Lighting control system

Info

Publication number
JPH0760743B2
JPH0760743B2 JP1076624A JP7662489A JPH0760743B2 JP H0760743 B2 JPH0760743 B2 JP H0760743B2 JP 1076624 A JP1076624 A JP 1076624A JP 7662489 A JP7662489 A JP 7662489A JP H0760743 B2 JPH0760743 B2 JP H0760743B2
Authority
JP
Japan
Prior art keywords
switch
channel
switches
control circuit
setting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1076624A
Other languages
Japanese (ja)
Other versions
JPH02257593A (en
Inventor
正之 森田
恭二 山崎
重行 徳永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Lighting and Technology Corp
Original Assignee
Toshiba Lighting and Technology Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Lighting and Technology Corp filed Critical Toshiba Lighting and Technology Corp
Priority to JP1076624A priority Critical patent/JPH0760743B2/en
Publication of JPH02257593A publication Critical patent/JPH02257593A/en
Publication of JPH0760743B2 publication Critical patent/JPH0760743B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Circuit Arrangement For Electric Light Sources In General (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、多数の照明負荷を複数の制御端末器を介して
中央処理装置から集中負荷制御する照明制御システムに
関する。
The present invention relates to a lighting control system for centrally controlling a large number of lighting loads from a central processing unit via a plurality of control terminals.

[従来の技術] 従来、中央処理装置と、単数または複数の照明負荷が接
続されこれらの照明負荷をオン/オフ制御する制御回路
系を有する制御端末器と、予め割付けられた制御回路系
を介して単数または複数の照明負荷をオン/オフする壁
スイッチを備えた操作端末器とを、2線の伝送線を介し
て接続し、これらの間で伝送信号を授受することにより
各照明負荷の動作を制御する照明制御システムがあっ
た。かかる照明制御システムにおいては、予め室内要所
に設けた壁スイッチに幾つかの制御回路系を割付けるこ
とが行なわれていた。このため従来は、中央処理装置に
テンキーおよび表示用のLEDを設けこれらを操作するこ
とにより割付けることとしていた。
[Prior Art] Conventionally, a central processing unit, a control terminal device having a control circuit system for connecting one or a plurality of lighting loads to ON / OFF control these lighting loads, and a control circuit system pre-allocated Operation of each lighting load by connecting a control terminal equipped with a wall switch for turning on / off one or more lighting loads via two transmission lines and transmitting / receiving a transmission signal between them. There was a lighting control system to control the. In such an illumination control system, some control circuit systems have been assigned to wall switches provided in advance in key locations in the room. For this reason, conventionally, the central processing unit is provided with a ten-key pad and an LED for display, which are assigned by operating them.

[発明が解決しようとする課題] ところが、かかる従来例によれば、中央処理装置に設け
られたテンキーにより番号で壁スイッチを特定し、また
番号で制御回路系(チャンネル)を特定することとな
る。従って、照明負荷との対応が取りにくく、操作方法
が複雑になってしまうという欠点があった。
[Problems to be Solved by the Invention] However, according to such a conventional example, a numeric keypad provided in the central processing unit specifies a wall switch by a number and a control circuit system (channel) by a number. . Therefore, it is difficult to cope with the lighting load, and the operation method becomes complicated.

本発明は、上述の従来形における問題点に鑑み、多数の
照明負荷を複数の制御端末器を介して中央処理装置から
集中負荷制御する照明制御システムにおいて、制御端末
器の制御回路系と壁スイッチとの割付けを理解しやすく
かつ操作しやすくすること、およびどのように割付けた
かをチェックしやすくすることを目的とする。
In view of the above-mentioned problems in the conventional type, the present invention provides a control circuit system of a control terminal and a wall switch in a lighting control system for centralized load control of a large number of lighting loads from a central processing unit via a plurality of control terminals. The purpose is to make it easy to understand and operate the assignment with and to check how it is assigned.

[課題を解決するための手段および作用] 上記の目的を達成するため、本発明は、中央処理装置と
制御回路系を有する制御端末器と壁スイッチを有する操
作端末器とが接続された2線の伝送線に、設定スイッチ
と操作スイッチとチャンネル指定スイッチとを備える操
作器を具備することとし、この操作器を操作することに
より壁スイッチと幾つかの制御回路系との割付けを行な
うこととしている。
[Means and Actions for Solving the Problems] In order to achieve the above object, the present invention provides a two-wire system in which a central processing unit, a control terminal having a control circuit system, and an operation terminal having a wall switch are connected. The transmission line is provided with an operating device including a setting switch, an operating switch, and a channel designating switch, and the wall switch and some control circuit systems are assigned by operating this operating device. .

すなわち、本発明にかかる照明制御システムにおいて
は、操作器の設定スイッチを押下することにより割付け
設定モードとすることができる。そして、割付け設定モ
ードとした後は壁スイッチと対応して同数設けられた操
作スイッチのうち割付けるべき壁スイッチに対応する操
作スイッチを押下し、その後制御回路系と対応して同数
設けられたチャンネル指定スイッチのうちから上記選択
した壁スイッチに割付けるべき制御回路系に対応する幾
つかのチャンネル指定スイッチを押下する。これにより
極めて簡単に割付けを行うことができる。
That is, in the lighting control system according to the present invention, the allocation setting mode can be set by pressing the setting switch of the operation device. After switching to the allocation setting mode, press the operation switch corresponding to the wall switch to be allocated among the operation switches provided in the same number corresponding to the wall switch, and then the same number of channels provided corresponding to the control circuit system. Among the designated switches, some channel designation switches corresponding to the control circuit system to be assigned to the selected wall switch are pressed. This makes allocation extremely easy.

[実施例] 以下、図面を用いて本発明の実施例を説明する。Embodiments Embodiments of the present invention will be described below with reference to the drawings.

第1図は、本発明の一実施例に係る照明制御システムの
概略構成を示すブロック図である。同図のシステムは、
中央処理装置1、中央処理装置1に伝送線2を介して接
続された操作器3、壁スイッチ8を備えた単数または複
数の操作端末器4、単数または複数の照明負荷6を接続
した単数または複数の制御端末器5等によって構成され
る。中央処理装置1は、メモリ11、制御部12、伝送イン
ターフェース13を備えている。操作器3は、そのパネル
上に、壁スイッチ8と対応して同数設けられた操作スイ
ッチ31と、制御端末器5の制御回路系に対応して同数設
けられたチャンネル指定スイッチ32と、設定スイッチ33
とを具備している。
FIG. 1 is a block diagram showing a schematic configuration of a lighting control system according to an embodiment of the present invention. The system in the figure is
Central processing unit 1, operating unit 3 connected to central processing unit 1 via transmission line 2, single or multiple operating terminals 4 equipped with wall switch 8, single unit connecting single or multiple lighting loads 6, or It is composed of a plurality of control terminals 5 and the like. The central processing unit 1 includes a memory 11, a control unit 12, and a transmission interface 13. The operation unit 3 has the same number of operation switches 31 corresponding to the wall switches 8 on the panel, the same number of channel specifying switches 32 corresponding to the control circuit system of the control terminal unit 5, and the setting switches. 33
It has and.

第2図は、第1図の操作器3のパネル上に設けられた各
スイッチ等の外観を示す。なお、ここでは説明を容易に
するため、1つの操作端末器4が4つの壁スイッチ8を
含むものとしその操作端末器4が6台ある場合について
説明する。また、同様に1台の制御端末器5が8つの制
御回路系を有するものとしその制御端末器5が2台ある
ものとして説明する。従って、操作器3のパネル上には
第2図(a)に示すように24個の操作スイッチ31と16個
のチャンネル指定スイッチ32とが存在する。同図(b)
は1台の操作端末器(4つの壁スイッチ8を有する)4
に対応する4つの操作スイッチ31を示す。操作スイッチ
31はプッシュボタンとなっており、その左右にはLED34,
35が備えられている。同図(c)は1台の操作端末器
(8つの制御回路系を含む)に対応する8つのチャンネ
ル指定スイッチ32を示している。チャンネル指定スイッ
チ32はプッシュボタンとなっており、表示LED36を備え
ている。同図(a)で、37は設定スイッチ33に設けられ
たLEDである。
FIG. 2 shows the external appearance of each switch and the like provided on the panel of the operation device 3 of FIG. In addition, here, in order to facilitate the description, it is assumed that one operation terminal device 4 includes four wall switches 8 and a case where there are six operation terminal devices 4 will be described. Similarly, it is assumed that one control terminal device 5 has eight control circuit systems and two control terminal devices 5 are provided. Therefore, there are 24 operation switches 31 and 16 channel designation switches 32 on the panel of the operation device 3 as shown in FIG. 2 (a). The same figure (b)
Is one operating terminal (having four wall switches 8) 4
The four operation switches 31 corresponding to are shown. Operation switch
31 is a push button, and LEDs 34,
35 are equipped. FIG. 7C shows eight channel designation switches 32 corresponding to one operation terminal unit (including eight control circuit systems). The channel designation switch 32 is a push button and has a display LED 36. In FIG. 9A, 37 is an LED provided on the setting switch 33.

次に、本実施例の照明制御システムの操作手順について
説明する。
Next, an operation procedure of the lighting control system of this embodiment will be described.

まず壁スイッチと制御回路系(チャンネル)とを割付け
るため設定スイッチ33を押下して割付け設定モードとす
る。これによりLED37が点灯する。次に、操作スイッチ3
1の中からチャンネルを割付けるべき操作スイッチ(1
つの壁スイッチ8に対応する)を選択し当該操作スイッ
チ31を押下する。これにより、当該操作スイッチ31の右
側に設けられたLED34が点灯し被選択の状態であること
を表示する。次に、割付けるべきチャンネルをチャンネ
ル指定スイッチ32を押下することにより選択する。チャ
ンネル指定スイッチ32の押下により、そのチャンネルが
選択状態であることを示すべく、対応するLED36が点灯
する。当該操作スイッチに割付けるべきチャンネルをす
べてチャンネル指定スイッチで選択した後、さらに他の
操作スイッチ(壁スイッチ)の割付けを行なう必要があ
る場合は、再び操作スイッチの押下から同様の動作を繰
り返す。すべての割付けが終了した後は、設定スイッチ
33を押下し設定モードを解除して通常モードへと戻る。
これによりLED37は消灯する。
First, in order to allocate the wall switch and the control circuit system (channel), the setting switch 33 is pressed to enter the allocation setting mode. This turns on the LED 37. Next, operation switch 3
Operation switch (1
(Corresponding to one wall switch 8) and presses the operation switch 31. As a result, the LED 34 provided on the right side of the operation switch 31 is lit to indicate that it is in the selected state. Next, the channel to be assigned is selected by pressing the channel designation switch 32. By depressing the channel designation switch 32, the corresponding LED 36 lights up to indicate that the channel is in the selected state. When it is necessary to further allocate another operation switch (wall switch) after selecting all the channels to be allocated to the operation switch with the channel designating switch, the same operation is repeated from the depression of the operation switch. After completing all the assignments, press the setting switch.
Press 33 to cancel the setting mode and return to the normal mode.
This turns off the LED 37.

通常モードにおいては、操作スイッチ31は対応する壁ス
イッチ8と2ケ所操作を行なうことができる。すなわ
ち、壁スイッチ8をオン/オフすることによってもまた
操作スイッチ31をオン/オフすることによっても、予め
割付けられた照明負荷6をオン/オフ制御することがで
きる。
In the normal mode, the operation switch 31 can be operated in two places with the corresponding wall switch 8. That is, the lighting load 6 assigned in advance can be controlled to be turned on / off by turning on / off the wall switch 8 and turning on / off the operation switch 31.

なお、操作スイッチ31の両側にあるLED34,35は設定モー
ドでは被選択表示を表していたが、通常モードでは当該
操作スイッチ31に割付けられたチャンネルの点灯/消灯
を表示することとしている。すなわち、当該操作スイッ
チ31に割付けられた幾つかのチャンネルが点灯状態のと
きはLED34が点灯し、それらのチャンネルが消灯状態の
ときはLED35が点灯する。また、チャンネル指定スイッ
チ32に設けられたLED36は設定モードにおいては被選択
状態を表示するものであるが、通常モードでは当該チャ
ンネルの点灯/消灯状態を表意するととしている。
It should be noted that the LEDs 34 and 35 on both sides of the operation switch 31 represent the selected display in the setting mode, but in the normal mode, the ON / OFF state of the channel assigned to the operation switch 31 is displayed. That is, when some channels assigned to the operation switch 31 are in a lighting state, the LED 34 is lit, and when those channels are in a non-lighting state, the LED 35 is lit. Further, the LED 36 provided on the channel designation switch 32 displays the selected state in the setting mode, but in the normal mode, it indicates that the channel is on / off.

第3図は、第1図の照明制御システムにおける中央処理
装置1の具体的回路例を示す。
FIG. 3 shows a specific circuit example of the central processing unit 1 in the lighting control system of FIG.

同図の中央処理装置1は、制御部(CPU)12、壁スイッ
チ8と各照明負荷6との対応関係を示す割付けデータを
格納するためのメモリ11、送信部17と受信部18とを備え
た伝送インターフェース13、電源回路14、交流電源のゼ
ロクロスを検出するゼロクロス検出回路15、CPU12を初
期状態に設定するためのリセット回路16、CPU12の駆動
クロックを発生する発振回路23を具備している。送信部
17は、ゼロクロス信号を伝送線に送出するためのゼロク
ロス信号送出回路19およびドライブ回路20を具備してい
る。受信回路18は、電流検出回路22およびこの電流検出
回路22のアナログ出力をCPU12が処理可能なデジタルデ
ータに変換して供給するためのA/Dコンバータ21を具備
している。
The central processing unit 1 in FIG. 1 includes a control unit (CPU) 12, a memory 11 for storing allocation data indicating a correspondence relationship between the wall switch 8 and each lighting load 6, a transmission unit 17, and a reception unit 18. The transmission interface 13, the power supply circuit 14, the zero-cross detection circuit 15 for detecting the zero-cross of the AC power supply, the reset circuit 16 for setting the CPU 12 to the initial state, and the oscillation circuit 23 for generating the drive clock of the CPU 12. Transmitter
The reference numeral 17 includes a zero-cross signal sending circuit 19 and a drive circuit 20 for sending a zero-cross signal to the transmission line. The reception circuit 18 includes a current detection circuit 22 and an A / D converter 21 for converting the analog output of the current detection circuit 22 into digital data that can be processed by the CPU 12 and supplying the digital data.

第4図は、第1図の照明制御システムにおける制御端末
器5の具体的回路例を示す。
FIG. 4 shows a specific circuit example of the control terminal 5 in the lighting control system of FIG.

同図において、81はマイクロプロセッサ(CPU)、82は
受信回路、83は送信回路、84はゼロクロス信号受信回
路、85は自己アドレス設定回路、86はクロック発生回路
を示す。さらに、C81はこの端末器の電源投入時にCPU81
をリセットするためのコンデンサ、DB81は復極(交流)
系である伝送線2と単極(直流)系である送信回路83お
よびゼロクロス信号受信回路84とを整合するためのダイ
オードブリッジである。87はCPU81の制御出力によりオ
ン/オフされる2T(two−transfer)リレー89を含むリ
レーユニット、88はリレー89が動作したときにそれを検
出して返送するための監視ユニットである。このユニッ
ト87,88は複数組設けることができる。本実施例におい
ては1台の制御端末器5にユニット87,88を8組もけけ
て8系統(8チャンネル)の照明負荷6を接続し、これ
をオン/オフ制御するようにしている。
In the figure, 81 is a microprocessor (CPU), 82 is a receiving circuit, 83 is a transmitting circuit, 84 is a zero-cross signal receiving circuit, 85 is a self-address setting circuit, and 86 is a clock generating circuit. Furthermore, C81 is CPU81 when the power of this terminal is turned on.
Capacitor for resetting, DB81 is depolarization (AC)
It is a diode bridge for matching the transmission line 2 which is a system with the transmission circuit 83 and the zero-cross signal reception circuit 84 which are a unipolar (DC) system. 87 is a relay unit including a 2T (two-transfer) relay 89 which is turned on / off by the control output of the CPU 81, and 88 is a monitoring unit for detecting and returning the relay 89 when it operates. Plural sets of these units 87 and 88 can be provided. In this embodiment, eight sets of units 87 and 88 are connected to one control terminal 5 to connect an illumination load 6 of eight systems (8 channels), and the on / off control is performed.

第5図は、第1図の照明制御システムにおける操作端末
器(壁スイッチ)4および操作器3の具体的回路例を示
す。
FIG. 5 shows a specific circuit example of the operation terminal device (wall switch) 4 and the operation device 3 in the lighting control system of FIG.

同図において、81から86は第4図の制御端末器における
同一付番の回路および部材と共通のものを示す。91はCP
U81の制御出力により点灯または消灯されるLED92を含む
LEDユニットであり、93はスイッチSW93を含むスイッチ
ユニットである。これらのユニット91,93は複数設ける
ことができ、本実施例の操作端末器4では4組設けるこ
ととしている。従って、1台の操作端末器4で4個の壁
スイッチ8を制御することができる。
In the figure, 81 to 86 are common to the circuits and members of the same numbering in the control terminal of FIG. 91 is CP
Includes LED92 that is turned on or off by the control output of U81
An LED unit 93 is a switch unit including a switch SW93. A plurality of these units 91, 93 can be provided, and four sets are provided in the operation terminal device 4 of the present embodiment. Therefore, it is possible to control the four wall switches 8 with one operation terminal device 4.

また、操作器3においては、第2図(b)に示す4つの
操作スイッチ31を第5図に示す1台の端末器によって制
御するため、LEDのユニット91は4個、スイッチのユニ
ット93は8個設けている。一方、チャンネル指定スイッ
チ32は8チャンネルを1つの端末器で制御することとし
ているので、第2図(c)に示す8個のチャンネル指定
スイッチ32を第5図に示す1台の端末器で制御する。従
って、チャンネル指定スイッチ32の端末器ではユニット
92,93を8組設けている。
Further, in the operation device 3, since the four operation switches 31 shown in FIG. 2 (b) are controlled by the single terminal device shown in FIG. 5, four LED units 91 and four switch units 93 are provided. Eight are provided. On the other hand, since the channel designating switch 32 controls eight channels by one terminal, the eight channel designating switches 32 shown in FIG. 2 (c) are controlled by one terminal shown in FIG. To do. Therefore, in the terminal of the channel designation switch 32, the unit
Eight 92, 93 sets are provided.

以上より、第2図(a)に示す操作器では、第5図の回
路を、操作スイッチ31に関して6個、チャンネル指定ス
イッチ32に関して2個、設定スイッチ33に関して1個備
えていることとなる。
From the above, the operating device shown in FIG. 2 (a) is provided with the circuit of FIG. 5 for the operation switch 31, six for the channel designating switch 32, and one for the setting switch 33.

第6図は、上述したような中央処理装置(第3図)およ
び端末器(第4,5図)の間で授受される伝送信号の操作
モード別詳細フォーマットを示す。
FIG. 6 shows a detailed format for each operation mode of transmission signals transmitted and received between the central processing unit (FIG. 3) and the terminals (FIGS. 4 and 5) as described above.

本実施例の照明制御システムは、伝送システムとして通
常モード、親起動モードおよび子起動モードの3つのモ
ードを有する。通常モードは中央処理装置1からスター
ト信号を送信し、もし端末からの起動があればその端末
データ信号を受信する等の処理を行なうモードである。
親起動モードには、制御モード、監視モード、および子
起動解除モードの3つのモードがある。制御モードは中
央処理装置1からデータを送って所定の端末器を制御す
る(例えば、照明負荷6を点灯または消灯する)場合に
用いられるモードである。監視モードは、例えば壁スイ
ッチ8の状態を監視するなど、各端末器の負荷の状態を
モニタする場合に用いられるモードである。子起動モー
ドは各端末器の側から中央処理装置1を起動する処理を
行なう場合のモードである。子起動モードは、親起動モ
ードの子起動解除モードにより解除される。
The lighting control system of this embodiment has three modes as a transmission system: a normal mode, a parent activation mode, and a child activation mode. The normal mode is a mode in which the central processing unit 1 transmits a start signal, and if the terminal is activated, the terminal data signal is received.
The parent activation mode has three modes: control mode, monitoring mode, and child activation cancellation mode. The control mode is a mode used when data is sent from the central processing unit 1 to control a predetermined terminal (for example, the lighting load 6 is turned on or off). The monitoring mode is a mode used when monitoring the load state of each terminal such as monitoring the state of the wall switch 8. The child activation mode is a mode in which processing for activating the central processing unit 1 is performed from the side of each terminal. The child activation mode is canceled by the child activation cancellation mode of the parent activation mode.

次に、第7図のフローチャートおよび第1から6図を参
照して、本実施例の照明制御システムの動作を説明す
る。
Next, the operation of the lighting control system of the present embodiment will be described with reference to the flowchart of FIG. 7 and FIGS.

先ず電源が投入されると中央処理装置1はステップS1で
初期化をし、ステップS2で監視データを受信する。な
お、本実施例における信号の伝送は時分割多重伝送で、
送信および受信は50または60サイクルの電源サイクルに
同期して行なわれる。ステップS2の監視データ受信は、
端末器におけるスイッチの操作データが子起動モードで
中央処理装置に向けて送信され、それを受信する処理で
ある。
First, when the power is turned on, the central processing unit 1 initializes in step S1 and receives monitoring data in step S2. The signal transmission in this embodiment is time division multiplexing transmission,
Transmission and reception are performed in synchronization with 50 or 60 power cycles. The monitoring data reception in step S2
This is a process in which the operation data of the switch in the terminal is transmitted to the central processing unit in the child start mode and is received.

次に、ステップS3で設定中フラグが1であるか否か判別
する。設定中フラグは、操作器3の設定スイッチ33の押
下により割付け設定処理を行なう場合にセットされ終了
するとリセットされるフラグであり、割付け設定モード
か否かを示す。設定中フラグが1でない場合は、ステッ
プS4に分岐し受信した監視データが設定スイッチ信号で
あるか否かを判別する。設定スイッチ信号である場合は
割付けを行なうために設定スイッチ33が押下されたとい
うことであるから、ステップS5で設定中フラグをセット
する。そしてステップS6で設定スイッチLED37を点灯す
る旨の送信データをセットし、ステップS7で全操作スイ
ッチ31に対応する表示LED34,35および全チャンネル指定
スイッチ32に対応する表示LED36をすべて消灯すべき旨
の送信データをセットし、ステップS8で送信する。これ
により、設定スイッチ33のLED37が点灯し、その他のLED
34,35,36はすべて消灯する。
Next, in step S3, it is determined whether or not the setting flag is 1. The setting flag is a flag which is set when the allocation setting process is performed by pressing the setting switch 33 of the operation unit 3 and reset when the allocation setting process is completed, and indicates whether or not the allocation setting mode is set. If the setting flag is not 1, it is determined in step S4 whether the received monitoring data is a setting switch signal. If it is a setting switch signal, it means that the setting switch 33 has been pressed for allocation, and therefore, the setting flag is set in step S5. Then, in step S6, the transmission data for turning on the setting switch LED 37 is set, and in step S7, all the display LEDs 34, 35 corresponding to all the operation switches 31 and the display LEDs 36 corresponding to all the channel designation switches 32 are turned off. The transmission data is set and transmitted in step S8. As a result, the LED 37 of the setting switch 33 lights up, and the other LEDs
All 34, 35 and 36 are turned off.

次に、ステップS8かステップS2に戻り再び監視データを
受信する。ここで設定中フラグは1がセットされている
ので、ステップS3からS9に分岐し、受信信号が設定スイ
ッチ信号であるか否かを判別する。設定スイッチ信号で
ない場合は、ステップS10で操作スイッチ信号であるか
否かを判別する。操作スイッチ信号である場合は、ステ
ップS11で中央処理装置1の内部にあるメモリ11の該当
操作スイッチの割付けフラグをセットする。そして、ス
テップS12で該当する操作スイッチ31の表示LED34を点灯
する旨の送信データをセットし、ステップS8で送信す
る。
Then, the process returns to step S8 or step S2 to receive the monitoring data again. Since the setting flag is set to 1 here, the process branches from steps S3 to S9 to determine whether the received signal is a setting switch signal. If it is not the setting switch signal, it is determined in step S10 whether it is an operation switch signal. If it is an operation switch signal, the allocation flag of the corresponding operation switch in the memory 11 inside the central processing unit 1 is set in step S11. Then, in step S12, transmission data indicating that the display LED 34 of the corresponding operation switch 31 is turned on is set, and the transmission data is transmitted in step S8.

次に、再びステップS2に戻り監視データを受信する。こ
こで設定中フラグは1にセットされているから、ステッ
プS3からステップS9へと分岐し、設定スイッチ信号が受
信されたか否かを判別する。設定スイッチ信号でない場
合は、ステップS10で操作スイッチ信号を受信したか否
か判別する。操作スイッチ信号でない場合は、ステップ
S13で中央処理措置1のメモリ11に割付けフラグがセッ
トされているかを判別する。割付けフラグがセットされ
ていない場合はステップS2に戻る。ここでは前記のステ
ップS11により割付けフラグがセットされているから、
ステップS13からテッS14へと分岐する。ステップS14で
チャンネル指定スイッチ信号が受信されたか否か判別す
る。チャンネル指定スイッチ信号でない場合はステップ
S2に戻る。チャンネル指定スイッチ32が押下されていた
場合はステップS14からステップS15へと分岐し、該当す
る操作スイッチ31の割付けメモリにチャンネル指定スイ
ッチ32で指定された該当チャンネルを割付ける。そし
て、押下されたチャンネル指定スイッチ32に対応する表
示LED36を点灯表示するためのデータを送信データとし
てセットし、ステップS8で送信する 以上のように、ステップS2→S3→S9→S10→S11→S12→S
8の処理により操作スイッチの割付けをし、ステップS2
→S3→S9→S10→S13→S14→S15→S8の処理により該当操
作スイッチに割付ける該当チャンネルを指定する。これ
を繰返して幾つかの割付けを行なった後、設定スイッチ
33を押下するとその監視データはステップS2で受信され
る。設定中フラグは1にセットされているから、ステッ
プS3からステップS9へと分岐し、ここで設定スイッチ信
号の受信であるか否かを判別する。設定スイッチ33の押
下であるからステップS9からステップS16へと分岐し、
ここで割付けを終了する。そして、全スイッチに対する
表示状態を示す送信データをセットし、設定中フラグお
よび割付けフラグをリセットして、ステップS8で送信を
行ない、再びステップS2へと戻る。以上により操作スイ
ッチ31(壁スイッチ)に対する幾つかのチャンネルの割
付けが終了する。
Next, the process returns to step S2 again to receive the monitoring data. Since the setting flag is set to 1 here, the process branches from step S3 to step S9 to determine whether or not the setting switch signal has been received. If it is not the setting switch signal, it is determined in step S10 whether or not the operation switch signal is received. If not an operation switch signal, step
In S13, it is determined whether the allocation flag is set in the memory 11 of the central processing unit 1. If the allocation flag is not set, the process returns to step S2. Here, since the allocation flag is set in step S11,
The process branches from step S13 to step S14. In step S14, it is determined whether the channel designation switch signal has been received. Step if not channel designated switch signal
Return to S2. When the channel designation switch 32 is pressed, the process branches from step S14 to step S15, and the corresponding channel designated by the channel designation switch 32 is assigned to the assignment memory of the corresponding operation switch 31. Then, the data for lighting the display LED 36 corresponding to the pressed channel designation switch 32 is set as the transmission data, and is transmitted in step S8 As described above, steps S2 → S3 → S9 → S10 → S11 → S12 → S
The operation switches are assigned by the processing in step 8, and step S2
→ S3 → S9 → S10 → S13 → S14 → S15 → S8 Specify the applicable channel to be assigned to the applicable operation switch by the process. Repeat this to make some assignments, and then
When 33 is pressed, the monitoring data is received in step S2. Since the setting flag is set to 1, the process branches from step S3 to step S9, where it is determined whether or not the setting switch signal has been received. Since the setting switch 33 is pressed, the process branches from step S9 to step S16.
The allocation is finished here. Then, the transmission data indicating the display state for all the switches is set, the setting flag and the allocation flag are reset, the transmission is performed in step S8, and the process returns to step S2 again. By the above, allocation of some channels to the operation switch 31 (wall switch) is completed.

なお、割付け処理を行っていない場合すなわち設定中フ
ラグが0の場合、操作器3の操作スイッチ31は予め割付
けられているチャンネルのオン/オフを行なうスイッチ
として用いることができる。また、通常時は壁スイッチ
8の操作状態を監視し、対応する制御端末に制御データ
を送るべくステップS17で通常処理が行なわれる。
When the allocation process is not performed, that is, when the setting flag is 0, the operation switch 31 of the operation device 3 can be used as a switch for turning on / off the channel which is allocated in advance. Further, normally, the operation state of the wall switch 8 is monitored, and normal processing is performed in step S17 to send control data to the corresponding control terminal.

すなわち、以上のようにして割付けが行われた後に壁ス
イッチ8を押下すると、その監視データはステップS2で
受信されステップS3,S4を介してステップS17に至る。ス
テップS17では中央処理装置1はメモリ11に記憶されて
いる割付けデータより当該壁スイッチ8に対応する割付
けデータを読出し、その割付けに従って該当するチャン
ネルをオンする。これにより予め割付けられたチャンネ
ルの照明負荷6が点灯する。
That is, when the wall switch 8 is pressed after the allocation is performed as described above, the monitoring data is received in step S2 and reaches step S17 via steps S3 and S4. In step S17, the central processing unit 1 reads out the allocation data corresponding to the wall switch 8 from the allocation data stored in the memory 11, and turns on the corresponding channel according to the allocation. As a result, the illumination load 6 of the channel assigned in advance is turned on.

第8図は、本発明の他の実施例に係る操作器のパネル上
の外観を示す。操作スイッチ31、チャンネル指定スイッ
チ34、LED34,35,36は第2図に示したものと同様のもの
である。33は設定スイッチ、37は設定スイッチに対応す
LED、38Uは上位チャンネル切替えスイッチ、39Uは上位
チャンネル切替えスイッチ38Uに対応するLED、38Lは下
位チャンネルスイッチ、39Lは下位チャンネル切替えス
イッチ38Lに対応するLEDを示す。第8図(b)はチャン
ネル指定スイッチ32の詳細図である。キートップ上のNP
1およびNP2は上位チャンネルおよび下位チャンネルをそ
れぞれ示し、切替えスイッチ38U,38Lにより上位チャン
ネルまたは下位チャンネルが選択されていた場合にそれ
ぞれ有効なチャンネルが表されている 本実施例の照明制御システムは指定べきチャンネルの数
が多い場合い用いて効果的である。すなわち、上位チャ
ンネル切替えスイッチ38Uにより上位チャンネルが選択
されている場合は複数ある各チャンネル指定スイッチ32
はその上側に表されたNP1のチャンネルを指定すること
ができるスイッチとして機能し、一方下位チャンネル切
替えスイッチ38Lが押下されていた場合はチャンネル指
定スイッチ32のNP2で表されたチャンネルを指定するこ
とができるスイッチとして機能する。
FIG. 8 shows an external appearance of a panel of an operating device according to another embodiment of the present invention. The operation switch 31, the channel designation switch 34, and the LEDs 34, 35, 36 are the same as those shown in FIG. 33 is a setting switch and 37 is a setting switch.
LED, 38U is an upper channel selection switch, 39U is an LED corresponding to the upper channel selection switch 38U, 38L is a lower channel switch, 39L is an LED corresponding to the lower channel selection switch 38L. FIG. 8B is a detailed diagram of the channel designation switch 32. NP on key top
1 and NP2 indicate the upper channel and the lower channel, respectively, and the valid channels are displayed when the upper channel or the lower channel is selected by the changeover switches 38U and 38L. The lighting control system of the present embodiment should be designated. It is effective when used with a large number of channels. That is, when the upper channel is selected by the upper channel changeover switch 38U, there are a plurality of channel designation switches 32.
Functions as a switch that can specify the channel of NP1 shown on the upper side, while if the lower channel changeover switch 38L is pressed, it can specify the channel shown by NP2 of the channel specifying switch 32. Functions as a switch that can.

本実施例による割付け設定は以下のように行なう。ま
ず、操作器パネル3の設定スイッチ33を押下し割付け設
定モードとする。これにより設定スイッチのLED37が点
灯する。次にチャンネルを割付けるべき操作スイッチ31
の1つを選択し押下する。これにより当該操作スイッチ
のLED34が点灯する。次に、割付けるべきチャンネルが
チャンネル指定スイッチのNP1側であるならチャンネル
指定切替えスイッチ38Uを押下しその後当該チャンネル
指定スイッチ32を押下する。これによりLED39Uと当該チ
ャンネル指定スイッチ32に対応するLED36が点灯する。
割付けるべきチャンネルNP1側である場合は引き続きチ
ャンネル指定スイッチ32を押下して割付けを行なう。
The allocation setting according to this embodiment is performed as follows. First, the setting switch 33 on the operation panel 3 is pressed to enter the allocation setting mode. This causes the LED 37 of the setting switch to light up. Operation switch 31 to assign the next channel
Select one and press. This causes the LED 34 of the operation switch to light up. Next, if the channel to be assigned is on the NP1 side of the channel designating switch, the channel designating switch 38U is depressed, and then the channel designating switch 32 is depressed. As a result, the LED 39U and the LED 36 corresponding to the channel designation switch 32 are turned on.
If it is on the side of the channel NP1 to be assigned, the channel designation switch 32 is continuously depressed to perform the assignment.

一方、割付けるべきチャンネルがチャンネル指定スイッ
チのNP2側であるなら、チャンネル指定切替えスイッチ3
8Lを押下する。これにより、チャンネル指定スイッチ32
はNP2側に表されたチャンネルに対応するスイッチとし
て機能することとなり、チャンネル指定スイッチ32を押
下することにより割付けができる。
On the other hand, if the channel to be assigned is on the NP2 side of the channel designation switch, channel designation switch 3
Press 8L. This allows the channel specification switch 32
Will function as a switch corresponding to the channel shown on the NP2 side, and can be assigned by pressing the channel designation switch 32.

これを繰返し幾つかのチャンネルを割付ける。さらに割
付けるべき操作スイッチがある場合は、操作スイッチ31
の押下からの操作を繰返し割付けを行なう。すべての割
付けが終了したら、再び設定スイッチ33を押下し割付け
設定モードから通常モードへと戻る。
Repeat this to assign some channels. If there are more operation switches to be assigned, the operation switch 31
Repeat the operation from pressing. When all the allocation is completed, the setting switch 33 is pressed again to return from the allocation setting mode to the normal mode.

第9図は、第8図の実施例における中央処理装置1の処
理シーケンスを示すフローチャートである。同図のフロ
ーチャートを参照して、上述したような処理手順で割付
け設定を行なった場合の動作を説明する。
FIG. 9 is a flow chart showing the processing sequence of the central processing unit 1 in the embodiment of FIG. The operation when the allocation setting is performed in the above-described processing procedure will be described with reference to the flowchart of FIG.

まず、電源が投入されると中央処理装置1はステップS2
1で初期化を行ない、ステップS22で監視データを受信す
る。ステップS23では設定中フラグが1か否かを判別
し、1でない場合はステップS24で設定スイッチ信号を
受信したか否かを判別する。設定スイッチ33の押下であ
った場合はステップS24からS25へと分岐し、設定中フラ
グを1にセットする。そして、ステップS26で設定スイ
ッチ33のLED37および下位チャンネル切替えスイッチ38L
のLED39Lを点灯すべき旨の送信データをセットし、全操
作スイッチ31のLED34,35および全チャンネル指定スイッ
チ32のLED36をすべて消灯すべき旨の送信データをセッ
トし、これらのデータをステップS27で送信する。その
後ステップS22に戻る。
First, when the power is turned on, the central processing unit 1 executes step S2.
Initialization is performed in 1, and monitoring data is received in step S22. In step S23, it is determined whether or not the setting flag is 1, and if it is not 1, it is determined in step S24 whether or not the setting switch signal is received. If the setting switch 33 is pressed, the process branches from step S24 to S25, and the setting flag is set to 1. Then, in step S26, the LED 37 of the setting switch 33 and the lower channel selection switch 38L
Set the transmission data to turn on the LED 39L of, and set the transmission data to turn off all the LEDs 34 and 35 of all the operation switches 31 and the LEDs 36 of all the channel designation switches 32, and set these data in step S27. Send. After that, the process returns to step S22.

次に、ステップS22で操作スイッチ31の押下を示すデー
タを受信した場合は、ステップS23で設定中フラグは1
であるからステップS28に進み、ここで設定スイッチ信
号であるか否かを判別する。この場合設定スイッチ信号
ではないからステップS29に分岐し、ここで操作スイッ
チ信号であるか否かを判別する。操作スイッチの押下で
あるからステップS30で当該操作スイッチの割付けフラ
グをセットし、当該操作スイッチ31に対応するLED34を
点灯すべき旨の送信データをセットし、ステップS27で
これらのデータを送信する。そして、再びステップS22
へと戻る。
Next, when the data indicating that the operation switch 31 is pressed is received in step S22, the setting flag is set to 1 in step S23.
Therefore, the process proceeds to step S28, where it is determined whether or not it is a setting switch signal. In this case, since it is not the setting switch signal, the process branches to step S29, and it is determined here whether it is the operation switch signal. Since the operation switch is pressed, the allocation flag of the operation switch is set in step S30, the transmission data indicating that the LED 34 corresponding to the operation switch 31 should be turned on is set, and these data are transmitted in step S27. And again step S22
Return to.

次に、ステップS22でチャンネル指定スイッチ32、上位
チャンネル切替えスイッチ38Uまたは下位チャンネル切
替えスイッチ38Lの押下を示すデータを受信した場合
は、ステップS22→S23→S28→S29を経てステップS31へ
と分岐する。ステップS31で割付けフラグがセットされ
ているか否判別し、セットされていない場合はステップ
S22へと戻る。
Next, when the data indicating that the channel designation switch 32, the upper channel changeover switch 38U or the lower channel changeover switch 38L is pressed is received in step S22, the process branches to step S31 through steps S22 → S23 → S28 → S29. In step S31, it is determined whether or not the allocation flag is set, and if it is not set, the step is
Return to S22.

ステップS31で割付けフラグがセトされている場合は、
ステップS32で上位チャンネル切替えスイッチ38Uの押下
であったか否かを判別する。上位チャンネル切替えスイ
ッチ38Uの押下である場合は、ステップS32からステップ
S33へと分岐し、ここでチャンネル切替えフラグをセッ
トする。そして、上位チャンネル切替えスイッチ38Uに
対応するLED39Uを点灯すべき旨の送信データをセット
し、ステップS27へと進む。
If the allocation flag is set in step S31,
In step S32, it is determined whether or not the upper channel selection switch 38U has been pressed. If the upper channel selector switch 38U is pressed, the steps from step S32 to step
The process branches to S33, where the channel switching flag is set. Then, the transmission data to the effect that the LED 39U corresponding to the upper channel changeover switch 38U should be turned on is set, and the process proceeds to step S27.

ステップS32で上位チャンネル切替えスイッチでない場
合は、ステップS34で下位チャンネル切替えスイッチの
押下であったか否かを判別する。ステップS34で下位チ
ャンネル切替えスイッチの押下であった場合は、ステッ
プS35へと分岐しチャンネル切替えフラグをリセットす
る。そして、下位チャンネル切替えスイッチ38Lに対応
するLED39Lを点灯すべき旨の送信データをセットし、ス
テップS27へと進む。
If it is not the upper channel selection switch in step S32, it is determined in step S34 whether or not the lower channel selection switch is pressed. If the lower channel switch is pressed at step S34, the process branches to step S35 to reset the channel switch flag. Then, the transmission data indicating that the LED 39L corresponding to the lower channel changeover switch 38L should be turned on is set, and the process proceeds to step S27.

ステップS34で下位チャンネル切替えスイッチでない場
合は、ステップS36でチャンネル切替えフラグを判別
し、上位チャンネルが指定されていた場合はステップS3
7へ、下位チャンネルが指定されていた場合はステップS
39へと、それぞれ分岐する。
If it is not the lower channel selection switch in step S34, the channel switching flag is determined in step S36, and if the upper channel is designated, step S3
Go to step 7, if lower channel is specified
Each branch to 39.

上位チャンネルの場合は、ステップS37でチャンネル指
定スイッチ32を押下した場合の信号を受信したかどうか
判別する。チャンネル指定スイッチ信号の受信であった
場合は、ステップS38で該当する操作スイッチ31の割付
けメモリに対し該当する上位チャンネルを割付け、該当
するチャンネル指定スイッチに対応するLED36を点灯す
べき旨の送信データをセットし、ステップS27へと進
む。
In the case of the upper channel, it is determined whether or not the signal when the channel designation switch 32 is pressed is received in step S37. If the channel designation switch signal is received, the corresponding upper channel is assigned to the assignment memory of the corresponding operation switch 31 in step S38, and the transmission data indicating that the LED 36 corresponding to the corresponding channel designation switch should be turned on is transmitted. Set and proceed to step S27.

ステップS37でチャンネル指定スイッチ信号の受信でな
い場合はステップS22へと戻る。
If the channel designation switch signal is not received in step S37, the process returns to step S22.

一方、ステップS36で下位チャンネルであった場合は、
ステップS39でチャンネル指定スイッチ信号の受信であ
ったか否か判別する。チャンネル指定スイッチ信号の受
信であった場合は、ステップS40で該当する操作スイッ
チの割付けメモリに対し該当する下位チャンネルを割付
け、該当するチャンネル指定スイッチに対応するLEDの
表示送信データをセットし、ステップS27へと進む。ス
テップS39でチャンンネル指定スイッチ信号の受信でな
い場合はステップS22へと戻る。
On the other hand, if it is the lower channel in step S36,
In step S39, it is determined whether or not the channel designation switch signal has been received. If the channel designation switch signal is received, the corresponding lower channel is assigned to the assignment memory of the corresponding operation switch in step S40, the LED display transmission data corresponding to the corresponding channel designation switch is set, and step S27 Go to. If the channel designation switch signal is not received in step S39, the process returns to step S22.

以上のように、操作スイッチ31の押下と、上位チャンネ
ル切替えスイッチ38Uまたは下位チャンネル切替えスイ
ッチ38Lの押下と、チャンネル指定スイッチ32の押下と
を、適宜繰返し割付けを行なう。
As described above, the pressing of the operation switch 31, the pressing of the upper channel switching switch 38U or the lower channel switching switch 38L, and the pressing of the channel designation switch 32 are appropriately repeated and allocated.

その後、設定スイッチ33を押下すると、その監視データ
はステップS22で受信され、ステップS23,S28を経てステ
ップS41で割付け終了となる。そして、全スイッチの表
示データを送信データとしてセットし、設定中フラグお
よび割付けフラグをリセトして、ステップS27へと進
む。ステップS27でこれらのデータを送信することによ
り割付けが終了する。
After that, when the setting switch 33 is pressed, the monitoring data is received in step S22, and the allocation is completed in step S41 via steps S23 and S28. Then, the display data of all the switches is set as the transmission data, the setting flag and the allocation flag are reset, and the process proceeds to step S27. The allocation is completed by transmitting these data in step S27.

通常モードの場合、ステップS22での監視データ受信か
らステップS23,S24を経てステップS42の通常処理に至
る。この通常モードにおいては、前期の実施例と同様
に、操作スイッチ31は対応する壁スイッチ8と2ケ所操
作で機能することとなる。
In the normal mode, the monitoring data is received in step S22, and then the normal processing of step S42 is performed through steps S23 and S24. In this normal mode, as in the previous embodiment, the operation switch 31 functions with the corresponding wall switch 8 at two locations.

本実施例によれば接続チャンネル数が多い場合でもチャ
ンネル指定スイッチ32の数を同数設ける必要がない。例
えば、総接続可能チャンネル数を256個とするとチャン
ネル指定スイッチ32の数はその半分である128個です
む。これにより操作器パネルは小型となりコストも安く
なる。
According to this embodiment, it is not necessary to provide the same number of channel designating switches 32 even if the number of connected channels is large. For example, assuming that the total number of connectable channels is 256, the number of channel designating switches 32 is only half, that is, 128. As a result, the operator panel is small and the cost is low.

[発明の効果] 以上説明したように、本発明によれば、壁スイッチと制
御端末器の制御回路系(照明負荷)とを割付けるための
操作器を具備しこれを操作することにより割付けを行な
うこととしているので、その操作は理解し易くかつ操作
し易い。また、スイッチに対応する表示灯を設ければ、
のチャンネルに割付けられているかのチェックも容易で
あるさらに、チャンネルとチャンネル指定スイッチとを
1:1対応とすれば物理的な対応関係が明確となり操作性
が向上する。また、チャンネル指定スイッチをチャンネ
ル指定切替えスイッチにより上位チャンネルと下位チャ
ンネルに分けて使用することにより、チャンネル指定ス
イッチをチャンネル数と同数設ける必要がなくその個数
を1/2または1/3などに減少させることができる。これに
より操作器は小型となりコストの減少も図るとができ
る。
[Effects of the Invention] As described above, according to the present invention, an operating device for allocating the wall switch and the control circuit system (lighting load) of the control terminal is provided, and the allocation is performed by operating the operating device. The operation is easy to understand and easy to operate. Moreover, if an indicator light corresponding to the switch is provided,
It is easy to check whether the channel is assigned to any of the channels.
The 1: 1 correspondence makes the physical correspondence clear and improves the operability. Also, by using the channel specification switch by dividing it into upper and lower channels with the channel selection switch, it is not necessary to provide the same number of channel specification switches as the number of channels, and the number can be reduced to 1/2 or 1/3. be able to. As a result, the operating device becomes smaller and the cost can be reduced.

【図面の簡単な説明】[Brief description of drawings]

第1図は、本発明の一実施例に係る照明制御システムの
概略構成を示すブロック図、 第2図は、本実施例のシステムにおける操作器のパネル
の外観図、 第3図は、本実施例の中央処理装置の回路図、 第4図は、本実施例のシステムにおける制御端末器の回
路図、 第5図は、本実施例のシステムにおける操作端末器の回
路図、 第6図は、本実施例のシステムにおける伝送信号を表す
波形図 第7図は、本実施例のシステムにおける中央処理装置の
動作を説明するためのフローチャート、 第8図は、本発明の他の実施例に係る操作器のパネル上
の外観図、 第9図は、第8図の実施例における中央処理装置の動作
を説明するためのフローチャートである。 1……中央処理装置、2……伝送線、3……操作器、4
……操作端末器、5……制御端末器、6……照明負荷、
8……壁スイッチ、11……メモリ、12……制御部、13…
…伝送インターフェース、31……操作スイッチ、32……
チャンネル指定スイッチ、33……設定スイッチ、34……
負荷点灯表示LED、35……負荷消灯表示LED、36……表示
LED。
FIG. 1 is a block diagram showing a schematic configuration of a lighting control system according to an embodiment of the present invention, FIG. 2 is an external view of a panel of an operating device in the system of the present embodiment, and FIG. FIG. 4 is a circuit diagram of a control terminal unit in the system of the present embodiment, FIG. 5 is a circuit diagram of an operation terminal unit in the system of the present embodiment, and FIG. FIG. 7 is a waveform diagram showing a transmission signal in the system of the present embodiment. FIG. 7 is a flow chart for explaining the operation of the central processing unit in the system of the present embodiment, and FIG. 8 is an operation according to another embodiment of the present invention. 9 is a flow chart for explaining the operation of the central processing unit in the embodiment of FIG. 1 ... Central processing unit, 2 ... Transmission line, 3 ... Operator, 4
…… Operation terminal, 5 …… Control terminal, 6 …… Lighting load,
8 ... Wall switch, 11 ... Memory, 12 ... Control unit, 13 ...
… Transmission interface, 31 …… Operation switch, 32 ……
Channel designation switch, 33 …… Setting switch, 34 ……
Load lit LED, 35 …… Load off LED, 36 …… display
LED.

フロントページの続き (56)参考文献 特開 昭54−103275(JP,A) 特開 昭56−138896(JP,A) 特開 昭60−119094(JP,A) 特開 昭61−271785(JP,A)Continuation of the front page (56) Reference JP 54-103275 (JP, A) JP 56-138896 (JP, A) JP 60-119094 (JP, A) JP 61-271785 (JP , A)

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】中央処理装置と、単数または複数の照明負
荷が接続されこれらの照明負荷をオン/オフ制御する制
御回路系を備えた制御端末器と、予め割付けられた制御
回路系を介して単数または複数の上記照明負荷をオン/
オフする壁スイッチを備えた操作端末器とを、2線の伝
送線を介して接続し、これらの間で伝送信号を授受する
ことにより上記各照明負荷の動作を制御する照明制御シ
ステムにおいて、 上記2線の伝送線に接続され、かつ上記制御端末器の制
御回路系の幾つかを上記操作端末器の壁スイッチに割付
けるため、設定スイッチと、上記壁スイッチと対応する
同数の操作スイッチと、上記制御回路系と対応する同数
のチャンネル指定スイッチとを備える操作器を具備し、
上記設定スイッチの押下により割付設定モードとした
後、割付けるべき壁スイッチに対応する操作スイッチと
該壁スイッチに割付けるべき制御回路系に対応する幾つ
かのチャンネル指定スイッチとを押下することにより割
付けを行なうことを特徴とする照明制御システム。
1. A central processing unit, a control terminal device having a control circuit system connected to a single or a plurality of lighting loads and controlling ON / OFF of these lighting loads, and a control circuit system pre-allocated. Turn on / load one or more of the above lighting loads
In a lighting control system for controlling an operation of each of the lighting loads by connecting an operation terminal equipped with a wall switch to be turned off via a two-wire transmission line, and transmitting and receiving a transmission signal between them. A setting switch and the same number of operation switches corresponding to the wall switches, which are connected to two transmission lines and allocate some of the control circuit system of the control terminal to the wall switches of the operation terminal. An operating device having the same number of channel designating switches as the control circuit system,
After setting the allocation setting mode by pressing the setting switch, the operation switch corresponding to the wall switch to be allocated and some channel specifying switches corresponding to the control circuit system to be allocated to the wall switch are allocated Lighting control system characterized by performing.
【請求項2】前記チャンネル指定スイッチに対応する表
示灯を具備し割付け設定モードのときは該表示灯を対応
する制御回路系が割付けられているか否かを示す表示灯
として用い、通常モードのときは該表示灯を対応する制
御回路系の点灯/消灯状態を示す表示灯として用いる請
求項1に記載の照明制御システム。
2. An indicator lamp corresponding to the channel designating switch is provided, and in the allocation setting mode, the indicator lamp is used as an indicator lamp indicating whether or not the corresponding control circuit system is allocated, and in the normal mode. The lighting control system according to claim 1, wherein the indicator lamp is used as an indicator lamp that indicates whether the corresponding control circuit system is turned on or off.
【請求項3】前記チャンネル指定スイッチを前記制御回
路系に対応して同数設ける代わりに、前記制御回路系を
N個のグループに分けてこれらのグループを選択するた
めの切替スイッチと1/N個のチャンネル指定スイッチと
を設け、該切替スイッチでグループを選択した後に該チ
ャンネル指定スイッチを押下して割付けを行なう請求項
1または2に記載の照明制御システム。
3. Instead of providing the same number of the channel designating switches corresponding to the control circuit system, the control circuit system is divided into N groups and changeover switches for selecting these groups and 1 / N number of switches. The lighting control system according to claim 1 or 2, wherein the channel designation switch is provided, and the channel designation switch is pressed after selecting a group with the changeover switch to perform allocation.
JP1076624A 1989-03-30 1989-03-30 Lighting control system Expired - Lifetime JPH0760743B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1076624A JPH0760743B2 (en) 1989-03-30 1989-03-30 Lighting control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1076624A JPH0760743B2 (en) 1989-03-30 1989-03-30 Lighting control system

Publications (2)

Publication Number Publication Date
JPH02257593A JPH02257593A (en) 1990-10-18
JPH0760743B2 true JPH0760743B2 (en) 1995-06-28

Family

ID=13610512

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1076624A Expired - Lifetime JPH0760743B2 (en) 1989-03-30 1989-03-30 Lighting control system

Country Status (1)

Country Link
JP (1) JPH0760743B2 (en)

Also Published As

Publication number Publication date
JPH02257593A (en) 1990-10-18

Similar Documents

Publication Publication Date Title
US4843386A (en) Remote control unit with hierarchical selection
CA2522140C (en) Operation switch wiring mechanism
JP6069864B2 (en) Monitoring terminal and lighting control system using the monitoring terminal
JP3752852B2 (en) Remote monitoring and control system
JPH0353840B2 (en)
JPH0760743B2 (en) Lighting control system
JPS6059716B2 (en) Lighting load control device
JP3451984B2 (en) Remote monitoring and control system
JPH0855681A (en) Lighting load control system
JPH0760744B2 (en) Lighting control system
JPH0434358B2 (en)
JP2557577Y2 (en) Lighting control system
JPH0695783B2 (en) Remote monitoring controller
JP2017084815A (en) Monitoring terminal device and lighting control system using the same
JPH02257594A (en) Lighting control system
JP2002110369A (en) Lighting equipment
JPH08251675A (en) Centralized operation device in load control system
JPS6348160B2 (en)
JP3184557B2 (en) Lighting control device
JP3087380B2 (en) Lighting monitoring and control device
JPH0695784B2 (en) Terminal for operation of remote monitoring and control device
JP3433604B2 (en) Selector switch for remote monitoring and control system
JP3367792B2 (en) Remote monitoring control device
JPH02260394A (en) Lighting control system
JP2000341769A (en) Remote monitoring and control system