JPH0777489B2 - Distribution line load accommodation method - Google Patents
Distribution line load accommodation methodInfo
- Publication number
- JPH0777489B2 JPH0777489B2 JP63060687A JP6068788A JPH0777489B2 JP H0777489 B2 JPH0777489 B2 JP H0777489B2 JP 63060687 A JP63060687 A JP 63060687A JP 6068788 A JP6068788 A JP 6068788A JP H0777489 B2 JPH0777489 B2 JP H0777489B2
- Authority
- JP
- Japan
- Prior art keywords
- section
- power
- route
- distribution line
- accommodation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 本発明は配電線負荷融通方法に係り、特に配電線系統事
故時にあらかじめ指定された優先停電復旧区間を優先的
に停電復旧させる配電線負荷融通方法に関する。The present invention relates to a distribution line load accommodating method, and particularly to a distribution line load accommodating method for preferentially recovering from a preferential power failure recovery section designated in advance at the time of a distribution line system accident. Regarding the method.
従来の配電線負荷融通方法は、特開昭61−12455号公報
配電線逆送方式および特開昭56−123741号公報に記載さ
れているように、基本的には、配電線系統事故の場合、
健全停電区間に直接接続されている配電線から供給可能
な予備電力の範囲で、当該停電区間に電力融通するよう
連係開閉器を投入操作し、次に前記操作で電力が融通さ
れない停電区間に対して救済および融通配電線の予備電
力の平均化のため、予備電力の多い変電所(配電線)か
ら予備電力の範囲で逆送ルートを求めて、この逆送ルー
トを構成する連係開閉器を投入する方法である。The conventional distribution line load accommodation method is basically used in the case of a distribution line system accident, as described in JP-A-61-2455, reverse distribution line method, and JP-A-56-123741. ,
In the range of standby power that can be supplied from the distribution line that is directly connected to the healthy blackout section, turn on the link switch so that the power can be accommodated in the blackout section, and then for the blackout section where the power is not accommodated by the above operation. In order to relieve and average the reserve power of the interchange distribution line, the reverse transmission route is obtained from the substation (distribution line) with a large amount of reserve power, and the link switch that constitutes this reverse transmission route is input. Is the way to do it.
上記従来技術においては、配電線系統事故による停電発
生時、病院、消防署、警察署等のように停電による社会
的影響の大きい重要負荷を優先的に停電復旧することが
配慮されておらず、全停電負荷を同じ重みとして、かつ
配電線系統全体を対象として融通計算処理により融通経
路を求め、融通操作をするため、重要負荷に対して停電
時間が長くなったり、極端な場合、融通電力量不足によ
り、重要負荷が接続されている区間が停電のまま取り残
される等、長時間停電による社会的混乱をまねく要因と
なる可能性があった。In the above-mentioned conventional technology, when a power failure occurs due to a distribution line system accident, priority is not given to restoration of important loads that have a great social impact due to a power failure, such as hospitals, fire departments, and police stations, and there is no consideration. The power outage load is set to the same weight, and the interchange path is calculated by the interchange calculation process for the entire distribution line system, and the interchange operation is performed. Due to this, there is a possibility that it may cause social confusion due to a long power outage, such as leaving a section to which an important load is connected as a power outage.
本発明の課題は、健全停電区間(配電線は健全である
が、他区間の事故により送電不能となった区間)の中
に、優先的に停電を復旧すべき区間が存在するとき、当
該区間に対して電力を融通する配電線が過負荷になら
ず、かつ最も早く電力を供給できる融通経路を探索し、
当該経路の開閉器操作により前記優先停電復旧区間の停
電を復旧するにある。An object of the present invention is to provide a section in which a power outage is preferentially restored in a sound outage section (section in which a distribution line is healthy, but power transmission is impossible due to an accident in another section). For the distribution line that interchanges power with respect to, does not become overloaded, and searches for a flexible route that can supply power earliest,
The power failure in the priority power failure recovery section is restored by operating the switch on the route.
上記の課題は、開閉器を介して相互に接続された複数の
区間からなる配電線と、該配電線に接続されて電力を供
給する複数の電力供給手段とを備えた配電線系統の状態
を監視し、配電線停電事故時に、前記開閉器を制御して
健全停電区間に送電する配電線負荷融通方法において、 イ.あらかじめ配電線ごとに停電時に優先的に停電を復
旧する優先区間を指定する手順と、 ロ.配電線停電事故発生時、健全停電区間群に存在する
前記優先区間を抽出する手順と、 ハ.該優先区間と前記電力供給手段とを接続する融通経
路を探索する手順と、 ニ.探索された融通経路のなかから、融通経路および優
先区間に接続された負荷が、該融通経路に接続されてい
る電力供給手段が供給可能な予備電力量を越えない融通
経路を抽出する手順と、 ホ.前記抽出された融通経路を形成するために必要な開
閉器の操作時間が最短である融通経路を選定する手順
と、 を備えた配電線負荷融通方法により達成される。The above-mentioned problem relates to the state of a distribution line system including a distribution line consisting of a plurality of sections connected to each other via a switch, and a plurality of power supply means connected to the distribution line to supply power. A distribution line load accommodating method for monitoring and controlling the switch to transmit power to a sound power failure section in the event of a distribution line power failure. Procedure for specifying the priority section for prioritizing restoration of power failure for each power distribution line in advance, and b. A procedure for extracting the priority section existing in the group of healthy blackout sections when a power line power failure occurs; A procedure for searching for an interchange route connecting the priority section and the power supply means; d. From the searched interchange route, the load connected to the interchange route and the priority section, a procedure for extracting an interchange route that does not exceed the reserve power amount that can be supplied by the power supply means connected to the interchange route, E. A distribution line load accommodation method comprising: a procedure of selecting an accommodation path that has the shortest operation time of a switch required to form the extracted accommodation path.
さらに、優先区間へ電力を供給する融通経路の形成と並
行して、該融通経路によって電力を供給されない残健全
停電区間に対し、前記融通経路が形成されていることを
前提として、残区間融通経路を探索決定する手順を備
え、前記融通経路の形成完了に引きつづいて前記探索決
定された残区間融通経路を形成する開閉器操作を行う配
電線負荷融通方法とすることも効果がある。Further, in parallel with the formation of the accommodation route for supplying power to the priority section, the remaining section accommodation route is provided on the assumption that the accommodation route is formed for the remaining healthy blackout section where power is not supplied by the accommodation route. It is also effective to provide a distribution line load accommodation method that includes a procedure for searching and deciding, and that, following the completion of the formation of the accommodation path, performs a switch operation to form the search-determined remaining section accommodation route.
また、開閉器を介して相互に接続された複数の区間から
なる配電線と、該配電線に接続されて電力を供給する複
数の電力供給手段とを備えた配電線系統の状態を監視
し、配電線停電事故時に、前記開閉器を制御して健全停
電区間に送電する配電線負荷融通方法において、 イ.あらかじめ、配電線ごとに停電時に優先的に停電を
復旧する優先区間を指定し、 ロ.指定された優先区間に対し、配電線停電事故時に電
力を融通する融通経路を事故発生区間に対応させてあら
かじめ探索しておき、 ハ.停電発生時には、事故発生区間を検知して、融通経
路を決定する。Further, the state of a distribution line system including a distribution line consisting of a plurality of sections connected to each other via a switch, and a plurality of power supply means connected to the distribution line to supply power, In a distribution line load accommodation method for controlling the switch to transmit power to a sound power failure section in the event of a power distribution line power failure, a. In advance, specify a priority section for each power distribution line that will be restored preferentially when a power failure occurs. For the designated priority section, search for an interchange route that will supply power in the event of a power outage in the distribution line, in advance corresponding to the section in which the accident occurred, and c. When a power failure occurs, the section where the accident occurred is detected and the interchange route is determined.
配電線負荷方法によっても達成される。It can also be achieved by the distribution line loading method.
さらに、探索された融通経路および優先区間に接続され
た負荷の合計値と、該融通経路に電力を融通する電力供
給手段の予備電力量の大きさとを、常時定められた時間
間隔で比較し、探索された融通経路のなかから、予備電
力量の方が大きい融通経路を抽出しておき、停電発生時
には、前記抽出された融通経路のなかから決定する方法
も効果がある。Furthermore, the total value of the load connected to the searched interchange route and the priority section, and the magnitude of the reserve power amount of the power supply means that interchanges the power to the interchange route, is constantly compared at a predetermined time interval, It is also effective to extract an accommodation route having a larger reserve power amount from the searched accommodation routes and to determine from the extracted accommodation routes when a power failure occurs.
優先的に停電を復旧する優先区間が指定され、停電時に
は、健全停電区間に存在する前記優先区間が抽出され、
この優先区間に電力を融通する融通経路が探索され、探
索された融通経路のなかから、融通経路および前記優先
区間に接続された負荷の大きさが、該融通経路に電力を
融通する電力供給手段がもつ予備電力量を越えない融通
経路が抽出され、抽出された融通経路のなかから、その
融通経路を形成するために必要な開閉器の操作時間が最
短である融通経路が選定され、この融通経路を形成すべ
く、開閉器が操作される。A priority section for recovering a power failure is designated preferentially, and at the time of a power failure, the priority section existing in a sound power failure section is extracted,
A flexible route that transfers power to this priority section is searched, and from the searched flexible paths, the size of the load connected to the flexible path and the priority section is a power supply unit that transfers power to the flexible path. The interchange route that does not exceed the reserve power of the device is extracted, and the interchange route that has the shortest operation time of the switch required to form the interchange route is selected from the extracted interchange routes. The switch is operated to form the path.
一方、優先区間停電復旧のための前記開閉器の操作と並
行して、前記開閉器の操作により形成された融通経路に
よっては停電が復旧されない残健全停電区間に対し、前
記融通経路が形成されていることを前提として、残区間
融通経路が探索・決定され、優先区間に対する融通経路
の形成後、ひきつづいて残区間融通経路を形成する開閉
器操作が行われる。On the other hand, in parallel with the operation of the switch for the priority section power failure recovery, the accommodation path is formed for the remaining healthy power failure section where the power failure is not restored by the accommodation path formed by the operation of the switch. On the premise that the remaining section accommodation route is found, the remaining section accommodation route is searched and determined, and after the accommodation section for the priority section is formed, the switch operation for continuously forming the remaining section accommodation route is performed.
また、優先区間の指定とともに、その優先区間が属する
配電線と他の区間に停電事故が発生したとき、電力融通
可能な融通経路をあらかじめ探索しておき、停電事故発
生時には、前記探索ずみの経路のなかから選定すること
もできる。Also, when a power outage occurs in the distribution line to which the priority section belongs and other sections together with the designation of the priority section, a flexible route that allows power interchange is searched in advance. You can also choose from among these.
さらに、前記探索された融通経路および優先区間に接続
された負荷の大きさと、該融通経路に電力を融通する電
力供給手段がもつ予備電力量とを、定められた時間間隔
で比較し、探索された融通経路のなかから、予備電力量
の方が大きい融通経路を抽出しておけば、停電時には、
前記抽出された融通経路のなかから選べば、選定に要す
る時間が短縮される。Further, the size of the load connected to the searched interchange route and the priority section, and the reserve power amount of the power supply means for accommodating power to the interchange route are compared at a predetermined time interval, and a search is performed. If a flexible route with a larger amount of reserve power is extracted from the flexible routes,
If one of the extracted flexible routes is selected, the time required for selection is shortened.
第2図〜第5図、第6a図〜第6c図により本発明の実施例
を説明する。第2図に示される配電線系統は、配電線F1
と、該配電線F1に、電力融通時の電力供給手段である連
係用開閉器(以下、TSWと略称する)1およびTSW2を介
して接続された配電線F2と、前記配電線F1にTSW3および
TSW4を介して接続され、前記配電線F2にTSW5を介して接
続されている配電線F3とからなっている。各配電線F1、
F2、およびF3の供給端には、フィーダ遮断器(以下、FC
Bと略称する)1、FCB2およびFCB3がそれぞれ設けら
れ、前記FCB1とTSW3の間の配電線F1には、順投機能付開
閉器(以下、SWと略称する)SW11〜SW16が配線線の各区
間を相互に接続して設置されている。説明の便宜上、各
配電線のFCB側を上流側、TSW側を下流側とよぶ。FCB1と
各SWおよびTSW3で区切られた配電線の、上流側から付番
された区間10〜16のうちの区間12、13および16には分岐
線が設けられ、区間12の分岐線は、SW17および区間17を
介して前記TSW1に、区間13の分岐線はTSW18、区間18、T
SW19および区間19を介して前記TSW4に、区間14の分岐線
は直線TSW2に、それぞれ接続されている。また、FCB2と
前記TSW2の間の配電線F2には、SW21〜23が設置され、FC
B2、SW21〜23、およびTSW2で区切られた配電線の、上流
側から順に付番された区間20〜23のうちの区間21および
23には分岐線が設けられている。区間21の分岐線はSW25
および区間25を介してTSW1に、区間23の分岐線はSW24お
よび区間24を介してTSW5にそれぞれ接続されている。更
にFCB3とTSW3の間の配電線F3にSW31〜34が配置され、FC
B3、SW31〜34、およびTSW3で区切られた配電線の、上流
柄から付番された区間30〜34のうちの区間31および33に
は分岐線が設けられている。区間31の分岐線はSW35、区
間35、SW36、および区間36を介してTSW5に、区間33の分
岐線はSW37、区間37、SW38、および区間38を介してTSW4
にそれぞれ接続されている。An embodiment of the present invention will be described with reference to FIGS. 2 to 5 and FIGS. 6a to 6c. The distribution line system shown in FIG. 2 is a distribution line F 1
If, on該配wire F 1, linked switching device is a power supply means at the time of power interchange (hereinafter, abbreviated as TSW) 1 and the distribution line F 2 which is connected via a TSW2, the distribution line F 1 To TSW3 and
It comprises a distribution line F 3 which is connected via TSW 4 and is connected to the distribution line F 2 via TSW 5. Each distribution line F 1 ,
F 2, and the feed end of the F 3, the feeder circuit breaker (hereinafter, FC
B and abbreviated) 1, FCB2 and FCB3 are provided respectively on the distribution line F 1 between the FCB1 and TSW3 is Junto function with switch (hereinafter abbreviated as SW) SW11~SW16 of wiring lines It is installed by connecting each section to each other. For convenience of explanation, the FCB side of each distribution line is called the upstream side, and the TSW side is called the downstream side. Branch lines are provided in sections 12, 13 and 16 of sections 10 to 16 numbered from the upstream side of the distribution line separated by FCB1 and each SW and TSW3, and the branch line of section 12 is SW17. And TSW1 via section 17 and the branch line of section 13 is TSW18, section 18, T
The TSW4 is connected to the TSW4 via the SW19 and the section 19, and the branch line of the section 14 is connected to the straight line TSW2. In addition, the distribution line F 2 between the the FCB2 TSW2, is installed SW21~23, FC
B2, SW21-23, and section 21 of the sections 20-23 numbered sequentially from the upstream side of the distribution line separated by TSW2 and
A branch line is provided at 23. The branch line of section 21 is SW25
And section 25 is connected to TSW1 via section 25, and the branch line of section 23 is connected to TSW5 via SW24 and section 24, respectively. Further arranged SW31~34 the distribution line F 3 between FCB3 and TSW3, FC
Branch lines are provided in sections 31 and 33 of sections 30 to 34 numbered from the upstream handle of the distribution line sectioned by B3, SW31 to 34, and TSW3. The branch line of section 31 is TSW5 via SW35, section 35, SW36, and section 36, and the branch line of section 33 is TSW4 via SW37, section 37, SW38, and section 38
Respectively connected to.
上述の配電線系統に対し、停電復旧を優先すべき重要負
荷が接続された区間が、第1表に示すように設定されて
いる。In the distribution line system described above, a section in which an important load for which restoration from a power failure should be prioritized is connected is set as shown in Table 1.
順投機能付開閉器SWは、その電源側端子(上流側)に電
圧が加わると、あらかじめ設定された順序投入時間(こ
の時間をX時限といい、一般的には0秒〜60秒の間に設
定される)経過後、投入(閉)されるが、負荷側端子
(下流側)に電圧が加わっても投入されない。また、投
入されてから一定時間(Y時限といい、通常、その下流
側のSWのX時限より短い、0〜5秒に設定される)内に
電圧がなくなると、投入動作ができないようにロックさ
れる。さらに閉状態で電源側が無電圧になると、直ちに
開になる。これらの機能により、配電線系統事故発生
時、事故が発生した区間(事故発生区間)の電力供給が
停止される。 When a voltage is applied to its power supply side terminal (upstream side), the switch SW with forward throw function has a preset sequence closing time (this time is called X time limit, generally between 0 seconds and 60 seconds). Is set (closed), but it is not closed even if a voltage is applied to the load side terminal (downstream side). Also, if the voltage runs out within a certain time after the power is turned on (called the Y time period, which is usually set to 0 to 5 seconds, which is shorter than the X time period of the SW on the downstream side), the power is locked so that the power can not be turned on. To be done. Further, when the power supply side has no voltage in the closed state, it opens immediately. With these functions, when a distribution line system accident occurs, the power supply to the section where the accident has occurred (accident occurrence section) is stopped.
各配電間の連係用開閉器TSWは、常時は開状態となって
いる。The switch TSW for linking each distribution is normally open.
各FCB、各TSW、および各SWには、第1図に示すように開
閉器子局Sが付設され、各遮断器および各開閉器の開閉
状態は信号伝送路4および開閉器子局Sを介して配電線
監視制御装置1で検知されており、該装置1により積極
的に制御操作を行い、開閉動作を行わせることも可能と
なっている。実際の開閉動作には、伝送系の伝送速度、
開閉器動作時間、制御間のインターバル等を考慮する
と、1開閉器当り5〜15秒程度の時間を要する。この配
電線監視制御装置1には、さらにマンマシン装置2が接
続されており、操作員による前記第1表の設定を含む各
種設定、制御操作を可能にしている。As shown in FIG. 1, each FCB, each TSW, and each SW is provided with a switch slave station S, and the open / close state of each breaker and each switch is determined by the signal transmission path 4 and the switch slave station S. It is also detected by the distribution line monitoring and control device 1 via this, and it is also possible to positively perform a control operation by the device 1 to perform the opening / closing operation. For the actual opening / closing operation, the transmission speed of the transmission system,
Considering the switch operating time and the interval between controls, it takes about 5 to 15 seconds per switch. A man-machine device 2 is further connected to the distribution line monitoring control device 1 so that an operator can perform various settings including the settings in Table 1 and control operations.
配電線の各区間は、FCBを経由して電力の供給を受ける
が、ある区間で短絡、地絡等の配電線系統事故が発生す
ると、周知のように変電所の保護Ryが動作してFCBがト
リップし、電力供給が断たれてこのFCBから電力を受け
ている配電線が停電するとともに、電源側に無電圧とな
たSWが開く。変電所側の動作で断された電力供給は、変
電所側の動作により一定時間後(通常、10秒〜30秒後に
設定される。)にFCBが閉路されて再開され、各SWの電
源側に電圧が加わり、各SWごとに設定されたX時限経過
後に順次閉投入される。Power is supplied to each section of the distribution line via the FCB, but if a distribution line system accident such as a short circuit or a ground fault occurs in a section, the protection substation Ry operates to Trips, the power supply is cut off, and the distribution line receiving power from this FCB loses power, and the unpowered SW opens on the power supply side. The power supply cut off by the operation of the substation side is restarted by closing the FCB after a certain time (usually set after 10 to 30 seconds) by the operation of the substation side, and the power supply side of each SW. A voltage is applied to the switches, and the switches are sequentially closed after the X time limit set for each SW has elapsed.
停電時のFCBおよびSWの動作例を、第2図の配電線F1を
例にとり、第3図および第4図によって説明する。各SW
には第2表に示すX時限が設定されている。An operation example of FCB and SW at the time of power failure will be described with reference to FIGS. 3 and 4 by taking the distribution line F 1 of FIG. 2 as an example. Each SW
Is set to the X time limit shown in Table 2.
第3図において、SW14、SW15、TSW2で区切られた区間14
で地絡事故が発生したとすると、F1の図示されていない
保護Ryが過電流を検出してFCB1がトリップする。配電線
F1は無電圧開放状態になり、SW11〜19は開状態となる
が、約t1時間後にFCB1は再閉路動作し、以下、第4図に
示す如く、SW11からSW14まで、各SWに設定されたX時限
ごとに閉投入される。第4図の二重線はFCBおよびSWの
閉状態を、一重線は開状態を示している。 In Fig. 3, section 14 divided by SW14, SW15, and TSW2
If a ground fault occurs at, the protection Ry (not shown) of F 1 detects an overcurrent and FCB 1 trips. Distribution line
F 1 becomes no-voltage open, SW11~19 is the open state, FCB 1 operates reclosing after about t 1 hour, or less, as shown in Figure 4, the SW11 to SW14, set each SW It is closed every X time limit. The double line in Fig. 4 shows the closed state of FCB and SW, and the single line shows the open state.
SW14閉投入時点で区間14が地絡しているため、FCB1が再
度トリップする。このトリップによってSW14はY時限以
内に無電圧状態になったため、投入ロックされる。事故
区間は、各SWの開閉動作の状況や、投入時間の監視によ
って判断される。FCB1は再トリップしてからt2時間(一
般には30秒〜60秒が設定される)後、再再閉路動作し、
SW14よりも電源側区間が充電され、最終的には、区間1
4、15、16が停電区間となる。FCB1 trips again because there is a ground fault in section 14 when SW14 is closed. As a result of this trip, SW14 is put into a non-voltage state within the Y time limit, and is locked. The accident section is judged by monitoring the opening / closing operation status of each SW and the closing time. FCB1 after re trip to the t 2 hours (typically 30 to 60 seconds is set to) operates again re-closure,
The power supply side section is charged more than SW14, and finally the section 1
4, 15, 16 are blackout sections.
第3図に示す配電線F1の、区間をノード、開閉器をブラ
ンチとし、区間番号(ノード番号)を円内に表示する
と、配電線F1は第5図のように表わされる。各円の外側
に付記した数字は、各ノードに接続されている負荷量
(後述する(1)式のInの値)であり、( )内に記さ
れた数字は、各TSWを介して配電線F1に接続された他の
配電線F2、F3から融通可能な予備電力量を示す。第3表
に各ノードの負荷量を示す。When the section of the distribution line F 1 shown in FIG. 3 is a node and the switch is a branch and the section number (node number) is displayed in a circle, the distribution line F 1 is represented as shown in FIG. The number attached to the outside of each circle is the load amount (the value of I n in equation (1) described later) connected to each node, and the number written in () is via each TSW. The reserve power amount that can be exchanged from the other distribution lines F 2 and F 3 connected to the distribution line F 1 is shown. Table 3 shows the load on each node.
第5図に示される配電線F1のノード12(区間12)で地絡
事故が発生すると、前述したような開閉器の動作によ
り、ノード10、11までは配電線F1の電源側から電力が供
給されるが、ノード12〜19の範囲は停電状態となる。事
故がおこったノードには電力を供給できないが、他のノ
ード(ノード13〜19)は事故のおこったノードの下流側
にあるために停電した健全停電区間であり、他の配電線
から電力を送ることにより、停電復旧が可能である。When a ground fault occurs at node 12 (section 12) of distribution line F 1 shown in Fig. 5, power is supplied from the power supply side of distribution line F 1 to nodes 10 and 11 by the operation of the switch as described above. However, the range of the nodes 12 to 19 is in a power failure state. Power cannot be supplied to the node where the accident occurred, but the other nodes (nodes 13 to 19) are in the normal power outage section where there is a power outage because they are on the downstream side of the node where the accident occurred, and power is supplied from other distribution lines. It is possible to recover from a power failure by sending it.
この健全停電区間に、重要負荷が接続され第1優先区間
に登録されたノード15が含まれている。尚、この優先区
間は、第1図に示されたマンマシン装置2により、第1
表に示すように1配電線に1〜3区間、優先順位をつけ
て指定される。このノード15に電力を融通できる融通経
路は、配電線F2からTSW2を経由する経路と、配電線F3か
らTSW3またはまたはTSW4を経由する経路である。 This healthy blackout section includes the node 15 connected to the important load and registered in the first priority section. It should be noted that this priority section is set by the man-machine device 2 shown in FIG.
As shown in the table, one distribution line is designated with 1 to 3 sections and priorities. The interchange route that can exchange power with the node 15 is a route from the distribution line F 2 to TSW 2 and a route from the distribution line F 3 to TSW 3 or TSW 4.
上記の各経路は、次の手順によって抽出される。Each of the above routes is extracted by the following procedure.
(1)優先ノードの電源側(上流側)ブランチの開閉器
属性が、TSWかSWかを調べ、TSWであれば融通可能ノード
とし、SWなら当該SWに接続されているノードについて、
そのノードに接続されているブランチの開閉器属性を調
べる。複数のブランチが接続されている場合は、それぞ
れのブランチについて、TSWかSWかを調べ、SWの場合
は、更にそのSWに接続されているノードについて、同様
の調査を行う。以上の作業をくりかえしながら電源側方
向のブランチに対して、TSW又は事故区間につきあたる
までつづける。(1) Check whether the switch attribute of the power supply side (upstream side) branch of the priority node is TSW or SW, and if TSW is a flexible node, and if SW is a node connected to the SW,
Examine the switch attributes of the branch connected to that node. When a plurality of branches are connected, it is checked whether each branch is TSW or SW. In the case of SW, the same investigation is performed for the node connected to the SW. While repeating the above work, continue until the branch toward the power supply side hits the TSW or accident area.
(2)(1)が終ったら、優先ノードの電源側ブランチ
以外のブランチに対して、(1)と同様の作業をTSWに
つきあたるまでつづける。(2) When (1) is completed, the same work as (1) is continued until the TSW is applied to the branches other than the power supply side branch of the priority node.
以上の作業により、優先ノードに対して電力融通可能な
TSW(ブランチ)とその経路が探索される。With the above work, power can be exchanged with the priority node.
The TSW (branch) and its route are searched.
次に電力融通可能な各TSWから優先ノードまでの経路の
区間合計負荷量が算出される。各区間の負荷量は、開閉
器に取付けられたセンサで測定され、開閉器子局に読み
こまれ、信号伝送路4経由で配電線監視制御装置にオン
ラインで送信される計測値か、または、あらかじめ区間
負荷を、当該区間に負荷として接続されている設備の合
計最大負荷量と、当該配電線の事故直前の合計実績負荷
とから下式により求められる値を使用する。Next, the total load on the section of the route from each TSW capable of power interchange to the priority node is calculated. The load amount of each section is measured by a sensor attached to the switch, read by the switch slave station, and transmitted online to the distribution line monitoring and control device via the signal transmission path 4, or For the section load, the value obtained by the following formula from the total maximum load amount of the equipment connected as a load to the section in advance and the total actual load immediately before the accident of the distribution line is used.
ここで、In…区間番号n(ノードn)の負荷 Cn…ノードnに接続されている設備の合計最大負荷量 If…当該配電線の予測負荷の最大値 Cf…当該配電線に接続されている設備の合計最大負荷量
(各ノードに接続されている設備の合計最大負荷量の当
該配電線全体のノードについての合計) であり、Ifは、電力の融通状態が数時間続くと考えて、
下式により数時間(通常2〜3時間)後までの予測負荷
を推定し、その間の最大値を使用する。 Here, In ... load of section number n (node n) Cn ... total maximum load of equipment connected to node n If ... maximum value of predicted load of the distribution line Cf ... connected to the distribution line It is the total maximum load of the equipment (total maximum load of the equipment connected to each node for all nodes in the distribution line), and If considers that the power interchange state lasts for several hours,
The estimated load up to several hours (usually 2 to 3 hours) is estimated by the following formula, and the maximum value in that period is used.
ここで、If(tn)…当該配電線のtn時の予測負荷 Ie(tn)…当該配電線のの計画負荷曲線のtn時の値 Ie(t0)…当該配電線の計画負荷曲線のt0時(事故直
前)の値 It(t0)…当該配電線のt0時(事故直前)の実績負荷 である。 Here, If (tn) ... Predicted load of the distribution line at tn Ie (tn) ... Value of the planned load curve of the distribution line at tn Ie (t 0 ) ... t of the planned load curve of the distribution line Value at 0 o'clock (immediately before the accident) It (t 0 ) ... It is the actual load of the relevant distribution line at t 0 o'clock (immediately before the accident).
上述の方法で得られた各区間の区間負荷を、予備電力の
融通源となるTSWから復旧優先区間までの経路に沿って
集計し、この合計負荷量をTIiとし、融通側の配電線の
予備電力量をAIiとする。iは融通経路を示す。The section load of each section obtained by the above method is aggregated along the route from the TSW, which is the source of reserve power interchange, to the restoration priority section, and this total load amount is set as TIi, and the reserve distribution line on the interchange side is reserved. The electric energy is AIi. i indicates an interchange route.
次に、TIiとATiとを比較し、 TIi≦AIi ……(3) の関係にある融通経路を抽出する。第5図において、TS
W2の予備電力量(TSW2を経由して供給することの可能な
予備電力量を意味する。他のTSWについても同様)AT2=
16,TSW3のAT3=10,TSW4のAT4=12であるから、区間負荷
の値として、第3表を用いて、TIiとAIiを各経路につい
て比較すると、 TSW2の経路、TI2=12<16=AT2 TSW3の経路、TI3=10=10=AT3 TSW4の経路、TI4=22>10=AT4 であり、(3)式を満足する経路はTSW2の経路とTSW3の
経路である。Next, TIi and ATi are compared, and an interchange route with a relationship of TIi ≤ AIi (3) is extracted. In Figure 5, TS
W2 reserve power amount (means the reserve power amount that can be supplied via TSW2. The same applies to other TSWs) AT 2 =
16, TSW3 AT 3 = 10, TSW4 AT 4 = 12. Therefore, using Table 3 as the interval load value, comparing TIi and AIi for each route, the route of TSW2, TI 2 = 12 <16 = AT 2 TSW3 route, TI 3 = 10 = 10 = AT 3 TSW4 route, TI 4 = 22> 10 = AT 4 , and the routes that satisfy equation (3) are the TSW2 route and TSW3 route. Is.
次に、抽出された経路に対して、融通電力の被融通端で
の電圧が規定値内に入るかどうかを確認する。各区間の
電圧降下は一般に下式で求められる。Next, for the extracted path, it is confirmed whether the voltage at the end to which the interchanged power is accommodated falls within a specified value. The voltage drop in each section is generally obtained by the following formula.
υn=Zn(in+1/2In) ……(4) ただし、υn…区間nの電圧降下 Zn…区間nのインピーダンス in…区間nの通過電流 In…区間nの負荷 従って、被融通端までの電圧降下は、 で示される。υn′はTSWから被融通区間末端までの合
計電圧降下量であり、υkは区間Kの電圧降下値であ
る。(5)式のK=1からK=nまでは、TSWから最末
端被融通区間までを意味し、第5図中のノード番号とは
無関係である。電力融通側のTSWにおける電圧Viは既知
であり、最末端被融通区間nの末端電圧Vnは、 Vn=Vi−υn′ ……(6) で求められ、このVnが規定値内にあるかどうかが調べら
れる。However υ n = Zn (in + 1 / 2In) ...... (4), the load of the passing current I n ... interval n of the impedance i n ... interval n of the voltage drop Z n ... interval n of upsilon n ... interval n Accordingly, the flexibility The voltage drop to the end is Indicated by. υ n ′ is the total voltage drop amount from the TSW to the end of the concession section, and υ k is the voltage drop value in the section K. K = 1 to K = n in the equation (5) means from TSW to the most end concession section, and is unrelated to the node number in FIG. The voltage Vi at the TSW on the power interchange side is known, and the terminal voltage Vn of the most end concealed section n is calculated by Vn = Vi−υ n ′ (6). Is this Vn within the specified value? I can investigate.
規定値としては、運用電圧基準の±10%が適用され、電
圧がこの値を外れる経路が除外される。TSW2の経路およ
びTSW3の経路は、この条件を満足しているものとする。As the specified value, ± 10% of the operating voltage standard is applied, and the route where the voltage deviates from this value is excluded. The route of TSW2 and the route of TSW3 satisfy this condition.
以上の手順により抽出された融通経路から融通操作時間
の短い経路が抽出される。まず、開閉器1個の操作時間
を10秒とし、融通経路上の開閉器で融通電流に対して順
投動作するものについては操作時間と順投動作時間(X
時限)を比較して短い方の時間を選定しておく。また、
TSWおよび融通電流に対して電源側端子が逆方向となるS
Wには、操作時間(10秒)が選定される。A route with a short interchange operation time is extracted from the interchange routes extracted by the above procedure. First, the operating time of one switch is set to 10 seconds, and the operating time and the forward operation time (X
Compare the (time limit) and select the shorter time. Also,
The terminal on the power supply side is in the opposite direction to TSW and the interchange current S
The operation time (10 seconds) is selected for W.
選定された時間に基づいて抽出された各経路の融通操作
時間が算出される。The flexible operation time of each extracted route is calculated based on the selected time.
TSW2の経路…TSW2の操作時間(10秒) +SW15のX時限(5秒) =15秒 TSW3の経路…TSW3の操作時間(10秒) +SW16の操作時間(10秒) =20秒 上記2個の経路の融通操作時間が比較され、短い方であ
るTSW2の経路が採用される。融通操作時間が等しい場合
は、電力融通後の予備電力量の大きい方の経路が採用さ
れる。TSW2 route… TSW2 operation time (10 sec) + SW15 X time limit (5 sec) = 15 seconds TSW3 route… TSW3 operation time (10 sec) + SW16 operation time (10 sec) = 20 sec The flexible operation times of the routes are compared, and the shorter route of TSW2 is adopted. When the interchange operation times are the same, the route having the larger amount of reserve power after the interchange of power is adopted.
電力融通経路が決まると、開閉器の操作が行われる。TS
W2の経路により、電力を融通するための操作手順を第4
表に示す。SW14の切操作は、何かの原因でノード13が充
電されたとき、SW13が順投機能により閉投入されて配電
線がループ状態になるのを防止するためである。When the power interchange path is determined, the switch is operated. TS
The operation procedure for exchanging power through the W2 route
Shown in the table. The disconnection operation of SW14 is to prevent the distribution line from becoming a loop state by closing the SW13 by the forward throwing function when the node 13 is charged for some reason.
復旧優先停電区間へ電力を融通するための開閉器操作と
並行して、この操作で電力を供給されない残健全停電区
間に対して最適負荷融通経路の探索を行う。この最適負
荷融通の対象とする配電線系統は、前述の復旧優先区間
への融通操作が完了しても停電したままである、第6a図
に破線で掴んで示される配電線系統である。最適負荷融
通経路の評価は次の項目で決定する。 In parallel with the switch operation for accommodating power to the restoration priority power failure section, the optimum load accommodation route is searched for the remaining healthy power failure section that is not supplied with power by this operation. The distribution line system targeted for this optimum load accommodation is the distribution line system shown by the broken line in FIG. 6a, which has been out of power even after the accommodation operation to the restoration priority section is completed. The evaluation of the optimum load accommodation route is determined by the following items.
(A)融通不能として停電が継続される区間の負荷量が
最小であること、 (B)SWの“切”制御回数が最小であること、 (C)操作回数が最小であること、 上記条件を満足する融通経路は、次の基準により探索さ
れる。もちろん、健全停電区間に対して、その区間に給
電可能なTSWが存在し、融通可能な配電線の予備電力
が、健全停電区間の負荷よりも大きいことが条件であ
る。(A) The amount of load in the section where the power outage is continued due to the inability to be interchanged is minimum, (B) The number of times the SW is turned off is minimum, and (C) The number of times of operation is minimum, the above conditions A flexible route that satisfies the following condition is searched for according to the following criteria. Of course, for a healthy power failure section, there is a TSW that can supply power to that section, and the reserve power of the flexible distribution line is larger than the load of the healthy power failure section.
(イ)停電区間への融通経路が必らずある負荷区間を通
る場合や、停電区間への給電に伴ってSWが動作してある
負荷区間が接続されるときは、当該負荷区間も対象系統
に含める。(B) When an interchange route to a power outage section inevitably passes through a certain load section, or when a load section in which the SW is operating is connected with power supply to the power outage section, the load section is also the target system. Include in.
(ロ)ただ一つのTSWからしか融通され得ない停電区間
には、そのTSWの経路を割りつける。(B) A TSW route is assigned to a power failure section that can be accommodated by only one TSW.
(ハ)隣接配電線系統の予備電力量が大で、それが融通
電力として、用いられないことにより停電が生じること
になり、しかもその隣接配電系統から直接に融通可能な
停電区間が一連の区間しかないときには、その一連の区
間に前記隣接配電線を割りつける。(C) There is a large amount of standby power in the adjacent distribution line system, and if it is not used as interchange power, a power outage will occur, and there will be a series of blackout intervals that can be directly interchanged from the adjacent distribution system. If there is only one, the adjacent distribution line is allocated to the series of sections.
(ニ)停電区間のうち、停電負荷の大きい区間を優先的
に割りつける。(D) Of the power outage sections, the section with a large power outage load is preferentially assigned.
(ホ)電力融通のための開閉機器操作手順が少くてすむ
停電区間を優先的に割りつける。(E) Prioritize power outage sections that require fewer switchgear operating procedures for power interchange.
以下、第6a図、第6b図、および第6c図を参照して説明す
る。第6a図において、ノード17,13,18および19が健全停
電区間である。ノード17へは、TSW1からしか電力融通で
きず、前述の基準(ロ)が適用されて、TSW1の経路が割
りつけられ、TSW1閉、SW17切の操作が行われる。SW17の
切操作は、前述のSW14の切操作と同じ理由によってい
る。ノード13,18および19へは、次の2個の経路から融
通可能である。Hereinafter, description will be given with reference to FIGS. 6a, 6b, and 6c. In FIG. 6a, nodes 17, 13, 18 and 19 are healthy blackout sections. Power can be exchanged to the node 17 only from the TSW1, the above-mentioned criterion (b) is applied, the route of the TSW1 is allocated, and the operation of closing the TSW1 and turning off the SW17 is performed. The switching operation of SW17 is based on the same reason as the switching operation of SW14 described above. Nodes 13, 18 and 19 can be accommodated by the following two routes.
I)TSW4の経路、 II)SW14を閉投入し、ノード14を経由してTSW2から融通
する経路、 I)の経路は基準(ハ)を適用するもので、TSW4,SW19,
およびSW18を投入し、SW13を切操作する。この場合のノ
ード負荷合計量は10で、TSW4の予備電力量12より少な
く、電力融通可能である。この場合の融通経路を、第6b
図太線で示す。一方、II)の場合は、先に優先区間への
送電のために設定されたTSW2の経路からの融通となり、
TSW2の予備電力量は4でノード13に対してのみ融通可能
である。この場合、残りのノード18,19に対しては、基
準(ロ)が適用されてTSW4からの融通操作となる。ノー
ド13への融通操作は、SW18切、SW13切、SW14投入であ
り、ノード18,19への融通操作は、TSW4投入、SW19投入
であり、合計5手順となる。IIの場合の融通経路を、第
6c図に太線で示す。I) TSW4 route, II) SW14 closed and routed from node TSW2 via node 14, I) route applies standard (C), TSW4, SW19,
Then, turn on SW18 and turn off SW13. In this case, the total node load is 10, which is less than the reserve power amount 12 of TSW4, and power interchange is possible. The interchange route in this case is 6b
It is indicated by a thick line in the figure. On the other hand, in the case of II), it will be accommodated from the route of TSW2 that was previously set for power transmission to the priority section,
The reserve power amount of TSW2 is 4 and can be accommodated only to the node 13. In this case, the standard (b) is applied to the remaining nodes 18 and 19 and the operation from the TSW 4 is performed. The flexible operation to the node 13 is SW18 OFF, SW13 OFF, and SW14 input, and the flexible operation to the nodes 18 and 19 is TSW4 input and SW19 input, for a total of five procedures. In the case of II,
It is shown in bold in Figure 6c.
第6b図および第6c図に示される融通経路が、いずれも電
圧降下基準を満足しているとし、これら2個の経路は、
比較評価される。評価項目を第5表に示す。It is assumed that the interchange paths shown in FIGS. 6b and 6c both satisfy the voltage drop criterion, and these two paths are
Comparatively evaluated. The evaluation items are shown in Table 5.
第5表から明らかなように、第6b図の経路が最適融通経
路として採用され、第4表に示される復旧優先停電区間
への融通操作完了後、引きつづいて、第6b図に示される
経路による融通操作が実施される。 As is clear from Table 5, the route shown in Fig. 6b is adopted as the optimum accommodation route, and after the accommodation operation to the restoration priority blackout section shown in Table 4 is completed, the route shown in Fig. 6b continues. The flexible operation is performed.
第3図に示されたように、配電線F1の区間14に地絡事故
が発生した場合は、優先区間15に電力を融通する経路
は、TSW3から経路のみであるが、区間13に地絡事故が発
生した場合は、TSW2の経路およびTSW3の経路の双方とも
に融通可能であり、さらに、地絡事故が区間10または区
間11に発生した場合は、TSW1およびTSW4の経路によって
も、融通可能である(融通経路に加わっている負荷の大
きさとTSW1およびTSW4の予備電力の大きさによっては融
通不可能)。従って融通経路に加わる負荷の大きさと予
備電力量の大きさは、変動していることから、これを別
に考えることとすれば、事故発生区間に対応して融通経
路をあらかじめ、探索しておくことができる。第6表
は、第3図の配電線F1の優先区間15に対して探索された
融通経路を示す。As shown in FIG. 3, when a ground fault occurs in the section 14 of the distribution line F 1 , the only route to transfer power to the priority section 15 is from TSW3, but the section 13 In the event of a ground fault, both the TSW2 and TSW3 routes can be accommodated, and if a ground fault occurs in section 10 or section 11, it can also be accommodated by the TSW1 and TSW4 routes. (It cannot be accommodated depending on the size of the load added to the accommodation route and the size of the reserve power of TSW1 and TSW4). Therefore, the size of the load applied to the interchange route and the amount of reserve power vary, so if we consider this separately, we should search for the interchange route in advance corresponding to the accident occurrence section. You can Table 6 shows the interchange routes searched for the priority section 15 of the distribution line F 1 in FIG.
地絡事故が発生した場合、投入ロックがかかった開閉器
を検知して事故区間番号を確認し、この事故区間番号か
ら直ちに融通経路が得られるから、事故が発生してから
融通経路を探索するより、短時間で融通経路の選定が可
能である。 When a ground fault occurs, the switch with the closing lock is detected to confirm the accident section number, and the accommodation route can be immediately obtained from this accident section number, so the accommodation route is searched after the accident occurs. Therefore, the flexible route can be selected in a short time.
また、第6表に示されている融通経路により実際に電力
を融通する前に、当該融通経路および優先区間に接続さ
れている設備の負荷が、予想される融通期間中当該融通
経路に予備電力を融通する電力供給手段(TSW)がもっ
ている予備電力を上まわることがないかどうかを調べな
ければならないが、停電事故の発生と無関係に、常時、
定められた時間間隔で、負荷と予備電力の大きさを調べ
て利用可能な融通経路を確認し、次の確認時間までの間
に停電事故が発生した場合、前記確認された融通経路区
間を通して電力融通を行うことにより、優先区間の停電
復旧をさらに短時間で行うことが可能となる。Further, before actually accommodating the electric power through the accommodation route shown in Table 6, the load of the equipment connected to the accommodation route and the priority section is the reserve power to the accommodation route during the expected accommodation period. It is necessary to check whether the power supply means (TSW) that accommodates the power supply exceeds the reserve power that it has, but regardless of the occurrence of a power outage,
At a specified time interval, check the load and standby power to check the available interchange route, and if a power outage occurs before the next confirmation time, power will be supplied through the confirmed interchange route section. By providing the flexibility, it is possible to restore the power failure of the priority section in a shorter time.
本発明によれば、配電線ごとに優先的に停電を復旧する
優先区間を指定しておき、該優先区間を健全停電区間に
含む停電事故が発生したとき、まず、前記優先区間に、
隣接する配電線から電力融通可能な経路を探索し、次い
で、探索された融通経路および前記優先区間に接続され
ている負荷が供給可能な予備力を上まわることはない
か、融通経路を形成するための開閉器操作時間が最短で
あるのはどれか、を調査して融通経路を決定するので、
優先区間に対する停電復旧を短時間で行うことが可能に
なり、停電事故が及ぼす社会的悪影響を低減する効果が
ある。According to the present invention, a priority section for preferentially recovering a power outage is designated for each distribution line, and when a power failure accident that includes the priority section in a healthy power failure section occurs, first, in the priority section,
A route that allows electric power to be exchanged is searched for from an adjacent distribution line, and then an interchange route that does not exceed the reserve capacity that can be supplied by the searched interchange route and the load connected to the priority section is formed. For which the switch operating time is the shortest, to determine the interchange route,
It is possible to recover from a power outage in a priority section in a short time, which has the effect of reducing the social adverse effects of a power outage accident.
また、優先区間に対する融通経路を形成する開閉器操作
と並行して、前記融通経路によって停電復旧されない残
健全停電区間に対し、前記優先区間への融通経路の形成
が完了しているという条件で、融通経路を探索するの
で、融通経路の探索条件が限定されて探索の範囲内が狭
くなり、短時間で残健全停電区間に対する融通経路が選
定され、残健全停電区間の停電復旧に要する時間を短縮
する効果がある。Further, in parallel with the switch operation to form an accommodation path for the priority section, for the remaining healthy power failure section that is not restored by a power failure by the accommodation path, on condition that the formation of the accommodation path to the priority section is completed, Since the flexible route is searched, the search condition of the flexible route is limited and the range of the search is narrowed, and the flexible route for the remaining healthy blackout section is selected in a short time, and the time required for power failure recovery of the remaining healthy blackout section is shortened. Has the effect of
さらに、あらかじめ配電線ごとに優先区間を指定し、指
定された優先区間に対して、電力を融通する経路を、想
定された事故発生区間に対応させてあらかじめ探索して
おき、停電事故発生時には、事故発生区間を検知して融
通経路を決定する方法により、融通経路を探索する時間
が短縮され、停電復旧時間を短縮する効果がある。Furthermore, a priority section is specified in advance for each distribution line, and for the specified priority section, a route for power supply is searched in advance in correspondence with the expected accident occurrence section, and when a power outage accident occurs, By the method of detecting the accident occurrence section and determining the accommodation route, the time for searching the accommodation route is shortened, and there is an effect of shortening the power failure recovery time.
また探索された融通経路および優先区間に接続された負
荷の大きさと、該融通経路に接続されている電力供給手
段がもつ予備電力量とを、常時、定められた時間間隔で
確認し、利用可能な融通経路を常時選定しておくことに
より、さらに優先区間に対する融通経路の決定に要する
時間が短縮され、停電復旧時間が短縮される効果があ
る。Also, the size of the load connected to the searched interchange route and the priority section and the amount of reserve power of the power supply means connected to the interchange route can be constantly confirmed and used at a predetermined time interval. By always selecting a flexible route, it is possible to further reduce the time required to determine the flexible route for the priority section and to shorten the power failure recovery time.
第1図は、本発明の適用例を示すブロック図であり、第
2図は配電線系統の例を示す系統図であり、第3図は第
2図の部分を示す系統図であり、第4図は第3図に示す
配電線で停電事故がおこった場合の各開閉器の動作を示
す波形図であり、第5図は第3図をノード・ブランチで
表わしたブロック図であり、第6a〜6c図は、融通経路を
示すブロック図である。 1……配電線監視制御装置、 2……優先区間を設定する手段(マンマシン装置)、 101……電力供給手段(連係用開閉器)、 102……開閉器(順投機能付開閉器)。FIG. 1 is a block diagram showing an application example of the present invention, FIG. 2 is a system diagram showing an example of a distribution line system, and FIG. 3 is a system diagram showing a part of FIG. FIG. 4 is a waveform diagram showing the operation of each switch when a power failure occurs on the distribution line shown in FIG. 3, and FIG. 5 is a block diagram showing FIG. 3 as nodes and branches. 6a to 6c are block diagrams showing interchange routes. 1 ... Distribution line monitoring control device, 2 ... means for setting a priority section (man-machine device), 101 ... power supply means (coupling switch), 102 ... switch (switch with forward throw function) .
───────────────────────────────────────────────────── フロントページの続き (72)発明者 宇之津 俊治 茨城県日立市幸町3丁目2番1号 日立エ ンジニアリング株式会社内 (72)発明者 速水 光夫 茨城県日立市大みか町5丁目2番1号 株 式会社日立製作所大みか工場内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Shunji Unoz 3-2-1, Saiwaicho, Hitachi City, Ibaraki Prefecture Hitachi Engineering Co., Ltd. (72) Inventor Mitsuo Hayami 5, Omikacho, Hitachi City, Ibaraki Prefecture 2-1 Hitachi Ltd. Omika factory
Claims (4)
間からなる配電線と、該配電線に接続されて電力を供給
する複数の電力供給手段とを備えた配電線系統の状態を
監視し、配電線停電事故時に、前記開閉器を制御して健
全停電区間に送電する配電線負荷融通方法において、 イ.あらかじめ配電線ごとに停電時に優先的に停電を復
旧する優先区間を指定する手順と、 ロ.配電線停電事故発生時、健全停電区間群に存在する
前記区間を抽出する手順と、 ハ.該優先区間と前記電力供給手段とを接続する融通経
路を探索する手順と、 ニ.探索された融通経路のなかから、融通経路および優
先区間に接続された負荷が、該融通経路に接続されてい
る電力供給手段が供給可能な予備電力量を越えない融通
経路を抽出する手順と、 ホ.前記抽出された融通経路を形成するために必要な開
閉器の操作時間が最短である融通経路を選定する手順
と、 を備えていることを特徴とする配電線負荷融通方法。1. A state of a distribution line system comprising a distribution line consisting of a plurality of sections connected to each other via a switch and a plurality of power supply means connected to the distribution line to supply power. A distribution line load accommodating method for monitoring and controlling the switch to transmit power to a sound power failure section in the event of a distribution line power failure. Procedure for specifying the priority section for prioritizing restoration of power failure for each power distribution line in advance, and b. When a distribution line blackout accident occurs, a procedure for extracting the section existing in the sound power failure section group, and c. A procedure for searching for an interchange route connecting the priority section and the power supply means; d. From the searched interchange route, the load connected to the interchange route and the priority section, a procedure for extracting an interchange route that does not exceed the reserve power amount that can be supplied by the power supply means connected to the interchange route, E. A distribution line load accommodating method comprising: a procedure for selecting an accommodation path having a shortest switch operation time required to form the extracted accommodation path.
と並行して、該融通経路によって電力を供給されない残
健全停電区間に対し、前記融通経路が形成されているこ
とを前提として、残区間融通経路を探索決定する手順を
備え、前記融通経路の形成完了に引きつづいて前記探索
決定された残区間融通経路を形成する開閉器操作を行う
ことを特徴とする請求項1に記載の配電線負荷融通方
法。2. In parallel with the formation of an accommodation route for supplying electric power to a priority section, the remaining route is formed on the assumption that the accommodation route is formed for the remaining healthy blackout section where electric power is not supplied by the accommodation route. The procedure according to claim 1, further comprising a step of searching for and determining a section accommodation route, and performing a switch operation to form the remaining section accommodation route determined to be searched after completion of formation of the accommodation route. Electric wire load accommodation method.
間からなる配電線と、該配電線に接続されて電力を供給
する複数の電力供給手段とを備えた配電線系統の状態を
監視し、配電線停電事故時に、前記開閉器を制御して健
全停電区間に送電する配電線負荷融通方法において、 イ.あらかじめ、配電線ごとに停電時に優先的に停電を
復旧する優先区間を指定し、 ロ.指定された優先区間に対し、配電線停電事故時に電
力を融通する融通経路を事故発生区間に対応させてあら
かじめ探索しておき、 ハ.停電発生時には、事故発生区間を検知して、融通経
路を決定する、 ことを特徴とする配電線負荷融通方法。3. A state of a distribution line system comprising a distribution line consisting of a plurality of sections connected to each other via a switch and a plurality of power supply means connected to the distribution line to supply power. A distribution line load accommodating method for monitoring and controlling the switch to transmit power to a sound power failure section in the event of a distribution line power failure. In advance, specify a priority section for each power distribution line that will be restored preferentially when a power failure occurs. For the designated priority section, search for an interchange route that will supply power in the event of a power outage in the distribution line, in advance corresponding to the section in which the accident occurred, and c. In the event of a power outage, the section for accommodating the load is determined by detecting the section where the accident occurred and determining the accommodation route.
された負荷の合計値と、該融通経路に電力を融通する電
力供給手段の予備電力量の大きさとを、常時定められた
時間間隔で比較し、探索された融通経路のなかから、予
備電力量の方が大きい融通経路を抽出しておき、停電発
生時には、前記抽出された融通経路のなかから決定する
ことを特徴とする請求項3に記載の配電線負荷融通方
法。4. The total value of the loads connected to the found concession route and the priority section and the size of the reserve power amount of the power supply means for conserving electric power to the concession route are constantly set at predetermined time intervals. 4. A comparison is made, wherein an accommodation route having a larger reserve power amount is extracted from the retrieved accommodation routes, and when the power failure occurs, the accommodation route is determined from the extracted accommodation routes. The method of accommodating the load of the distribution line described in.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63060687A JPH0777489B2 (en) | 1988-03-15 | 1988-03-15 | Distribution line load accommodation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63060687A JPH0777489B2 (en) | 1988-03-15 | 1988-03-15 | Distribution line load accommodation method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH01234021A JPH01234021A (en) | 1989-09-19 |
| JPH0777489B2 true JPH0777489B2 (en) | 1995-08-16 |
Family
ID=13149464
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP63060687A Expired - Fee Related JPH0777489B2 (en) | 1988-03-15 | 1988-03-15 | Distribution line load accommodation method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0777489B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106505564A (en) * | 2016-12-02 | 2017-03-15 | 中国农业大学 | A transfer method for medium-voltage distribution network based on bus backbanding |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH03284125A (en) * | 1990-03-29 | 1991-12-13 | Chubu Electric Power Co Inc | Automatically operating apparatus for distribution line system |
| JP2680466B2 (en) * | 1990-05-28 | 1997-11-19 | 中部電力株式会社 | Distribution system controller |
| WO2016194821A1 (en) * | 2015-05-29 | 2016-12-08 | 東京電力ホールディングス株式会社 | Power distribution control device, power distribution control method and program |
| JP7480523B2 (en) * | 2020-02-26 | 2024-05-10 | 富士電機株式会社 | State estimation device, state estimation program, and state estimation method |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5771229A (en) * | 1980-10-20 | 1982-05-04 | Tokyo Electric Power Co | Automatic recovery operation system for power system |
-
1988
- 1988-03-15 JP JP63060687A patent/JPH0777489B2/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106505564A (en) * | 2016-12-02 | 2017-03-15 | 中国农业大学 | A transfer method for medium-voltage distribution network based on bus backbanding |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH01234021A (en) | 1989-09-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6539287B1 (en) | Distribution control system capable of isolating fault section without using time limited sequential shift function | |
| US6963793B2 (en) | Distribution network monitoring and control system | |
| KR101047728B1 (en) | Method for controlling electric power system in response to circuit abnormality and system | |
| US7751166B2 (en) | Advanced feeder architecture with automated power restoration | |
| KR970003187B1 (en) | Method and system for disconnecting faulty distribution line section from power distribution line | |
| EP2232664B1 (en) | Load restoration for feeder automation in electric power distribution systems | |
| CN101931218B (en) | Apparatus for electronic monitoring of the supply current of modules connected to a bus | |
| CN101641849A (en) | Fuse saving power distribution system fault protection | |
| JPH0777489B2 (en) | Distribution line load accommodation method | |
| CN109713646A (en) | Bus failure protection switching method based on other female disconnecting link sideband main transformer | |
| JP2009017617A (en) | Supervisory control system and method | |
| JP2000184600A (en) | Selected load cut-off apparatus | |
| JPH04331416A (en) | Ground fault protection system for distribution line | |
| JPH0226222A (en) | Distribution line protection relay device and distribution line device | |
| JPH10111395A (en) | DC power supply for nuclear power plants | |
| JP2956601B2 (en) | Fault segmentation device for distribution system | |
| JPS6016141A (en) | Power distributing operation monitoring device | |
| JP2007159188A (en) | Power distribution monitoring control system and method | |
| JPH0349536A (en) | Power interchange system for power distribution system | |
| JPH0227895B2 (en) | ||
| JP3255450B2 (en) | Distribution line accident section separation method | |
| JP2645013B2 (en) | Power system accident recovery system | |
| JPH05103419A (en) | Distribution system operating device | |
| JPS63206120A (en) | Operation equipment distribution system | |
| JPH0767237B2 (en) | Power system operating device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |