JPH0724929B2 - Die casting machine Hot water supply control method - Google Patents
Die casting machine Hot water supply control methodInfo
- Publication number
- JPH0724929B2 JPH0724929B2 JP28507487A JP28507487A JPH0724929B2 JP H0724929 B2 JPH0724929 B2 JP H0724929B2 JP 28507487 A JP28507487 A JP 28507487A JP 28507487 A JP28507487 A JP 28507487A JP H0724929 B2 JPH0724929 B2 JP H0724929B2
- Authority
- JP
- Japan
- Prior art keywords
- angle
- hot water
- water supply
- pouring completion
- completion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Injection Moulding Of Plastics Or The Like (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 本発明はダイカストマシン給湯量制御方法に係り、特に
押湯効果を一定化させるとともに巣の発生防止効果が得
られるようにしたダイカストマシン給湯量制御方法に関
する。Description: TECHNICAL FIELD The present invention relates to a method for controlling the amount of hot water supplied by a die casting machine, and in particular, the amount of hot water supplied by a die casting machine that is capable of stabilizing the effect of the feeder and preventing the formation of burrs. Regarding control method.
一般に、ダイカストマシンは金型のキャビティに通じる
ランナ部に射出装置を接続し、給湯装置から供給されて
ショットスリーブに充填している溶湯をプランジャによ
って押し出し、前記キャビティに射出するようにしてい
る。射出操作は前記プランジャを後退限度位置から、最
初一定の低速度で前進させ、溶湯の注入口通過後、高速
移動させ、ショットスリーブ端面までの間隔を若干残し
て鋳込みを完了するようになっている。Generally, in a die casting machine, an injection device is connected to a runner portion that communicates with a cavity of a mold, and molten metal supplied from a hot water supply device and filling a shot sleeve is pushed out by a plunger and injected into the cavity. In the injection operation, the plunger is moved forward from the retreat limit position at a constant low speed, is moved at a high speed after passing through the molten metal injection port, and the casting is completed with a slight gap to the end surface of the shot sleeve. .
ところで、射出装置への給湯量は同一のキャビティに対
しては一定量とされるが、給湯をなすラドルの掬い量は
厳密には一定ではなく、したがって給湯量にばらつきが
生じることがある。このため、給湯量の誤差に起因して
射出装置による押湯効果が不安定となり、鋳造品の品質
安定化を図ることができなくなる問題があった。このよ
うな問題を改善するために、従来技術として、各ショッ
ト毎に射出装置のショットスリーブにおけるランナ開口
端面である分流子端位置と、プランジャの鋳込み完了位
置との間に残存する溶湯厚さ、すなわちビスケット厚み
を検出し、これが一定になるように供給溶湯量を調整制
御する方法が提案されている(特公昭59−21262)号。
これによれば、ビスケット部分がランナ部より先に凝固
したり、ショットスリーブ接触面の凝固開始が早期に行
われてプランジャの摺動抵抗が大きくなること等、押湯
効果を失わせることがない利点が得られる。By the way, the amount of hot water supplied to the injection device is constant for the same cavity, but the scooping amount of the ladle for hot water supply is not strictly constant, and therefore the amount of hot water supplied may vary. For this reason, there is a problem in that the effect of the feeder by the injection device becomes unstable due to an error in the amount of hot water supplied, and it becomes impossible to stabilize the quality of the cast product. In order to improve such a problem, as a conventional technique, a shunt end position which is a runner opening end face in the shot sleeve of the injection device for each shot, and the molten metal thickness remaining between the casting completion position of the plunger, That is, a method has been proposed in which the thickness of the biscuit is detected and the amount of molten metal supplied is adjusted and controlled so that the thickness is constant (Japanese Patent Publication No. 59-21262).
According to this, the biscuit portion does not solidify before the runner portion, the sliding resistance of the plunger increases due to the start of solidification of the shot sleeve contact surface, and the feeder effect is not lost. Benefits are obtained.
しかしながら、上記の如き方法によれば、ビスケット厚
み(=|分流子端位置−鋳込み完了位置|)の値を設定
範囲内に収まるように、給湯量の増減によって抑えてい
るが、このような給湯量の調整は同時に鋳込み完了位置
の変動を生じさせる。この結果、鋳込み完了位置とプラ
ンジャの高速移動開始指令位置との距離が変わり、特に
高速射出区間が長くなる場合には、鋳造品に巣が発生し
てしまう問題があった。これは高速射出区間が長くなる
ことによって、製品の残留ガスが増加し、巣の発生原因
となるからである。したがって、巣の少ないダイカスト
製品を鋳造するには、高速射出区間を短くした方がよい
ことは明らかであるが、前記した従来方法では、押湯効
果が得られるものの、巣の発生面での品質上の問題は依
然として残っていた。However, according to the method as described above, the value of the biscuit thickness (= | shunt end position−casting completion position |) is suppressed by increasing / decreasing the hot water supply amount so that it falls within the set range. The adjustment of the amount causes a variation of the pouring completion position at the same time. As a result, there is a problem in that the distance between the casting completion position and the high-speed movement start command position of the plunger changes, and in particular when the high-speed injection section becomes long, cavities occur in the cast product. This is because the residual gas of the product increases due to the lengthening of the high-speed injection section, which causes the formation of cavities. Therefore, in order to cast die-cast products with few cavities, it is clear that it is better to shorten the high-speed injection section, but with the above-mentioned conventional method, although the feeder effect can be obtained, the quality of the cavities on the surface The above problem still remained.
本発明は、上記従来の問題点に着目し、押湯効果と巣の
発生防止を同時に満足できるようにして鋳造品の品質向
上を図ることができるダイカストマシン給湯量制御方法
を提供することを目的とする。The present invention focuses on the above conventional problems, and an object of the present invention is to provide a die casting machine hot water supply amount control method capable of improving the quality of a cast product by simultaneously satisfying the feeder effect and the prevention of generation of burrs. And
上記目的を達成するために、本発明に係るダイカストマ
シン給湯量制御方法は、鋳造ショット毎の鋳込み完了位
置を測定し、この位置とショット毎の高速立ち上がり位
置とを二次元座標の一軸上に転写するとともに、前記高
速立ち上がり位置を通る直交軸上の定点に対する鋳込み
完了位置と高速立ち上がり位置とのなす角度を鋳込み完
了角度として算出し、当該鋳込み完了角度と予め設定さ
れている鋳込み完了設定角度との角度差が許容値を越え
た場合に前記角度差に応じて給油量を修正し高速射出区
間を一定化させることを特徴とするものである。In order to achieve the above object, the method for controlling the amount of hot water supplied by the die casting machine according to the present invention measures the pouring completion position for each casting shot, and transfers this position and the high-speed rising position for each shot onto one axis of the two-dimensional coordinate. Along with, calculate the angle formed by the pouring completion position and the high-speed rising position with respect to the fixed point on the orthogonal axis passing through the high-speed rising position as the pouring completion angle, and between the pouring completion angle and the preset pouring completion setting angle. When the angle difference exceeds the allowable value, the amount of oil supply is corrected according to the angle difference to make the high-speed injection section constant.
具体的には、高速射出区間に対応する鋳込み完了角度を
導入設定し、この角度を各ショット毎に検出し、この検
出値と予め適正値として設定されている角度と比較し、
設定値との差が許容範囲を越えたときに、給湯装置の給
湯量を自動的に修正して設定範囲内に抑え、もって高速
射出区間を一定化するようにした給湯量の制御方法とし
た。Specifically, the casting completion angle corresponding to the high-speed injection section is introduced and set, this angle is detected for each shot, and the detected value is compared with the angle set as an appropriate value in advance,
When the difference from the set value exceeds the allowable range, the hot water supply amount of the hot water supply device is automatically corrected and kept within the set range, and the high-speed injection section is thus made constant. .
〔作用〕 上記構成によれば、鋳造ショット毎の高速射出区間は高
速立ち上がり位置から鋳込み完了位置までのショットプ
ランジャのストローク量に一致する。ラドルの掬い量に
誤差があり、このため給湯量が変動した場合にはプラン
ジャの後退限度位置は一定で、ショットスリーブ容量も
一定であるので、鋳込み完了位置は変動することとな
る。このような鋳込み完了位置の変化は二次元座標の軸
上における高速立ち上がり位置との間の距離変化として
表れ、高速立ち上がり位置を通る直交軸上の定点と各位
置とを結合した線のなす角度がこれらに対応する。この
角度を鋳込み完了角度として、予め最適高速射出区間に
対応して設定されている鋳込み完了設定角度との比較を
なし、角度差が許容範囲を越えている場合にこれを修正
するように給湯ラドルの傾斜角を調整して、給湯量を補
正する。これにより、次回のショットに際しては、高速
射出区間が設定範囲内に収まり、製品への巣の発生が防
止され緻密な耐圧鋳造品が得られる。[Operation] According to the above configuration, the high-speed injection section for each casting shot matches the stroke amount of the shot plunger from the high-speed rising position to the casting completion position. There is an error in the scooping amount of the ladle. Therefore, when the hot water supply amount changes, the retracting limit position of the plunger is constant and the shot sleeve capacity is also constant, so the pouring completion position changes. Such a change in the pouring completion position appears as a change in the distance between the high-speed rising position on the axis of the two-dimensional coordinate, and the angle formed by the line connecting the fixed point on the orthogonal axis passing through the high-speed rising position and each position. Corresponding to these. This angle is used as the pouring completion angle, and is compared with the pouring completion setting angle that is set in advance for the optimum high-speed injection section, and if the angle difference exceeds the allowable range, the hot water supply ladle is corrected. Adjust the inclination angle of to correct the amount of hot water supplied. As a result, in the next shot, the high-speed injection section falls within the set range, the formation of cavities in the product is prevented, and a dense pressure-resistant cast product is obtained.
上述のような作用を行わせる本発明の原理は次のような
ものである。The principle of the present invention that causes the above-described operation is as follows.
すなわち、ダイカストマシンは、第2図に示すように、
固定盤10に固設された固定金型10aと可動盤12に固設さ
れた可動金型12aを有し、両者の接合面にキャビティ14
を形成している。固定金型10aにはキャビティ14に通じ
るランナ16が形成され、このランナ16に溶湯18を射出供
給する射出装置20が接続されている。射出装置20はプラ
ンジャ22の先端にあるピストン22aを内蔵するショット
スリーブ24を備え、ショットスリーブ24に設けられた注
入口26から供給された溶湯18を駆動装置(ショットシリ
ンダ)28により駆動されるピストン22aによって押し出
し、キャビティ14に射出充填する。ピストン22aの動作
は、図示しない制御装置により、後退限度位置から前進
し、注入口26を通過し高速立ち上がり指令位置まで低速
移動するが、この高速立ち上がり指令位置から鋳込み完
了位置まで高速移動してキャビティ14への高速射出を行
う。ピストン22aの前進移動端である鋳込み完了位置は
ランナ16が開口されているショットスリーブ24の奥端面
である分流子端位置との間に一定の距離をおいた位置と
なり、この距離がいわゆるビスケット厚さとなる。That is, the die casting machine, as shown in FIG.
A fixed mold 10a fixed to the fixed plate 10 and a movable mold 12a fixed to the movable plate 12 are provided, and a cavity 14 is formed on the joint surface between them.
Is formed. A runner 16 communicating with the cavity 14 is formed in the fixed mold 10a, and an injection device 20 for injecting and supplying the molten metal 18 is connected to the runner 16. The injection device 20 includes a shot sleeve 24 having a piston 22a at the tip of a plunger 22 and a piston driven by a drive device (shot cylinder) 28 to supply the molten metal 18 supplied from an injection port 26 provided in the shot sleeve 24. It is extruded by 22a, and the cavity 14 is injected and filled. The operation of the piston 22a moves forward from the backward limit position by the controller (not shown), moves through the injection port 26 at a low speed to the high-speed rising command position, and moves from the high-speed rising command position to the pouring completion position at high speed to move the cavity. Make a fast injection to 14. The casting completion position, which is the forward movement end of the piston 22a, is a position with a certain distance from the shunt end position, which is the deep end face of the shot sleeve 24 in which the runner 16 is opened, and this distance is the so-called biscuit thickness. It becomes
ここで、前記高速射出区間を把握するために、鋳込み完
了位置を測定し、これに基づいて第3図に示すように鋳
込み完了位置と高速立ち上がり位置とを二次元座標の一
軸上に転写したダイアグラムを作成する。すなわち、X
−Y座標の原点(0,0)を例えばピストン22aの後退限度
位置とし、X軸上に高速立ち上がり位置A、分流子端位
置Bをプロットし、これに測定した鋳込み完了位置ξを
プロットする。そして、高速立ち上がり位置A、分流子
端位置Bを通る直交軸上にL=|B−A|の長さを持つ定点
D、Cをとり、矩形ABCDを完成させる。高速立ち上がり
位置Aを通る直交軸上の定点Dと鋳込み完了位置ξとを
結ぶと、∠ADξは高速射出区間に対応する。Here, in order to grasp the high-speed injection section, a pouring completion position is measured, and based on this, a pouring completion position and a high-speed rising position are transferred onto one axis of two-dimensional coordinates as shown in FIG. To create. That is, X
The origin (0, 0) of the −Y coordinate is set as the retract limit position of the piston 22a, for example, and the high speed rising position A and the shunt end position B are plotted on the X axis, and the measured pouring completion position ξ is plotted on this. Then, fixed points D and C having a length of L = | B−A | are set on an orthogonal axis passing through the high-speed rising position A and the shunt end position B to complete the rectangle ABCD. When the fixed point D on the orthogonal axis passing through the high speed rising position A and the pouring completion position ξ are connected, ∠ADξ corresponds to the high speed injection section.
いま、この角度を鋳込み完了角度θとすると、次式が成
立する。Now, assuming that this angle is the casting completion angle θ, the following equation is established.
θ=tan-1|ξ−A|/L ……(1) したがって、上記ダイアグラムに基づいて、各ショット
毎に測定した鋳込み完了位置ξiに対応する鋳込み完了
角度θiを算出することができる。この鋳込み完了角度
θiの大きさは高速射出区間のストローク量の指標とな
り、その値が小さければ高速立ち上がり区間が短く、大
きければ長いことを表す。したがって、θiを予め設定
されている鋳込み完了設定位置ξsに対応する鋳込み完
了設定角度θsと比較することにより、高速射出区間の
変動量を把握することができる。この場合において、θ
iがθsより小さい場合には高速射出区間が短いので問
題はないが、大きい場合には高速射出区間が長くなり、
製品へのガス巻き込みによる巣発生のおそれがある。し
たがって、巣の発生防止の観点からは、θiがθsより
大きい場合を対象として給湯量を制御すればよい。θ = tan −1 | ξ−A | / L (1) Therefore, the casting completion angle θi corresponding to the casting completion position ξi measured for each shot can be calculated based on the above diagram. The magnitude of the pouring completion angle θi serves as an index of the stroke amount in the high-speed injection section, and a smaller value indicates a shorter high-speed rising section, and a larger value indicates a longer stroke. Therefore, by comparing θi with the preset pouring completion setting angle θs corresponding to the preset pouring completion setting position ξs, the variation amount in the high-speed injection section can be grasped. In this case, θ
When i is smaller than θs, there is no problem because the high-speed injection section is short, but when i is large, the high-speed injection section becomes long,
There is a risk of nest formation due to gas entrapment in the product. Therefore, from the viewpoint of preventing the formation of nests, the hot water supply amount may be controlled for the case where θi is larger than θs.
ところで、給湯量はラドルの傾斜角によって定まり、こ
れらの関係は第4図に示すように、ラドル傾斜角が増す
にしたがって給湯量が減少する線形一次式が近似的に成
立する。今、最大給湯量(g)をWMAX、WMAXに対応する
最小ラドル傾斜角(度)をΨMIN、最小給湯量(g)をW
MIN、WMINに対応する最大ラドル傾斜角(度)をΨMAX、
αをα=(WMAX−WMIN)/(ΨMAX−ΨMIN)とすると、
給湯量Wからラドル傾斜角Ψを求める式は次のようにな
る。By the way, the amount of hot water supply is determined by the inclination angle of the ladle, and as shown in FIG. 4, a linear linear equation in which the amount of hot water supply decreases as the inclination angle of the ladle increases is approximately established. Now, the maximum hot water supply amount (g) is W MAX , the minimum ladle inclination angle (degree) corresponding to W MAX is Ψ MIN , and the minimum hot water supply amount (g) is W
Ψ MAX is the maximum ladle inclination angle (degree) corresponding to MIN and W MIN .
If α is α = (W MAX −W MIN ) / (Ψ MAX −Ψ MIN ),
The formula for obtaining the ladle inclination angle Ψ from the hot water supply amount W is as follows.
Ψ=ΨMIN+(W−WMAX)×α ……(2) この(2)式から、鋳込み完了位置ξi(mm)と鋳込み
完了設定位置ξs(mm)と差分に対応する補正溶湯重量
Wc(g)からラドル補正傾斜角度Ψcを求める式は、シ
ョットスリーブ24のチップ径をR(cm)、溶湯の比重量
をρ(g/cm3)とすると、 Wc=|ξi−ξs|×πR2ρ/4×1/10 ……(3) となるので、ラドル補正傾斜角度Ψcは、 Ψc=ΨMIN+(Wc−WMAX)×α ……(4) として求めることができる。Ψ = Ψ MIN + (W−W MAX ) × α (2) From this equation (2), the weight of the molten metal corresponding to the difference between the pouring completion position ξi (mm) and the pouring completion setting position ξs (mm).
Wc = | ξi−ξs | ×, where R (cm) is the tip diameter of the shot sleeve 24 and ρ (g / cm 3 ) is the specific weight of the molten metal. Since π R 2 ρ / 4 × 1/10 (3), the Laddle corrected tilt angle Ψc can be obtained as Ψc = Ψ MIN + (Wc−W MAX ) × α (4).
しかして、鋳込み完了角度θiからラドル傾斜角度を算
出するためには、前記(3)式は、Wc=L|tanθi−tan
θs|・πR2ρ/400 ……(5) であるから、(5)式を(4)式に代入すれば、 Ψc=ΨMIN+(L|tanθi−tanθs|・πRRρ/400 −WMAX)×α ……(6) となり、これが給湯量の修正量に応じたラドルの傾斜角
修正量となる。したがって第5図に示すように、鋳込み
完了位置ξiが変動し、鋳込み完了角度θiが設定角度
θsより大きくなって許容範囲を越えた場合には、前記
(6)式に基づき、前回ラドル傾斜角に(6)式により
修正角度分を加えて給湯量を減少させることにより、増
大した高速射出区間が短くなるように修正し、ガス巻き
込みによる巣の発生を防止できることとなる。Then, in order to calculate the ladle tilt angle from the casting completion angle θi, the above equation (3) is expressed as Wc = L | tan θi−tan
θs | · πR 2 ρ / 400 because it is ... (5), by substituting the equation (5) to (4), Ψc = Ψ MIN + (L | tanθi-tanθs | · πRRρ / 400 -W MAX ) × α (6), which is the amount of correction of the tilt angle of the ladle according to the amount of correction of the hot water supply. Therefore, as shown in FIG. 5, when the pouring completion position ξi fluctuates and the pouring completion angle θi becomes larger than the set angle θs and exceeds the allowable range, the previous ladle tilt angle is calculated based on the equation (6). By adding the correction angle by the equation (6) to reduce the hot water supply amount, the increased high-speed injection section is corrected so as to be short, and it is possible to prevent the formation of cavities due to gas entrainment.
以下に、本発明に係るダイカストマシン給湯量制御方法
の実施例を第1図に基づいて、詳細に説明する。Hereinafter, an embodiment of a hot water supply amount control method for a die casting machine according to the present invention will be described in detail with reference to FIG.
第1図は実施例に係るダイカストマシン給湯量制御方法
の処理手順を示すフローチャートである。FIG. 1 is a flowchart showing a processing procedure of a hot water supply amount control method for a die casting machine according to an embodiment.
この図において、ステップ101はショットスリーブ24へ
の給湯を示し、給湯完了後はステップ102でショットシ
リンダ28を作動させてショットが開始される。In this figure, step 101 shows the hot water supply to the shot sleeve 24, and after the hot water supply is completed, the shot cylinder 28 is operated in step 102 to start the shot.
ショット開始に伴い、ステップ103で鋳込み完了位置ξ
iの測定を行う。As the shot starts, in step 103 the pouring completion position ξ
Measure i.
次いで、ステップ104で鋳込み完了位置ξiに対応する
鋳込み完了角度θiを演算する。これは前記(1)式に
基づいて行えばよい。この場合において、高速立ち上が
り位置A、分流子端位置Bは固定点として設定されてい
るので、変数ξiを検出するだけで容易に鋳込み完了角
度θiを算出できる。Next, at step 104, the pouring completion angle θi corresponding to the pouring completion position ξi is calculated. This may be done based on the above formula (1). In this case, since the high-speed rising position A and the shunt end position B are set as fixed points, the pouring completion angle θi can be easily calculated only by detecting the variable ξi.
次に、ステップ105に進み、演算された鋳込み完了角度
θiが鋳込み完了設定角度θsの設定上限θHighと設定
下限θLowとの間、すなわち設定範囲内にあるか否かを
比較判定する。この比較判定は、通常、鋳込み完了角度
θiと鋳込み完了設定角度θsとを比較し、その差が許
容範囲±ε内にあるか否かを判定することによって行わ
れる。例えば、鋳込み完了角度θiを鋳込み完了設定角
度θsと比較して、その差が±10%以内にあればOKと
し、±10%以外のときにはNGとする判定を行うようにし
ている。Then, in step 105, determines comparison between set upper limit theta H IgH complete set angle θs that computed casting completion angle θi is cast and the set lower limit theta L ow, i.e. whether it is within the set range . This comparison determination is usually performed by comparing the pouring completion angle θi and the pouring completion setting angle θs and determining whether or not the difference is within the allowable range ± ε. For example, the pouring completion angle θi is compared with the pouring completion setting angle θs, and if the difference is within ± 10%, it is determined as OK, and if it is other than ± 10%, it is determined as NG.
以上の処理を各ショット毎に行い、ステップ105の判定
結果、OK判定の場合にはステップ101に戻って連続して
鋳造作業を行い、NG判定の場合にはステップ106で不良
表示を出力し、当該ショットでの鋳造品を取り出した
後、不良品置き場に搬送させるような選別装置を作動さ
せる。また、ステップ105からのNG信号はステップ107に
出力され、給湯量の修正動作に入る。The above processing is performed for each shot, the determination result of step 105, if OK determination, returns to step 101 to continuously perform casting work, and if NG determination, outputs a defect display in step 106, After taking out the cast product in the shot, a sorting device for transporting the cast product to the defective product storage is operated. Further, the NG signal from step 105 is output to step 107, and the hot water supply amount correction operation is started.
ステップ107では、鋳込み完了位置ξiと鋳込み完了設
定位置ξsの前後関係をθに対応させ、鋳込み完了角度
θiと鋳込み完了設定角度θsの比較により判定させる
ようにしている。すなわち、θs<θi、あるいはθs
>θiの判別がなされる。この場合において、θs>θ
iのときには高速射出区間が設定範囲より短いことを示
すので射出時のガス巻き込みのおそれがないため、ステ
ップ101に戻り、給湯作業を再実行させる。しかし、θ
s<θiのときには逆にガス巻き込みのおそれがあるの
で、かかる場合にはステップ108に進み、給湯量修正を
なす。これは、前記(6)式に基づいて演算し、ラドル
の傾斜角度Ψcを求め、この角度相当分だけ傾斜角度を
減少させて給湯量を増加するように給湯装置に修正指令
を出力させることで実行される。In step 107, the front-rear relationship between the pouring completion position ξi and the pouring completion setting position ξs is made to correspond to θ, and judgment is made by comparing the pouring completion angle θi and the pouring completion setting angle θs. That is, θs <θi, or θs
> Θi is determined. In this case, θs> θ
When i indicates that the high-speed injection section is shorter than the set range, there is no possibility of gas entrainment during injection, and therefore the process returns to step 101 and the hot water supply operation is re-executed. However, θ
On the contrary, when s <θi, there is a risk of gas entrapment, and in such a case, the routine proceeds to step 108, where the hot water supply amount is corrected. This is calculated based on the equation (6), the tilt angle ψc of the ladle is obtained, and the hot water supply device outputs a correction command so as to decrease the tilt angle by an amount corresponding to this angle and increase the hot water supply amount. To be executed.
給湯装置としては、公知の装置を用いればよく、ラドル
の傾斜角度によって溶湯の掬い量が第4図に示す特性を
示す一般的な構造の装置を用いればよい。As the hot water supply device, a known device may be used, and a device having a general structure in which the scooping amount of the molten metal exhibits the characteristics shown in FIG. 4 depending on the inclination angle of the ladle may be used.
上述のような実施例では、特に、ビスケット厚さと高速
射出区間との大小関係の判断を単純な角度要素で処理す
ることができる。また、鋳込み完了角度の取り得る角度
範囲は0〜45度であり、ラドル傾斜角度の範囲が20〜60
度に比較して、ラドル傾斜角度を鋳込み完了角度と角度
定数の和で処理することも可能となる効果が得られる。In the embodiment as described above, in particular, the determination of the magnitude relationship between the biscuit thickness and the high-speed injection section can be processed by a simple angle element. Moreover, the angle range of the casting completion angle is 0 to 45 degrees, and the range of the ladle tilt angle is 20 to 60 degrees.
Compared with the degree, it is possible to process the ladle tilt angle by the sum of the casting completion angle and the angle constant.
以上説明したように、本発明によれば、高速立ち上がり
位置に対する鋳込み完了位置の変動を鋳込み完了角度と
いう概念を導入し、有意な最小高速射出区間に対応する
鋳込み完了設定角度との比較で、高速射出区間が有意な
最小高速射出区間となるように給湯量を修正するように
したので、簡易な制御によって押湯効果とともに巣の発
生のない緻密な鋳造品を成形することができる。As described above, according to the present invention, the concept of the casting completion angle is introduced as the variation of the casting completion position with respect to the high-speed rising position, and in comparison with the casting completion setting angle corresponding to the significant minimum high-speed injection section, the high speed Since the amount of hot water supplied is adjusted so that the injection section becomes the significant minimum high-speed injection section, it is possible to mold a dense cast product that does not have a riser effect and cavities by simple control.
第1図は実施例に係るダイカストマシン給湯量制御方法
の処理手順を示すフローチャート、第2図はダイカスト
マシンの動作を説明する断面図、第3図は鋳込み完了角
度を示すダイアグラム、第4図はラドル傾斜角度と給湯
量の関係を示す特性図、第5図はラドル傾斜角度と鋳込
み完了角度の関係を示す説明図である。 20……射出装置、22……プランジャ、24……ショットス
リーブ。FIG. 1 is a flowchart showing a processing procedure of a hot water supply amount control method for a die casting machine according to an embodiment, FIG. 2 is a sectional view for explaining the operation of the die casting machine, FIG. 3 is a diagram showing a pouring completion angle, and FIG. FIG. 5 is a characteristic diagram showing the relationship between the ladle tilt angle and the amount of hot water supplied, and FIG. 5 is an explanatory diagram showing the relationship between the ladle tilt angle and the pouring completion angle. 20 …… Injection device, 22 …… Plunger, 24 …… Shot sleeve.
Claims (1)
て、鋳造ショット毎の鋳込み完了位置を測定し、この位
置とショット毎の高速立ち上がり位置とを二次元座標の
一軸上に転写するとともに、前記高速立ち上がり位置を
通る直交軸上の定点に対する鋳込み完了位置と高速立ち
上がり位置とのなす角度を鋳込み完了角度として算出
し、当該鋳込み完了角度と予め設定されている鋳込み完
了設定角度との角度差が許容値を越えた場合に前記角度
差に応じて給湯量を修正し高速射出区間を一定化させる
ことを特徴とするダイカストマシンの給湯量制御方法。1. A hot water supply amount control method for a die casting machine, wherein a pouring completion position for each casting shot is measured, and this position and the high speed rising position for each shot are transferred onto one axis of two-dimensional coordinates, and the high speed rising is performed. The angle between the pouring completion position and the high-speed rising position with respect to the fixed point on the orthogonal axis passing through the position is calculated as the pouring completion angle, and the angle difference between the pouring completion angle and the preset pouring completion setting angle has an allowable value. A hot water supply amount control method for a die casting machine, characterized in that, when it exceeds, the hot water supply amount is corrected according to the angle difference to make the high-speed injection section constant.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP28507487A JPH0724929B2 (en) | 1987-11-11 | 1987-11-11 | Die casting machine Hot water supply control method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP28507487A JPH0724929B2 (en) | 1987-11-11 | 1987-11-11 | Die casting machine Hot water supply control method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH01127166A JPH01127166A (en) | 1989-05-19 |
| JPH0724929B2 true JPH0724929B2 (en) | 1995-03-22 |
Family
ID=17686810
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP28507487A Expired - Fee Related JPH0724929B2 (en) | 1987-11-11 | 1987-11-11 | Die casting machine Hot water supply control method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0724929B2 (en) |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5921262B2 (en) | 2012-03-08 | 2016-05-24 | 三菱電機株式会社 | Broadcast program recording device |
-
1987
- 1987-11-11 JP JP28507487A patent/JPH0724929B2/en not_active Expired - Fee Related
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5921262B2 (en) | 2012-03-08 | 2016-05-24 | 三菱電機株式会社 | Broadcast program recording device |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH01127166A (en) | 1989-05-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| TW200426017A (en) | Method of controlling injection molding machine | |
| JP4504800B2 (en) | Metering control method for injection molding machine and injection molding machine | |
| JP3212237B2 (en) | Automatic setting method of injection molding speed condition of injection molding machine | |
| JP2020131241A (en) | Die-casting machine, die-casting machine with dies, die-casting machine control device, and die-casting method | |
| US5232714A (en) | In-line screw type injection molding machine | |
| JP2022059111A (en) | Ladle water heater | |
| JPH0724929B2 (en) | Die casting machine Hot water supply control method | |
| JP7324576B2 (en) | die casting machine | |
| JPH084912B2 (en) | Injection control method of die casting machine | |
| JP2008207235A (en) | Die casting apparatus and die casting method | |
| JPH036891B2 (en) | ||
| JPH01154858A (en) | Method for controlling injection in die casting machine | |
| JP2881952B2 (en) | Hot water supply control method for die casting machine | |
| JPS5922617B2 (en) | Shot plunger speed control method for die casting machine | |
| JPS62296949A (en) | Control method for supplying molten metal in die-casting machine | |
| JP2000190060A (en) | Injection control method of molten metal in die casting machine | |
| JPS5921262B2 (en) | How to control hot water supply amount for die casting machine | |
| JPS6139175B2 (en) | ||
| JP3951910B2 (en) | Control method of multilayer injection molding apparatus | |
| CN110947930A (en) | Correction Method of Injection Condition of Die Casting Machine Based on Molten Supply | |
| JPH11129297A (en) | Control method and control device for injection process of injection molding machine | |
| JP3880442B2 (en) | Control method of screw forward speed in injection molding machine | |
| JPH0310019Y2 (en) | ||
| JP4002563B2 (en) | Pressure feedback control system and control method thereof | |
| JPH0994859A (en) | Control method of mold clamping pressure in injection compression molding |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |