すなわち、この捩り搬送装
置20は、ガイド部材27によってペッグトレイ17をベルト
23に圧接させた状態に保持し、その状態でベルト23を駆
動することによりペッグトレイ17をベルト23とともに移
動させるものである。従って、第10図に示すようにガイ
ド部材27をベルト23に対して捩れた状態に配置すること
により、ペッグトレイ17に装着された空ボビンE又は満
ボビンFの姿勢を自由に変更することができる。
As shown in FIGS. 1 and 2, in the twisting and conveying device 20, the movement path of the belt 23 for transferring the peg tray 17 is the tray guide 14.
And the part that runs in parallel with the spindle 16 and the spindle 16
Is wound around a large number of guide pulleys 24 so as to have a portion that runs in parallel with the lower portion of and a portion that runs parallel to the spindle rail above the full bobbin inserted on the spindle 16. Along with the drive pulley 26 fitted to the drive shaft of the motor 25 disposed at the center of the lower part of the machine base, the portion running parallel to the tray guide 14 is the traveling direction during pipe change of the pipe changer 1. Is driven to be the same as. Further, a pair of linear guide members 27 are arranged along the traveling path of the belt 23 so as to sandwich the peg 17a of the peg tray 17 and to urge the peg tray 17 toward the belt 23 side. That is, the twisting and conveying device 20 uses the guide member 27 to move the peg tray 17 to the belt.
The peg tray 17 is moved together with the belt 23 by keeping the pressed state against the 23 and driving the belt 23 in this state. Therefore, by disposing the guide member 27 in a twisted state with respect to the belt 23 as shown in FIG. 10, the posture of the empty bobbin E or the full bobbin F mounted on the peg tray 17 can be freely changed. .

前記ペッグトレイ取入装置18は第1,8図に示すように、
半円弧状のガイド部28aを有するガイドプレート28にお
ける該ガイド部28aが管替機1の管替え時走行方向側に
配置されるとともに、図示しない駆動機構により回動さ
れる回動軸29に固定され、トレイガイド14と交差するペ
ッグトレイ17のペッグ17aと係合可能な作用位置と、ト
レイガイド14上のペッグトレイ17と係合不能な退避位置
とに回動配置されるようになっている。ガイドプレート
28の上方にはトレイガイド14内に載置されたペッグトレ
イ17上の空ボビンEの頂部と係合して空ボビンEを精紡
機機台側へ傾斜させるとともに、ペッグトレイ17の下面
をトレイガイド14の側縁部14aより上方に移動させる係
合部材30が配設されている。又、ペッグトレイ受渡装置
19のガイドプレート31も前記ペッグトレイ取入装置18の
ガイドプレート28と同様に半円弧状のガイド部31aを備
え、該ガイド部31aが管替機1の管替え時走行方向と反
対側に向かった状態で回動軸32に固定されている。そし
て、図示しない駆動機構により回動軸32が回動されるこ
とにより、ガイドプレート31がトレイガイド14と交差し
て前記捩り搬送装置20により配送されてきた満ボビンF
が挿入されたペッグトレイ17をトレイガイド14内に案内
する作用位置と、トレイガイド14内に載置されたペッグ
トレイ17と係合不能な退避位置とに回動配置されるよう
になっている。
The peg tray intake device 18 is, as shown in FIGS.
The guide portion 28a in the guide plate 28 having the semicircular arc-shaped guide portion 28a is arranged on the traveling direction side during pipe change of the pipe changer 1, and is fixed to the rotating shaft 29 rotated by a drive mechanism (not shown). The peg tray 17 intersects with the tray guide 14, and the peg tray 17 can be engaged with the peg tray 17a. Guide plate
Above the 28, the empty bobbin E on the peg tray 17 placed in the tray guide 14 is engaged with the top of the empty bobbin E to incline the empty bobbin E toward the spinning machine base side, and the lower surface of the peg tray 17 is placed on the tray guide 14 side. An engagement member 30 that moves upward from the edge portion 14a is provided. Also, a peg tray delivery device
Similarly to the guide plate 28 of the peg tray intake device 18, the guide plate 31 of 19 is also provided with a semi-arcuate guide portion 31a, and the guide portion 31a faces the side opposite to the traveling direction of the pipe changer 1 during pipe change. It is fixed to the rotating shaft 32 in this state. The rotating shaft 32 is rotated by a drive mechanism (not shown), so that the guide plate 31 intersects with the tray guide 14 and is delivered by the twist transfer device 20.
The peg tray 17 in which is inserted is guided into the tray guide 14 and a retracted position where the peg tray 17 placed in the tray guide 14 cannot engage with the peg tray 17 is rotated.

第2,3図に示すように管替機1の上部には前記捩り搬送
装置20によりペッグトレイ17とともに搬送され、その頂
部が斜め下方へ向かうように姿勢が変更された空ボビン
Eの頂部を支承するボビン支承部材33が配設されてい
る。ボビン支承部材33はその上端部において支軸34に対
して回動可能に支持され、捩りばね35によりベルト23側
に回動付勢されるとともにストッパ36に当接してその下
端が空ボビンEの頂部と係合する位置に配置されるよう
になっている。
As shown in FIGS. 2 and 3, the top of the empty bobbin E is supported on the pipe changer 1 together with the peg tray 17 by the twisting and conveying device 20 and the top of the empty bobbin E is changed so as to be directed obliquely downward. A bobbin supporting member 33 is provided. The bobbin supporting member 33 is rotatably supported at its upper end with respect to the support shaft 34, is urged to rotate toward the belt 23 by a torsion spring 35, and abuts against a stopper 36 so that its lower end is an empty bobbin E. It is arranged to be in a position where it engages with the top.

管替機1の精紡機機台と反対側の壁面にはスピンドル16
と対応する位置に一対の支持軸37,38がスピンドルレー
ル13と平行に上下に配設され、該支持軸37,38には箱状
の走行体39が摺動可能に支持されている。走行体39には
前記空ボビン抜取挿入装置21及び満ボビン抜上挿入装置
22が一体移動可能に装備されている。走行体39の上部一
側には支持ブラケット40がその下端において固定されて
いる。支持ブラケット40の上端には捩り搬送装置20のベ
ルト23と直行する方向に延びる軸41がその基端において
回動可能に支持されるとともに、その先端にL字状をな
すペッグトレイ規制アーム42が固定されている。支持ブ
ラケット40の上部にはロータリソレノイド43が固定さ
れ、前記軸41はリンク機構44を介してロータリソレノイ
ド43の駆動軸と連結され、ロータリソレノイド43の作動
により軸41が回動されてペッグトレイ規制アーム42が第
2図に実線で示すペッグトレイ17と係合する作用位置と
鎖線で示す退避位置とに移動配置されるようになってい
る。
Spindle 16 is installed on the wall opposite the spinning frame of the pipe changer 1.
A pair of support shafts 37, 38 are vertically arranged in parallel with the spindle rail 13 at positions corresponding to, and a box-shaped traveling body 39 is slidably supported by the support shafts 37, 38. The traveling body 39 includes the empty bobbin removing / inserting device 21 and the full bobbin removing / inserting device.
22 are equipped so that they can move together. A support bracket 40 is fixed to one side of the upper part of the traveling body 39 at its lower end. A shaft 41 extending in a direction orthogonal to the belt 23 of the twisting and conveying device 20 is rotatably supported at the base end of the support bracket 40, and an L-shaped peg tray regulating arm 42 is fixed to the tip thereof. Has been done. A rotary solenoid 43 is fixed to an upper portion of the support bracket 40, the shaft 41 is connected to a drive shaft of the rotary solenoid 43 through a link mechanism 44, and the shaft 41 is rotated by the operation of the rotary solenoid 43 to rotate the peg tray regulating arm. 42 is moved and arranged in an operating position for engaging the peg tray 17 shown by a solid line in FIG. 2 and a retracted position shown by a chain line.

又、走行体39の下端一側には支持ブラケット45がスピン
ドル16の下部と対応する位置を走行するベルト23の下方
を横切り管替機1の前方まで延びる状態に固定され、そ
の先端には満ボビンFから精紡機側に連なる糸を管替え
時に切断する公知のカッター46が取付ブラケット47を介
して取付けられている。支持ブラケット45にはロータリ
ソレノイド48が固定され、その駆動軸にはベルト23上を
移動するペッグトレイ17と係合してその移動を規制する
作用位置と、ペッグトレイ17と係合不能な退避位置とに
移動配置されるペッグトレイ規制片49aが固定されてい
る。又、走行体39の他側にも同様なペッグトレイ規制片
49bが配設されている。
A support bracket 45 is fixed to one side of the lower end of the traveling body 39 so as to extend below the belt 23 traveling at a position corresponding to the lower portion of the spindle 16 and extend to the front of the pipe changer 1. A known cutter 46, which cuts the yarn connecting from the bobbin F to the spinning machine side at the time of pipe replacement, is attached via a mounting bracket 47. A rotary solenoid 48 is fixed to the support bracket 45, and its drive shaft is in an operating position that engages with the peg tray 17 that moves on the belt 23 to restrict its movement, and a retracted position that cannot engage with the peg tray 17. The movable peg tray restricting piece 49a is fixed. Also, a similar peg tray control piece is provided on the other side of the traveling body 39.
49b is provided.

次に空ボビン抜取挿入装置21いついて説明する。第2,3,
6図に示すように、走行体39の上部には支軸50が、その
両端部が走行体39の外部に突出する状態で走行体39と一
体移動可能かつ回動可能に支持されている。支軸50の両
端部にはアーム51がその基端において一体回動可能に固
定され、アーム51の先端にはボビン把持装置52が軸53に
より回動可能に支持されている。走行体39の中央には前
記スクリューローラ7と同期して回転駆動される回転軸
54が配設され、支軸50には回転軸54に嵌着固定されたカ
ム(図示せず)により回動されるギヤ(図示せず)と噛
合するギヤ55(第2図に図示)が嵌着され、回転軸54の
回転によりギヤ55を介してアーム51が揺動され、ボビン
把持装置52が空ボビン受取位置と空ボビン開放位置とに
回動配置されるようになっている。又、支軸50には前記
回転軸54からカム及びギヤ(図示せず)を介して回動さ
れるギヤ部56aを有する支持筒56が回動可能に支持さ
れ、該支持筒56の一端にはレバー57が一体回動可能に支
持されている。レバー57の先端には一端が前記ボビン把
持装置52に回動可能に連結されたロッド58の他端がピン
により回動可能に連結されている。
Next, the empty bobbin extracting / inserting device 21 will be described. Second, third,
As shown in FIG. 6, a spindle 50 is supported on the upper part of the traveling body 39 so as to be integrally movable and rotatable with the traveling body 39 in a state where both ends thereof project outside the traveling body 39. An arm 51 is rotatably fixed to both ends of the support shaft 50 at its base end, and a bobbin holding device 52 is rotatably supported by a shaft 53 at the tip of the arm 51. At the center of the traveling body 39, a rotary shaft that is rotationally driven in synchronization with the screw roller 7.
54 is provided, and a gear 55 (shown in FIG. 2) meshing with a gear (not shown) rotated by a cam (not shown) fitted and fixed to the rotary shaft 54 is provided on the support shaft 50. The arm 51 is fitted and fitted, and the rotation of the rotary shaft 54 causes the arm 51 to swing via the gear 55, so that the bobbin holding device 52 is pivotally arranged between the empty bobbin receiving position and the empty bobbin opening position. A support cylinder 56 having a gear portion 56a that is rotated from the rotary shaft 54 via a cam and a gear (not shown) is rotatably supported on the support shaft 50, and one end of the support cylinder 56 is supported by the support cylinder 56. The lever 57 is supported so as to be integrally rotatable. One end of the lever 57 is rotatably connected to the bobbin holding device 52, and the other end of a rod 58 is rotatably connected by a pin.

ボビン把持装置52は第4図及び第5図(a)に示すよう
に、側面L字状をなす支持フレーム59の上面にその歯部
が互いに噛合する状態で軸60に対して回動可能に支持さ
れるとともに、把持片61の延出部61aに張架された引張
りばね104により互いに把持方向に回動付勢された一対
の把持片61,62がスピンドル16のピッチと同一ピッチで
4組配設されている。各組の一方の把持片61は後方への
延出部61aを有し、該延出部61aには係合ローラ63が取付
けられている。支持フレーム59の上面には前記各係合ロ
ーラ63と係合して把持片61を解放側へ回動させる係合板
64が、支持フレーム59の上面に突設されたガイドピン65
を介して支持フレーム59の長手方向に沿って摺動可能に
配設されている。係合板64はばね105により各把持片61
を解放側へ付勢する方向(第5図(a)の右方)付勢さ
れるとともに、その一端(第5図(a)の左端)におい
て一端が前記回転軸54により駆動されるカム機構に連結
されたワイヤ66の他端に連結されている。そして、各把
持片61,62による空ボビンEの把持解放がワイヤ66、係
合板64を介して管替機1の走行と同期して行われる。
As shown in FIGS. 4 and 5 (a), the bobbin gripping device 52 is rotatable with respect to the shaft 60 with its teeth engaging with each other on the upper surface of the supporting frame 59 having an L-shaped side surface. A pair of gripping pieces 61, 62 which are supported and urged to rotate in the gripping direction by a tension spring 104 stretched around the extending portion 61a of the gripping piece 61 have four pairs at the same pitch as the spindle 16. It is arranged. One gripping piece 61 of each set has a rearward extending portion 61a, and an engaging roller 63 is attached to the extending portion 61a. On the upper surface of the support frame 59, an engagement plate that engages with each of the engagement rollers 63 and rotates the grip piece 61 to the release side.
64 is a guide pin 65 protruding from the upper surface of the support frame 59.
It is slidably arranged along the longitudinal direction of the support frame 59 via. Engagement plate 64 is provided with springs 105 for gripping pieces 61.
The cam mechanism is urged toward the disengagement side (to the right in FIG. 5A), and has one end (the left end in FIG. 5A) driven by the rotary shaft 54 at one end (the left end in FIG. 5A). Is connected to the other end of the wire 66 connected to. Then, the gripping and releasing of the empty bobbin E by the gripping pieces 61, 62 is performed in synchronization with the traveling of the pipe changer 1 via the wire 66 and the engaging plate 64.

次に満ボビン抜上挿入装置22について説明する。第2,3,
7図に示すように走行体39の前記支軸50の下方には、回
動支軸67がその両端が走行体39の外側に突出する状態で
回動可能かつ走行体39と一体移動可能に支持されてい
る。回転支軸67の両端部には一対の支持アーム68が一体
回動可能に固定され、その先端部には支軸69が支持され
ている。支軸69には一対のアーム70がその基端において
回動可能に支持され、該アーム70の先端にはボビン把持
装置71が回動可能に支持されている。一方、前記支軸50
には前記回転軸54の回転がカム及びギヤを介して伝達さ
れる支持筒72が回動可能に支持され、該支持筒72に対し
てレバー73がその基端において一体回動可能に固定され
ている。レバー73の一端には一端が前記アーム70の中間
部に架設された軸70aに対して回動可能に連結されたロ
ッド74の他端が回動可能に連結されている。又、支軸69
の一端には連結レバー75がその基端において回動可能に
支持されている。連結レバー75の先端一側には一端が前
記ボビン把持装置71の下端にピン連結されたロッド76の
他端が回動可能に連結されている。前記回動支軸67には
前記回転軸54の回転がカム及びギヤを介して伝達される
回動レバー77が回動可能に支持されている。回動レバー
77と前記連結レバー75とはリンク78により連結されてい
る。ボビン把持装置71は前記空ボビン抜取挿入装置21の
ボビン把持装置52とほぼ同一に構成されている。すなわ
ち、支持フレーム59、把持片61,62、係合板64の構成は
前記ボビン把持装置52と全く同一であり、係合板64をば
ねの力に抗して移動させるワイヤ79が直接係合板64に連
結される代わりに平面L字状の回動レバー80を介して連
結されている。
Next, the full bobbin removing / inserting device 22 will be described. Second, third,
As shown in FIG. 7, below the support shaft 50 of the traveling body 39, a rotation supporting shaft 67 is rotatable and movable integrally with the traveling body 39 in a state where both ends thereof protrude outside the traveling body 39. It is supported. A pair of support arms 68 are integrally rotatably fixed to both ends of the rotary support shaft 67, and a support shaft 69 is supported at the tip thereof. A pair of arms 70 is rotatably supported at the base end of the support shaft 69, and a bobbin holding device 71 is rotatably supported at the tip of the arm 70. On the other hand, the support shaft 50
A support cylinder 72, to which the rotation of the rotary shaft 54 is transmitted via a cam and a gear, is rotatably supported by the lever 73, and a lever 73 is fixed to the support cylinder 72 at its base end so as to be integrally rotatable. ing. One end of the lever 73 is rotatably connected to the other end of a rod 74, one end of which is rotatably connected to a shaft 70a provided in the middle of the arm 70. Also, support shaft 69
A coupling lever 75 is rotatably supported at its base end at one end thereof. One end of the connecting lever 75 is pivotally connected to the other end of a rod 76, one end of which is pin-connected to the lower end of the bobbin gripping device 71. A rotation lever 77, which transmits the rotation of the rotation shaft 54 via a cam and a gear, is rotatably supported on the rotation support shaft 67. Rotating lever
77 and the connecting lever 75 are connected by a link 78. The bobbin holding device 71 is configured substantially the same as the bobbin holding device 52 of the empty bobbin removing / inserting device 21. That is, the structure of the support frame 59, the gripping pieces 61, 62, and the engagement plate 64 is exactly the same as that of the bobbin gripping device 52, and the wire 79 that moves the engagement plate 64 against the force of the spring is directly attached to the engagement plate 64. Instead of being connected, they are connected via a rotary lever 80 having a plane L shape.

次に前記空ボビン抜取挿入装置21及び満ボビン抜上挿入
装置22の駆動源としての回転軸54にスクリューローラ7
の回転軸10の回転を伝達する機構及び走行体39を管替機
1の走行と同期して支持軸37,38に沿って往復動させる
駆動機構について説明する。管替機1の精紡機機台と反
対側寄りには前記回転軸10とほぼ同じ高さに駆動軸81が
回転自在に配設され、該駆動軸81にはクラッチ(図示せ
ず)を介して一体的に回転可能に歯付きプーリ82が取付
けられ、該プーリ82と前記回転軸10に嵌着された歯付き
プーリ83との間に掛装された歯付きベルト84を介して駆
動軸81が回転駆動される。又、回転軸10の上方には回転
軸85が回転自在に支持されている。回転軸85はボールス
プライン軸からなり、回転軸85上には一端が前記走行体
39に固定されたブラケット86を介して走行体39と一体移
動可能にボールブッシュ87が支持されている。ボールブ
ッシュ87にはスプロケット88が回転可能に支持され、該
スプロケット88と前記回転軸54の一端に嵌着固定された
スプロケット89との間にチェーン90が巻掛けられてい
る。回転軸85の側方には回転軸85と直交する方向すなわ
ち管替機1の走行方向と直交する方向に中間軸91が回転
自在に支持されている。中間軸91にはかさ歯車92,93が
一体回転可能に嵌着され、前記駆動軸81に嵌着されたか
さ歯車94の回転がかさ歯車95,96を介してかさ歯車92に
伝達されて中間軸91が回転駆動される。そして、前記回
転軸85に嵌着されたかさ歯車97がかさ歯車93と噛合する
ことにより中間軸91の回転が回転軸85に伝達される。
Next, the screw roller 7 is attached to the rotary shaft 54 as a driving source of the empty bobbin removing / inserting device 21 and the full bobbin removing / inserting device 22.
A mechanism for transmitting the rotation of the rotary shaft 10 and a drive mechanism for reciprocating the traveling body 39 along the support shafts 37, 38 in synchronization with the traveling of the pipe changer 1 will be described. A drive shaft 81 is rotatably arranged at a height substantially the same as the rotary shaft 10 on the side of the pipe changer 1 opposite to the spinning machine base, and a clutch (not shown) is provided on the drive shaft 81. A toothed pulley 82 is integrally rotatably attached to the drive shaft 81 via a toothed belt 84 hung between the pulley 82 and the toothed pulley 83 fitted to the rotating shaft 10. Is driven to rotate. A rotary shaft 85 is rotatably supported above the rotary shaft 10. The rotary shaft 85 is composed of a ball spline shaft, and one end of the rotary shaft 85 is on the running body.
A ball bush 87 is supported so as to be movable integrally with the traveling body 39 via a bracket 86 fixed to 39. A sprocket 88 is rotatably supported by the ball bush 87, and a chain 90 is wound between the sprocket 88 and a sprocket 89 fitted and fixed to one end of the rotary shaft 54. An intermediate shaft 91 is rotatably supported laterally of the rotary shaft 85 in a direction orthogonal to the rotary shaft 85, that is, in a direction orthogonal to the traveling direction of the pipe changer 1. Bevel gears 92 and 93 are integrally rotatably fitted to the intermediate shaft 91, and the rotation of the bevel gear 94 fitted to the drive shaft 81 is transmitted to the bevel gear 92 via the bevel gears 95 and 96 to be intermediate. The shaft 91 is rotationally driven. Then, the bevel gear 97 fitted on the rotating shaft 85 meshes with the bevel gear 93, whereby the rotation of the intermediate shaft 91 is transmitted to the rotating shaft 85.

前記中間軸91にはカム98が一体回転可能に嵌着されてい
る。中間軸91の下方に配設された支軸99にはカムレバー
100がその基端において回動可能に支持されている。カ
ムレバー100の中間部には前記カム98のカム溝89aに係合
するカムフォロアー101が取付けられ、カムレバー100の
先端部は前記走行体39の下端に突設された連結部102と
ピン連結されている。従って、中間部軸91とともにカム
98が回転駆動されることによりカムレバー100が支軸99
を中心に揺動され、カムレバー100の揺動に伴い走行体3
9が支持軸37,38上を往復動する。
A cam 98 is fitted on the intermediate shaft 91 so as to rotate integrally. A cam lever is attached to the support shaft 99 arranged below the intermediate shaft 91.
100 is rotatably supported at its proximal end. A cam follower 101 that engages with a cam groove 89a of the cam 98 is attached to an intermediate portion of the cam lever 100, and a tip end portion of the cam lever 100 is pin-connected to a connecting portion 102 projecting from a lower end of the traveling body 39. There is. Therefore, the cam together with the intermediate shaft 91
The cam lever 100 is pivoted by the rotation of 98.
Is swung around and the traveling body 3
9 reciprocates on the support shafts 37 and 38.

次に前記のように構成された装置の作用を説明する。精
紡機が満管指令により停止すると、機台端に停止してい
る管替機1の駆動モータ8が駆動され、スクリューロー
ラ7が回転されて溝7aとピン6との係合により管替機1
はレール2に沿って一定速度で移動を開始する。又、ね
じり搬送装置20のモータ25が駆動され、ベルト23が第1,
2図の矢印方向に移動を開始する。又、ペッグトレイ取
入装置18及びペッグトレイ受渡装置19のガイドプレート
28,31がトレイガイド14と交差する作用位置に配置され
る。
Next, the operation of the device configured as described above will be described. When the spinning machine stops due to the full pipe command, the drive motor 8 of the pipe changer 1 stopped at the machine base is driven, the screw roller 7 is rotated, and the groove 7a and the pin 6 are engaged with each other.
Starts moving at a constant speed along the rail 2. Further, the motor 25 of the twist conveying device 20 is driven, and the belt 23
2 Start moving in the direction of the arrow in the figure. A guide plate for the peg tray intake device 18 and the peg tray delivery device 19
28 and 31 are arranged at working positions intersecting with the tray guide 14.

そして、管替機1の走行に伴いトレイガイド14上に載置
された空ボビンEと対応する位置にペッグトレイ取入装
置18が到達すると、空ボビンEの頂部が係合部材30と係
合することによりトレイ17の一側下面がトレイガイド14
の側縁部14aより上方に位置され、管替機1の移動に伴
いガイドプレート28のガイド部28aにペッグ17aが係合し
て第8図に示すようにペッグトレイ17が捩り搬送装置20
のベルト23と係合する位置に案内される。そして、ペッ
グトレイ17下面がベルト23と係合することによりベルト
23と一体的に移動され、ガイド部材27の作用により空ボ
ビンEがほぼ水平となるようにその姿勢が変更されて管
替機1の上方へと搬送される。管替機1の走行開始時に
は空ボビンEが挿入された状態のペッグトレイ17の移動
を規制するペッグトレイ規制アーム42は第2図に実線で
示す係合位置に配置され、スピンドル16の下部と対応す
る位置に配置されたペッグトレイ規制片49a,49bはペッ
グトレイ17の移動を規制する係合位置に配置されてい
る。又、スピンドル16の下部と対応する位置を走行する
ベルト23上には4個の空のペッグトレイ17がペッグトレ
イ規制片49aと係合して満ボビン抜上挿入装置22と対応
する状態に配置されている。
When the peg tray loading device 18 reaches the position corresponding to the empty bobbin E placed on the tray guide 14 as the pipe changer 1 travels, the top of the empty bobbin E engages with the engaging member 30. As a result, the bottom surface of one side of the tray 17 is fixed to the tray guide 14.
8 is located above the side edge 14a of the peg tray 17a, and the peg 17a engages with the guide portion 28a of the guide plate 28 as the pipe changer 1 moves. As shown in FIG.
Is guided to a position where it engages with the belt 23. Then, the lower surface of the peg tray 17 is engaged with the belt 23 so that the belt
23, the posture of the empty bobbin E is changed by the action of the guide member 27 so that the empty bobbin E becomes substantially horizontal, and the empty bobbin E is conveyed above the pipe changer 1. The peg tray restricting arm 42 for restricting the movement of the peg tray 17 with the empty bobbin E inserted therein at the start of running of the pipe changer 1 is arranged at the engagement position shown by the solid line in FIG. The peg tray restricting pieces 49a, 49b arranged at the positions are arranged at engaging positions for restricting the movement of the peg tray 17. Further, four empty peg trays 17 are arranged on the belt 23 running at a position corresponding to the lower part of the spindle 16 in a state corresponding to the full bobbin removing / inserting device 22 by engaging the peg tray restricting pieces 49a. There is.

ベルト23は管替機1の走行速度よりも高速で走行するた
め、空ボビン抜取挿入装置21の駆動が開始されるまでに
4個のペッグトレイ17が第1,2図に示すようにペッグト
レイ規制アーム42の作用により各空ボビンEの頂部がボ
ビン支承部材33に係合しかつスピンドルピッチと対応す
る状態で待機する。走行体39は管替機1の走行開始時に
は第2図に示す位置と反対側の後退位置に配置され、満
ボビン抜上挿入装置22が最初のスピンドル16を通過した
時点で駆動軸81がクラッチを介して回転駆動され、カム
98及びカムレバー100を介して走行体39が前方(第1,2図
の左方)へ移動されるとともに、空ボビン抜取挿入装置
21及び満ボビン抜上挿入装置22が駆動を開始する。
Since the belt 23 travels at a speed higher than the traveling speed of the pipe changer 1, the four peg trays 17 have the peg tray regulating arms as shown in FIGS. 1 and 2 before the driving of the empty bobbin removing / inserting device 21 is started. By the action of 42, the top of each empty bobbin E is engaged with the bobbin supporting member 33 and stands by in a state corresponding to the spindle pitch. The traveling body 39 is arranged in a retracted position on the side opposite to the position shown in FIG. 2 when the pipe changer 1 starts traveling, and when the full bobbin removing / inserting device 22 has passed the first spindle 16, the drive shaft 81 becomes the clutch. Is driven to rotate via a cam
The traveling body 39 is moved forward (to the left in FIGS. 1 and 2) via 98 and the cam lever 100, and an empty bobbin extracting / inserting device is also provided.
21 and the full bobbin removing / inserting device 22 start driving.

走行体39が第2図に示す最前進位置に配置された時点で
満ボビン抜上挿入装置22の各把持片61,62がスピンドル1
6と対応する上方位置に解放状態で配置される。一方、
このとき空ボビン抜取挿入装置21のボビン把持装置52は
第12図(a)に示すように、ペッグトレイ17のペッグ17
aからの空ボビンEの抜取りが完了した状態にある。こ
の状態から管替機1がさらに走行すると、走行体39は空
ボビン抜取挿入装置21及び満ボビン抜上挿入装置22のス
ピンドル16に対する位置関係が一定となるようにカム98
及びカムレバー100の作用により後方に移動される。走
行体39の後方への移動開始とともに満ボビン抜上挿入装
置22の支持アーム68が時計方向に回動されるとともに回
動レバー77が反時計方向に回動されることにより、リン
ク78、連結レバー75、ロッド76を介してボビン把持装置
71がその把持片61,62が水平状態を保持するように姿勢
制御されながら満ボビンFの頂部と対応する位置まで下
降移動された後、同位置において把持片61,62が把持側
に回動されて満ボビンFの頂部を把持する。次いで回動
支軸67とともに支持アーム68が反時計方向に回動される
とともにレバー73及び回動レバー77が同期駆動され、ボ
ビン把持装置71はその姿勢が満ボビンFの抜上げに無理
な抵抗がかからないように制御されながら上方へ移動さ
れ、第12図(b)に示すようにスピンドル16上から満ボ
ビンFが抜上げられる。満ボビンFの抜上げ完了後支持
アーム68が再び時計方向に回動されるとともにレバー73
及び回動レバー77が時計方向に回動され、ボビン把持装
置71の姿勢が制御されながらスピンドル16の下部と対応
する位置に配置されているペッグトレイ17のペッグ17a
上に挿入されるとともに、把持片61,62が開放位置に回
動されて満ボビンFの把持が解除され、第12図(c)に
示す状態となる。次いで支持アーム68が反時計方向に若
干回動され、把持片61,62が満ボビンFの頂部より上方
位置に移動配置される。この時点で走行体39の後退移動
が終了する。
When the traveling body 39 is arranged at the most advanced position shown in FIG. 2, the gripping pieces 61, 62 of the full bobbin removing / inserting device 22 have the spindle 1
It is placed in the open position in the upper position corresponding to 6. on the other hand,
At this time, the bobbin gripping device 52 of the empty bobbin removing / inserting device 21 moves the peg 17 of the peg tray 17 as shown in FIG. 12 (a).
The empty bobbin E has been completely removed from a. When the pipe changer 1 further travels from this state, the traveling body 39 causes the cam 98 so that the positional relationship between the empty bobbin removing / inserting device 21 and the full bobbin removing / inserting device 22 with respect to the spindle 16 becomes constant.
Also, it is moved rearward by the action of the cam lever 100. When the traveling body 39 starts moving rearward, the support arm 68 of the full bobbin removing / inserting device 22 is rotated in the clockwise direction, and the rotation lever 77 is rotated in the counterclockwise direction. Bobbin gripping device via lever 75 and rod 76
71 is moved down to a position corresponding to the top of the full bobbin F while the postures of the gripping pieces 61, 62 are controlled so as to maintain the horizontal state, and then the gripping pieces 61, 62 rotate to the gripping side at the same position. Then, the top of the full bobbin F is gripped. Next, the support arm 68 is rotated counterclockwise together with the rotation support shaft 67, and the lever 73 and the rotation lever 77 are synchronously driven, so that the bobbin gripping device 71 has a posture that makes it impossible to lift the full bobbin F. The full bobbin F is pulled out from the spindle 16 as shown in FIG. After the lifting of the full bobbin F is completed, the support arm 68 is rotated clockwise again and the lever 73 is rotated.
And the rotation lever 77 is rotated clockwise, and the peg 17a of the peg tray 17 arranged at a position corresponding to the lower portion of the spindle 16 while the attitude of the bobbin holding device 71 is controlled.
While being inserted upward, the grip pieces 61, 62 are rotated to the open position to release the grip of the full bobbin F, and the state shown in FIG. 12 (c) is obtained. Next, the support arm 68 is slightly rotated counterclockwise, and the gripping pieces 61, 62 are moved and arranged above the top of the full bobbin F. At this point, the backward movement of the traveling body 39 ends.

一方、空ボビン抜取挿入装置21のアーム51は満ボビン抜
上挿入装置22のボビン把持装置71がスピンドル16上の満
ボビンFを把持した時点で時計方向への回動が開始され
る。そして、満ボビン抜上挿入装置22によるスピンドル
16上からの満ボビンFの抜上が完了し、ボビン把持装置
71が下降移動を開始して空ボビン抜取挿入装置21のボビ
ン把持装置52の移動に支承のない位置まで下降した時点
で空ボビンEがスピンドル16の頂部と係合を開始し、満
ボビンFのペッグトレイ17に対する挿入が完了した時点
で空ボビンEのスピンドル16への挿入が完了するととも
に把持片61,62による空ボビンEの把持が解除され、第1
2図(c)に示す状態となる。
On the other hand, the arm 51 of the empty bobbin removing / inserting device 21 starts to rotate clockwise when the bobbin holding device 71 of the full bobbin removing / inserting device 22 holds the full bobbin F on the spindle 16. And the spindle by the full bobbin removal / insertion device 22
16 When the full bobbin F has been removed from the top, the bobbin gripping device
The empty bobbin E starts to engage with the top of the spindle 16 when the 71 starts to move down to a position where the bobbin gripping device 52 of the empty bobbin extracting / inserting device 21 is not supported by the movement of the full bobbin F. When the insertion of the empty bobbin E into the spindle 16 is completed when the insertion into the peg tray 17 is completed, the empty bobbin E is released from the gripping pieces 61 and 62,
2 The state shown in FIG.

前記走行体39の相対移動開始時、すなわちボビン支承部
材33に頂部が支承された状態における空ボビンEのペッ
グトレイ17からの抜取が完了した時点でロータリソレノ
イド43が駆動され、ペッグトレイ規制アーム42が退避位
置に回動配置されるとともに空ボビンEが抜取られた後
のペッグトレイ17はベルト23の作用により下方へと移送
される。そして、スピンドル16の下部と対応する位置ま
で搬送された後、ガイド部材27の作用によりペッグ17a
がスピンドル16と平行となるように姿勢が制御されると
ともに作用位置に配置されたペッグトレイ規制片49bと
係合した状態で待機する。
At the start of relative movement of the traveling body 39, that is, when the empty bobbin E is completely removed from the peg tray 17 in the state where the top is supported by the bobbin supporting member 33, the rotary solenoid 43 is driven and the peg tray restricting arm 42 retracts. The peg tray 17 after the empty bobbin E has been pulled out and is moved to the position is moved downward by the action of the belt 23. Then, after being conveyed to a position corresponding to the lower part of the spindle 16, the peg 17a is moved by the action of the guide member 27.
The posture is controlled so as to be parallel to the spindle 16, and the robot waits in a state of being engaged with the peg tray restricting piece 49b arranged at the operating position.

一方、満ボビン抜上挿入装置22によるペッグトレイ17の
ペッグ17aに対する満ボビンFの挿入完了後、走行体39
の前方への移動開始と同時にペッグトレイ規制片49aが
退避位置に回動配置され、満ボビンFが挿入されたペッ
グトレイ17はベルト23とともに移動される。そして、ガ
イド部材27の作用により姿勢を変更しながらペッグトレ
イ受渡装置19と対応する位置まで搬送され、同位置にお
いて第9図に示すようにガイドプレート31のガイド部31
aに案内されトレイガイド14へと受渡される。ペッグト
レイ規制片49aが退避位置に回動されると同時に他方の
ペッグトレイ規制片49bも退避位置に回動され、満ボビ
ンFが挿入された4個のペッグトレイ17がペッグトレイ
規制片49aと対応する位置を通過した後、両規制片49a,4
9bが作用位置に配置されて4個の空のペッグトレイ17が
満ボビン抜上挿入装置と対応する位置に待機する。
On the other hand, after the full bobbin F is completely inserted into the peg 17a of the peg tray 17 by the full bobbin removing / inserting device 22, the traveling body 39
At the same time as the start of the forward movement of the peg tray restricting piece 49a, the peg tray 17 with the full bobbin F inserted therein is moved together with the belt 23. Then, it is conveyed to a position corresponding to the peg tray delivery device 19 while changing its posture by the action of the guide member 27, and at the same position, as shown in FIG.
Guided by a and delivered to the tray guide 14. At the same time when the peg tray restriction piece 49a is rotated to the retracted position, the other peg tray restriction piece 49b is also rotated to the retracted position, and the four peg trays 17 with the full bobbin F inserted are moved to positions corresponding to the peg tray restriction pieces 49a. After passing, both regulation pieces 49a, 4
9b is placed in the operating position and the four empty peg trays 17 stand by at positions corresponding to the full bobbin removing / inserting device.

走行体39の前方への移動時に空ボビン抜取り挿入装置21
のアーム51が反時計方向に回動される。又、ペッグトレ
イ規制アーム42がペッグトレイ17と係合する作用位置に
配置され、捩り搬送装置20により順次搬送されてくる空
ボビンEが挿入されたペッグトレイ17は空ボビンEの頂
部がボビン支承部材33と係合する状態でかつボビン把持
装置52の各把持片61,62と対応する位置に整列保持され
る。ボビン把持装置52の各把持片61,62が空ボビンEと
対応する位置まで移動配置される前に4個のペッグトレ
イ17の整列が完了し、その後第12図(d)に鎖線で示す
ようにボビン把持装置52の把持片が空ボビンEと対応す
る位置まで移動する。そして、その位置で把持片61,62
が把持側へ回動付勢され、把持片61,62により空ボビン
Eが把持された後アーム51がさらに反時計方向に回動さ
れて空ボビンEをペッグトレイ17のペッグ17aから抜取
り、第12図(d)に実線で示す状態となる。一方、走行
体39の前方への移動時には、満ボビン抜上挿入装置22は
大きな動作は行わず、支持アーム68が若干反時計方向に
回動されるとともにレバー74が時計方向に回動され、第
12図(d)に示すようにボビン把持装置71がスピンドル
16上の満ボビンFの頂部より若干上方位置に配置され
る。
Empty bobbin removing / inserting device 21 when the traveling body 39 moves forward
The arm 51 of is rotated counterclockwise. Further, in the peg tray 17 in which the peg tray restricting arm 42 is disposed at the position where it engages with the peg tray 17, and the empty bobbins E sequentially conveyed by the twisting and conveying device 20 are inserted, the top of the empty bobbin E becomes the bobbin support member 33. In the engaged state, the bobbin holding device 52 is aligned and held at a position corresponding to the holding pieces 61, 62 of the bobbin holding device 52. The alignment of the four peg trays 17 is completed before the gripping pieces 61, 62 of the bobbin gripping device 52 are moved to the position corresponding to the empty bobbin E, and then, as shown by the chain line in FIG. 12 (d). The gripping piece of the bobbin gripping device 52 moves to a position corresponding to the empty bobbin E. Then, at that position, the gripping pieces 61, 62
Is urged to rotate to the gripping side, and after the empty bobbins E are gripped by the gripping pieces 61 and 62, the arm 51 is further rotated counterclockwise to remove the empty bobbin E from the peg 17a of the peg tray 17, The state shown by the solid line in FIG. On the other hand, when the traveling body 39 is moved forward, the full bobbin removing / inserting device 22 does not perform a large operation, and the support arm 68 is slightly rotated counterclockwise and the lever 74 is rotated clockwise. First
As shown in Fig. 12 (d), the bobbin gripping device 71 has a spindle.
It is located slightly above the top of the full bobbin F above 16.

以下、前記と同様に走行体39が管替機1の移動速度と同
じ速度で後方へ移動する際に、空ボビン抜取挿入装置21
及び満ボビン抜上挿入装置22によりスピンドル16との相
対速度0の状態で4錘ずつ同時に空ボビンEと満ボビン
Fとの交換作業が行われ、スピンドル16から抜上げられ
た満ボビンFは空ボビンEが抜取られた後のペッグトレ
イ17のペッグ17aに挿入され、管替機下方へ移送されて
トレイガイド14へと受渡される。全錘の管替え作業完了
後、ペッグトレイ取入装置18及びペッグトレイ受渡装置
19のガイドプレート28,31がトレイガイド14上のペッグ
トレイ17と係合不能な退避位置に回動配置された後、管
替機1がスピンドルレール13に沿って元の位置まで後退
して全ての作業が完了する。
Thereafter, when the traveling body 39 moves rearward at the same speed as the moving speed of the pipe changer 1 as described above, the empty bobbin extracting / inserting device 21
Further, the empty bobbin E and the full bobbin F are simultaneously replaced by the empty bobbin E and the full bobbin F by the full bobbin removing / inserting device 22 at a speed of 0 relative to the spindle 16, and the full bobbin F lifted from the spindle 16 is empty. The bobbin E is inserted into the peg 17a of the peg tray 17 after being taken out, transferred to the lower part of the pipe changer, and delivered to the tray guide 14. After completing the pipe replacement work for all weights, peg tray intake device 18 and peg tray delivery device
After the guide plates 28 and 31 of 19 are pivotally arranged at the retracted position where they cannot engage with the peg tray 17 on the tray guide 14, the pipe changer 1 is retracted back to the original position along the spindle rail 13 and all The work is completed.

なお、この発明は前記実施例に限定されるものではな
く、例えば、第13図に示すように捩り搬送装置20を空ボ
ビンEが挿入されたペッグトレイ17を管替機1の上方部
まで搬送する部分と、満ボビンFが挿入されたペッグト
レイ17をペッグトレイ受渡装置19まで搬送する部分と、
空ボビンが抜取られた後のペッグトレイ17をスピンドル
16下部と平行に走行するベルト23まで搬送する部分との
3つの部分から構成し、空ボビンEが抜取られた後のペ
ッグトレイ17を搬送するベルト103の移動速度を他の部
分より高速にするようにしてもよい。このように構成し
た場合には管替え開始時にスピンドル下部と対応する位
置に予備のペッグトレイ17を準備する必要がなくなる。
又、前記実施例では、1サイクル4錘ずつ管替えを行う
例について説明したが、管替えの本数は任意に増減して
もよい。さらに、前記実施例では連続移動間欠管替えに
ついて説明したが、間欠移動間欠管替えに変更してもよ
い。その場合には空ボビン抜取挿入装置21及び満ボビン
抜上挿入装置22を管替機1の走行に伴い往復動させる必
要がなく、機構がより簡単となる。
The present invention is not limited to the above-described embodiment, and for example, as shown in FIG. 13, the twist transfer device 20 transfers the peg tray 17 in which the empty bobbin E is inserted to the upper portion of the pipe changer 1. A part and a part for conveying the peg tray 17 with the full bobbin F inserted therein to the peg tray delivery device 19,
Spin the peg tray 17 after the empty bobbin is removed.
16 It is composed of three parts, that is, a part that conveys to the belt 23 that runs in parallel with the lower part, and the moving speed of the belt 103 that conveys the peg tray 17 after the empty bobbin E is removed is higher than the other parts. You may With such a configuration, it is not necessary to prepare a spare peg tray 17 at a position corresponding to the lower part of the spindle at the time of starting the pipe replacement.
Further, in the above-described embodiment, an example in which the tubes are replaced by 4 spindles per cycle has been described, but the number of tubes replaced may be arbitrarily increased or decreased. Further, in the above embodiment, the continuous movement intermittent pipe replacement has been described, but it may be changed to the intermittent movement intermittent pipe replacement. In that case, it is not necessary to reciprocate the empty bobbin removing / inserting device 21 and the full bobbin removing / inserting device 22 as the pipe changer 1 travels, and the mechanism becomes simpler.

発明の効果 以上詳述したように、この発明によれば空ボビンが挿入
されたペッグトレイを管替機内に取入れ、所定の位置に
搬送した後スピンドル上の満ボビンとペッグトレイ上の
空ボビンとを交換する作業を行うため、トレイガイド上
にペッグトレイがスピンドルと対応して配置されていな
くとも管替機内でスピンドルピッチと対応した位置に配
置されるため、管替作業が円滑に行われ、機台の多数錘
化が進んだ場合でも空ボビンが装着されたペッグトレイ
をスピンドルレール下部に搬入するコンベア装置の構造
が簡単になりペッグトレイのピッチの精度もさほど厳密
性が要求されず保全管理が容易となる。又、空ボビンあ
るいは満ボビンがペッグトレイに装着された状態で機台
下部のコンベアとの授受が行われるため、機高の低い既
設精紡機に対してもスピンドルレールの下方にボビン搬
送用のコンベアを設置でき設置面積を広くすることなく
適用可能となる。さらに、管替機内に取入れられた空ボ
ビンはスピンドルと対応する上方位置に配置されその状
態から空ボビンの抜取及びスピンドルへの挿入が行われ
るため、空ボビン抜取挿入装置による空ボビンの移動経
路が単純となり機構が簡単となる。
EFFECTS OF THE INVENTION As described in detail above, according to the present invention, the peg tray in which the empty bobbin is inserted is taken into the pipe changing machine, and after being transferred to a predetermined position, the work of replacing the full bobbin on the spindle with the empty bobbin on the peg tray. Therefore, even if the peg tray is not placed on the tray guide in correspondence with the spindle, it is placed at the position corresponding to the spindle pitch in the pipe changer, so pipe change work is performed smoothly and multiple spindle weights Even if the progress is made, the structure of the conveyor device for carrying in the peg tray with the empty bobbin loaded under the spindle rail is simplified, and the pitch accuracy of the peg tray is not required to be very strict, which facilitates maintenance management. In addition, since the empty bobbin or full bobbin is transferred to and from the conveyor at the bottom of the machine with the peg tray mounted, a conveyor for bobbin transportation is installed below the spindle rail even for existing spinning machines with low machine height. It can be installed and can be applied without increasing the installation area. Furthermore, since the empty bobbin taken in the pipe changer is arranged at the upper position corresponding to the spindle and the empty bobbin is taken out and inserted into the spindle from that state, the empty bobbin moving path of the empty bobbin removing / inserting device is It becomes simple and the mechanism becomes simple.

【図面の簡単な説明】[Brief description of drawings]

第1〜12図はこの発明を具体化した一実施例を示すもの
であって第1図は管替装置と精紡機との関係を示す概略
斜視図、第2図は管替機の背面図、第3図は側断面図、
第4図はボビン把持装置の側面図、第5図(a)は空ボ
ビン抜取挿入装置のボビン把持装置の平面図、第5図
(b)は満ボビン抜上挿入装置のボビン把持装置の部分
平面図、第6図は空ボビン抜取挿入装置の側面図、第7
図は満ボビン抜上挿入装置の側面図、第8図は空ボビン
付のペッグトレイを管替機内に取入れる状態を示す概略
斜視図、第9図は満ボビンが挿入されたペッグトレイを
スピンドルレール下部のコンベアに受渡す状態を示す概
略斜視図、第10図はねじり搬送装置の作用を示す部分斜
視図、第11図は管替作業の途中状態を示す概略斜視図、
第12図(a)〜(d)は管替作業の作用を示す概略側面
図、第13図は変更例のねじり搬送装置を示す該略図、第
14図(a)〜(c)は従来装置のドッフィング装置及び
ドンニング装置の作用を示す概略側面図、第15図は別の
従来装置の概略斜視図である。 管替機1、スピンドルレール13、トレイガイド14、スピ
ンドル16、ペッグトレイ17、ペッグトレイ取入装置18、
ペッグトレイ受渡装置19、ねじり搬送装置20、空ボビン
抜取挿入装置21、満ボビン抜上挿入装置22、ベルト23、
ガイド部材27、走行体39、ボビン把持装置52,71、空ボ
ビンE、満ボビンF。
1 to 12 show an embodiment embodying the present invention. FIG. 1 is a schematic perspective view showing the relationship between a pipe changing device and a spinning machine, and FIG. 2 is a rear view of the pipe changing device. , Fig. 3 is a side sectional view,
4 is a side view of the bobbin holding device, FIG. 5 (a) is a plan view of the bobbin holding device of the empty bobbin removing / inserting device, and FIG. 5 (b) is a part of the bobbin holding device of the full bobbin removing / inserting device. FIG. 6 is a plan view, FIG. 6 is a side view of the empty bobbin extracting / inserting device, FIG.
The figure is a side view of the full bobbin removing / inserting device, FIG. 8 is a schematic perspective view showing a state in which a peg tray with an empty bobbin is taken into the pipe changing machine, and FIG. 9 is a peg tray with a full bobbin inserted under the spindle rail. , A schematic perspective view showing a state of delivering to a conveyor, FIG. 10 is a partial perspective view showing the action of the twisting and conveying device, and FIG. 11 is a schematic perspective view showing an intermediate state of the pipe replacement work,
12 (a) to 12 (d) are schematic side views showing the operation of the pipe replacement work, and FIG. 13 is a schematic view showing a twisting and conveying device of a modified example,
14 (a) to 14 (c) are schematic side views showing the operation of the doffing device and the donning device of the conventional device, and FIG. 15 is a schematic perspective view of another conventional device. Pipe changer 1, spindle rail 13, tray guide 14, spindle 16, peg tray 17, peg tray loading device 18,
Peg tray delivery device 19, twisting and conveying device 20, empty bobbin removing / inserting device 21, full bobbin removing / inserting device 22, belt 23,
Guide member 27, traveling body 39, bobbin holding devices 52, 71, empty bobbin E, full bobbin F.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 大橋 憲吾 愛知県刈谷市豊田町2丁目1番地 株式会 社豊田自動織機製作所内 (72)発明者 森田 隆征 愛知県刈谷市豊田町2丁目1番地 株式会 社豊田自動織機製作所内 (72)発明者 中村 晴佳 愛知県刈谷市豊田町2丁目1番地 株式会 社豊田自動織機製作所内 (56)参考文献 特開 昭63−12727(JP,A) ─────────────────────────────────────────────────── ─── Continuation of front page (72) Inventor Kengo Ohashi, 2-chome, Toyota-cho, Kariya city, Aichi Prefecture Toyota Industries Corporation (72) Inventor Takayuki Morita 2-chome, Toyota-cho, Kariya city, Aichi prefecture Stock company Toyota Automatic Loom Works (72) Inventor Haruka Nakamura 2-chome, Toyota-cho, Kariya city, Aichi Stock company Toyota Automatic Loom Works (56) Reference JP-A-63-12727 (JP, A)

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】紡機のスピンドル列の下方にスピンドルレ
ールと平行に配設されたコンベア上に空ボビンが挿入さ
れたペッグトレイを予め準備し、紡機機台の満管停止
後、機台の一端から管替機をスピンドルレールに沿って
走行させ、スピンドル上の満ボビンとコンベア上の空ボ
ビンとを順次交換する管替え方法において、 前記コンベア上から空ボビンをペッグトレイとともに管
替機内に取入れ、該空ボビンをペッグトレイに装着され
た状態でスピンドル上に挿入されている満ボビンより上
方に搬送するとともに該満ボビンと対応する位置に配置
し、その位置で空ボビンをペッグから抜取り、満ボビン
をスピンドルから抜上げ、満ボビンが抜上げられたスピ
ンドルに空ボビンを挿入し、スピンドルから抜上げた満
ボビンをスピンドル下部とほぼ同じ高さに配置されたペ
ッグトレイのペッグに挿入し、その後満ボビンが挿入さ
れたペッグトレイを前記コンベアに返送する紡機におけ
る管替え方法。
1. A peg tray in which an empty bobbin is inserted is preliminarily prepared on a conveyor arranged parallel to a spindle rail below a spindle row of a spinning machine. In the pipe changing method of running the pipe changing machine along the spindle rail and sequentially replacing the full bobbin on the spindle and the empty bobbin on the conveyor, the empty bobbin is taken into the pipe changing machine together with the peg tray from the conveyor, and the empty bobbin is removed. While being mounted on the peg tray, it is conveyed above the full bobbin inserted on the spindle and is placed at a position corresponding to the full bobbin, at which position the empty bobbin is pulled out from the peg, and the full bobbin is pulled out from the spindle. , Insert the empty bobbin into the spindle where the full bobbin has been lifted, and A tube changing method in a spinning machine, which inserts into a peg of a peg tray arranged at the same height, and then returns the peg tray with a full bobbin inserted to the conveyor.
【請求項2】紡機のスピンドル列の下方にスピンドルレ
ールと平行に配設されたコンベア上に空ボビンが挿入さ
れたペッグトレイを予め準備し、紡機機台の満管停止
後、機台の一端からスピンドルレールに沿って走行し、
スピンドル上の満ボビンとコンベア上の空ボビンとを順
次交換する管替機に、 前記コンベア上に載置された空ボビン付のペッグトレイ
を管替機内に取入れるペッグトレイ取入装置と、 該ペッグトレイ取入装置によりペッグトレイとともに取
入れられた空ボビンをペッグトレイに装着された状態
で、スピンドル上に挿入されている満ボビンより上方で
かつ満ボビンと対応する位置へ搬送する搬送装置と、 前記満ボビンより上方に搬送された空ボビンをペッグか
ら抜取り、満ボビンが抜上げられたスピンドルに該空ボ
ビンを挿入する空ボビン抜取挿入装置と、 空ボビンが抜取られたペッグトレイをスピンドル下部と
ほぼ同じ高さ位置まで搬送する搬送装置と、 スピンドルから満ボビンを抜上げ、前記ペッグトレイの
ペッグに挿入する満ボビン抜上挿入装置と、 満ボビンが挿入されたペッグトレイを前記コンベア近傍
まで搬送する搬送装置と、 該搬送装置により搬送されてきたペッグトレイをコンベ
ア上に受渡すペッグトレイ受渡装置とを備えた紡機にお
ける管替装置。
2. A peg tray in which an empty bobbin is inserted is preliminarily provided on a conveyor arranged in parallel with a spindle rail below a spindle row of a spinning machine, and after the spinning machine is fully stopped, one end of the spinning machine is started. Run along the spindle rail,
A peg tray take-in device for taking a peg tray with an empty bobbin placed on the conveyor into the pipe changer, and a peg tray take-in device for the pipe changer that sequentially replaces the full bobbin on the spindle and the empty bobbin on the conveyor. With the empty bobbin taken in together with the peg tray installed in the peg tray, it is carried to a position above the full bobbin inserted on the spindle and to a position corresponding to the full bobbin, and above the full bobbin. The empty bobbin removed from the peg and the empty bobbin removing / inserting device that inserts the empty bobbin into the spindle where the full bobbin has been lifted up, and the peg tray from which the empty bobbin has been removed are conveyed to almost the same height as the lower part of the spindle. Full bobbin that pulls out the full bobbin from the carrier and spindle and inserts it into the peg of the peg tray. A pipe changing device in a spinning machine including an upper insertion device, a conveying device that conveys a peg tray in which a full bobbin is inserted to the vicinity of the conveyor, and a peg tray delivering device that delivers the peg tray conveyed by the conveying device onto the conveyor. .
【請求項3】前記各搬送装置は一体に形成され、駆動プ
ーリと複数のガイドプーリ間に巻掛けられたベルトと、
ペッグトレイのペッグを挾むように配置されるとともに
ペッグトレイをベルト側に押圧付勢する線状のガイド部
材とから構成されている特許請求の範囲第2項に記載の
紡機における管替装置。
3. Each of the conveying devices is integrally formed, and a belt wound between a drive pulley and a plurality of guide pulleys,
The pipe changing device for a spinning machine according to claim 2, wherein the pipe changing device is arranged so as to sandwich the pegs of the peg tray and is composed of a linear guide member that presses and urges the peg tray toward the belt.
JP10954087A 1987-05-01 1987-05-01 Replacement method and device for spinning machine Expired - Lifetime JPH07113170B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10954087A JPH07113170B2 (en) 1987-05-01 1987-05-01 Replacement method and device for spinning machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10954087A JPH07113170B2 (en) 1987-05-01 1987-05-01 Replacement method and device for spinning machine

Publications (2)

Publication Number Publication Date
JPS63275725A JPS63275725A (en) 1988-11-14
JPH07113170B2 true JPH07113170B2 (en) 1995-12-06

Family

ID=14512836

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10954087A Expired - Lifetime JPH07113170B2 (en) 1987-05-01 1987-05-01 Replacement method and device for spinning machine

Country Status (1)

Country Link
JP (1) JPH07113170B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0287081U (en) * 1988-12-24 1990-07-10
JPH0340823A (en) * 1989-07-05 1991-02-21 O M Ltd Simultaneously doffing automatic doffer
JPH04114576U (en) * 1991-03-28 1992-10-08 株式会社豊田自動織機製作所 Safety device of Pezgu tray conveyor device
CN116331953B (en) * 2023-05-31 2023-07-25 射阳益源纺织有限公司 Intelligent textile system and method for full-automatic yarn feeding and tube changing

Also Published As

Publication number Publication date
JPS63275725A (en) 1988-11-14

Similar Documents

Publication Publication Date Title
EP0277363B1 (en) Machine for filling containers with rod-shaped objects
JP4010685B2 (en) Empty bag stocker device for supplying empty bags to the conveyor magazine of a bagging and packaging machine
US5099641A (en) Method and apparatus for exchanging roving bobbins
JPH11510773A (en) Carton feeding opening wheel assembly
US5544389A (en) Sliver piecing in spinning machines
JPH07113170B2 (en) Replacement method and device for spinning machine
JPS6117743B2 (en)
JPH07113171B2 (en) Peg tray positioning device in the changer in spinning machine
US4548029A (en) Method of and apparatus for exchanging bobbins in a flyer frame
US3832823A (en) Tray and pad interleaving apparatus
US5697877A (en) Apparatus for feeding packaging machines
JPH10182008A (en) Empty bobbin feeder to spinning automatic machine
JPH0663150B2 (en) Rover replacement device
JPH03172288A (en) Bobbin transfer method and device between fiber machines
JPH0512306Y2 (en)
JP2538995B2 (en) Tube replacement method for spinning machine
JPH0772373B2 (en) Empty bobbin insertion device for spinning machine
JPH0523586Y2 (en)
JPS63105128A (en) Doffer for spinning machine
JPS6330418B2 (en)
JPS63105129A (en) Bobbin change in spinning machine
JPH0714782B2 (en) Full bobbin insertion method in doffing machine
JPH0226944Y2 (en)
JPS5915525A (en) Apparatus for intermitently transferring magazine for conveying roving bobbin
JPH0663151B2 (en) Rover replacement method