JPH0762379B2 - Construction method of plaster wall and plaster wall base material used for the construction method - Google Patents
[go: Go Back, main page]

JPH0762379B2 - Construction method of plaster wall and plaster wall base material used for the construction method - Google Patents

Construction method of plaster wall and plaster wall base material used for the construction method

Info

Publication number
JPH0762379B2
JPH0762379B2 JP25343887A JP25343887A JPH0762379B2 JP H0762379 B2 JPH0762379 B2 JP H0762379B2 JP 25343887 A JP25343887 A JP 25343887A JP 25343887 A JP25343887 A JP 25343887A JP H0762379 B2 JPH0762379 B2 JP H0762379B2
Authority
JP
Japan
Prior art keywords
wall
base
coating
adjusting
base material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP25343887A
Other languages
Japanese (ja)
Other versions
JPH0194147A (en
Inventor
繁行 河田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP25343887A priority Critical patent/JPH0762379B2/en
Publication of JPH0194147A publication Critical patent/JPH0194147A/en
Publication of JPH0762379B2 publication Critical patent/JPH0762379B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)
  • Building Environments (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、塗り壁(吹きつけ等を含む)の施工方法およ
びその施工方法に用いる塗り壁下地材に係り、より詳細
には、下地調整塗り材が壁下地板(天井下地板を包含す
る)としての木質合板に対して強固に接合合体され容易
に剥離することがない塗り壁の施工方法およびその施工
方法に用いる塗り壁下地材に関するものである。
Description: TECHNICAL FIELD The present invention relates to a method for applying a painted wall (including spraying) and a painted wall base material used in the method, and more specifically, to a ground conditioner. TECHNICAL FIELD The present invention relates to a coating wall construction method in which a coating material is firmly joined and integrated to a wood plywood as a wall foundation plate (including a ceiling foundation plate) and does not easily peel off, and a coating wall base material used in the construction method. Is.

〔発明の技術的背景〕[Technical background of the invention]

塗り壁の施工するに際しては、まず、塗り壁下地を施工
した後、該下地に塗り壁材料を塗ることでその施工を行
っている。そして該塗り壁下地の施工方法としては、多
種多様の方法が知られており、その方法と問題点を列記
すると、 通常は下地板の上にメタルラスやワイヤラスを張りセ
メントモルタルを塗ることが多いが該方法では工期が長
くなり、またクラックも生じ易いし、薄塗りもできない
という問題点があった。
When constructing a plaster wall, first, after constructing a plaster wall underlayer, the plaster wall is coated with a plaster wall material to perform the construction. A wide variety of methods are known as construction methods for the painted wall foundation, and when the methods and problems are listed, usually, a metal lath or wire lath is spread on the foundation plate and cement mortar is often applied. This method has problems that the construction period is long, cracks are likely to occur, and thin coating cannot be performed.

下地材として石膏ボードを用い、その上にボード用石
膏プラスターを主原料とする下地調整塗り材を薄塗りす
る方法があるが、石膏ボードは衝撃に弱く破損事故が生
じ易い。また石膏ボードを使用する場合には、その隣接
ボード間の継ぎ目にクラックが生じ易いので、そのクラ
ック防止策を取る必要があるが石膏ボードはステーブル
や釘があまりきかないので継ぎ目は繊維質のネットをい
ちいち塗り材で張り付けなければならず作業が大変であ
る。
There is a method in which a gypsum board is used as a base material, and a base adjustment coating material whose main raw material is gypsum plaster for board is thinly applied to the base material. Also, when using gypsum board, cracks are likely to occur at the joints between adjacent boards, so it is necessary to take measures to prevent the cracks, but since gypsum board does not have too many stables and nails, the joints are fibrous. The net must be attached with a coating material one by one, which makes the work difficult.

セメント及び石灰を主原料とする塗り材などを予め木
質合板に塗った壁下地材があるが、壁面に合わせて現場
加工するのが困難で特殊道具を必要とし、残材の焼却処
理ができない。そのようなことから経済的にもコスト高
になる。
There is a wall base material that is made by coating a wood-based plywood with a coating material mainly composed of cement and lime in advance, but it is difficult to perform on-site processing according to the wall surface, special tools are required, and incineration of the remaining material cannot be performed. As a result, the cost becomes high economically.

石膏ラスボードを使用して、その上にボード用石膏プ
ラスターを主原料とする下地調整塗り材などを塗り天井
を形成するような場合、結露現象により石膏ラスボード
が軟化し、表面に張ってある厚紙が剥離して表面のボー
ド用石膏プラスター仕上げ面にクラックまたは剥離等の
問題が生じる場合があり、小規模の天井にしか使用出来
ないなどの難点があった。
When a plaster lath board is used and a ceiling coating is applied on it using a plaster plaster for board as a main raw material, the gypsum lath board is softened by the dew condensation phenomenon, and the thick paper on the surface is There is a problem in that the surface of the plaster plaster for board may be cracked or peeled off to cause a problem such as cracking or peeling, so that it can be used only for a small-scale ceiling.

その他、下地板に合板、パルプセメント板、木毛セメ
ント板等々を使用し、これに下地調整塗り材を塗り、モ
ルタル仕上げ、セメント系吹きつけ仕上げなど行う場合
があるが下地板に対する下地調整塗り材の接合合体効果
が弱いという問題点があった。
In addition, plywood, pulp cement board, wood wool cement board, etc. are used for the base plate, and a base adjustment coating material may be applied to this, and mortar finishing, cement-based spray finishing, etc. may be performed. There was a problem that the effect of joining and joining was weak.

本発明は、上述の種々の問題点に対処するために創案し
たものであって、その目的とする処は、塗り壁材料が剥
離することなく、且つクラックが生じ難く、振動や衝撃
にも強い塗り壁の施工方法およびその施工方法に用いる
塗り壁下地材を提供することにある。
The present invention was devised in order to address the above-mentioned various problems, and the purpose is to prevent the coating wall material from peeling off, to prevent cracks from occurring, and to withstand vibration and impact. It is intended to provide a painted wall construction method and a painted wall base material used for the construction method.

〔問題点を解決するための手段〕[Means for solving problems]

そして、上記目的を達成するための手段として本発明の
塗り壁の施工方法は、多数の貫通孔を穿設した木質合板
等の基材に下地調整材を塗布あるいは吹きつけ等の手段
でもって配設し、該下地調整材を該貫通孔内に充填させ
ると供に該下地調整材が該貫通孔を通って下地調整材配
設綿の反対面側に突出係合するようにして壁下地を形成
した後、該壁下地の表面に壁材料を配設するようにした
構成よりなる。
Then, as a means for achieving the above object, the method of constructing a painted wall according to the present invention is such that a base adjusting material is applied or sprayed to a base material such as wood plywood having a large number of through holes. When the base adjusting material is filled in the through hole, the base adjusting material passes through the through hole and protrudes and engages with the opposite surface of the cotton provided with the base adjusting material to form a wall base. After the formation, a wall material is arranged on the surface of the wall base.

ここで、上記構成において、通常、上記木質合板への直
径が5〜15mm程度で、それぞれの貫通孔の隣接間隔が35
〜150mm程度としている。また、下地調整材としては、
セメントと石灰を主原料としたものを用いている。
Here, in the above structure, the diameter of the wood plywood is usually about 5 to 15 mm, and the distance between adjacent through holes is 35 mm.
Approximately 150 mm. In addition, as a ground control material,
The main raw material is cement and lime.

また、上記目的を達成するための手段として本発明の塗
り壁下地材は、基材として木質合板を用い、該木質合板
に多数の貫通孔を穿設し、該合板の一方の面に下地調整
材を配設して壁下地層を形成し、且つ該下地調整材が該
貫通孔内に充填されると供に該充填先端部が木質合板の
下地調整材配設面の反対面側に突出係合するようにした
構成となっている。
Further, as a means for achieving the above-mentioned object, the painted wall base material of the present invention uses a wood plywood as a base material, a large number of through holes are bored in the wood plywood, and the base is adjusted on one surface of the plywood. A wall base layer is formed by arranging the material, and when the base adjusting material is filled in the through hole, the filling tip portion projects to the opposite side of the surface of the wood plywood from which the base adjusting material is arranged. It is configured to be engaged.

ここで、上記構成において、通常、壁下地層の厚さとし
ては3〜4mmとしている。
Here, in the above structure, the thickness of the wall underlayer is usually 3 to 4 mm.

〔作用〕[Action]

そして、上記構成に基づく、本発明の塗り壁の施工方法
は、例えば、縦910mm、横1820mm、厚さ6mm程度の大きさ
の木質合板に、直径が10mmの貫通孔を50mm隣接間隔おき
に都合450個程度穿設し、該孔あき合板を壁や天井下地
板として用い、壁枠組(木製軸組)に釘で打ちつけ固定
した後に、または打ちつけ固定前に、セメント、石灰を
主原料とする下地調整材を左官工事で塗り、該下地調整
材が貫通孔の中に食い込んで充填されると供に、該下地
調整材は下地板の流側に流出し突出係合した状態で凝固
し、表面の下地調整材による壁下地層は、貫通孔に対す
る係合により下地板と強固に合体接合されて一体化し、
塗り壁下地部を形成した後、該壁下地部の下地調整材配
設面(表面)に壁材料を配設(塗布等)することで、該
壁材料と下地調整材とが一体化し、該壁材料が壁下地材
に対して容易に剥離することがないように作用する。
Then, based on the above configuration, the method of constructing a painted wall of the present invention is, for example, 910 mm in length, 1820 mm in width, wood plywood having a size of about 6 mm, and a through hole having a diameter of 10 mm is convenient at intervals of 50 mm adjacent to each other. Approximately 450 holes are made, and the perforated plywood is used as a wall or ceiling base plate, and after cementing and fixing to the wall framework (wooden frame) with nails, or before cementing and fixing, the base material mainly made of cement or lime. When the adjusting material is applied by plastering, and the underlying adjusting material bites into the through hole to be filled, the underlying adjusting material flows out to the flow side of the underlying plate and solidifies in a protruding engagement state, The wall base layer made of the base adjusting material of is firmly joined and integrated with the base plate by engagement with the through hole,
After forming the painted wall underlayer, by arranging (coating, etc.) a wall material on the surface (surface) on which the underlayer adjusting material is provided in the wall underlayer, the wall material and the underlayer adjusting material are integrated, The wall material acts so as not to be easily separated from the wall base material.

また、上記構成に基づく、本発明の塗り壁の施工方法に
用いる塗り壁下地材は、下地材の基材として木質合板を
用い、この一方の面に配設した下地調整材が貫通孔によ
って強固に一体化されているので、その表面に配設する
壁材料が該下地調整材に充分に保持されるように作用す
る。
Further, based on the above configuration, the coating wall base material used in the coating wall construction method of the present invention uses wood plywood as the base material of the base material, and the base adjustment material arranged on this one surface is firmly fixed by the through holes. , The wall material disposed on the surface thereof is sufficiently retained by the base adjusting material.

以上のように、本発明の塗り壁の施工方法およびその施
工方法に用いる壁下地材は、壁を塗布等の手段でもって
施工する際に用いる基材としての下地材に複数個の貫通
孔を穿設し、該孔に下地調整材が該下地材の裏面に突出
係合するようにして、該下地材と下地調整材との接着性
を向上させることができ、表面に配設する壁材料が容易
に剥離しないという格別な作用を奏するものである。
As described above, the wall foundation material used in the method for constructing a painted wall of the present invention and the construction method has a plurality of through holes in the foundation material as a base material used when constructing a wall by means such as coating. A wall material to be provided on the surface, which is provided by drilling the base adjusting material so as to projectly engage with the back surface of the base material in the hole to improve the adhesiveness between the base adjusting material and the base adjusting material. Has a special effect that it does not peel off easily.

〔実施例〕〔Example〕

以下、図面を参照しながら、本発明を具体化した実施例
について説明する。
Embodiments embodying the present invention will be described below with reference to the drawings.

ここに、第1図は本発明の施工工程を説明するための工
程図、第2〜4図は壁下地材の実施例であって、第2図
は有孔合板の部分平面図、第3図は縦壁の部分断面図、
第4図は天井壁の部分断面図、第5図は本発明の施工工
程で得た縦壁の展開断面図である。
Here, FIG. 1 is a process diagram for explaining a construction process of the present invention, FIGS. 2 to 4 are examples of a wall base material, and FIG. 2 is a partial plan view of a perforated plywood, and FIG. The figure shows a partial sectional view of the vertical wall,
FIG. 4 is a partial sectional view of the ceiling wall, and FIG. 5 is a developed sectional view of the vertical wall obtained by the construction process of the present invention.

本実施例の塗り壁の施工方法は、住宅における塗り壁と
して具体化した実施例であって、第1図に示す工程で施
工する方法である。すなわち、大別すると、貫通孔穿
設工程、下地調整材塗布工程、下地材配設工程、
塗り壁塗布工程の四工程よりなる。そして、以下にそれ
ぞれの工程について、第2〜5図を参照しながら具体的
に説明する。
The construction method of the painted wall of the present embodiment is an embodiment embodied as a painted wall in a house, and is the method of carrying out the steps shown in FIG. That is, when roughly classified, a through hole drilling step, a base adjusting material applying step, a base material disposing step,
It consists of four steps of coating wall coating. Then, each step will be specifically described below with reference to FIGS.

(貫通孔穿設工程) 本工程は、塗り壁下地材1を形成する基材となる板体2
に複数個の貫通孔3、3・・を穿設する工程である。
(Through Hole Drilling Step) In this step, a plate body 2 serving as a base material for forming the painted wall base material 1 is formed.
Is a step of forming a plurality of through holes 3, 3 ,.

すなわち、該板体2として、厚みが6mm程度のベニヤ合
板を用い、該合板に直径が10mm程度の大きさの貫通孔3
を、その隣接間隔が50mm程度となるように穿設する工程
である。該合板の大きさは建築物における軸組等によっ
て、所定の大きさに予め切断等の手段で形成しておき、
これに複数個の貫通孔3を穿設するようにしている(第
2図参照)。通常、合板の大きさは、縦910mm、横1820m
mの大きさのものを用い、また該合板に穿設する貫通孔
3は、別段、円形孔である必要はなく、三角孔、四角孔
等であってもよい。しかし、強度の点よりして、孔の大
きさは、形状は一定のものとすることが好ましく、また
孔間隔も一定に保つことが好ましい。そして、該形状の
板体を用いた場合、450個程度の貫通孔が穿設されるよ
うになる。
That is, a veneer plywood having a thickness of about 6 mm is used as the plate body 2, and a through hole 3 having a diameter of about 10 mm is formed in the plywood.
Is a step of boring so that the space between them is about 50 mm. The size of the plywood is preliminarily formed into a predetermined size by cutting or the like by a frame or the like in a building,
A plurality of through holes 3 are formed in this (see FIG. 2). Normally, the size of plywood is 910 mm long and 1820 m wide.
The size of m is used, and the through hole 3 formed in the plywood need not be a circular hole, but may be a triangular hole, a square hole, or the like. However, from the viewpoint of strength, it is preferable that the size of the holes has a constant shape and that the distance between the holes is also kept constant. Then, when the plate body having the shape is used, about 450 through holes are formed.

ここで、基材となる板体2としては、ベニヤ合板(三枚
重ね合板)に限られるものでなく、一枚の板体や樹脂性
板等を用いてもよい。しかし、膨張度等を考慮すれば、
合板が好ましい。
Here, the plate body 2 serving as the base material is not limited to the veneer plywood (three-ply plywood), and a single plate body or a resin plate may be used. However, considering the degree of expansion,
Plywood is preferred.

(下地調整塗り材塗布工程) 本工程は、貫通孔3、3・・を穿設した板体2の表面に
下地調整塗り材4を塗布して、塗り壁下地層5を形成す
ると共に、該板体2の裏面6に該下地調整塗り材4が貫
通孔3を通って突出係合させる工程である。
(Undercoat adjusting coating material applying step) In this step, the undercoat adjusting coating material 4 is applied to the surface of the plate body 2 having the through holes 3, 3 ... In this step, the back surface adjusting coating material 4 is projectedly engaged with the back surface 6 of the plate body 2 through the through hole 3.

すなわち、下地調整塗り材4として、セメントと石灰と
を主原料とし、これにセメント系ポリマーディスパジョ
ン等を混和したものを用い、これを下地材1を形成する
板体2の表面に3〜4mm厚程度塗布し、該表面に下地調
整塗り材4による塗り壁下地層5を形成すると共に、該
下地調整塗り材4を貫通孔3、3・・を介して、板体2
の裏面6に突出係合させ塗り材係合部7を形成し(第2
図参照)、板体2と塗り壁下地層5とを一体化させるた
めの工程である。塗り材係合部7は、下地調整塗り材4
の板体2の裏面6よりの突出部で、該下地調整塗り材4
の流出・凝固でもって形成され、通常、3〜15mmの長さ
としている。しかし、この長さは任意であって、板体2
と塗り壁下地層5とが強固に一体化になる長さ、形状等
であれば如何なる形態であってもよい。また、下地調整
塗り材4による塗り壁下地層5は、必要に応じて複層に
形成してもよい。
That is, as the undercoat adjusting coating material 4, a material in which cement and lime are main raw materials and cement-based polymer dispersion or the like is mixed is used, and this is applied to the surface of the plate body 2 forming the undercoat material 1 by 3 to 4 mm. It is applied to a thickness to form a coating wall foundation layer 5 of the foundation adjustment coating material 4 on the surface, and the base adjustment coating material 4 is passed through the through holes 3, 3 ,.
To form a coating material engaging portion 7 (second
(Refer to the drawing), which is a step for integrating the plate body 2 and the painted wall base layer 5. The coating material engaging portion 7 is a base adjustment coating material 4
Of the base adjusting coating material 4 at the protruding portion from the back surface 6 of the plate body 2 of
It is formed by the outflow and solidification of, and usually has a length of 3 to 15 mm. However, this length is arbitrary and the plate 2
Any shape may be used as long as the coating wall base layer 5 and the coating wall base layer 5 are firmly integrated. Further, the coating wall base layer 5 made of the base adjusting coating material 4 may be formed in a multi-layered structure, if necessary.

ところで、下地調整塗り材4を板体2の表面より塗布す
るに当たり、該下地調整塗り材4を塗厚1〜3mm程度塗
ると、貫通孔3、3・・を介して板体2の裏面6に該下
地調整塗り材4が突出する3〜15mm程度の塗り材係合部
7が形成されて下地調整塗り材4を板体2が一体化する
が、それと共に、板体2の表面は該下地調整塗り材4に
よって充分な状態で充填され、また垂れ等がない整面化
された状態の塗り壁下地層5が形成されるように作用す
る。従って、後述する塗り壁塗布工程で、各種塗装を薄
く仕上げることが可能となり、例えば、板体表面から塗
装(塗り壁)表面までの厚さ(塗厚)を5〜10mm前後の
薄塗仕上げが可能となるという利点を有する。
By the way, in applying the undercoat adjusting coating material 4 from the front surface of the plate body 2, if the undercoat adjusting coating material 4 is applied with a coating thickness of about 1 to 3 mm, the back surface 6 of the plate body 2 through the through holes 3, 3 ,. A coating material engaging portion 7 of about 3 to 15 mm from which the base adjustment coating material 4 projects is formed on the plate body 2 to integrate the base adjustment coating material 4 with the surface of the plate body 2 It acts so as to form the coating wall base layer 5 which is filled with the base adjustment coating material 4 in a sufficient state and has a leveled surface without sagging. Therefore, it becomes possible to finish various coatings thinly in the coating wall application step described later, for example, a thin coating finish of about 5 to 10 mm from the plate surface to the coating (painting wall) surface (coating thickness). It has the advantage of being possible.

(下地材配設工程) 本工程は、塗り壁下地層5を板体2の表面に一体化して
得た塗り壁下地材1を、建築物の木製軸組の上に、ステ
ンレスの螺旋釘で強固に取りつけて、塗り壁の下地を形
成する工程である。なお、該工程は、必要に応じて、板
体2の表面に塗り壁下地層5を形成する前、換言すれ
ば、貫通孔3、3・・を穿設した板体2の状態で建築物
の木製軸組の上に、ステンレスの螺旋釘で強固に取りつ
けて、その後に塗り壁下地層5を形成するようにしても
よい。
(Substrate disposing step) In this step, the coating wall foundation material 1 obtained by integrating the coating wall foundation layer 5 on the surface of the plate body 2 is mounted on the wooden frame of the building with a stainless steel spiral nail. It is a step of firmly attaching and forming the base of the painted wall. Incidentally, this step is performed before forming the coating wall base layer 5 on the surface of the plate body 2, if necessary, in other words, in the state of the plate body 2 having the through holes 3, 3 ... It is also possible to firmly attach it to the wooden frame with a stainless steel spiral nail, and then form the painted wall base layer 5.

(塗り壁塗布工程) 本工程は、塗り壁下地材の塗り壁下地層5に塗り壁材料
(塗料)によって表面塗装をする工程である。すなわ
ち、塗り壁9を施工する工程であって、該塗り壁材料
(塗料)としては、通常のモルタルその他の材料を使用
する。しかし、塗布以外の他の仕上げ方法を採用しても
よい。例えば、セメント系吹付け仕上げ、有機系吹付け
仕上げ等を採用してもよい。
(Coating Wall Coating Step) In this step, the coating wall base layer 5 of the coating wall base material is surface-coated with a coating wall material (paint). That is, in the step of constructing the painted wall 9, as the painted wall material (paint), ordinary mortar or other material is used. However, a finishing method other than coating may be adopted. For example, a cement-based spray finish, an organic-based spray finish, or the like may be adopted.

なお、通常、本工程を施工するに際しては、塗り壁下地
層5の表面に中塗り材8を塗布した後に施工するように
している。そして、該塗り壁9の下地材1に対する付着
力は、通常、3〜5kg/cm2程度としている。しかし、そ
れ以上の付着力としてもよい。
In addition, when performing this process, normally, it applies after applying the intermediate coating material 8 on the surface of the coating wall foundation layer 5. The adhesion of the coating wall 9 to the base material 1 is usually about 3 to 5 kg / cm 2 . However, the adhesive force may be higher than that.

そして、上述の工程を経て施工した建築物における壁に
ついて、1kgのなす形重りを1.5mの距離より突出させた
場合の塗り壁の下地材よりの剥離およびクラック現象を
調べた処、全く剥離およびクラックが認められ無かっ
た。これに対し、貫通孔3で下地調整塗り材4を固定、
一体化していない工程の下地材を用いたものについて同
様の試験をしたものについては、剥離現象が認められ
た。また、本実施例によるものについては3年間の耐久
試験においても剥離現象は全く認められず、また天井壁
として実施した場合についても同様の結果を得た。
Then, with respect to the wall in the building constructed through the above-mentioned process, when the shape weight of 1 kg is projected from the base material of the painted wall when protruding from a distance of 1.5 m and a crack phenomenon is examined, it is completely peeled and No crack was observed. On the other hand, the base adjustment coating material 4 is fixed by the through hole 3,
The peeling phenomenon was observed in the same test using the base material in the non-integrated process. Further, in the case of the example, no peeling phenomenon was observed even in the durability test for 3 years, and the same result was obtained when it was used as a ceiling wall.

次に、本実施例に採用する塗り壁下地材1の構成につい
て、より具体的に説明する。
Next, the structure of the painted wall base material 1 used in this embodiment will be described more specifically.

塗り壁下地材1は、第2〜4図に示すように、複数個の
8mm程度の孔よりなる貫通孔3、3・・が50mm程度の間
隔で穿設されたフェノール樹脂をコーティングもしくは
含浸等した木質合板2に、アクリル系ラテックスポリマ
ーの希釈液を塗布・乾燥した状態(好ましくは、一週間
以内)で、その表面に下地調整塗り材〔JIS−6916(セ
メント系下地調整塗り材)〕4を塗布し、該下地調整塗
り材4が複数個の貫通孔3、3・・を介して木質合板2
の裏面6に3〜15mm突出(それ以上あるいは以下突出す
るようにしてもよい)して塗り材係合部7を形成し、塗
り壁下地層5が木質合板2と一体化し、その表面を塗り
壁を施工できるようにした構成となっている。なお、下
地調整材係合部7は、第3図に示すような団子状にした
構成としてもよい。
As shown in FIGS. 2 to 4, the painted wall base material 1 is composed of a plurality of
A state in which the acrylic latex polymer diluent is applied and dried on the wood-based plywood 2 coated with or impregnated with the phenolic resin in which the through holes 3, 3 ... Consisting of about 8 mm are formed at intervals of about 50 mm ( Preferably, within one week), a surface adjusting coating material [JIS-6916 (cement-based surface adjusting coating material)] 4 is applied to the surface thereof, and the surface adjusting coating material 4 has a plurality of through holes 3, 3. · Through wood plywood 2
The coating material engagement portion 7 is formed by projecting 3 to 15 mm (more or less) on the back surface 6 of the, and the coating wall base layer 5 is integrated with the wood plywood 2 and the surface thereof is coated. It has a structure that allows construction of walls. The base adjusting material engaging portion 7 may have a dumpling-like configuration as shown in FIG.

また、下地調整塗り材4としては、漆喰等の石灰系の塗
材を採用することもできる。この場合、従来、用いてい
た剥離やクラック防止のためのマニラ麻などの下げ苧を
打つ必要がないという利点を有する。
A lime-based coating material such as plaster can also be used as the base adjustment coating material 4. In this case, there is an advantage in that it is not necessary to hit a lowering tab such as Manila hemp for preventing peeling and cracks which has been conventionally used.

ところで、上述した実施例においては、下地材を形成す
る板体をフェノール樹脂を使用した厚さ5mm程度の木質
合板で説明したが、他の種類の板体でもって構成しても
よく、例えば、その厚みが厚いものを用いてもよい。す
なわち、本発明の場合、下地材を形成する板体に貫通孔
を有する、換言すれば有孔板体、特に有孔合板を用い、
該孔を介して下地調整材(下地調整塗り材)を板体の裏
面で固定し、該板体と該下地調整材(下地調整塗り材)
とを一体化した点に特徴を有するものである。
By the way, in the above-mentioned embodiment, the plate forming the base material is described as a wood-made plywood having a thickness of about 5 mm using a phenol resin, but it may be configured by other kinds of plate, for example, You may use the thing with the thick thickness. That is, in the case of the present invention, the plate forming the base material has a through hole, in other words, a perforated plate, particularly a perforated plywood,
A base adjusting material (base adjusting coating material) is fixed on the back surface of the plate body through the hole, and the plate body and the base adjusting material (base adjustment coating material) are fixed.
It is characterized by the fact that they are integrated.

なお、本発明は上述した実施例に限定されるものでな
く、本発明の要旨を変更しない範囲内で変形実施できる
ものを含むものである。
It should be noted that the present invention is not limited to the above-described embodiments, but includes modifications that can be implemented without departing from the scope of the present invention.

〔発明の効果〕 以上の記載より明らかなように、本発明の塗り壁の施工
方法によれば、下地材の基材としての板体と下地調整材
とが強固に合体接合し、下地調整材が板体から容易に剥
離しない効果を有する。また、板体の継ぎ目にはメタル
ラスが使用できてステーブルや釘を止めえるので、振
動、衝撃にも強くクラックが生じ難い。また、貫通孔内
には不燃製の下地調整材が充填固化されるから木質合板
自体不燃性に優れるようになり火災時においても壁材料
の脱落が遅いなどの利点がある。更には板体は軽量で現
場で加工もし易く残材の焼却処理ができ、コスト安で施
工できるし、曲面天井壁の大天井などの施工が可能であ
る。
[Effects of the Invention] As is clear from the above description, according to the method for applying a coating wall of the present invention, the plate body as the base material of the base material and the base adjusting material are firmly joined together to form a base adjusting material. Has an effect of not easily peeling from the plate. In addition, since metal laths can be used at the seams of the plates to stop the stables and nails, they are resistant to vibration and impact, and cracks are less likely to occur. In addition, since the non-combustible base conditioner is filled and solidified in the through holes, the wood plywood itself is excellent in non-combustibility, and there is an advantage that the wall material comes off slowly even during a fire. Furthermore, the plate is light in weight, easy to work on site, can incinerate the remaining material, can be constructed at low cost, and can be constructed such as a large ceiling with a curved ceiling wall.

また、本発明の塗り壁の施工方法に用いる塗り壁板地材
によれば、合板と下地調整材とが貫通孔を介して強固に
合体接合した状態にあるので、塗り(吹きつけ等を含
む)壁を壁下地に強固な塗装状態で保持できる壁下地材
を提供できるという効果を有する。
Further, according to the painted wall plate base material used in the method for applying a painted wall of the present invention, since the plywood and the ground control material are in a state of being firmly united and joined through the through holes, coating (including spraying and the like is included. ) There is an effect that it is possible to provide a wall base material that can hold a wall on a wall base in a strongly painted state.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の施工工程を説明するための工程図、第
2〜4図は塗り壁下地材の実施例であって、第2図は有
孔合板の部分平面図、第3図は縦壁の部分断面図、第4
図は天井壁の部分断面図、第5図は本発明の施工工程で
得た縦壁の展開断面図である。 1……壁下地材、2……板体(木質合板)、3……貫通
孔、4……下地調整材、5……壁下地層、6……板体の
裏面、7……下地調整材係合部、8……中塗り材、9…
…塗り壁
FIG. 1 is a process diagram for explaining a construction process of the present invention, FIGS. 2 to 4 are examples of a painted wall base material, FIG. 2 is a partial plan view of a perforated plywood, and FIG. Partial sectional view of the vertical wall, No. 4
The figure is a partial cross-sectional view of the ceiling wall, and FIG. 5 is a developed cross-sectional view of the vertical wall obtained in the construction process of the present invention. 1 ... Wall base material, 2 ... Plate (wood plywood), 3 ... Through hole, 4 ... Base adjustment material, 5 ... Wall base layer, 6 ... Back surface of plate, 7 ... Base adjustment Material engaging part, 8 ... Intermediate coating material, 9 ...
… Painted wall

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】多数の貫通孔を穿設した木質合板等の基材
に下地調整材を塗布あるいは吹きつけ等の手段でもって
配設し、該下地調整材を該貫通孔内に充填させると供に
該下地調整材が該貫通孔を通って下地調整材配設面の反
対面側に突出係合するようにして壁下地を形成した後、
該壁下地の表面に壁材料を配設するようにしたことを特
徴とする塗り壁の施工方法。
1. A base material such as a wood plywood having a large number of through holes formed thereon is provided with a base adjusting material by means such as coating or spraying, and the base adjusting material is filled in the through holes. In addition, after forming the wall base material so that the base material adjusting member protrudes and engages with the surface opposite to the surface of the base material adjusting member through the through hole,
A method for constructing a painted wall, characterized in that a wall material is arranged on the surface of the wall base.
【請求項2】基材への貫通孔の直径が5〜15mm程度で、
それぞれの貫通孔の隣接間隔が35〜150mm程度である特
許請求の範囲第1項記載の塗り壁の施工方法。
2. The diameter of the through hole to the base material is about 5 to 15 mm,
The method for constructing a coated wall according to claim 1, wherein the through holes have an adjacent interval of about 35 to 150 mm.
【請求項3】下地調整材が、セメントと石灰を主原料と
したものである特許請求の範囲第1項記載の塗り壁の施
工方法。
3. The method for constructing a painted wall according to claim 1, wherein the ground control material is mainly composed of cement and lime.
【請求項4】基材として木質合板を用い、該木質合板に
多数の貫通孔を穿設し、該合板の一方の面に下地調整材
を配設して壁下地層を形成し、且つ該下地調整材が該貫
通孔内に充填されると供に該充填先端部が木質合板の下
地調整材配設面の反対面側に突出係合するようにしたこ
とを特徴とする塗り壁下地材。
4. A wood plywood is used as a base material, a large number of through holes are formed in the wood plywood, and a base adjusting material is provided on one surface of the plywood to form a wall base layer, and When the base adjusting material is filled in the through-hole, the filling tip portion is adapted to projectly engage with the surface of the wood plywood opposite to the surface on which the base adjusting material is arranged. .
【請求項5】壁下地層の厚さが、2〜5mmである特許請
求の範囲第4項記載の塗り壁下地材。
5. The coated wall base material according to claim 4, wherein the wall base layer has a thickness of 2 to 5 mm.
JP25343887A 1987-10-06 1987-10-06 Construction method of plaster wall and plaster wall base material used for the construction method Expired - Lifetime JPH0762379B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25343887A JPH0762379B2 (en) 1987-10-06 1987-10-06 Construction method of plaster wall and plaster wall base material used for the construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25343887A JPH0762379B2 (en) 1987-10-06 1987-10-06 Construction method of plaster wall and plaster wall base material used for the construction method

Publications (2)

Publication Number Publication Date
JPH0194147A JPH0194147A (en) 1989-04-12
JPH0762379B2 true JPH0762379B2 (en) 1995-07-05

Family

ID=17251401

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25343887A Expired - Lifetime JPH0762379B2 (en) 1987-10-06 1987-10-06 Construction method of plaster wall and plaster wall base material used for the construction method

Country Status (1)

Country Link
JP (1) JPH0762379B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4769030B2 (en) * 2005-06-22 2011-09-07 株式会社ノダ Curved surface construction method
JP2021181679A (en) * 2020-05-18 2021-11-25 清水建設株式会社 Wood member
CN112065957A (en) * 2020-08-31 2020-12-11 安徽江淮汽车集团股份有限公司 Gearbox system and vehicle

Also Published As

Publication number Publication date
JPH0194147A (en) 1989-04-12

Similar Documents

Publication Publication Date Title
US10920420B2 (en) Modified OSB board and its use in walls for house building systems
US5367847A (en) Composite building structure and method for constructing same
US5657602A (en) Exterior wall system and method of constructing same
US7743569B1 (en) Support panel for thin brick
JPH0762379B2 (en) Construction method of plaster wall and plaster wall base material used for the construction method
AU2010100010A4 (en) Wall lining
US20240376711A1 (en) Clt building acoustic sprinkler drop flooring system
JP2002161623A (en) Exterior base structure and exterior base construction method
US4606160A (en) Plaster backing panel for ventilated curtain wall system
JPS587060A (en) Tile construction of house wall surface
JPS63125768A (en) External heat insulating remodeling construction method of wood wall
JPH0567750B2 (en)
EP3109370B1 (en) Modified osb board and its use in walls for house building systems
KR100216633B1 (en) Urethane shingle method
USG The gypsum construction Handbook
JPS581538Y2 (en) Fire retardant mortar base material
JPH0412183Y2 (en)
JPH0830381B2 (en) Construction method for undercoating on buildings
JP2004003288A (en) Fireproof coating method for steel
JPH0633669B2 (en) Insulation repair method for wooden walls
JPH0612032B2 (en) Outside wall insulation construction method
JPH09256542A (en) Fitting type mud wall
JPH0225849Y2 (en)
JPH0676726B2 (en) Outside wall insulation construction method
JPH0243955Y2 (en)