Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0721261B2 - Vertical vertical erecting jig - Google Patents
[go: Go Back, main page]

JPH0721261B2 - Vertical vertical erecting jig - Google Patents

Vertical vertical erecting jig

Info

Publication number
JPH0721261B2
JPH0721261B2 JP24252386A JP24252386A JPH0721261B2 JP H0721261 B2 JPH0721261 B2 JP H0721261B2 JP 24252386 A JP24252386 A JP 24252386A JP 24252386 A JP24252386 A JP 24252386A JP H0721261 B2 JPH0721261 B2 JP H0721261B2
Authority
JP
Japan
Prior art keywords
pole
vertical
slide
mounting ring
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP24252386A
Other languages
Japanese (ja)
Other versions
JPS6397777A (en
Inventor
清一 大坂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanki Engineering Co Ltd
Original Assignee
Sanki Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanki Engineering Co Ltd filed Critical Sanki Engineering Co Ltd
Priority to JP24252386A priority Critical patent/JPH0721261B2/en
Publication of JPS6397777A publication Critical patent/JPS6397777A/en
Publication of JPH0721261B2 publication Critical patent/JPH0721261B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、照明ポール等の布設工事に於て、ポールの垂
直建方を容易としたポール垂直建方調整治具に関する。
Description: TECHNICAL FIELD The present invention relates to a pole vertical erection adjusting jig that facilitates vertical erection of a pole in laying construction of a lighting pole or the like.

〔従来の技術〕[Conventional technology]

従来、照明ポール等の布設工事に於て、照明ポール設置
場所の基礎スパイラル布設が完了すると、第6図及び第
7図に示す手段によって、照明ポールの垂直建方が施工
されている。
Conventionally, in laying a lighting pole or the like, when basic spiral laying of a lighting pole installation place is completed, a vertical erection of the lighting pole is constructed by means shown in FIGS. 6 and 7.

即ち、照明ポール(以下、「ポール」という)1の設置
場所に基礎スパイラル3が布設されると、この基礎スパ
イラル3に挿入されるボール1の垂直建方を行なうた
め、先ず、基礎スパイラル3の廻りに長さ約1m,径80φ
〜100φの松杭5を等間隔で4本打ち込み、この松杭5
に2本のタル木7を平行に打ち付ける。そして、ポール
1の芯を決めてタル木7を順次組み付け、基礎スパイラ
ル3の地上開口部に、ポール1の径より若干長い一辺か
らなる正方形の開口部9をもつ枠11を形成する。
That is, when the foundation spiral 3 is laid at the installation location of the lighting pole (hereinafter referred to as “pole”) 1, the ball 1 inserted into the foundation spiral 3 is vertically erected. Around 1m long, diameter 80φ
4 pine piles of ~ 100φ are driven at equal intervals, and this pine pile 5
Two tar trees 7 are struck in parallel to. Then, the core of the pole 1 is determined and the wooden talls 7 are sequentially assembled, and a frame 11 having a square opening 9 having one side slightly longer than the diameter of the pole 1 is formed in the ground opening of the basic spiral 3.

しかる後、建柱車(図示せず)により懸吊したポール1
を、上記枠11の開口部9に挿入し乍ら基礎スパイラル1
内に立設し、ポール1とタル木7との間に木楔13を4箇
所楔着する。そして、ポール1の垂直状態をトランシッ
ト(図示せず)によって確認し乍ら、上記木楔13を更に
圧入し、或いは緩めてポール1の垂直状態を調整した
後、基礎スパイラル1内にコンクリートを打設し、これ
を養生してコンクリートの固化後にタル木7を撤去し、
松杭5を引き抜いて松杭5の穴を整地するといった作業
工法を採っていた。
After that, the pole 1 suspended by a column car (not shown)
Is inserted into the opening 9 of the frame 11 and the basic spiral 1
It stands upright inside, and four wooden wedges 13 are wedged between the pole 1 and the tall tree 7. Then, after confirming the vertical state of the pole 1 with a transit (not shown), the wooden wedge 13 is further pressed or loosened to adjust the vertical state of the pole 1, and then concrete is poured into the foundation spiral 1. Installed and cured to solidify the concrete and remove the tar tree 7.
A work method was adopted in which the pine pile 5 was pulled out and the holes of the pine pile 5 were leveled.

〔発明が解決しようとする問題点〕[Problems to be solved by the invention]

しかし、上記従来工法にあっては、松杭5を打ち込み、
これにタル木7を順次組み付けて枠11を形成するといっ
た多くの手間を要しており、また、木楔13によるポール
1の垂直建方の調整には手間が掛かる等、作業能率性の
点で問題があった。
However, in the above conventional method, the pine pile 5 is driven in,
It requires a lot of work such as sequentially assembling the tall wood 7 to form the frame 11, and it takes time to adjust the vertical erection of the pole 1 by the wood wedge 13, which is a point of work efficiency. I had a problem with.

〔発明の目的〕[Object of the Invention]

本発明は、斯かる実情に鑑み案出されたもので、照明ポ
ール等の布設工事に於て、ポールの垂直建方を容易に施
工できるポール垂直建方調整治具を提供することを目的
とする。
The present invention has been devised in view of the above circumstances, and an object thereof is to provide a pole vertical erection adjusting jig that can easily construct a vertical erection of a pole in laying construction of a lighting pole or the like. To do.

〔問題点を解決するための手段〕[Means for solving problems]

斯かる目的を達成するために、本発明は、ポールの布設
場所に形成された穴の地上開口部に取り付けられる取付
リングと、当該取付リングに設けた螺嵌部材に螺嵌して
取付リングの中心方向にスライドして夫々直角に交差す
る2本の垂直調整棒と、この垂直調整棒の取付リング中
心側先端部に夫々連結されたポール締付金具と、上記取
付リングに設けた挿通部材に挿通し、上記垂直調整棒と
夫々同一方向にスライドする2本のスライド棒と、上記
各ポール締付金具と相対峙して当該スライド棒先端に固
着されたポール締付金具と、このスライド棒のスライド
を規制する規制手段とからなり、上記各垂直調整棒の直
角2方向へのスライドによって、ポールの垂直建方の調
整を可能としたものである。
In order to achieve such an object, the present invention provides a mounting ring that is mounted on a ground opening of a hole formed at a place where a pole is laid, and a mounting ring that is screwed to a screw fitting member provided on the mounting ring. Two vertical adjusting rods that slide in the center direction and intersect each other at right angles, pole tightening fittings respectively connected to the tip of the vertical adjusting rod on the center side of the mounting ring, and an insertion member provided on the mounting ring. Two slide rods that are inserted and slide in the same direction as the vertical adjustment rods, a pole tightening metal member fixed to the tip of the slide rod relative to each pole tightening metal member, and a slide rod It comprises a regulating means for regulating the slide, and the vertical erection of the pole can be adjusted by sliding the vertical adjusting rods in two directions at right angles.

〔発明の作用〕[Operation of the invention]

本発明によれば、取付リングに貫通させたポールをポー
ル締付金具で四方から挾持した後、各垂直調整棒をスラ
イドさせてポールを挾持する上下各一対のポール締付金
具をポールの直角2方向に移動させることによって、ポ
ールの垂直建方の調整がなされることとなる。
According to the present invention, a pair of upper and lower pole clamps for holding the pole penetrating the mounting ring from four sides by the pole clamps and then sliding the vertical adjustment rods to clamp the poles is used. By moving it in the direction, the vertical erection of the pole will be adjusted.

〔発明の実施例〕Example of Invention

以下、本発明に係るポール垂直建方調整治具の実施例
を、第1図乃至第5図に基づき詳細に説明する。
Hereinafter, an embodiment of a pole vertical erecting jig according to the present invention will be described in detail with reference to FIGS. 1 to 5.

図に於て、15は布設された基礎スパイラル17の地上開口
部17′に冠着する半割形の取付リングで、この取付リン
グ15は、縦断面逆L字状の半割リング15a,15bの端部に
相対峙して設けられた連結フランジ19と、半割リング15
aの他端部に固着された連結片21を介して夫々ボルト23,
ナット25で連結されて形成されている。尚、上記連結フ
ランジ19の長さlは、ボルト23,ナット25の締め付けを
行ない易くするため、各半割リング15a,15bの上面部15
a′,15b′の幅mよりも若干長く形成されている。ま
た、図示するように、連結フランジ19と各上面部15a′,
15b′の間には切欠き16を設けて、ボルト23,ナット25の
締め付けの便宜を図っている。
In the figure, reference numeral 15 is a half ring-shaped mounting ring that is attached to the ground opening 17 'of the installed basic spiral 17, and this mounting ring 15 is a half ring 15a, 15b having an inverted L-shaped cross section. The connecting flange 19 and the half ring 15 that are provided at the end of the
Via the connecting piece 21 fixed to the other end of a, bolts 23,
It is formed by connecting with a nut 25. The length l of the connecting flange 19 is set so that the bolts 23 and the nuts 25 can be easily tightened by the upper surface portion 15 of each half ring 15a, 15b.
It is formed to be slightly longer than the width m of a ', 15b'. Further, as shown in the figure, the connecting flange 19 and each upper surface portion 15a ′,
A notch 16 is provided between 15b 'to facilitate tightening of the bolt 23 and the nut 25.

また、27は一端にハンドル部28が取り付く垂直調整棒
で、その外周にはねじ山が形成されている。そして、こ
の垂直調整棒27は、上記半割リング15aの上面部15a′に
固着された長ナット29と、断面L字状のポール締付金具
31の底面上部31′に固着された螺合部材33に螺嵌してお
り、この垂直調整棒27の矢印A,B方向の回動によって、
図示のようにポール締付金具31が取付リング15内を矢印
C,D方向にスライドするようになっている。尚、上記垂
直調整棒27のポール締付金具31側先端部には抜け防止部
材35が螺着されており、この抜け防止部材35によって垂
直調整棒27が上記螺合部材33から抜けないようになって
いる。
Further, 27 is a vertical adjusting rod to which a handle portion 28 is attached at one end, and a thread is formed on the outer periphery thereof. The vertical adjusting rod 27 includes a long nut 29 fixed to the upper surface portion 15a 'of the half ring 15a, and a pole tightening fitting having an L-shaped cross section.
It is screwed into a screwing member 33 fixed to the bottom upper portion 31 ′ of 31, and by the rotation of the vertical adjusting rod 27 in the directions of arrows A and B,
As shown in the figure, the pole clamp 31
It is designed to slide in the C and D directions. A pull-out preventing member 35 is screwed to the tip end of the vertical adjusting rod 27 on the side of the pole tightening fitting 31. The pull-out preventing member 35 prevents the vertical adjusting rod 27 from coming off the screwing member 33. Has become.

一方、半割リング15bの上面部15b′には挿通部材37が固
着されており、この挿通部材37に上記垂直調整棒27と同
一線上をスライドするスライド棒39が挿通されている。
そして、当該スライド棒39の一端には上記ポール締付金
具31と同一形状のポール締付金具41が固着されており、
スライド棒39が矢印C,D方向にスライドすることによっ
てポール締付金具41が矢印C,D方向に移動するようにな
っている。また、上記挿通部材37にはスライド棒39を固
定するスライド固定ボルト43が上方から螺嵌されてお
り、このスライド固定ボルト43の締付けによって、ポー
ル締付金具41及びスライド棒39の矢印C,D方向の動きが
規制されるようになっている。尚、上記ポール締付金具
31とポール締付金具41は、図示の如く共に からなり、その左右両端部にはボルト挿入穴(図示せ
ず)が穿設されている。そして、基礎スパイラル17内に
挿入された照明ポール45の垂直建方を行なう際に、ボル
ト23及び長ナット46で連結することによって、ポール45
を両側から締め付けるようになっている。その他、47は
上記スライド固定ボルト43の頭部に固着されたハンドル
で、このハンドル47を矢印E,F方向に回動することによ
って、スライド固定ボルト43がスライド棒39の動きを規
制し、或いは解除できるようになっている。
On the other hand, an insertion member 37 is fixed to the upper surface portion 15b 'of the half ring 15b, and a slide rod 39 that slides on the same line as the vertical adjustment rod 27 is inserted into the insertion member 37.
And, a pole tightening fitting 41 having the same shape as the pole tightening fitting 31 is fixed to one end of the slide rod 39,
As the slide rod 39 slides in the directions of arrows C and D, the pole tightening metal fitting 41 moves in the directions of arrows C and D. Further, a slide fixing bolt 43 for fixing the slide rod 39 is screwed into the insertion member 37 from above. Directional movement is regulated. The pole clamp
31 and pole clamp 41 are And a bolt insertion hole (not shown) is formed at both left and right ends thereof. When the lighting pole 45 inserted in the foundation spiral 17 is vertically erected, the pole 45 is connected by the bolt 23 and the long nut 46.
It is designed to be tightened from both sides. In addition, 47 is a handle fixed to the head of the slide fixing bolt 43, and by rotating the handle 47 in the arrow E and F directions, the slide fixing bolt 43 regulates the movement of the slide rod 39, or It can be released.

更に、上記ポール締付金具31,41の上方には、当該ポー
ル締付金具31,41と同一の形状からなり、ポール締付金
具31,41のスライド方向と直交してスライドするポール
締付金具49,51が同様の支持構造を以って配置されてい
る。
Further, above the pole tightening fittings 31 and 41, the pole tightening fittings 31 and 41 having the same shape as the pole tightening fittings 31 and 41 and sliding at right angles to the sliding direction of the pole tightening fittings 31 and 41. 49,51 are arranged with a similar support structure.

即ち、上記螺合部材33がポール締付金具49に固着される
と共に、半割リング15aの上面部15a′には、上記長ナッ
ト29と同一のナット(図示せず)が嵌着された垂直調整
棒螺嵌部材53が固着されており、垂直調整棒55がこの螺
合部材33及び垂直調整棒螺嵌部材53に螺嵌することによ
って、ポール締付金具49が半割リング15aに支持され、
また、上記垂直調整棒55の矢印G,H方向の回動によっ
て、矢印I,J方向にスライドできるようになっている。
尚、この垂直調整棒55は上記垂直調整棒27と同一の構造
である。
That is, the screw member 33 is fixed to the pole tightening fitting 49, and the same nut (not shown) as the long nut 29 is fitted on the upper surface portion 15a 'of the half ring 15a. The adjustment rod screw fitting member 53 is fixed, and the vertical adjustment rod 55 is screwed into the screwing member 33 and the vertical adjustment rod screw fitting member 53, so that the pole fastening fitting 49 is supported by the half ring 15a. ,
Further, the vertical adjustment rod 55 can be slid in the directions of arrows I and J by rotating in the directions of arrows G and H.
The vertical adjusting rod 55 has the same structure as the vertical adjusting rod 27.

また、上記垂直調整棒螺嵌部材53と反対側の半割リング
15b上または挿通部材57が固着されており、この挿通部
材57にスライド棒59が垂直調整棒55と同一方向にスライ
ド可能に挿通している。そして、当該スライド棒59の一
端に上記ポール締付金具51が固着されており、スライド
棒59のスライドに合わせて、ポール締付金具51が半割リ
ング15bに矢印I,J方向にスライド可能に支持されてい
る。尚、上記挿通部材57にも、挿通部材41と同様、スラ
イド棒59を固定するスライド固定ボルト61が上方から螺
嵌されており、このスライド固定ボルト61の頭部に固着
したハンドル63を矢印E,F方向に回動することによっ
て、ポール締付金具51及びスライド棒59のスライドが規
制され、また、解除されるようになっている。その他、
図中、65は補強リブである。
Also, a half ring on the side opposite to the vertical adjustment rod screw fitting member 53.
15b or an insertion member 57 is fixed, and a slide rod 59 is inserted into the insertion member 57 so as to be slidable in the same direction as the vertical adjustment rod 55. The pole tightening fitting 51 is fixed to one end of the slide rod 59, and the pole tightening fitting 51 is slidable on the half ring 15b in the directions of arrows I and J in accordance with the slide of the slide rod 59. It is supported. Similar to the insertion member 41, a slide fixing bolt 61 for fixing the slide rod 59 is screwed into the insertion member 57 from above, and the handle 63 fixed to the head of the slide fixing bolt 61 is indicated by an arrow E. By rotating in the F direction, the pole tightening fitting 51 and the slide rod 59 are restricted from sliding and released. Other,
In the figure, 65 is a reinforcing rib.

本実施例に係るポール垂直建方調整治具はこのように構
成されているから、ポール45の設置場所に基礎スパイラ
ル17が布設された段階で、先ず、基礎スパイラル17の地
上開口端17′の外周に半割リング15a,15bを当接し、連
結フランジ19と連結片21を介してボルト23及びナット25
で両半割リング15a,15bを連結し、取付リング15を嵌着
する。これによって、本実施例のポール垂直建方調整治
具が基礎スパイラル17に固定されたことになる。
Since the pole vertical erecting jig according to this embodiment is configured in this way, at the stage where the foundation spiral 17 is laid at the installation location of the pole 45, first, the ground opening end 17 'of the foundation spiral 17 is Abut the half rings 15a, 15b on the outer circumference, and through the connecting flange 19 and connecting piece 21, bolt 23 and nut 25.
The two half rings 15a and 15b are connected with each other, and the mounting ring 15 is fitted. As a result, the pole vertical erection adjusting jig of this embodiment is fixed to the foundation spiral 17.

次いで、垂直調整棒27を矢印B方向に回転してポール締
付金具31を矢印D方向にスライドさせると共に、スライ
ド棒39を矢印C方向にスライドさせてポール締付金具41
を同方向にスライドしておく。同様に、他方の垂直調整
棒55を矢印H方向に回転してポール締付金具49を矢印J
方向にスライドし、また、スライド棒59を矢印I方向に
スライドさせてポール締付金具51を同方向にスライドす
ることによって、建柱車(図示せず)により懸吊したポ
ール45が、取付リング15を貫通して基礎スパイラル17内
に挿入し易くしておく。
Next, the vertical adjusting rod 27 is rotated in the direction of arrow B to slide the pole fastening fitting 31 in the direction of arrow D, and the slide rod 39 is slid in the direction of arrow C to pull up the pole fastening fitting 41.
Slide in the same direction. Similarly, rotate the other vertical adjustment rod 55 in the direction of arrow H to move the pole tightening fitting 49 to the direction of arrow J.
Direction, and by sliding the slide rod 59 in the direction of arrow I and sliding the pole tightening fitting 51 in the same direction, the pole 45 that is suspended by a column car (not shown) is attached to the mounting ring. Make it easy to insert through the 15 into the basic spiral 17.

しかる後、建柱車(図示せず)により懸吊したポール45
を、取付リング15を貫通し乍ら基礎スパイラル17内に挿
入する。そして、第3図に示すように、ポール締付金具
31,41を夫々矢印C,D方向にスライドさせてボルト23,長
ナット46で両ポール締付金具31,41を連結してポール45
を挾持した後、ポール締付金具49,51を夫々矢印I,J方向
にスライドさせてボルト23,長ナット46でポール45を挾
持する。これによって、ポール45は各ポール締付金具3
1,41,49,51によって四方から基礎スパイラル17に固定さ
れたこととなる。
Then, the pole 45 is suspended by a column car (not shown).
Is pierced through the mounting ring 15 and inserted into the basic spiral 17. Then, as shown in FIG.
Slide 31 and 41 in the directions of arrows C and D, respectively, and connect the pole tightening fittings 31 and 41 with the bolt 23 and long nut 46 to connect the pole 45.
After holding, the pole tightening metal fittings 49, 51 are slid in the directions of arrows I and J, respectively, and the pole 45 is held by the bolt 23 and the long nut 46. As a result, the pole 45 is attached to each pole clamp 3
It was fixed to the foundation spiral 17 from all sides by 1,41,49,51.

而して、トランシット(図示せず)によってポール45の
垂直状態を測定し乍ら、垂直調整棒27,55を夫々回動す
ると共に、ハンドル28の微調整によって、直角2方向に
よりポール45の垂直建方を調整する。この時、ポール15
を挾持する一対のポール締付金具31,41が、垂直調整棒2
7の矢印A方向、或いは矢印B方向に回動によって矢印
C方向又は矢印D方向に移動すると共に、他方のポール
締付金具49,51が垂直調整棒55の矢印G方向、或いは矢
印H方向の回動によって矢印I方向又は矢印J方向に移
動してポール45が直角2方向に移動するので、垂直建方
の調整がなされることとなる。
Then, the vertical state of the pole 45 is measured by a transit (not shown), and the vertical adjustment rods 27 and 55 are respectively rotated, and the handle 28 is finely adjusted to make the vertical direction of the pole 45 perpendicular to two directions. Adjust the erection. At this time, Paul 15
The pair of pole clamps 31 and 41 that hold the
While rotating in the arrow A direction or arrow B direction of 7 to move in the arrow C direction or the arrow D direction, the other pole tightening metal fittings 49, 51 are in the arrow G direction or the arrow H direction of the vertical adjustment rod 55. By the rotation, the pole 45 moves in two directions at right angles by moving in the arrow I direction or the arrow J direction, so that the vertical erection is adjusted.

そして、ポール45の垂直建方の調整完了後、固定ボルト
43,61を締め付けて各スライド棒39,59のスライドを規制
し、基礎スパイラル17内にコンクリートを打設してこれ
を養生し、コンクリートの固化後に治具を撤去すればよ
い。
Then, after adjusting the vertical erection of the pole 45, the fixing bolt
It suffices to tighten the screws 43 and 61 to regulate the slide of the slide rods 39 and 59, pour concrete into the basic spiral 17 to cure it, and then remove the jig after solidification of the concrete.

このように、本実施例によれば、垂直調整棒27の矢印A
方向、或いは矢印B方向の回動と、垂直調整棒55の矢印
G方向、或いは矢印H方向の回動によってポール45の垂
直建方の調整が可能となった。
Thus, according to this embodiment, the arrow A of the vertical adjustment rod 27 is used.
The vertical erection of the pole 45 can be adjusted by rotating the pole 45 in the direction or the direction of the arrow B and rotating the vertical adjusting rod 55 in the direction of the arrow G or the direction of the arrow H.

従って、従来、木楔によるボールの垂直建方の調整は面
倒であったが、本実施例によれば、ポールの直角2方向
に配置された垂直調整棒を回動することによって、ポー
ルの垂直建方の施工が容易に且つ正確に行なうことがで
きることとなった。また、従来の如く基礎スパイラルの
周囲に松杭を打ち込んだり、タル木を複数本組み付ける
といった面倒な作業を要せず、布設された基礎スパイラ
ルに治具を取り付けるだけでよく、またその取付けも、
半割リングをボルト,ナットで連結すればよい等、その
作業能率が飛躍的に向上することとなった。更に、本実
施例は、種々の径をもつポールにも利用可能であること
は勿論、何度も再使用できる利点を有する。
Therefore, conventionally, it has been troublesome to adjust the vertical erection of the ball by the wooden wedge, but according to the present embodiment, the vertical adjustment of the pole is performed by rotating the vertical adjustment rods arranged in two directions at right angles to the pole. The construction of the erection can now be done easily and accurately. In addition, it does not require the troublesome work of hitting pine piles around the foundation spiral and assembling multiple tar trees as in the past, and it suffices to attach a jig to the installed foundation spiral.
Work efficiency has been dramatically improved by connecting the split ring with bolts and nuts. Further, the present embodiment has an advantage that it can be reused many times as well as being applicable to poles having various diameters.

尚、上記実施例は、本実施例に係るポール垂直建方調整
治具を基礎スパイラルに冠着して使用した施工例につい
て説明したが、基礎スパイラルが布設されないポールの
布設工事に於ても、適宜の手段を以って治具を固定する
ことによって利用できること勿論である。
In the above example, the pole vertical erection adjusting jig according to the present example is described as a construction example in which the foundation spiral is worn on the foundation spiral, but even in the construction work of the pole in which the foundation spiral is not laid, Of course, it can be used by fixing the jig with an appropriate means.

また、本実施例に係るポール垂直建方調整治具は、照明
用ポールに限らず、あらゆるポールの垂直建方を施工す
る際に利用することが可能である。
Further, the pole vertical erection adjusting jig according to the present embodiment is not limited to the lighting pole, and can be used when performing vertical erection of any pole.

〔発明の効果〕〔The invention's effect〕

このように、本発明によれば、照明ポール等の布設工事
に於て、ポールの垂直建方を容易に施工することが可能
である。
As described above, according to the present invention, it is possible to easily construct a vertical erection of a pole when laying a lighting pole or the like.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明実施例に係るポール垂直建方調整治具の
平面図、第2図は本発明実施例を基礎スパイラルに冠着
した状態を示す側面図、第3図は本実施例によるポール
の垂直建方の施工状態を示す平面図、第4図は本発明実
施例の半割リングの連結部の斜視図、第5図は同半割リ
ングの他方の連結部の拡大側面図、第6図は従来工法に
よるポールの垂直建方の施工状態を示す平面図、第7図
はその側面図である。 15……取付リング、15a,15b……半割リング、17……基
礎スパイラル、23……ボルト、25……ナット、27,55…
…垂直調整棒、29……長ナット、31,41,49,51……ポー
ル締付金具、33……螺合部材、35……抜け防止部材、3
7,57……挿通部材、39,59……スライド棒、43,61……固
定ボルト、45……ポール、46……長ナット、28……ハン
ドル、53……垂直調整用ハンドル螺嵌部材。
FIG. 1 is a plan view of a pole vertical erecting adjustment jig according to an embodiment of the present invention, FIG. 2 is a side view showing a state in which an embodiment of the present invention is attached to a basic spiral, and FIG. 3 is according to this embodiment. The top view which shows the construction state of the vertical construction of a pole, FIG. 4 is a perspective view of the connection part of the half-ring of this invention Example, FIG. 5 is the enlarged side view of the other connection part of the same half-ring, FIG. 6 is a plan view showing a construction state of a vertical pole erection by the conventional construction method, and FIG. 7 is a side view thereof. 15 …… Mounting ring, 15a, 15b …… Half ring, 17 …… Basic spiral, 23 …… Bolt, 25 …… Nut, 27,55…
… Vertical adjustment rod, 29 …… long nut, 31,41,49,51 …… pole tightening fitting, 33 …… screw member, 35 …… prevention member, 3
7,57 …… Insertion member, 39,59 …… Slide rod, 43,61 …… Fixing bolt, 45 …… Pole, 46 …… Long nut, 28 …… Handle, 53 …… Vertical adjustment handle screw fitting member .

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】ポールの布設場所に形成された穴の地上開
口部に取り付けられる取付リングと、当該取付リングに
設けた螺嵌部材に螺嵌して取付リングの中心方向にスラ
イドして夫々直角に交差する2本の垂直調整棒と、この
垂直調整棒の取付リング中心側先端部に夫々連結された
ポール締付金具と、上記取付リングに設けた挿通部材に
挿通し、上記垂直調整棒と夫々同一方向にスライドする
2本のスライド棒と、上記各ポール締付金具と相対峙し
て当該スライド棒先端に固着されたポール締付金具と、
このスライド棒のスライドを規制する規制手段とからな
り、上記各垂直調整棒の直角2方向へのスライドによっ
て、ポールの垂直建方の調整を可能としたことを特徴と
するポール垂直建方調整治具。
1. A mounting ring mounted on a ground opening of a hole formed in a place where a pole is laid, and a mounting member provided on the mounting ring, and the mounting ring is slid toward the center of the mounting ring to form a right angle. Two vertical adjustment rods intersecting with each other, pole tightening metal fittings respectively connected to the tip of the vertical adjustment rod on the center side of the mounting ring, and the vertical adjustment rod through the insertion member provided on the mounting ring. Two slide rods that slide in the same direction, respectively, and pole clamps fixed to the tip ends of the slide rods, facing each other with the pole clamps.
A pole vertical erection adjustment jig characterized in that it comprises a regulating means for regulating the slide of the slide rod, and that the vertical erection of the pole can be adjusted by sliding the vertical adjustment rods in two directions at right angles. Ingredient
【請求項2】取付リングは、二つの半割リングからなる
ことを特徴とする特許請求の範囲第1項記載のポール垂
直建方調整治具。
2. The pole vertical erection adjusting jig according to claim 1, wherein the attachment ring is composed of two half rings.
JP24252386A 1986-10-13 1986-10-13 Vertical vertical erecting jig Expired - Lifetime JPH0721261B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24252386A JPH0721261B2 (en) 1986-10-13 1986-10-13 Vertical vertical erecting jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24252386A JPH0721261B2 (en) 1986-10-13 1986-10-13 Vertical vertical erecting jig

Publications (2)

Publication Number Publication Date
JPS6397777A JPS6397777A (en) 1988-04-28
JPH0721261B2 true JPH0721261B2 (en) 1995-03-08

Family

ID=17090374

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24252386A Expired - Lifetime JPH0721261B2 (en) 1986-10-13 1986-10-13 Vertical vertical erecting jig

Country Status (1)

Country Link
JP (1) JPH0721261B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0227071A (en) * 1988-07-18 1990-01-29 Sanki Eng Co Ltd Pole vertical raise adjusting jig
JP4884117B2 (en) * 2006-07-26 2012-02-29 Jfeスチール株式会社 Column and steel pipe pile positioning device and positioning method
EP1983161A1 (en) * 2007-04-16 2008-10-22 Siemens Aktiengesellschaft Safety device for protection of a rotor of a fluid flow engine installed at right angles to the horizontal plane against overturning and mounting device
KR100944627B1 (en) 2008-03-28 2010-02-26 백남진 Normative framework for column installation

Also Published As

Publication number Publication date
JPS6397777A (en) 1988-04-28

Similar Documents

Publication Publication Date Title
KR101784392B1 (en) Construction method for post using foundation structure for post
US4202149A (en) Construction device
JPH0721261B2 (en) Vertical vertical erecting jig
CN112502182B (en) Anchor type carapace column foot node and installation method thereof
JP2004143867A (en) Supporting device for post and rope and its installation method
JP7594290B2 (en) Liner clamp and equipment installation method using same
JP2579387Y2 (en) Storage fixed structure
CN207974013U (en) A kind of anti-tipping apparatus suitable for polymorphic type precast beam
JP2878800B2 (en) Anchor bolt fixing device
JPH0410282Y2 (en)
CN224213532U (en) A connection device between a wooden column and a ground embedded part
JP2001295287A (en) Pile head joint hardware
JPH0849306A (en) Anchorage device of anchor bolt
JPH08319624A (en) Execution method of anchor bolt
CN215443103U (en) A formwork instrument for shutoff reservation entrance to a cave
JPH0433283Y2 (en)
CN212716404U (en) Ladder stand device for overhead transmission line mountain area high outcrop foundation
JPH0227071A (en) Pole vertical raise adjusting jig
JPS6123086Y2 (en)
JP2000023579A (en) Method and apparatus for fixing root ball of planted tree
JP2541963Y2 (en) Diversion base mortar formwork
JPH0544317A (en) Supporting anchor of outdoor staircase and the like
JP2502915B2 (en) Fixing method for building scaffolding
JPH0648048Y2 (en) Stone scaffolding tether for building
CN116442171A (en) Quick screwing device for tower foundation nuts of power steel pipe tower

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term