Load sorting device

Info

Publication number
JPH0757643B2
JPH0757643B2 JP14903087A JP14903087A JPH0757643B2 JP H0757643 B2 JPH0757643 B2 JP H0757643B2 JP 14903087 A JP14903087 A JP 14903087A JP 14903087 A JP14903087 A JP 14903087A JP H0757643 B2 JPH0757643 B2 JP H0757643B2
Authority
JP
Japan
Prior art keywords
load
lifter
lifters
loads
conveyor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP14903087A
Other languages
Japanese (ja)
Other versions
JPS63315406A (en
Inventor
道即 川口
則昭 浜口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP14903087A priority Critical patent/JPH0757643B2/en
Publication of JPS63315406A publication Critical patent/JPS63315406A/en
Publication of JPH0757643B2 publication Critical patent/JPH0757643B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Discharge Of Articles From Conveyors (AREA)
  • Warehouses Or Storage Devices (AREA)
  • Control Of Conveyors (AREA)
  • Intermediate Stations On Conveyors (AREA)
  • Branching, Merging, And Special Transfer Between Conveyors (AREA)
  • Attitude Control For Articles On Conveyors (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は無作為の順序で並べられた荷を希望する順序に
並べ換える装置に関するものであり、特に倉庫の出庫装
置として好適である。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to an apparatus for rearranging loads arranged in a random order in a desired order, and is particularly suitable as a delivery apparatus for a warehouse.

〔従来の技術〕[Conventional technology]

各種製品の配送センタ等において自動倉庫が多く用いら
れている。自動倉庫は、多数の荷の格納棚を有する立体
格納棚と、この立体格納棚に沿って走行し、格納棚と入
出庫口との間で荷を搬送するスタッカクレーン、この入
出庫口とトラック等との間を接続するコンベヤ等からな
る。(特開昭60−128101号公報) 荷を出庫する場合について説明すると、出庫指示に基づ
きスタッカクレーンは格納棚から荷を取出し、出庫口に
出庫する。この荷はコンベヤ等で搬送され、フォークリ
フト等でトラック等に積込まれる。
Automated warehouses are often used in distribution centers for various products. An automated warehouse is a three-dimensional storage rack having a large number of storage shelves, a stacker crane that travels along the three-dimensional storage shelves, and transports loads between the storage shelves and the loading / unloading ports. Etc. Consists of a conveyor and so on. (Japanese Patent Application Laid-Open No. 60-128101) Explaining the case of unloading a load, the stacker crane unloads the load from the storage shelf based on the shipping instruction and outputs it to the shipping port. This load is conveyed by a conveyor or the like and loaded on a truck or the like by a forklift or the like.

トラックに荷を積込む場合、トラックから荷を降す順序
を考えて積込むことが必要である。例えば、複数の店舗
に荷を配送するトラックである場合において、先ず、X
店にA,B,Cの荷を配送し、次にY店にB,C,Dの荷を配送す
る場合には、トラックの荷降し口側にX店用の荷を、そ
の奥にY店用の荷を積込むことが必要である。即ち、一
般に、荷降しとは逆の順序で積込むことが必要である。
また、同一場所に全ての荷を輸送する場合であっても、
輸送先の作業内容,保管内容の点から荷降しの順序を考
えた積込みが必要な場合がある。
When loading a truck, it is necessary to consider the order of unloading the truck. For example, in the case of a truck that delivers loads to multiple stores, first, X
When delivering the A, B, C loads to the store and then the B, C, D loads to the Y store, place the X store load on the unloading side of the truck and the It is necessary to load a load for Y shop. That is, it is generally necessary to load in the reverse order of unloading.
In addition, even when all the cargo is transported to the same place,
It may be necessary to carry out loading considering the order of unloading from the viewpoint of work contents and storage contents at the destination.

この場合、立体格納棚から荷をスタッカクレーンを用い
て出庫させる場合、トラックからの荷降しとは逆の順序
で出庫させれば良い。しかし、このようにすれば、周知
の如く一組の荷を出庫するのに極めて多大な時間がかか
る。
In this case, when the load is unloaded from the three-dimensional storage shelf using the stacker crane, the load may be unloaded in the reverse order of the unloading from the truck. However, in this way, as is well known, it takes an extremely long time to unload a set of loads.

〔発明が解決しようとする問題点〕[Problems to be solved by the invention]

このため、立体格納棚からはランダムに出庫させ立体格
納棚の出庫口等の荷の供給部とトラックへの積込み場所
等の荷の被供給部との間に荷の並べ換えを行う装置を設
ければ、この並べ換え装置で荷の順序を要求された順序
とすることができる。
For this reason, there is provided a device for randomly unloading the three-dimensional storage shelves and rearranging the loads between the load supply section such as the exit of the three-dimensional storage shelf and the load receiving section such as the loading place on the truck. For example, the order of the loads can be set in the requested order by the sorting device.

この並べ換え装置は、荷を搬送するコンベヤラインと、
該コンベヤラインに沿って設けられ、コンベヤライン上
の荷を上方に持ち上げる油圧リフタとからなるものであ
る。
This rearrangement device has a conveyor line for carrying loads,
And a hydraulic lifter which is provided along the conveyor line and lifts a load on the conveyor line upward.

例えば、供給部のA,B,C,Dの四つの荷をA,B,C,Dの順序で
被供給部に供給する場合、荷の供給部はこの四つの荷を
供給(例えば出庫)しやすい順序で供給する。このた
め、コンベヤラインには、B,D,A,Cの順序で搬送されて
くる。先頭のBの荷は先頭から2番目のリフタで上昇さ
せ、次のDの荷は最後尾(先頭から4番目)のリフタで
上昇させ、3番目のAの荷は先頭から4番目,2番目の荷
の下方を通って先頭(1番目)の位置で停止させるか、
又はそのまま搬送し、最後尾のCの荷は3番目のリフタ
で上昇させる。これによって、荷は先頭からA,B,C,Dの
順序で並んだことになる。次に、このリフタの荷をコン
ベヤラインに下降させて被供給部に供給するものであ
る。
For example, when supplying four loads A, B, C, D from the supply unit to the supplied unit in the order A, B, C, D, the load supply unit supplies these four loads (for example, shipping). Supply in easy order. Therefore, B, D, A, and C are conveyed to the conveyor line in this order. The top B load is lifted by the second lifter from the top, the next D load is lifted by the last (fourth from the top) lifter, and the third A load is the fourth and second lifters from the top. Or stop at the top (first) position under the load of
Or, it is conveyed as it is, and the load of the last C is lifted by the third lifter. As a result, the loads are arranged in the order of A, B, C, D from the top. Next, the load of this lifter is lowered to the conveyor line and supplied to the supply target portion.

ここで、リフタの数が三つあるとした場合、リフタを駆
動する(荷を上昇させる)油圧ポンプの能力は前記三つ
のリフタを同時に駆動する能力のあることが望ましい。
しかしそのようにすると、油圧ポンプが大きくなり、高
価になる。
If there are three lifters, it is desirable that the hydraulic pumps that drive the lifters (raise the load) have the ability to drive the three lifters at the same time.
However, doing so makes the hydraulic pump bulky and expensive.

そこで、油圧ポンプの能力は同時に二つのリフタしか駆
動できないようにすることが考えられる。この場合、実
質的に同一時間帯を三つのリフタの上昇要求があった場
合、上昇要求順に同時に二つのリフタを駆動することも
考えられる。しかし、このようにすると、全体の荷の並
べ換えに多大な時間を必要とする。
Therefore, it is conceivable that the hydraulic pump is capable of driving only two lifters at the same time. In this case, if three lifters are requested to rise in substantially the same time zone, it is possible to drive two lifters at the same time in the order of raising requests. However, this would require a great deal of time to rearrange the entire load.

本発明はこの新規な課題に基づきなされたもので、その
目的は全ての荷の並べ換えを短時間で行えるようにする
ことにある。
The present invention has been made based on this novel problem, and an object thereof is to make it possible to rearrange all loads in a short time.

〔問題点を解決するための手段〕[Means for solving problems]

本発明は、同時に上昇運転の可能なリフタの数を全ての
リフタよりも少く設けたものにおいて、コンベヤライン
の搬送方向の上流側のリフタが下流側のリフタよりも上
昇動作の優先順位を高く設け、同時に上昇要求のあった
リフタの数が所定数よりも多い場合は、優先順位の高い
方から前記所定数のリフタを選択し、この選択したリフ
タに上昇指令を与えるようにしたものである。
In the present invention, the number of lifters that can be simultaneously lifted is set to be smaller than that of all lifters, and the lifter on the upstream side in the conveying direction of the conveyor line is set to have a higher priority for the lift operation than the lifters on the downstream side. At the same time, if the number of lifters that have been requested to be lifted is larger than a predetermined number, the predetermined number of lifters are selected from the higher priority, and a lift command is given to the selected lifters.

〔作用〕[Action]

優先順位の高いリフタ(即ち、上流側のリフタ)を早く
上昇させるようにしているので、この上昇運転を終了し
た後にはより上流側の荷を下流側に供給する時間帯に下
流側のリフタの上昇運転を行うことができるので、並べ
換えを短時間に行えるようになる。
Since the lifter with the higher priority (that is, the lifter on the upstream side) is raised earlier, after the lifting operation is finished, the lifter on the downstream side is supplied during the time zone when the load on the upstream side is supplied to the downstream side. Since the ascending operation can be performed, the rearrangement can be performed in a short time.

〔実 施 例〕〔Example〕

以下、本発明の一実施例を第1図〜第8図により説明す
る。本実施例は立体格納棚の荷をスタッカクレーンで出
庫し、トラックに積込む場合の例である。
An embodiment of the present invention will be described below with reference to FIGS. The present embodiment is an example in which the load of the three-dimensional storage rack is unloaded by a stacker crane and loaded on a truck.

第3図において、トラック1にはA〜Jの10個の荷2を
5個×2列の状態で載せている。トラック1は後側から
荷降しをするとする。荷A〜Jは図に示す位置に載せる
必要があるとする。並べ換え装置30は5個×2列の一組
の荷を一時期に作ることができるものである。
In FIG. 3, ten loads 2 of A to J are placed on the truck 1 in a state of 5 × 2 rows. It is assumed that truck 1 is unloaded from the rear side. It is assumed that the loads A to J need to be placed at the positions shown in the figure. The rearrangement device 30 can make a set of 5 pieces × 2 rows at a time.

倉庫はスタッカクレーン3とその両側の立体格納棚5と
からなるものを一組として複数組並設している。スタッ
カクレーン3は二組のフォーク装置を備え、出庫口6に
二つの荷2を一度に出庫することができる。二組のフォ
ーク装置は水平方向に並列に設けている。
A plurality of warehouses are provided side by side, each including a stacker crane 3 and three-dimensional storage shelves 5 on both sides thereof. The stacker crane 3 includes two sets of fork devices, and can load two loads 2 into the shipping port 6 at one time. The two sets of fork devices are provided in parallel in the horizontal direction.

出庫口6の二つの荷2は一つの台車8に載せられ、コン
ベヤからなるバッファ20に供給される。台車8は循環路
9を循環するものであり、各出庫口6,バッファ20の上流
端の位置で停止する。出庫口6、および台車8の上面に
はコンベヤを備えている。台車8は走行方向に並列に二
つの荷2を載せている。
The two loads 2 at the delivery port 6 are placed on one carriage 8 and supplied to a buffer 20 composed of a conveyor. The dolly 8 circulates in the circulation path 9 and stops at the positions of the respective outlets 6 and the upstream end of the buffer 20. A conveyor is provided on the upper surface of the delivery port 6 and the dolly 8. The carriage 8 carries two loads 2 in parallel in the traveling direction.

バッファ20は2列のコンベヤからなるものであり、それ
ぞれ単独で運転できる。各列のバッファ20は5個の荷2
を載せることができる。つまり、トラック1台分の荷を
滞留できるものである。各列の荷2の間には隙間があ
る。このような荷の停止手段は公知である。列方向の荷
2の間には隙間がある。各列のバッファ20は並べ換え装
置30に1個ずつ荷2を供給する。
The buffer 20 consists of two rows of conveyors, each of which can be operated independently. The buffer 20 in each row has 5 loads 2
Can be placed. That is, the load for one truck can be retained. There is a gap between the loads 2 in each row. Such load stopping means are known. There is a gap between the loads 2 in the row direction. The buffers 20 in each row supply the loads 2 to the sorting device 30 one by one.

2列のバッファ20を区別する必要があるときは、図にお
いて上方の列のバッファ20を20aとし、図において下方
の列のバッファを20bと称する。
When it is necessary to distinguish the two columns of buffers 20, the upper column buffer 20 is referred to as 20a in the figure, and the lower column buffer 20 is referred to as 20b in the figure.

バッファ20と台車8の停止位置11との間には台車8の荷
を各列20a,20bに区分して供給するための仕分け装置25
を設置している。
A sorting device 25 is provided between the buffer 20 and the stop position 11 of the truck 8 to divide the load of the truck 8 into each row 20a, 20b.
Has been installed.

仕分け装置25は、停止位置11とバッファ20aを接続する
X方向の第1のコンベヤと、このコンベヤに並列であっ
てバッファ20bに接続したX方向の第2のコンベヤと、
二つのX方向のコンベヤを接続するY方向のコンベヤと
からなる。Y方向のコンベヤは二つのX方向のコンベヤ
に対して上下動自在である。第1のコンベヤは二つの荷
を載せることができる。このようむ仕分け装置は基本的
に公知である。
The sorting device 25 includes a first conveyor in the X direction that connects the stop position 11 and the buffer 20a, and a second conveyor in the X direction that is parallel to the conveyor and connected to the buffer 20b.
It consists of a Y-direction conveyor connecting two X-direction conveyors. The Y-direction conveyor is vertically movable with respect to the two X-direction conveyors. The first conveyor can carry two loads. Such a sorting device is basically known.

並べ換え装置30はバッファ20に接続している。並べ換え
装置30は図において上下に2列の装置からなる。上下の
列を区別する必要があるときは、上方の列の並べ換え装
置30を30aとし、下方の列の並べ換え装置30を30bとす
る。
The rearrangement device 30 is connected to the buffer 20. The rearrangement device 30 is composed of two rows of devices in the figure. When it is necessary to distinguish the upper and lower rows, the rearrangement apparatus 30 in the upper row is set to 30a and the rearrangement apparatus 30 in the lower row is set to 30b.

各列の並べ換え装置30は、荷を搬送するコンベヤライン
31と、コンベヤライン31上の荷を上昇させるリフタ33と
からなる。リフタ33で荷を持上げた状態で、その下方を
荷が通過できる。コンベヤライン31はコンベヤ上に荷を
載せて搬送するものである。コンベヤライン31は5個の
荷を載せることができる、5箇所の停止位置を有する。
このような荷の停止手段は公知である。停止位置に停止
した荷の前後の間には隙間がある。リフタ33は先頭の停
止位置を除いた2番目から5番目のそれぞれの停止位置
に設置している。各リフタ33は単独で動作可能である。
The sorting device 30 in each row is a conveyor line that conveys loads.
31 and a lifter 33 for raising the load on the conveyor line 31. With the load lifted by the lifter 33, the load can pass under the load. The conveyor line 31 is for carrying a load on a conveyor. The conveyor line 31 has five stop positions capable of carrying five loads.
Such load stopping means are known. There is a gap between the front and back of the load stopped at the stop position. The lifter 33 is installed at each of the second to fifth stop positions except the first stop position. Each lifter 33 can operate independently.

リフタ33で持上げた位置および先頭の位置が荷の滞留部
である。リフタ33で持上げた位置は退避部といえる。
The position lifted by the lifter 33 and the position at the beginning are the load retaining portions. It can be said that the position lifted by the lifter 33 is the retracting part.

並べ換え装置30aと30bは図において上下で対称であり、
各列の荷の間には隙間がある。
The rearrangement devices 30a and 30b are vertically symmetrical in the figure,
There is a gap between the loads in each row.

並べ換え装置30で並べ換えられた一組の荷はコンベヤ42
を介してトラック1への移載部のコンベヤ45に搬送され
る。
The set of loads sorted by the sorting device 30 is conveyed by the conveyor 42.
And is conveyed to the conveyor 45 of the transfer section on the truck 1.

トラック1に荷を載せたとき、前後の荷の間の隙間、2
列の荷の間の隙間を無くしたい場合には、コンベヤ42又
はコンベヤ45でこの作業を行う。先頭の荷をストッパに
当てて移動しないようにした状態で、コンベヤを駆動し
空転させれば、前後の隙間を無くすることができる。荷
を載せた状態で一方の列のコンベヤを他方の列のコンベ
ヤ側に移動すれば、2列の間の隙間を無くすことができ
る。
When loading a load on truck 1, the gap between the front and rear loads, 2
This is done on conveyor 42 or conveyor 45 if it is desired to eliminate the gaps between the loads in the row. If the conveyor is driven to idle while the top load is applied to the stopper so as not to move, the front and rear gaps can be eliminated. If the conveyor in one row is moved to the conveyor side in the other row with a load placed, the gap between the two rows can be eliminated.

コンベヤ45の一組の荷は公知のトラックローダ48でトラ
ック1に一度に載せられる。荷の下部にはトラックロー
ダ48のフォークの入る空間を設けている。
A set of loads of conveyors 45 are loaded onto truck 1 at a time by a known truck loader 48. A space for the fork of the truck loader 48 is provided under the load.

上方の列の並べ換え装置30aの構成の詳細を第4図〜第
8図により説明する。
Details of the arrangement of the rearrangement device 30a in the upper row will be described with reference to FIGS.

コンベヤライン31は2列一組のチェンコンベヤからな
る。コンベヤライン31は下流側から上流側に向けて31a,
31b,31cの三つに分割されている。即ち、(先頭(1番
目)の停止位置のチェンコンベヤ31a、2番目と3番目
の停止位置のチェンコンベヤ31b、4番目と5番目の停
止位置のチェンコンベヤ31cとからなり、それぞれ単独
で運転可能である。2番目〜5番目の停止位置のコンベ
ヤは二つの停止位置で設け、駆動用のモータ等を少くし
ている。各停止位置には荷の有無を検出するセンサや、
荷の移動を停止させるためにコンベヤから上下動するス
トッパーを備える。これら停止位置に荷を停止させるた
めの構成は公知である。
The conveyor line 31 is made up of two chains of chain conveyors. Conveyor line 31 runs from downstream to upstream 31a,
It is divided into three parts 31b and 31c. That is, it consists of a chain conveyor 31a at the first (first) stop position, a chain conveyor 31b at the second and third stop positions, and a chain conveyor 31c at the fourth and fifth stop positions, each of which can be operated independently. The conveyors at the second to fifth stop positions are provided at two stop positions, and the number of drive motors is reduced. Each stop position has a sensor for detecting the presence or absence of a load,
It has a stopper that moves up and down from the conveyor to stop the movement of the load. A configuration for stopping the load at these stop positions is known.

リフタ33側の2番目から5番目の各停止位置のチェンコ
ンベヤの中央部は第7図に示す如くリフタ33のアーム37
が上下動できるよう切断している。この切断部はチェン
で連結している。
As shown in FIG. 7, the central portion of the chain conveyor at the second to fifth stop positions on the lifter 33 side is the arm 37 of the lifter 33.
Is cut so that it can move up and down. The cuts are connected by chains.

リフタ33は、立設した四角形のフレーム34に沿って上下
動する昇降体35と、フレーム34と昇降体35との間に設置
したシリンダ装置36とからなる。昇降体35には水平方向
に1本のアーム37を突出させている。アーム37の先端の
上面には荷を載せる座38を設置している。座38は2列の
チェンコンベヤ31の間を昇降できる。座38はブラケット
38aを介してアーム37に固定されている。
The lifter 33 includes an elevating body 35 that moves up and down along an upright rectangular frame 34, and a cylinder device 36 installed between the frame 34 and the elevating body 35. One arm 37 is horizontally projected from the elevating body 35. A seat 38 for mounting a load is installed on the upper surface of the tip of the arm 37. The seat 38 can be moved up and down between the two rows of chain conveyors 31. Seat 38 is a bracket
It is fixed to the arm 37 via 38a.

かかる構成の動作を説明する。The operation of this configuration will be described.

出庫口6の二つの荷を載せた台車8は停止位置11に停止
する。台車8の荷は仕分け装置25によって上方の列のバ
ッファ20a、又は下方の列のバッファ25bに振分けられ
る。例えば、一つの台車8の荷がCとDである場合にお
いて、Cの荷は上方の列20aに搬送され、Dの荷は下側
の列25bに搬送される。
The dolly 8 on which the two loads at the exit 6 are placed stops at the stop position 11. The load of the truck 8 is sorted by the sorting device 25 into the buffer 20a in the upper row or the buffer 25b in the lower row. For example, when the load of one truck 8 is C and D, the load of C is transported to the upper row 20a and the load of D is transported to the lower row 25b.

このようにして各列のバッファ20a、20bに並べられた荷
は一つずつ並べ換え装置30a、30bに搬送される。
The loads thus arranged in the buffers 20a and 20b in each column are conveyed one by one to the rearrangement devices 30a and 30b.

並べ換え装置30において、それぞれの荷はそれぞれの位
置まで搬送される。今、バッファ20に図示の如く荷が載
っていた場合、荷Cは先頭から2番目の位置まで搬送さ
れ、停止させられる。そして該部のリフタ33でこの荷C
を上方に持上げる。荷E,Iは先頭から3番目,5番目のリ
フタ33,33で上昇させられる。荷Aは荷I,E,Cの下方を通
って先頭の1番目の位置まで搬送される。先頭の位置を
通過する荷が無いこと、および一つの荷に対して一つの
コンベヤ31aであることにより、先頭の荷は持上げる必
要はない。
In the rearrangement device 30, each load is transported to each position. Now, when the load is loaded on the buffer 20 as shown in the figure, the load C is transported to the second position from the beginning and stopped. Then, with the lifter 33 of this part, this load C
Lift up. The loads E and I are lifted by the third and fifth lifters 33 and 33 from the top. The cargo A is conveyed under the cargoes I, E, and C to the first position at the top. Since there is no load passing the leading position and there is one conveyor 31a for one load, it is not necessary to lift the leading load.

1番目、および2番目の荷が到着し、3番目の荷が未着
の場合は、2番目と3番目とのコンベヤ31bが一組ある
ので、2番目の荷はリフタ33で上昇させていなければな
らない。1番目と2番目の荷が到着している状態で3番
目の荷が到着した場合は3番目のリフタ33は上昇させる
必要はない。また、1番目と3番目の荷が到着している
状態で2番目の荷が到着した場合は2番目のリフタ33を
上昇させる必要はない。
When the 1st and 2nd loads arrive and the 3rd load has not arrived, there is one set of conveyors 31b of the 2nd and 3rd, so the 2nd load must be lifted by the lifter 33. I have to. If the third load arrives while the first and second loads have arrived, the third lifter 33 need not be raised. Further, when the second load arrives while the first and third loads have arrived, it is not necessary to raise the second lifter 33.

このようにして5個×2列の一組の荷がそろうと、全て
の荷をコンベヤ42に搬送する。搬送の動作は前述のとお
りである。
In this way, all the loads are conveyed to the conveyor 42 when a set of loads of 5 pieces × 2 rows is collected. The transport operation is as described above.

なお、それぞれの台車8,仕分け装置25,バッファ20,並べ
換え装置30の各位置において、いずれの荷であるかの認
識が必要であるが、これはトラッキングという公知の技
術を用ることにより可能である。
It should be noted that at each position of each trolley 8, the sorting device 25, the buffer 20, and the rearrangement device 30, it is necessary to recognize which load, which is possible by using a known technique called tracking. is there.

ここで、リフタ33を上昇させるための油圧回路を第6図
に示す。油圧ポンプ用モータ51は常時回転しており、油
圧ポンプ52は常に油を送っている。全てのリフタ33の上
昇動作が無い場合は、メインバルブ53がONしており、油
はバイパスして流れる。
Here, a hydraulic circuit for raising the lifter 33 is shown in FIG. The hydraulic pump motor 51 is constantly rotating, and the hydraulic pump 52 is always sending oil. When all lifters 33 do not move up, the main valve 53 is ON and oil flows by bypass.

荷の並べ換えのためのリフタ33の上昇が必要な場合は、
該当のリフタ33のシリンダ装置36のバルブ56をONすると
共にバルブ57をOFFし、更にメインバルブ53をOFFするこ
とにより、油が指定のシリンダ装置36へ流れ、その流れ
によりリフタ33が上昇する。リフタ33が上昇位置まで上
昇した場合、又は上昇動作を一時停止させる場合(下降
ではない)は、バルブ56をOFFする。リフタ33を下降さ
せる場合はバルブ56をOFFにすると共にバルブ57をONす
る。
If you need to lift the lifter 33 to sort the load,
By turning on the valve 56 of the cylinder device 36 of the corresponding lifter 33, turning off the valve 57, and further turning off the main valve 53, the oil flows to the designated cylinder device 36, and the lifter 33 rises due to the flow. When the lifter 33 is raised to the raised position, or when the raising operation is temporarily stopped (not lowered), the valve 56 is turned off. When lowering the lifter 33, the valve 56 is turned off and the valve 57 is turned on.

しかし、油圧ポンプ52の能力にも限界があるため、ここ
で同時にリフタ33を2台しか上昇させる能力しかない場
合、3台以上同時に上昇要求が発生すれば、その内の2
台のみ上昇させ、残りは、その上昇が終わるまで待つ必
要がある。
However, since the capacity of the hydraulic pump 52 is also limited, if there is only the capacity to lift only two lifters 33 at the same time, if three or more lifters are requested to be lifted at the same time, two of them will be used.
Only the pedestal needs to be raised and the rest have to wait until the climb is over.

このようなケースにおいては、どのリフタ33の上昇を優
先させるかにより、並べ換え装置の能力(並べ換えに要
する時間)、ひいては立体格納棚よりの出庫能力に大き
く影響してくる。上記実施例は、リフタ33が四つで数が
少いが、リフタの数が多く、それに対して同時使用可能
なリフタの数が少い場合は、並べ換えに要する時間がな
くなる。
In such a case, the ability of the rearrangement device (time required for rearrangement), and eventually the delivery capacity from the three-dimensional storage rack, is greatly affected by which lifter 33 is raised. In the above embodiment, the number of lifters 33 is four and the number is small. However, when the number of lifters is large and the number of lifters that can be used simultaneously is small, the time required for rearrangement is eliminated.

そこで、リフタ33の4台それぞれに上昇の優先順位を設
け、この優先順位によりリフタ33の上昇と上昇待ちの制
御を行う。
Therefore, each of the four lifters 33 is provided with an ascending priority order, and the ascending and ascending waiting control of the lifter 33 is performed according to this priority order.

この制御は制御装置によって行う。コンベヤ31の五つの
停止位置には荷の有無を検出するセンサ(図示せず)が
設置してあり、その検出信号は制御装置に入力される。
制御装置は前記センサの信号および上位の制御装置の信
号によっていずれの停止位置にいずれの荷が到着したか
否かを検出できる。荷が所定の順位の位置に停止し、リ
フタ33を上昇させる必要があることを前記センサ等によ
って検出すると、制御装置はそのリフタ33に上昇指令を
与える。同一時間帯に三つのリフタの上昇要求がある
と、優先順位の高い二つのリフタに上昇指令を与える。
This control is performed by the control device. Sensors (not shown) for detecting the presence / absence of a load are installed at the five stop positions of the conveyor 31, and the detection signals are input to the control device.
The control device can detect which load has arrived at which stop position based on the signal from the sensor and the signal from the host control device. When the load or the like stops at a predetermined position and the sensor or the like detects that the lifter 33 needs to be lifted, the control device gives the lifter 33 a lift command. When three lifters are requested to be lifted in the same time zone, a lift command is given to the two lifters having higher priorities.

リフタ33の上昇動作の優先順位は、コンベヤライン31の
搬送方向の上流側を下流側よりも高くする。即ち、図に
おいて、四つのリフタの呼称を上流側から下流側に向け
て33I,33G,33E,33Cとすると、その優先順位は33I>33G
>33E>33Cとする。
The lifting operation of the lifter 33 has a higher priority on the upstream side in the transport direction of the conveyor line 31 than on the downstream side. That is, in the figure, if the names of the four lifters are 33I, 33G, 33E, and 33C from the upstream side to the downstream side, the priority order is 33I> 33G.
>33E> 33C.

以下、実施例を第1図,第2図により説明する。An embodiment will be described below with reference to FIGS. 1 and 2.

先ず、第2図により、リフタを用いて荷を上昇させるか
否かを説明する。
First, referring to FIG. 2, it will be described whether or not the load is lifted by using the lifter.

荷2が上流のバッファ20から搬送されると(F10)、所
定の荷の停止位置まで移動させる(F15)。荷2が所定
の位置に到着したことにより(F20)、その位置より前
方(下流側)の停止位置の荷2の到着状態をチェックし
(F25)、前方へまだ空き位置がある場合は後の荷の追
い越しを可能にするため、前記荷が到着した位置のリフ
タの上昇動作(F30)を行う。
When the load 2 is transported from the upstream buffer 20 (F10), it is moved to a predetermined load stop position (F15). When the load 2 arrives at the predetermined position (F20), the arrival state of the load 2 at the stop position in front (downstream side) of the position is checked (F25). In order to allow the load to pass, the lifter (F30) at the position where the load arrives is performed.

次に、第1図により、リフタの上昇動作の選択について
説明する。
Next, referring to FIG. 1, the selection of the lifting operation of the lifter will be described.

前記ステップF30による前記リフタの上昇動作の要求(F
50)により、まず、現在既にリフタが2個以上上昇中か
をチェックする(F25)。これは、前述のように、油圧
ポンプ52の能力にり、同時に上昇可能なリフタの数が最
大2個までであることによる。2個以上上昇中でなけれ
ば、(即ち、上昇動作中のリフタが零又は1)、上昇要
求のあったリフタの上昇を指令する(F60)。
Request for lifting operation of the lifter in step F30 (F
First, check if 50 or more lifters are currently being lifted (F25). This is because, as described above, the maximum number of lifters that can be simultaneously raised is two due to the capacity of the hydraulic pump 52. If two or more are not being lifted (that is, the lifter in the lifting operation is zero or one), the lifter that has been requested to lift is commanded to be lifted (F60).

既に2個のリフタが上昇中であれば、その2個と上昇要
求のリフタとのそれぞれの上昇優先順位を比べる(F6
5)。既に上昇中のリフタ2個とも、上昇要求のリフタ
より優先順位が高ければ、上昇要求のリフタ上昇を待機
させる(F70)。
If two lifters have already been lifted, the two lifters are compared with the lift requesting lifter (F6).
Five). If the two lifters that are already climbing have a higher priority than the lifters that request climbing, the lifters that are climbing request are placed on standby (F70).

上昇要求のリフタの優先順位が、既に上昇中の2個のリ
フタのどちらかより高ければ、まず、既に上昇中の2個
のリフタの優先順位を比較し(F75)、優先順位の低い
方の上昇を一旦停止させる(F80),(F85)。その後、
要求のリフタの上昇を開始する(F90)。
If the priority of the lifter of the ascending request is higher than either of the two lifters that are already ascending, first the priority of the two lifters that are already ascending is compared (F75), and the one with the lower priority is compared. Stop the ascent (F80), (F85). afterwards,
Start lifting the demand lifter (F90).

また、リフタが上昇点に到達し、上昇動作完了したなら
ば(F95)、他に上昇待ちのリフタがないかチェックし
(F97)、有れば上記の流れを再び実行する。
If the lifter reaches the ascending point and the ascending operation is completed (F95), it is checked whether there is another lifter waiting for the ascent (F97), and if there is, the above flow is executed again.

以上の制御を実行することにより、設定された上昇の優
先順位に従ったリフタの上昇動作が実現できる。
By performing the above-described control, the lifter raising operation according to the set rising priority can be realized.

具体的に荷を搬送する際の例を第5図により説明する。An example of concrete transportation of a load will be described with reference to FIG.

今、バッファ20に荷2が先頭からC,E,I,A,Gの順序で並
んでおり、これをバッファ30で先頭からA,C,E,G,Iの順
序に並べ換えるとする。また、第5図において、リフタ
33は先頭33A,33C,33E,33G,33Iと呼ぶことにする。
Now, it is assumed that the loads 2 are arranged in the buffer 20 in the order of C, E, I, A, G from the beginning, and are rearranged in the buffer 30 in the order of A, C, E, G, I from the beginning. Also, in FIG. 5, the lifter
33 will be called the top 33A, 33C, 33E, 33G, 33I.

第5図において、荷C,Eがそれぞれ所定の位置に到着
し、それぞれのリフタ33C,33Eにより上昇中である。ま
た、荷Iも所定の位置に今、到着し、これから上昇させ
ようとしている。さらに、バッファ20には下流端側に荷
A,Gが順次搬送されてきて停止している。上向きの矢印T
1,T2,T3は、リフタの現在時点から上昇動作完了までに
要する時間の大きさを示し、T1<T2<T3である。
In FIG. 5, loads C and E have arrived at predetermined positions and are being lifted by the lifters 33C and 33E. The load I has also arrived at a predetermined position and is about to be lifted. Further, the buffer 20 is loaded on the downstream end side.
A and G have been sequentially transported and stopped. Up arrow T
1 , T 2 , T 3 indicate the magnitude of the time required from the present time of the lifter to the completion of the raising operation, and T 1 <T 2 <T 3 .

さて、優先順位は、リフタ33Iが最も高く、次に、リフ
タ33G、次に、リフタ33Eであり、リフタ33Cが最も小さ
い。即ち、優先順位は荷の流れの上流側から下流側に向
けて順次低く設ける。
The lifter 33I has the highest priority, the lifter 33G has the second highest priority, the lifter 33E has the second highest priority, and the lifter 33C has the lowest priority. That is, the priority is set to be gradually lower from the upstream side of the load flow toward the downstream side.

さて、第5図の状態において、荷Iがリフタ33Iの位置
に停止することにより、リフタ33Iの上昇要求があった
場合、第1図に基づき、リフタ33C,33E,33Iの上昇の優
先順位を比較する。優先順位はリフタ33Cが最も低いの
で、リフタ3Cの上昇動作を一旦停止させ(下降はさせな
い)、代りにリフタ33Iの上昇を開始させる。結果的
に、リフタ33I,33Eが上昇する。そしてリフタ33Iの上昇
が完了すると、リフタ33Cの上昇が開始される。同時
に、バッファ20の荷A,Gは下流に向けて搬送が開始され
る。
Now, in the state of FIG. 5, when the load I is stopped at the position of the lifter 33I, and there is a request for lifting of the lifter 33I, the priority of lifting of the lifters 33C, 33E, 33I is set based on FIG. Compare. Since the lifter 33C has the lowest priority, the lifting operation of the lifter 3C is temporarily stopped (not lowered), and instead the lifter 33I starts to rise. As a result, the lifters 33I and 33E rise. Then, when the lifter 33I is lifted, the lifter 33C is started to lift. At the same time, the loads A and G of the buffer 20 are started to be transported downstream.

ここで、バッファ20の下流端に位置する荷Aが並べ換え
装置30の下流端(コンベヤ31a)まで移動するに要する
時間をT5とする。但し、T5>T1とする。今、第5図の状
態から計時を開始して荷Aをコンベヤ31aに搬送するま
でに要する時間Tは“T4+T5"である。リフタ33Cの上昇
は荷Aの搬送と同一時間帯であるので、T1は除いてい
る。
Here, the time required for the load A located at the downstream end of the buffer 20 to move to the downstream end (conveyor 31a) of the rearrangement device 30 is T 5 . However, T 5 > T 1 . Now, the time T required to carry the load A to the conveyor 31a after starting the timing from the state of FIG. 5 is “T 4 + T 5 ”. T 1 is omitted because the lifter 33C rises at the same time as the load A is transported.

それに対して、優先順位を設けず、要求のあった順序で
リフタの上昇動作を行わせるとすると、リフタ33Cの上
昇完了までリフタ33Iの上昇開始ができないので、T=T
1+T4+T5となる。
On the other hand, if the lifter lifting operation is performed in the requested order without setting the priority order, the lifter 33I cannot start rising until the lifter 33C completes lifting, so T = T
It becomes 1 + T 4 + T 5 .

従って、優先順位を用いた本発明によれば、並べ換えに
要する時間を短縮できるものである。リフタの数が多く
なるに従ってその効果は大きくなると考えられる。即
ち、荷をリフタで上昇させている場合、そのすぐ後に控
えている荷の移動待ち時間が短縮される。これは、後の
荷、更にその後の荷にも直接影響していくため、全体的
には並べ換えに要する時間を大きく短縮できるものであ
る。
Therefore, according to the present invention using the priority order, the time required for rearrangement can be shortened. It is considered that the effect increases as the number of lifters increases. That is, when the load is being lifted by the lifter, the waiting time for moving the load, which is waiting immediately after that, is shortened. This directly affects subsequent loads and further loads, so that the time required for rearrangement can be greatly reduced as a whole.

なお、第5図の状態が生ずる理由について説明する。例
えば、その一つの理由は、並べ換え装置30内での荷の水
平方向の搬送は連続的に行われているに対し、バッファ
20から並べ換え装置30への荷の供給は一つずつ間欠的に
供給しているためである。また、バッファ20の端部の荷
の停止位置とリフタ33I間の距離が各リフタ33の相互間
の距離よりも大きいためである。上記実施例ではリフタ
の数が少いが、リフタの数が多くなると種々の条件の組
合せにより上記のような状態が生じやすくなる。また、
運転開始時等、バッファ20に全ての荷がストックされて
いない場合に、並べ換え装置30に荷を供給して並べ換え
を開始した場合に生ずる。
The reason why the state of FIG. 5 occurs will be described. For example, one of the reasons is that the horizontal movement of the load in the sorting device 30 is continuously performed, whereas
This is because the load is supplied from 20 to the sorting device 30 intermittently one by one. Also, the distance between the lifter 33I and the load stop position at the end of the buffer 20 is larger than the distance between the lifters 33. In the above embodiment, the number of lifters is small, but when the number of lifters is large, the above-mentioned state is likely to occur due to the combination of various conditions. Also,
This occurs when the load is supplied to the rearrangement device 30 and the rearrangement is started when all the loads are not stocked in the buffer 20 such as at the start of operation.

上記実施例では同時に上昇可能なリフタの数は2であっ
たが、1でも又は2より大きくてもよい。
In the above embodiment, the number of lifters that can be raised simultaneously is two, but it may be one or more than two.

〔発明の効果〕〔The invention's effect〕

以上の如く、本発明によれば、優先順位に従ってリフタ
を動作させているので、荷の並べ換えに要する時間を短
縮できるものである。
As described above, according to the present invention, since the lifters are operated according to the priority order, the time required for rearranging the loads can be shortened.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の荷の並べ換え装置のリフタを駆動する
ための一実施例のフローチャート、第2図は本発明の荷
の並べ換え装置のコンベヤラインの駆動するためのフロ
ーチャート、第3図は本発明の一実施例の並べ換え装置
の配置図、第4図は本発明の一実施例の並べ換え装置の
要部の平面図、第5図は第4図の5−5線図、第6図は
本発明の一実施例のリフタの油圧配管図、第7図は本発
明の一実施例のリフタの正面図、第8図は第7図の右側
面図である。 20……バッファ、30……並べ換え装置、31……コンベ
ヤ、33……リフタ、36……シリンダ装置、52……ポンプ
FIG. 1 is a flow chart of an embodiment for driving a lifter of a load rearranging apparatus of the present invention, FIG. 2 is a flow chart for driving a conveyor line of a load rearranging apparatus of the present invention, and FIG. 3 is a book. FIG. 4 is a plan view of a rearrangement apparatus according to an embodiment of the invention, FIG. 4 is a plan view of a main part of the rearrangement apparatus according to an embodiment of the present invention, FIG. 5 is a line 5-5 of FIG. 4, and FIG. FIG. 7 is a hydraulic piping view of a lifter according to an embodiment of the present invention, FIG. 7 is a front view of a lifter according to an embodiment of the present invention, and FIG. 8 is a right side view of FIG. 20 …… buffer, 30 …… sorting device, 31 …… conveyor, 33 …… lifter, 36 …… cylinder device, 52 …… pump

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭59−163225(JP,A) 特開 昭63−272703(JP,A) 特開 昭63−282008(JP,A) 実開 昭61−151921(JP,U) 実開 昭62−5126(JP,U) 特公 昭55−32610(JP,B2) ─────────────────────────────────────────────────── ─── Continuation of the front page (56) References JP-A-59-163225 (JP, A) JP-A-63-272703 (JP, A) JP-A-63-282008 (JP, A) Actual development Sho-61- 151921 (JP, U) Actually opened Sho 62-5126 (JP, U) Japanese Patent Sho 55-32610 (JP, B2)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】複数の荷を水平方向に並べて搬送すること
のできるコンベヤラインと、 前記コンベヤラインの搬送方向に沿って複数設置され、
該コンベヤライン上の荷を該コンベヤライン上の荷より
も高所にまでそれぞれ単独で上昇させる複数のリフタ
と、 前記リフタの上昇のための駆動装置としてそれぞれのリ
フタに設置した複数のシリンダ装置と、 前記複数のシリンダ装置に油圧を供給するためのもので
あって、その能力は前記リフタの全てよりも少い所定の
数のリフタを同時に上昇動作させる能力しか有しない油
圧ポンプと、 上昇動作の要求のあった前記リフタに上昇動作の指令を
与えるものであって、前記所定の数よりも多い数の上昇
動作の要求があった場合には、前記複数のリフタ毎に予
じめ設定した優先順位の高い方から前記所定の数のリフ
タを選択するようになっており、前記優先順位は前記コ
ンベヤラインによる搬送方向の上流側のリフタを下流側
のリフタよりも高く設定してなる制御装置と、 からなる荷の並べ換え装置。
1. A conveyor line capable of horizontally transporting a plurality of loads side by side, and a plurality of conveyor lines installed along the conveyor direction of the conveyor line.
A plurality of lifters for individually raising the load on the conveyor line to a higher place than a load on the conveyor line; and a plurality of cylinder devices installed in the respective lifters as a drive device for raising the lifter. , A hydraulic pump for supplying hydraulic pressure to the plurality of cylinder devices, the capacity of which is less than all of the lifters, and a hydraulic pump having only the capacity to raise the lifters at the same time; A command for ascending operation is given to the lifter that has made a request, and when there is a request for ascending operation in a number larger than the predetermined number, the priority set in advance for each of the plurality of lifters is given. The predetermined number of lifters is selected from the higher order, and the priority is such that the lifter on the upstream side in the conveying direction by the conveyor line is more than the lifter on the downstream side. Ku and set to become the controller, the load consisting of reordering device.
JP14903087A 1987-06-17 1987-06-17 Load sorting device Expired - Fee Related JPH0757643B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14903087A JPH0757643B2 (en) 1987-06-17 1987-06-17 Load sorting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14903087A JPH0757643B2 (en) 1987-06-17 1987-06-17 Load sorting device

Publications (2)

Publication Number Publication Date
JPS63315406A JPS63315406A (en) 1988-12-23
JPH0757643B2 true JPH0757643B2 (en) 1995-06-21

Family

ID=15466133

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14903087A Expired - Fee Related JPH0757643B2 (en) 1987-06-17 1987-06-17 Load sorting device

Country Status (1)

Country Link
JP (1) JPH0757643B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115338123A (en) * 2021-05-12 2022-11-15 顺丰科技有限公司 Cargo carrying device, sorting system and sorting method
CN114408547B (en) * 2021-12-24 2023-04-07 广东顺力智能物流装备股份有限公司 Jacking type orientation adjustment goods shelf manipulator for intelligent logistics and application method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5532610B2 (en) 2008-05-19 2014-06-25 マックス株式会社 Wire reel and rebar binding machine

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5532610B2 (en) 2008-05-19 2014-06-25 マックス株式会社 Wire reel and rebar binding machine

Also Published As

Publication number Publication date
JPS63315406A (en) 1988-12-23

Similar Documents

Publication Publication Date Title
JP5078563B2 (en) Automatic warehouse
JP2016052947A5 (en)
JP7315095B2 (en) Automated warehouse system
JP4036097B2 (en) Processing and storage facilities
JP3823720B2 (en) Goods storage equipment
JP2019014583A (en) Transport vehicle system
JP2695781B2 (en) Load sorting equipment
JP3369392B2 (en) Article storage facility
JPH07117815A (en) Automatic warehouse
JPH0757643B2 (en) Load sorting device
JP7443936B2 (en) Automatic warehouse
CN117715838A (en) Storage system with multi-level storage shelves, vertical lift connecting levels of multi-level storage shelves, and method of operation
JP5105180B2 (en) Goods storage equipment
JP2005272053A (en) Commodity storage facility
JP2002145407A (en) Carry-in system for automated storage and retrieval warehouse installation
JP2008044729A (en) Automated warehouse and storage and retrieval control method
JP3840900B2 (en) Automatic warehouse equipment delivery system
JP2000272722A (en) Commodity storage facility
JP2000272719A (en) Commodity storage facility
JP3531720B2 (en) Article storage facility
JPH1179314A (en) Pallet carrying-in-and-out intersection system of automated storage and retrieval rack
JPH0314721B2 (en)
JP2557467B2 (en) Equipment for changing shipping order in automated warehouse
JP4521663B2 (en) Goods storage equipment
JPH07257707A (en) Article carrying out method in automatic warehouse

Legal Events

Date Code Title Description
S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees