JPH0718124B2 - Railroad crossing construction method - Google Patents
[go: Go Back, main page]

JPH0718124B2 - Railroad crossing construction method - Google Patents

Railroad crossing construction method

Info

Publication number
JPH0718124B2
JPH0718124B2 JP17949392A JP17949392A JPH0718124B2 JP H0718124 B2 JPH0718124 B2 JP H0718124B2 JP 17949392 A JP17949392 A JP 17949392A JP 17949392 A JP17949392 A JP 17949392A JP H0718124 B2 JPH0718124 B2 JP H0718124B2
Authority
JP
Japan
Prior art keywords
rail
block
laid
railroad crossing
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP17949392A
Other languages
Japanese (ja)
Other versions
JPH0626003A (en
Inventor
穣 清田
Original Assignee
清田軌道工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 清田軌道工業株式会社 filed Critical 清田軌道工業株式会社
Priority to JP17949392A priority Critical patent/JPH0718124B2/en
Publication of JPH0626003A publication Critical patent/JPH0626003A/en
Publication of JPH0718124B2 publication Critical patent/JPH0718124B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、剛質構造踏切のレー
ル交換にともなう踏切施工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a railroad crossing for a railroad crossing of a rigid structure railroad.

【0002】[0002]

【従来の技術】従来の剛質構造踏切道は、通常、軌道の
バラスト、枕木並びに踏切舗装材料を1つのコンクリー
トブロックとして工場生産し、現場に搬入したブロック
を連続状に敷設して、このブロック上面の二条の溝内の
パッド上に敷設レールの底部を載置し、然るのち、ブロ
ックの溝の両側に前もって埋設してある埋込栓にねじ込
むボルトに係合する押え金具(Vバネ及びレールクリッ
プ)を介しブロックにレールを固定する。
2. Description of the Related Art Conventional rigid structure crossing roads are normally produced by factory production of track ballast, sleepers and crossing pavement material as one concrete block, and the blocks brought into the site are laid in a continuous manner. The bottom of the laying rail is placed on the pad in the two grooves on the top surface, and then the retainer fittings (V spring and V spring and V spring and Secure the rail to the block via the rail clip).

【0003】このような踏切構造により舗装の破壊が少
なく、かつ軌道の耐久性も増加して電車の通過にも安定
する。
With such a railroad crossing structure, the pavement is less damaged, and the durability of the track is increased to stabilize the passage of trains.

【0004】[0004]

【発明が解決しようとする課題】上記のような剛質構造
踏切に於いて、電車の通過トン数(年間の運行回数や列
車の車両連結両数によって異なる)の増加に対して軌道
を強化するため、50kgレールから60kgレールに敷設
替えを行なう場合、50kgレールの底部に対して60kg
レールの底部の幅が大きくなるため、50kgレールの敷
設ブロックの埋込栓にボルト及び押え金具を介し60kg
レールを締結することができない。
In the rigid structure crossing as described above, the track is strengthened against the increase in the tonnage of passing trains (depending on the number of trains operated per year and the number of connected trains). Therefore, when replacing the 50kg rail with a 60kg rail, 60kg is added to the bottom of the 50kg rail.
Since the width of the bottom of the rail becomes large, 60 kg can be inserted into the embedment plug of the 50 kg rail laying block via bolts and retainers.
The rail cannot be fastened.

【0005】勿論、50kgレールの底部から頭部迄の高
さに対して60kgレールの底部から頭部迄の高さが大き
くなるため、ブロックの上面に対して60kgレールの頭
部の上面が上方に突出する。このため、60kgレールに
対応するブロックの敷設をしなおす必要があり、極めて
大きな出費になる問題があった。
Of course, since the height from the bottom to the head of the 60 kg rail is larger than the height from the bottom to the head of the 50 kg rail, the upper surface of the head of the 60 kg rail is above the upper surface of the block. Project to. For this reason, it is necessary to re-lay the block corresponding to the 60 kg rail, which causes a problem of extremely large expense.

【0006】また、撤去した50kgレールのブロック
は、再転用の見込みが少なく、保管場所の確保の問題な
どが発生する。
Further, the removed 50 kg rail block is unlikely to be reused, and problems such as securing a storage place occur.

【0007】そこで、この発明の課題は、50kgレール
から60kgレールに敷設替えを行なう場合、50kgレー
ル用のブロックをそのまま使用するようにした踏切施工
法を提供することである。
Therefore, an object of the present invention is to provide a railroad crossing construction method in which the block for the 50 kg rail is used as it is when the installation is relocated from the 50 kg rail to the 60 kg rail.

【0008】[0008]

【課題を解決するための手段】上記の課題を解決するた
めに、この発明は、踏切区域に路面として敷き詰めるコ
ンクリート製ブロックと、このブロックの上面に設けて
ある二条の平行する溝内のパッド上に底部を載置して敷
設した50kgレールと、上記ブロックの埋込栓にねじ込
むボルトに係合した押え金具により前記ブロックに上記
50kgレールを固定した踏切に於いて、上記50kgレー
ル及びパッドの撤去後に上記溝上に複数枚の60kgレー
ル取付けタイプレートを上記埋込栓にねじ込むボルトを
介し固定したのち、前記タイプレート上にレールパッド
を載置してその上に60kgレールを敷設し、次いで上記
タイプレートの両側に設けてある係止部にボルトの頭部
を係合して、このボルトにねじ込むナットにより前記ボ
ルトに係合した押え金具を押し付けながら上記60kgレ
ールの底部を固定し、また、ブロックの上に上面が前記
60kgレールの頭部上面と同レベルの増厚板を敷設し
て、前記ブロックに前記増厚板を適宜の方法で固定した
ことを特徴とする踏切施工法を採用したものである。
In order to solve the above-mentioned problems, the present invention relates to a concrete block laid as a road surface in a railroad crossing area and a pad in two parallel grooves provided on the upper surface of the block. At the railroad crossing in which the 50 kg rail is fixed to the block with a 50 kg rail laid with the bottom part laid and a holding metal fitting engaged with a bolt screwed into the embedding plug of the block, removal of the 50 kg rail and pad Later, after fixing a plurality of 60 kg rail mounting tie plates on the groove with bolts that screw into the embedding plug, place a rail pad on the tie plate and lay a 60 kg rail on it, then A presser foot that engages the heads of bolts with the locking parts provided on both sides of the rate plate and engages the bolts with nuts that are screwed into the bolts. The bottom of the 60 kg rail is fixed while pressing the tool, and the thickening plate whose upper surface is at the same level as the upper surface of the head of the 60 kg rail is laid on the block, and the thickening plate is appropriately attached to the block. It adopts a railroad crossing construction method characterized by being fixed by a method.

【0009】[0009]

【作用】50kgレールから60kgレールに敷設替えを行
なったとき、50kgレールの締結用埋込栓にボルトをね
じ込んでタイプレートを固定するため、このタイプレー
トの係止部にボルトを係合してナットのねじ込みにより
押え金具を介し60kgレールの幅の寸法が大きくなった
底部を締結することができる。
[Operation] When the 50 kg rail is replaced with a 60 kg rail, the bolt is screwed into the fastening plug of the 50 kg rail to fix the tie plate. Therefore, the bolt is engaged with the locking portion of the tie plate. By screwing in the nut, it is possible to fasten the bottom of the 60 kg rail, which has a large width, through the metal fitting.

【0010】また、ブロック上に増圧板を敷設して、ブ
ロックに増圧板を固定するため、60kgレールの頭部と
ブロックとの段差を増圧板により回避することができ
る。
Further, since the pressure booster plate is laid on the block and fixed to the block, the step between the head of the 60 kg rail and the block can be avoided by the pressure booster plate.

【0011】[0011]

【実施例】以下、この発明の実施例を添付図面に基づい
て説明する。
Embodiments of the present invention will be described below with reference to the accompanying drawings.

【0012】図1及び図2は、50kgレールAを敷設し
た踏切構造である。
1 and 2 show a railroad crossing structure in which a 50 kg rail A is laid.

【0013】上記踏切の施工法は、まず、踏切区域に路
面として工場生産されたコンクリート製ブロック11を
軌道方向に連続して敷き詰める。
In the method of constructing the railroad crossing, first, concrete blocks 11 manufactured as a road surface in the factory are continuously spread in the railroad crossing in the railroad crossing area.

【0014】上記ブロック11の上面両側には、溝12
が前もって形成されており、また、溝12の両側には、
締結用ボルト13のねじ込み用埋込栓14が前もって埋
設されている。
Grooves 12 are formed on both sides of the upper surface of the block 11.
Are formed in advance, and on both sides of the groove 12,
An embedding plug 14 for screwing the fastening bolt 13 is embedded in advance.

【0015】なお、軌道ブロック11の対向端間や軌道
ブロック11と道路との間には、アスファルト15が充
填されている。
Asphalt 15 is filled between the opposite ends of the track block 11 and between the track block 11 and the road.

【0016】次に、各溝12に50kgレールA用のレー
ルパッド16を敷設して、このレールパッド16上に底
部1を載置しながら50kgレールAを敷設する。
Next, the rail pad 16 for the 50 kg rail A is laid in each groove 12, and the 50 kg rail A is laid while placing the bottom portion 1 on the rail pad 16.

【0017】その後に、底部1の両側縁上に押え金具の
レールクリップ17の一端を重ね、溝12の側縁上に載
置した調節楔18上にレールクリップ17の他端を重ね
る。
After that, one end of the rail clip 17 of the retainer is overlapped on both side edges of the bottom portion 1, and the other end of the rail clip 17 is overlapped on the adjustment wedge 18 placed on the side edge of the groove 12.

【0018】しかして、レールクリップ17の長孔19
に挿通したボルト13を埋込栓14にねじ込みながら、
レールクリップ17により底部1を押え込んでブロック
11に50kgレールAを締結する。
Therefore, the long hole 19 of the rail clip 17
While screwing the bolt 13 inserted in the
The bottom portion 1 is pressed by the rail clip 17 and the 50 kg rail A is fastened to the block 11.

【0019】なお、ボルト13には、ボルト13の頭部
とレールクリップ17との間に介在する押え金具のVバ
ネ20が嵌装され、ボルト13のねじ込みによりVバネ
20を圧縮する。
The bolt 13 is fitted with a V spring 20 which is a metal fitting interposed between the head of the bolt 13 and the rail clip 17, and the V spring 20 is compressed by screwing the bolt 13.

【0020】上記踏切の50kgレールAを60kgレール
A’に敷設替えを行なう場合、緩めたボルト13と共に
Vバネ20及びレールクリップ17を取り外して50kg
レールAの締結を解除する。
When the 50 kg rail A at the railroad crossing is replaced with the 60 kg rail A ', the loosened bolt 13 and the V spring 20 and the rail clip 17 are removed to remove the 50 kg rail A'.
Release the fastening of rail A.

【0021】次に、50kgレールAを撤去し、また、レ
ールパッド16を回収する。その後に、ブロック11の
溝12にタイプレートパッド16’を敷設し、またタイ
プレートパッド16’の側縁と溝12の側縁との間に調
節楔18を挿入したのち、図3に示す金属製のタイプレ
ート21を載置して、タイプレート21の両側の長孔2
2に挿入したボルト23を埋込栓14にねじ込んで溝1
2の底にタイプレート21を固定する。
Next, the 50 kg rail A is removed and the rail pad 16 is recovered. Thereafter, the tie plate pad 16 'is laid in the groove 12 of the block 11, and the adjusting wedge 18 is inserted between the side edge of the tie plate pad 16' and the side edge of the groove 12, and then the metal shown in FIG. The tie plate 21 made of steel is placed, and the long holes 2 on both sides of the tie plate 21 are placed.
The bolt 23 inserted into the screw 2 is screwed into the embedding plug 14, and the groove 1
Fix the tie plate 21 on the bottom of 2.

【0022】しかるのち、タイプレート21上の両側縁
部間にレールパッド24を載置したのち、レールパッド
24の上に底部1’を重ねて60kgレールA’を敷設す
る。
Thereafter, the rail pad 24 is placed between both side edges of the tie plate 21, and then the bottom portion 1'is overlapped on the rail pad 24 to lay a 60 kg rail A '.

【0023】60kgレールA’の敷設後に、タイプレー
ト21上の両側縁に設けてある係合部25にボルト26
の頭部を係合する。
After laying the 60 kg rail A ', bolts 26 are attached to the engaging portions 25 provided on both side edges of the tie plate 21.
Engage the heads of.

【0024】上記の係合部25は、図4に示すように、
タイプレート21の1つの対角線上にそれぞれ所定の間
隔を存して対向するようタイプレート21に下端を溶接
などにより固定した起立片27と、この両起立片27の
上端から連なって互に内方に突出する突片28とで構成
し、起立片27間にボルト26の頭部を嵌入しながら、
突片28間にボルト26の軸部を貫通させて、突片28
の下面とボルト26の頭部裏面との当接により支持する
ようにしたが、タイプレートの上面にコ字形屈曲板の下
方に向く両端を溶接により固定して、屈曲板の頂部に設
けてあるU字状の切欠きにボルトの軸部を貫通させ、屈
曲板にボルトの頭部を係合するようにしてもよい。
The engaging portion 25 is, as shown in FIG.
Standing pieces 27 whose lower ends are fixed to the tie plate 21 by welding or the like so as to be opposed to each other on one diagonal of the tie plate 21 with a predetermined interval, and the standing pieces 27 are connected from the upper ends of the standing pieces 27 to each other and are inward. It is composed of a projecting piece 28 protruding to the inside, and while the head of the bolt 26 is fitted between the standing pieces 27,
The shaft portion of the bolt 26 is penetrated between the projecting pieces 28,
The lower surface of the U-shaped bending plate is supported by contacting the lower surface of the bolt 26 with the back surface of the head of the bolt 26, but both ends of the U-shaped bending plate facing downward are fixed to the upper surface of the bending plate by welding. The shaft portion of the bolt may pass through the U-shaped notch, and the head portion of the bolt may be engaged with the bending plate.

【0025】なお、図示のように、タイプレート21の
上面もう一方の対向線上の位置に上方に突出するストッ
パ片29を設けて、60kgレールA’の底部1’の側縁
にストッパ片29を当接しておくと、タイプレート21
の横方向の移動(60kgレールAに対して直角に交差す
る方向)は勿論、回転方向の移動を止めることができ
る。
As shown in the figure, a stopper piece 29 projecting upward is provided at a position on the other side of the upper surface of the tie plate 21 on the opposite line, and the stopper piece 29 is provided on the side edge of the bottom portion 1'of the 60 kg rail A '. If you touch it, tie plate 21
It is possible to stop the movement in the rotation direction as well as the movement in the lateral direction (direction intersecting at right angles to the 60 kg rail A).

【0026】しかして、それぞれのボルト26に座鉄3
0を嵌装(中心の透孔31にボルト26を貫通させて)
すると共に、60kgレールA’の底部1’の側縁部上面
に座鉄30の一端部を重ね、係合部25の上面に座鉄3
0の他端部を載置し、次にそれぞれのボルト26にVバ
ネ20を嵌装したのち、ボルト26にねじ込んだナット
32の締め付けより60kgレールA’を締結する。
The bolts 3 are attached to the respective bolts 26.
Fitting 0 (bolt 26 penetrates through central through hole 31)
At the same time, one end of the seat iron 30 is placed on the upper surface of the side edge of the bottom part 1 ′ of the 60 kg rail A ′, and the seat iron 3 is placed on the upper surface of the engaging portion 25.
The other end of 0 is placed, and then the V spring 20 is fitted to each bolt 26, and then the 60 kg rail A ′ is fastened by tightening the nut 32 screwed into the bolt 26.

【0027】また、ブロック11の上面に増厚板33を
敷設して、ブロック11に増圧板33を固定し、60kg
レールA’の頭部2’の頂面と増厚板33の上面とが同
レベルになるようにする。
Further, a thickening plate 33 is laid on the upper surface of the block 11, and the pressure increasing plate 33 is fixed to the block 11, and 60 kg
The top surface of the head 2 ′ of the rail A ′ and the top surface of the thickening plate 33 are at the same level.

【0028】ブロック11に対する増厚板33の固定
は、例えば図3に示すようにブロック11の上面から下
方に凹入孔34を点在的に設けて、この凹入孔34に埋
込栓35を嵌入すると共に、充填接着剤36に埋込栓3
5を固定する。
The thickening plate 33 is fixed to the block 11 by, for example, as shown in FIG. Insert the plug 3 into the filling adhesive 36
Fix 5

【0029】次に、ゴム製の増厚板33の透孔37に挿
通したボルト38を埋込栓35にねじ込んでブロック1
1の上面に増厚板33を固定する。
Next, the bolt 38 inserted into the through hole 37 of the rubber thickening plate 33 is screwed into the embedding plug 35 to block 1
The thickening plate 33 is fixed to the upper surface of 1.

【0030】また、増厚板33に埋め込んである受圧板
39にボルト38の頭部裏面を接触させて、増厚板33
のボルト38の頭部接触部分の変形を防止し、さらに、
増厚板33の上面凹所40にボルト38の頭部を落し込
んで歩行の妨げを防止する。
Further, the back surface of the head of the bolt 38 is brought into contact with the pressure receiving plate 39 embedded in the thickening plate 33 to make the thickening plate 33.
Prevents deformation of the head contact portion of the bolt 38 of
The head of the bolt 38 is dropped into the upper surface recess 40 of the thickening plate 33 to prevent the walking from being disturbed.

【0031】なお、溝12とレールとの間隙には、車両
輪縁通過に支障をきたさない程度にアスファルト又はゴ
ム製のチップなどが充填される。
The gap between the groove 12 and the rail is filled with asphalt or rubber chips to the extent that it does not hinder the passage of the vehicle wheel edge.

【0032】図中41は凹所40に充填したアスファル
トなどの充填材である。
Reference numeral 41 in the drawing denotes a filling material such as asphalt filled in the recess 40.

【0033】[0033]

【効果】以上のように、この発明に係る踏切施工法によ
れば、50kgレールから60kgレールに敷設替えを行な
う場合、50kgレールのブロックをそのまま使用するこ
とができるので、工期が短縮されると共に、工事費が安
価になる。
As described above, according to the railroad crossing construction method of the present invention, the block of the 50 kg rail can be used as it is when replacing the 50 kg rail with the 60 kg rail, which shortens the construction period. , Construction costs will be cheaper.

【0034】また、ブロック上に増厚板を固定して、増
厚板の上面と60kgレールの頭部頂面とが同レベルにな
るようにしてあるので、歩行の妨げにならない。
Further, since the thickening plate is fixed on the block so that the upper surface of the thickening plate and the top surface of the head of the 60 kg rail are at the same level, it does not hinder walking.

【図面の簡単な説明】[Brief description of drawings]

【図1】50kgレールを敷設した踏切の平面図[Figure 1] Plan view of railroad crossing with 50kg rail

【図2】同上の縦断拡大正面図FIG. 2 is an enlarged vertical front view of the same as above.

【図3】50kgのレールを撤去して60kgのレールを敷
設した縦断正面図
[Fig. 3] Front view in vertical section with a 50kg rail removed and a 60kg rail laid.

【図4】タイプレートの斜視図FIG. 4 is a perspective view of a tie plate.

【符号の説明】[Explanation of symbols]

A 50kgレール A’ 60kgレール 1、1’ 底部 2’ 頭部 11 ブロック 12 溝 13 ボルト 14 埋込栓 15 アスファルト 16 レールパッド 17 レールクリップ 18 調節楔 19 長孔 20 Vバネ 21 タイプレート 22 長孔 23 ボルト 24 レールパッド 25 係合部 26 ボルト 27 起立片 28 突片 30 座鉄 31 透孔 32 ナット 33 増厚板 A 50kg rail A'60kg rail 1, 1'bottom 2'head 11 block 12 groove 13 bolt 14 plug stopper 15 asphalt 16 rail pad 17 rail clip 18 adjusting wedge 19 long hole 20 V spring 21 tie plate 22 long hole 23 Bolt 24 Rail pad 25 Engagement portion 26 Bolt 27 Standing piece 28 Projecting piece 30 Seat iron 31 Through hole 32 Nut 33 Thickening plate

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 踏切区域に路面として敷き詰めるコンク
リート製ブロックと、このブロックの上面に設けてある
二条の平行する溝内のパッド上に底部を載置して敷設し
た50kgレールと、上記ブロックの埋込栓にねじ込むボ
ルトに係合した押え金具により前記ブロックに上記50
kgレールを固定した踏切に於いて、上記50kgレール及
びパッドの撤去後に上記溝上に複数枚の60kgレール取
付けタイプレートを上記埋込栓にねじ込むボルトを介し
固定したのち、前記タイプレート上にレールパッドを載
置してその上に60kgレールを敷設し、次いで上記タイ
プレートの両側に設けてある係止部にボルトの頭部を係
合して、このボルトにねじ込むナットにより前記ボルト
に係合した押え金具を押し付けながら上記60kgレール
の底部を固定し、また、ブロックの上に上面が前記60
kgレールの頭部上面と同レベルの増厚板を敷設して、前
記ブロックに前記増厚板を適宜の方法で固定しことを特
徴とする踏切施工法。
1. A concrete block to be laid as a road surface in a railroad crossing area, a 50 kg rail laid with a bottom placed on pads in two parallel grooves provided on the upper surface of the block, and an embedding of the block. The above-mentioned 50 is attached to the block by a retainer engaged with a bolt screwed into the stopper.
At a railroad crossing with a kg rail fixed, after removing the 50 kg rail and the pad, a plurality of 60 kg rail mounting tie plates are fixed on the groove with bolts screwed into the embedded plug, and then the rail pad is mounted on the tie plate. Is laid and 60 kg rails are laid on it, and then the heads of the bolts are engaged with the engaging portions provided on both sides of the tie plate, and the bolts are engaged with the nuts screwed into the bolts. The bottom of the 60kg rail is fixed while pressing the holding metal fitting, and the upper surface of the 60kg rail is above the block.
A railroad crossing construction method characterized in that a thickening plate having the same level as the upper surface of the head of a kg rail is laid, and the thickening plate is fixed to the block by an appropriate method.
JP17949392A 1992-07-07 1992-07-07 Railroad crossing construction method Expired - Fee Related JPH0718124B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17949392A JPH0718124B2 (en) 1992-07-07 1992-07-07 Railroad crossing construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17949392A JPH0718124B2 (en) 1992-07-07 1992-07-07 Railroad crossing construction method

Publications (2)

Publication Number Publication Date
JPH0626003A JPH0626003A (en) 1994-02-01
JPH0718124B2 true JPH0718124B2 (en) 1995-03-01

Family

ID=16066792

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17949392A Expired - Fee Related JPH0718124B2 (en) 1992-07-07 1992-07-07 Railroad crossing construction method

Country Status (1)

Country Link
JP (1) JPH0718124B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT410561B (en) * 1999-05-31 2003-06-25 Gmundner Fertigteile Gmbh TRACK
KR101674513B1 (en) * 2014-08-07 2016-11-22 한국철도기술연구원 Dual absorbing embedded track

Also Published As

Publication number Publication date
JPH0626003A (en) 1994-02-01

Similar Documents

Publication Publication Date Title
US5285964A (en) Method for constructing a railroad in concrete having vertical and lateral adjustment steps prior to concrete pouring
US8485452B2 (en) Guard rail apparatus for guiding derailed wheels
US6079630A (en) Railway grade crossing apparatus and method of installation
US5538182A (en) Railroad crossing system
CN214033190U (en) Elastic fastener assembly applied to rail transit
KR102196373B1 (en) Rail construction method using precast slab panel
JPH0718124B2 (en) Railroad crossing construction method
JP3845475B2 (en) Rail fastening device and rail fastening method
US4326670A (en) Adjustable spring clip
US1571008A (en) Rail-fastening means
JPS6119761B2 (en)
JPH04126901U (en) Rail fastening device
US5230469A (en) Bolted rail fastening system for joint bar location
JP3349912B2 (en) Rail buckling prevention device
JP3798210B2 (en) Prestress ballast track structure
JP2887720B2 (en) Level crossing pavement
JP3048329B2 (en) Rail height adjustment method
KR102458085B1 (en) Segmented sleepers for railroads and underplates combined with them
JP4723282B2 (en) Derailment prevention guard
JP3195311U (en) Derailment return slope fixing bracket
CN219621505U (en) Ballastless track heightening fastener system
RU2038440C1 (en) Device for securing a rail to a sleeper
KR200281054Y1 (en) Apparatus for fastening guard rail for PCT
KR100453985B1 (en) Apparatus for fastening guard rail for PCT
JPH0449202Y2 (en)

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19950822

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090301

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090301

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100301

Year of fee payment: 15

LAPS Cancellation because of no payment of annual fees