Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0723680B2 - Tunnel shield digging method - Google Patents
[go: Go Back, main page]

JPH0723680B2 - Tunnel shield digging method - Google Patents

Tunnel shield digging method

Info

Publication number
JPH0723680B2
JPH0723680B2 JP63150400A JP15040088A JPH0723680B2 JP H0723680 B2 JPH0723680 B2 JP H0723680B2 JP 63150400 A JP63150400 A JP 63150400A JP 15040088 A JP15040088 A JP 15040088A JP H0723680 B2 JPH0723680 B2 JP H0723680B2
Authority
JP
Japan
Prior art keywords
tunnel
gap
concrete
sealing ring
fine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP63150400A
Other languages
Japanese (ja)
Other versions
JPH01142196A (en
Inventor
ズィークムント,バベンデレルデ
Original Assignee
ホッホティーフ、アクチェンゲゼルシャフト、フォールマールス、ゲブリューダー、ヘルフマン
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ホッホティーフ、アクチェンゲゼルシャフト、フォールマールス、ゲブリューダー、ヘルフマン filed Critical ホッホティーフ、アクチェンゲゼルシャフト、フォールマールス、ゲブリューダー、ヘルフマン
Publication of JPH01142196A publication Critical patent/JPH01142196A/en
Publication of JPH0723680B2 publication Critical patent/JPH0723680B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0635Tail sealing means, e.g. used as end shuttering

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Sealing Material Composition (AREA)

Description

【発明の詳細な説明】 産業上の利用分野 本発明は、延先面を圧力媒体によつて支持し、この圧力
媒体は、シールドの制御間隙を介してシールド尾部又は
地盤又は岩盤とトンネル支保の間の間隙空間に接続され
ており、かつ間隙空間は、シールド尾部とトンネル支保
の間で作業空間の方へ間隙密閉リングにより閉じられて
おり、かつ間隙密閉リングにおいて管片によりプレスコ
ンクリートが間隙空間内に押込まれる、外気圧を受けた
作業空間を有するシールド掘進機によるトンネルのシー
ルド掘進方法に関する。この方法は、特にゆるい地盤に
使われる。圧力媒体は流動媒体である。例えば水、チク
ソトロープ液体、又はガス、特に空気が使用できる。プ
レスコンクリートは、任意の結合剤、特に水中硬化結合
剤又は合成樹脂結合剤を含んでいてもよい。間隙密閉リ
ングは種々の方法で作ることができる。
FIELD OF THE INVENTION The present invention supports the extension surface by means of a pressure medium which, via the controlled gap of the shield, shields the tail or the ground or rock and the tunnel support. Is connected to the interstitial space between them, and the interstitial space is closed towards the working space between the shield tail and the tunnel support, and in the interstitial sealing ring the press concrete is interspersed by the pipe pieces. The present invention relates to a shield excavation method for a tunnel by a shield excavator having a work space that is pushed into the interior thereof and receives an external pressure. This method is used especially on loose ground. The pressure medium is a fluid medium. For example, water, thixotropic liquids, or gases, especially air, can be used. The pressed concrete may contain any binder, especially an underwater curing binder or a synthetic resin binder. The gap sealing ring can be made in various ways.

従来の技術 初めに述べたような方法で作業する場合、間隙密閉リン
グとシールド尾部及び/又はトンネル支保との間の非密
閉継目は常に排除できるわけではない。このことは、特
にトンネル支保が、筒状セグメントを組み立ててなる筒
状支保として構成されており、かつ個々の筒状セグメン
トが半径方向に互いに僅かだけずれることが防止できな
い場合にあてはまる。詳細に述べれば、この問題範囲に
対して次のことがわかつた。
Prior Art When working in the manner described at the outset, the non-sealing seam between the gap sealing ring and the shield tail and / or the tunnel support cannot always be eliminated. This is especially true if the tunnel support is constructed as a tubular support made by assembling tubular segments and it is not possible to prevent the individual tubular segments from being slightly displaced from each other in the radial direction. To elaborate, we have found the following for this problem area:

特にゆるい地盤におけるトンネル掘進の際、延先面は、
探鉱デイスクにより機械的に、又は圧力媒体によつて支
持される。機械的支持は不完全であり、かつ延先面の変
形を引起こし、このことは、地形表面の沈下を引起こ
す。液体による延先面の支持は極めて効果的であり、か
つずれの少ない掘進を生じる。掘さく物質を液体と混合
して送り出さなければならないことは不利である。この
掘さく物質は坑外で液体から分離され、このことには、
特に微粒子地盤の場合に手間がかかる。それに対して圧
縮空気支持に有利である。なぜなら採掘した地盤は乾燥
して送り出すことができるからである。実際にこれまで
延先面における地盤を支持するため、トンネル管全体に
圧縮空気が加えられている。シールドの前側部分にある
作業空間だけに圧縮空気を加え、それにとり掘進作業員
が外気圧で作業できるようにする試みは周知になつてい
るが、うまくいつていない。圧力媒体が、シールド外側
において制御間隙内で後方へ流れ、かつ間隙密閉リング
の不完全な密閉により作業空間内に侵入する場合、圧力
媒体損失及び特に圧縮空気損失が生じる。ほぼ10cmの間
隙幅を有するこの間隙空間は、前記のようなシールドの
送りと同時に、プレスコンクリートにより圧縮され、そ
れにより地下水中にあることもあるまわりの地盤が間隙
空間内へ侵入しないようにする。しかしながらプレスコ
ンクリート用のプレス圧力が常に確実に負荷から生じる
圧力よりも大きいということは保証できない。それによ
りコンクリートは間隙内へ落下し、それによりシールド
尾部間隙を完全に満たすことは不可能になる。もろい岩
石においても同様な状態が生じる。
Especially when tunneling in loose ground,
It is supported mechanically by the exploration disk or by a pressure medium. Mechanical support is imperfect and causes deformation of the extension surface, which causes subsidence of the terrain surface. The support of the extension surface by the liquid is extremely effective and produces excavation with less displacement. It is disadvantageous that the drilling material must be mixed with the liquid and pumped. This drilling material is separated from the liquid outside the mine, which means that
Especially in the case of fine ground, it takes time. On the other hand, it is advantageous for supporting compressed air. This is because the mined ground can be dried and sent out. Actually, compressed air has been added to the entire tunnel pipe to actually support the ground on the extension surface. Attempts to add compressed air only to the working space in the front part of the shield and allow it to work at ambient pressure have been well known but have been unsuccessful. If the pressure medium flows backwards in the control gap outside the shield and enters the working space due to the incomplete sealing of the gap sealing ring, pressure medium losses and especially compressed air losses occur. This interstitial space with a gap width of approximately 10 cm is compressed by the press concrete at the same time as the shield feed as described above, so that the surrounding ground, which may be in groundwater, does not enter into the interstitial space. . However, it cannot be guaranteed that the pressing pressure for pressed concrete is always greater than the pressure generated by the load. This causes the concrete to fall into the gap, which makes it impossible to completely fill the shield tail gap. Similar conditions occur in brittle rocks.

不完全にしか満たされていない間隙空間を通つて圧力媒
体、特にガス状圧力媒体が流れることができ、このガス
状圧力媒体は、シールドを囲む制御間隙を通つてシール
ド尾部の後まで流れる。間隙密閉リングが密閉していな
い場合、圧力媒体は作業空間内に逃げる。間隙空間の不
完全な充てんは、可動の弾性支持された間隙密閉リング
によつて防止できる(ドイツ連邦共和国特許出願第3642
893.0−24号明細書参照)。しかしこのようにしても、
例えば筒状支保の場合に何かの理由で隣接するセグメン
トの間にずれが生じ、このずれを越えて間隙密閉リング
のパツキンが摺動する場合、間隙空間の確実な充てんを
行うことはできない。時には15mm以下の非密閉継目が生
じる。この非密閉継目を通つて液状プレスコンクリート
はシールド内部へ流出し、その際まわりの地盤を支持す
るためプレスコンクリート内の考慮された圧力を維持す
ることができない。この流出の危険は、プレス圧力が高
い程大きく、その際高いプレス圧力は、トンネルが深い
所にある際に必要である。
A pressure medium, in particular a gaseous pressure medium, can flow through the incompletely filled interstitial space, which gaseous pressure medium flows through the control gap surrounding the shield to the rear of the shield tail. If the gap sealing ring is not closed, the pressure medium escapes into the working space. Incomplete filling of the interstitial space can be prevented by a movable elastically supported interstitial sealing ring (German Patent Application No. 3642).
893.0-24 specification). But even with this
For example, in the case of a tubular support, if a gap occurs between adjacent segments for some reason, and the packing of the gap sealing ring slides over this gap, the gap space cannot be reliably filled. Occasionally unsealed seams of 15 mm or less occur. Through this non-sealing seam, the liquid press concrete flows out into the interior of the shield, whereupon the pressure considered in the press concrete cannot be maintained because it supports the surrounding ground. The risk of this outflow is greater at higher pressing pressures, which is necessary when the tunnel is deep.

発明の目的 本発明の課題は、間隙密閉リングとシールド尾部及び/
又はトンネル支保との間に生じることがある非密閉継目
が自動的に閉じ、従つて前記の欠点が回避されるよう
に、初めに述べたような方法を改善することにある。
OBJECT OF THE INVENTION The object of the invention is to provide a gap sealing ring and a shield tail and / or
Another object is to improve the method as described at the outset such that the non-sealing seam that may occur between the tunnel bearings is automatically closed, thus avoiding the disadvantages mentioned above.

発明の構成 この課題を解決するため本発明は次のことを示してい
る。(a)地下構築物を介してトンネル掘進機を推進し
て掘削孔を形成し、 (b)上記掘削孔内に孔壁に対して間隙をもたせてトン
ネル支保を配置し、その場合、上記のトンネル掘進機は
シールド尾部を有していて、そのシールド尾部が上記孔
壁に接触し、且つ上記トンネル支保を同支保から間隙を
もたせて包囲しており、 (c)上記シールド尾部とトンネル支保との間に間隙密
閉リングを設けることにより、トンネル掘進機の掘進方
向において上記間隙空間を閉鎖し、 (d)上記間隙密閉リングを流体圧にて弾性支持し、こ
の流体圧によって上記間隙密閉リングの上記方向への前
進に対して抵抗力を与え、 (e)コンクリートを上記トンネル支保と孔壁との間に
形成された間隙空間内に高圧にて圧入し、 (f)上記間隙空間へ圧入されるコンクリートの圧力に
よって上記流体圧に抗して上記方向へ間隙密閉リングを
押し進め、 (g)(g1)上記コンクリート内に粒子寸法が4mm以上
の粗粒骨材を含ませ、この粗粒骨材が、上記間隙密閉リ
ングとトンネル支保との間に発生する非密閉継目の前方
に、粗粒骨材の層から成る粒子フィルタを形成するよう
になし、 (g2)上記間隙空間に圧入されるコンクリート内に砂及
び/又は繊維から成る細粒骨材を含ませ、この細粒骨材
が上記の粒子フィルタ内に捕捉されるようになし、 (g3)上記細粒骨材を捕捉した粒子フィルタが形成され
且つこの粒子フィルタ内に捕捉された細粒骨材が上記の
非密閉継目を密封するように、コンクリートを上記非密
閉継目へ向けて押し動かす、 ことによって上記非密閉継目を密封することプレスコン
クリートが、その他に既存の教示に従つて構成され、か
つ流動剤、遅延剤および安定剤のようなその他の通常の
添加物を含むことは明らかである。粒子フイルタは、非
密閉継目の前に流体力学的な理由により生じ、かつその
際及びその後いわば目詰まりを起こす。
Structure of the Invention In order to solve this problem, the present invention shows the following. (A) A tunnel machine is propelled through an underground structure to form an excavation hole, and (b) a tunnel support is arranged in the excavation hole with a gap with respect to the hole wall, in which case the tunnel described above. The excavator has a shield tail, the shield tail contacts the hole wall, and surrounds the tunnel support with a gap from the support, (c) the shield tail and the tunnel support. By providing a gap sealing ring therebetween, the gap space is closed in the excavation direction of the tunnel machine, and (d) the gap sealing ring is elastically supported by fluid pressure, and the fluid pressure causes the gap sealing ring to (E) Concrete is press-fitted into the gap space formed between the tunnel support and the hole wall at high pressure, and (f) Press-fitted into the gap space. Ko The pressure of the cleat pushes the gap sealing ring in the above direction against the fluid pressure, and (g) (g1) includes coarse aggregate having a particle size of 4 mm or more in the concrete. , A particle filter composed of a layer of coarse-grained aggregate is formed in front of the non-sealing seam generated between the gap sealing ring and the tunnel support, and (g2) in the concrete press-fitted into the gap space. To contain fine aggregates composed of sand and / or fibers so that the fine aggregates are trapped in the above-mentioned particle filter, and (g3) a particle filter capturing the above-mentioned fine-grain aggregates is formed. Sealing the non-sealing seam by pushing the concrete towards the non-sealing seam so that the fine-grained aggregate that is trapped in the particle filter seals the non-sealing seam. But Other accordance connexion is constructed in an existing teaching, and flow agents, it is clear that contain other conventional additives such as retarders and stabilizers. Particulate filters are created for hydrodynamic reasons before the non-sealing seam and during and after that clogging.

粗粒骨材の粒子寸法が4mm以上であるプレスコンクリー
トを使用する場合、前記の粒子フィルタ作用が常に達成
される。特に、細粒骨材が砂及び/又は繊維からなるプ
レスコンクリートを使用する場合に達成される。前記の
ように弾性支持された間隙密閉リングを使用し、この間
隙密閉リング弾性支持が間隙空間内のプレスコンクリー
トに向つて押される場合、前記の処置は特に重要であ
る。それ故にこのように配置されかつ形成された間隙密
閉リングの利用と前記方法処置との組合わせは、特に重
要である。粒子フイルタの形成により可能な密閉は、お
どろくべきことに10バール以下の圧力をかけてプレスコ
ンクリートを間隙空間に押込む場合でさえ有効である。
When using pressed concrete in which the particle size of the coarse-grained aggregate is greater than or equal to 4 mm, the above-mentioned particle filtering action is always achieved. This is especially achieved when using pressed concrete in which the fine aggregate is sand and / or fibers. The procedure described above is particularly important when using the elastically supported gap sealing ring as described above, which is pushed towards the pressed concrete in the gap space. The combination of the use of a gap-sealing ring arranged and formed in this way with the method procedure is therefore of particular importance. The sealing possible through the formation of a particle filter is surprisingly effective even when pressing concrete into the interstitial space with a pressure below 10 bar.

実施例 本発明の実施例を以下図面によつて詳細に説明する。Embodiment An embodiment of the present invention will be described in detail below with reference to the drawings.

図示した間隙密閉リングは、シールド尾部1の後端部と
トンネル支保2の前端部の間に配置されており、かつプ
レスコンクリートにより間隙空間をプレスする途中で間
隙空間3を密閉するために使われる。間隙密閉リング
は、シールド尾部1とトンネル支保2に対して相対的に
自由に可動に、シリンダピストン装置の形をした調節可
能な支持ユニツトを介して掘進方向に弾性的に、例えば
シールドに支持されている。これら支持ユニツトは、図
には詳細に示されておらず、第1図には支持ユニツトを
取付ける複数の取付け穴4のうち1つだけが示されてい
る。間隙密閉リングの前端面には、周にわたつて均一に
分散して複数のプレス材料供給管片5が設けられている
(第2図参照)。さらに間隙密閉リングは、弾性的な外
側パツキン6及び弾性的な内側パツキン7を有する。弾
性的な外側パツキン6は、ゴム又はプラスチツクのリン
グからなり、このリングは、シールド尾部1の内側に接
触できる。そのため相応して半径方向調節ねじ8が設け
られている。トンネル支保2の外側に押付け可能な内側
パツキン7は、半径方向ねじ9により間隙密閉リングに
取付けられた追従するばね板パツキンからなる。
The illustrated gap sealing ring is arranged between the rear end of the shield tail 1 and the front end of the tunnel support 2 and is used to seal the gap space 3 during the pressing of the gap space with press concrete. . The gap sealing ring is supported freely movable relative to the shield tail 1 and the tunnel support 2 and elastically in the direction of excavation via an adjustable support unit in the form of a cylinder piston arrangement, for example a shield. ing. These support units are not shown in detail in the drawing, only one of the mounting holes 4 for mounting the support unit is shown in FIG. A plurality of press material supply pipe pieces 5 are provided on the front end surface of the gap sealing ring so as to be uniformly dispersed over the circumference (see FIG. 2). Furthermore, the gap sealing ring has an elastic outer packing 6 and an elastic inner packing 7. The elastic outer packing 6 consists of a rubber or plastic ring which can contact the inside of the shield tail 1. For this purpose, a radial adjusting screw 8 is provided accordingly. The inner packing 7 which can be pressed onto the outside of the tunnel support 2 consists of a compliant spring packing which is attached to the gap sealing ring by means of radial screws 9.

第1図と第2図に概略的に示すように、断面が通じた範
囲においてトンネル支保2にあるセグメントのずれによ
り、非密閉継目10が形成されている。第1図に示すよう
に、非密閉継目10の前にプレスコンクリートの粗粒子砕
石即ち粗粒骨材の層からなる粒子フイルタ11が形成され
ており、かつ粒子フイルタの穴は、粗粒骨材12により閉
じられている。そのうちいくらかのものは、粒子フイル
タを通過し、かつ非密閉継目10を閉じる。粗粒骨材の割
合、特に粉末粒子成分の割合は、通常のプレスコンクリ
ートに対して多くすることができる。本発明の有利な構
成は次のような特徴を有する。すなわちプレスコンクリ
ートに、沈殿ケイ酸又は高温加水分解により作られたケ
イ酸の形の無定形ケイ酸を添加する。一般にセメント重
量に対して2〜4重量%の無定形ケイ酸で十分である。
流動剤、遅延剤及び安定剤のようなその他の添加物の整
合によつても、密閉度の改善を行うことができる。セメ
ント重量に対して例えば2〜6重量%、有利には4重量
%の量のベントナイトを加えることも、本発明の権利範
囲に属する。
As shown diagrammatically in FIGS. 1 and 2, the unsealed seam 10 is formed by the displacement of the segments in the tunnel support 2 in the region where the cross-sections are open. As shown in FIG. 1, a particle filter 11 consisting of a layer of coarse-grained crushed stone of pressed concrete, that is, a coarse-grain aggregate, is formed before the non-sealed seam 10, and the hole of the particle filter has a coarse-grain aggregate. Closed by 12. Some of them pass through the particle filter and close the unsealed seam 10. The proportion of coarse-grained aggregate, especially the proportion of powder particle components, can be higher than that of ordinary press concrete. The advantageous configuration of the present invention has the following features. That is, to the press concrete, precipitated silicic acid or amorphous silicic acid in the form of silicic acid produced by high temperature hydrolysis is added. In general, 2 to 4% by weight of amorphous silicic acid, based on the weight of cement, is sufficient.
The matching of other additives such as flow agents, retarders and stabilizers can also provide improved tightness. It is also within the scope of the invention to add bentonite in an amount of, for example, 2 to 6% by weight, preferably 4% by weight, based on the weight of the cement.

【図面の簡単な説明】[Brief description of drawings]

第1図は、本発明による方法によりトンネル掘進を行う
場合の間隙密閉リングの断面図、第2図は、別の角度位
置における間隙密閉リングの第1図に相当する断面図で
ある。 1……シールド尾部、2……タビング支保、3……間隙
空間、4……取付け穴、5……プレス材料供給管片、6
……外側パツキン、7……内側パツキン、8……調節ね
じ、9……半径方向ねじ、10……非密閉つぎ目、11……
粒子フイルタ、12……添加物
FIG. 1 is a sectional view of the gap sealing ring when tunneling is performed by the method according to the present invention, and FIG. 2 is a sectional view corresponding to FIG. 1 of the gap sealing ring at another angular position. 1 ... Shield tail, 2 ... Tabbing support, 3 ... Gap space, 4 ... Mounting hole, 5 ... Press material supply pipe piece, 6
...... Outer packing, 7 …… Inner packing, 8 …… Adjusting screw, 9 …… Radial screw, 10 …… Unsealed seam, 11 ……
Particle filter, 12 ... Additive

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】トンネルのシールド掘進方法であって、 (a)地下構築物を介してトンネル掘進機を推進して掘
削孔を形成し、 (b)上記掘削孔内に孔壁に対して間隙をもたせてトン
ネル支保(2)を配置し、その場合、上記のトンネル掘
進機はシールド尾部(1)を有していて、このシールド
尾部が上記孔壁に接触し、且つ上記トンネル支保を同支
保から間隙をもたせて包囲しており、 (c)上記シールド尾部とトンネル支保との間に間隙密
閉リングを設けることにより、トンネル掘進機の掘進方
向において上記間隙空間(3)を閉鎖し、 (d)上記間隙密閉リングを流体圧にて弾性支持し、こ
の流体圧によって上記間隙密閉リングの上記方向への前
進に対して抵抗力を与え、 (e)コンクリートを上記トンネル支保と孔壁との間に
形成された間隙空間(3)内に高圧にて圧入し、 (f)上記間隙空間(3)へ圧入されるコンクリートの
圧力によって上記流体圧に抗して上記方向へ間隙密閉リ
ングを押し進め、 (g)(g1)上記コンクリート内に粒子寸法が4mm以上
の粗粒骨材(11)を含ませ、この粗粒骨材が、上記間隙
密閉リングとトンネル支保(2)との間に発生する非密
閉継目(10)の前方に、粗粒骨材の層から成る粒子フィ
ルタを形成するようになし、 (g2)上記間隙空間(3)に圧入されるコンクリート内
に砂及び/又は繊維から成る細粒骨材(12)を含ませ、
この細粒骨材が上記の粒子フィルタ内に捕捉されるよう
になし、 (g3)上記細粒骨材(12)を捕捉した粒子フィルタが形
成され且つこの粒子フィルタ内に捕捉された細粒骨材が
上記の非密閉継目(10)を密封するように、コンクリー
トを上記非密閉継目へ向けて押し動かす、 ことによって、上記の非密閉継目(10)を密封すること
を特徴とする、トンネルのシールド掘進方法。
1. A shield excavation method for a tunnel, comprising: (a) propelling a tunnel excavator through an underground structure to form an excavation hole; and (b) forming a gap in the excavation hole with respect to a hole wall. The tunnel support (2) is arranged so that the tunnel excavator has a shield tail (1), the shield tail contacts the hole wall, and the tunnel support is removed from the support. (C) The gap space (3) is closed in the excavation direction of the tunnel machine by providing a gap sealing ring between the shield tail and the tunnel support, and (d) The gap sealing ring is elastically supported by a fluid pressure, and the fluid pressure gives a resistance force to the advance of the gap sealing ring in the direction, and (e) concrete is provided between the tunnel support and the hole wall. Formation (F) The pressure of the concrete press-fitted into the gap space (3) pushes the gap sealing ring in the above direction against the fluid pressure, and ) (G1) The concrete contains a coarse aggregate (11) with a particle size of 4 mm or more, and this coarse aggregate is not sealed between the gap sealing ring and the tunnel support (2). In the front of the seam (10), a particle filter composed of a layer of coarse-grained aggregate is formed, and (g2) fine particles composed of sand and / or fibers in concrete which is press-fitted into the gap space (3). Including aggregate (12),
This fine-grain aggregate is made to be trapped in the particle filter, and (g3) the fine-grain aggregate in which the fine-grain aggregate (12) is trapped is formed and the fine-grain bone trapped in the particle filter is formed. A tunnel characterized by sealing the unsealed seam (10) by pushing concrete towards the unsealed seam so that the material seals the unsealed seam (10). Shield digging method.
【請求項2】上記の細粒骨材の比率が、一般的なコンク
リート内の細粒骨材の標準的比率よりも高い、請求項1
に記載の方法。
2. The proportion of fine aggregates is higher than the standard proportion of fine aggregates in common concrete.
The method described in.
【請求項3】沈澱ケイ酸又は高温加水分解により作られ
たケイ酸の形のケイ酸がコンクリートと混合されてい
る、請求項1に記載の方法。
3. The method according to claim 1, wherein precipitated silicic acid or silicic acid in the form of silicic acid made by high temperature hydrolysis is mixed with concrete.
JP63150400A 1987-08-13 1988-06-20 Tunnel shield digging method Expired - Lifetime JPH0723680B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE3726900.3 1987-08-13
DE3726900 1987-08-13

Publications (2)

Publication Number Publication Date
JPH01142196A JPH01142196A (en) 1989-06-05
JPH0723680B2 true JPH0723680B2 (en) 1995-03-15

Family

ID=6333615

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63150400A Expired - Lifetime JPH0723680B2 (en) 1987-08-13 1988-06-20 Tunnel shield digging method

Country Status (4)

Country Link
US (1) US4911578A (en)
EP (1) EP0303775B1 (en)
JP (1) JPH0723680B2 (en)
DK (1) DK171200B1 (en)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19800963A1 (en) * 1998-01-14 1999-07-22 Holzmann Philipp Ag Process for grouting the annular space between Tübbingen and the mountains
US6554368B2 (en) * 2000-03-13 2003-04-29 Oil Sands Underground Mining, Inc. Method and system for mining hydrocarbon-containing materials
AU2003216047A1 (en) * 2002-01-09 2003-07-30 Oil Sands Underground Mining, Inc. Method and means for processing oil sands while excavating
US7128375B2 (en) * 2003-06-04 2006-10-31 Oil Stands Underground Mining Corp. Method and means for recovering hydrocarbons from oil sands by underground mining
US20070044957A1 (en) * 2005-05-27 2007-03-01 Oil Sands Underground Mining, Inc. Method for underground recovery of hydrocarbons
US8287050B2 (en) * 2005-07-18 2012-10-16 Osum Oil Sands Corp. Method of increasing reservoir permeability
US8127865B2 (en) * 2006-04-21 2012-03-06 Osum Oil Sands Corp. Method of drilling from a shaft for underground recovery of hydrocarbons
US20080078552A1 (en) * 2006-09-29 2008-04-03 Osum Oil Sands Corp. Method of heating hydrocarbons
US7644769B2 (en) * 2006-10-16 2010-01-12 Osum Oil Sands Corp. Method of collecting hydrocarbons using a barrier tunnel
WO2008064305A2 (en) 2006-11-22 2008-05-29 Osum Oil Sands Corp. Recovery of bitumen by hydraulic excavation
WO2009040683A2 (en) * 2007-09-28 2009-04-02 Osum Oil Sands Corp. Method of upgrading bitumen and heavy oil
CA2698238C (en) * 2007-10-22 2014-04-01 Osum Oil Sands Corp. Method of removing carbon dioxide emissions from in-situ recovery of bitumen and heavy oil
CA2701164A1 (en) * 2007-12-03 2009-06-11 Osum Oil Sands Corp. Method of recovering bitumen from a tunnel or shaft with heating elements and recovery wells
US8176982B2 (en) * 2008-02-06 2012-05-15 Osum Oil Sands Corp. Method of controlling a recovery and upgrading operation in a reservoir
CA2718885C (en) 2008-05-20 2014-05-06 Osum Oil Sands Corp. Method of managing carbon reduction for hydrocarbon producers
CN103726857B (en) * 2013-11-28 2017-01-04 江苏牧羊控股有限公司 A kind of flexible die for shield segment
US12209498B2 (en) * 2019-02-21 2025-01-28 TopEng Inc. System and method for simultaneous excavation and segment erection of TBM by thrust shell
CN110031369A (en) * 2019-05-22 2019-07-19 中国水利水电第八工程局有限公司 The underwater slurry shield mud film of bad ground forms simulator and analogy method
CN114017070B (en) * 2021-12-08 2023-08-25 河北工程大学 A visualization device that can be used to simulate the accumulation effect of grouting particles in fractured rock mass

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR451532A (en) * 1912-12-06 1913-04-21 Eugene Louis Marie Martin Waterproof concrete
US3672173A (en) * 1969-05-13 1972-06-27 Halliburton Co Forming self-supporting barriers in mine passages and the like
US3774683A (en) * 1972-05-23 1973-11-27 Halliburton Co Method for stabilizing bore holes
US3845632A (en) * 1973-05-21 1974-11-05 Mineral Ind Method of sealing coal against methane emission
JPS5125534U (en) * 1974-08-15 1976-02-25
DE2623223C3 (en) * 1975-05-30 1978-05-24 Tekken Kensetu Co. Ltd., Tokio Annular gap seal for tunneling
DE2555780C3 (en) * 1975-12-11 1979-04-19 Wayss & Freytag Ag, 6000 Frankfurt Annular gap sealing for shield tunneling machines
DE3043312C2 (en) * 1980-11-17 1986-10-09 Heinz-Theo Dipl.-Ing. 5300 Bonn Walbröhl Sliding formwork for inserting an in-situ concrete lining as well as a method for inserting in-situ concrete in gallery and tunnel construction
JPS6214237Y2 (en) * 1981-02-02 1987-04-11
FR2515092A1 (en) * 1981-10-22 1983-04-29 Comminges Betons Inexpensive concrete for construction industry - where part of conventional cement is replaced by ultrafine silica flour, and very short mixing time is used
DE3407384A1 (en) * 1983-09-07 1985-08-29 Dyckerhoff & Widmann AG, 8000 München Method of producing a tubular underground hollow space, e.g. a traffic tunnel, and apparatus for carrying out the method
FI69503C (en) * 1984-03-13 1986-02-10 Neste Oy YTBELAGD BERGSBEHAOLLARE ELLER TUNNEL
DE3411857C1 (en) * 1984-03-30 1985-04-18 Hochtief Ag Vorm. Gebr. Helfmann, 4300 Essen Between a shield jacket of a tunnel boring machine and a tunnel inner formwork, length-adjustable front circuit
US4789267A (en) * 1985-03-13 1988-12-06 Hochtief Aktiengesellschaft Vorm. Gebr. Helfmann Method of and apparatus for concrete tunnel lining

Also Published As

Publication number Publication date
EP0303775B1 (en) 1992-03-04
US4911578A (en) 1990-03-27
DK282888A (en) 1989-02-14
JPH01142196A (en) 1989-06-05
EP0303775A1 (en) 1989-02-22
DK282888D0 (en) 1988-05-24
DK171200B1 (en) 1996-07-22

Similar Documents

Publication Publication Date Title
JPH0723680B2 (en) Tunnel shield digging method
CN105781564B (en) The scalable main driving sealing device of large-diameter shield machine
JPS5814920B2 (en) Shield tunnel excavation equipment
CN206246125U (en) A kind of modified earth pressure balanced shield, EPBS hinge seal device
GB2133438A (en) Shield machine for enlarging a tunnel
JPS60188596A (en) Drilling machine of tunnel and pit
Babendererde Tunnelling machines in soft ground: a comparison of slurry and EPB shield systems
US3958648A (en) Drilling equipment
JP4453879B2 (en) Shield tunnel method
DE3125644A1 (en) Method of driving a tunnel with the use of a shield with liquid-filled working chamber
JP4771159B2 (en) Tunnel closing method and tunnel closing device
DE3827441A1 (en) Shield driving method for a tunnel
JPS6346557Y2 (en)
Dowden et al. ‘Shielded TBM’s—matching the machine to the job.’’
JP4904580B2 (en) Tunnel closing method and tunnel closing device
SU1634786A1 (en) Method for crossing over cavities in which gas dynamic effect occurs
JPS60181498A (en) Pipeline wall construction method and apparatus by tunnel shield construction method
JPH026157Y2 (en)
SU739215A1 (en) Packer
JPS5814917B2 (en) Shield tunnel excavation equipment
JPH0657939B2 (en) Ground improvement method and equipment by injection of fine powder
JPS6126461Y2 (en)
JP3122362B2 (en) Wellhead packing mounting structure
JPS6131110Y2 (en)
SU977727A1 (en) Method for consolidating well shaft