JPH0724063B2 - Central management system - Google Patents
Central management systemInfo
- Publication number
- JPH0724063B2 JPH0724063B2 JP16911284A JP16911284A JPH0724063B2 JP H0724063 B2 JPH0724063 B2 JP H0724063B2 JP 16911284 A JP16911284 A JP 16911284A JP 16911284 A JP16911284 A JP 16911284A JP H0724063 B2 JPH0724063 B2 JP H0724063B2
- Authority
- JP
- Japan
- Prior art keywords
- information
- disaster
- construction
- output
- work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、磁気カード、光カード、ICカード等の個人携
帯カードを使って作業所毎に入力される労務・工程管理
情報や健康管理情報、災害経歴情報等の作業員各自の固
有情報、カメラを使って撮影される作業所毎の映像情報
を中央で管理する集中管理システムに関するものであ
る。DETAILED DESCRIPTION OF THE INVENTION [Industrial field of application] The present invention relates to labor / process management information and health management information input for each work site using a personal portable card such as a magnetic card, an optical card, or an IC card. The present invention relates to a centralized management system that centrally manages unique information of each worker such as disaster history information and image information of each work place photographed using a camera.
作業所を管理する場合、一般に複数の作業所がその対象
となるのが普通である。ところで、各作業所では、応援
者、短期就労者、新規入場者、遅刻者等の様々な作業員
がいてこれらの把握が必要であるとともに、また、常勤
者であっても、当日の就労者氏名の確認、退場者の確認
が必要である等、把握しなければならい管理事項は非常
に多岐にわたっている。このように作業所においては、
就労者氏名の把握、受入教育の徹底、連絡先や健康状態
のチェック、定時以後の残留者の確認、その他多岐にわ
たる労務管理が必要であるが、その労務管理は、工事規
模により種々の方法で実施されている。When managing a work place, it is common to have multiple work places. By the way, at each work place, there are various workers such as supporters, short-term workers, new visitors, late workers, etc., and it is necessary to understand these. There are a wide variety of management items that must be understood, such as confirmation of name and confirmation of exiters. In this way, in the workplace,
It is necessary to grasp the name of the worker, thorough receiving education, check contact information and health condition, check the remaining person after the scheduled time, and various other labor management, but the labor management can be done by various methods depending on the scale of construction. It has been implemented.
一般に、或る1日についてその日に就労する作業員は、
管理対象となる作業員全員のうちの約1/5程度であると
いわれており、作業員全員を対象とする作業所毎の作業
員の把握、労務管理、工程管理、安全管理は、重要であ
るが、現実には労務管理をそれぞれの工事現場の責任者
が個別に行ったりしており、総合的に管理する等の有効
な管理方式の採用は非常に難しかった。そのため、作業
所の労務管理に一貫性がなく、工事総合管理を進める上
で大きなネックになっていた。本発明は、このような考
案に基づくものであり、作業員各自の固有情報と各作業
所の映像情報とをもとに中央で総合的な工事管理が可能
な集中管理システムの提供を目的とするものである。In general, a worker who works on a certain day
It is said that about one-fifth of all workers subject to management are grasped, and it is important to grasp the workers at each work site, labor management, process management, and safety management for all workers. However, in reality, the personnel in charge of each construction site individually perform labor management, and it was very difficult to adopt an effective management method such as comprehensive management. As a result, labor management at work sites is inconsistent, which has been a major obstacle in advancing comprehensive work management. The present invention is based on such a device, and an object thereof is to provide a centralized management system capable of comprehensive construction management in the center based on the unique information of each worker and the image information of each work place. To do.
そのために本発明は、複数の作業所をそれぞれ子局に
し、該子局の作業所とその作業員とを中央の親局より集
中して管理する集中管理システムであって、各子局は、
作業員各自の固有情報を記録したカードを読み取るカー
ド・リーダ、作業所内を撮影するカメラ、該カメラの映
像情報を記録する映像情報記録手段、各種情報の印字/
表示出力を行う出力手段、及びカード・リーダで読み取
られた固有情報の処理を行い該処理した情報と映像情報
記録手段に記録された映像情報とを親局に送出するとと
もに出力手段から前記処理した情報の出力と親局より送
られてきたメッセージその他の情報の出力とを行うデー
タ処理・伝送制御手段を備え、親局は、各作業所毎に工
事の内容や条件によって評価値が固定される項目の値と
工事の進行に伴って評価値が変動する現場の安定管理状
況等の項目の値を積算して災害危険度を計算し災害危険
度が所定値より大きい場合に安全管理状況の悪い項目に
関し災害予知を行う工事災害予知情報システム、評価値
の入力その他の入出力を行う入出力手段、及び各子局か
ら送られてきた映像情報を映像により入出力手段から固
有情報を工事災害予知情報システムと入出力手段とに出
力するとともに工事災害予知情報システムからの災害予
知メッセージその他の情報を各子局に送出するデータ集
中管理・伝送制御手段を備え、作業員の入退場に際して
カード・リーダで作業員の携帯するカードを読み取り、
工事の進行に伴って安全管理状況等の項目を入力するこ
とによって、工事の進行及び現場の状況に応じた災害予
知を可能にしたことを特徴とするものである。To this end, the present invention is a centralized management system in which a plurality of work stations are respectively made slave stations, and the work stations of the slave stations and their workers are centrally managed from a central master station.
A card reader for reading a card in which each worker's unique information is recorded, a camera for photographing the inside of a work place, a video information recording means for recording the video information of the camera, and printing of various information.
Output means for displaying and outputting, and processing of the unique information read by the card reader, sending the processed information and the video information recorded in the video information recording means to the master station, and performing the above processing from the output means. Equipped with data processing and transmission control means to output information and output messages and other information sent from the master station, the master station has an evaluation value fixed for each work site depending on the construction content and conditions. The value of the item and the evaluation value fluctuate with the progress of construction work are added to the value of items such as the stable management status of the site to calculate the disaster risk level.If the disaster risk level is higher than the specified value, the safety management status is bad. Construction disaster prediction information system for predicting disasters related to items, input / output means for inputting and receiving evaluation values and other input / output, and video information sent from each slave station by video It is equipped with data centralized management / transmission control means that outputs to the intelligent information system and input / output means, and sends a disaster prediction message and other information from the construction disaster prediction information system to each slave station. Read the card carried by the worker with the reader,
It is characterized in that it is possible to predict a disaster according to the progress of the construction and the situation of the site by inputting items such as the safety management status along with the progress of the construction.
本発明の集中管理システムにおいて、子局では、作業員
が作業所に入場する際、作業員各自の固有情報が入力さ
れると、その固有情報について所定の処理が行われ、親
局に送出される。また、カメラにより作業所内の様子が
撮影されると、その映像情報は一旦映像情報記録手段に
記録された後親局に送出される。一方、親局では、子局
から固有情報が送られてくると、災害予知に必要な情報
は工事災害予知情報システムに登録され、入出力手段か
らの出力指示がある場合にはその情報が出力される。同
様に、子局から映像情報が送られてくると、その映像情
報は入出力手段から映像出力される。In the centralized management system of the present invention, in the slave station, when the worker enters the work place, when the unique information of each worker is input, a predetermined process is performed on the unique information and it is sent to the master station. It When the inside of the work place is photographed by the camera, the video information is once recorded in the video information recording means and then sent to the master station. On the other hand, in the master station, when the specific information is sent from the slave station, the information necessary for disaster prediction is registered in the construction disaster prediction information system, and if there is an output instruction from the input / output means, that information is output. To be done. Similarly, when video information is sent from the child station, the video information is output from the input / output means.
親局の工事災害予知情報システムでは、各作業所毎に工
事の内容や工事進行現場の状況、例えば定期的に行われ
る安全診断の内容をもとに災害危険度を計算し、災害危
険度が高くなった場合に災害予知を行うが、その災害予
知では、災害の内容に応じたメッセージや災害発生状況
図、各作業員の固有情報に基づいてリスト・アップされ
た作業員リストなどが出力される。これらメッセージそ
の他の情報は、親局の入出力手段から出力されるととも
に、子局に送られ子局の出力手段からも出力される。In the construction disaster prediction information system of the parent station, the disaster risk is calculated based on the contents of the construction and the situation of the construction progress site at each work place, for example, the contents of regularly conducted safety diagnosis, and the disaster risk is calculated. When it becomes higher, disaster prediction is performed.In the disaster prediction, a message according to the content of the disaster, a disaster occurrence status diagram, a worker list that is listed based on the unique information of each worker, etc. are output. It These messages and other information are output from the input / output means of the master station and also sent to the slave station and output from the output means of the slave station.
以下、実施例を図面を参照しつつ説明する。 Hereinafter, embodiments will be described with reference to the drawings.
第1図は本発明の1実施例システム構成を示す図であ
り、1は中央管理装置、2と5は伝送制御部、3は入出
力装置、4は工事災害予知情報システム(SAFEシステ
ム)、6はデータ処理装置、7はカード・リーダ、8は
出力装置、9は画像情報記憶装置、10はカメラをそれぞ
れ示している。FIG. 1 is a diagram showing a system configuration of an embodiment of the present invention, in which 1 is a central management device, 2 and 5 are transmission control units, 3 is an input / output device, 4 is a construction disaster prediction information system (SAFE system), 6 is a data processing device, 7 is a card reader, 8 is an output device, 9 is an image information storage device, and 10 is a camera.
第1図において、親局の伝送制御部2は、通信網を介し
て各子局の伝送制御部5と接続される。通信網は、専用
回線を使っても公衆回線を使っても、さらには他の通信
手段を使ってもよいことはいうまでもない。In FIG. 1, the transmission control unit 2 of the master station is connected to the transmission control unit 5 of each slave station via a communication network. It goes without saying that the communication network may use a dedicated line, a public line, or other communication means.
子局は、作業所毎に設けられ、カード・リーダ7は、作
業員が作業所を入退場する際、作業員各自が携帯する磁
気カードや光カード、ICカードなどに記録された固有情
報を読み取るものである。作業員各自の固有情報として
は、例えば、その作業員の所属や本籍、生年月日、氏
名、職種、資格等の労務・工程管理情報、血圧とその
測定日、障害その他の健康管理情報、過去の災害発生
内容や災害発生日等の災害予知情報が記録される。出力
装置8は、プリンタやディスプレイなどからなり、固有
情報を処理して得られた労務管理データや工程管理デー
タ、健康管理データ、さらには親局から送られてきた災
害予知のメッセージその他の情報を出力するものであ
る。カメラ10は、作業状況、工事の進行状況その他作業
所内の種々の状況を撮影するものである。そしてその撮
影した映像情報を記録するのが画像情報記憶装置9であ
り、例えばフロッピィ・ディスク、光ディスクなどが使
用される。データ処理装置6は、カード・リーダ7、出
力装置8、画像情報記憶装置9などの制御を行うととも
に、カード・リーダ7で読み込んだ固有情報の処理を行
うものである。また、データ処理装置6は、伝送制御部
5を通して、画像情報記憶装置9に記録された映像情報
や固有情報を伝送ラインに送出する。A slave station is provided in each work place, and the card reader 7 stores unique information recorded on magnetic cards, optical cards, IC cards, etc. carried by each worker when the worker enters and leaves the work place. It is something to read. Specific information for each worker includes, for example, labor and process management information such as the worker's affiliation, permanent domicile, date of birth, name, occupation, and qualification, blood pressure and its measurement date, disability and other health management information, and past information. Disaster prediction information such as the content of disaster occurrence and the date of disaster occurrence is recorded. The output device 8 is composed of a printer, a display, and the like, and outputs labor management data, process management data, health management data obtained by processing the unique information, and a disaster prediction message and other information sent from the parent station. It is what is output. The camera 10 photographs the work status, the progress status of the construction, and various other conditions inside the work place. The image information storage device 9 records the captured video information, and for example, a floppy disk, an optical disk, or the like is used. The data processing device 6 controls the card reader 7, the output device 8, the image information storage device 9 and the like, and also processes the unique information read by the card reader 7. Further, the data processing device 6 sends the video information and the unique information recorded in the image information storage device 9 to the transmission line through the transmission control unit 5.
親局では、中央管理装置1が伝送制御部2、伝送ライン
を介して各子局と情報を送/受信する。子局から送られ
てきた映像情報は、入出力装置3から作業状況や工事の
進行状況その他作業所内の種々の状況を写した映像とし
て出力することにより、子局側の状況をモニタし、固有
情報は、工事災害予知情報システム4の作業員ファイル
に登録される。工事災害予知情報システム4は、災害予
知をするための要因測定項目より経験に基づいた災害危
険度を算出するものである。災害危険度の測定項目とし
ては、受注した工事の内容と条件によって評価される固
定値と、工事の進行に伴って評価される変動値とがあ
る。固定値の特性要因としては、工事区分や構造、延面
積、階数(地下、地上)、工期その他の要素により評価
される工事の難易度、工事責任者や作業員及びその作業
所の過去の災害発生データ等により評価される災害経歴
の有無、鉄骨建方工事や足場組払し工事等の危険工事工
程の有無があり、変動値の特性要因としては、事前計画
の実施状況、安全施工サイクルの実施状況、安全管理状
況の評価、是正状況の経理評価があり、これらは工事報
告書や安全診断チェック・シートなどに基づいて入出力
装置3を使って入力される。そしてこれらの特性要因を
もとに、工事の進行に伴って所定の期間毎に、過去の経
験に基づいて算定された数値を使って評価を行い、危険
度の配分計算を行うことによって、墜落、飛来、落下、
クレーンその他の災害予知を行う。災害予知のため、災
害の内容に応じたメッセージやその発生状況図などを予
めテーブルに登録しておく。そして災害危険度が異常に
高いと判定された場合、その災害予知のメッセージを編
集し、また、作業員ファイルからその災害の過去の経歴
者リスト、予想される災害発生者リストを作成して出力
する。中央管理装置1は、これらの災害予知情報を入出
力装置3から出力するとともに、伝送制御部2を介して
伝送ラインに送出する。In the master station, the central management device 1 sends / receives information to / from each slave station via the transmission controller 2 and the transmission line. The video information sent from the slave station is output from the input / output device 3 as a video showing the work status, the progress status of the construction and various other conditions in the work place, so that the status of the slave station can be monitored and The information is registered in the worker file of the construction disaster prediction information system 4. The construction disaster prediction information system 4 calculates a disaster risk degree based on experience from factor measurement items for predicting a disaster. The disaster risk measurement items include a fixed value that is evaluated according to the contents and conditions of the ordered construction and a variable value that is evaluated as the construction progresses. Characteristic factors of fixed values include construction classification, structure, total area, number of floors (underground, above ground), difficulty level of construction evaluated by factors such as construction period, construction managers and workers, and past disasters of the workplace. There is a history of disasters evaluated based on the occurrence data, and the presence or absence of dangerous construction processes such as steel erection work and scaffolding assembly work.The characteristic factors of the fluctuation values are the implementation status of the preliminary plan and the safety construction cycle. There are implementation status, safety management status evaluation, and correction status accounting evaluation, which are input using the input / output device 3 based on a construction report, a safety diagnosis check sheet, and the like. Then, based on these characteristic factors, evaluation is performed using a numerical value calculated based on past experience for each predetermined period along with the progress of construction, and risk distribution is calculated. Flying, falling,
Predict cranes and other disasters. In order to predict a disaster, a message according to the content of the disaster and a diagram of its occurrence are registered in advance in a table. When it is determined that the disaster risk is abnormally high, the disaster prediction message is edited, and the past history list of the disaster and the expected disaster occurrence list are created and output from the worker file. To do. The central management device 1 outputs these disaster prediction information from the input / output device 3 and sends it to the transmission line via the transmission control unit 2.
第2図は子局のデータ処理装置の1構成例を示す図、第
3図は工事災害予知情報システムの1構成例を示す図で
ある。図において、21はカード・リーダ、22はシステム
・データ入力部、23は工程管理テーブル、24は工程管理
情報処理部、25は労務管理情報処理部、26は健康管理情
報処理部、31は入力装置、32は災害予知情報設定部、33
は災害危険度演算部、34は災害予知出力部、35は災害予
知情報格納バッファ、36はメッセージ・テーブル、37は
状況図テーブル、38は作業員ファイルをそれぞれ示して
いる。FIG. 2 is a diagram showing one configuration example of the data processing device of the slave station, and FIG. 3 is a diagram showing one configuration example of the construction disaster prediction information system. In the figure, 21 is a card reader, 22 is a system data input unit, 23 is a process management table, 24 is a process management information processing unit, 25 is a labor management information processing unit, 26 is a health management information processing unit, and 31 is an input. Device, 32 is a disaster prediction information setting unit, 33
Is a disaster risk degree calculation unit, 34 is a disaster prediction output unit, 35 is a disaster prediction information storage buffer, 36 is a message table, 37 is a situation diagram table, and 38 is a worker file.
子局のデータ処理装置は、本件の出願人によって労務安
全管理システムにおいて別途提案されているが、その概
要を第2図を参照しつつ説明する。The data processing device of the slave station has been separately proposed in the labor safety management system by the applicant of the present application, and its outline will be described with reference to FIG.
第2図において、工程管理テーブル23は、作業の基準工
程情報を登録しておくものであり、工事を受注したとき
に作成される作業工程(日程)に従って登録される。例
えば、鳶の資格者が必要な高所作業がある場合には、鳶
の資格者が必要であることや作業日程に対応して鳶の資
格者の所要人日数が登録される。システム・データ入力
部22は、例えばキーボードにより構成され、工程管理テ
ーブル23に登録される作業の基準工程情報などを入力す
るものである。In FIG. 2, the process management table 23 is for registering the standard process information of the work, and is registered according to the work process (schedule) created when the work is ordered. For example, if there is work at a high place that requires a eagle qualification, the number of days required for the eagle qualification is registered in correspondence with the necessity of the eagle qualification and the work schedule. The system data input unit 22 is composed of, for example, a keyboard, and is used for inputting reference process information of the work registered in the process management table 23.
工程管理情報処理部24は、カード・リーダ21より作業員
各自の固有情報が入力されると、労務・工程管理情報か
ら工程管理に必要なデータを作成するものである。工程
管理に必要なデータとしては、例えば、その日の各職種
の人数を集計することにより、工程管理テーブル23に登
録されたその日の各工程毎に必要な職種の人数割合から
工程/職種別作業員予測データが作成され、或いはその
日迄の各職種毎の就業実績人日数を集計し、その集計値
と工程管理テーブル23に登録されたその日迄の人日数と
を比較することにより、翌月、2ケ月先、3ケ月先の職
種別作業員の過不足予測データが作成され、さらには、
業者(所属)別に作業員を集計することにより業者別作
業員の過不足予測データが作成される。予測としては、
或る工程において佐官工による作業が10日の予定で設定
され、5日目を迎え、予定によれば5日で佐官工が35人
日になっているとする。この予定に対して5日目までの
実績を計算した結果では20人日になる場合、この予定人
日数と実績人日数とをもとに翌日以降の不足人日数や実
績人日数のまま作業が継続した場合における作業の遅延
日数等を計算される。When the unique information of each worker is input from the card reader 21, the process control information processing unit 24 creates data necessary for process control from the labor / process control information. As the data necessary for process control, for example, by counting the number of persons of each job type on that day, the number of job types required for each process of the day registered in the process control table 23 can be used to calculate the number of workers for each process / job type. Forecast data is created, or the actual number of working days for each job type up to that day is totaled, and the totaled value is compared with the number of human days up to that day registered in the process control table 23. Forecast and deficiency data of workers by occupation for three months ahead are created.
By calculating the number of workers by trader (affiliation), the worker excess / deficiency prediction data for each trader is created. As a prediction,
It is assumed that in a certain process, work by Sekiko will be scheduled for 10 days, and the fifth day will be reached, and according to the schedule, it will be 35 mandays in 5 days. If the result of calculating the results up to the 5th day for this schedule is 20 man days, the work can be done with the remaining man days and the actual man days remaining after the next day based on this planned man days and actual man days. If the work continues, the number of work delay days etc. is calculated.
労務管理情報処理部25は、カード・リーダ21より作業員
各自の固有情報が入力されると、労務・工程管理情報か
ら労務管理に必要なデータを作成するものである。労務
管理に必要なデータとしては、例えば、工程管理テーブ
ル23に登録されたその日の各工程毎に必要な職種と資格
とをもとに、無資格者のチェックを行うことにより、工
程別の無資格者リストが作成され、また、作業員各自の
入場時刻と退場時刻とを記録し、退場時刻の未記録者を
サーチすることによって残留者リストが作成される。The labor management information processing unit 25 creates data necessary for labor management from the labor / process management information when the unique information of each worker is input from the card reader 21. As the data necessary for labor management, for example, by checking unqualified persons based on the types of jobs and qualifications required for each process of the day registered in the process control table 23, the process-specific The qualified person list is created, and the remaining person list is created by recording the entry time and exit time of each worker and searching for the unrecorded person at the exit time.
健康管理情報処理部26は、健康管理に必要な血圧その他
の値につき、比較基準値と有効期間が設定されており、
カード・リーダ21より作業員各自の固有情報が入力され
ると、作業員各自の健康管理情報が比較基準値を越えて
いるか否か、測定日が有効期間を過ぎているか否かを調
べ、比較基準値を越えている作業員、有効期間を過ぎて
いる作業員のリストを作成したり、障害者のサーチを行
い、障害者リストを作成したりする。The health management information processing unit 26, for blood pressure and other values required for health management, the comparison reference value and the effective period are set,
When the unique information of each worker is input from the card reader 21, it is checked whether the health management information of each worker exceeds the comparison reference value, and whether the measurement date has passed the valid period, and comparison is made. Create a list of workers who have exceeded the standard value or those whose validity period has expired, or search for persons with disabilities to create a list of persons with disabilities.
次に本件の出願人によって別途提案されている工事災害
予知情報システムの1例を第3図を参照しつつ説明す
る。Next, an example of a construction disaster prediction information system separately proposed by the applicant of the present application will be described with reference to FIG.
第3図において、災害予知情報格納バッファ35は、作業
所毎に用意され、災害危険度を算出するための要因測定
項目の評価値を格納するものである。災害危険度の測定
項目としては、先に述べた如く受注した工事の内容によ
って評価される固定値と、工事の進行に伴って評価され
る変動値とがあり、それらのうち固定値を格納するのが
固定値バッファであり、変動値を格納するのが変動値バ
ッファである。In FIG. 3, the disaster prediction information storage buffer 35 is prepared for each work place and stores the evaluation value of the factor measurement item for calculating the disaster risk. As the disaster risk measurement items, there are fixed values that are evaluated according to the contents of the ordered construction and variable values that are evaluated as the construction progresses, as described above, and the fixed values are stored. Is the fixed value buffer, and the variable value buffer stores the variable value.
入力装置31は、指令やデータをキー入力したり、先に述
べた各測定項目に関するインプット帳票を読み込んだり
するものである。この入力装置31に災害危険度を算出す
るための要因測定項目の評価値が入力されると、災害予
知情報測定部32は、固定値を固定値バッファに格納し、
変動値を変動値バッファに格納する。そして、災害危険
度演算部33は、災害予知情報格納バッファ35の固定値バ
ッファと変動値バッファに格納された各評価値をもとに
過去の経験に基づいて算定された数値を使って危険度の
配分計算を行うことによって、墜落、飛来、落下、クレ
ーンその他の災害予知を行う。この結果に従って災害予
知出力部34は、メッセージ・テーブル36、状況図テーブ
ル37及び作業員ファイル38を参照し、災害予知のメッセ
ージ、その発生状況図、作業員リストを出力する。The input device 31 is for inputting commands and data by keys, and reading the input form for each measurement item described above. When the evaluation value of the factor measurement item for calculating the disaster risk is input to the input device 31, the disaster prediction information measuring unit 32 stores the fixed value in the fixed value buffer,
The variable value is stored in the variable value buffer. Then, the disaster risk calculation unit 33 uses the numerical value calculated based on past experience based on each evaluation value stored in the fixed value buffer and the variable value buffer of the disaster prediction information storage buffer 35 to use the risk level. By calculating the distribution of, the forecast of disasters such as crashes, arrivals, drops, cranes, etc. will be performed. According to this result, the disaster prediction output unit 34 refers to the message table 36, the situation diagram table 37 and the worker file 38, and outputs a disaster prediction message, its occurrence situation diagram, and a worker list.
メッセージ・テーブル36は、墜落、飛来、落下、クレー
ンその他の各種の災害を具体的に予知するため、その予
知の内容に対応した各種のメッセージを登録するもので
あり、状況図テーブル37は、過去の災害発生事例をもと
に代表的な災害事例の発生状況図を登録するものであ
り、作業員ファイル38は、全作業員について災害経歴情
報と災害発生を予想するための災害発生予想情報が登録
されるものである。災害経歴情報としては、災害経歴の
有無、その内容、その時期などであり、災害発生予想情
報としては、血圧その他の健康管理情報、作業所の管理
者による就労評価情報、高所作業の向き、不向き、一般
作業の向き、不向き、運動神経、視覚、判断能力、情緒
安定度の如き作業適応性や性格に関する情報などであ
る。The message table 36 is for registering various messages corresponding to the content of the prediction in order to specifically predict various disasters such as crashes, flying, falling, cranes, etc. The purpose of this is to register the occurrence status diagram of a typical disaster case based on the disaster occurrence cases described in 1., and the worker file 38 contains disaster history information and disaster occurrence forecast information for predicting a disaster occurrence for all workers. It is to be registered. The disaster history information includes the presence or absence of a disaster history, its content, the time, etc., and the disaster occurrence prediction information includes blood pressure and other health management information, employment evaluation information by the manager of the workplace, direction of work at height, Information about work adaptability and personality such as unsuitability, orientation of general work, unsuitability, motor nerves, vision, judgment ability, and emotional stability.
次に具体的に災害予知の例を説明する。例えば墜落防止
の観点から、設備関係をみると作業床設置や開口部、受
台足場、枠組足場等の是正指摘項目、さらにその是正指
摘細目が挙げられ、作業床設置の是正指摘細目として
は、作業床無、手摺無・脱落、手摺高90cm未満、床幅40
cm未満、すきま3cm以上、足場板選別、支持物、端部囲
い、棚養生、床材固定転位等が挙げられる。そこで作業
所現場において、これらの各細目について診断を行い、
安全診断チェック・シートを作成して、この安全診断チ
ェック・シートの内容が本発明のシステムに入力され
る。Next, a specific example of disaster prediction will be described. For example, from the viewpoint of crash prevention, from the viewpoint of equipment, there are items to be pointed out for correction such as work floor installation and openings, pedestal scaffolding, frame scaffolding, etc. No work floor, no handrails, falling, handrail height less than 90 cm, floor width 40
Less than cm, clearance 3 cm or more, scaffolding board selection, support, edge enclosure, shelf curing, floor material fixed dislocation, etc. Therefore, at the workplace site, we diagnose each of these details,
A safety diagnosis check sheet is created, and the contents of this safety diagnosis check sheet are input to the system of the present invention.
災害危険度の算出では、例えば先に説明した固定値の特
性要因のうち、工事の難易度についてみると、用途別が
事務所の場合には0.85、構造別がSRC造の場合には0.7
0、延面積別が4000坪の場合には0.50、階数が9階の場
合には0.75、工期が12カ月の場合には0.85のように過去
の災害発生事例のデータをもとに評価点を設定する。同
様に、工事長の災害経歴の有無、翌月の危険工事、事前
計画実施状況、安全施工サイクル、安全管理状況評価、
是正状況経歴評価等の項目についてもそれぞれ評価点を
設定しその評価点を積算する。そして、積算値が所定値
を越えた場合(例えば総合点100に対して40を越えた場
合)に災害危険度が高いと判断して災害予知情報を選択
し出力する。この場合において、例えば是正指摘細目の
「作業床無」や「手摺無」が2か月前から当月まで診断
指摘細目にされているとすると、これらの状況から「作
業床設置」が特に注意を要する是正指摘項目に該当する
こととなり、メッセージ・テーブル36を参照することに
より「過去の事例から、墜落災害の危険が高い。KYミー
ティング、点検是正等の実施強化」の如きメッセージの
出力、状況図テーブル37を参照することにより災害発生
状況図の出力、さらには作業員ファイル38を参照するこ
とによりその現場で作業中の作業員で墜落災害の経歴者
のリストや予想される災害発生者のリストの出力が行わ
れる。予想される災害発生者は、例えば墜落災害の予知
において、それが鉄骨建方である場合は、登録済鳶職の
うち、高血圧、就労評価が低い、作業適応性が低いなど
の要素を考慮してリスト・アップされる。また、災害危
険度が高くなって或る是正指摘項目の災害予知を行う際
に、その是正指摘項目に関して状況図テーブル37に複数
の災害発生状況図(過去の災害事例)がある場合、子局
から送られてくる現場の状況の映像を見ることにより、
より相応しい状況図を選び出すことができる。このよう
にすることによって複数の作業所に対してそれぞれの作
業所に応じた災害予知情報を提供することができ、複数
の作業所に対しきめ細かな集中管理を行うことができ
る。In the calculation of disaster risk, for example, looking at the difficulty of construction among the characteristic factors of the fixed value explained above, 0.85 when the usage type is office and 0.7% when the structure type is SRC
0, if the total floor area is 4000 tsubo, 0.50, if the number of floors is 9 floors is 0.75, and if the construction period is 12 months, it is 0.85. Set. Similarly, the construction manager's history of disaster, next month's dangerous construction, pre-plan implementation status, safe construction cycle, safety management status evaluation,
For each item such as correction status history evaluation, an evaluation score is set and the evaluation score is added up. Then, when the integrated value exceeds a predetermined value (for example, when the total value exceeds 40 with respect to 100), it is determined that the disaster risk is high, and disaster prediction information is selected and output. In this case, for example, if "no work floor" and "no handrail" of the correction point are diagnosed from 2 months ago to this month, "work floor installation" should be especially careful from these situations. It corresponds to the required correction point, and by referring to message table 36, output of messages such as "The risk of a fall disaster is high from past cases. KY meetings, strengthening the implementation of inspection and correction, etc." By referring to the table 37, the disaster occurrence status diagram is output, and by referring to the worker file 38, a list of workers who have experienced a fall accident and a list of expected disaster occurrences among workers who are working at the site. Is output. For example, in the prediction of a fall disaster, if it is a steel frame construction, the expected disaster victim considers factors such as high blood pressure, low employment evaluation, low work adaptability among registered hawks. Listed up. In addition, when the disaster risk becomes high and the disaster prediction of a certain correction indication item is performed, if there are multiple disaster occurrence status diagrams (past disaster cases) in the situation chart table 37 for the correction indication item, the slave station By watching the video of the situation of the site sent from
You can select a more appropriate situation map. By doing so, it is possible to provide disaster prediction information corresponding to each work place to a plurality of work places, and it is possible to perform detailed centralized management for a plurality of work places.
以上の説明から明らかなように、本発明によれば、中央
において映像情報により複数の作業所を監視、管理する
ことができ、さらには、中央において複数の作業所に関
する種々の工事別労務実績データが簡単に得られるた
め、これを総合的に分析することにより工事・工種別適
正標準工数の設定や見積・実行予算へ反映させることが
できる。また、本発明のシステムを作業員把握のツール
として利用することにより、固定化された作業員の把
握ができるので、品質向上対策として教育の充実を図る
ことができる、コスト低減対策として、業者別労務の
需給調整と先行手配による平滑化を図ることができる、
工程管理対策として、予定工期の遅延状況に対する予
測と事前応援体制の手当を迅速に行うことができる、
安全対策として、血圧等、健康管理と災害予測に対する
的確な対応をとることができる、等工事総合管理の推進
を支援することができる。As is clear from the above description, according to the present invention, it is possible to monitor and manage a plurality of worksites based on video information in the center, and further, various work-related labor record data for each worksite in the center. Since it can be easily obtained, it can be reflected in the setting of appropriate standard man-hours for each construction / manufacturing and the estimation / execution budget by comprehensively analyzing this. Further, by using the system of the present invention as a tool for grasping workers, it is possible to grasp fixed workers, so that it is possible to enhance education as a quality improvement measure. It is possible to achieve smoothing by adjusting the supply and demand of labor and making advance arrangements.
As a process control measure, it is possible to quickly predict the delay situation of the planned construction period and pay for the advance support system.
As a safety measure, it is possible to support the promotion of general construction management, such as taking appropriate measures for health management such as blood pressure and disaster prediction.
第1図は本発明の1実施例システム構成を示す図第2図
は子局のデータ処理装置の1構成例を示す図、第3図は
工事災害予知情報システムの1構成例を示す図である。 1……中央管理装置、2と5……伝送制御部、3……入
出力装置、4……工事災害予知情報システム(SAFEシス
テム)、6……データ処理装置、7……カード・リー
ダ、8……出力装置、9……画像情報記憶装置、10……
カメラ、21……カード・リーダ、22……システム・デー
タ入力部、23……工程管理テーブル、24……工程管理情
報処理部、25……労務管理情報処理部、26……健康管理
情報処理部、31……入力装置、32……災害予知情報設定
部、33……災害危険度演算部、34……災害予知出力部、
35……災害予知情報格納バッファ、36……メッセージ・
テーブル、37……状況図テーブル、38……作業員ファイ
ル。FIG. 1 is a diagram showing a system configuration of an embodiment of the present invention. FIG. 2 is a diagram showing a configuration example of a data processing device of a slave station, and FIG. 3 is a diagram showing a configuration example of a construction disaster prediction information system. is there. 1 ... Central management unit, 2 and 5 ... Transmission control unit, 3 ... Input / output unit, 4 ... Construction disaster prediction information system (SAFE system), 6 ... Data processing unit, 7 ... Card reader, 8 ... Output device, 9 ... Image information storage device, 10 ...
Camera, 21 ... Card reader, 22 ... System data input section, 23 ... Process management table, 24 ... Process management information processing section, 25 ... Labor management information processing section, 26 ... Health management information processing Section, 31 ... input device, 32 ... disaster prediction information setting section, 33 ... disaster risk calculation section, 34 ... disaster prediction output section,
35 …… Disaster prediction information storage buffer, 36 …… Message
Table, 37 ... Status chart table, 38 ... Worker file.
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 情報処理ハンドブック(情報処理学会昭 和47年)P.11−1〜11−36「11編経営情 報システムの基礎」 エレクトロニクス 昭和58年5月号 P.37−42「光ディスク画像ファイル・シ ステム」 東芝レビューVol.36 No.3 (1981)P.250−254「画像情報ファイル 装置」 ─────────────────────────────────────────────────── ─── Continuation of the front page (56) References Information Processing Handbook (Information Processing Society of Japan, Showa 47) 11-1 to 11-36 “11 Basics of Management Information System” Electronics May 1983 issue P. 37-42 “Optical Disk Image File System” Toshiba Review Vol. 36 No. 3 (1981) P. 250-254 "Image information file device"
Claims (1)
の作業所とその作業員とを中央の親局より集中して管理
する集中管理システムであって、各子局は、作業員各自
の固有情報を記録したカードを読み取るカード・リー
ダ、作業所内を撮影するカメラ、該カメラの映像情報を
記録する映像情報記録手段、各種情報の印字/表示出力
を行う出力手段、及びカード・リーダで読み取られた固
有情報の処理を行い該処理した情報と映像情報記録手段
に記録された映像情報とを親局に送出するとともに出力
手段から前記処理した情報の出力と親局より送られてき
たメッセージその他の情報の出力とを行うデータ処理・
伝送制御手段を備え、親局は、各作業所毎に工事の内容
や条件によって評価値が固定される項目の値と工事の進
行に伴って評価値が変動する現場の安全管理状況等の項
目の値を積算して災害危険度を計算し災害危険度が所定
値より大きい場合に安全管理状況の悪い項目に関し災害
予知を行う工事災害予知情報システム、評価値の入力そ
の他の入出力を行う入出力手段、及び各子局から送られ
てきた映像情報を映像により入出力手段から出力し固有
情報を工事災害予知情報システムと入出力手段とに出力
するとともに工事災害予知情報システムからの災害予知
メッセージその他の情報を各子局に送出するデータ集中
管理・伝送制御手段を備え、作業員の入退場に際してカ
ード・リーダで作業員の携帯するカードを読み取り、工
事の進行に伴って安全管理状況等の項目を入力すること
によって、工事の進行及び現場の状況に応じた災害予知
を可能にしたことを特徴とする集中管理システム。1. A centralized management system in which a plurality of work stations are respectively set as slave stations, and the work stations of the slave stations and their workers are centrally managed from a central master station. A card reader for reading a card recording individual information of each member, a camera for photographing the inside of a work place, a video information recording means for recording video information of the camera, an output means for printing / displaying various information, and a card. The unique information read by the reader is processed, the processed information and the video information recorded in the video information recording means are sent to the master station, and the output means outputs the processed information and the master station sends the processed information. Data processing to output messages and other information
The master station is equipped with transmission control means, and the master station has items such as the safety management status at the work site where the evaluation value is fixed depending on the construction content and conditions and the evaluation value fluctuates as the construction progresses. Value is calculated to calculate the disaster risk, and when the disaster risk is higher than a predetermined value, the disaster prediction information system for predicting disasters related to items with poor safety management status, inputting evaluation values, and other input / output The image information sent from the output means and each slave station is output from the input / output means in the form of video, and the unique information is output to the construction disaster prediction information system and the input / output means, and a disaster prediction message from the construction disaster prediction information system. Equipped with data centralized management and transmission control means for sending other information to each slave station, when the worker enters and leaves, the card reader reads the card carried by the worker, and as the construction progresses Centralized management system by entering the item, such as a total management status, characterized in that to enable disaster prediction according to the situation of progression and site construction.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16911284A JPH0724063B2 (en) | 1984-08-13 | 1984-08-13 | Central management system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16911284A JPH0724063B2 (en) | 1984-08-13 | 1984-08-13 | Central management system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6148068A JPS6148068A (en) | 1986-03-08 |
| JPH0724063B2 true JPH0724063B2 (en) | 1995-03-15 |
Family
ID=15880519
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP16911284A Expired - Lifetime JPH0724063B2 (en) | 1984-08-13 | 1984-08-13 | Central management system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0724063B2 (en) |
-
1984
- 1984-08-13 JP JP16911284A patent/JPH0724063B2/en not_active Expired - Lifetime
Non-Patent Citations (3)
| Title |
|---|
| エレクトロニクス昭和58年5月号P.37−42「光ディスク画像ファイル・システム」 |
| 情報処理ハンドブック(情報処理学会昭和47年)P.11−1〜11−36「11編経営情報システムの基礎」 |
| 東芝レビューVol.36No.3(1981)P.250−254「画像情報ファイル装置」 |
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6148068A (en) | 1986-03-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7120612B2 (en) | Method and apparatus for recommending an optimum training to a trainee, and a computer product | |
| CN107545632B (en) | Integrated management system and equipment for access and visit registration | |
| JP2821227B2 (en) | Building maintenance management system | |
| JP2008204150A (en) | Business management method, business management device, storage medium, and computer program | |
| JP7295723B2 (en) | MAINTENANCE WORK PLANNING SUPPORT DEVICE AND MAINTENANCE WORK PLANNING SUPPORT METHOD | |
| JPH0724061B2 (en) | Labor safety management system | |
| JPH0724063B2 (en) | Central management system | |
| JPH0724062B2 (en) | Labor safety management device | |
| JP2517223B2 (en) | Work place management system | |
| JP2021089621A (en) | Assignment management device and assignment management system | |
| JPH0461145B2 (en) | ||
| JP2003242316A (en) | Worker placement adjustment management system | |
| JP3213893B2 (en) | Equipment management equipment at work sites | |
| JP3026119B2 (en) | Large-scale workplace management system | |
| Mitchell et al. | Estimating training requirements from job and training models | |
| Hunt Jr et al. | System to measure the use of pharmacy personnel | |
| JPH08320899A (en) | Business flow grasp method and system | |
| JP2845300B2 (en) | Building maintenance outsourcing management device | |
| JPH0797861A (en) | Construction work management system | |
| McKinnon | The Design, Implementation, and Audit of Health and Safety Management Systems | |
| Area | Bureau of Land Management | |
| JPS6370375A (en) | Work managing system | |
| JP2002032524A (en) | Method and system for health and safety management and promotion of inspection business | |
| Massie | Using total quality management in long-term care case management | |
| JPH0972092A (en) | Entrance / exit management system for construction works |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| EXPY | Cancellation because of completion of term |