Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH07114522B2 - Transmission line transfer method and transfer tool used in the method - Google Patents
[go: Go Back, main page]

JPH07114522B2 - Transmission line transfer method and transfer tool used in the method - Google Patents

Transmission line transfer method and transfer tool used in the method

Info

Publication number
JPH07114522B2
JPH07114522B2 JP892593A JP892593A JPH07114522B2 JP H07114522 B2 JPH07114522 B2 JP H07114522B2 JP 892593 A JP892593 A JP 892593A JP 892593 A JP892593 A JP 892593A JP H07114522 B2 JPH07114522 B2 JP H07114522B2
Authority
JP
Japan
Prior art keywords
steel tower
transmission line
wire
roller
transfer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP892593A
Other languages
Japanese (ja)
Other versions
JPH06225418A (en
Inventor
修 山本
秀則 柿原
広昭 山田
知久 西村
均 井上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kansai Electric Power Co Inc
Fujii Denko Co Ltd
Original Assignee
Kansai Electric Power Co Inc
Fujii Denko Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kansai Electric Power Co Inc, Fujii Denko Co Ltd filed Critical Kansai Electric Power Co Inc
Priority to JP892593A priority Critical patent/JPH07114522B2/en
Publication of JPH06225418A publication Critical patent/JPH06225418A/en
Publication of JPH07114522B2 publication Critical patent/JPH07114522B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、既設鉄塔のアーム間に
張架された送電線を既設鉄塔より側方に位置した新設鉄
塔側に移線する送電線の移線工法およびその工法に使用
される移線用工具に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is used in a method for transferring a transmission line for transferring a transmission line stretched between arms of an existing steel tower to a new steel tower located on the side of the existing steel tower and its construction method. The present invention relates to a wire transfer tool.

【0002】[0002]

【従来の技術】鉄塔建替工事や送電線建設工事で既製鉄
塔から新設鉄塔に送電線の移し変えが行われる。古い時
代に建設された鉄塔は、全体的に電線地上高が低い状態
にある。近年送電線付近の都市化が進み土地の有効利用
を図るため、建造物の高層化が著しく送電線嵩上の地域
ニーズが多く発生してきている。鉄塔建替の場合、この
ような状況であるので、通常、既設鉄塔より新設鉄塔が
高い。
2. Description of the Related Art Transmission lines are transferred from existing steel towers to new steel towers in steel tower rebuilding work and power transmission line construction work. The towers that were built in the old days have a low height above the ground. In recent years, urbanization near the power transmission lines has progressed, and in order to make effective use of land, the height of buildings has increased significantly, and many needs for bulky power transmission lines have arisen. In the case of reconstructing a steel tower, this is the situation, so the new steel tower is usually higher than the existing steel tower.

【0003】ところで、既設鉄塔のアーム間に張架され
た送電線を既設鉄塔の側方に位置し且つ既設鉄塔より高
い新設鉄塔側に移線する送電線の移線工法としては、図
15・図16および図17に示すものがある。まず、図15によ
り送電線切断による移線工法について説明する。既設鉄
塔301 の塔体302 の上部には水平状のアーム303 ・304
・305 が所定間隔へだてて配設され、各アーム303 ・30
4 ・305 の先端には電線支持装置306 ・307 ・308 を介
して上線、中線、下線の送電線1A・2A・3Aが吊り
下げられている。
By the way, as a transfer line construction method for a power transmission line, which is located on the side of the existing steel tower and is moved to a new steel tower side higher than the existing steel tower, the transmission line stretched between the arms of the existing steel tower is
15 ・ There are those shown in Fig. 16 and Fig. 17. First, a transfer method by cutting a power transmission line will be described with reference to FIG. On the upper part of the tower body 302 of the existing steel tower 301, horizontal arms 303 and 304
・ 305 are arranged at a predetermined interval and each arm 303 ・ 30
The upper, middle, and lower transmission lines 1A, 2A, and 3A are suspended from the ends of 4 305 via electric wire supporting devices 306 307 308.

【0004】新設鉄塔351 は、既設鉄塔301 の側方に配
置され、既設鉄塔301 より高く、同様に塔体352 の上部
には水平状のアーム353 ・354 ・355 が所定間隔へだて
て配設され、各アーム353 ・354 ・355 の先端に前記送
電線1A・2A・3Aを移線して吊り下げるようになっ
ている。既設鉄塔301 のアーム303 の張架された送電線
1Aを、新設鉄塔351 のアーム353 に移線するのに、送
電線1Aを既設鉄塔301 のアーム先303 の電線支持装置
306 に対向するU字状部の図示のC点で切断する。
The new steel tower 351 is arranged on the side of the existing steel tower 301 and is higher than the existing steel tower 301. Similarly, horizontal arms 353, 354 and 355 are arranged at predetermined intervals above the tower body 352. The power transmission lines 1A, 2A and 3A are transferred to and suspended from the ends of the arms 353, 354 and 355, respectively. To transfer the power transmission line 1A on which the arm 303 of the existing steel tower 301 is stretched to the arm 353 of the new steel tower 351, the power transmission line 1A is attached to the wire support device of the arm tip 303 of the existing steel tower 301.
Cut at the point C of the U-shaped portion facing 306.

【0005】送電線1AをC点で切断するには、送電線
1AのU字状部より外側に送電線引き止め具(カマロン
グ)309 を取付け、この送電線引き止め具309 に金車31
0 を介して送り出しワイヤー311 の上端を接続し、送り
出しワイヤー311 は途中に金車312 を介在させてその基
端は地上のウインチ313 に接続する。ここで、ウインチ
313 により送り出しワイヤー311 を巻き取ることによ
り、送電線1Aをアーム303 に向けて引き寄せ送電線1
AのU字状部にたるみを持たせ、電線支持装置306 から
送電線1Aを離し、C点で電線を切断する。
In order to cut the power transmission line 1A at a point C, a power transmission line detent (Kamalong) 309 is attached to the outside of the U-shaped portion of the power transmission line 1A, and the gold wheel 31 is attached to the power transmission detent 309.
The upper end of the sending wire 311 is connected via 0, and the sending wire 311 is connected to the winch 313 on the ground by interposing the gold wheel 312 on the way. Where the winch
By winding the sending wire 311 by the 313, the power transmission line 1A is pulled toward the arm 303 and the power transmission line 1A is pulled.
The U-shaped portion of A is provided with slack, the power transmission line 1A is separated from the electric wire support device 306, and the electric wire is cut at a point C.

【0006】一方、新設鉄塔351 のアーム353 先と電線
支持装置を取付け、この電線支持装置に金車315 を取付
け、この金車315 に引きワイヤー316 の先端を連結し、
引きワイヤー316 の途中に金車317 を介在させてその基
端を地上のウインチ318 に連結する。引きワイヤー316
先端の金車315 と前記送電線引き止め具309 の金車310
とを連結し、ウインチ313 により送り出しワイヤー311
を送り出しながらウインチ318 により引きワイヤー316
を引き、新設鉄塔351 のアーム353 先まで送電線1Aを
引き寄せる。
On the other hand, the tip of the arm 353 of the new steel tower 351 and the electric wire support device are attached, the gold wheel 315 is attached to this electric wire support device, and the tip of the pulling wire 316 is connected to this gold wheel 315.
A gold wheel 317 is interposed in the middle of the pulling wire 316 and its proximal end is connected to a winch 318 on the ground. Pull wire 316
Gold wheel 315 at the tip and gold wheel 310 of the transmission line detent 309
Connect with and send out wire 311 with winch 313.
Pulling out wire 316 by winch 318 while sending out
And pull the transmission line 1A to the end of the arm 353 of the new steel tower 351.

【0007】ここで、送り出しワイヤー311 を金車310
より取り外し、規定の張力まで送電線1Aを張り、電線
支持装置に送電線1Aを取付ける。次に、引きワイヤー
316 を金車315 より取り外す。続いて、送電線引き止め
具309 を送電線1Aより取り外す。最後に、送電線1A
を接続する。
Here, the sending wire 311 is connected to the gold wheel 310.
Then, the power transmission line 1A is stretched to a specified tension, and the power transmission line 1A is attached to the electric wire support device. Then pull wire
Remove 316 from the gold wheel 315. Then, the power transmission line detent 309 is removed from the power transmission line 1A. Finally, power transmission line 1A
Connect.

【0008】この移線工法の作業者は既設鉄塔311 の塔
上の作業者319 ・320 ・321 ・322、地上の作業者323
・324 、新設鉄塔351 の塔上の作業者325 ・326 ・327
・328 、地上の作業者329 ・330 、地上で作業を監視す
る作業者331 の合計13名が必要である。他の送電線2A
・3Aも同様にして移線する。
The workers of this transfer method are the workers on the tower of the existing steel tower 311 319, 320, 321, 322, and the workers on the ground 323.
・ 324, workers on the new steel tower 351 325 ・ 326 ・ 327
・ A total of 13 people are required: 328, ground workers 329, 330, and ground-based workers 331. Other power transmission line 2A
・ Relocate 3A in the same way.

【0009】図16に示す既設鉄塔のアームから新設鉄塔
の頂部をかわし新設鉄塔に送電線を移送する従来工法に
ついて説明する。既設鉄塔101 の塔体102 の上部には水
平状のアーム103 ・104 ・105 が所定間隔へだてて配設
され、各アーム103 ・104 ・105 の先端には碍子連 (図
示せず)を介して上線、中線、下線の送電線1B・2B
・3Bが吊り下げられている。
A conventional method of transferring a transmission line from the arm of an existing steel tower shown in FIG. 16 to the top of the new steel tower to transfer the power transmission line to the new steel tower will be described. Horizontal arms 103, 104, and 105 are arranged at a predetermined interval above the tower body 102 of the existing steel tower 101, and at the tip of each arm 103, 104, and 105, an insulator string (not shown) is provided. Transmission lines 1B and 2B for upper, middle, and lower lines
・ 3B is suspended.

【0010】新設鉄塔111 は、既設鉄塔101 の側方に配
置され、既設鉄塔101 より高く、同様に塔体112 の上部
には水平状のアーム113 ・114 ・115 が所定間隔へだて
て配設され、各アーム113 ・114 ・115 の先端に前記送
電線1B・2B・3Bを移線して吊り下げるようになっ
ている。ここで、新設鉄塔111 の頂部に台棒116 を取付
け、その台棒116 に金車117 を取付ける。
The new steel tower 111 is arranged beside the existing steel tower 101 and is higher than the existing steel tower 101. Similarly, horizontal arms 113, 114 and 115 are arranged above the tower body 112 at predetermined intervals. The power transmission lines 1B, 2B, and 3B are transferred to and suspended from the ends of the arms 113, 114, and 115, respectively. Here, the pedestal 116 is attached to the top of the new steel tower 111, and the gold wheel 117 is attached to the pedestal 116.

【0011】次に、台棒116 に取付けてある金車117 に
引きワイヤー118 を通す。前記引きワイヤー118 の先端
に移線用電線保持用金車119 を取付け、その移線用電線
保持用金車119 に送電線3Bを保持させる。この移線用
電線保持用金車119 に送り出しワイヤー120 を取付け、
送り出しワイヤー120 の途中に金車121 を介在させて地
上のウインチ122 に連結する。
Next, the pulling wire 118 is passed through the gold wheel 117 attached to the pedestal 116. An electric wire holding wire wheel 119 for wire transfer is attached to the tip of the pulling wire 118, and the electric wire holding wire wheel 119 for wire transfer is held by the electric wire 3B. Attach the sending wire 120 to the transfer wire holding wheel 119,
A gold wheel 121 is interposed in the middle of the delivery wire 120 and is connected to a winch 122 on the ground.

【0012】他方、引きワイヤー118 の途中に金車123
を介在させてその基端はウンイチ124 に連結する。新設
鉄塔111 のアーム113 ・114 ・115 先には移線する送電
線3Bがアーム113 ・114 ・115 内に来ないようにアー
ム113 ・114 ・115 外方に送電線3Bを位置させるよう
に蹴り出す作業員125 ・126 ・127 をそれぞれ配置す
る。
On the other hand, a gold wheel 123 is provided in the middle of the pulling wire 118.
The base end is connected to the unit 124 with the interposition of. Arms 113 ・ 114 ・ 115 of the new steel tower 111 Kick to position the transmission lines 3B outside so that the transmission lines 3B to be transferred do not come inside the arms 113 ・ 114 ・ 115. Workers 125, 126, and 127 will be assigned.

【0013】ウインチ124 で引きワイヤー118 を巻取
り、ウインチ122 で送り出しワイヤー120 を送りなが
ら、移線する送電線3Bを新設鉄塔111 の頂部まで引き
上げる。水平方向に張架された送電線3Bをアーム115
まで移線するには、新設鉄塔111 の頂部で、送電線3B
は新設鉄塔111 頂部と台棒116 とをかわさなければなら
ない。
The pulling wire 118 is wound by the winch 124, and the sending wire 120 is fed by the winch 122, and the power transmission line 3B to be transferred is pulled up to the top of the new steel tower 111. The power line 3B stretched horizontally is attached to the arm 115.
To transfer the line to the top of the new tower 111, take the transmission line 3B.
Must dodge the top of the new steel tower 111 and the pedestal 116.

【0014】それで、新設鉄塔111 の頂部にワイヤーと
送電線引き止め工具 (カマロング)を用いて送電線3B
を引き止める。次に、移線用電線保持用金車119 より移
線する送電線3Bを取り外す。送電線3Bを引き止めて
いるワイヤーを地上のウインチ124 で巻き取り、新設鉄
塔111 の頂部および台棒116 がかわせるよう頂部に位置
する送電線3Bに円弧状のゆとりを持たせる。
Then, by using a wire and a power line holding tool (Kamalong) on the top of the new steel tower 111, the power line 3B
Stop. Next, the power transmission line 3B to be transferred from the transfer wire holding wheel 119 is removed. The wire holding the power transmission line 3B is wound up by a winch 124 on the ground, and the transmission line 3B located at the top so that the top of the new steel tower 111 and the pedestal 116 can be overlapped has an arcuate space.

【0015】送電線3Bのその円弧状部分で新設鉄塔11
1 の頂部と台棒116 とをかわす。次に、前記の移線用電
線保持用金車119 を送り出し用金車として送電線3Bを
再び取付ける。既設鉄塔101 より新設鉄塔111 に前記送
り出しワイヤー120 を延ばす。この送り出しワイヤー12
0 の先端を頂部金車117 を通して前記移線用電線保持用
金車119 に取付ける。
A new steel tower 11 is formed on the arc-shaped portion of the power transmission line 3B.
Dodge the top of 1 and the pedestal 116. Next, the power transmission wire 3B is reattached by using the transfer wire holding wire wheel 119 as a feed wire wheel. The delivery wire 120 is extended from the existing steel tower 101 to the new steel tower 111. This sending wire 12
The tip of 0 is attached to the transfer wire holding gold wheel 119 through the top gold wheel 117.

【0016】今度は移線用押えワイヤー128 を移線用電
線保持用金車119 に取付ける。移線用電線保持用金車11
9 を作業者129 ・130 が移線用電線押えワイヤー128を
押さえて移線すべき送電線3Bの地上高を調整してウイ
ンチ122 により送り出しワイヤー120 を送り出して送電
線3Bをアーム115 の先端に吊り下げる。送電線3Bの
吊り下げ位置を3B' で示す。
Next, the transfer wire 12 is attached to the wire holding wire 119 for wire transfer. Wire car for holding wire for transfer 11
Workers 129 and 130 hold the transfer wire holding wire 128 to adjust the ground height of the power transmission line 3B to be transferred, and send out the wire 120 by the winch 122 to move the power line 3B to the tip of the arm 115. Be suspended. The hanging position of the power transmission line 3B is indicated by 3B '.

【0017】この移線工法の作業者は、上述の外に地上
のウインチ122 ・124 を操作する作業者131 ・132 と、
新設鉄塔111 の頂部で送電線3Bのかわし作業などを行
う作業者133 と、既設鉄塔101 のアーム105 上で移線用
電線保持用金車119 への電線3Bを装着したりする作業
者134 ・135 と、地上で作業を監視する作業者136 との
合計11名が必要である。
In addition to the above, operators of this transfer method are operators 131 and 132 who operate the winches 122 and 124 on the ground,
An operator 133 who works to dodge the power transmission line 3B at the top of the new steel tower 111, and an operator who installs the electric wire 3B to the wire carrier 119 for holding the electric wire for transfer on the arm 105 of the existing steel tower 101. A total of 11 people are required, 135 and 136 workers who monitor the work on the ground.

【0018】他の送電線2B・1Bも同様にして移線す
る。次に、図17に示すように既設鉄塔アームより既設鉄
塔頂部を送電線をかわして新設鉄塔の各アームに移線す
る移線用ガイドローラを用いた工法について述べる。な
お、この工法は特開平4−185215号として述べられてい
る。前記と同様に既設鉄塔201 の塔体202 の上部には水
平状のアーム203 ・204 ・205 が所定間隔へだてて配設
され、各アーム203 ・204 ・205 の先端には碍子連(図
示せず) を介して上線、中線、下線の送電線1A・2A
・3Aが吊り下げられる。
The other power transmission lines 2B and 1B are also transferred in the same manner. Next, as shown in FIG. 17, a method of using a transfer guide roller for transferring the existing steel tower top from the existing steel tower arm to each arm of the new steel tower by bypassing the power transmission line will be described. This method is described in Japanese Patent Laid-Open No. 4-185215. Similar to the above, horizontal arms 203, 204 and 205 are arranged at predetermined intervals above the tower body 202 of the existing steel tower 201, and insulators (not shown) are provided at the tips of the arms 203, 204 and 205. ) Via the upper, middle and underline transmission lines 1A and 2A
・ 3A is suspended.

【0019】新設鉄塔211 は既設鉄塔201 の側方に配置
され既設鉄塔201 より高く、同様に塔体212 の上部には
水平状のアーム213 ・214 ・215 が所定間隔へだてて配
置され、各アーム213 ・214 ・215 の先端に前記送電線
1A・2A・3Aを移線して吊り下げるようになってい
る。ここで、既設鉄塔201 の頂部に台棒216 を取付け
る。その台棒216 に金車217を取付ける。
The new steel tower 211 is arranged on the side of the existing steel tower 201 and is higher than the existing steel tower 201. Similarly, horizontal arms 213, 214, 215 are arranged at predetermined intervals above the tower body 212, and each arm is arranged at a predetermined interval. The power transmission lines 1A, 2A and 3A are transferred to and suspended from the tips of 213, 214 and 215, respectively. Here, a pedestal 216 is attached to the top of the existing steel tower 201. The gold wheel 217 is attached to the base 216.

【0020】既設鉄塔201 のアーム203 ・204 ・205 の
端部にそれぞれ移線用ガイドローラ206 ・207 ・208 を
それぞれ取付ける。台棒216 に取付けた金車217 に引き
ワイヤー218 を通す。引きワイヤー218 を移線用ガイド
ローラ206 の溝に通し、移線する送電線1Aまで延ば
す。
The transfer guide rollers 206, 207, and 208 are attached to the ends of the arms 203, 204, and 205 of the existing steel tower 201, respectively. Pass the pulling wire 218 through the gold wheel 217 attached to the pedestal 216. The pulling wire 218 is passed through the groove of the transfer guide roller 206 and extended to the power transmission line 1A to be transferred.

【0021】引きワイヤー218 先端に移線する移線用送
電線保持用金車を取付け、送電線1Aを保持させる。引
きワイヤー218 の他端を新設鉄塔211 のアーム213 先端
の金車242 を通り金車223 を介在させて地上の新設鉄塔
211 側のウインチ224 に連結する。ウインチ224 を作業
者232 が作動させて引きワイヤー218 を巻き取って既設
鉄塔201 の頂部まで送電線1Aを巻き上げる。この時、
送電線1Aを保持している移線用電線保持用金車は移線
用ガイドローラ206 を通過可能なるように設定してあ
る。
A transfer wheel holding wire wheel for wire transfer is attached to the tip of the pulling wire 218 to hold the power wire 1A. The other end of the pulling wire 218 passes through the gold wheel 242 at the end of the arm 213 of the new steel tower 211, and the gold wheel 223 is interposed therebetween.
Connect to the winch 224 on the 211 side. The worker 232 operates the winch 224 to wind up the pulling wire 218 and wind up the transmission line 1A to the top of the existing steel tower 201. This time,
The wire-carrying wire-carrying wire holding wire for holding the power transmission line 1A is set so as to be able to pass the wire-transfer guide roller 206.

【0022】既設鉄塔201 の頂部に至った送電線1A
は、前記の従来工法と同様にして既設鉄塔201 の頂部と
台棒216 を作業員233 ・241 にてかわし、移線用電線保
持用金車をかわした送電線1Aに再び取付け、新設鉄塔
211 側のウインチ224 を作業員232 が操作して引きワイ
ヤー218 を巻き取り、既設鉄塔201 側のウインチ222 を
作業員231 により金車221 を介在させて前記移線用電線
保持用金車に連結した送り出しワイヤー220 を送り出し
ながら、送電線1Aの地上高を調整しながら、作業員24
3 ・244 により新設鉄塔211 のアーム213 先端に配置す
る。送電線1Aの配置位置を1A' で示す。
Transmission line 1A reaching the top of the existing steel tower 201
In the same manner as in the conventional method above, the top of the existing steel tower 201 and the pedestal 216 were evacuated by the workers 233 and 241 and reattached to the power transmission line 1A where the transfer wire holding car was evaded, and the new steel tower was installed.
The winch 224 on the 211 side is operated by the worker 232 to wind up the pulling wire 218, and the winch 222 on the existing tower 201 side is connected to the wire holding wire car for wire transfer by the worker 231 through the gold wheel 221. The worker 24 while adjusting the ground clearance of the power transmission line 1A while sending out the sent wire 220
3 ・ By 244, locate at the tip of arm 213 of new steel tower 211. The arrangement position of the power transmission line 1A is indicated by 1A '.

【0023】この移線工法の作業者は、上述の外に既設
鉄塔201 のアーム205 上の作業者245 と、地上で作業を
監視する作業者246 との合計8名が必要である。他の送
電線2A・3Aも同様にして行う。
In addition to the above, a total of eight workers, namely, a worker 245 on the arm 205 of the existing steel tower 201 and a worker 246 who monitors the work on the ground are required as the workers of this transfer method. The other power transmission lines 2A and 3A are similarly processed.

【0024】[0024]

【発明が解決しようとする課題】上述のように送電線を
移線するのに送電線を切断して行う工法では送電線落下
に対する防護対策が必要で、その防護対策として広い範
囲に保護足場を構築する必要があるが、昨今の社会情勢
下で用地交渉が難航することが多く、また、長期間防護
足場を設置したままとなることが多い。
As described above, in the construction method in which the power transmission line is cut in order to transfer the power transmission line, it is necessary to take protective measures against a drop in the transmission line. Although it is necessary to build it, land negotiations are often difficult under the recent social conditions, and in many cases, protection scaffolding remains installed for a long time.

【0025】また、既設鉄塔のアームから新設鉄塔の頂
部をかわした新設鉄塔に、既設鉄塔から仮設鉄塔側にあ
るいは仮設鉄塔から新設鉄塔側に送電線を移線する従来
工法および既設鉄塔アームより既設鉄塔頂部を送電線を
かわして新設鉄塔の各アームに移線する移線用ガイドロ
ーラを用いた工法のいずれにおいても、送電線を鉄塔の
頂部および台棒をかわす必要があり、送電線の移線に多
大な時間を要し、また、送電線の移線に多くの作業員を
要し、さらに、作業員の鉄塔上での移動が多く危険であ
るばかりか作業性の向上が図れなかった。
[0025] In addition, a conventional construction method of transferring a transmission line from the existing steel tower arm to the new steel tower, which is the top of the new steel tower, or from the existing steel tower to the temporary steel tower side, or from the existing steel tower arm to the existing steel tower arm In any of the methods using the transfer guide rollers that move the transmission line from the top of the steel tower to each arm of the new steel tower, it is necessary to dodge the top of the steel tower and the pedestal, and It took a lot of time for the line, many workers were required for transferring the transmission line, and moreover, there was a lot of worker movement on the tower, which was dangerous and workability could not be improved. .

【0026】[0026]

【課題を解決するための手段】そこで、本発明は、上記
の事情に鑑み、防護足場を設けて送電線を切断して送電
線のかわし作業における防護足場をなくすため、また、
鉄塔頂部における送電線のかわし作業をなくしできるだ
け作業員を少なくし、しかも安全で効率的な送電線の移
線工法とすべく、既設鉄塔のアーム間に張架された送電
線を既設鉄塔の側方に位置した新設鉄塔側に、既設鉄塔
から仮設鉄塔側にあるいは仮設鉄塔から新設鉄塔側に送
電線を移線する送電線の移線工法であって、鉄塔の頂部
に頂部金車を配置し、アーム端部にアーム先金車を配置
し、頂部金車とアーム先金車との間に送電線を案内する
ガイドワイヤーを張架し、移線すべき送電線の一部に移
線用ローラを装着し、この移線用ローラに引きワイヤー
と送り出しワイヤーとを連結したのち、送り出しワイヤ
ーを移線元鉄塔側から送り出しながら引きワイヤーを移
線先鉄塔側において引き上げ、移線すべき送電線を移線
元鉄塔側から移線先鉄塔側に引き上げるに際し、前記頂
部金車およびアーム先金車により前記引きワイヤー、送
り出しワイヤーおよび移線用ローラの引き上げ動作を案
内し、鉄塔頂部を通過する移線すべき送電線のかわし動
作を前記頂部金車およびアーム先金車で案内するように
成したものである。
In view of the above circumstances, the present invention provides a protective scaffold to cut off the power transmission line to eliminate the protective scaffold in the work of bypassing the power transmission line.
In order to eliminate the work to dodge the transmission line at the top of the tower and to reduce the number of workers as much as possible, and to make the transmission line construction method safe and efficient, the transmission line stretched between the arms of the existing tower is installed on the side of the existing tower. It is a method of transferring a transmission line to a new steel tower side located on the side of the existing steel tower to the temporary steel tower side or from the temporary steel tower to the new steel tower side. , Place an arm tip wagon at the end of the arm, stretch a guide wire that guides the power transmission line between the top wagon and the arm tip wagon, and transfer it to a part of the transmission line to be transferred After installing the roller and connecting the pulling wire and the sending wire to this transfer roller, pulling out the pulling wire at the moving tower tower side while sending the sending wire from the moving tower tower side, the power transmission line to be transferred Transfer from the original tower side When pulling up to the steel tower side, guide the pulling operation of the pulling wire, the sending wire and the wire transfer roller by the top wire wheel and the arm tip wringing wheel, and dodge the power transmission line to be transferred passing through the top of the steel tower. It is designed to be guided by a top gold wheel and an arm tip gold wire.

【0027】また、本発明は、送電線の脱線防止と送電
線の下方への移動を円滑に行わせるために、既設鉄塔の
アーム間に張架された送電線を既設鉄塔の側方に位置し
た新設鉄塔側に、既設鉄塔から仮設鉄塔側にあるいは仮
設鉄塔から新設鉄塔側に送電線を移線する際に送電線の
案内に使用する鉄塔頂部に配置する頂部金車、アーム端
部に配置するアーム先金車の移線用工具において、送電
線が外れるのを防止する脱線防止用ローラを設けると共
に、送電線を案内するガイドワイヤーを張架するガイド
ワイヤー用ローラを設けたものである。
Further, according to the present invention, in order to prevent derailment of the power transmission line and to smoothly move the power transmission line downward, the power transmission line stretched between the arms of the existing steel tower is located on the side of the existing steel tower. Installed on the new steel tower side, the top rail car to be installed on the top of the steel tower used for guiding the power transmission line when transferring the power transmission line from the existing steel tower to the temporary steel tower side or from the temporary steel tower to the new steel tower side, and the arm end In the tool for wire transfer of the arm tip wrench, the derailment prevention roller for preventing the power transmission line from coming off and the guide wire roller for stretching the guide wire for guiding the power transmission line are provided.

【0028】さらに、本発明は、送電線が保持でき鉄塔
頂部およびアーム先を移動できるようにすべく、既設鉄
塔のアーム間に張架された送電線を既設鉄塔の側方に位
置した新設鉄塔側に、既設鉄塔から仮設鉄塔側にあるい
は仮設鉄塔から新設鉄塔側に送電線を移線する送電線の
移線工法に使用される移線用ローラであって、フレーム
の両端に送電線を案内する水平ローラと垂直ローラとを
設け、送電線に取付け可能にするため一部の水平ローラ
を開閉自在とし、フレームの中央部に引きワイヤーと送
り出しワイヤーとを連結するようにしたものである。
Further, according to the present invention, in order to be able to hold the power transmission line and move the tower top and the arm tip, the power transmission line stretched between the arms of the existing steel tower is located at the side of the existing steel tower. A transfer roller used in the transfer line construction method for transferring a transmission line from the existing steel tower to the temporary steel tower side or from the temporary steel tower to the new steel tower side, and guides the power transmission line to both ends of the frame. A horizontal roller and a vertical roller are provided, some of the horizontal rollers can be opened and closed so that they can be attached to the power transmission line, and the pulling wire and the sending wire are connected to the central portion of the frame.

【0029】[0029]

【作用】鉄塔の頂部に頂部金車を配置し、アーム端部に
アーム先金車を配置し、頂部金車とアーム先金車との間
に送電線を案内するガイドワイヤーを張架し、移線すべ
き送電線の一部に移線用ローラを装着し、この移線用ロ
ーラに引きワイヤーと送り出しワイヤーとを連結したの
ち、送り出しワイヤーを移線元鉄塔側から送り出しなが
ら引きワイヤーを移線先鉄塔側において引き上げ、移線
すべき送電線を移線元鉄塔側から移線先鉄塔側に引き上
げるに際し、前記頂部金車およびアーム先金車により前
記引きワイヤー、送り出しワイヤーおよび移線用ローラ
の引き上げ動作を案内し、鉄塔頂部を通過する移線すべ
き送電線のかわし動作を前記頂部金車およびアーム先金
車で案内する。
[Operation] A top gold wheel is placed on the top of the steel tower, an arm tip gold wheel is placed at the end of the arm, and a guide wire for guiding the power transmission line is stretched between the top gold wheel and the arm tip gold wheel. A transfer roller is attached to a part of the power transmission line to be transferred, and after connecting the pulling wire and the sending wire to this moving roller, the pulling wire is transferred while sending the sending wire from the side of the transfer original tower. At the time of pulling up on the side of the railway tower, when pulling the transmission line to be transferred from the side of the source tower to the side of the destination tower, the pulling wire, the sending wire and the transfer roller are moved by the top and the end wheels. Of the power transmission line to be transferred passing through the top of the steel tower is guided by the top wrench and the arm tip wrench.

【0030】また、頂部金車およびアーム先金車では、
脱線防止用ローラを開いて送電線を装着し、頂部金車と
アーム先金車との間にガイドワイヤーを張架して送電線
を案内する。さらに、移線用ローラには水平ローラを開
閉して送電線を取付け、引きワイヤーと送りワイヤーと
を連結し、頂部金車およびアーム先金車を通過させる。
Further, in the top gold wheel and the arm tip gold wheel,
The derailment prevention roller is opened to attach the power transmission line, and a guide wire is stretched between the top gold wheel and the arm tip gold wire to guide the power line. Further, a horizontal roller is opened and closed on the transfer roller to attach a power transmission line, and the pulling wire and the feed wire are connected to each other so that the top shed wheel and the arm tip shed wheel are passed.

【0031】[0031]

【実施例】本発明を、添付する図面に示す具体的一実施
例に基づいて以下詳細に説明する。本発明の移線工法で
は、頂部金車、アーム先金車および移線用ローラが使用
され、頂部金車には新設鉄塔用と仮鉄塔用とがある。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below based on a specific embodiment shown in the accompanying drawings. In the wire transfer method of the present invention, a top gold wheel, an arm tip gold wire and a wire transfer roller are used, and there are a top gold wheel for a new steel tower and a temporary steel tower.

【0032】まず、新設鉄塔用頂部金車1について図1
・2・3により説明する。取付ベース2上に所定間隔へ
だてて2枚のフレーム3を起立させ、2枚のフレーム3
の間で両側にはワイヤーを通る溝4を刻設したローラ5
が回転軸6の回りに回転自在に設けられている。このフ
レーム3の両端部には前記ローラ5にワイヤーを通した
際、ワイヤーがローラ5から脱線しないように前記回転
軸6のまわりにローラフレーム7を介して脱線防止用ロ
ーラ8を回転自在に設ける。脱線防止用ローラ8はロー
ラ5の溝4にワイヤーが通せるように支軸9のまわりに
開閉できるように枢着され、先端に螺着したナット10に
よりフレーム3に固定できるようにされている。
First, regarding the top rail car 1 for the new steel tower, FIG.
・ Explanation will be given in 2-3. Place the two frames 3 on the mounting base 2 at a predetermined interval, and raise the two frames 3
Roller 5 with groove 4 passing through the wire on both sides between
Is rotatably provided around the rotary shaft 6. At both ends of the frame 3, derailment prevention rollers 8 are rotatably provided around the rotating shaft 6 via roller frames 7 so that the wires do not derail from the roller 5 when the wire is passed through the rollers 5. . The derailment prevention roller 8 is pivotally attached to the groove 4 of the roller 5 so as to be opened and closed around a support shaft 9 so that the wire can pass therethrough, and can be fixed to the frame 3 by a nut 10 screwed to the tip. .

【0033】また、フレーム3の中央部のローラ5とロ
ーラ5との間には、補助ローラ11が回転自在に架設され
ている。さらに、回転軸6の突出した両端にはガイドワ
イヤー用ローラ12がそれぞれ回転自在に設けられ、この
ガイドワイヤー用ローラ12にもガイドワイヤーの脱線防
止用ローラ14が同様にローラフレーム13を介して設けら
れ、脱線防止用ローラ14は支軸15のまわりに開閉自在で
ローラ14の先端に螺着したナット16によりローラフレー
ム13に固定する。
An auxiliary roller 11 is rotatably installed between the roller 5 and the roller 5 at the center of the frame 3. Further, guide wire rollers 12 are rotatably provided at both ends of the rotation shaft 6, and guide wire derailing prevention rollers 14 are also provided on the guide wire rollers 12 via roller frames 13. The derailment prevention roller 14 is freely openable and closable around the support shaft 15 and fixed to the roller frame 13 by a nut 16 screwed to the tip of the roller 14.

【0034】次に図4・5・6で仮鉄塔用頂部金車21に
ついて述べる。取付ベース22上に2枚のフレーム23を起
立させ、フレーム23間にワイヤーを通す溝24を刻設した
ローラ25を回転軸26のまわりに回転自在に設ける。この
フレーム23には、前記ローラ25にワイヤーを通した際、
ワイヤーがローラ25から脱線しないように前記回転軸26
のまわりにローラフレーム27を介して脱線防止用ローラ
28を回転自在に設ける。脱線防止用ローラ28はローラ25
の溝24にワイヤーが通せるように支軸29のまわりに開閉
できるように枢着され、先端に螺着したナット30により
フレーム23に固定できるようにされている。
Next, the top wheel & pinion 21 for the temporary tower will be described with reference to FIGS. Two frames 23 are erected on the mounting base 22, and a roller 25 having grooves 24 for passing wires between the frames 23 is provided rotatably around a rotary shaft 26. In this frame 23, when a wire is passed through the roller 25,
In order to prevent the wire from derailing from the roller 25, the rotary shaft 26
Derailment prevention roller around the roller frame 27
28 is rotatably installed. Derailment prevention roller 28 is roller 25
It is pivotally mounted so that it can be opened and closed around a support shaft 29 so that the wire can pass through the groove 24, and can be fixed to the frame 23 by a nut 30 screwed at the tip.

【0035】また、回転軸26の突出した両端にはガイド
ワイヤー用ローラ32がそれぞれ回転自在に設けられ、こ
のガイドワイヤー用ローラ32にもガイドワイヤーの脱線
防止用ローラ34が同様にローラフレーム33を介して設け
られ、脱線防止用ローラ34は支軸35のまわりに開閉自在
でローラ34の先端に螺着したナット36によりローラフレ
ーム33に固定する。
A guide wire roller 32 is rotatably provided at both ends of the rotary shaft 26, and a guide wire derailing prevention roller 34 is also provided on the guide wire roller 32. The derailment prevention roller 34, which is provided via the support shaft 35, can be freely opened and closed around the support shaft 35 and is fixed to the roller frame 33 by a nut 36 screwed to the tip of the roller 34.

【0036】図7・8・9によりアーム先金車41につい
て述べる。取付金具42から起立させた2枚のフレーム43
間に、ワイヤーを通す溝44を刻設したローラ45を回転軸
46のまわりに回転自在に設ける。このフレーム43には、
前記ローラ45にワイヤーを通した際ワイヤーがローラ45
から脱線しないように前記回転軸46のまわりにローラフ
レーム47を介して脱線防止用ローラ48を回転自在に設け
る。脱線防止用ローラ48はローラ45の溝44にワイヤーが
通せるように支軸49のまわりに開閉できるように枢着さ
れ、先端に螺着したナット50によりフレーム43に固定で
きるようにされている。
The arm tip wheel 41 will be described with reference to FIGS. Two frames 43 standing upright from the mounting bracket 42
A roller 45 with a groove 44 through which a wire is inserted
It is rotatably installed around 46. In this frame 43,
When the wire is passed through the roller 45, the wire
A derailment prevention roller 48 is rotatably provided around the rotating shaft 46 via a roller frame 47 so as not to be derailed. The derailment prevention roller 48 is pivotally mounted so that it can be opened and closed around a support shaft 49 so that the wire can pass through the groove 44 of the roller 45, and can be fixed to the frame 43 by a nut 50 screwed at the tip. .

【0037】また、回転軸46の突出した両端にはガイド
ワイヤー用ローラ52がそれぞれ回転自在に設けられ、こ
のガイドワイヤー用ローラ52にもガイドワイヤーの脱線
防止用ローラ54が同様にローラフレーム53を介して設け
られ、脱線防止用ローラ54は支軸55のまわりに開閉自在
で脱線防止用ローラ54の先端に螺着したナット56により
ローラフレーム53に固定する。
A guide wire roller 52 is rotatably provided at both ends of the rotary shaft 46, and a guide wire derailing prevention roller 54 is also provided on the guide wire roller 52. The derailment prevention roller 54 is opened and closed around the support shaft 55 and fixed to the roller frame 53 by a nut 56 screwed to the tip of the derailment prevention roller 54.

【0038】次に、図10・11・12により移線用ローラ61
について述べる。フレーム62の両端にそれぞれ水平ロー
ラ63・64を配置する。水平ローラ63・64はワイヤーが案
内できるように円弧溝65・66に形成されている。また、
水平ローラ63と水平ローラ64との間は送電線が通り得る
ように上下に隔てて配置してある。
Next, referring to FIGS.
I will describe. Horizontal rollers 63 and 64 are arranged at both ends of the frame 62, respectively. The horizontal rollers 63 and 64 are formed in circular arc grooves 65 and 66 so that the wires can be guided. Also,
The horizontal roller 63 and the horizontal roller 64 are vertically separated from each other so that a power transmission line can pass therethrough.

【0039】この移線用ローラ61に送電線が装着できる
ように、水平ローラ64は、外側の水平ローラ641 ・644
は垂直の支軸651 ・654 のまわりに水平方向に回動可能
に設けられ、ナット661 ・664 により固定可能に設けら
れ、内側の水平ローラ642 ・643 は水平支軸652 ・653
のまわりに垂直方向に回動可能に設けられ、ナット662
・663 により固定可能に設けられている。
The horizontal roller 64 is an outer horizontal roller 64 1 64 4 so that the power transmission line can be mounted on the transfer roller 61.
Is provided rotatably in a horizontal direction around the vertical support shaft 65 1 - 65 4, provided to be secured by a nut 66 1-66 4, the inside of the horizontal roller 64 2-64 3 horizontal shaft 65 2・ 65 3
Rotatably mounted vertically around the nut 66 2
It is provided to be fixed by-66 3.

【0040】また、このフレーム62の両端には送電線が
通り得るようにして垂直ローラ67が設けられている。さ
らに、フレーム63の下面にはガイドローラ68が設けられ
ている。次に、上述の頂部金車1、アーム先金車41およ
び移線用ローラ61を用いて送電線を移線する工法を説明
する。
Further, vertical rollers 67 are provided at both ends of the frame 62 so that power transmission lines can pass therethrough. Further, a guide roller 68 is provided on the lower surface of the frame 63. Next, a method of transferring a power transmission line using the above-described top gold wheel 1, arm tip gold wheel 41 and wire transfer roller 61 will be described.

【0041】まず、図13に示す既設鉄塔71のアーム73か
ら新設鉄塔81の頂部をかわし新設鉄塔81に送電線1Bを
移送する工法について説明する。既設鉄塔71の塔体72の
上部には水平状のアーム73・74・75が所定間隔へだてて
配設され、各アーム73・74・75の先端には碍子連 (図示
せず) を介して上線・中線・下線の送電線1B・2B・
3Bが吊り下げられている。
First, a method of transferring the power transmission line 1B to the new steel tower 81 by bypassing the top of the new steel tower 81 from the arm 73 of the existing steel tower 71 shown in FIG. 13 will be described. Horizontal arms 73, 74, and 75 are arranged at predetermined intervals above the tower body 72 of the existing steel tower 71, and at the tip of each arm 73, 74, and 75, there is an insulator string (not shown). Upper / middle / underline transmission lines 1B / 2B /
3B is suspended.

【0042】新設鉄塔81は既設鉄塔71の側方に配置さ
れ、既設鉄塔71より高く、同様に塔体82の上方に水平状
のアーム83・84・85が所定間隔へだてて配設され、各ア
ーム83・84・85の先端に前記送電線1B・2B・3Bを
移線して吊り下げるようになっている。ここで、新設鉄
塔81の頂部に頂部金車1を取付ける。
The new steel tower 81 is arranged beside the existing steel tower 71 and is higher than the existing steel tower 71. Similarly, horizontal arms 83, 84 and 85 are arranged above the tower body 82 at predetermined intervals. The power transmission lines 1B, 2B and 3B are transferred to and suspended from the ends of the arms 83, 84 and 85. Here, the top gold wheel 1 is attached to the top of the new steel tower 81.

【0043】新設鉄塔81のアーム83・84・85先端にアー
ム先金車41を取付ける。次に、新設鉄塔81より既設鉄塔
71に引きワイヤー76を通す。引きワイヤー76を頂部金車
1の脱線防止用ローラ8を開いて通し脱線防止用ローラ
8を閉じて頂部金車1のローラ5に通し、さらに、引き
ワイヤー76をアーム先金車41の脱線防止用ローラ48を開
いて通し脱線防止用ローラ48を閉じてアーム先金車41の
ローラ45に通す。
The arm tip pinion 41 is attached to the tips of the arms 83, 84 and 85 of the new steel tower 81. Next, from the new steel tower 81 to the existing steel tower
Draw wire 76 through 71. The pull wire 76 is opened to open the derailment prevention roller 8 of the top gold wheel 1 and the derailment prevention roller 8 is closed to pass through the roller 5 of the top gold wheel 1. Further, the pull wire 76 is prevented from derailing the arm tip wagon 41. The roller 48 is opened and the derailment prevention roller 48 is closed, and the roller 45 is passed through the arm 45.

【0044】この引きワイヤー76の先端を移線用ローラ
61のフック69に取付け、移線用ローラ61の水平ローラ64
を開き、図18・図19に示すように、送電線3Bを水平ロ
ーラ64と水平ローラ63および縦ローラ67の間に入れ、水
平ローラ64を閉じ、水平ローラ63、水平ローラ64、縦ロ
ーラ67と送電線3Bとの接触面で送電線3Bを保持す
る。
The tip of this pulling wire 76 is a roller for transfer.
Attached to the hook 69 of 61, the horizontal roller 64 of the transfer roller 61
18 and 19, as shown in FIGS. 18 and 19, the power transmission line 3B is inserted between the horizontal roller 64 and the horizontal roller 63 and the vertical roller 67, the horizontal roller 64 is closed, and the horizontal roller 63, the horizontal roller 64, and the vertical roller 67 are closed. The power transmission line 3B is held by the contact surface between the power transmission line 3B and the power transmission line 3B.

【0045】引きワイヤー76の他端側途中に金車77・78
を介在させてウインチ79に連結する。一方、既設鉄塔71
側では送り出しワイヤー86を前記移線用ローラ61のフッ
ク87に連結し、途中に金車88・89を介在させてウインチ
90に連結する。引きワイヤー76を作業者91がウインチ79
にて巻き取り同時に送り出しワイヤー86を作業者92によ
り送り出しながら送電線3Bを新設鉄塔81の頂部まで巻
き上げる。
Gold wheels 77 and 78 are provided in the middle of the other end of the pulling wire 76.
Is connected to the winch 79 by interposing. On the other hand, the existing steel tower 71
On the side, the sending wire 86 is connected to the hook 87 of the transfer roller 61, and the gold wheels 88 and 89 are interposed in the middle of the winch.
Connect to 90. Worker 91 winches 79 with pulling wire 76
At the same time as winding up, the sending wire 86 is sent out by the worker 92 and the power transmission line 3B is wound up to the top of the new steel tower 81.

【0046】すると、移線用ローラ61に取付けられてい
る引きワイヤー76および送り出しワイヤー86は、頂部金
車1のローラ5の溝4を通る。この際、移線用ローラ61
が頂部金車1の脱線防止用ローラ8の手前まで引っ張ら
れて来たとき、引きワイヤー76および送り出しワイヤー
86を一時停止し、頂部金車1の脱線防止用ローラ8およ
び14を開き移線用ローラ61が通過できるようにした後、
一時停止していた引きワイヤー76を作業者91がウインチ
79にて巻き取り同時に、送り出しワイヤー86を作業者92
により送り出し、頂部金車1のローラ5の溝4を移線用
ローラ61が通過する。また、移線用ローラ61が通過した
後頂部金車1の脱線防止用ローラ8および14を閉じて通
過完了となる。
Then, the pulling wire 76 and the sending wire 86 attached to the transfer roller 61 pass through the groove 4 of the roller 5 of the top wheel & pinion 1. At this time, the transfer roller 61
When the wire is pulled up to just before the derailment prevention roller 8 of the top wheel & pinion 1, the pulling wire 76 and the sending wire
After temporarily stopping 86 and opening the derailment prevention rollers 8 and 14 of the top wheel & pinion 1 to allow the transfer roller 61 to pass,
The worker 91 winches the pulling wire 76 that was suspended.
At the same time as winding at 79, the worker sends out the sending wire 86.
And the transfer roller 61 passes through the groove 4 of the roller 5 of the top wheel & pinion 1. In addition, after the transfer roller 61 has passed, the derailment prevention rollers 8 and 14 of the top gold wheel 1 are closed to complete the passage.

【0047】送電線3Bを保持した移線用ローラ61が頂
部金車1を安全かつ確実に通過できるように、図18・図
19に示すように、頂部金車1の両側のガイドワイヤー用
ローラ12にはガイドワイヤー99が掛け回され、そのガイ
ドワイヤー99上を移線用ローラ61のガイドローラ68が回
転すると共に、移線用ローラ61のフレーム62下面の全幅
にわたって設けたガイド棒70が頂部金車1のローラ5の
溝4に案内される。
In order that the transfer roller 61 holding the power transmission line 3B can safely and reliably pass through the top wheel & pinion 1, FIG.
As shown in FIG. 19, the guide wire 99 is wound around the guide wire rollers 12 on both sides of the top wheel & pinion 1, and the guide roller 68 of the transfer roller 61 rotates on the guide wire 99 and the wire transfer is performed. A guide rod 70 provided over the entire width of the lower surface of the frame 62 of the roller 61 is guided to the groove 4 of the roller 5 of the top wheel & pinion 1.

【0048】また、頂部金車1の脱線防止用ローラ8
は、既設鉄塔に対し新設鉄塔が側方でなく斜め側方に設
置されている場合、引きワイヤー76や送り出しワイヤー
86が頂部金車1のローラ5から外れるのを積極的に防止
できる。
Further, the derailment prevention roller 8 of the top gold wheel 1
If the new steel tower is installed on the diagonal side of the existing steel tower instead of on the side, the pulling wire 76 and the sending wire
It is possible to positively prevent the 86 from coming off the roller 5 of the top wheel & pinion 1.

【0049】さらに、引きワイヤー76は巻き取られ、送
り出しワイヤー86は送り出され、送電線3Bを保持した
移線用ローラ61は、アーム83のアーム先金車41の手前ま
で引っ張られその時点で一時停止し、アーム83はアーム
先金車41の脱線防止用ローラ48および54を開いて、移線
用ローラ61が通過出来る状態にし、一時停止していた引
きワイヤー76を作業者91がウインチ79にて巻き取り同時
に、送り出しワイヤー86を作業者92により送り出し、ア
ーム83のアーム先金車41の金車溝44を移線用ローラ61が
通過する。また、移線用ローラ61が通過した後アーム83
のアーム先金車41の脱線防止用ローラ48および54を閉じ
て通過完了となる。さらに、アーム84のアーム先金車41
とアーム85のアーム先金車41を同じように移線用ローラ
61を通過させる。送電線3Bはアーム85上の作業員93に
より移線用ローラ61から水平ローラ64を開き取り出さ
れ、所定位置に配置される。送電線3Bの配置位置を3
B'で示す。
Further, the pulling wire 76 is wound up, the sending wire 86 is sent out, and the transfer roller 61 holding the power transmission line 3B is pulled up to the front of the arm tip wagon 41 of the arm 83, and at that time, When the arm 83 stops, the derailment prevention rollers 48 and 54 of the arm tip wring 41 are opened so that the transfer roller 61 can pass through, and the worker 91 moves the temporarily stopped pulling wire 76 to the winch 79. At the same time as the winding, the sending wire 86 is sent out by the worker 92, and the transfer roller 61 passes through the gold wheel groove 44 of the arm tip ratchet wheel 41 of the arm 83. Also, the rear arm 83 after the transfer roller 61 has passed
The derailment preventing rollers 48 and 54 of the arm tip wring 41 are closed to complete the passage. In addition, the arm tip car 41 of the arm 84
And arm 85 of arm tip wagon 41 in the same way
Pass 61. The power transmission line 3B is placed at a predetermined position by the worker 93 on the arm 85 opening and removing the horizontal roller 64 from the transfer roller 61. Set the position of transmission line 3B to 3
Shown as B '.

【0050】送電線3Bを保持した移線用ローラ61がア
ーム先金車41を安全かつ確実に通過できるように、図20
・図21に示すように、アーム先金車41の両側のガイドワ
イヤー用ローラ52にはガイドワイヤー99が掛けられ、そ
のガイドワイヤー99に移線用ローラ61のガイドローラ68
が当接して回転すると共に、移線用ローラのガイド棒70
がアーム先金車41のローラ45の溝44に案内される。
In order that the transfer roller 61 holding the power transmission line 3B can safely and reliably pass through the arm tip pulley 41, as shown in FIG.
As shown in FIG. 21, the guide wire 99 is hooked on the guide wire rollers 52 on both sides of the arm tip ratchet 41, and the guide roller 68 of the transfer roller 61 is attached to the guide wire 99.
Abuts and rotates, and the guide rod 70 of the transfer roller
Is guided to the groove 44 of the roller 45 of the arm tip pulley 41.

【0051】この移線工法の作業者は、上述の外に新設
鉄塔81頂部の作業者97と、既設鉄塔71のアーム75上の作
業者94・95と、地上で作業を監視する作業者96との合計
7名である。他の送電線2B・1Bも同様にして移線す
る。次に図14に示すように既設鉄塔71のアームより既設
鉄塔71の頂部で送電線をかわして新設鉄塔81の各アーム
へ移線する送電線の移線工法について述べる。
In addition to the above, the workers of this transfer method are workers 97 at the top of the new steel tower 81, workers 94 and 95 on the arm 75 of the existing steel tower 71, and workers 96 who monitor the work on the ground. And a total of 7 people. The other power transmission lines 2B and 1B are also transferred in the same manner. Next, as shown in FIG. 14, a method of transferring a transmission line from the arm of the existing steel tower 71 to the respective arms of the new steel tower 81 by bypassing the transmission line at the top of the existing steel tower 71 will be described.

【0052】まず、既設鉄塔71の頂部に頂部金車1を取
付け、アーム73・74・75先端にアーム先金車41を通し、
引きワイヤー76の先端に移線用ローラ61を取付け、この
移線用ローラ61に送電線1Aを保持させる。引きワイヤ
ー76の基端側はアーム83を通して金車78を介在させてウ
インチ79に連結する。
First, the top gold wheel 1 is attached to the top of the existing steel tower 71, and the arm tip gold wheel 41 is passed through the tips of the arms 73, 74, and 75,
A transfer roller 61 is attached to the tip of the pulling wire 76, and the transfer roller 61 holds the power transmission line 1A. The base end side of the pulling wire 76 is connected to the winch 79 through the arm 83 with the gold wheel 78 interposed.

【0053】一方、前記移線用ローラ61に送り出しワイ
ヤー86は途中に金車77・78を介在させてウインチ90に連
結する。作業者91がウインチ79を作動させて引きワイヤ
ー76を巻き取り、作業者92によりウインチ90を作動して
送り出しワイヤー86を送り出す。すると、移線用ローラ
61に保持された送電線1Aは既設鉄塔71の頂部の頂部金
車1に至り直ちに通過し、アーム83先端に至る。アーム
83上の作業者93・94は移線用ローラ61から送電線1Aを
取り外し、アーム83先端に取付ける。なお、ガイドワイ
ヤー99は送電線1Aを案内する。送電線1Aの配置位置
を1A' で示す。
On the other hand, the sending wire 86 is connected to the winch 90 with the gold wheels 77 and 78 interposed on the way to the transfer roller 61. The worker 91 operates the winch 79 to wind up the pulling wire 76, and the worker 92 operates the winch 90 to send out the sending wire 86. Then, the transfer roller
The power transmission line 1A held by 61 reaches the top rail car 1 at the top of the existing steel tower 71 and immediately passes therethrough to reach the tip of the arm 83. arm
The workers 93 and 94 on 83 remove the power transmission line 1A from the transfer roller 61 and attach it to the tip of the arm 83. The guide wire 99 guides the power transmission line 1A. The arrangement position of the power transmission line 1A is indicated by 1A '.

【0054】この移線工法の作業者も合計7名である。
他の送電線2A・3Aも同様にして移線する。また、上
記の実施例では新設鉄塔が既設鉄塔の真横にある例につ
いて述べているが、新設鉄塔が真横にある場合だけでな
く斜め横に設置された場合にも適用できる。
There are a total of 7 workers in this transfer method.
The other power transmission lines 2A and 3A are also transferred in the same manner. Further, although the above-mentioned embodiment describes the example in which the new steel tower is right next to the existing steel tower, the present invention can be applied not only when the new steel tower is right next to it but also when it is diagonally installed.

【0055】新設鉄塔を既設鉄塔の斜め横に設置した場
合、その平面図を図22および図23に示す。既設鉄塔71と
既設鉄塔71との間隔は、ほぼ 350m程度で、新設鉄塔81
の既設鉄塔71からの平行移動距離はほぼ15mまでであ
る。移設元の既設鉄塔71に取付けてある送電線1Aをア
ーム先から取り外し、移線用ローラ61に保持させ、この
移線用ローラ61には送り出しワイヤー86と引きワイヤー
76とを設け、アーム先部にガイドワイヤー99を張り、送
電線1Aを送り出しワイヤー86で送りつつ引きワイヤー
76で引きつつ緊張させた状態で送電線1Aを移動させ、
アーム先金車41、頂部金車1をかわして新設鉄塔81の移
動先に移線する。
22 and 23 are plan views showing a case where the new steel tower is installed diagonally to the side of the existing steel tower. The distance between the existing steel tower 71 and the existing steel tower 71 is approximately 350 m.
The parallel travel distance from the existing steel tower 71 is up to approximately 15 m. The power transmission line 1A attached to the existing steel tower 71 of the relocation source is detached from the arm tip and held by the transfer roller 61, and the transfer roller 61 has a sending wire 86 and a pulling wire.
76 is provided, a guide wire 99 is stretched at the arm tip, and the transmission wire 1A is sent out by the wire 86 while being pulled.
Move the power transmission line 1A while pulling at 76 and being tense,
Dodge the arm tip wagon 41 and the top wagon 1, and transfer to the destination of the new steel tower 81.

【0056】送電線1Aはアーム先での支持部および既
設鉄塔71間にたわみを存在して張設されているので、通
常は移線元のみを取り外し、移線元の両側では送電線1
Aを固定した状態で移線を行う。移線する際、移線先へ
の長さが足りない場合は、移線元で送電線1Aを切断せ
ずに、移線元の両側のうちの何れか一箇所で送電線1A
を切断してつけ足し長さを確保する。
Since the power transmission line 1A is stretched and stretched between the supporting portion at the arm tip and the existing steel tower 71, only the transfer source is normally removed, and the transmission line 1 is provided on both sides of the transfer source.
Transfer the wire with A fixed. When the length of the transfer destination is insufficient when the wire is transferred, the power transmission line 1A is not cut at the wire transfer source and is cut at any one of both sides of the wire transfer source.
Cut and add to secure the length.

【0057】図22の図で上側の送電線1Aを新設鉄塔81
の図で上側に移線する斜視図が図14に対応し、図22の図
で下側の送電線1Aを新設鉄塔81の図で下側に移線する
斜視図が図13に対応する。図23には、図で下側の送電線
1Aを新設鉄塔81の図で下側に移線する例について示し
てある。の状態から順次の状態になって移線され
る。この際、送電線1Aの張り角度は徐々に変化する。
したがって、送電線1Aは移線ローラ61内を移動できる
ものでなければならない。送電線1Aは移線ローラ61内
を移動可能なものでなければならないが、移線ローラ61
が外れてはならず、移線ローラ61は送電線1Aを保持し
ているものである。移線ローラ61は送り出しワイヤー86
と引きワイヤー76とによって送電線1Aに緊張を与えて
送電線1Aを移線する。
In the diagram of FIG. 22, the upper transmission line 1A is connected to a new steel tower 81.
14 corresponds to FIG. 14, and the perspective view of the lower transmission line 1A in FIG. 22 corresponds to FIG. 13 for the new steel tower 81. FIG. 23 shows an example in which the lower transmission line 1A in the figure is transferred to the lower side in the figure of the new steel tower 81. The state is changed to a sequential state and the line is transferred. At this time, the tension angle of the power transmission line 1A gradually changes.
Therefore, the power transmission line 1A must be movable in the transfer roller 61. The power transmission line 1A must be movable in the transfer roller 61.
The transfer roller 61 holds the power transmission line 1A. Transfer roller 61 is sending wire 86
The power transmission line 1A is tensioned by the pulling wire 76 and the power transmission line 1A is transferred.

【0058】なお、上記の実施例では既設鉄塔から新設
鉄塔に送電線を移線する例について述べたが、既設鉄塔
から仮設鉄塔に、仮設鉄塔から新設鉄塔に移線する場合
も同様である。また、仮設鉄塔でなく仮設鉄柱の場合も
全く同様である。
In the above embodiment, an example of transferring the transmission line from the existing steel tower to the new steel tower has been described, but the same applies to the case of transferring the existing steel tower to the temporary steel tower and from the temporary steel tower to the new steel tower. The same applies to the case of a temporary iron pillar instead of a temporary steel tower.

【0059】[0059]

【発明の効果】本発明は、上述のように、既設鉄塔のア
ーム間に張架された送電線を既設鉄塔の側方に位置した
新設鉄塔側に、既設鉄塔から仮設鉄塔側にあるいは仮設
鉄塔から新設鉄塔側に送電線を移線する送電線の移線工
法であって、鉄塔の頂部に頂部金車を配置し、アーム端
部にアーム先金車を配置し、頂部金車とアーム先金車と
の間に送電線を案内するガイドワイヤーを張架し、移線
すべき送電線の一部に移線用ローラを装着し、この移線
用ローラに引きワイヤーと送り出しワイヤーとを連結し
たのち、送り出しワイヤーを移線元鉄塔側から送り出し
ながら引きワイヤーを移線先鉄塔側において引き上げ、
移線すべき送電線を移線元鉄塔側から移線先鉄塔側に引
き上げるに際し、前記頂部金車およびアーム先金車によ
り前記引きワイヤー、送り出しワイヤーおよび移線用ロ
ーラの引き上げ動作を案内し、鉄塔頂部を通過する移線
すべき送電線のかわし動作を前記頂部金車およびアーム
先金車で案内するように成したから、送電線を切断せず
に移線でき、防護足場は不要となり、広大な用地の確保
は不要となる。また、鉄塔頂部における送電線のかわし
作業をなくし、大幅に作業員を削減でき、さらに作業時
間の短縮が図れ、しかも安全で効率的な送電線の移線工
法とすることができる。
As described above, according to the present invention, the transmission line stretched between the arms of the existing steel tower is installed on the side of the new steel tower located on the side of the existing steel tower, or from the existing steel tower to the side of the temporary steel tower or the temporary steel tower. This is a method of transferring a transmission line to transfer the transmission line to the new steel tower side.The top gold wheel is placed at the top of the steel tower, the arm tip wagon is placed at the arm end, and the top gold wheel and the arm tip are placed. A guide wire that guides the power transmission line is stretched between the gold wheel and the transfer wire is attached to a part of the power transmission line to be transferred, and the pulling wire and the sending wire are connected to this transfer roller. After that, while pulling out the sending wire from the transfer source steel tower side, pull up the pulling wire at the transfer destination steel tower side,
In pulling up the power transmission line to be transferred from the transfer source steel tower side to the transfer destination steel tower side, guiding the pulling operation of the pulling wire, the sending wire and the transfer roller by the top gold wheel and arm tip gold wheel, Since it was configured to guide the dodging action of the power transmission line to be transferred that passes through the top of the steel tower with the top gold wheel and the arm tip wagon, it is possible to transfer without disconnecting the power line, and a protective scaffold becomes unnecessary, There is no need to secure vast land. In addition, the work of dodging the transmission line at the top of the steel tower can be eliminated, the number of workers can be significantly reduced, the work time can be shortened, and a safe and efficient transmission line transfer method can be provided.

【0060】また、本発明は、既設鉄塔のアーム間に張
架された送電線を既設鉄塔の側方に位置した新設鉄塔側
に、既設鉄塔から仮設鉄塔側にあるいは仮設鉄塔から新
設鉄塔側に送電線を移線する際に送電線の案内に使用す
る鉄塔頂部に配置する頂部金車、アーム端部に配置する
アーム先金車の移線用工具において、送電線が外れるの
を防止する脱線防止用ローラを設けると共に、送電線を
案内するガイドワイヤーを張架するガイドワイヤー用ロ
ーラを設けた移線用工具であるので、送電線の脱落防止
と送電線の下方への移動を円滑に行わせることができ
る。
Further, according to the present invention, the transmission line stretched between the arms of the existing steel tower is installed on the side of the new steel tower located on the side of the existing steel tower, from the existing steel tower to the temporary steel tower side, or from the temporary steel tower to the new steel tower side. Derailment to prevent the transmission line from being disconnected in the transfer tool of the top metal wheel to be installed on the top of the tower used for guiding the power line when transferring the power line, and the arm tip metal wheel to be installed at the end of the arm Since it is a transfer tool equipped with a prevention roller and a guide wire roller that stretches a guide wire that guides the power transmission line, it prevents the power transmission line from falling off and smoothly moves the power transmission line downward. Can be made.

【0061】さらに、本発明は、既設鉄塔のアーム間に
張架された送電線を既設鉄塔の側方に位置した新設鉄塔
側に移線する送電線の移線工法に使用される移線用ロー
ラであって、フレームの両端に送電線を案内する水平ロ
ーラと垂直ローラとを設け、送電線に取付け可能にする
ため一部の水平ローラを開閉自在とし、フレームの中央
部に引きワイヤーと送り出しワイヤーとを連結するよう
にした送電線の移線工法に使用される移線用ローラであ
るので、鉄塔の頂部金車およびアーム先金車で送電線の
かわし動作は必要でなく、直ちに鉄塔頂部およびアーム
先を通過させることができる。
Furthermore, the present invention is for a transfer line used in a transfer line construction method for transferring a transmission line stretched between the arms of an existing steel tower to the side of a new steel tower located on the side of the existing steel tower. Horizontal rollers and vertical rollers that guide the power transmission line at both ends of the frame, some of the horizontal rollers can be opened and closed so that they can be attached to the power transmission line, and a pulling wire and a feeding wire are sent to the center of the frame. Since it is a transfer roller used for the transfer method of the transmission line that is connected to the wire, it is not necessary to dodge the transmission line with the top wagon and the arm tip wagon of the steel tower. And the arm tip can be passed.

【図面の簡単な説明】[Brief description of drawings]

【図1】新設鉄塔用頂部金車の正面図である。FIG. 1 is a front view of a top rail car for a new steel tower.

【図2】図1の平面図である。FIG. 2 is a plan view of FIG.

【図3】図1の側面図である。FIG. 3 is a side view of FIG.

【図4】仮鉄塔用頂部金車の正面図である。FIG. 4 is a front view of a top rail wheel for a temporary steel tower.

【図5】図4の平面図である。FIG. 5 is a plan view of FIG.

【図6】図4の側面図である。FIG. 6 is a side view of FIG.

【図7】アーム先金車の正面図である。FIG. 7 is a front view of an arm tip wheel.

【図8】図7の平面図である。FIG. 8 is a plan view of FIG.

【図9】図7の側面図である。9 is a side view of FIG. 7. FIG.

【図10】移線用ローラの正面図である。FIG. 10 is a front view of a transfer roller.

【図11】図10の平面図である。11 is a plan view of FIG.

【図12】図10の側面図である。12 is a side view of FIG.

【図13】本発明の既設鉄塔のアームから新設鉄塔の頂
部をかわし新設鉄塔に送電線を移線する工法を説明する
斜視図である。
FIG. 13 is a perspective view illustrating a method of transferring a transmission line from the arm of an existing steel tower of the present invention to the top of the new steel tower and shifting the transmission line to the new steel tower.

【図14】本発明の既設鉄塔のアームより既設鉄塔の頂
部で送電線をかわして新設鉄塔の各アームへ移送する送
電線の移送工法を示す斜視図である。
FIG. 14 is a perspective view showing a method of transferring a power transmission line from the arm of the existing steel tower of the present invention to the power transmission line at the top of the existing steel tower to transfer to each arm of the new steel tower.

【図15】送電線を切断して既設鉄塔から新設鉄塔に送
電線を移線する従来工法の斜視図である。
FIG. 15 is a perspective view of a conventional method of cutting a power transmission line and transferring the power transmission line from an existing steel tower to a new steel tower.

【図16】既設鉄塔のアームから新設鉄塔の頂部をかわ
し新設鉄塔に送電線を移線する従来工法の斜視図であ
る。
FIG. 16 is a perspective view of a conventional method in which the transmission line is transferred to the new steel tower by bypassing the top of the new steel tower from the arm of the existing steel tower.

【図17】既設鉄塔アームより既設鉄塔頂部を送電線を
かわして新設鉄塔の各アームに移線する移線用ガイドロ
ーラを用いた工法の斜視図である。
FIG. 17 is a perspective view of a construction method using a transfer guide roller that transfers an existing steel tower top from the existing steel tower arm to each arm of the new steel tower by bypassing the power transmission line.

【図18】送電線を保持し引きワイヤーと送り出しワイ
ヤーとを連結した移線用ローラが頂部金車を通過する状
態を説明する正面図である。
FIG. 18 is a front view illustrating a state in which a transfer roller, which holds a power transmission line and connects a pulling wire and a sending wire, passes through a top wheel.

【図19】図18の側面図である。FIG. 19 is a side view of FIG.

【図20】送電線を保持し引きワイヤーと送り出しワイ
ヤーとを連結した移線用ローラがアーム先金車を通過す
る状態を説明する正面図である。
FIG. 20 is a front view illustrating a state in which a transfer roller holding a power transmission line and connecting a pulling wire and a sending wire passes through an arm tip wheel.

【図21】図20の側面図である。FIG. 21 is a side view of FIG. 20.

【図22】新設鉄塔を既設鉄塔の斜め横に設置した場合
の平面図である。
FIG. 22 is a plan view showing a case where a new steel tower is installed diagonally to the side of an existing steel tower.

【図23】新設鉄塔を既設鉄塔の斜め横に設置した場合
の移線状態を説明する平面図である。
FIG. 23 is a plan view for explaining a transfer state when a new steel tower is installed diagonally to the side of an existing steel tower.

【符号の説明】[Explanation of symbols]

71…既設鉄塔 73 ・74・75…アーム 1A・2A・3A…送電線 81…新設鉄塔 1B・2B・3B…送電線 1…頂部金車 21…アーム先金車 61…移線用ローラ 76…引きワイヤー 86…送り出しワイヤー 71… Existing steel tower 73 ・ 74 ・ 75… Arm 1A ・ 2A ・ 3A… Power transmission line 81… New steel tower 1B ・ 2B ・ 3B… Power transmission line 1… Top gold wheel 21… Arm tip wire 61… Transfer roller 76… Pull wire 86… Sending wire

───────────────────────────────────────────────────── フロントページの続き (72)発明者 柿原 秀則 大阪府大阪市北区中之島3丁目3番22号 関西電力株式会社内 (72)発明者 山田 広昭 大阪府大阪市北区中之島3丁目3番22号 関西電力株式会社内 (72)発明者 西村 知久 大阪府大阪市北区本庄東2丁目9番18号 関電興業株式会社内 (72)発明者 井上 均 兵庫県加東郡滝野町下滝野4丁目62番地 藤井電工株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Hidenori Kakihara 3-22 Nakanoshima, Kita-ku, Osaka City, Osaka Prefecture 3-22 Kansai Electric Power Co., Inc. (72) Hiroaki Yamada 3-chome Nakanoshima, Kita-ku, Osaka City, Osaka Prefecture No. 22 In Kansai Electric Power Co., Inc. (72) Inventor Tomohisa Nishimura 2-9-18 Honjo-higashi, Kita-ku, Osaka-shi, Osaka Inside Kanden Kogyo Co., Ltd. (72) Inventor Hitoshi Inoue 4-62 Shimotakino, Takino-cho, Kato-gun, Hyogo Prefecture Address within Fujii Electric Works Co., Ltd.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 既設鉄塔のアーム間に張架された送電線
を既設鉄塔の側方に位置した新設鉄塔側に、既設鉄塔か
ら仮設鉄塔側にあるいは仮設鉄塔から新設鉄塔側に送電
線を移線する送電線の移線工法であって、鉄塔の頂部に
頂部金車を配置し、アーム端部にアーム先金車を配置
し、頂部金車とアーム先金車との間に送電線を案内する
ガイドワイヤーを張架し、移線すべき送電線の一部に移
線用ローラを装着し、この移線用ローラに引きワイヤー
と送り出しワイヤーとを連結したのち、送り出しワイヤ
ーを移線元鉄塔側から送り出しながら引きワイヤーを移
線先鉄塔側において引き上げ、移線すべき送電線を移線
元鉄塔側から移線先鉄塔側に引き上げるに際し、前記頂
部金車およびアーム先金車により前記引きワイヤー、送
り出しワイヤーおよび移線用ローラの引き上げ動作を案
内し、鉄塔頂部を通過する移線すべき送電線のかわし動
作を前記頂部金車およびアーム先金車で案内するように
成した送電線の移線工法。
1. A transmission line extended between the arms of an existing steel tower is moved to the new steel tower side located on the side of the existing steel tower, from the existing steel tower to the temporary steel tower side, or from the temporary steel tower to the new steel tower side. It is a transfer method of a transmission line to be lined, in which a top gold wheel is placed at the top of the steel tower, an arm tip wagon is placed at the end of the arm, and a power transmission line is placed between the top gold wheel and the arm tip wagon. A guide wire to be guided is stretched, a transfer roller is attached to a part of the power transmission line to be transferred, the pulling wire and the feed wire are connected to this transfer roller, and then the feed wire is moved to the transfer source. While pulling out the pulling wire from the steel tower side at the transfer iron tower side, when pulling the transmission line to be transferred from the source steel tower side to the wire iron tower side, pull the wire with the top gold wheel and arm gold wire. Wire, delivery wire and A method for transferring a transmission line, which guides the pulling-up operation of the transfer roller and guides the dodging operation of the transmission line passing through the top of the steel tower to be transferred by the top gold wheel and the arm tip wheel.
【請求項2】 既設鉄塔のアーム間に張架された送電線
を既設鉄塔の側方に位置した新設鉄塔側に、既設鉄塔か
ら仮設鉄塔側にあるいは仮設鉄塔から新設鉄塔側に送電
線を移線する際に送電線の案内に使用する鉄塔頂部に配
置する頂部金車、アーム端部に配置するアーム先金車の
移線用工具において、送電線が外れるのを防止する脱線
防止用ローラを設けると共に、送電線を案内するガイド
ワイヤーを張架するガイドワイヤー用ローラを設けた移
線用工具。
2. The transmission line extended between the arms of the existing steel tower is moved to the new steel tower side located on the side of the existing steel tower, from the existing steel tower to the temporary steel tower side, or from the temporary steel tower to the new steel tower side. In the transfer tool for the top gold wheel to be installed on the top of the tower used for guiding the power transmission line when wiring, and the arm tip gold wheel to be installed at the arm end, a derailment prevention roller that prevents the power line from coming off is installed. A transfer tool provided with a guide wire roller for stretching a guide wire for guiding a power transmission line.
【請求項3】 既設鉄塔のアーム間に張架された送電線
を既設鉄塔の側方に位置した新設鉄塔側に、既設鉄塔か
ら仮設鉄塔側にあるいは仮設鉄塔から新設鉄塔側に送電
線を移線する送電線の移線工法に使用される移線用ロー
ラであって、フレームの両端に送電線を案内する水平ロ
ーラと垂直ローラとを設け、送電線に取付け可能にする
ため一部の水平ローラを開閉自在とし、フレームの中央
部に引きワイヤーと送り出しワイヤーとを連結するよう
にした送電線の移線工法に使用される移線用ローラ。
3. The transmission line extended between the arms of the existing steel tower is moved to the new steel tower side located on the side of the existing steel tower, from the existing steel tower to the temporary steel tower side, or from the temporary steel tower to the new steel tower side. A transfer roller used for a transfer method of a transmission line to be connected, in which a horizontal roller and a vertical roller for guiding the transmission line are provided at both ends of the frame, and a part of the horizontal roller is installed so that the frame can be attached to the transmission line. A transfer roller used in the power transmission line transfer method in which the roller can be opened and closed and the pull wire and the feed wire are connected to the center of the frame.
JP892593A 1993-01-22 1993-01-22 Transmission line transfer method and transfer tool used in the method Expired - Fee Related JPH07114522B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP892593A JPH07114522B2 (en) 1993-01-22 1993-01-22 Transmission line transfer method and transfer tool used in the method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP892593A JPH07114522B2 (en) 1993-01-22 1993-01-22 Transmission line transfer method and transfer tool used in the method

Publications (2)

Publication Number Publication Date
JPH06225418A JPH06225418A (en) 1994-08-12
JPH07114522B2 true JPH07114522B2 (en) 1995-12-06

Family

ID=11706240

Family Applications (1)

Application Number Title Priority Date Filing Date
JP892593A Expired - Fee Related JPH07114522B2 (en) 1993-01-22 1993-01-22 Transmission line transfer method and transfer tool used in the method

Country Status (1)

Country Link
JP (1) JPH07114522B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104319689A (en) * 2014-11-10 2015-01-28 国网四川省电力公司德阳供电公司 Electric transmission line danger alarm device

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5280175B2 (en) * 2008-12-10 2013-09-04 株式会社Tlc Electric wire vertical transfer method
CN101997281B (en) * 2010-09-21 2013-04-03 河南省电力公司驻马店供电公司 Tower ground wire universal lifting mechanism
CN102386588B (en) * 2011-11-29 2014-08-27 国家电网公司 Lifting device for live installation of equipment on power supply line column

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104319689A (en) * 2014-11-10 2015-01-28 国网四川省电力公司德阳供电公司 Electric transmission line danger alarm device
CN104319689B (en) * 2014-11-10 2017-01-18 国网四川省电力公司德阳供电公司 Electric transmission line danger alarm device

Also Published As

Publication number Publication date
JPH06225418A (en) 1994-08-12

Similar Documents

Publication Publication Date Title
CN209767009U (en) automatic cable laying system and cable laying device thereof
JP6068226B2 (en) Gold wheel equipment and overhead ground wire replacement method
CN115282521B (en) A fire rescue system
JP7013992B2 (en) Overhead line removal method and overhead wire removal tool
EP0897826A3 (en) Catenary wire stringing device
EP1211122B1 (en) Installation machine and method for a catenary line
EP0706910B1 (en) Machine for the continuous installing of a power line of an electrical catenary
JPH07114522B2 (en) Transmission line transfer method and transfer tool used in the method
US3103345A (en) Cable guiding device
JP4349529B2 (en) Suspension pulley device used in the overhead ground wire replacement method and overhead ground wire replacement method
EP0116102A2 (en) Apparatus for assisting in rescue work, particularly in high-rise buildings
EP1314678B1 (en) Safety device for maintenance personnel
JPH0664891A (en) Manual mini crane for work on steel tower
CN218407423U (en) Coal-winning machine cable towing device
JPH0549128A (en) Sag control Overhead ground wire replacement method
JPH06205511A (en) Overhead ground wire sag control replacement method
JPH08205347A (en) Load metal wheel for stringing cable
JPH10203751A (en) Main rope replacement method and apparatus for 2: 1 roping elevator
CN221958557U (en) A special bracket for installing monitoring equipment that can be lifted and lowered
KR100320278B1 (en) A Wiring Apparatus of an Electric Wire
CN223246164U (en) Auxiliary device convenient to crane span structure cabling with adjustable
JPH0697804B2 (en) Wire drawing method and its equipment
JP2000295726A (en) Overhead cable installation method and spiral wire pay- off device used for the method
JPH06217432A (en) Hanging wire car for overhead line construction
JPH03103016A (en) Moving drum type manipulator cable stringing vehicle

Legal Events

Date Code Title Description
S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: R3D04

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081206

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091206

Year of fee payment: 14

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091206

Year of fee payment: 14

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101206

Year of fee payment: 15

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111206

Year of fee payment: 16

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111206

Year of fee payment: 16

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111206

Year of fee payment: 16

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121206

Year of fee payment: 17

LAPS Cancellation because of no payment of annual fees