Construction method of steel pipe concrete structure

Info

Publication number
JPH0781401B2
JPH0781401B2 JP1089810A JP8981089A JPH0781401B2 JP H0781401 B2 JPH0781401 B2 JP H0781401B2 JP 1089810 A JP1089810 A JP 1089810A JP 8981089 A JP8981089 A JP 8981089A JP H0781401 B2 JPH0781401 B2 JP H0781401B2
Authority
JP
Japan
Prior art keywords
steel pipe
concrete
concrete structure
water
constructing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1089810A
Other languages
Japanese (ja)
Other versions
JPH02269268A (en
Inventor
薫 木村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP1089810A priority Critical patent/JPH0781401B2/en
Publication of JPH02269268A publication Critical patent/JPH02269268A/en
Publication of JPH0781401B2 publication Critical patent/JPH0781401B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】 《産業上の利用分野》 この発明は、中空な鋼管と、これの内部に充填打設され
る鉄筋篭が埋設されたコンクリート硬化体とからなる鋼
管コンクリート構造物を構築する際に、前記鋼管の内周
面と前記コンクリート硬化体の外周面との付着を防止す
べく採用される鋼管コンクリート構造物の構築工法に関
する。
DETAILED DESCRIPTION OF THE INVENTION <Industrial field of application> The present invention constructs a steel pipe concrete structure comprising a hollow steel pipe and a concrete hardened body in which a reinforcing bar cage to be filled and placed is buried. In this case, the present invention relates to a method for constructing a steel pipe concrete structure that is adopted to prevent the inner peripheral surface of the steel pipe from adhering to the outer peripheral surface of the hardened concrete.

《従来の技術》 円形ないしは角形断面図の中空鋼管内にコンクリートを
充填した構造物は、建築構造物の柱部材などに利用され
ている。
<< Prior Art >> A structure in which a hollow steel pipe having a circular or rectangular cross section is filled with concrete is used as a pillar member of a building structure.

この種の構造物では、コンクリートに圧縮加重が加わっ
たときに、鋼管がこれを規制することにより、鋼管が引
張り力に対抗するとともに、コンクリートが圧縮力に対
抗して、双方の材料が有している特性が効果的に発揮さ
れることが期待されている。
In this type of structure, when a compressive load is applied to concrete, the steel pipe regulates this so that the steel pipe resists the tensile force and the concrete resists the compressive force, and both materials have It is expected that these characteristics will be effectively exhibited.

ところが、鋼管内に充填されたコンクリートが、鋼管と
接着していると、これらの2部材が力学的に同じ挙動を
示し、鋼管が座屈するなどの問題があって、前述した効
果が得られない。
However, when the concrete filled in the steel pipe adheres to the steel pipe, these two members exhibit the same dynamic behavior, and there is a problem that the steel pipe buckles, and the above-mentioned effects cannot be obtained. .

そこで、例えば、特開昭62-72837号公報には、鋼管の内
面にパラフィン,アスファルト,オイル,ワセリンなど
の粘凋性のある分離材を塗布しておき、コンクリートが
鋼管の内面に付着することを防止する鋼管コンクリート
構造物の構築工法が開示されている。
Therefore, for example, in Japanese Patent Laid-Open No. 62-72837, a viscous separating material such as paraffin, asphalt, oil, and vaseline is applied to the inner surface of a steel pipe, and concrete adheres to the inner surface of the steel pipe. There is disclosed a construction method of a steel pipe concrete structure for preventing the above.

しかしながら、この公報に示されている構築工法には、
以下に説明する技術的課題があった。
However, in the construction method shown in this publication,
There was a technical problem described below.

《発明が解決しようとする課題》 すなわち、上記工法に開示されている構築工法では、分
離材を鋼管の内面に塗布することによって、コンクリー
トの付着を防止しているが、分離材の塗布作業は煩雑で
ある上に、工期がかかり、塗布むらが生じ易く、コンク
リートの付着を完全に防止することが困難であった。
<< Problems to be Solved by the Invention >> That is, in the construction method disclosed in the above-mentioned construction method, the adhesion of concrete is prevented by applying the separating material to the inner surface of the steel pipe. In addition to being complicated, it takes a construction period, uneven coating is likely to occur, and it has been difficult to completely prevent the adhesion of concrete.

この発明は、このような従来の問題点に鑑みてなされた
ものであり、その目的とするところは、コンクリートが
鋼管に付着することを完全に防止できるとともに、簡単
に施工できる鋼管コンクリート構造物の構築工法を提供
することにある。
The present invention has been made in view of such conventional problems, and an object thereof is to completely prevent concrete from adhering to a steel pipe and to easily construct a steel pipe concrete structure. To provide a construction method.

《課題を解決するための手段》 上記目的を達成するために、本発明は、中空な鋼管と、
これらの内部に充填打設される鉄筋篭が埋設されたコン
クリート硬化体とからなる鋼管コンクリート構造物を構
築する際に、前記鋼管の内周面と前記コンクリート硬化
体の外周面との付着を防止すべく採用される鋼管コンク
リート構造物の構築工法であって、前記鋼管の内部にコ
ンクリートを打設した後に、前記鋼管と前記鉄筋篭との
間に、前記鋼管側が負極となる直流電圧を印加すること
により、コンクリート中の水の一部を鋼管側に移動させ
て当該水を鋼管とコンクリートとの間に介在させること
を特徴とするものである。
<< Means for Solving the Problem >> In order to achieve the above object, the present invention is a hollow steel pipe,
Prevents adhesion between the inner peripheral surface of the steel pipe and the outer peripheral surface of the concrete hardened body when constructing a steel pipe concrete structure consisting of a concrete hardened body in which a reinforced cage to be filled and placed inside is buried. A method for constructing a steel pipe concrete structure adopted in order to place a concrete inside the steel pipe, and then, between the steel pipe and the rebar cage, apply a DC voltage at which the steel pipe side becomes a negative electrode. Thus, a part of the water in the concrete is moved to the steel pipe side, and the water is interposed between the steel pipe and the concrete.

上記鋼管には、その内面に保水性のシートが層状に設け
られていてもよい。
A water retaining sheet may be provided in layers on the inner surface of the steel pipe.

上記シートは、その一部または全部が導電性を有してい
てもよい。
Part or all of the above-mentioned sheet may have conductivity.

上記シートには、高吸水性樹脂が担持させられていても
よい。
A highly water-absorbent resin may be supported on the sheet.

《作用》 上記構成の鋼管コンクリート構造物の構築工法によれ
ば、コンクリートの打設後に、鋼管と鉄筋篭との間に、
鋼管側が負極となる直流電圧を印加すると、電気浸透現
象により、コンクリート中の水が、鋼管側に移動し、こ
れにより、鋼管の内周面には、水膜が形成され、この状
態でコンクリートが硬化すると、コンクリートが鋼管の
内面に接着することが防止される。
<Operation> According to the construction method of the steel pipe concrete structure having the above-mentioned configuration, after placing concrete, between the steel pipe and the rebar cage,
When a direct current voltage with which the steel pipe side becomes the negative electrode is applied, the water in the concrete moves to the steel pipe side due to the electroosmosis phenomenon, whereby a water film is formed on the inner peripheral surface of the steel pipe, and the concrete in this state When hardened, the concrete is prevented from adhering to the inner surface of the steel pipe.

この場合、鋼管の内面に保水性のシートを層状に設けて
おけば、電気浸透現象により移動した水が、シートに保
持されるので、より確実に、コンクリートが鋼管に接着
することが防止される。
In this case, if a water-retaining sheet is provided in layers on the inner surface of the steel pipe, the water that has moved due to the electroosmosis phenomenon is retained by the sheet, so concrete is more reliably prevented from adhering to the steel pipe. .

さらに、上記シートに高吸水性樹脂の粉体を担持させて
おけば、電気浸透現象により鋼管側に移動した水が、こ
の樹脂に吸収されて、保持されるとともに、水を吸収し
た樹脂はゲル化し、コンクリートが鋼管に接着すること
が防止されると同時に、ゲル化した高吸水性樹脂は、か
なり圧力が加えられても水を殆ど放出しないので、コン
クリートと鋼管との間に介在して、これらの間の摩擦を
低減させる。
Furthermore, if the above-mentioned sheet is made to carry the powder of superabsorbent resin, the water that has moved to the steel pipe side due to the electroosmosis phenomenon is absorbed and retained by this resin, and the resin that has absorbed water is a gel. And prevents the concrete from adhering to the steel pipe, and at the same time, the gelled superabsorbent resin releases almost no water even when a considerable pressure is applied, so that it intervenes between the concrete and the steel pipe, It reduces the friction between them.

《実施例》 以下、この発明の好適な実施例について添付図面を参照
にして詳細に説明する。
<Example> Hereinafter, a preferred example of the present invention will be described in detail with reference to the accompanying drawings.

第1図および第2図は、この発明にかかる鋼管コンクリ
ート構造物の構築工法の一実施例を示している。
1 and 2 show an embodiment of a method for constructing a steel pipe concrete structure according to the present invention.

同図に示す構築工法は、この発明をスラブ1,1間に構築
される柱部材2に適用した場合を例示しており、柱部材
2は、円形断面の鋼管3と、その内部に充填形成された
コンクリート硬化体4と、コンクリート硬化体4中に埋
設された鉄筋篭5とから構成されている。
The construction method shown in the figure illustrates a case where the present invention is applied to a column member 2 constructed between slabs 1 and 1, and the column member 2 is a steel pipe 3 having a circular cross section and a filling formation inside thereof. The hardened concrete body 4 and the reinforced basket 5 embedded in the hardened concrete body 4 are included.

柱部材2の構築に当ったては、鋼管2内に鉄筋篭5を所
定の位置にセットした後に、鋼管3の内部にコンクリー
トを打設して形成される。
In constructing the pillar member 2, after the rebar cage 5 is set in the steel pipe 2 at a predetermined position, concrete is placed inside the steel pipe 3 to form the pillar member 2.

その際、予め鉄筋篭5の外周適宜箇所に絶縁スペーサを
固設して、鋼管2と鉄筋篭5とが接触することを防止し
てもよい。
At that time, an insulating spacer may be fixedly provided at an appropriate location on the outer circumference of the rebar cage 5 to prevent the steel pipe 2 and the rebar cage 5 from coming into contact with each other.

コンクリートの打設が終了すると、コンクリートの硬化
が完了する前に、上記鋼管3に直流電源6の負極側が接
続されるとともに、鉄筋篭5に直流電源6の正極側が接
続され、鋼管3と鉄筋篭5との間に直流電圧が印加され
る。
When the pouring of the concrete is completed, the negative side of the DC power supply 6 is connected to the steel pipe 3 and the positive side of the DC power supply 6 is connected to the rebar cage 5 before the hardening of the concrete is completed, so that the steel pipe 3 and the rebar cage are connected. A DC voltage is applied between the DC voltage and the voltage.

この場合の直流電圧は、例えば、10V/cm程度である。The DC voltage in this case is, for example, about 10 V / cm.

このようにして、鋼管3と鉄筋篭5との間に直流電圧が
加えられると、電気浸透現象により、コンクリート中の
水が鋼管3の内面側に移動して、水膜を形成する。
In this way, when a DC voltage is applied between the steel pipe 3 and the rebar cage 5, the water in the concrete moves to the inner surface side of the steel pipe 3 due to the electroosmosis phenomenon to form a water film.

従って、この状態でコンクリートが硬化してコンクリー
ト硬化体4が形成されると、鋼管3の内面とコンクリー
ト硬化体4との間にはわずかな隙間が形成され、コンク
リートが鋼管3の内面に接着することが防止される。
Therefore, when the concrete hardens to form the hardened concrete body 4 in this state, a slight gap is formed between the inner surface of the steel pipe 3 and the hardened concrete body 4, and the concrete adheres to the inner surface of the steel pipe 3. Is prevented.

この場合、鋼管の内面に保水性のシートを層状に設けて
おけば、電気浸透現象により移動した水が、シートに保
持されるので、より確実に、コンクリートが鋼管3に接
着することが防止される。また、この場合に、シートの
一部または全部を、例えば、炭素繊維で構成し、導電性
を持たせておけば、シートを鋼管3に変えて直流電源6
の負極側に接続しても良い。
In this case, if water-retaining sheets are provided in layers on the inner surface of the steel pipe, the water that has moved due to the electroosmosis phenomenon is retained in the sheet, so that the concrete is more reliably prevented from adhering to the steel pipe 3. It Further, in this case, if a part or all of the sheet is made of, for example, carbon fiber and has conductivity, the sheet is changed to the steel pipe 3 and the DC power source 6 is used.
It may be connected to the negative electrode side.

さらに、上記シートに高吸水性樹脂の球状ないしはフレ
ーク状の粉体を担持させておけば、電気浸透現象により
鋼管3側に移動した水が、この樹脂に吸収されて、保持
されるとともに、水を吸収した樹脂はゲル化し、コンク
リートが鋼管3に接着することが防止されると同時に、
ゲル化した高吸水性樹脂は、かなり圧力が加えられても
水を殆ど放出しないので、コンクリート硬化体4と鋼管
3との間に長期間介在して、これらの間の摩擦を低減さ
せる。
Further, if the sheet is made to carry a spherical or flake-like powder of superabsorbent resin, the water that has moved to the steel pipe 3 side due to the electroosmotic phenomenon is absorbed by this resin and held, and The resin that has absorbed is gelled, preventing concrete from adhering to the steel pipe 3, and at the same time,
The gelled highly water-absorbent resin hardly releases water even when a considerable pressure is applied, so that it intervenes between the concrete hardened body 4 and the steel pipe 3 for a long period of time to reduce friction between them.

《発明の効果》 以上実施例で説明したように、この発明にかかる鋼管コ
ンクリート構造物の構築工法によれば、鋼管の設置前に
鋼管の内周面にアスファルト等の粘稠性の分離材を塗布
するといった煩雑かつむらの生じやすい作業を要するこ
となく、コンクリートを打設した後に、鋼管と鉄筋篭と
の間に、鋼管側が負極となる直流電圧を印加するだけの
簡単な構成により、鋼管の内周面とコンクリート硬化体
の外周面との付着を防止して、鋼管とコンクリートの各
々の特性を効果的に発揮し得る鋼管コンクリート構造物
を容易に得ることができる。
<< Effects of the Invention >> As described in the above embodiments, according to the method for constructing a steel pipe concrete structure according to the present invention, a viscous separation material such as asphalt is provided on the inner peripheral surface of the steel pipe before the installation of the steel pipe. After pouring concrete without the need for complicated and uneven work such as coating, a simple structure of simply applying a DC voltage with the steel tube side acting as a negative electrode between the steel tube and the rebar cage, It is possible to easily obtain a steel pipe concrete structure capable of effectively adhering the respective properties of the steel pipe and the concrete by preventing adhesion between the inner peripheral surface and the outer peripheral surface of the hardened concrete.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明工法の一実施例を示す断面図、第2図は
第1図要部拡大断面図である。 2……柱部材 3……鋼管 4……コンクリート硬化体 5……鉄筋篭 6……直流電源
FIG. 1 is a sectional view showing an embodiment of the method of the present invention, and FIG. 2 is an enlarged sectional view of an essential part of FIG. 2 …… Pillar member 3 …… Steel tube 4 …… Hardened concrete 5 …… Reinforcing cage 6 …… DC power supply

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】中空な鋼管と、これの内部に充填打設され
る鉄筋篭が埋設されたコンクリート硬化体とからなる鋼
管コンクリート構造物を構築する際に、前記鋼管の内周
面と前記コンクリート硬化体の外周面との付着を防止す
べく採用される鋼管コンクリート構造物の構築工法であ
って、前記鋼管の内部にコンクリートを打設した後に、
前記鋼管と前記鉄筋篭との間に、前記鋼管側が負極とな
る直流電圧を印加することにより、コンクリート中の水
の一部を鋼管側に移動させて当該水を鋼管とコンクリー
トとの間に介在させることを特徴とする鋼管コンクリー
ト構造物の構築工法。
1. When constructing a steel pipe concrete structure comprising a hollow steel pipe and a concrete hardened body in which a reinforced cage to be filled and placed is buried, an inner peripheral surface of the steel pipe and the concrete are constructed. A construction method of a steel pipe concrete structure adopted to prevent adhesion with the outer peripheral surface of a hardened body, after placing concrete inside the steel pipe,
Between the steel pipe and the rebar cage, by applying a DC voltage with the steel pipe side being a negative electrode, a portion of the water in the concrete is moved to the steel pipe side and the water is interposed between the steel pipe and the concrete. A construction method for a steel pipe concrete structure characterized by:
【請求項2】上記鋼管は、その内面に保水性のシートが
層状に設けられていることを特徴とする請求項1に記載
の鋼管コンクリート構造物の構築工法。
2. The method for constructing a steel pipe concrete structure according to claim 1, wherein the steel pipe is provided with a water-retaining sheet in a layered manner on the inner surface thereof.
【請求項3】上記シートは、その一部または全部が導電
性を有することを特徴する請求項2に記載の鋼管コンク
リート構造物の構築工法。
3. The method for constructing a steel pipe concrete structure according to claim 2, wherein a part or all of the sheet has conductivity.
【請求項4】上記シートには、高吸水性樹脂が担持させ
られていることを特徴とする請求項2または3に記載の
鋼管コンクリート構造物の構築工法。
4. The method for constructing a steel pipe concrete structure according to claim 2, wherein the sheet has a superabsorbent resin supported thereon.
JP1089810A 1989-04-11 1989-04-11 Construction method of steel pipe concrete structure Expired - Lifetime JPH0781401B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1089810A JPH0781401B2 (en) 1989-04-11 1989-04-11 Construction method of steel pipe concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1089810A JPH0781401B2 (en) 1989-04-11 1989-04-11 Construction method of steel pipe concrete structure

Publications (2)

Publication Number Publication Date
JPH02269268A JPH02269268A (en) 1990-11-02
JPH0781401B2 true JPH0781401B2 (en) 1995-08-30

Family

ID=13981082

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1089810A Expired - Lifetime JPH0781401B2 (en) 1989-04-11 1989-04-11 Construction method of steel pipe concrete structure

Country Status (1)

Country Link
JP (1) JPH0781401B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102888992A (en) * 2011-07-20 2013-01-23 黄传茂 Lattice beam construction method
JP5933297B2 (en) * 2012-03-07 2016-06-08 デンカ株式会社 How to energize concrete
CN103031955B (en) * 2012-12-27 2014-11-26 山东万鑫建设有限公司 Template supporting system resisting impact force of horizontal pipe and construction method of template supporting system
JP6210831B2 (en) * 2013-10-08 2017-10-11 鹿島建設株式会社 Method for improving the quality of reinforced concrete structures
CN103603495B (en) * 2013-11-07 2015-06-24 中煤建筑安装工程集团有限公司 Cylinder construction method
FR3101089B1 (en) * 2019-09-20 2021-12-17 Outinord St Amand POWER SUPPLY AND ELECTRICAL CONNECTION FOR ELECTRICAL POLARIZATION TO FACILITATE THE DECOFFRING OF A REINFORCED CONCRETE WALL BENCH
CN115069682B (en) * 2022-06-15 2023-06-02 江苏徐工工程机械研究院有限公司 Method and device for efficiently desorbing clay by rotary drilling
CN117550859B (en) * 2023-11-30 2025-11-28 淮阴工学院 Preparation method of maintenance-free concrete

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4884115A (en) * 1972-02-12 1973-11-08
JPS5022432A (en) * 1973-07-05 1975-03-10
JPS528011B2 (en) * 1974-02-02 1977-03-05

Also Published As

Publication number Publication date
JPH02269268A (en) 1990-11-02

Similar Documents

Publication Publication Date Title
US20100319295A1 (en) Foam-concrete rebar tie
US20090229214A1 (en) Foam-concrete rebar tie
JPH0781401B2 (en) Construction method of steel pipe concrete structure
JP3968303B2 (en) Reinforcing bar connection method using expansion joint and expansion joint
JPH01256651A (en) Steel pipe concrete pillar structure and construction thereof
EP3751068B1 (en) Expansion joint strip for active, automatic, permanent sealing of joints between building parts
JP2000054647A (en) Method and device for reinforcing concrete structure
EP1481138B1 (en) Use of a film to join and/or seal and/or statically reinforce two rigid surfaces or surfaces which can move towards each other
JPH0619684Y2 (en) Water-stop structure for concrete joints
CN212294625U (en) prefabricated building structures
JPH0516289Y2 (en)
JPS6192239A (en) Water stopping material for concrete cast joint part
JPH0326810Y2 (en)
JPH0633112Y2 (en) Concrete formwork splicing device
JPS5841228Y2 (en) Mountain stop member
JPS6290455A (en) Water stop panel
CN217174878U (en) A assembled interlock foundation structure for interim engineering
JPH0274753A (en) Concrete mold for construction of mass concrete structure
JPH0237876Y2 (en)
JPH0334964Y2 (en)
JPH0326809Y2 (en)
JP3550437B2 (en) How to join buried formwork
JPH0442419Y2 (en)
JPH0726506Y2 (en) Concrete splicing formwork
JPH0354725B2 (en)