- Publication number
- JPH0765606B2 JPH0765606B2 JP30026690A JP30026690A JPH0765606B2 JP H0765606 B2 JPH0765606 B2 JP H0765606B2 JP 30026690 A JP30026690 A JP 30026690A JP 30026690 A JP30026690 A JP 30026690A JP H0765606 B2 JPH0765606 B2 JP H0765606B2
- Authority
- JP
- Japan
- Prior art keywords
- positioning
- fitting
- metal fitting
- joining
- housing unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000002184 metal Substances 0.000 claims description 39
- 238000003466 welding Methods 0.000 claims description 11
- 239000000463 material Substances 0.000 description 6
- 239000000470 constituent Substances 0.000 description 2
- 238000004080 punching Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009751 slip forming Methods 0.000 description 1
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、住宅ユニットの骨組みを形成する柱と梁を溶
接接合する際に、これらを位置決めするための位置決め
具に関する。Description: TECHNICAL FIELD The present invention relates to a positioning tool for positioning a pillar and a beam forming a frame of a housing unit when they are joined by welding.
〔背景技術〕 第5図はユニット住宅の構成要素である住宅ユニット40
の骨組み41を示す。この骨組み41は四隅の4本の柱42の
上端同士および下端同士を長辺梁43、短辺梁44で接合し
たボックス状に形成され、骨組み41に工場で壁材、床
材、天井材等が取り付けられる。このように工場で生産
された複数の住宅ユニット40が建設現場で複数組み合わ
されることにより、ユニット住宅が建てられる。[Background Art] FIG. 5 shows a housing unit 40 which is a constituent element of a unit housing.
The framework 41 of this is shown. The frame 41 is formed in a box shape in which the upper ends and the lower ends of the four columns 42 at the four corners are joined by a long-side beam 43 and a short-side beam 44, and the frame 41 is a factory-made wall material, floor material, ceiling material, etc. Is attached. In this way, a plurality of housing units 40 produced in the factory are combined at the construction site to build a unit housing.
以上において、柱42と梁43,44との接合は溶接で行わ
れ、この溶接接合のため、従来では、柱42の側面に梁4
3,44の長手方向に延びる仕口金物を取り付け、この仕口
金物に梁43,44を嵌合し、これらの仕口金物と梁43,44と
を溶接していた。In the above, the column 42 and the beams 43 and 44 are joined by welding.Because of this welding, the beam 4 is conventionally attached to the side surface of the column 42.
The fittings extending in the longitudinal direction of 3,44 are attached, the beams 43,44 are fitted to the fittings, and the fittings and the beams 43,44 are welded.
この溶接時に梁43,44を柱42に対して梁43,44の長手方向
に位置決めする必要があり、この位置決めのため、従来
では、仕口金物と梁43,44との互いに嵌合される嵌合部
分に位置決め孔を設け、仕口金物に梁43,44を嵌合した
ときにこれらの位置決め孔に位置決めピンを挿入し、こ
れにより梁43,44を位置決め状態とし、この後、仕口金
物と梁43,44との溶接作業を行っていた。At the time of this welding, it is necessary to position the beams 43, 44 with respect to the column 42 in the longitudinal direction of the beams 43, 44. For this positioning, conventionally, the fitting and the beams 43, 44 are fitted to each other. Positioning holes are provided in the fitting part, and when the beams 43, 44 are fitted into the fitting, the positioning pins are inserted into these positioning holes, which brings the beams 43, 44 into the positioning state. We were doing welding work between the hardware and the beams 43 and 44.
従来において、以上のように仕口金物と梁との互いに嵌
合される嵌合部分に位置決め孔を設け、これらの位置決
め孔に位置決めピンを挿入して梁を位置決めできたの
は、仕口金物と梁との嵌合部分が位置決め孔を設けるこ
とができる十分に長い長さを有していたためである。し
かし、柱の梁接合箇所の強度を大きくする等のため、こ
の梁接合箇所に例えば箱型の梁接合金具を設けた場合に
は、この接合金具の形状、構造等によっては接合金具と
梁との互いに嵌合される嵌合部分の長さを十分に確保で
きない場合があり、このような場合には、梁の位置決め
のため、従来と異なる位置決め手段が必要になる。Conventionally, as described above, it is possible to position the beam by providing the positioning holes in the fitting portions where the fitting and the beam are fitted to each other and inserting the positioning pins into these positioning holes. This is because the fitting portion of the beam and the beam had a length long enough to provide the positioning hole. However, in order to increase the strength of the beam joints of the pillars, for example, when a box-shaped beam joint fitting is provided at this beam joint, depending on the shape and structure of the joint fittings In some cases, it is not possible to secure a sufficient length of the fitting portions to be fitted to each other. In such a case, a positioning means different from the conventional one is required for positioning the beam.
本発明の目的は、柱に設けられた接合金具と梁との互い
に嵌合される嵌合部分の長さが短くても、接合金具と梁
との溶接作業時に梁を位置決めできるようになる住宅ユ
ニットの柱梁接合用位置決め具を提供するところにあ
る。An object of the present invention is to provide a housing in which the beam can be positioned during the welding operation of the joining metal member and the beam even if the length of the fitting portion where the joining metal member provided on the pillar and the beam are fitted to each other is short. The present invention is to provide a positioner for connecting beam-columns of a unit.
本発明に係る住宅ユニットの柱梁接合用位置決め具は、
柱に取り付けられた接合金具と梁とを溶接接合して住宅
ユニットの骨組みを形成するときに前記接合金具に対し
て前記梁を位置決めするための位置決め具であって、前
記接合金具の垂直面部と前記梁の垂直面部のうちの一方
に2個設けられた位置決め孔に挿入される第1および第
2位置決めピンと、他方に1個設けられた位置決め孔に
挿入される第3位置決めピンとを備えることを特徴とす
るものである。The positioning device for beam-column joining of the housing unit according to the present invention,
A positioning tool for positioning the beam with respect to the joint fitting when the joint fitting attached to the pillar and the beam are welded and joined to each other to form a frame of the housing unit. A first and a second positioning pin inserted into two positioning holes provided on one of the vertical surface portions of the beam, and a third positioning pin inserted into a positioning hole provided on the other side; It is a feature.
接合金具と梁とを嵌合させた後、接合金具の垂直面部と
梁の垂直面部とに合計3個設けられた位置決め孔に第
1、第2、第3位置決めピンを挿入すると、梁は接合金
具に対して梁の長手方向に位置決めされるとともに、接
合金具との嵌合部分を中心とした上下回動方向にも位置
決めされ、この位置決め後、梁は接合金具に溶接され
る。After fitting the joining metal fitting and the beam, when the first, second and third positioning pins are inserted into the positioning holes provided in total three in the vertical surface portion of the joining metal fitting and the vertical surface portion of the beam, the beam is joined. The beam is positioned in the longitudinal direction of the beam with respect to the metal fitting, and is also positioned in the vertical rotation direction around the fitting portion with the joining metal fitting. After this positioning, the beam is welded to the joining metal fitting.
以下に本発明の一実施例を添付図面に基づいて説明す
る。An embodiment of the present invention will be described below with reference to the accompanying drawings.
第1図における柱1、長辺梁2、短辺梁3は住宅ユニッ
トの骨組みを形成し、この骨組みは第5図で示した従来
例と同じくボックス状となっており、柱1と梁2,3は接
合金具4を介して接合される。The pillar 1, the long-sided beam 2 and the short-sided beam 3 in FIG. 1 form a frame of the housing unit, and this frame has a box shape like the conventional example shown in FIG. , 3 are joined via the joining metal fitting 4.
第4図は接合金具4の分解図を示し、接合金具4は金具
本体5、ベース部材6、側面部材7、補助部材8、補強
部材9からなり、金具本体5はウェブ5Aと上下のフラン
ジ5B,5Cとを有するコ字形状となっており、補助部材8
は平面L字型となっている。これらの接合金具4の構成
部材5〜9はプレス機械による板金の打ち抜き加工、折
り曲げ加工で作られ、前記長辺梁2が接合される金具本
体5の端縁には突片部10がフランジ5B,5C毎に形成さ
れ、側面部材7にも突片部10と対応する突片部11が形成
され、さらに前記短辺梁3が接合される金具本体5の端
縁には突片部12がウェブ5A、フランジ5B,5Cに連続して
形成されている。FIG. 4 shows an exploded view of the joining metal fitting 4, which comprises a fitting main body 5, a base member 6, a side member 7, an auxiliary member 8 and a reinforcing member 9. The fitting main body 5 has a web 5A and upper and lower flanges 5B. , 5C, and the auxiliary member 8
Has a plane L shape. The constituent members 5 to 9 of these joining fittings 4 are made by punching and bending a sheet metal by a press machine, and a projecting piece portion 10 is provided with a flange 5B on the edge of the fitting body 5 to which the long side beam 2 is joined. , 5C, and a projecting piece 11 corresponding to the projecting piece 10 is also formed on the side surface member 7. Further, a projecting piece 12 is formed at the end of the metal fitting body 5 to which the short side beam 3 is joined. The web 5A and the flanges 5B and 5C are continuously formed.
金具本体5のフランジ5C上にベース部材6は溶接され、
側面部材7は突片部10と直角をなして金具本体5のフラ
ンジ5B,5Cの端部に溶接され、補助部材8は金具本体5
の内部に挿入されてベース部材6とフランジ5Bとに溶接
され、補強部材9はベース部材6上に立てられてベース
部材6と補助部材8とに溶接される。The base member 6 is welded onto the flange 5C of the metal fitting body 5,
The side member 7 is welded to the ends of the flanges 5B and 5C of the metal fitting body 5 at right angles to the projecting piece portion 10, and the auxiliary member 8 is used for the auxiliary material 8
Is inserted into the interior of the base member 6 and welded to the base member 6 and the flange 5B, and the reinforcing member 9 is erected on the base member 6 and welded to the base member 6 and the auxiliary member 8.
以上において、金具本体5の垂直面部であるウェブ5Aに
は2個の位置決め孔13,14が上下に形成されている。こ
れらの位置決め孔13,14は、金具本体5をプレス機械に
よる板金の打ち抜き加工で作る際、板金をプレス機械の
金型に対して位置決めするために、プレス機械の位置決
め部材挿入用として板金にもともと形成されていたもの
であり、これが金具本体5にそのまま残されている。ま
た、側面部材7にも位置決め孔15,16が上下に形成され
ており、これらの位置決め孔15,16も側面部材7をプレ
ス機械による板金の打ち抜き加工で作る際に板金の位置
決め用として形成されていたものである。In the above, two positioning holes 13 and 14 are vertically formed in the web 5A which is the vertical surface portion of the metal fitting body 5. These positioning holes 13 and 14 are originally provided on the sheet metal for inserting the positioning member of the press machine so as to position the sheet metal with respect to the die of the press machine when the metal fitting body 5 is punched by the press machine. It was formed, and this is left as it is in the metal fitting body 5. Positioning holes 15 and 16 are also formed vertically in the side member 7, and these positioning holes 15 and 16 are also used for positioning the sheet metal when the side member 7 is punched by a press machine. It was what was there.
第1図で示した柱1は角筒材からなり、また、長辺梁
2、短辺梁3は共にウェブ2A,3Aと上下のフランジ2B,3
B,2C,3Cとを有するチャンネル材からなる。これらの梁
2,3の垂直面部であるウェブ2A,3Aには、梁2,3を接合金
具4に溶接する作業を行う前に、各1個の位置決め孔1
7,18を形成しておく。The pillar 1 shown in FIG. 1 is made of a square tube material, and the long side beam 2 and the short side beam 3 are both webs 2A, 3A and upper and lower flanges 2B, 3
It consists of a channel material having B, 2C and 3C. These beams
Before the work of welding the beams 2 and 3 to the joining metal fitting 4 is carried out on the webs 2A and 3A which are the vertical surface portions of the 2, 3 respectively, one positioning hole 1
Form 7,18.
第3図は本実施例に係る位置決め具19を示す。この位置
決め具19は、板状の本体20と、本体20に突設された第
1、第2、第3位置決めピン21,22,23とからなる。これ
らの位置決めピン21,22,23の位置決め関係は、短辺梁3
の端部を接合金具4の前記突片部12に嵌合して柱1と短
辺梁3とを所定の正確な位置関係としたとき、前記位置
決め孔13,14,17に位置決めピン21,22,23が挿入可能にな
るものとし、また、長辺梁2の端部を接合金具4の前記
突片部10,11に嵌合して柱1と長辺梁2とを所定の正確
な位置関係としたとき、前記位置決め孔15,16,18に位置
決めピン21,22,23が挿入可能になるものとする。FIG. 3 shows a positioning tool 19 according to this embodiment. The positioning tool 19 includes a plate-shaped main body 20 and first, second, and third positioning pins 21, 22, 23 protruding from the main body 20. The positioning relationship between these positioning pins 21, 22, 23 is that the short side beam 3
When the end of the column 1 is fitted to the projecting piece 12 of the joining metal fitting 4 to bring the column 1 and the short side beam 3 into a predetermined accurate positional relationship, the positioning pins 21, 14 and 17 are positioned in the positioning holes 13, 14, 17, respectively. 22 and 23 can be inserted, and the ends of the long-side beam 2 are fitted to the projecting pieces 10 and 11 of the joint fitting 4 so that the pillar 1 and the long-side beam 2 can be fitted to each other with a predetermined accuracy. In the positional relationship, the positioning pins 21, 22, 23 can be inserted into the positioning holes 15, 16, 18, respectively.
次に作用について説明する。Next, the operation will be described.
柱1の端部に接合金具4は溶接で接合され、この後、柱
1に接合金具4を介して短辺梁3を接合するためには、
短辺梁3の端部を接合金具4の突片部12に嵌合し、この
とき、位置決め具19を使用し、位置決めピン21,22,23が
位置決め孔13,14,17に挿入されるまで短辺梁3を接合金
具4に対して移動させる。位置決めピン21,22,23が位置
決め孔13,14,17に挿入されたときには、短辺部3は接合
金具4に対して正確な位置決め状態となっており、これ
により、短辺梁3は柱1に対して梁3の長手方向に正確
に位置決めされているとともに、位置決めピン21,22,23
が挿入される位置決め孔13,14,17は接合金具4の垂直面
部および梁3の垂直面部に形成されているため、短辺梁
3は接合金具4との嵌合部分を中心とした上下回動方向
にも位置決めされている。In order to join the short side beam 3 to the pillar 1 via the joining metal fitting 4, the joining metal fitting 4 is joined to the end of the pillar 1 by welding.
The end portion of the short-side beam 3 is fitted to the projecting piece portion 12 of the joint metal fitting 4, and at this time, the positioning tool 19 is used and the positioning pins 21, 22, 23 are inserted into the positioning holes 13, 14, 17, respectively. The short side beam 3 is moved with respect to the joint fitting 4. When the positioning pins 21, 22, 23 are inserted into the positioning holes 13, 14, 17, the short side portion 3 is in an accurate positioning state with respect to the joint fitting 4, whereby the short side beam 3 is a pillar. 1 is accurately positioned in the longitudinal direction of the beam 3 and the positioning pins 21, 22, 23
Since the positioning holes 13, 14 and 17 into which are inserted are formed in the vertical surface portion of the joint fitting 4 and the vertical surface portion of the beam 3, the short-side beam 3 is rotated vertically around the fitting portion with the joint fitting 4. It is also positioned in the moving direction.
この後、短辺梁3と接合金具4とを仮付け溶接し、次い
で位置決め具9を取り外し、短辺梁3と接合金具4とを
溶接接合する。After that, the short-side beam 3 and the joint fitting 4 are temporarily welded together, the positioning tool 9 is then removed, and the short-side beam 3 and the joint fitting 4 are welded and joined.
以上の位置決め具19を使用した位置決め作業および溶接
作業は、長辺梁2と接合金具4とを接合する場合にも行
う。The above-described positioning work and welding work using the positioning tool 19 are also performed when the long-side beam 2 and the joining fitting 4 are joined.
以上説明した本実施例によれば、接合金具4と梁2,3と
の互いに嵌合される嵌合部分の長さが突片部10,11,12の
幅だけの短いものであっても、位置決め具19により梁2,
3を接合金具4に対して正確に位置決めできるようにな
り、特に、前記嵌合部分の長さが短く、従ってこの嵌合
部分を中心に梁2,3が上下に回動可能となっていても、
接合金具4の垂直面部および梁2,3の垂直面部に形成さ
れた位置決め孔に位置決め具19の位置決めピンが挿入さ
れると、梁2,3はこの回動方向にも自動的に位置決めさ
れることになる。According to the present embodiment described above, even if the length of the fitting portion where the joining metal fitting 4 and the beams 2 and 3 are fitted to each other is as short as the width of the projecting piece portions 10, 11 and 12. , Beam 2 by positioning tool 19,
3 can be accurately positioned with respect to the joining metal fitting 4, and in particular, the length of the fitting portion is short, and therefore the beams 2 and 3 can be vertically rotated around this fitting portion. Also,
When the positioning pins of the positioning tool 19 are inserted into the positioning holes formed in the vertical surface portion of the joining metal fitting 4 and the vertical surface portions of the beams 2 and 3, the beams 2 and 3 are automatically positioned also in this rotation direction. It will be.
また、本実施例によれば、接合金具4の位置決め孔13,1
4および15,16は、接合金具4の構成部材をプレス機械に
よる板金の打ち抜き加工で作る際に板金を位置決めする
ためにもともとあったものを利用しているため、接合金
具4に位置決め孔を形成する作業を省略できる。Further, according to the present embodiment, the positioning holes 13, 1 of the joining fitting 4 are
Since 4 and 15, 16 are used for positioning the sheet metal when forming the components of the joining metal member 4 by punching the sheet metal with a press machine, a positioning hole is formed in the joining metal member 4. The work to do can be omitted.
以上説明した本実施例に係る位置決め具19は柱1の下端
に設けられた接合金具4について適用されていたが、本
発明に係る位置決め具は柱1の上端に設けられる接合金
具についても適用できる。Although the positioning tool 19 according to the present embodiment described above is applied to the joint fitting 4 provided at the lower end of the pillar 1, the positioning tool according to the present invention is also applicable to the joining fitting provided at the upper end of the pillar 1. .
また、前記実施例の接合金具4は一例であり、これ以外
の形状、構造を有する接合金具についても本発明に係る
位置決め具は使用できる。また、前記実施例では接合金
具4に1本の梁について2個の位置決め孔が設けられ、
梁には1個の位置決め孔が設けられていたが、接合金具
に1本の梁について1個の位置決め孔を設け、梁には2
個の位置決め孔を設けてもよい。Further, the joining metal fitting 4 of the above-mentioned embodiment is an example, and the positioning tool according to the present invention can be used for a joining metal fitting having a shape and structure other than this. Further, in the above-described embodiment, the joint fitting 4 is provided with two positioning holes for one beam,
The beam had one positioning hole, but the joining metal fitting had one positioning hole for each beam, and the beam had two positioning holes.
Individual positioning holes may be provided.
本発明によれば、柱に設けられた接合金具と梁との互い
に嵌合される嵌合部分の長さが短くても、接合金具と梁
とを溶接するときに梁を接合金具に対して正確に位置決
めできるようになる。ADVANTAGE OF THE INVENTION According to this invention, even if the length of the fitting part with which the joining metal fitting and the beam provided in the pillar are mutually fitted is short, when welding the joining metal fitting and the beam, the beam with respect to the joining metal fitting. It enables accurate positioning.
第1図は柱、梁、接合金具を示す斜視図、第2図は接合
金具の分解斜視図、第3図は位置決め具の斜視図、第4
図は位置決め具を使用した位置決め作業を示す斜視図、
第5図は住宅ユニットの骨組みを示す斜視図である。 1…柱、2,3…梁、4…接合金具、2A,3A,5A…垂直面で
あるウェブ、13〜18…位置決め孔、19…位置決め具、21
〜23…位置決めピン。1 is a perspective view showing a pillar, a beam, and a joint fitting, FIG. 2 is an exploded perspective view of the joint fitting, FIG. 3 is a perspective view of a positioning tool, and FIG.
The figure is a perspective view showing the positioning work using the positioning tool,
FIG. 5 is a perspective view showing the framework of the housing unit. 1 ... Pillar, 2, 3 ... Beam, 4 ... Joining metal fitting, 2A, 3A, 5A ... Web which is a vertical surface, 13-18 ... Positioning hole, 19 ... Positioning tool, 21
~ 23 ... Locating pin.
Claims (1)
接合して住宅ユニットの骨組みを形成するときに前記接
合金具に対して前記梁を位置決めするための位置決め具
であって、前記接合金具の垂直面部と前記梁の垂直面部
のうちの一方に2個設けられた位置決め孔に挿入される
第1および第2位置決めピンと、他方に1個設けられた
位置決め孔に挿入される第3位置決めピンとを備えるこ
とを特徴とする住宅ユニットの柱梁接合用位置決め具。1. A positioning tool for positioning the beam with respect to the joining fitting when the joining fitting attached to a pillar and the beam are joined by welding to form a frame of a housing unit. First and second positioning pins inserted into two positioning holes provided on one of the vertical surface of the metal fitting and the vertical surface of the beam, and third positioning inserted into one positioning hole provided on the other A positioning device for beam-column joining of a housing unit, comprising a pin.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP30026690A JPH0765606B2 (en) | 1990-11-06 | 1990-11-06 | Positioning tool for beam-column joint of housing unit |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP30026690A JPH0765606B2 (en) | 1990-11-06 | 1990-11-06 | Positioning tool for beam-column joint of housing unit |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH04175505A JPH04175505A (en) | 1992-06-23 |
| JPH0765606B2 true JPH0765606B2 (en) | 1995-07-19 |
Family
ID=17882719
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP30026690A Expired - Lifetime JPH0765606B2 (en) | 1990-11-06 | 1990-11-06 | Positioning tool for beam-column joint of housing unit |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0765606B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6289115B2 (en) * | 2014-01-20 | 2018-03-07 | ミサワホーム株式会社 | Thermal insulation structure and thermal insulation method for building unit |
-
1990
- 1990-11-06 JP JP30026690A patent/JPH0765606B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH04175505A (en) | 1992-06-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100260626B1 (en) | Connector for building unit and the making method thereof | |
| JP3014203U (en) | Building unit connection structure | |
| EP1144140A1 (en) | Structural components and their manufacture | |
| JPH0765606B2 (en) | Positioning tool for beam-column joint of housing unit | |
| JPH0444545A (en) | Joint of column and beam and reinforcing metal | |
| JPH108567A (en) | Column and beam joints for frame units | |
| JPS6123132Y2 (en) | ||
| JPH0829462B2 (en) | Beam-column joint fitting in a housing unit and method of manufacturing the same | |
| JP3549373B2 (en) | Joining structure and joining method of steel members | |
| JP2618512B2 (en) | Method of manufacturing a residential unit with an intermediate floor | |
| JP2000034776A (en) | How to join beams and columns | |
| JPH0425441Y2 (en) | ||
| JP2565361Y2 (en) | Beam joining equipment | |
| JP2552037Y2 (en) | Column and beam joining equipment | |
| JP2537320Y2 (en) | Connection structure of beam end to column | |
| JPH0547204Y2 (en) | ||
| JPH02272123A (en) | Post-girder joining-section structure | |
| JP2000320148A (en) | Panel positioning jig | |
| JPS59224740A (en) | Method and metal fittings for connecting pillar and beam | |
| JPH0829463B2 (en) | Beam-column joint fitting in a housing unit and method of manufacturing the same | |
| JP2509657Y2 (en) | Frame unit assembly structure | |
| JP2004293114A (en) | Steel frame structure | |
| JPH04330136A (en) | Column/beam joining structure of dwelling house unit | |
| JP2618542B2 (en) | Column joints for housing units | |
| JPH07173883A (en) | Metal fittings for joining |