Protective method for structures constructed on sand ground that tends to liquefy

Info

Publication number
JPH0742692B2
JPH0742692B2 JP63063613A JP6361388A JPH0742692B2 JP H0742692 B2 JPH0742692 B2 JP H0742692B2 JP 63063613 A JP63063613 A JP 63063613A JP 6361388 A JP6361388 A JP 6361388A JP H0742692 B2 JPH0742692 B2 JP H0742692B2
Authority
JP
Japan
Prior art keywords
ground
foundation
sand ground
gravel layer
sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP63063613A
Other languages
Japanese (ja)
Other versions
JPH01239218A (en
Inventor
忠男 杉本
茂希 土山
誠 早川
洋三 後藤
忠男 小出
保 遠藤
誠 鳥井原
譲嗣 江尻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Chubu Electric Power Co Inc
Original Assignee
Obayashi Corp
Chubu Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp, Chubu Electric Power Co Inc filed Critical Obayashi Corp
Priority to JP63063613A priority Critical patent/JPH0742692B2/en
Publication of JPH01239218A publication Critical patent/JPH01239218A/en
Publication of JPH0742692B2 publication Critical patent/JPH0742692B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

【発明の詳細な説明】 《産業上の利用分野》 この発明は、液状化しやすい砂地盤上に構築された構造
物の防護工法に関し、特に、構造物に沈下や浮上がりを
防止する工法に関する。
TECHNICAL FIELD The present invention relates to a protection method for a structure constructed on sand ground that is likely to be liquefied, and more particularly to a method for preventing the structure from sinking or rising.

《従来の技術》 建築構造物を砂地盤上に構築すると、地震時に地盤内に
発生する過剰間隙水圧の上昇により、砂地盤が液状化し
て、これらの構造物が沈下したり浮上がる被害が過去の
地震でしばしば発生している。
<Conventional technology> When building structures are built on sand ground, excess pore water pressure rises in the ground at the time of an earthquake, and the sand ground is liquefied, causing damage to these structures that sink or float. Often occur in earthquakes.

このような問題に対する対策としては、地盤改良や、グ
ラベルドレーンあるいは地下水位低下工法があるが、立
地条件の制約や長期の維持管理上の問題があって、実際
にはあまり採用されていない。
As measures against such problems, there are ground improvement, gravel drains and groundwater level lowering construction methods, but they are not often used because of restrictions on site conditions and problems in long-term maintenance.

そこで、このような問題を解決する方法として、例え
ば、特開昭58−127823号公報に開示されているような液
状化防止構造がある。
Then, as a method for solving such a problem, for example, there is a liquefaction prevention structure as disclosed in JP-A-58-127823.

しかし、この公報に開示されている構造を具体的に構造
物の防護に適用するには以下に説明する問題があった。
However, there is a problem described below when the structure disclosed in this publication is specifically applied to the protection of the structure.

《発明が解決しようとする問題点》 すなわち、上記公報の液状化防止構造では、構造物を支
える基礎地盤内に、透水コンクリート柱の外周に砂利,
細石,鉱滓その他の材料による透水壁を造成したドレー
ン柱を所定本数打設し、このドレーン柱により過剰間隙
水圧の上昇を防止するものであるが、構造物の下方にこ
のようなドレーン柱を打設することは、施工の困難性が
あるとともに、工費もかさむという問題があった。
<< Problems to be Solved by the Invention >> That is, in the liquefaction prevention structure of the above publication, gravel is formed on the outer periphery of the permeable concrete column in the foundation ground supporting the structure.
A certain number of drain columns are constructed by permeable walls made of fine stones, slag, and other materials, and the drain columns prevent the increase of excess pore water pressure. The installation is not only difficult to construct, but also expensive to construct.

また、構造物の下方にドレーン柱を設けた構造では、地
盤が液状化したときにドレーン柱中を上昇する水の圧力
により、構造物が浮上がるという問題もあった。
Further, in the structure in which the drain pillar is provided below the structure, there is a problem that the structure floats due to the pressure of water rising in the drain pillar when the ground is liquefied.

この発明はこのような従来の問題点に鑑みてなされたも
のであり、その目的とするところは、構造物の沈下や浮
上がりが防止できる施工が容易でかつ経済的な液状化し
やすい砂地盤上に構築された構造物の防護工法を提供す
ることにある。
The present invention has been made in view of such conventional problems, and an object of the present invention is to easily and economically construct a sand ground that can prevent the sinking or rising of a structure and can be liquefied easily. The purpose is to provide a protection method for the structures constructed in.

《問題点を解決するための手段》 上記目的を達成するために、この発明は、液状化しやす
い砂地盤上に構築された構造物の地中基礎の下方の水平
方向に地中基礎の面積に相当する面積を有して敷石工を
兼ねた礫層を形成するとともに、この礫層から前記地中
基礎内を通って水平方向に延びる1本または複数本の排
水管を設置し、前記砂地盤に生じる過剰間隙水を前記礫
層で集水した後、これを前記排水管から地上に自然排水
することを特徴とする。
<< Means for Solving Problems >> In order to achieve the above-mentioned object, the present invention is directed to the area of the ground foundation in the horizontal direction below the ground foundation of the structure constructed on the sand ground that is easily liquefied. While forming a gravel layer that has a corresponding area and doubles as paving masonry, install one or more drainage pipes that extend horizontally from this gravel layer through the underground foundation, and the sand ground The excessive pore water generated in 1) is collected in the gravel layer and then naturally drained from the drain pipe to the ground.

《作用》 上記構成の防護工法によれば、砂地盤に地震力が作用し
て、間隙水圧が上昇すると、過剰な間隙水は礫層に集め
られた後、構造物の地中基礎に埋設された水平方向に延
びる排水管から地上に迅速に排水されるので、地中基礎
下の地盤において間隙水圧の上昇と液状化が抑制され構
造物の沈下や浮上がりが効果的に防止される。
<Operation> According to the protection method with the above configuration, when seismic force acts on the sand ground and the pore water pressure rises, excess pore water is collected in the gravel layer and then buried in the underground foundation of the structure. Since it is quickly drained to the ground from the horizontally extending drain pipe, the rise of pore water pressure and liquefaction are suppressed in the ground under the ground foundation, and the subsidence and uplift of the structure are effectively prevented.

《実施例》 以下、この発明の好適な実施例について添付図面を参照
にして詳細に説明する。
<Example> Hereinafter, a preferred example of the present invention will be described in detail with reference to the accompanying drawings.

第1図はこの発明にかかる液状化しやすい砂地盤上に構
築される構造物の防護工法の一実施例を示している。
FIG. 1 shows an embodiment of a method for protecting a structure constructed on sand ground which is easily liquefied according to the present invention.

同図に示す構造物10は、液状化しやすい砂地盤12上に位
置し、その基礎14が地表から若干堀下げられた地中に設
けられている。
The structure 10 shown in the figure is located on a sand ground 12 that is easily liquefied, and its foundation 14 is provided in the ground slightly dug from the surface of the ground.

防護工法の施工は、構造物10の構築前に施工され、ま
ず、構造物10の基礎14の下方に敷石工を兼ねる所定の厚
みを有する礫層16が形成される。
The construction of the protective construction method is performed before the construction of the structure 10, and first, the gravel layer 16 having a predetermined thickness which also serves as paving stone is formed below the foundation 14 of the structure 10.

礫層16は、所定の大きさを有する礫が用いられ、これを
構築される基礎14の面積に相当する大きさに敷きつめ
る。
As the gravel layer 16, gravel having a predetermined size is used, and the gravel layer 16 is spread over a size corresponding to the area of the foundation 14 to be constructed.

このようにして礫層16が形成されると、その上方に基礎
14を構築し、基礎14上に構造物10の側壁18、スラブ20な
どを構築して構造物10が構築される。
When the gravel layer 16 is formed in this manner, the foundation is formed above it.
The structure 10 is constructed by constructing 14 and constructing the side wall 18, the slab 20, etc. of the structure 10 on the foundation 14.

そして、基礎14の構築中に、その内部に水平方向の延び
る1本または複数本の排水管22a〜22cが設置される。
Then, during construction of the foundation 14, one or a plurality of drain pipes 22a to 22c extending in the horizontal direction are installed therein.

この実施例では、中空パイプ状の3本の排水管22a〜c
が設置され、それぞれの排水管22a〜cは、一端が礫層1
6に位置し、他端は地上に設けられた雨水の排水マス24
に開口している。
In this embodiment, three hollow pipe-shaped drain pipes 22a to 22c are used.
Is installed, and one end of each drainage pipe 22a-c is a gravel layer 1
Located at 6, the other end is a rainwater drainage mass 24 provided above ground.
It is open to.

さて、以上のように構成された防護工法では、砂地盤12
に地震力が作用して、間隙水圧が上昇すると、過剰な間
隙水は礫層16に集められた後、構造物10の基礎14内に埋
設され水平方向にのびる排水管22a〜cから排水マス24
に迅速に排水されるので、地中基礎14下の地盤において
間隙水圧の上昇と液状化とが抑制され構造物10の沈下や
浮上がりが効果的に防止される。
Now, with the protection method constructed as above, the sand ground 12
When the pore water pressure rises due to the seismic force acting on the ground, excess pore water is collected in the gravel layer 16 and then buried in the foundation 14 of the structure 10 and drained from the drain pipes 22a to 22c extending in the horizontal direction. twenty four
Since the water is quickly drained, the rise of pore water pressure and liquefaction in the ground below the underground foundation 14 are suppressed, and the subsidence and uplift of the structure 10 are effectively prevented.

《発明の効果》 以上実施例で説明したように、この発明にかかる液状化
しやすい砂地盤上に構築された構造物の防護工法によれ
ば、液状化しやすい砂地盤上に構築された構造物の地中
基礎の下方の水平方向に地中基礎の面積に相当する面積
を有して敷石工を兼ねた礫層を形成するとともに、この
礫層から前記地中基礎内を通って水平方向に延びる1本
または複数本の排水管を設置し、前記砂地盤に生じる過
剰間隙水を前記礫層で集水した後、これを前記排水管か
ら地上に自然排水するので、地中基礎下の地盤において
間隙水圧の上昇に伴なう液状化が緩和消滅され、構造物
の沈下や浮上がりが防止される。
<< Effects of the Invention >> As described in the above embodiments, according to the method for protecting a structure constructed on the sand ground that is liquified easily according to the present invention, the structure constructed on the sand ground that is easily liquefied Form a gravel layer that has an area equivalent to the area of the underground foundation in the horizontal direction below the underground foundation and also serves as paving stone, and extends horizontally from this gravel layer through the underground foundation. Since one or more drainage pipes are installed and excess pore water generated in the sand ground is collected in the gravel layer, this is naturally drained to the ground from the drainage pipe, so that in the ground below the ground foundation. Liquefaction associated with the increase of pore water pressure is relaxed and eliminated, and the subsidence and uplift of the structure are prevented.

また、防護工法は、構造物の基礎の下方に敷石工を兼ね
た礫層を形成し、この礫層からほぼ水平方向に延びる1
本または複数本の排水管を設置するだけなので、施工が
簡単に行え、経済的な面でも有利になる。
In the protection method, a gravel layer that doubles as paving stone is formed below the foundation of the structure, and extends almost horizontally from this gravel layer.
Since only one or a plurality of drainage pipes are installed, the construction can be performed easily, which is advantageous in terms of economy.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明方法の一実施例を示す断面図である。 10……構造物 12……砂地盤 14……基礎 16……礫層 22a〜c……排水管 FIG. 1 is a sectional view showing an embodiment of the method of the present invention. 10 …… Structure 12 …… Sand ground 14 …… Foundation 16 …… Gravel layer 22a ~ c …… Drainage pipe

───────────────────────────────────────────────────── フロントページの続き (72)発明者 土山 茂希 愛知県名古屋市緑区大高町字北関山20番地 の1 中部電力株式会社総合技術研究所内 (72)発明者 早川 誠 愛知県名古屋市緑区大高町字北関山20番地 の1 中部電力株式会社総合技術研究所内 (72)発明者 後藤 洋三 東京都杉並区久我山5―30―13―101 (72)発明者 小出 忠男 埼玉県狭山市水野468―30 (72)発明者 遠藤 保 神奈川県横浜市緑区あざみ野3―1―1― 404 (72)発明者 鳥井原 誠 埼玉県入間郡日高町武蔵台5―28―9 (72)発明者 江尻 譲嗣 東京都清瀬市下清戸4―640 (56)参考文献 特開 昭55−142815(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Shigeki Tsuchiyama 1 No. 20 Kitakanyama, Otaka-cho, Midori-ku, Nagoya-shi, Aichi Chubu Electric Power Co., Inc. Research Institute (72) Inventor Makoto Hayakawa Nagoya, Aichi 20-1 Kitakanyama, Otakamachi, Midori-ku Chubu Electric Power Co., Inc. Research Institute (72) Inventor Yozo Goto 5-30-13-101 Kugayama, Suginami-ku, Tokyo (72) Inventor Tadao Koide Sayama, Saitama Prefecture 468-30 Mizuno, Ichino (72) Inventor, Ho Ho Endo 3-1-4-1-404, Azamino, Midori-ku, Yokohama, Kanagawa Prefecture (72) Makoto Toriihara 5-28-9, Musashidai, Hidaka-cho, Iruma-gun, Saitama Prefecture (72) ) Inventor Joji Ejiri 4-640 Shimoseido, Kiyose City, Tokyo (56) Reference JP-A-55-142815 (JP, A)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】液状化しやすい砂地盤上に構築された構造
物の地中基礎の下方の水平方向に該地中基礎の面積に相
当する面積を有して敷石工を兼ねた礫層を形成するとと
もに、この礫層から前記地中基礎内を通って水平方向に
延びる1本または複数本の排水管を設置し、前記砂地盤
に生じる過剰間隙水を前記礫層で集水した後、これを前
記排水管から地上に自然排水することを特徴とする液状
化しやすい砂地盤上に構築された構造物の防護工法。
1. A gravel layer that doubles as a masonry is formed in a horizontal direction below a ground foundation of a structure constructed on a sand ground that is easily liquefied and has an area corresponding to the area of the ground foundation. At the same time, one or a plurality of drain pipes extending horizontally from the gravel layer through the underground foundation are installed, and excess pore water generated in the sand ground is collected by the gravel layer. A method for protecting a structure constructed on sand ground that is easily liquefied, characterized in that the water is naturally drained from the drainage pipe to the ground.
JP63063613A 1988-03-18 1988-03-18 Protective method for structures constructed on sand ground that tends to liquefy Expired - Fee Related JPH0742692B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63063613A JPH0742692B2 (en) 1988-03-18 1988-03-18 Protective method for structures constructed on sand ground that tends to liquefy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63063613A JPH0742692B2 (en) 1988-03-18 1988-03-18 Protective method for structures constructed on sand ground that tends to liquefy

Publications (2)

Publication Number Publication Date
JPH01239218A JPH01239218A (en) 1989-09-25
JPH0742692B2 true JPH0742692B2 (en) 1995-05-10

Family

ID=13234329

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63063613A Expired - Fee Related JPH0742692B2 (en) 1988-03-18 1988-03-18 Protective method for structures constructed on sand ground that tends to liquefy

Country Status (1)

Country Link
JP (1) JPH0742692B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4800119B2 (en) * 2006-06-12 2011-10-26 クボタシーアイ株式会社 Anti-floating structure for underground objects

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55142815A (en) * 1979-04-24 1980-11-07 Shimizu Constr Co Ltd Liquefaction preventing method for sandy ground

Also Published As

Publication number Publication date
JPH01239218A (en) 1989-09-25

Similar Documents

Publication Publication Date Title
Tokimatsu et al. Building damage associated with geotechnical problems in the 2011 Tohoku Pacific Earthquake
US12565752B2 (en) Drainage pressure relief anti-floating system suitable for weakly permeable soft stratum
CN110397050B (en) Beam-anchor type light drainage retaining wall and construction method thereof
Tokimatsu et al. Geotechnical problems in the 2011 Tohoku Pacific earthquakes
JPH06983B2 (en) Protective method of underground structure in sand ground that is easily liquefied
RU2024691C1 (en) Method for protecting bridge pier against freezing swelling
JPH0742692B2 (en) Protective method for structures constructed on sand ground that tends to liquefy
JP2814898B2 (en) Underground storage facility
RU2057848C1 (en) Building or construction erected on swelled soils
CN106948311A (en) A kind of penetrating staged reinforced concrete frame flood control structure of landscape
RU2081246C1 (en) Method for providing seismic insulation of building foundation
Hartal et al. Tiberias
JPH08302661A (en) Mat constructing method for prevention of sand spout
JP2612763B2 (en) Basic structure of structure
JPH03256889A (en) Water storage tank
CN112302678A (en) Deformation control construction process for shallow tunnel of underpass building
RU2552741C2 (en) Foundation under column grid
Jain et al. Geotechnical damage due to bihar earthquake of august 1988
KR100631362B1 (en) Dependant basement wall supported to the protecting structure
JPH0649991B2 (en) Floating prevention method for underground structures in sand ground that tends to liquefy
JP2813835B2 (en) Earthquake countermeasure construction method of underground structure installed in liquefied ground under pavement
JP2524537B2 (en) Foundation structure of underground structure
CN210421109U (en) Foundation pit supporting device
JPH086337B2 (en) Foundation construction method and foundation pile
JP2524536B2 (en) Foundation structure of underground structure

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees