JPH0721192B2 - Top-end construction method for cloth foundation - Google Patents
Top-end construction method for cloth foundationInfo
- Publication number
- JPH0721192B2 JPH0721192B2 JP16264786A JP16264786A JPH0721192B2 JP H0721192 B2 JPH0721192 B2 JP H0721192B2 JP 16264786 A JP16264786 A JP 16264786A JP 16264786 A JP16264786 A JP 16264786A JP H0721192 B2 JPH0721192 B2 JP H0721192B2
- Authority
- JP
- Japan
- Prior art keywords
- cloth foundation
- strip plate
- strip
- top end
- anchor bolts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Foundations (AREA)
Description
【発明の詳細な説明】 産業上の利用分野 この発明は、現場施工による布基礎の天端施工方法に関
する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a top of a cloth foundation by on-site construction.
従来の技術 一般に、住宅基礎としては、現場施工による布基礎が採
用される。この種の布基礎は、施工現場で組み立てた型
枠にコンクリートを打設して、コンクリート硬化後に型
枠を除去することによって構築される。しかし、現場で
打設したコンクリートの立ち上がり部分の天端、すなわ
ち上端部分には不陸や凹凸が多くて、そのままでは建方
工事を行なうことができない状況であるため、モルタル
等の天端仕上げ材をコンクリートの上に薄く流して、天
端表面を凹凸のない水平状態にするのが一般的である。2. Description of the Related Art Generally, a cloth foundation made on site is adopted as a housing foundation. This kind of cloth foundation is constructed by placing concrete on a formwork assembled at a construction site and removing the formwork after hardening the concrete. However, since the top of the rising part of the concrete cast at the site, that is, the top, has a lot of unevenness and unevenness, it is not possible to carry out the erection work as it is. It is common to pour a thin layer of concrete on top of the concrete so that the top surface is level and flat.
発明が解決しようとする問題点 しかしながら、従来の方法では、天端仕上げ材として用
いるモルタル等が硬化するまでには、次の作業を行なう
ことができないという難点があった。しかも、天端仕上
げ材による薄い表面層が温度の影響を受けやすく、その
ために乾燥収縮による割れや、寒気による凍結等によっ
て損傷する事故が発生することがあった。更に、そのよ
うな天端仕上げによる布基礎では、布基礎天端を頂点と
して両端部分が下方に曲がる弓形の変形に対して弱く、
上下方向に走るひび割れが発生するという問題点があっ
た。Problems to be Solved by the Invention However, the conventional method has a drawback in that the following work cannot be performed before the mortar or the like used as the top finish material is cured. In addition, the thin surface layer made of the top finish material is easily affected by temperature, which may cause damage due to cracking due to drying shrinkage or freezing due to cold air. Furthermore, in such a cloth foundation with a top end finish, the top end of the cloth foundation is the apex, and both end portions are weak against bow-shaped deformation that bends downward,
There was a problem that cracks running in the vertical direction occurred.
この発明は、従来から問題となっていた天端仕上げに要
する期間を短縮するとともに、布基礎天端を頂点とする
曲げの力に強い布基礎を得ることを目的としている。An object of the present invention is to shorten the period required for top end finishing, which has been a problem in the past, and to obtain a cloth foundation having a bending force with the top end of the cloth foundation as the apex.
問題点を解決するための手段 上記目的を達成するために、この発明では、まず長尺の
帯板(8)を、布基礎(1)の配向方向に添って配置し
て布基礎天端(4)を覆うとともに、その帯板(8)端
部に、前記布基礎天端(4)から上方に突出したアンカ
ーボルト(2)を貫通させて上方に突出させ、そのアン
カーボルト(2)に上下調節自在に螺合させた支持部材
(5)を用いて前記の帯板(8)を支持するようにして
いる。しかる後に、帯板(8)に形成した開口部(9)
から充填材(17)を充填するようにしている。Means for Solving the Problems In order to achieve the above object, in the present invention, first, a long strip plate (8) is arranged along the orientation direction of the cloth foundation (1) to form a cloth foundation top ( 4), while covering the strip plate (8), the anchor bolt (2) protruding upward from the cloth foundation top end (4) is penetrated to protrude upward, and the anchor bolt (2) is attached to the anchor bolt (2). The strip plate (8) is supported by using a support member (5) screwed up and down so as to be adjustable. After that, the opening (9) formed in the strip (8)
The filling material (17) is filled from above.
作用 布基礎天端(4)を覆う帯板(8)を、その布基礎天端
(4)から突出するアンカーボルト(2)に取り付けた
支持部材(5)によって予め支持し、それから充填材
(17)を上記帯板(8)に設けた開口部(9)から充填
するようにしたことにより、充填材(17)の上部が帯板
(8)によって覆われる。Action The strip plate (8) covering the cloth base top end (4) is previously supported by the support member (5) attached to the anchor bolt (2) protruding from the cloth base top end (4), and then the filler ( By filling 17) from the opening (9) provided in the strip (8), the upper part of the filling material (17) is covered with the strip (8).
実施例 以下、この発明の具体的な実施例を図面を参照して説明
する。Embodiments Embodiments of the present invention will be described below with reference to the drawings.
第1図において、(1)は布基礎を示し、この布基礎
(1)には、2本のアンカーボルト(2)(2)が近接
して植設され、それらのアンカーボルト(2)(2)先
端の螺子部(3)(3)は、布基礎天端(4)から上方
に突出している。(5)(5)は、この発明に係る支持
部材としての支持ナットを示し、これらの支持ナット
(5)(5)は、前記アンカーボルト(2)(2)の螺
子部(3)(3)に螺合され、上下方向に高さが調節さ
れるようになっている。また、(6)は、両端部分に透
孔(7)(7)を形成した繋ぎプレートを示し、この繋
ぎプレート(6)は、上記2本のアンカーボルト(2)
(2)に前記の支持ナット(5)(5)を螺合した後か
ら、上方に突出する螺子部(3)(3)を上記の透孔
(7)(7)に挿通させることにより、両方のアンカー
ボルト(2)(2)に跨って装着されるようになってい
る。In FIG. 1, (1) shows a cloth foundation, and two anchor bolts (2) and (2) are planted in close proximity to the cloth foundation (1), and the anchor bolts (2) ( 2) The screw parts (3) and (3) at the tip end project upward from the cloth foundation top end (4). (5) (5) shows a support nut as a support member according to the present invention. These support nuts (5) and (5) are screw parts (3) and (3) of the anchor bolts (2) and (2). ), The height is adjusted vertically. Further, (6) shows a connecting plate in which through holes (7) and (7) are formed at both ends, and the connecting plate (6) includes the two anchor bolts (2).
After the support nuts (5) and (5) are screwed into (2), the screw portions (3) and (3) projecting upward are inserted into the through holes (7) and (7). It is designed to be mounted across both anchor bolts (2) (2).
そして、(8)は、この発明において使用する長尺の鋼
板からなる帯板を示している。この帯板(8)には、多
数の長孔状の開口部(9)(9)……が表裏貫通して形
成されている。なお、開口部(9)(9)による開口部
分の面積は、トータルすると帯板(8)の全面積の半分
程度となる。また、帯板(8)の端部には、前記のアン
カーボルト(2)の螺子部(3)が挿通する透孔(10)
が形成されている。そして、この帯板(8)の左右の側
縁部分は、下方へ折曲された垂下片(11)(11)となっ
ている。この両垂下片(11)(11)の間の内法幅W1は、
布基礎天端(4)両側の左右の側面壁(12)(12)の幅
W2よりもほんのわずか狭くなっている。And, (8) shows a strip plate made of a long steel plate used in the present invention. A large number of elongated hole-shaped openings (9) (9) ... Are formed through the front and back of the strip plate (8). The total area of the openings formed by the openings 9 and 9 is about half of the total area of the strip plate 8. Further, a through hole (10) through which the screw portion (3) of the anchor bolt (2) is inserted is provided at an end portion of the strip plate (8).
Are formed. The left and right side edge portions of the strip plate (8) are hanging pieces (11) (11) bent downward. The inner width W 1 between these hanging pieces (11) (11) is
Width of left and right side walls (12) (12) on both sides of the cloth foundation crown (4)
It is slightly smaller than W 2 .
(13)は柱体を示し、この柱体(13)の下端部分には、
前記のアンカーボルト(2)(2)に対応した位置に透
孔(14)(14)を形成したベースプレート(15)が一体
に設けられている。そして、そのベースプレート(15)
に設けた上記の透孔(14)(14)に、前記のアンカーボ
ルト(2)(2)の螺子部(3)(3)を挿通させてか
ら、前記支持ナット(5)(5)とは別の固定ナット
(16)(16)を螺合させて上記の柱体(13)を保持する
ようになっている。(13) shows a pillar, and the lower end of this pillar (13) has
A base plate (15) having through holes (14) (14) is integrally provided at a position corresponding to the anchor bolts (2) (2). And its base plate (15)
After inserting the screw portions (3) and (3) of the anchor bolts (2) and (2) into the through holes (14) and (14) provided in the support nuts (5) and (5), The other fixing nuts (16) and (16) are screwed together to hold the column body (13).
次に、この発明の施工手順を実施例に則して説明する。Next, the construction procedure of the present invention will be described with reference to examples.
まず、型枠(図示せず)を組み立てて、アンカーボルト
(2)(2)……を所定の位置に設置し、コンクリート
を打設する点は従来方法と共通している。そして、コン
クリート硬化後に型枠を脱却する。ここまでは準備作業
である。First, a form (not shown) is assembled, anchor bolts (2), (2) ... Are set at predetermined positions, and concrete is poured, which is common to the conventional method. Then, after the concrete is hardened, the formwork is removed. This is the preparation work.
次いで、第2図に示すように、布基礎天端(14)から上
方に突出する総てのアンカーボルト(2)(2)……
に、前記の支持ナット(5)(5)……を螺合させて、
各支持ナット(5)上端が同一平面内の同じ高さになる
ように調節する。その次に、隣接した2本のアンカーボ
ルト(2)(2)に跨って前記の繋ぎプレート(6)を
装着し、その繋ぎプレート(6)を両方の支持ナット
(5)(5)によって支持する。Then, as shown in FIG. 2, all anchor bolts (2) (2) protruding upward from the top end (14) of the cloth foundation.
To the support nuts (5) (5) ..
Adjust so that the upper end of each support nut (5) is at the same height in the same plane. Next, the connecting plate (6) is mounted over the two adjacent anchor bolts (2) (2), and the connecting plate (6) is supported by both support nuts (5) (5). To do.
次に、前記した帯板(8)を、その端部が繋ぎプレート
(6)の略中央に位置するように配置する。そして、帯
板(8)端部の透孔(10)(10)にアンカーボルト
(2)(2)の螺子部(3)(3)を挿通し、その状態
のままアンカーボルト(2)(2)に添って帯板(8)
を下げて、第3図に示すように、両側の垂下片(11)
(11)を布基礎(1)の左右の側面壁(12)(12)に当
接させた状態で、帯板(8)を前記の支持ナット(5)
(5)によって支持する。それによって、帯板(8)は
水平方向に配向された状態で、布基礎天端(4)を覆う
ことになる。なお、作業に確実性を持たせるために、帯
板(8)上方に突出する螺子部(3)(3)に、固定ナ
ット(16)(16)を仮締めして、帯板(8)が動かない
ように保持する。Next, the strip plate (8) described above is arranged so that its end portion is located substantially in the center of the connecting plate (6). Then, the screw portions (3) and (3) of the anchor bolts (2) and (2) are inserted into the through holes (10) and (10) at the end of the strip plate (8), and the anchor bolts (2) ( Along with 2) strip (8)
And lower the hanging pieces (11) on both sides as shown in FIG.
While the (11) is in contact with the left and right side walls (12) (12) of the cloth foundation (1), the strip plate (8) is attached to the support nut (5).
Support by (5). As a result, the strip plate (8) covers the cloth foundation top end (4) while being oriented horizontally. In order to give certainty to the work, the fixing nuts (16) (16) are temporarily tightened on the screw portions (3) (3) protruding above the strip plate (8) to make the strip plate (8). Hold it in place.
しかる後に、帯板(8)に設けた開口部(9)(9)…
…から充填材(17)を充填する。この充填材(17)とし
ては、モルタル、ベースト、セメント系セルフレベリン
グ剤、エポキシ系樹脂接着剤等を適宜使用する。After that, the openings (9) (9) provided on the strip plate (8) ...
Fill the filling material (17) from. As the filler (17), a mortar, a base, a cement self-leveling agent, an epoxy resin adhesive or the like is appropriately used.
そして、柱体(13)を設置する場合には、帯板(8)を
仮締めしている前記の固定ナット(16)(16)を取り外
して、第4図に示すように、柱体(13)下部のベースプ
レート(15)の透孔(14)(14)にアンカーボルト
(2)(2)を挿通し、固定ナット(16)(16)を再び
螺合させて締め付ける。なお、この場合において、前記
の帯板(8)は下部側の支持ナット(5)によって支持
されているから、充填材(17)の硬化状態とは無関係に
柱体(13)を取り付けることができる。Then, when the pillar body (13) is installed, the fixing nuts (16) and (16) which are temporarily tightening the strip plate (8) are removed, and as shown in FIG. 13) Insert the anchor bolts (2) and (2) through the through holes (14) and (14) of the lower base plate (15), screw the fixing nuts (16) and (16) again, and tighten them. In this case, since the strip plate (8) is supported by the lower support nut (5), the pillar body (13) can be attached regardless of the hardening state of the filler (17). it can.
発明の効果 以上のように、この発明の方法によれば、充填材の上部
を覆う帯板が、アンカーボルトを介して支持されること
になるので、従来のように天端仕上げ材の自然硬化をま
つことなく次の作業に移ることが可能となり、建方工事
に着手する期間が短縮することができるという利点があ
る。しかも、充填材の相当部分が、開口部分を除いて帯
板によって保護されるので、暑さ、寒さの影響を受けに
くくなる。更に、従来では天端仕上げ材の硬化後におい
ても、その上を歩けば、表面層がはがれたり、割れたり
する場合があったが、この発明によれば天端の最外層が
帯板によって覆われるため、そのような支障がなくな
る。EFFECTS OF THE INVENTION As described above, according to the method of the present invention, since the strip plate covering the upper portion of the filling material is supported via the anchor bolts, natural hardening of the top end finishing material as in the conventional method is performed. There is an advantage that it is possible to move to the next work without having to wait, and it is possible to shorten the period for starting the erection work. Moreover, since a considerable part of the filler is protected by the strip except for the opening, it is less likely to be affected by heat and cold. Further, in the past, even after the top end finishing material was cured, there was a case where the surface layer peeled off or cracked when walking on it, but according to the present invention, the outermost layer of the top end is covered with the strip plate. Therefore, such obstacles will disappear.
特に、この発明では、完成後においても、前記の帯板が
引張材として機能し、天端を頂点とする曲げに対しても
充分対抗して、布基礎のひび割れを防止することができ
るという利点がある。In particular, according to the present invention, even after completion, the strip plate functions as a tensile member, and it is possible to sufficiently resist the bending with the top end as the apex and prevent cracks in the cloth foundation. There is.
第1図は、この発明において使用ずる構成部品の配置状
態を示す分解斜視図、第2図は、布基礎に帯板を取り付
ける前の状態を示す概略断面図、第3図は、布基礎に帯
板を取り付けた状態を示す要部斜視図、第4図は、完成
後の状態を示す要部断面図である。 (1)…布基礎、(2)…アンカーボルト、(4)…布
基礎天端、(5)…支持ナット、(8)…帯板、(9)
…帯板の開口部、(10)…帯板端部の透孔、(17)…充
填材。FIG. 1 is an exploded perspective view showing an arrangement state of components used in the present invention, FIG. 2 is a schematic sectional view showing a state before attaching a strip plate to a cloth foundation, and FIG. FIG. 4 is a perspective view of an essential part showing a state in which the strip plate is attached, and FIG. 4 is a sectional view of the essential part showing a state after completion. (1) ... Cloth foundation, (2) ... Anchor bolt, (4) ... Cloth foundation top, (5) ... Support nut, (8) ... Strip plate, (9)
… Strip plate openings, (10)… Strip hole end holes, (17)… Filler.
Claims (1)
配置して布基礎天端を覆うとともに、その帯板の端部
に、前記布基礎天端から上方に突出したアンカーボルト
を貫通させて上方に突出させ、そのアンカーボルトに上
下調節自在に螺合させた支持部材を用いて前記の帯板を
支持して、しかる後に帯板に形成した開口部から充填材
を充填することを特徴とする布基礎の天端施工方法。1. An anchor, in which a long strip is arranged along an orientation direction of a cloth foundation to cover the top of the cloth foundation, and an end of the strip protrudes upward from the top of the cloth foundation. The band plate is supported by using a support member that penetrates the bolt and protrudes upward, and is screwed to the anchor bolt so as to be vertically adjustable, and then fills the filling material from the opening formed in the band plate. A method for constructing a top of a cloth foundation, which is characterized by:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16264786A JPH0721192B2 (en) | 1986-07-09 | 1986-07-09 | Top-end construction method for cloth foundation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16264786A JPH0721192B2 (en) | 1986-07-09 | 1986-07-09 | Top-end construction method for cloth foundation |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6319339A JPS6319339A (en) | 1988-01-27 |
| JPH0721192B2 true JPH0721192B2 (en) | 1995-03-08 |
Family
ID=15758596
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP16264786A Expired - Fee Related JPH0721192B2 (en) | 1986-07-09 | 1986-07-09 | Top-end construction method for cloth foundation |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0721192B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6728552B2 (en) * | 2017-06-12 | 2020-07-22 | 青木あすなろ建設株式会社 | Base mortar construction method |
-
1986
- 1986-07-09 JP JP16264786A patent/JPH0721192B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6319339A (en) | 1988-01-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0721192B2 (en) | Top-end construction method for cloth foundation | |
| JP2004339890A (en) | Alc wall panel, and structure and method of fixing alc wall panel to floor slab | |
| JPH0138947B2 (en) | ||
| JPH0674591B2 (en) | Anchor support beam construction method | |
| JP2001107498A (en) | Precast slab laying structure and method of laying precast slab | |
| JPH072828Y2 (en) | Hollow concrete slab mounting structure | |
| CN220100442U (en) | A kind of embedded bolt fixing device for prefabricated stairs | |
| KR200234872Y1 (en) | An iron reinforcing bar prop | |
| JPH0142599Y2 (en) | ||
| JP2001059226A (en) | Concrete footing level setter and column installation method to concrete footing | |
| JPS6133089Y2 (en) | ||
| JP2650449B2 (en) | Gate construction method | |
| JP2000110175A (en) | Individual footing for mat foundation | |
| JPH0571242U (en) | Steel pillar anchor device | |
| JPH0544218A (en) | Jig for fixing anchor bolt | |
| JPH0222178B2 (en) | ||
| JPS5818500Y2 (en) | Building or structure face plate construction structure | |
| JPH0417718Y2 (en) | ||
| KR200143184Y1 (en) | Formwork Support | |
| JP2972972B2 (en) | How to fix anchor bolt | |
| JP2585064Y2 (en) | Anchor bolt and sheath tube positioning jig for foundation | |
| JPH0617610B2 (en) | Parapet construction method | |
| JP2026054634A (en) | Method for fixing the base of a building column and washer for the column base fixing structure | |
| JPH084514Y2 (en) | Concrete formwork | |
| JPH0810106Y2 (en) | Mounting hardware and precast concrete board equipped with the mounting hardware |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |