JPH0733875B2 - Manufacturing and installation method of vertical tube unit - Google Patents
[go: Go Back, main page]

JPH0733875B2 - Manufacturing and installation method of vertical tube unit - Google Patents

Manufacturing and installation method of vertical tube unit

Info

Publication number
JPH0733875B2
JPH0733875B2 JP16349392A JP16349392A JPH0733875B2 JP H0733875 B2 JPH0733875 B2 JP H0733875B2 JP 16349392 A JP16349392 A JP 16349392A JP 16349392 A JP16349392 A JP 16349392A JP H0733875 B2 JPH0733875 B2 JP H0733875B2
Authority
JP
Japan
Prior art keywords
pipe
vertical
floor
unit
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP16349392A
Other languages
Japanese (ja)
Other versions
JPH05332475A (en
Inventor
一則 雨森
義人 尾崎
淳 泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Benkan Corp
Original Assignee
Benkan Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Benkan Corp filed Critical Benkan Corp
Priority to JP16349392A priority Critical patent/JPH0733875B2/en
Publication of JPH05332475A publication Critical patent/JPH05332475A/en
Publication of JPH0733875B2 publication Critical patent/JPH0733875B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、竪管ユニットの製作据
付方法に係り、殊に竪管を貫通支持するスリーブの製作
組付及び竪管の支持に特長を有するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of manufacturing and installing a vertical tube unit, and is particularly characterized in manufacturing and assembling a sleeve for penetrating and supporting the vertical tube and supporting the vertical tube.

【0002】[0002]

【従来の技術】従来、竪管ユニットの竪管を貫通支持す
るスリーブは、図12に示すようにフレーム31に連結
プレート37を介して固定した管状スリーブ35であ
り、この管状スリーブ35の上端面と略同一レベルに水
平なバンド受けプレート38を支持板39にて設け、こ
れに2つ割りにした竪管固定バンド40或いは防振バン
ドを取付けできるようにしてあって、これにより竪管ユ
ニットの運搬吊り込み時に竪管2が固定支持される(先
行技術として実開平2−18988号公報がある)。
2. Description of the Related Art Conventionally, a sleeve for penetrating and supporting a vertical tube of a vertical tube unit is a tubular sleeve 35 fixed to a frame 31 via a connecting plate 37 as shown in FIG. 12, and an upper end surface of the tubular sleeve 35. A horizontal band receiving plate 38 is provided on the support plate 39 at substantially the same level as the above, and a vertical tube fixing band 40 or a vibration isolating band divided into two can be attached to the supporting plate 39. The vertical tube 2 is fixedly supported during transportation and suspension (as a prior art, there is Japanese Utility Model Laid-Open No. 2-18988).

【0003】ところで、上記の竪管ユニットに於ける管
状スリーブ35では、スリーブ径よりも大きい径の管継
手を備えた竪管や枝管部の長い竪管は貫通させることが
できなかった。また防振バンドの取付台である水平なバ
ンド受けプレート38が竪管固定バンド40の取付台と
兼用となっていたため、竪管ユニットを建築現場に搬送
し、鉄骨構造体の所定の開口部に吊り込んで据付けた
後、竪管固定バンド40を取外し、防振バンドを取替え
なければならなかった。
By the way, in the tubular sleeve 35 in the above vertical tube unit, a vertical tube provided with a pipe joint having a diameter larger than the sleeve diameter or a vertical tube having a long branch pipe portion cannot be penetrated. Further, since the horizontal band receiving plate 38, which is the mounting base for the vibration-proof band, was also used as the mounting base for the vertical pipe fixing band 40, the vertical pipe unit was transported to the construction site and was installed in the predetermined opening portion of the steel frame structure. After hanging and installing, the vertical tube fixing band 40 had to be removed and the vibration proof band had to be replaced.

【0004】[0004]

【発明が解決しようとする課題】そこで本発明は、スリ
ーブ径よりも大きい径の管継手を備えた竪管や枝管部の
長い竪管でも貫通支持することができ、また防振ゴムも
スリーブ内に予め取付けることができる竪管ユニットの
製作据付方法を提供しようとするものである。
SUMMARY OF THE INVENTION Therefore, according to the present invention, a vertical pipe having a pipe joint having a diameter larger than the sleeve diameter or a vertical pipe having a long branch pipe portion can be penetrated and supported, and a vibration-proof rubber can also be used for the sleeve. It is intended to provide a method of manufacturing and installing a vertical tube unit that can be pre-installed inside.

【0005】[0005]

【課題を解決するための手段】上記課題を解決するため
の本発明の竪管ユニットの製作据付方法は、鋼管又はロ
ール成形した鋼板を2つ割りすると共に各々その両側端
にフランジを取付けて割型スリーブを形成し、次にこの
割型スリーブの内周面に防振ゴムを取付け、次いで一方
の割型スリーブを工場で連結アングルを介して複数階の
ユニットフレームに於ける各階の外枠フレームに夫々横
向きに取付け、次に一方の割型スリーブのフランジ外面
に配管固定金具を取付けてこの配管固定金具に横向きに
竪管をUボルトにて挾持固定し、次いで他方の割型スリ
ーブを前記一方の割型スリーブにフランジ接合し、次に
各階の外枠フレームに竪管を挾んで床板を取付けて竪管
ユニットを製作し、次いでこの竪管ユニットを建築現場
に搬送し、鉄骨構造体の所定の開口部に吊り込んで各階
の外枠フレームを梁上に載架し、然る後前記Uボルト及
び配管固定金具を取外すことを特徴とするものである。
A vertical pipe unit manufacturing and installing method according to the present invention for solving the above problems is to divide a steel pipe or a roll-formed steel plate into two parts and attach flanges to both side ends of the steel pipe or roll-formed steel plate. Form a mold sleeve, then attach a vibration-proof rubber to the inner peripheral surface of this split sleeve, and then connect one split sleeve at the factory through a connecting angle to the outer frame of each floor in a unit frame of multiple floors. Sideways, and then a pipe fixing metal fitting is attached to the outer surface of the flange of one split sleeve, and the vertical pipe is clamped and fixed laterally to the pipe fixing metal fixture by U bolts, and then the other split sleeve is attached to the one side. We made a vertical pipe unit by flange-joining to the split sleeve of No. 1, then installed a vertical pipe on the outer frame of each floor and attached a floor plate, and then transported this vertical pipe unit to the construction site to construct a steel frame structure. Crowded hanging predetermined body opening and rests the floor of the outer frame on the beam, it is characterized in removing the thereafter the U-bolt and the pipe fixing bracket.

【0006】[0006]

【作用】上記のように本発明の竪管ユニットの製作据付
方法では、予め分割スリーブを製作するので、これの内
周面に容易に防振ゴムを取付けることができ、また工場
でのユニットフレームにおける各階の外枠フレームに対
するスリーブの組付けが容易であり、さらに径の大きい
管継手を備えた竪管や枝管部の長い竪管でも横向きにス
リーブ内に容易にセットすることができ、また竪管をセ
ットしたスリーブ内に耐火断熱材を充填すれば、工場で
防火区画貫通処理を容易に行うことができる。その上、
本発明の竪管ユニットの製作据付方法では、各階の外枠
フレームに竪管を挾んで床板を取付けて竪管ユニットを
製作するので、著しく製作能率が向上する。そしてこの
竪管ユニットを建築現場に搬送し、鉄骨構造体の所定の
開口部に吊り込んで各階の外枠フレームを梁上に載架す
ることにより、竪管ユニットの据付が完了するので、現
場での作業は竪管をスリーブ内にセットした際に用いた
Uボルト及び配管固定金具を取外すだけで良い。
As described above, according to the method for manufacturing and installing the vertical tube unit of the present invention, the divided sleeve is manufactured in advance, so that the rubber vibration isolator can be easily attached to the inner peripheral surface of the divided sleeve, and the unit frame in the factory is also installed. It is easy to assemble the sleeve to the outer frame of each floor, and even vertical pipes with pipe joints with large diameter or long vertical pipes can be easily set sideways in the sleeve. By filling the sleeve in which the vertical pipe is set with the fireproof heat insulating material, it is possible to easily perform the fireproof compartment penetration process at the factory. Moreover,
In the method for manufacturing and installing the vertical tube unit of the present invention, since the vertical tube is sandwiched between the outer frame of each floor and the floor plate is attached to manufacture the vertical tube unit, the manufacturing efficiency is remarkably improved. Then, by transporting this vertical pipe unit to the construction site, suspending it in the predetermined opening of the steel structure and mounting the outer frame of each floor on the beam, the installation of the vertical pipe unit is completed, so the site For this work, all that is necessary is to remove the U bolt and the pipe fixing metal used when the vertical pipe was set in the sleeve.

【0007】[0007]

【実施例】本発明の竪管ユニットの製作据付方法の一実
施例を図によって説明すると、図1のaに示す鋼管1又
は図1のbに示すロール成形した鋼板1′を2つ割りす
ると共に各々その両側端に図2に示すようにフランジ2
を取付けて割型スリーブ3,3′を形成した。この割型
スリーブ3,3′の各々のフランジ2には同じ位置にボ
ルト挿通孔4を4個穿設した。次にこの割型スリーブ
3,3′の内周面に、図3に示すように防振ゴム5を直
接ビス6にて取付けた。この防振ゴム5を取付けた一対
の割型スリーブ3,3′を多数用意し、一方の割型スリ
ーブ3のフランジ2の下端に外側方に水平に突出する連
結アングル7(図4参照)を取付け、この割型スリーブ
3を工場で図4に示すように横向きに製作する複数階の
ユニットフレーム8に於ける各階の一方の外枠フレーム
9即ち外方に溝を向けた溝型のフレームに、連結アング
ル7の一端を溶接して夫々横向きに取付けた。次に夫々
一方の割型スリーブ3のフランジ2の外面上端部に、図
5に示すように上向きのアングル材10の水平辺の両端
部下側に夫々に直角にアングル材11を下向きに且つ外
向きにして水平辺の一端を接合し、その水平辺の他端に
下側に直角折曲げた取付板12を有しその取付板12に
ボルト孔を有する配管固定金具14を、取付板12にて
ボルトナットにて結合した。そしてこの配管固定金具1
4に、図6に示すように竪管15をUボルト16にて挾
持固定した。次いで図7に示すように他方の割型スリー
ブ3′を前記一方の割型スリーブ3に、フランジ2同志
を突き合わせてボルトナットにて接合した。この時、配
管固定金具14の取付板12のボルトナットを一旦取外
し、改めて割型スリーブ3,3′のフランジ2と取付板
12とをボルトナットにて結合した。そしてこの組合わ
せた割型スリーブ3,3′内に、図8に示すように耐火
断熱材17を充填した。次に各階の外枠フレーム8に取
付けた割型スリーブ3の連結アングル7の他端に、図9
に示すように外方に溝を向けた溝型フレームよりなる他
方の外枠フレーム9′を溶接し、さらに竪管15を挾ん
で貫通孔18を有する床板19,19′を外枠フレーム
9,9′に溶接して、竪管ユニット20を製作した。次
いでこの竪管ユニット20を建築現場に搬送し、鉄骨構
造体の所定の開口部に吊り込んで、図10に示すように
各階の外枠フレーム9,9′を鉄骨構造体の梁21上に
載架した。然る後図11に示すように前記Uボルト16
及び配管固定金具14を取外して、竪管ユニット20の
製作据付を完了した。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a method for manufacturing and installing a vertical pipe unit of the present invention will be described with reference to the drawings. The steel pipe 1 shown in FIG. 1A or the roll-formed steel plate 1'shown in FIG. 1B is divided into two parts. With flanges 2 on each side as shown in FIG.
Was attached to form split mold sleeves 3 and 3 '. Each of the flanges 2 of the split sleeves 3 and 3'has four bolt insertion holes 4 formed at the same position. Next, the anti-vibration rubber 5 was directly attached to the inner peripheral surfaces of the split sleeves 3 and 3'with screws 6 as shown in FIG. A large number of a pair of split mold sleeves 3 and 3'on which the anti-vibration rubber 5 is attached are prepared, and a connecting angle 7 (see FIG. 4) horizontally projecting outward is provided at the lower end of the flange 2 of one split mold sleeve 3. The split sleeve 3 is attached to one of the outer frame frames 9 on each floor of the unit frames 8 of a plurality of floors which are horizontally produced in the factory as shown in FIG. , One end of the connecting angle 7 was welded and attached sideways. Next, at the upper end of the outer surface of the flange 2 of each split sleeve 3, as shown in FIG. 5, the angle members 11 are directed downward and outward at right angles to the lower ends of the horizontal sides of the angle members 10 facing upward. , One end of the horizontal side is joined, and the other end of the horizontal side has a mounting plate 12 bent downward at a right angle, and a pipe fixing metal fitting 14 having a bolt hole in the mounting plate 12 is attached to the mounting plate 12. It was connected with bolts and nuts. And this pipe fixing metal fitting 1
As shown in FIG. 6, the vertical tube 15 was clamped and fixed to the No. 4 by the U bolt 16. Next, as shown in FIG. 7, the other split mold sleeve 3'was joined to the one split mold sleeve 3 with their flanges 2 butted against each other with bolts and nuts. At this time, the bolts and nuts of the mounting plate 12 of the pipe fixing metal fitting 14 were once removed, and the flanges 2 of the split sleeves 3 and 3'and the mounting plate 12 were joined again with the bolts and nuts. Then, in the combined split sleeves 3 and 3 ', a fireproof heat insulating material 17 was filled as shown in FIG. Next, at the other end of the connecting angle 7 of the split sleeve 3 attached to the outer frame 8 on each floor,
The other outer frame 9'consisting of a groove-shaped frame with a groove facing outward is welded, and the vertical pipe 15 is sandwiched between the floor plates 19, 19 'having the through holes 18 to form the outer frame 9, Vertical pipe unit 20 was manufactured by welding to 9 '. Next, this vertical pipe unit 20 is transported to a construction site and suspended in a predetermined opening of the steel frame structure, and the outer frame frames 9 and 9'of each floor are placed on the beam 21 of the steel frame structure as shown in FIG. I put it up. Then, as shown in FIG. 11, the U bolt 16
And the pipe fixing metal fitting 14 was removed, and the manufacturing and installation of the vertical pipe unit 20 was completed.

【0008】この実施例の竪管ユニットの製作据付方法
に於いては、上記のように予め分割スリーブ3,3′を
製作したので、これの内周面に容易に防振ゴム5を取付
けることができた。また工場でのユニットフレーム8に
於ける各階の外枠フレーム9に対する分割スリーブ3,
3′の組付けが容易であり、さらに径の大きい管継手を
備えた竪管15や枝管部の長い竪管15でも横向きに分
割スリーブ3,3′内に容易にセットすることができ
た。また竪管15をセットした分割スリーブ3,3′内
に、予め耐火断熱材17を充填したので、工場で防火区
画貫通処理を容易に行うことができた。その上各階の外
枠フレーム9,9′に、竪管15を挾んで床板19,1
9′を取付けて竪管ユニット20を製作したので、著し
く製作能率が向上した。そしてこの竪管ユニット20を
建築現場に搬送し、鉄骨構造体の所定の開口部に吊り込
んで各階の外枠フレーム9,9′を梁21上に載架した
ことにより、竪管ユニット20の据付が完了したので、
現場での作業は竪管15を分割スリーブ9内にセットし
た際に用いたUボルト16及び配管固定金具14を取外
すだけで据付後の煩雑な防振工事や防火区画貫通処理工
事は不要となった。
In the method of manufacturing and installing the vertical tube unit of this embodiment, since the split sleeves 3 and 3'are manufactured in advance as described above, the vibration isolating rubber 5 can be easily attached to the inner peripheral surface of the split sleeves 3 and 3 '. I was able to. The split sleeves 3 for the outer frame 9 on each floor in the unit frame 8 at the factory
It was easy to assemble the 3 ', and even the vertical pipe 15 having a pipe joint with a large diameter or the vertical pipe 15 having a long branch pipe portion could be easily set laterally in the split sleeves 3, 3'. . Further, since the fireproof heat insulating material 17 is filled in advance in the divided sleeves 3 and 3'in which the vertical pipes 15 are set, it is possible to easily carry out the fireproof compartment penetration process in the factory. On top of that, the vertical pipes 15 are sandwiched between the outer frames 9 and 9'of each floor, and the floorboards 19
Since the vertical tube unit 20 is manufactured by attaching 9 ', the manufacturing efficiency is remarkably improved. Then, the vertical pipe unit 20 is transported to a construction site, suspended in a predetermined opening portion of the steel frame structure, and the outer frame frames 9 and 9 ′ of each floor are mounted on the beam 21. Since the installation is complete,
For on-site work, the U-bolt 16 and the pipe fixing bracket 14 used when the vertical pipe 15 is set in the split sleeve 9 are simply removed to eliminate the need for complicated anti-vibration work and fire-blocking penetration work after installation. It was

【0009】尚、上記実施例では、外枠フレーム9′を
あとから分割スリーブ3の連結アングル7の他端に溶接
しているが、外枠フレーム9と連結アングルの一端との
溶接と同時に外枠フレーム9′を連結アングル7の他端
と溶接しても良い。この場合、竪管15の分割スリーブ
3,3′内への取付け後の床板19,19′の外枠フレ
ーム9,9′への取付けは、タッピングビス等を用いる
と、溶接火花による竪管15の損傷等を解消できる。
Although the outer frame 9'is later welded to the other end of the connecting angle 7 of the split sleeve 3 in the above-described embodiment, the outer frame 9'and the other end of the connecting angle are simultaneously welded to each other. The frame 9 ′ may be welded to the other end of the connecting angle 7. In this case, when the floor plates 19, 19 'are attached to the outer frame frames 9, 9'after the vertical pipes 15 are attached in the split sleeves 3, 3', tapping screws or the like may be used to attach the vertical pipes 15 by welding sparks. The damage etc. of can be eliminated.

【0010】また、上記実施例では工場で組合わせた分
割スリーブ3,3′内に耐火断熱材17を充填したが、
建築現場で鉄骨構造体の所定の開口部に竪管ユニット2
0を吊り込んで据付けた後、耐火断熱材17を組合せた
分割スリーブ3,3′内に充填しても良い。
In the above embodiment, the split sleeves 3 and 3'combined at the factory are filled with the fireproof heat insulating material 17,
Vertical pipe unit 2 at the predetermined opening of the steel structure at the construction site
After suspending and installing 0, it may be filled in the divided sleeves 3 and 3'combined with the fireproof heat insulating material 17.

【0011】[0011]

【発明の効果】以上の通り本発明の竪管ユニットの製作
据付方法に於いては、スリーブ径よりも大きい径の管継
手を備えた竪管や枝管部の長い竪管等各種形状の竪管
を、ユニット組立前に先行して製作でき、この製作した
各種形状の竪管は、工場でユニットフレームの各階の外
枠フレームに取付けた分割スリーブ内に容易にセットす
ることができ、また防振ゴムもスリーブ内に予め取付け
ることができて、竪管ユニットは工場で能率よく製作さ
れる。また建築現場では鉄骨構造体の所定の開口部に吊
り込んで梁上に載架することにより据付けられ、据付後
の煩雑な防振工事は不要となり、しかも工場でスリーブ
内に耐火断熱材を充填すれば、据付後の防火区画貫通処
理工事は不要となって、据付後の工事が一層減少するの
で、著しく施工性が向上する。
As described above, according to the method for manufacturing and installing the vertical pipe unit of the present invention, the vertical pipe having various shapes such as the vertical pipe having the pipe joint having the diameter larger than the sleeve diameter and the vertical pipe having the long branch pipe portion is formed. The pipes can be manufactured in advance before the unit is assembled, and the various types of vertical pipes thus manufactured can be easily set in the split sleeve attached to the outer frame of each floor of the unit frame at the factory, The vibrating rubber can also be pre-installed in the sleeve, and the vertical tube unit is efficiently manufactured at the factory. At the construction site, it is installed by suspending it in a predetermined opening of the steel frame structure and mounting it on the beam, eliminating the need for complicated anti-vibration work after installation, and filling the sleeve with fireproof insulation material at the factory. If this is done, the work for penetrating the fire compartment after installation is unnecessary, and the work after installation will be further reduced, so that the workability will be significantly improved.

【図面の簡単な説明】[Brief description of drawings]

【図1〜図11】本発明の竪管ユニットの製作据付方法
の一実施例の工程を示す図である。
1 to 11 are views showing steps of an embodiment of a method for manufacturing and installing a vertical tube unit of the present invention.

【図12】従来の竪管ユニットの竪管を貫通支持する部
分を示す要部斜視図である。
FIG. 12 is a perspective view of an essential part showing a portion of a conventional vertical tube unit that supports a vertical tube through.

【符号の説明】[Explanation of symbols]

1 鋼管 1′ ロール成形した鋼板 2 フランジ 3,3′ 分割スリーブ 5 防振ゴム 7 連結アングル 8 ユニットフレーム 9,9′ 外枠フレーム 14 配管固定金具 15 竪管 16 Uボルト 17 防火断熱材 19,19′ 床板 20 竪管ユニット 21 鉄骨構造体の梁 1 Steel Pipe 1'Rolled Steel Plate 2 Flange 3,3 'Split Sleeve 5 Anti-vibration Rubber 7 Connection Angle 8 Unit Frame 9,9' Outer Frame 14 Pipe Fixing Fitting 15 Vertical Pipe 16 U Bolt 17 Fire Insulation Insulation 19,19 ′ Floor board 20 Vertical tube unit 21 Steel structure beam

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 鋼管又はロール成形した鋼板を2つ割り
すると共に各々その両側端にフランジを取付けて割型ス
リーブを形成し、次にこの割型スリーブの内周面に防振
ゴムを取付け、次いで一方の割型スリーブを工場で連結
アングルを介して複数階のユニットフレームに於ける各
階の外枠フレームに夫々横向きに取付け、次に一方の割
型スリーブのフランジ外面に配管固定金具を取付けてこ
の配管固定金具に横向きに竪管をUボルトにて挾持固定
し、次いで他方の割型スリーブを前記の一方の割型スリ
ーブにフランジ接合し、次に各階の外枠フレームに竪管
を挾んで床板を取付け、次いでこの竪管ユニットを建築
現場に搬送し、鉄骨構造体の所定の開口部に吊り込んで
各階の外枠フレームを梁上に載架し、然る後前記Uボル
ト及び配管固定金具を取外すことを特徴とする竪管ユニ
ットの製作据付方法。
1. A split pipe is formed by dividing a steel pipe or a roll-formed steel plate into two and attaching flanges to both side ends thereof, and then attaching a vibration-proof rubber to the inner peripheral surface of the split sleeve. Next, one split sleeve is attached sideways to the outer frame of each floor in the unit frame of multiple floors via the connecting angle at the factory, and then the pipe fixing metal fitting is attached to the flange outer surface of one split sleeve. A vertical pipe is sandwiched and fixed to this pipe fixing bracket sideways by U bolts, then the other split sleeve is flange-joined to the one split sleeve, and then the vertical pipe is sandwiched in the outer frame of each floor. Install the floor board, then transport this vertical pipe unit to the construction site, hang it on the predetermined opening of the steel frame structure and mount the outer frame of each floor on the beam, then fix the U bolts and pipes Metal fittings A method for manufacturing and installing a vertical tube unit characterized by removing the vertical tube unit.
JP16349392A 1992-05-29 1992-05-29 Manufacturing and installation method of vertical tube unit Expired - Lifetime JPH0733875B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16349392A JPH0733875B2 (en) 1992-05-29 1992-05-29 Manufacturing and installation method of vertical tube unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16349392A JPH0733875B2 (en) 1992-05-29 1992-05-29 Manufacturing and installation method of vertical tube unit

Publications (2)

Publication Number Publication Date
JPH05332475A JPH05332475A (en) 1993-12-14
JPH0733875B2 true JPH0733875B2 (en) 1995-04-12

Family

ID=15774915

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16349392A Expired - Lifetime JPH0733875B2 (en) 1992-05-29 1992-05-29 Manufacturing and installation method of vertical tube unit

Country Status (1)

Country Link
JP (1) JPH0733875B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6320824B2 (en) 2014-03-31 2018-05-09 株式会社東芝 Gas supply pipe and gas processing apparatus
CN104048108B (en) * 2014-06-18 2016-02-03 广州市水电设备安装有限公司 A kind of pipeline support frame

Also Published As

Publication number Publication date
JPH05332475A (en) 1993-12-14

Similar Documents

Publication Publication Date Title
KR101711614B1 (en) Connection structure of steel column and steel beam
JP7190159B2 (en) Supporting device and construction method using it
JPH0733875B2 (en) Manufacturing and installation method of vertical tube unit
JP3630731B2 (en) Boiler installation method
JP2010032027A (en) Vibration-resistant piping support
JPS6246762Y2 (en)
CN111173176B (en) Connecting node of assembled steel structure building external wall board and mounting method
CN220770360U (en) Suspended pipeline fixing device
JPH07116781B2 (en) External wall concrete panel installation method
CN214368522U (en) Horizontal tube shock absorber
JP2001336674A (en) Supporting method for extension piping
JP3112767B2 (en) Suspension tool for scaffold erection and scaffold erection method
JP7202849B2 (en) Mounting structure for unit room
JPH0414561A (en) Installing method for floor board for placing concrete for vertical pipe unit of building
JP3607810B2 (en) Support device for lower end of outer wall panel
KR20260022047A (en) Insulation Support Bracket
JPH0412296Y2 (en)
JP3607811B2 (en) Support device for outer wall panel and support bracket used for it
JPH04149339A (en) Attachment structure for concrete panel
JPS624133Y2 (en)
JP3010695U (en) Aluminum rail suspension structure and storage rail structure for moving walls
JP4079613B2 (en) Building structure
JP2026052454A (en) Ductwork installation method and vertical attachment
JPH042267Y2 (en)
JP2997022B2 (en) Plumbing method and plumbing equipment structure