JPH0715171B2 - Precast reinforced concrete foundation material and foundation construction method - Google Patents
[go: Go Back, main page]

JPH0715171B2 - Precast reinforced concrete foundation material and foundation construction method - Google Patents

Precast reinforced concrete foundation material and foundation construction method

Info

Publication number
JPH0715171B2
JPH0715171B2 JP2159388A JP15938890A JPH0715171B2 JP H0715171 B2 JPH0715171 B2 JP H0715171B2 JP 2159388 A JP2159388 A JP 2159388A JP 15938890 A JP15938890 A JP 15938890A JP H0715171 B2 JPH0715171 B2 JP H0715171B2
Authority
JP
Japan
Prior art keywords
base plate
concrete
embedded
anchor
exposed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2159388A
Other languages
Japanese (ja)
Other versions
JPH0449330A (en
Inventor
興一 山田
俊明 池田
Original Assignee
高村建材工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 高村建材工業株式会社 filed Critical 高村建材工業株式会社
Priority to JP2159388A priority Critical patent/JPH0715171B2/en
Publication of JPH0449330A publication Critical patent/JPH0449330A/en
Publication of JPH0715171B2 publication Critical patent/JPH0715171B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、鉄筋構造で形成される建築物のプレキャスト
鉄筋コンクリート基礎材、及びその基礎施工方法に関す
るものである。
TECHNICAL FIELD The present invention relates to a precast reinforced concrete foundation material for a building having a reinforced structure, and a foundation construction method thereof.

〔従来の技術〕[Conventional technology]

従来、鉄骨や鉄筋の建築物の基礎は、根伐り地業を行っ
て、基礎固めを行った後に捨てコンクリートを打ち、そ
の上に内側の組立、鉄筋の加工組立、更には外型の組立
を行い、これにコンクリート打ちを行っていた。
Conventionally, the foundations of steel frames and reinforcing bars have been subjected to root cutting ground work, solidifying the foundations, and then discarding concrete, then assembling the inside, processing and assembling the reinforcing bars, and then assembling the outer mold. It was done, and this was done with concrete.

〔発明が解決しようとする課題〕[Problems to be Solved by the Invention]

このような施工方法では、職種の異なる工程の積重ね
で、1つの工程が終わってから次の工程に移るようにな
るため、待ち時間を生ずる等のロスもあり、長期間を費
やさざるを得ず、例えば2ケ月程度であれば良しとされ
る程である。
In such a construction method, since one process is completed and the next process is started by stacking processes of different types of work, there is a loss such as waiting time, and there is no choice but to spend a long period of time. For example, about two months is good.

又、アンカーボルトは、現場でのコンクリート打ち作業
によって、多少の位置ずれを生じ、再確認の墨出しに沿
って、台直し修正を必要とする等の問題があった。
Further, the anchor bolt has a problem in that it is slightly displaced due to the concrete pouring work at the site, and needs to be re-corrected in accordance with the reconfirmation marking.

〔発明の目的〕[Object of the Invention]

本発明は、従来の鉄筋コンクリート基礎の施工に対する
前述の問題点を解決するために、基礎材をプレキャスト
鉄筋コンクリートで形成し、これを現場で組立施工する
ことにより、現場での作業日程を短縮すると共に、工場
生産による精度の向上により、アンカーボルトの台直し
作業等の必要のない高精度の鉄骨及び木造建方の基礎を
得ることを目的とする。
The present invention, in order to solve the above-mentioned problems for the construction of conventional reinforced concrete foundation, by forming a base material of precast reinforced concrete, by assembling and constructing this at the site, while shortening the work schedule at the site, By improving the accuracy by factory production, the purpose is to obtain a highly accurate foundation of steel frame and wooden construction without the need for reworking anchor bolts.

〔課題を解決するための手段〕[Means for Solving the Problems]

本発明の1は、前記の目的を達成するためのプレキャス
ト鉄筋コンクリート基礎材に関し、平面状に鉄筋を配設
し、その中心部分の上面アンカー筋を露出させて前記鉄
筋をコンクリートで盤状に埋設したベース版と、該ベー
ス版のアンカー筋に側端部を近接させてベース版上に載
置され、スターラップと結合させた主筋を側端部から露
出させて、角柱状に埋設すると共に表裏面の所定間隔毎
にインサートを埋め込んだ地中梁とで構成することであ
る。
1 of the present invention relates to a precast reinforced concrete foundation material for achieving the above object, wherein reinforcing bars are arranged in a plane, the upper surface anchoring bars of the central portion thereof are exposed, and the reinforcing bars are embedded in concrete in a disk shape. The base plate and the anchor bar of the base plate are placed on the base plate with their side ends close to each other, and the main bar combined with the stirrup is exposed from the side ends and embedded in a prismatic shape and the front and back surfaces It is configured with an underground beam in which inserts are embedded at predetermined intervals.

その2としては、プレキャスト鉄筋コンクリート基礎の
施工方法に関し、基礎面となる捨てコンクリート上に、
平面状に鉄筋を配設し、その中心部分の上面にアンカー
筋を露出させて前記鉄筋コンクリートで盤状に埋設した
ベース版を所定間隔で配置し、スターラップと結合され
た主筋を側端部から露出させてコンクリートで埋設した
地中梁を、その側端部をベース版のアンカー筋に近接し
てベース版上に載置し、ベース版のアンカー筋と地中梁
の主筋を結合すると共に前記地中梁に埋め込まれたイン
サートを利用して前記結合部分の周囲を定形型枠で囲繞
した後、コンクリートを打ち込んでベース版と地中梁と
を接続することである。
As for the second, regarding the construction method of the precast reinforced concrete foundation, on the discarded concrete that becomes the foundation surface,
The reinforcing bars are arranged in a plane, the anchor bars are exposed on the upper surface of the central part of the reinforcing bars, and the base plates embedded in the board shape with the reinforced concrete are arranged at predetermined intervals. Place the underground girder exposed and embedded in concrete on the base plate with its side end close to the anchor bar of the base plate, and connect the anchor bar of the base plate and the main bar of the underground beam and This is to use an insert embedded in the underground beam to surround the joint portion with a fixed formwork and then to pour concrete to connect the base plate and the underground beam.

〔作用〕[Action]

本発明の基礎材、及びこれを使用した施工方法において
は、ベース版上面に露出しているアンカー筋の位置を正
確な位置に置くことにより、台直しの作業を不要とし、
ベース版上に置かれた地中梁の主筋の露出部とアンカー
筋の結合、この部分の定形型枠での囲繞とコンクリート
打込みによって、ベース版と地中梁の一体化を図るもの
である。
In the base material of the present invention, and the construction method using the same, by placing the position of the anchor bar exposed on the upper surface of the base plate at an accurate position, the work of re-updating is unnecessary,
By connecting the exposed part of the main bar of the underground girder placed on the base plate and the anchor bar, and surrounding this part with a fixed formwork and concrete driving, the base plate and the girder are integrated.

〔発明の実施例〕Example of Invention

次に、本発明の実施の一例を、図面について説明する。 Next, an example of implementation of the present invention will be described with reference to the drawings.

第2図、第3図はベース版Aを示す。2 and 3 show the base plate A.

このベース版Aは、縦横に配力筋1を配設する。柱主筋
3はL字状に形成して、その水平部を補助筋2とし、こ
の補助筋2を配力筋1に対して斜めに配置すると共に、
アンカー筋4の下端が埋め込まれ、柱主筋3の立ち上げ
部が上面に露出するように、柱主筋3、フープ筋12、配
力筋1、補助筋2をコンクリート5で埋め込む。
In this base plate A, the force distribution muscles 1 are arranged vertically and horizontally. The column main muscle 3 is formed in an L shape, and the horizontal portion thereof is used as the auxiliary muscle 2, and the auxiliary muscle 2 is obliquely arranged with respect to the force distributing muscle 1.
The main pillar 3, the hoop muscle 12, the distribution muscle 1, and the auxiliary muscle 2 are embedded with concrete 5 so that the lower end of the anchor muscle 4 is embedded and the rising portion of the main pillar muscle 3 is exposed on the upper surface.

この時、コンクリート5には4方に吊り金具6を埋め込
んで置き、前記コンクリート5の打込み型から、このベ
ース版Aを引き抜く時、及び現場でこれを設置する時の
吊り下げ用として利用する。
At this time, the hanging metal fittings 6 are embedded in the concrete 5 in four directions, and are used for pulling out the base plate A from the casting mold of the concrete 5 and for hanging at the time of installing it.

又、コンクリート5の上面には、その打込み養生後に中
心線7,7′を描出しておく。
Further, on the upper surface of the concrete 5, the center lines 7 and 7'are drawn out after the setting and curing.

第4図〜第6図は地中梁Bを示す。4 to 6 show the underground beam B.

この地中梁Bは、4角形状に折曲した多数のスターラッ
プ8に、主筋9を直交して結合させ、所定の型枠から主
筋9を側端に露出させて型枠内にコンクリート10を打込
み、側端から主筋9が露出している所定長の地中梁Bが
得られる。
In this underground beam B, main bars 9 are orthogonally joined to a large number of stir wraps 8 that are bent in a square shape, and the main bars 9 are exposed to the side ends from a predetermined formwork so that concrete 10 is formed in the formwork. And the main beam 9 is exposed from the side end to obtain an underground beam B having a predetermined length.

このコンクリート打込みに際し、地中梁Bの側面にイン
サート11を埋め込んでおき、床配筋の継ぎアンカーの定
着用と、後述の定形型枠の仮止め用インサートとして併
用使用する。
At the time of this concrete driving, an insert 11 is embedded in the side surface of the underground beam B and used as an insert for fixing a joint anchor for floor reinforcement and a temporary fixing insert for a fixed form frame described later.

又、間柱のアンカーボルトも、この時に地中梁の上面に
埋め込んでおくものである。
The anchor bolts of the studs are also embedded in the upper surface of the underground beam at this time.

その他に地中梁B1と地中梁B2を接合するために第9図、
第10図に示す小ベース版Cが用意されている。
Besides, in order to join the underground beam B 1 and the underground beam B 2 , FIG. 9,
A small base version C shown in Fig. 10 is prepared.

これは、地中梁Bの中継点のためと小柱のアンカーボル
トを固定するためのものである。
This is for the relay point of the underground beam B and for fixing the anchor bolt of the small pillar.

この小ベース版Cはベース版Aと同様に配力筋1′、柱
主筋3′の水平部である補助筋2′、アンカー筋4′が
コンクリート5中に埋込まれているもので、その上面に
はベース版Aと同様に柱主筋3′、アンカー筋4′は露
出させ中心線7′も描出しておく。
Similar to the base plate A, the small base plate C is one in which the distribution muscles 1 ', the auxiliary muscles 2'which are horizontal portions of the column main muscles 3', and the anchor muscles 4'are embedded in the concrete 5. Similar to the base plate A, the column main bar 3'and the anchor bar 4'are exposed and the center line 7'is also drawn on the upper surface.

次に、この基礎材を使用した基礎の施工方法を第7図に
ついて説明する。
Next, a method of constructing a foundation using this foundation material will be described with reference to FIG.

先ず、配置図に従って、根伐り、捨てコンクリート床を
従来と同様な工法、順序で施工する。
First, according to the layout plan, root cutting and abandoned concrete floors will be constructed in the same construction method and order as in the past.

そして、ベース版Aの底面の高さに仕上げた捨てコンク
リート床上に、第7図に示すように、ベース版Aの中心
線7が一直線上に位置すると共に、中心線7が所定の間
隔になるように、ベース版A1,A2,A3……Anを設置す
る。
Then, as shown in FIG. 7, the center line 7 of the base plate A is located on a straight line on the abandoned concrete floor finished to the height of the bottom surface of the base plate A, and the center line 7 has a predetermined interval. In this way, the base versions A 1 , A 2 , A 3 ... An are installed.

この時、ベース版A1,……Anの高さは、捨てコンクリー
トによって、略一定の高さとはなるが、微調整は捨てコ
ンクリート上の空モルタルによって行われる。
At this time, the height of the base plate A 1 , ... An is almost constant due to the discarded concrete, but the fine adjustment is performed by the empty mortar on the discarded concrete.

又同様にして、ベース版Aの間に小ベース版Cが設置さ
れる。
Similarly, the small base plate C is installed between the base plates A.

次に、ベース版A、小ベース版Cの上に、第7図、第8
図に示すように、地中梁Bが載置されるが、地中梁Bの
側端から露出している主筋9は、ベース版Aの主筋3、
小ベース版Cの主筋3の間から中心に向かって入り込ん
だ状態となる。
Next, on the base plate A and the small base plate C,
As shown in the figure, the underground beam B is placed, but the main bar 9 exposed from the side end of the underground beam B is the main bar 3 of the base plate A.
The small base plate C is in a state of entering from between the main bars 3 toward the center.

そこで、地中梁Bの主筋9と、ベース版Aの主筋3に対
して、4角形に折曲したフープ筋12を結合して、これ等
を固定する。
Therefore, the main bar 9 of the underground beam B and the main bar 3 of the base plate A are connected to the hoop bar 12 which is bent in a square shape, and these are fixed.

又、小ベース版C上においては、隣接する地中梁Bの主
筋9と小ベース版Cの主筋3とを、直線状の継ぎ筋13で
結合して、これ等を固定する。
Further, on the small base plate C, the main bar 9 of the underground beam B and the main bar 3 of the small base plate C which are adjacent to each other are connected by a linear joint bar 13 to fix them.

そして、これ等の結合部分の周囲に、上から定形型枠14
を被せて、更に地中梁Bのインサート11を用いて打ち込
むコンクリートの側圧を支持させるように定形型枠14を
仮留めする。
Then, the fixed form 14
Then, the fixed form 14 is temporarily fastened so as to support the lateral pressure of the concrete to be driven in using the insert 11 of the underground beam B.

この定形型枠14としては、ベース版A上において、地中
梁Bを直線上に固定するもの、直角に固定するもの、小
ベース版C上で固定するものの3種類が必要であり、イ
ンサート11によって、その着脱は簡単にできる。
As the fixed form frame 14, three types are required: one for fixing the underground beam B on the base plate A in a straight line, one for fixing the underground beam B at a right angle, and one for fixing on the small base plate C. It can be easily attached and detached.

又、アンカー筋4は、前記の定形型枠14の上端から、補
助板21を介して固定するようにすれば、基本墨上に正確
に据付けることができ、地中梁Bの中心線15も同様に、
正確に設置することができる。
If the anchor bar 4 is fixed from the upper end of the fixed form 14 via the auxiliary plate 21, it can be accurately installed on the basic black, and the center line 15 of the underground beam B can be set. As well as
Can be installed accurately.

従って、墨出し再確認によって、修正の台直しを生ずる
ことはない。
Therefore, the re-confirmation of marking does not cause a correction correction.

斯くして、定形型枠14内にコンクリートを打込んだ後、
定形型枠14を取り外して、基礎の施工は完了する。
Thus, after driving the concrete into the fixed form 14,
The fixed form 14 is removed, and the foundation construction is completed.

以上は小ベース版Cを使用した実施例について説明した
が、柱の間隔によっては、小ベース版Cを省略すること
もできる。また、ベース版Aはハンチをつけた盤とする
こともできる。
Although the embodiment using the small base plate C has been described above, the small base plate C may be omitted depending on the distance between the columns. The base plate A can also be a board with a haunch.

以上の実施例では、コンクリートと鉄筋の付着力は、鉄
筋の表面積に比例するので、公称直径13〜16mmSD30の異
形鉄筋で、定着長さを40cm以上とし、30d以上を確保し
た。
In the above examples, since the adhesive force between the concrete and the reinforcing bar is proportional to the surface area of the reinforcing bar, the deformed reinforcing bar having a nominal diameter of 13 to 16 mm SD30 has a fixing length of 40 cm or more and 30 d or more is secured.

本発明を45m×34m=1530m2で小柱18本、柱33本、地中梁
延長158mの鉄骨構造の平家建に実施した場合、その工程
日数は次の通りである。
When the present invention is carried out in a flat structure of steel frame structure of 45 m × 34 m = 1530 m 2 with 18 small columns, 33 columns, and underground beam extension of 158 m, the number of process days is as follows.

根伐り捨てコンクリート 在来工法 墨出し工程 0.5日 据付け工程 1.5日 再墨出し工程 0.3日 継手仮枠工程 0.5日 継手コンクリート打ち 0.5日 計 3.3日 以上のように、従来は約2ケ月を要した基礎工事が大巾
に短縮された。
Conventional construction method Ink scraping process 0.5 days Installation process 1.5 days Re-inking process 0.3 days Joint temporary frame process 0.5 days Joint concrete pouring 0.5 days Total 3.3 days Construction work has been greatly shortened.

〔発明の効果〕〔The invention's effect〕

本発明は如上のように、ベース版と地中梁とをプレキャ
スト鉄筋コンクリートとすることで、これを工事現場で
設置し、ウェットコンクリートは定形型枠による継手部
分への打込みだけとなり、極めて短い工期で、重量の大
きい基礎の施工が完了する。
As described above, the present invention uses the precast reinforced concrete as the base plate and the underground girder to install it at the construction site, and wet concrete is only driven into the joint part with the fixed form, and in an extremely short construction period. The construction of a heavy foundation is completed.

また、定形型枠内では、地中梁の主筋とベース版のアン
カー筋とが結合されて、コンクリートが打込まれるた
め、いずれの方向に対しても、力学的に一体化され、基
礎の強度が劣化することはない。
Also, in the fixed formwork, the main reinforcement of the underground beam and the anchor reinforcement of the base plate are connected and concrete is driven in, so they are mechanically integrated in any direction and the strength of the foundation is increased. Does not deteriorate.

このように、本発明の基礎材を使用し、これを施工する
ことによって、工期が短縮できて、その工賃を引き下げ
ることが可能となり、更に地中梁、ベース版はプレキャ
スト鉄筋コンクリートで工場生産されるため、精度が高
く、信頼性のある基礎材が得られるものである。
As described above, by using the foundation material of the present invention and constructing it, the construction period can be shortened and the wage can be reduced. Further, the underground beam and the base plate are factory-produced with precast reinforced concrete. Therefore, a highly accurate and reliable base material can be obtained.

また、本発明の特に施工方法において有効なことは、ベ
ース版と地中梁とを接続し、この接続部分にコンクリー
トを打ち込む際に用いる定形型枠を、地中梁に埋め込ん
だインサートを利用して固定できるので、定形型枠の取
付け、取外しが従来の方法に比して簡単となり、従っ
て、作業性が向上して、より工期の短縮が図れる等の効
果を有するものである。
In addition, what is particularly effective in the construction method of the present invention is to connect the base plate and the underground beam, and use the insert embedded in the underground beam for the fixed formwork used when driving concrete into this connection portion. Since the fixed form can be attached and detached as compared with the conventional method, the workability is improved and the work period can be further shortened.

【図面の簡単な説明】[Brief description of drawings]

第1図は全体の施工の平面図、第2図と第3図はベース
版の側面図と平面図、第4図〜第6図は地中梁の断面図
と平面図、及び側面図、第7図と第8図は施工時の要部
の平面図と側面図、第9図と第10図は小ベース版の側面
図と平面図である。 A……ベース版、B……地中梁、C……小ベース版、1
……配力筋、3……主筋、4……アンカー筋、5……コ
ンクリート、9……主筋、10……コンクリート、12,13
……連結筋、14……定形型枠。
FIG. 1 is a plan view of the entire construction, FIGS. 2 and 3 are side views and plan views of the base plate, and FIGS. 4 to 6 are cross-sectional views and plan views of the underground beam, and side views, FIGS. 7 and 8 are a plan view and a side view of the main part during construction, and FIGS. 9 and 10 are a side view and a plan view of the small base plate. A ... Base version, B ... Underground beam, C ... Small base version, 1
…… Strengthening muscle, 3 …… Main reinforcement, 4 …… Anchor reinforcement, 5 …… Concrete, 9 …… Main reinforcement, 10 …… Concrete, 12,13
...... Connecting bars, 14 ...... Standard formwork.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】平面状に鉄筋を配設し、その中心部分の上
面アンカー筋を露出させて前記鉄筋をコンクリートで盤
状に埋設したベース版と、該ベース版のアンカー筋に側
端部を近接させてベース版上に載置され、スターラップ
と結合させた主筋を側端部から露出させて、角柱状に埋
設すると共に表裏面の所定間隔毎にインサートを埋め込
んだ地中梁とで構成したことを特徴とするプレキャスト
鉄筋コンクリート基礎材。
1. A base plate in which reinforcing bars are arranged in a plane, the upper surface anchor bars of the central portion thereof are exposed, and the reinforcing bars are embedded in concrete in a disk shape, and side ends of the anchor bars of the base plate are provided. Placed close to each other on the base plate, the main bar connected to the stirrup is exposed from the side end, embedded in a prismatic shape, and composed of underground beams with embedded inserts at regular intervals on the front and back surfaces. Precast reinforced concrete foundation material characterized by
【請求項2】基礎面となる捨てコンクリート上に、平面
状に鉄筋を配設し、その中心部分の上面にアンカー筋を
露出させて前記鉄筋コンクリートで盤状に埋設したベー
ス版を所定間隔で配置し、スターラップと結合された主
筋を側端部から露出させてコンクリートで埋設した地中
梁を、その側端部をベース版のアンカー筋に近接してベ
ース版上に載置し、ベース版のアンカー筋と地中梁の主
筋を結合すると共に前記地中梁に埋め込まれたインサー
トを利用して前記結合部分の周囲を定形型枠で囲繞した
後、コンクリートを打ち込んでベース版と地中梁とを接
続したことを特徴とするプレキャスト鉄筋コンクリート
基礎施工方法。
2. Reinforcing bars are arranged in a plane on a waste concrete which is a foundation surface, and an anchor bar is exposed on an upper surface of a central portion of the base, and base plates embedded in a plate shape with the reinforced concrete are arranged at predetermined intervals. Then, the main beam connected to the stirrup is exposed from the side end and the underground beam is embedded in concrete.Place the side end near the anchor bar of the base plate and place it on the base plate. After connecting the anchor bars of the and the main bars of the underground girder and using the insert embedded in the underground girder to surround the circumference of the connected part with a fixed formwork, concrete is driven in and the base plate and the underground girder are embedded. A precast reinforced concrete foundation construction method characterized by connecting to.
JP2159388A 1990-06-18 1990-06-18 Precast reinforced concrete foundation material and foundation construction method Expired - Lifetime JPH0715171B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2159388A JPH0715171B2 (en) 1990-06-18 1990-06-18 Precast reinforced concrete foundation material and foundation construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2159388A JPH0715171B2 (en) 1990-06-18 1990-06-18 Precast reinforced concrete foundation material and foundation construction method

Publications (2)

Publication Number Publication Date
JPH0449330A JPH0449330A (en) 1992-02-18
JPH0715171B2 true JPH0715171B2 (en) 1995-02-22

Family

ID=15692698

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2159388A Expired - Lifetime JPH0715171B2 (en) 1990-06-18 1990-06-18 Precast reinforced concrete foundation material and foundation construction method

Country Status (1)

Country Link
JP (1) JPH0715171B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018059318A (en) * 2016-10-05 2018-04-12 株式会社竹中工務店 Foundation beam structure and foundation beam construction method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63280123A (en) * 1987-05-12 1988-11-17 Fujita Corp Foundation construction work
JPH01111923A (en) * 1987-10-22 1989-04-28 Hiromi Yamada Construction of concrete foundation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018059318A (en) * 2016-10-05 2018-04-12 株式会社竹中工務店 Foundation beam structure and foundation beam construction method

Also Published As

Publication number Publication date
JPH0449330A (en) 1992-02-18

Similar Documents

Publication Publication Date Title
KR20210004289A (en) Transfer Structure Construction Method Using U-shaped Steel Girder
JPH0715171B2 (en) Precast reinforced concrete foundation material and foundation construction method
JPH11158813A (en) How to build a concrete pier
JPH0434161A (en) Centrifugally molded hollow pc concrete column and column construction method
JP2000336747A (en) Construction method of column / beam joint
JPH084196A (en) Building panel
JP2759131B2 (en) Foundation beam construction method for steel reinforced concrete columns
JP2620118B2 (en) Net formwork method for walls and floors
KR102585732B1 (en) Prestressed precast module with integrated girder and column and construction method using the same
KR102585728B1 (en) Prestressed precast module with integrated girder and column and construction method using the same
JPS6195136A (en) Construction of multistoried building skeletal by precast reinforced concrete unit
JP2811211B2 (en) Flat slab construction method
JP2759361B2 (en) Pillar support members for building reinforced concrete buildings
JP2025122529A (en) Building construction method and joint members used therein
JP3010355B1 (en) Construction method of joint of prestressed concrete floor
JPH09256631A (en) Construction method of reinforced concrete wall
JP3153468B2 (en) Construction method of concrete structure
JPH0588331B2 (en)
JP2782111B2 (en) Steel framing construction method
JPH084029A (en) Precast concrete foundation structure
JP2715162B2 (en) Reinforcement method for joints between piles and foundations
JPH04161628A (en) Building method using reinforced concrete column and steel beam
JPH08269979A (en) Single-side precast concrete underground beam and its constituent member
JPH07197510A (en) Reservoir construction method
JPH0715177B2 (en) How to build a reinforced concrete structure