JPH0786315B2 - Concrete pouring method - Google Patents
Concrete pouring methodInfo
- Publication number
- JPH0786315B2 JPH0786315B2 JP2019330A JP1933090A JPH0786315B2 JP H0786315 B2 JPH0786315 B2 JP H0786315B2 JP 2019330 A JP2019330 A JP 2019330A JP 1933090 A JP1933090 A JP 1933090A JP H0786315 B2 JPH0786315 B2 JP H0786315B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- amount
- support
- displacement
- pouring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/003—Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines
- E21D9/004—Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines using light beams for direction or position control
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Bridges Or Land Bridges (AREA)
- Lining And Supports For Tunnels (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、トンネル覆工や、アーチ橋等略半円形断面の
コンクリート内面を型枠支保を用いて打設する際のコン
クリート打設方法に関するものである。Description: TECHNICAL FIELD The present invention relates to a concrete lining method for laying a tunnel lining or a concrete inner surface having a substantially semicircular cross section such as an arch bridge using a form support. It is a thing.
従来、上記のごとき略半円形断面構造物のコンクリート
を打設する際には、第10図のトンネル覆工例のごとく、
掘削したトンネル坑1内のコンクリートの打設空間2に
沿って型枠3を配置し、この型枠3を、トンネル坑1内
のレール4上を移動可能に設けられたガントリー5及び
ターンバックル6からなる型枠支保で支持した状態で、
打設空間2内にコンクリートを打設する。Conventionally, when placing concrete having a substantially semi-circular cross-section structure as described above, as in the tunnel lining example of FIG. 10,
A form 3 is arranged along the concrete placing space 2 in the excavated tunnel pit 1, and this form 3 is movably provided on a rail 4 in the tunnel pit 1 and a turnbuckle 6. While being supported by a formwork support consisting of
Concrete is poured into the casting space 2.
その際、コンクリート打設中の型枠3や上記の型枠支保
の各変位量をダイヤルゲージ7により測定し、また型枠
3に設けた点検窓8により左右の打設高さを目視により
チェックすることにより、コンクリートの打設速度や打
設位置を調整するという管理方法が用いられていた。At that time, each displacement amount of the mold 3 and the above-mentioned mold support during concrete pouring is measured by the dial gauge 7, and the pouring height on the left and right is visually checked by the inspection window 8 provided in the mold 3. By doing so, a management method of adjusting the pouring speed and pouring position of concrete was used.
しかしながら、ダイヤルゲージ7は非常に敏感であり、
コンクリートの打設作業中に人や物が触れると測定がで
きなくなると共に、そのゲージを読みとるための手間が
かかり、かつ正確に管理が得られないという問題があっ
た。However, the dial gauge 7 is very sensitive,
There is a problem that if a person or an object touches during concrete pouring work, measurement cannot be performed, and it takes time and labor to read the gauge, and accurate management cannot be obtained.
本発明は、前記従来の問題点を解決するためになされた
ものであり、略半円形断面のコンクリート内面を型枠支
保を用いて打設する際の型枠、または型枠支保の変位量
を確実に設定し、確認しながらコンクリートの打設を行
なえるコンクリート打設方法を提供することを解決課題
としたものである。The present invention has been made to solve the above-mentioned conventional problems, and it is a formwork when placing a concrete inner surface of a substantially semicircular cross section using a formwork support, or a displacement amount of the formwork support. It is an object of the present invention to provide a concrete pouring method capable of pouring concrete while surely setting and checking.
上記の課題を解決するための手段として、本発明のコン
クリート打設方法は、コンクリートな型枠支保の少なく
とも左右両側の各点と、それに対応した固定点とにそれ
ぞれ対向して設けたセンサーヘッドと反射板とにより計
測される型枠支保の各変位置を表示すると共に、それら
の変位量があらかじめ設定された許容変位量内にあるこ
とをCRT及び警報装置などで確認しながらコンクリート
の打設を行なうことを特徴としたものであり、型枠支保
の変位量がほぼ同じになるようにコンクリートの打設速
度及び打設位置を適宜に調整することができる。As a means for solving the above problems, the concrete pouring method of the present invention, at least each of the left and right sides of the concrete form support, and the sensor heads provided facing the fixed points corresponding thereto, respectively. While displaying each variable position of the formwork support measured by the reflector and placing the concrete while confirming that the displacement amount is within the preset allowable displacement amount with a CRT and alarm device, etc. This is a characteristic feature of the method, and the pouring speed and pouring position of the concrete can be appropriately adjusted so that the displacement amount of the form support is almost the same.
なお、型枠支保に固定されるセンサーヘッドとそれに対
応して設けられる反射板とは、型枠支保の左右両側の
他、そのつま側、または中心部等にも設けることがで
き、それらセンサーヘッドと反射板とからなる光源セン
サー装置の数を多数設けることにより、精度の高いコン
クリート打設が行なわれる。The sensor head fixed to the formwork support and the reflector provided corresponding to it can be provided not only on the left and right sides of the formwork support, but also on the toe side or the center part of the formwork support. By arranging a large number of light source sensor devices each including a reflector and a reflection plate, concrete can be placed with high accuracy.
以下図面を参照して本発明の各実施例を説明するが、各
実施例及び第10図の従来例において、それぞれ同じ部品
は同じ部品番号で示している。Each embodiment of the present invention will be described below with reference to the drawings. In each embodiment and the conventional example of FIG. 10, the same parts are denoted by the same part numbers.
まず、第1図の正面図、第2図の平面図、第1図のガン
トリーの右側要部拡大の正面図の第3図及び第4図の装
置構成図に示す実施例1においては、第10図の従来例と
同様にトンネル覆工のコンクリート打設空間に本発明の
方法を適用してコンクリート打設を行なう例を示してい
る。First, in the first embodiment shown in the front view of FIG. 1, the plan view of FIG. 2 and the apparatus configuration diagram of FIG. 3 and FIG. Similar to the conventional example shown in FIG. 10, an example is shown in which the method of the present invention is applied to a concrete placing space of a tunnel lining to perform concrete placing.
そこで、この実施例1では、第1図、第2図及び第3図
に示すように、コンクリートの型枠支保であるガントリ
ー5の左右両側の下部にそれぞれ2個所、即ち、第2図
のC及びEで示す空間の左右各1個所と、矢印Tで示す
トンネルのつま側と、矢印Rで示すラップ側のうちのつ
ま側Tに1個所の合計5個所に、センターヘッド10,10A
を固定し、これらのセンターヘッド10,10Aの例えば、第
3図のd=50〜70mm前方に対応して、地盤G.L上に固定
して各反射板11,11Aを設けている。Therefore, in the first embodiment, as shown in FIGS. 1, 2 and 3, there are two places respectively on the lower left and right sides of the gantry 5, which is a concrete frame support, that is, C in FIG. Center heads 10 and 10A at the left and right of the space indicated by E and E, the toe side of the tunnel indicated by the arrow T, and one on the toe side T of the lap indicated by the arrow R.
Is fixed, and corresponding to the front of these center heads 10 and 10A, for example, d = 50 to 70 mm in FIG. 3, fixed to the ground GL and the respective reflection plates 11 and 11A are provided.
このセンターヘッド10,10Aには、例えば半導体レーザー
と位置検出素子とから構成される測距式光電センサーが
使用され、反射板11,11Aにこのセンサヘッド10,10Aのレ
ーザー光を反射させて、返ってくる時間から上記距離d
を計測するものである。For this center head 10, 10A, for example, a distance-measuring photoelectric sensor composed of a semiconductor laser and a position detection element is used, and the laser light of this sensor head 10, 10A is reflected on the reflection plates 11, 11A, The distance d from the time it returns
Is to measure.
次に、第4図に示すごとく、上記センサーヘッド10,10A
により計測される型枠支保の許容変位量を任意に設定で
きるコントロールボックス12及びそれらの変位量を表示
する表示ボックス13とプリンタ14とを設けると共に、許
容変位量を超えた場合に作動する回転灯15及びブザー16
等の警報装置、更にコンクリート打設量と型枠3または
型枠支保の変位量との相関を表示するCRT17を設けてい
る。Next, as shown in FIG. 4, the sensor head 10, 10A
A control box 12 capable of arbitrarily setting the allowable displacement amount of the formwork support measured by, a display box 13 for displaying the displacement amount and a printer 14 are provided, and a rotating lamp that operates when the allowable displacement amount is exceeded. 15 and buzzer 16
In addition, an alarm device such as CRT17 is provided to display the correlation between the amount of concrete placed and the amount of displacement of the formwork 3 or formwork support.
なお、この場合のコンクリート打設量は、コンクリート
アジテータトラックの台数を数えるコンクリート量カウ
ント計18によって行なっている。The amount of concrete placed in this case is determined by a concrete amount counter 18 that counts the number of concrete agitator trucks.
そこで、各センサーヘッド10,10Aにより計測させる変位
量が、コントロールボックス12で設定された許容変位量
に対し、どれか1つでも超えると、上記の警報装置が作
動するようになっており、このような状態でコンクリー
トの打設を行なうことになる。Therefore, if the displacement amount measured by each sensor head 10 or 10A exceeds any one of the allowable displacement amounts set in the control box 12, the above-mentioned alarm device is activated. Concrete will be poured in such a state.
その結果、第5図に示すように、CRT17上にコンクリー
ト打設量Qと型枠支保の計測変位量Fとが表示され、こ
れを目視して、型枠支保の左右両側の変位量F1とF2とが
ほぼ同じになるように、コンクリートの打設速度及び打
設位置を調整する。As a result, as shown in FIG. 5, the concrete placement amount Q and the measured displacement amount F of the formwork support are displayed on the CRT 17, and by visually observing this, the displacement amount F 1 on both the left and right sides of the formwork support is displayed. Adjust the pouring speed and pouring position of concrete so that and F 2 are almost the same.
この時に、型枠3の点検窓8から打設高さHを確認し、
内空変位量ΔSをメジャーで測定して入力することによ
りCRT17に同時に表示すれば更に好ましい。At this time, check the pouring height H from the inspection window 8 of the form 3,
It is more preferable that the inner-air displacement amount ΔS is measured by a measure and input, and simultaneously displayed on the CRT 17.
なお、第3図において、型枠支保であるガントリー5の
脚部は、レール4上に油圧ジャッキ9を介して支持され
ている。In FIG. 3, the legs of the gantry 5, which is a frame support, are supported on the rails 4 via hydraulic jacks 9.
次に、第6図の正面図、第6図の中央部の要部拡大の正
面図の第7図及び第6図の右側の要部拡大の正面図の第
8図に示す実施例2は、アーチ橋などのアーチコンクリ
ートの打設に本発明の方法で適用した例であり、この実
施例2では、型枠支保20の左右両側の上部の2つの点
に、第8図のごとく反射板11Bを設け、これらに対応し
た地盤G.L上の足場21の左右両側の上部の2つの固定点
にそれぞれセンサーヘッド10Bを設けており、更に型枠
支保20の中央下方の地盤G.L上の固定点にセンサーヘッ
ド10Cを設け、このセンサーヘッド10Cに対しては、枠型
支保20の中心と地盤G.Lの表面との間にピアノ線22を張
設し、第7図に示すごとく、センサーヘッド10Cに対向
した位置に反射板11Cを固定している。Next, the second embodiment shown in FIG. 6 is a front view, FIG. 7 is a front view of an enlarged main part of the central portion of FIG. 6, and FIG. 8 is a front view of an enlarged main part of the right side of FIG. This is an example in which the method of the present invention is applied to pouring arch concrete such as an arch bridge. In the second embodiment, as shown in FIG. 11B are provided, and the sensor heads 10B are provided at the upper two fixed points on the left and right sides of the scaffold 21 on the ground GL corresponding to these, respectively, and further at the fixed points on the ground GL below the center of the formwork support 20. A sensor head 10C is provided, and a piano wire 22 is stretched between the center of the frame-shaped support 20 and the surface of the ground GL with respect to the sensor head 10C so as to face the sensor head 10C as shown in FIG. The reflector 11C is fixed at the position.
以上の構成からなる実施例2においても、前記実施例1
と同様に、上記各センサーヘッド10B,10Cにより得られ
る型枠支保20の両側と中心部の変位量と、コンクリート
の打設量とをCRT17に表示しながらコンクリートの打設
を行ない、コンクリートの打設速度と打設位置とを調整
するが、この場合のCRT17に表示されるコンクリート打
設量Vcと型枠支保変位量S1との関係線図を第9図に示
し、型枠支保20の左右の変位量をF1,F2で、そして中心
部の変位量をC.Lで示している。Also in the second embodiment having the above configuration, the first embodiment
In the same manner as above, while placing the concrete while displaying the displacement amount of both sides and the center portion of the form support 20 obtained by each of the sensor heads 10B and 10C and the concrete placement amount on the CRT 17, the concrete placement is performed. Although the setting speed and the setting position are adjusted, the relationship diagram between the concrete placing amount Vc and the form support displacement S 1 displayed on the CRT 17 in this case is shown in FIG. The left and right displacement amounts are indicated by F 1 and F 2 , and the center displacement amount is indicated by CL.
なお、前記実施例1では、センサーヘッド10,10Aを型枠
支保であるガントリー5の左右両側の各点に設け、これ
に対応した反射板11,11Aを地盤G.L上の固定点に対向し
て設け、一方、実施例2ではセンサーヘッド10B,10Cを
地盤G.L上の固定点に設けているが、これらセンサーヘ
ッド10,10A,10B,10Cと反射板11,11A,11B,11Cとは、型枠
支保側、または固定点側のどちらに設けてもよい。In the first embodiment, the sensor heads 10 and 10A are provided at each of the left and right sides of the gantry 5, which is the frame support, and the reflecting plates 11 and 11A corresponding to the sensor heads 10 and 10A face the fixed points on the ground GL. On the other hand, the sensor heads 10B, 10C are provided at fixed points on the ground GL in the second embodiment, but the sensor heads 10, 10A, 10B, 10C and the reflection plates 11, 11A, 11B, 11C are It may be provided on either the frame support side or the fixed point side.
以上に説明したごとく、本発明のコンクリート打設方法
によれば、コンクリート打設用の型枠または型枠支保の
変位量を確実に確認しながらコンクリートを打設できる
ので、変位傾向や変位量に支障をきたした場合に、コン
クリートの打設速度や打設位置を直ちに変更できるとい
う効果がある。As explained above, according to the concrete placing method of the present invention, it is possible to place concrete while surely confirming the displacement amount of the formwork or formwork support for concrete placement, so that the displacement tendency and displacement amount In case of trouble, it is possible to immediately change the pouring speed and pouring position of concrete.
また、アーチ橋のコンクリートやトンネル覆工用コンク
リートのように、左右均等にコンクリートを打設する必
要がある場合に、型枠または型枠支保の変位量を同時に
知ることができるので、施工が容易になるという利点が
ある。In addition, when it is necessary to place concrete evenly on the left and right, such as concrete for arch bridges and tunnel lining, it is possible to know the displacement of the form or frame support at the same time, so construction is easy. Has the advantage that
【図面の簡単な説明】 図面は本発明の方法を適用してコンクリート打設を行な
う場合の各実施例を示しており、第1図はその実施例1
における型枠支保を示す正面図、第2図は第1図の平面
図、第3図は第1図の右側要部拡大の正面図、第4図は
第1図の実施例1における装置構成図、第5図は第4図
のCRTに表示されるコンクリート打設量と計測変位量と
の関係線図、第6図はその実施例2における型枠支保を
示す正面図、第7図は第6図の中央部の要部拡大の正面
図、第8図は第6図の右側上部の要部拡大の正面図、第
9図は第6図の実施例2においてCRTに表示されるコン
クリート打設量と型枠支保変位量との関係線図、第10図
は従来の方法によりコンクリート打設の際の型枠支保の
正面図である。 3……型枠、5……ガントリー、6……ターンバック
ル、10,10A,10B,10C……センサーヘッド、11,11A,11B,1
1C……反射板、17……CRT、20……型枠支保、G.L……地
盤。BRIEF DESCRIPTION OF THE DRAWINGS The drawings show the respective embodiments in which concrete pouring is performed by applying the method of the present invention, and FIG. 1 shows the first embodiment.
FIG. 2 is a front view showing the form support in FIG. 2, FIG. 2 is a plan view of FIG. 1, FIG. 3 is a front view of an enlarged right side main portion of FIG. 1, and FIG. 4 is an apparatus configuration in Example 1 of FIG. Fig. 5 is a diagram showing the relationship between the concrete placement amount and the measured displacement amount displayed on the CRT shown in Fig. 4, Fig. 6 is a front view showing the form support in Example 2, and Fig. 7 is FIG. 6 is a front view of an enlarged main part of the central portion of FIG. 6, FIG. 8 is a front view of an enlarged main part of the right upper portion of FIG. 6, and FIG. 9 is concrete displayed on the CRT in Example 2 of FIG. FIG. 10 is a front view of the form support during concrete placing by the conventional method, and FIG. 10 is a relational diagram between the amount of placement and the amount of displacement of the form support. 3 ... Formwork, 5 ... Gantry, 6 ... Turnbuckle, 10,10A, 10B, 10C ... Sensor head, 11,11A, 11B, 1
1C: Reflector, 17: CRT, 20: Form support, GL: Ground.
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭63−226498(JP,A) 特開 昭63−226497(JP,A) 特開 平1−263509(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page (56) References JP-A-63-226498 (JP, A) JP-A-63-226497 (JP, A) JP-A-1-263509 (JP, A)
Claims (1)
両側の各点と、それに対応した固定点とにそれぞれ対向
して設けたセンターヘッドと反射板とにより計測される
型枠支保の各変位量を表示すると共に、それらの変位量
があらかじめ設定された許容変位量内にあることを確認
しながらコンクリートの打設を行なうコンクリート打設
方法。1. A displacement amount of a formwork support measured by a center head and a reflection plate which are provided so as to face at least respective points on the left and right sides of a concrete formwork support and fixed points corresponding thereto. A concrete pouring method in which concrete is poured while displaying and confirming that the amount of displacement is within a preset allowable amount of displacement.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2019330A JPH0786315B2 (en) | 1990-01-31 | 1990-01-31 | Concrete pouring method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2019330A JPH0786315B2 (en) | 1990-01-31 | 1990-01-31 | Concrete pouring method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH03224992A JPH03224992A (en) | 1991-10-03 |
| JPH0786315B2 true JPH0786315B2 (en) | 1995-09-20 |
Family
ID=11996401
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2019330A Expired - Fee Related JPH0786315B2 (en) | 1990-01-31 | 1990-01-31 | Concrete pouring method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0786315B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2527385B2 (en) * | 1990-11-13 | 1996-08-21 | 株式会社フジタ | Tunnel Lining Form Positioning Method |
| JP5067337B2 (en) * | 2008-10-03 | 2012-11-07 | 株式会社大林組 | Concrete spraying equipment |
| JP5247491B2 (en) * | 2009-01-19 | 2013-07-24 | マック株式会社 | Concrete filling method and concrete filling system |
| CN105735145B (en) * | 2016-02-29 | 2017-09-19 | 中交第一公路工程局有限公司 | A construction method and its structure for accurate centering control of bridge swivel construction |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS63226498A (en) * | 1987-03-17 | 1988-09-21 | 三井建設株式会社 | Concrete-mortar placing-quantity controller in moving formwork |
| JPS63226497A (en) * | 1987-03-17 | 1988-09-21 | 三井建設株式会社 | Moving formwork device |
| JP2843567B2 (en) * | 1988-04-15 | 1999-01-06 | 株式会社間組 | Segment positioning method |
-
1990
- 1990-01-31 JP JP2019330A patent/JPH0786315B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH03224992A (en) | 1991-10-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107289903A (en) | Straight line bridge cantilever method Arched Bridge Construction Linear continuously measures monitoring system and monitoring method | |
| JP6108337B2 (en) | Concrete stacking time interval management system | |
| JPH0786315B2 (en) | Concrete pouring method | |
| JPH0599648A (en) | Automatic measuring method for use in maintenance and management of base isolation building | |
| KR100430106B1 (en) | Device for testing crack progress with vernier type | |
| JPS6157801A (en) | Measuring instrument for cross unevenness of road surface and measuring and calculating method of leveling quantity of road surface | |
| JP2000314624A (en) | Survey system in slip form method and slip form method using the survey system | |
| CN222142464U (en) | Control device for cast-in-situ box girder elevation | |
| Gramling et al. | Rational approach to cross-profile and rut depth analysis | |
| JP2002267422A (en) | Crack detection method and device | |
| JP2588834B2 (en) | Manufacturing method of precast block by short line method | |
| JP2590008B2 (en) | Automatic displacement measurement method for structures | |
| JPH10293023A (en) | Leveling ruler | |
| KR200231405Y1 (en) | A gauging instrument of a fall for bridge's slab form | |
| CN207050709U (en) | Straight line bridge cantilever method Arched Bridge Construction Linear continuously measures monitoring system | |
| JPH10332366A (en) | Non-measurement machine | |
| GB2263973A (en) | Level monitoring of building components | |
| Enckell-El Jemli et al. | Monitoring of the new Årsta railway bridge using traditional and fiber optic sensors | |
| JP2596971Y2 (en) | Laser beam center point display | |
| JP2506730Y2 (en) | Distance between press dies | |
| JPH0749367Y2 (en) | Width meter calibration reference piece | |
| JPS5827006A (en) | Measuring device for tunnel interior displacement, etc. | |
| JPS62197505A (en) | How to manage the shape of suspension bridge cables | |
| JPS5851111B2 (en) | Guide frame for concrete floor level construction | |
| JPH0413919A (en) | Equipment and method for measuring precision in alignment of construction site |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |