Blocking plug loading method and loading jig in concrete construct

Info

Publication number
JPH0718231B2
JPH0718231B2 JP11552486A JP11552486A JPH0718231B2 JP H0718231 B2 JPH0718231 B2 JP H0718231B2 JP 11552486 A JP11552486 A JP 11552486A JP 11552486 A JP11552486 A JP 11552486A JP H0718231 B2 JPH0718231 B2 JP H0718231B2
Authority
JP
Japan
Prior art keywords
concrete
hole
jig
loading
plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP11552486A
Other languages
Japanese (ja)
Other versions
JPS62273361A (en
Inventor
寛人 五味
巖 森
国治 菊間
Original Assignee
岡部株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 岡部株式会社 filed Critical 岡部株式会社
Priority to JP11552486A priority Critical patent/JPH0718231B2/en
Publication of JPS62273361A publication Critical patent/JPS62273361A/en
Publication of JPH0718231B2 publication Critical patent/JPH0718231B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、コンクリート構築物施工の際に用いられる閉
塞栓を完全に装填する方法と、その治具に関するもので
ある。
Description: TECHNICAL FIELD The present invention relates to a method for completely loading an obstruction plug used in the construction of a concrete structure, and a jig therefor.

(従来技術と問題点) コンクリート構造物、特に塩害防止の具体的な有効手段
として、コンクリート構造物に埋設される鉄筋、鉄骨、
PC鋼材、コンクリート型枠間隔保持杆等の鋼材表面とこ
れを覆うコンクリート表面までの最短距離を大きくとる
とともに、緻密なコンクリートの打設により海塩粒子の
コンクリート構造物中への侵入を防止してきた。
(Conventional Technology and Problems) Concrete structures, particularly reinforcing bars, steel frames embedded in concrete structures, as concrete effective means for preventing salt damage,
The shortest distance between the surface of the steel such as PC steel and the concrete frame spacing rod and the surface of the concrete covering it has been increased, and the dense concrete has been placed to prevent sea salt particles from entering the concrete structure. .

一方、従来用いられてきた通常のコンクリート構造物で
は、コンクリート型枠間隔保持杆のかぶり厚さが10〜20
数ミリと比較的小さいものであるために用いられる型枠
支承具の長さも短く、それを除去した跡の孔を埋め戻す
ための補修も単にモルタルで形成した閉塞栓の先端に接
着剤を塗布して挿入し、固定して、コンクリート表面を
形成してきた。
On the other hand, in the conventional concrete structure that has been conventionally used, the cover thickness of the concrete formwork space maintaining rod is 10 to 20.
The length of the formwork support used because it is relatively small as a few millimeters, the repair to refill the hole of the trace that was removed is also simply apply adhesive to the tip of the closure plug made of mortar Then, insert and fix it to form a concrete surface.

しかるに、上記の如き、従来の閉塞栓を挿入、固定をも
つてしては、塩害防止のためにかぶり厚さの大きいコン
クリート構造物の施工において、型枠支承具を抜き去つ
た跡の孔に挿入、固定する閉塞栓のスムーズな挿入と、
挿入後の完全な機能、すなわち、作用効果を奏し得ない
という欠点を有するものであつた。
However, by inserting and fixing the conventional obstruction plugs as described above, in the construction of a concrete structure with a large cover thickness to prevent salt damage, the holes in the marks left after removing the frame support Inserting and fixing the obstruction plug smoothly,
It has a defect that it cannot function completely after being inserted, that is, it has no effect.

そこで、本発明は、かぶり厚さが比較的大きなコンクリ
ート構造物におけるコンクリート型枠間隔保持杆に長い
型枠支承具を用いて、型枠の支承を行い、コンクリート
の打設をした後に型枠と、その支承部材である型枠支承
具を除去し、その跡の孔の深さと同じに形成した円錐状
の閉塞栓を簡単容易に完全に装填する方法と、その装填
治具を提供するものである。
Therefore, the present invention uses a long form supporting member for a concrete form spacing holding rod in a concrete structure having a relatively large cover thickness, supports the form, and forms the concrete after placing the concrete. The method of removing the formwork support tool that is the support member and simply and easily and completely loading the conical blocking plug formed to have the same depth as the depth of the hole and the loading jig are provided. is there.

(問題点を解決するための手段) 本発明を実施例にもとづいて説明すると、本発明の構成
は第1図に示すように、コンクリート構造物1を構築す
る際に、コンクリート型枠2を組み立てる場合、コンク
リート型枠間隔保持杆3のねじ部端部からコンクリート
型枠2までの間隔、すなわち、コンクリート硬化後、前
記型枠2を脱型した後におけるコンクリート型枠間隔保
持杆3のカブリ厚さHを大きくし、且つ、コンクリート
型枠支承具4を除去した跡にできる孔5を閉塞栓10によ
り完全に密封してコンクリート構築物1を塩害から保護
するための有効な方法を講じるものである。
(Means for Solving Problems) The present invention will be described based on Examples. As shown in FIG. 1, the structure of the present invention assembles a concrete formwork 2 when constructing a concrete structure 1. In this case, the distance from the screw end of the concrete formwork space holding rod 3 to the concrete formwork 2, that is, the fog thickness of the concrete formworking space holding rod 3 after the mold 2 is removed from the mold after the concrete has hardened. An effective method for protecting the concrete structure 1 from salt damage by enlarging the hole 5 formed by removing the concrete form supporting member 4 with a closing plug 10 and enlarging H is provided.

本発明において用いられるコンクリート型枠支承具4は
第1図に示すような円錐体状をなすもので、その中心に
型枠間隔保持杆3と、型枠締付杆17とが螺合連結される
心金8が埋込孔9に嵌着されているものであり、その長
さがコンクリート構築物1のカブリ厚さHを考慮した長
さで構成されている。
The concrete formwork support 4 used in the present invention has a conical shape as shown in FIG. 1, and the formwork space holding rod 3 and the formwork clamping rod 17 are screwed and connected at the center thereof. The core metal 8 is fitted into the embedding hole 9, and the length thereof is configured in consideration of the fog thickness H of the concrete structure 1.

さらに、該心金8の型枠2寄りは、型枠2を挿通し、外
側に位置するコンクリート型枠締付杆17と螺合されて、
型枠2を係止固定している。
Further, the mandrel 8 near the formwork 2 is inserted through the formwork 2 and screwed with a concrete formwork clamping rod 17 located outside,
The mold 2 is locked and fixed.

そして、コンクリートの打設後に、その硬化をまつてコ
ンクリート型枠2を取外し、円錐体状の型枠支承具4を
コンクリート型枠間隔保持杆3より除去した跡の孔5は
第2図に示したようなものとなる。
Then, after the concrete has been poured, the concrete formwork 2 is removed by the hardening thereof, and the conical formwork support 4 is removed from the concrete formwork space holding rod 3. It becomes something like.

つまり、コンクリート構築物1のカブリ厚さHに相当す
る孔5は、その先端部にコンクリート型枠間隔保持杆3
の先端部3aが突出した状態になつている。
In other words, the hole 5 corresponding to the fog thickness H of the concrete structure 1 has a concrete formwork space holding rod 3 at the tip thereof.
The tip portion 3a of the is protruding.

つぎに、円錐体状のコンクリート型枠支承具4を除去し
た跡の孔5に挿入装填する円錐体状の閉塞栓10は第3図
に示されているような形状のもので、その本体がモルタ
ル又は合成樹脂等で形成されているものであり、コンク
リート壁の外側に面した部分が大きく、先端側が細い円
錐体状のものにして、その先端の細い方には、コンクリ
ート型枠間隔保持杆3の先端部3aを収容するための孔11
が設けられているものであり、その全体長さは前記コン
クリート型枠支承具4とほゞ同じであるが、直径の同一
断面径においては、型枠支承具4の径より接着剤の厚み
分だけ細いものとして形成されている。
Next, the conical closure plug 10 to be inserted and loaded into the hole 5 after removing the conical concrete formwork support 4 has a shape as shown in FIG. It is made of mortar or synthetic resin, etc., the part facing the outside of the concrete wall is large, and the tip side is made into a cone-like shape, and the narrow tip end has a concrete form space holding rod. Hole 11 for accommodating the tip portion 3a of 3
Although the entire length is almost the same as that of the concrete formwork support 4, the diameter of the formwork support 4 is larger than the diameter of the adhesive in the same cross-sectional diameter. It is formed as a thin one.

このように構成されている前記円錐体状の閉塞栓10は第
4図に示すように、コンクリート型枠支承具4の抜き去
つた跡の孔5に挿入、装填するのであるが、まず、孔5
の内周壁6に接着剤12を均一に塗布するための後述する
治具13を接着剤中に浸漬し、のち、この治具13を前記孔
5内に挿入し、軽く2〜3回、回動して抜き去る時は、
孔5の内周壁6にムラなく接着剤12が均一に塗布される
こととなる。
As shown in FIG. 4, the conical obstruction plug 10 thus constructed is inserted and loaded into the hole 5 which has been left out of the concrete form supporting member 4, but first, 5
A jig 13 to be described below for uniformly applying the adhesive 12 to the inner peripheral wall 6 is immersed in the adhesive, and then the jig 13 is inserted into the hole 5 and lightly rotated 2-3 times. When moving and pulling out,
The adhesive 12 is evenly applied to the inner peripheral wall 6 of the hole 5 without any unevenness.

その後、直ちに、閉塞栓10を孔5内に挿入し、閉塞栓10
の太い部分を前記治具13の決め押し叩打部16で決め押し
をして孔5内へ装填するのである。
Immediately thereafter, the obstruction plug 10 is inserted into the hole 5, and the obstruction plug 10 is inserted.
The thick portion of the jig is fixedly pushed by the depressing and tapping section 16 of the jig 13 to load it into the hole 5.

つぎに、前述の装填治具13は第5図に示される如く、円
錐体状の閉塞栓10に比して、先端の円錐体状部14の長さ
は、約数分の1程度短く形成されているとともに、この
円錐体状部14に接続して細い棒状のにぎりに便利な把手
部15と、続いてその後端の決め押し叩打部16が成型して
なるものであつて、決め押し叩打部16の径は、円錐体状
の閉塞栓10の太い後端部の径よりも稍小径に形成され、
閉塞栓10の孔5内への挿入に際して決め押し装填を無駄
のないものとしている。
Next, as shown in FIG. 5, the above-mentioned loading jig 13 is formed such that the length of the conical portion 14 at the tip is shorter than that of the conical closure plug 10 by about a fraction. In addition, it is connected to this cone-shaped part 14 and is a convenient grip part 15 for a thin rod-shaped grip, followed by a fixed push tapping part 16 at the rear end. The diameter of the portion 16 is formed to be slightly smaller than the diameter of the thick rear end portion of the conical closure plug 10.
When inserting the obstruction plug 10 into the hole 5, the push-and-load operation is not wasted.

また、治具13を接着剤12中に浸漬した場合に、該治具13
の円錐状体部14に付着した接着剤量は孔5の内周壁面6
より外部へ溢流しない量加減として、孔5の深さ、すな
わち、閉塞栓10の長さより短小に形成してあるのはその
ためである。
When the jig 13 is immersed in the adhesive 12, the jig 13
The amount of adhesive adhered to the conical body portion 14 of the
This is the reason why the depth of the hole 5, that is, the length of the obstruction plug 10 is made shorter than the length of the obstruction plug 10 so that the overflow does not overflow further.

該装填治具13は、携帯に便利なように、軽く、また、摩
耗、変形防止或いは接着剤の表面付着等の点から硬質の
合成樹脂製或いは木製のものが好しい。
The loading jig 13 is preferably made of synthetic resin or wood, which is light and convenient for carrying, and is hard and prevents deformation and adhesion of the adhesive to the surface.

本治具は、前述の如く、閉塞栓の挿入、装填に当つて
は、予め孔の内周壁面に接着剤を塗布しておくことによ
つて、コンクリート型枠支承具を抜き去つた跡の孔の深
く、長い場合、孔の最深部と閉塞栓の先端部間に空気溜
りが生じたり、閉塞栓と孔の内周壁面間の接着剤が不均
一になることはない。
As described above, this jig is designed so that when the obstruction plug is inserted and loaded, the adhesive is applied to the inner peripheral wall surface of the hole in advance so that the concrete form supporting tool is removed. When the hole is deep and long, there is no possibility that air will be trapped between the deepest part of the hole and the tip of the plug, and the adhesive between the plug and the inner wall surface of the hole will not be uneven.

(発明の効果) このように、本発明においては、カブリ厚さを大きくと
るコンクリート構造物の施工にあつて、コンクリート型
枠支承具の除去後の孔の閉塞栓の挿入、装填で現行の2
倍〜3、4倍と長い閉塞栓でも、正確な位置に挿入、装
填を容易にすることのみか、作業者の熟練度に関係なく
簡単、迅速にコンクリート型枠支承具除去後の孔の処理
を可能にする閉塞栓の装填方法である。
(Effect of the Invention) As described above, according to the present invention, in the construction of a concrete structure having a large fog thickness, the insertion and loading of the block plugs of the holes after the removal of the concrete form supporting member are required.
Even if the obstruction plug is as long as double to 3 or 4 times, it is easy to insert and load it in the correct position, or it is easy and quick to treat the hole after removing the concrete formwork support regardless of the skill of the operator. It is a method of loading an obstruction plug that enables the above.

【図面の簡単な説明】[Brief description of drawings]

第1図は、コンクリート打設時における型枠等の付帯設
備をしたコンクリート構築物施工説明図。 第2図は、コンクリート型枠支承具を取り除いた跡の孔
の側断面図。 第3図は、円錐体状の閉塞栓の一部截断した側断面図。 第4図は、本発明の方法により閉塞栓を挿入、装填した
時の一部截断した側断面図。 第5図は、本発明に使用される閉塞栓装填治具の説明
図。 1……コンクリート構築物、2……コンクリート型枠、
3……コンクリート型枠間隔保持杆、3a……コンクリー
ト型枠間隔保持杆3の先端部、4……コンクリート型枠
支承具、5……孔、6……孔の内周壁面、8……心金、
9……埋込孔、10……閉塞栓、11……孔、12……接着
剤、13……装填治具、14……治具の円錐体状部、15……
把手部、16……決め押し叩打部、17……コンクリート型
枠締付杆、H……カブリ厚さ。
FIG. 1 is an explanatory diagram of a concrete structure construction with auxiliary equipment such as formwork at the time of placing concrete. FIG. 2 is a side sectional view of a hole left after removing the concrete formwork support tool. FIG. 3 is a side sectional view in which a conical obstruction plug is partially cut. FIG. 4 is a side cross-sectional view in which a blocking plug is inserted and loaded by the method of the present invention and is partially cut. FIG. 5 is an explanatory view of the plug stopper loading jig used in the present invention. 1 ... Concrete structure, 2 ... Concrete formwork,
3 ... concrete formwork space holding rod, 3a ... the tip of the concrete formwork space holding rod 3, 4 ... concrete formwork support, 5 ... hole, 6 ... hole inner wall surface, 8 ... mandrel,
9 ... Embedding hole, 10 ... Blocking plug, 11 ... Hole, 12 ... Adhesive, 13 ... Loading jig, 14 ... Jig conical part, 15 ...
Grip part, 16 …… Pressing and tapping part, 17 …… Concrete form clamping rod, H …… Fog thickness.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】カブリ厚さを大きくとるコンクリート構築
物の施工において、コンクリート型枠間隔保持杆とコン
クリート型枠締付杆間に位置する型枠支承具除去跡の孔
に挿入固定する閉塞栓を、予め該閉塞栓と同大の治具に
接着剤を塗布して前記孔内周面に接着剤を塗布せしめて
後、前記閉塞栓を挿入固着することを特徴とする閉塞栓
の装填方法。
1. In the construction of a concrete structure having a large fog thickness, a plug for inserting and fixing into a hole of a form supporting member removal mark located between a concrete form spacing rod and a concrete form clamping rod, A method for loading a closure plug, characterized in that an adhesive is previously applied to a jig of the same size as the closure plug, the adhesive is applied to the inner peripheral surface of the hole, and then the closure plug is inserted and fixed.
【請求項2】先端に円錐状体部、中間に握手部、後端に
決め押し叩打部を設けたことを特徴とするコンクリート
構築物の閉塞栓装填治具。
2. A closure plug loading jig for a concrete structure, wherein a conical body is provided at the tip, a handshake is provided in the middle, and a depressing and hitting section is provided at the rear end.
JP11552486A 1986-05-20 1986-05-20 Blocking plug loading method and loading jig in concrete construct Expired - Lifetime JPH0718231B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11552486A JPH0718231B2 (en) 1986-05-20 1986-05-20 Blocking plug loading method and loading jig in concrete construct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11552486A JPH0718231B2 (en) 1986-05-20 1986-05-20 Blocking plug loading method and loading jig in concrete construct

Publications (2)

Publication Number Publication Date
JPS62273361A JPS62273361A (en) 1987-11-27
JPH0718231B2 true JPH0718231B2 (en) 1995-03-01

Family

ID=14664659

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11552486A Expired - Lifetime JPH0718231B2 (en) 1986-05-20 1986-05-20 Blocking plug loading method and loading jig in concrete construct

Country Status (1)

Country Link
JP (1) JPH0718231B2 (en)

Also Published As

Publication number Publication date
JPS62273361A (en) 1987-11-27

Similar Documents

Publication Publication Date Title
WO1998057004A3 (en) Apparatus and method for anchoring and erecting concrete or similar materials
US4354332A (en) Plaster and dry wall hole repair
JPH0718231B2 (en) Blocking plug loading method and loading jig in concrete construct
JP2005307468A (en) Device and removal method for sleeve tube for forming through hole
KR20200025712A (en) Insert fixing apparatus for concrete-structure
US1958674A (en) Device for facilitating the securing of bolts in walls
JP2873223B2 (en) Lifting jig for concrete molding
JP4168022B2 (en) Reinforcement method of foundation mortar layer in finished outer wall structure
JPH08247119A (en) Chemical anchor execution method and anchor bolt
JP2001073555A (en) Recessed-section embedding tool
KR100255764B1 (en) Fixed nail for slab insulant
JPS5944464A (en) Anchoring of building to concrete foundation
JP3071280U (en) Salt damage prevention plug
JPH0330481Y2 (en)
JP6920795B2 (en) Concrete buried member
BE501092A (en)
JPH0228023Y2 (en)
JPS5935693Y2 (en) Fixing body for PC steel materials
JPH0221207Y2 (en)
JPH0885958A (en) Anchor bolt fixing pedestal
JPS5847791Y2 (en) Fixing device for embedded electrical wiring box to concrete formwork
JPH06341164A (en) Linking method of plurality of blocks
JPS6030327Y2 (en) Anchor for concrete
JPH08226428A (en) Placing for insert nut
JPH019850Y2 (en)