JPH0721191B2 - Anchor bolt driving Precast concrete block and anchor bolt driving method - Google Patents
[go: Go Back, main page]

JPH0721191B2 - Anchor bolt driving Precast concrete block and anchor bolt driving method - Google Patents

Anchor bolt driving Precast concrete block and anchor bolt driving method

Info

Publication number
JPH0721191B2
JPH0721191B2 JP8613486A JP8613486A JPH0721191B2 JP H0721191 B2 JPH0721191 B2 JP H0721191B2 JP 8613486 A JP8613486 A JP 8613486A JP 8613486 A JP8613486 A JP 8613486A JP H0721191 B2 JPH0721191 B2 JP H0721191B2
Authority
JP
Japan
Prior art keywords
anchor bolt
precast concrete
bolt driving
concrete block
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP8613486A
Other languages
Japanese (ja)
Other versions
JPS62244923A (en
Inventor
幸男 長谷川
康夫 井上
一彦 新井
祐輔 松下
伸二 山下
信博 奥山
章 坪田
正人 森
徹 篠崎
亮二 吉武
周 武田
和良 国塩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Kajima Corp
Waseda University
Obayashi Corp
Takenaka Corp
Fujita Corp
Komatsu Ltd
Kumagai Gumi Co Ltd
Sato Kogyo Co Ltd
Toda Corp
Shimizu Corp
Kanadevia Corp
Original Assignee
Taisei Corp
Kajima Corp
Waseda University
Obayashi Corp
Takenaka Corp
Fujita Corp
Komatsu Ltd
Hitachi Zosen Corp
Kumagai Gumi Co Ltd
Sato Kogyo Co Ltd
Toda Corp
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp, Kajima Corp, Waseda University, Obayashi Corp, Takenaka Corp, Fujita Corp, Komatsu Ltd, Hitachi Zosen Corp, Kumagai Gumi Co Ltd, Sato Kogyo Co Ltd, Toda Corp, Shimizu Corp filed Critical Taisei Corp
Priority to JP8613486A priority Critical patent/JPH0721191B2/en
Publication of JPS62244923A publication Critical patent/JPS62244923A/en
Publication of JPH0721191B2 publication Critical patent/JPH0721191B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、鉄骨鉄筋コンクリート造建築物の鉄骨の足元
を固定するためのアンカーボルト打ち込みプレキャスト
コンクリート・ブロック及びアンカーボルト打ち込み法
に関するものである。
TECHNICAL FIELD The present invention relates to an anchor bolt driving precast concrete block and an anchor bolt driving method for fixing the foot of a steel frame of a steel frame reinforced concrete building.

〔従来の技術〕[Conventional technology]

第3図は従来の柱鉄骨を使った中高層建築における基礎
コンクリート打設、柱鉄骨固定までの作業を説明するた
めの図である。図中、11は砕石、12は捨てコンクリー
ト、13は基礎筋、14は柱筋、15は柱鉄骨、16はベースプ
レートを示す。
FIG. 3 is a diagram for explaining the work up to the placing of concrete foundation and the fixing of the pillar steel frame in the conventional high-rise building using the pillar steel frame. In the figure, 11 is crushed stone, 12 is discarded concrete, 13 is foundation reinforcement, 14 is column reinforcement, 15 is column steel, and 16 is a base plate.

鉄骨コンクリート造(S)、鉄骨鉄筋コンクリート造
(SRC)等の中高層建築の基礎工事では、例えば第3図
(a)に示すように、まず、地面を所定の深さに掘削し
ブルドーザ等を使って均らしてから100〜150mm程度の厚
さで砕石11を敷き、その上に約50mm程度の厚さで捨てコ
ンクリート12を打設する。しかる後、捨てコンクリート
12上で位置出しを行って、第3図(b)に示すように基
礎筋13、さらに各柱の位置に鉄筋14、X方向とY方向の
地中梁筋(図示省略)を組み、再び基礎筋(ハカマ筋)
を組んで外周に型枠をセットする。そして、ここにフレ
ームをセットしてアンカーボルトの位置決めをし溶接に
よりアンカーボルトを地中梁筋に固定する。このように
して鉄筋、地中梁筋、アンカーボルトの組立、固定を行
った状態にしてから基礎コンクリートの打設が行われ
る。この基礎コンクリートの打設が終わると、第3図
(c)に示すような柱鉄骨15をベースプレート16の固定
孔に合わせてアンカーボルトに落とし込み、ナット締め
により柱鉄骨15を固定する。
In the basic construction of high-rise buildings such as steel-framed concrete (S) and steel-framed reinforced concrete (SRC), for example, as shown in Fig. 3 (a), first, excavate the ground to a predetermined depth and use a bulldozer or the like. After leveling, crushed stone 11 is laid with a thickness of about 100 to 150 mm, and discarded concrete 12 is cast on it with a thickness of about 50 mm. After that, discard concrete
Positioning is performed on 12, and as shown in FIG. 3 (b), the basic reinforcement 13, the reinforcing bars 14 at the positions of the columns, and the underground beam reinforcements (not shown) in the X and Y directions are assembled, and again. Basic muscle (Hakama muscle)
Assemble and set the form on the outer circumference. Then, a frame is set here, the anchor bolt is positioned, and the anchor bolt is fixed to the underground beam by welding. In this way, the reinforcing bars, the underground beam bars, and the anchor bolts are assembled and fixed, and then the foundation concrete is placed. When the casting of the basic concrete is completed, the pillar steel frame 15 as shown in FIG. 3 (c) is dropped into the anchor bolt in alignment with the fixing hole of the base plate 16, and the pillar steel frame 15 is fixed by tightening the nut.

〔発明が解決しようとする問題点〕[Problems to be solved by the invention]

一般に鉄筋のジョイント方法としては、ラップジョイン
ト(重ね継ぎ手)法、圧接法、機械継ぎ手法等が採用さ
れており、地中梁筋のジョイントにもこれらの方法が採
用されるが、これらの方法によりジョイントされた地中
梁筋にアンカーボルトを溶接固定しても、実際には地中
梁筋との納まり、コンクリートの打設等により精度誤差
が生じやすく、アンカーボルトのピッチと柱鉄骨のベー
スプレートの固定孔のピッチ位置とが合わなかったり、
柱の位置がずれてしまったりするという問題がある。
Generally, the lap joint (lap joint) method, pressure welding method, mechanical joint method, etc. are adopted as the joint method of the reinforcing bar. These methods are also adopted for the joint of the underground beam, but these methods are used. Even if the anchor bolts are welded and fixed to the jointed underground beam reinforcement, the accuracy error is likely to occur due to the fact that the anchor beam is actually accommodated, the concrete is placed, etc., and the pitch of the anchor bolts and the base plate of the column steel frame The pitch position of the fixing hole does not match,
There is a problem that the position of the pillar is misaligned.

本発明は、上記の問題点を解決するものであって、据え
付け精度の確保、作業性の向上を図ったアンカーボルト
打ち込みプレキャストコンクリート・ブロック及びアン
カーボルト打ち込み法の提供を目的とするものである。
The present invention solves the above problems, and an object of the present invention is to provide an anchor bolt driven precast concrete block and an anchor bolt driven method that ensure installation accuracy and improve workability.

〔問題点を解決するための手段〕[Means for solving problems]

そのため本発明のアンカーボルト打ち込みプレキャスト
コンクリート・ブロックは、予め基礎筋、柱鉄筋及び地
中梁筋と共に鉄骨のベースプレートの固定孔に合わせて
アンカーボルトを打ち込んだことを特徴とするものであ
り、また、アンカーボルト打ち込み法は、位置出しをし
た捨てコンクリート上に、予め基礎筋、柱鉄筋及び地中
梁筋と共に柱鉄骨のベースプレートの固定孔に合わせて
アンカーボルトを打ち込んだアンカーボルト打ち込みプ
レキャストコンクリート・ブロックを据え付けて地中梁
筋を組み、しかる後基礎コンクリートの打設を行うこと
を特徴とするものである。
Therefore, the anchor bolt driven precast concrete block of the present invention is characterized in that the anchor bolts are driven in advance together with the base reinforcement, the column reinforcement and the underground beam reinforcement in accordance with the fixing holes of the base plate of the steel frame, and The anchor bolt driving method is an anchor bolt driving precast concrete block in which anchor bolts have been driven in advance along with the foundation reinforcement, column reinforcement and underground beam reinforcement on the fixed holes of the base plate of the column steel frame on the positioned concrete. It is characterized in that it is installed and assembled with underground girder bars, and then concrete concrete is placed.

〔作用〕[Action]

本発明のアンカーボルト打ち込みプレキャストコンクリ
ート・ブロック及びアンカーボルト打ち込み法では、予
め工場で所定の寸法に従ってアンカーボルトを打ち込ん
でしまうので、現場では、アンカーボルト打ち込みプレ
キャストコンクリート・ブロックを据え付けるだけで、
個々のアンカーボルトについての位置決めや地中梁筋へ
の溶接固定作業等は不要となる。また、プレキャストコ
ンクリート・ブロックは、重量物となるので、据え付け
後コンクリートの打設により動くこともなくなるので、
据え付け後にズレが生じることもなくなる。
In the anchor bolt driving precast concrete block and the anchor bolt driving method of the present invention, since the anchor bolt is driven in accordance with the predetermined dimensions in the factory in advance, at the site, just install the anchor bolt driving precast concrete block,
Positioning of individual anchor bolts and welding and fixing work to the underground beam reinforcement are unnecessary. Also, since the precast concrete block is a heavy object, it will not move due to the placement of concrete after installation,
There will be no misalignment after installation.

〔実施例〕〔Example〕

以下、実施例を図面を参照しつつ説明する。 Hereinafter, embodiments will be described with reference to the drawings.

第1図は本発明に係るアンカーボルト打ち込みプレキャ
ストコンクリート・ブロックの1実施例を示す図、第2
図は本発明に係るアンカーボルト打ち込み方法を説明す
るための図である。図中、1は柱筋、2はアンカーボル
ト、3と6は地中梁筋、4はプレキャストコンクリート
・ブロック、5は柱鉄骨、7は捨てコンクリートを示
す。
FIG. 1 is a diagram showing an embodiment of an anchor bolt driven precast concrete block according to the present invention, FIG.
The drawings are views for explaining an anchor bolt driving method according to the present invention. In the figure, 1 is a column reinforcing bar, 2 is an anchor bolt, 3 and 6 are underground beam reinforcing bars, 4 is a precast concrete block, 5 is a column steel frame, and 7 is a discarded concrete.

アンカーボルト打ち込みプレキャストコンクリート・ブ
ロックは、第1図に示すように予め工場で基礎筋、柱筋
1、アンカーボルト2、地中梁筋3を箱型のプレキャス
トコンクリート・ブロック4に打ち込んだものであり、
アンカーボルト2は、柱鉄骨のベースプレートの固定孔
の寸法に合わせた大きさ及びピッチで配置され、そのア
ンカーボルト2によって固定される柱鉄筋の周囲に柱筋
1が所定の長さで配置される。また、地中梁筋3は、捨
てコンクリート上に組まれる地中梁筋とジョイントする
ように所定の長さで配置される。従って、アンカーボル
ト打ち込みプレキャストコンクリート・ブロックを所定
の位置(柱の位置)に据え付けることによってアンカー
ボルト2の位置決めができる。
As shown in Fig. 1, the anchor bolt driven precast concrete block is one in which the foundation reinforcement, column reinforcement 1, anchor bolt 2, underground beam reinforcement 3 have been driven into the box-shaped precast concrete block 4 in advance at the factory. ,
The anchor bolts 2 are arranged with a size and pitch according to the dimensions of the fixing holes of the base plate of the pillar steel frame, and the pillar reinforcing bars 1 are arranged with a predetermined length around the pillar reinforcing bars fixed by the anchor bolts 2. . Further, the underground beam reinforcement 3 is arranged with a predetermined length so as to be jointed with the underground beam reinforcement assembled on the discarded concrete. Therefore, the anchor bolt 2 can be positioned by installing the anchor bolt driven precast concrete block at a predetermined position (column position).

上記第1図に示すアンカーボルト打ち込みプレキャスト
コンクリート・ブロックを用いたアンカーボルト打ち込
み方法を説明するための図が第2図である。先に述べた
ように地面を掘削し均らして砕石を敷き、その上に捨て
コンクリートを打設すると、位置出しを行って基礎筋、
柱筋、地中梁筋の組立を行い、アンカーボルトの固定を
行うが、本発明のアンカーボルト打ち込みプレキャスト
コンクリート・ブロックを用いる場合には、第2図に示
すようにまず捨てコンクリート7上の位置出しに従って
アンカーボルト打ち込みプレキャストコンクリート・ブ
ロック8を据え付け、そこに地中梁筋6をジョイントし
て地中梁筋の組立を行う。そして、例えば図示点線の高
さまで基礎コンクリートの打設を行い、コンクリートの
打設が完了するとアンカーボルト打ち込みプレキャスト
コンクリート・ブロック8のアンカーボルトに柱鉄骨を
落とし込みナットで締め付けて柱鉄骨の及び柱鉄筋の組
立を行う。
FIG. 2 is a diagram for explaining an anchor bolt driving method using the anchor bolt driving precast concrete block shown in FIG. As mentioned earlier, excavating the ground, leveling it, laying crushed stones, and throwing concrete on it, positioning is performed and the foundation bar,
Assembling the column reinforcement and the underground girder reinforcement and fixing the anchor bolts. When using the anchor bolt driven precast concrete block of the present invention, first the position on the discarded concrete 7 as shown in FIG. The anchor bolt driving precast concrete block 8 is installed according to the start, and the underground beam reinforcement 6 is joined thereto to assemble the underground beam reinforcement. Then, for example, the foundation concrete is cast up to the height of the dotted line in the figure, and when the casting of the concrete is completed, the pillar steel frame is dropped into the anchor bolt of the precast concrete block 8 and tightened with the nut to tighten the pillar steel bar and the pillar reinforcement. Assemble.

なお、本発明は、種々の変形が可能であり、上記実施例
に限定されるものではない。例えば実施例では、アンカ
ーボルト打ち込みプレキャストコンクリート・ブロック
の形状を矩形(立方体、直方体)で示したが、捨てコン
クリートのレベルから柱鉄骨の足元の固定レベルまでの
厚さを有するものであれば他の形状でもよい。
The present invention can be modified in various ways and is not limited to the above-mentioned embodiments. For example, in the examples, the shape of the precast concrete block with anchor bolts is shown as a rectangle (cube, rectangular parallelepiped), but if the thickness is from the level of waste concrete to the level at which the feet of pillar steel frames are fixed, other shapes can be used. It may have a shape.

〔発明の効果〕〔The invention's effect〕

以上の説明から明らかなように、本発明によれば、予め
工場においてアンカーボルトを地中梁筋及び柱鉄筋と共
に打ち込んたアンカーボルト打ち込みプレキャストコン
クリート・ブロックとしてしまうので、工場生産による
作業の効率化、製品の品質、精度の向上を図ることがで
き、現場作業によりずれが生じてアンカーボルトの寸法
が柱鉄骨のベースプレートの固定用孔と合わなくなるこ
とがなくなる。また、アンカーボルト打ち込みプレキャ
ストコンクリート・ブロックとするので、基礎コンクリ
ートの打設によって動くこともない。さらに、捨てコン
クリート上の位置出しに従ってアンカーボルト打ち込み
プレキャストコンクリート・ブロックを据え付けること
によって、その後アンカーボルト打ち込みプレキャスト
コンクリート・ブロックは、コンクリートの打設によっ
てもずれることがないので、アンカーボルトの埋め込み
位置をアンカーボルト打ち込みプレキャストコンクリー
ト・ブロックの据え付け精度により確保することができ
る。
As is clear from the above description, according to the present invention, the anchor bolts are pre-cast concrete blocks that have been previously anchored with anchor beams in the factory together with the underground beam reinforcement and column reinforcement, so that the efficiency of work by factory production, It is possible to improve the quality and accuracy of the product, and prevent the size of the anchor bolt from becoming inconsistent with the fixing hole of the base plate of the pillar steel frame due to the deviation caused by the site work. Also, because it is a precast concrete block with anchor bolts, it does not move due to the placement of foundation concrete. In addition, by installing the anchor bolt driven precast concrete block according to the positioning on the discarded concrete, the anchor bolt driven precast concrete block will not be displaced even when the concrete is placed, so the anchor bolt embedding position is fixed. It can be secured by the installation accuracy of the bolt-in precast concrete block.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明に係るアンカーボルト打ち込みプレキャ
ストコンクリート・ブロックの1実施例を示す図、第2
図は本発明に係るアンカーボルト打ち込み方法を説明す
るための図、第3図は従来の柱鉄骨を使った中高層建築
における基礎コンクリート打設、柱鉄骨固定までの作業
を説明するための図である。 1…柱筋、2…アンカーボルト、3と6…地中梁筋、4
…プレキャストコンクリート・ブロック、5…柱鉄骨、
7…捨てコンクリート。
FIG. 1 is a diagram showing an embodiment of an anchor bolt driven precast concrete block according to the present invention, FIG.
FIG. 3 is a diagram for explaining the anchor bolt driving method according to the present invention, and FIG. 3 is a diagram for explaining the work up to the foundation concrete placement and the column steel frame fixing in the conventional high-rise building using the column steel frame. . 1 ... Column reinforcement, 2 ... Anchor bolt, 3 and 6 ... Underground beam reinforcement, 4
... precast concrete blocks, 5 ... column steel frames,
7 ... Discarded concrete.

───────────────────────────────────────────────────── フロントページの続き (71)出願人 999999999 佐藤工業株式会社 富山県富山市桜木町1番11号 (71)出願人 999999999 清水建設株式会社 東京都中央区京橋2丁目16番1号 (71)出願人 999999999 大成建設株式会社 東京都新宿区西新宿1丁目25番1号 (71)出願人 999999999 株式会社竹中工務店 大阪府大阪市東区本町4丁目27番地 (71)出願人 999999999 戸田建設株式会社 東京都中央区京橋1丁目7番1号 (71)出願人 999999999 株式会社フジタ 東京都渋谷区千駄ヶ谷4丁目6番15号 (71)出願人 999999999 株式会社小松製作所 東京都港区赤坂2丁目3番6号 (71)出願人 999999999 日立造船株式会社 大阪府大阪市西区江戸堀1丁目6番14号 (72)発明者 長谷川 幸男 東京都新宿区大久保3―4―1 早稲田大 学システム科学研究所内 (72)発明者 井上 康夫 埼玉県川口市芝園町3丁目4の543 (72)発明者 新井 一彦 埼玉県浦和市仲町2―9―16 (72)発明者 松下 祐輔 東京都新宿区築地町16 ライオンズマンシ ョン神楽坂第3―102号 (72)発明者 山下 伸二 神奈川県厚木市三田91―1 (72)発明者 奥山 信博 東京都世田谷区代田1―20―8 清水建設 寮 (72)発明者 坪田 章 東京都江東区南砂2―5―14 株式会社竹 中工務店技術研究所内 (72)発明者 森 正人 神奈川県横浜市港北区小机町246番地 (72)発明者 篠崎 徹 茨城県下妻市下木戸24 (72)発明者 吉武 亮二 東京都町田市能ヶ谷町1521―93 (72)発明者 武田 周 神奈川県平▲塚▼市万田18 小松製作所平 ▲塚▼寮311号 (72)発明者 国塩 和良 大阪府大阪市西区江戸堀1丁目6番14号 日立造船株式会社内 (56)参考文献 特開 昭52−132508(JP,A) 特開 昭58−37235(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page (71) Applicant 999999999 Sato Industry Co., Ltd. 1-11 Sakuragicho, Toyama City, Toyama Prefecture (71) Applicant 999999999 Shimizu Corporation 2-16-1 Kyobashi, Chuo-ku, Tokyo (71) ) Applicant 999999999 Taisei Corporation 1-25-1 Nishishinjuku, Shinjuku-ku, Tokyo (71) Applicant 999999999 Takenaka Corporation Ltd. 4-27, Honmachi, Higashi-ku, Osaka-shi, Osaka (71) Applicant 999999999 Toda Construction Co., Ltd. Company 1-7-1, Kyobashi, Chuo-ku, Tokyo (71) Applicant 999999999 Fujita Co., Ltd. 4-6-15 Sendagaya, Shibuya-ku, Tokyo (71) Applicant 999999999 2-3 Akasaka, Minato-ku, Tokyo No. 6 (71) Applicant 999999999 Hitachi Zosen Corporation 1-6-14 Edobori, Nishi-ku, Osaka-shi, Osaka (72) Inventor Yukio Hasegawa Tokyo 3-4-1 Okubo, Shinjuku-ku, Institute of Systems Science, Waseda University (72) Inventor Yasuo Inoue 3-543, Shibazonocho, Kawaguchi City, Saitama Prefecture (543) (72) Kazuhiko Arai 2-9-16 Nakamachi, Urawa City, Saitama Prefecture (72) Inventor Yusuke Matsushita Lions Mansion Kagurazaka No. 3-102 16 Tsukiji-cho, Shinjuku-ku, Tokyo (72) Inventor Shinji Yamashita 91-1, Mita, Atsugi-shi, Kanagawa Prefecture (72) Inventor Nobuhiro Okuyama Setagaya-ku, Tokyo 1-20-8 Shirota Dormitory of Shimizu Corporation (72) Inventor Akira Tsubota 2-5-14 Minamisuna, Koto-ku, Tokyo Inside the Takenaka Corporation Technical Research Institute (72) Masato Mori Kohoku-ku, Yokohama-shi, Kanagawa 246, Machi (72) Inventor Toru Shinozaki 24 Shimogido, Shimotsuma-shi, Ibaraki Prefecture (72) Ryoji Yoshitake 1521-93 Nogaya-cho, Machida-shi, Tokyo (72) Inventor Shu Takeda 18 Manda, Hiratsuka, Kanagawa Prefecture Komatsu Ltd. Taira ▲ Tsuka ▼ Dormitory No. 311 (72) Inventor Kura Kazuo 1-6-14 Edobori, Nishi-ku, Osaka City, Osaka Prefecture Hitachi Zosen Corporation Inner (56) References Patent Sho 52-132508 (JP, A) JP Akira 58-37235 (JP, A)

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】鉄骨鉄筋コンクリート造建築物の鉄骨の足
元を固定するためのアンカーボルト打ち込みプレキャス
トコンクリート・ブロックであって、予め、基礎筋、柱
鉄筋及び地中梁筋と共に鉄骨のベースプレートの固定孔
に合わせてアンカーボルトを打ち込んだことを特徴とす
るアンカーボルト打ち込みプレキャストコンクリート・
ブロック。
1. A precast concrete block with anchor bolts for fixing the foot of a steel frame of a steel-framed reinforced concrete structure, which is previously provided in a fixing hole of a base plate of a steel frame together with a foundation bar, a column reinforcing bar and an underground beam reinforcing bar. Anchor bolt driving precast concrete characterized by driving anchor bolts together
block.
【請求項2】捨てコンクリートのレベルから柱鉄骨足元
の固定レベルまでの厚さを有することを特徴とする特許
請求の範囲第1項記載のアンカーボルト打ち込みプレキ
ャストコンクリート・ブロック。
2. The precast concrete block with anchor bolts as set forth in claim 1, having a thickness from the level of waste concrete to the level at which the column steel foot is fixed.
【請求項3】アンカーボルト打ち込みプレキャストコン
クリート・ブロックを用いて鉄骨鉄筋コンクリート造建
築物の鉄骨の足元を固定するためのアンカーボルトを打
ち込むアンカーボルト打ち込み法であって、位置出しを
した捨てコンクリート上に、予め基礎筋、柱鉄筋及び地
中梁筋と共に鉄骨のベースプレートの固定孔に合わせて
アンカーボルトを打ち込んだアンカーボルト打ち込みプ
レキャストコンクリート・ブロックを据え付けて地中梁
筋を組み、しかる後基礎コンクリートを打設することを
特徴とするアンカーボルト打ち込み法。
3. An anchor bolt driving method for driving an anchor bolt for fixing a foot of a steel frame of a steel-framed reinforced concrete building using an anchor bolt driving precast concrete block, which comprises: Anchor bolt driving precast concrete block in which anchor bolts have been driven in advance together with foundation reinforcements, column reinforcements and underground beam reinforcements to fix holes in the base plate of the steel frame, and underground beam reinforcements are assembled, and then foundation concrete is placed. Anchor bolt driving method characterized by:
JP8613486A 1986-04-16 1986-04-16 Anchor bolt driving Precast concrete block and anchor bolt driving method Expired - Lifetime JPH0721191B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8613486A JPH0721191B2 (en) 1986-04-16 1986-04-16 Anchor bolt driving Precast concrete block and anchor bolt driving method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8613486A JPH0721191B2 (en) 1986-04-16 1986-04-16 Anchor bolt driving Precast concrete block and anchor bolt driving method

Publications (2)

Publication Number Publication Date
JPS62244923A JPS62244923A (en) 1987-10-26
JPH0721191B2 true JPH0721191B2 (en) 1995-03-08

Family

ID=13878240

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8613486A Expired - Lifetime JPH0721191B2 (en) 1986-04-16 1986-04-16 Anchor bolt driving Precast concrete block and anchor bolt driving method

Country Status (1)

Country Link
JP (1) JPH0721191B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01304221A (en) * 1988-06-02 1989-12-07 Kajima Corp Joining construction of column steel frame and reinforced concrete member
JP2619335B2 (en) * 1994-08-05 1997-06-11 前田製管株式会社 Construction method of building attached to dam body structure and building forming block
JP6543077B2 (en) * 2015-04-27 2019-07-10 株式会社竹中工務店 Construction method of structure
JP6630399B2 (en) * 2018-05-21 2020-01-15 本清鋼材株式会社 Pca footing

Also Published As

Publication number Publication date
JPS62244923A (en) 1987-10-26

Similar Documents

Publication Publication Date Title
EP0537189B1 (en) A method of erecting a foundation structure for a building substructure
JPH03250130A (en) Building frame construction method
JPH0721191B2 (en) Anchor bolt driving Precast concrete block and anchor bolt driving method
JP2004263507A (en) Building foundation construction method and building foundation structure
JPH11343667A (en) Structure for fixing column base with underground beam made of reinforced concrete
KR102398605B1 (en) Construction method of seismic retrofit system using pc panel
JP2880027B2 (en) Joint structure between steel pipe column and reinforced concrete slab
JP2001140348A (en) Structure of steel framed concrete foundation and column
WO2002018725A1 (en) Crux-bar concrete structure
JP2003161044A (en) Method for installing base-isolation device in existing column
JP3232487B2 (en) Construction method of column base and column base structure
JP2860491B2 (en) Solid foundation using steel frame
JP2951795B2 (en) Construction method of foundation structure
JP2754377B2 (en) Building structure
JP2900840B2 (en) How to build underground structures
JP2605484B2 (en) Steel construction method in building construction
JP3072604B2 (en) Precast reinforced concrete beam and its joining method
JP2836488B2 (en) Joint structure and construction method of reinforced concrete columns and steel beams
JP3678695B2 (en) Fixing method of column to concrete foundation
JP3250059B2 (en) Underground pillar construction method
JP2836476B2 (en) Frame structure
JP2805154B2 (en) Construction method of concrete panel and cloth foundation used for it
JP2984727B2 (en) Building seismic retrofitting method
JP2784450B2 (en) Reinforced concrete foundation
JP2959436B2 (en) How to build underground structures