Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH079006B2 - Blast furnace bellless charging equipment control method - Google Patents
[go: Go Back, main page]

JPH079006B2 - Blast furnace bellless charging equipment control method - Google Patents

Blast furnace bellless charging equipment control method

Info

Publication number
JPH079006B2
JPH079006B2 JP7184889A JP7184889A JPH079006B2 JP H079006 B2 JPH079006 B2 JP H079006B2 JP 7184889 A JP7184889 A JP 7184889A JP 7184889 A JP7184889 A JP 7184889A JP H079006 B2 JPH079006 B2 JP H079006B2
Authority
JP
Japan
Prior art keywords
raw material
correction amount
opening
fcg
charging speed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP7184889A
Other languages
Japanese (ja)
Other versions
JPH02254111A (en
Inventor
亮介 木村
正人 小奈
康一 木村
Original Assignee
日本鋼管株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本鋼管株式会社 filed Critical 日本鋼管株式会社
Priority to JP7184889A priority Critical patent/JPH079006B2/en
Publication of JPH02254111A publication Critical patent/JPH02254111A/en
Publication of JPH079006B2 publication Critical patent/JPH079006B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Manufacture Of Iron (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] この発明は高炉ベルレス装入設備の制御方法に関する。The present invention relates to a method for controlling a blast furnace bellless charging facility.

[従来の技術] 従来高炉ベルレス装入設備の原料流量調整弁(以下FCG
という)の開度の制御は次の方法によって行われてい
る。
[Prior Art] Raw material flow rate control valve (hereinafter FCG) of conventional blast furnace bellless charging equipment
The opening degree is controlled by the following method.

例えば特開昭60-46306号公報に開示されている制御方法
は、原料の排出中に下部バンカー内の重量をロードセル
等で計測し、目標重量パターンと一致するようにFCGの
開度を制御している。
For example, in the control method disclosed in Japanese Patent Laid-Open No. 60-46306, the weight in the lower bunker is measured with a load cell or the like while the raw material is being discharged, and the opening of the FCG is controlled so as to match the target weight pattern. ing.

また、特開昭61-238906号公報に開示されている制御方
法は、過去の複数チャージの排出時間と設定値との差に
基づいて開度の修正量を算出し、次回の必要開度を補正
してFCGの開度を制御している。
Further, the control method disclosed in Japanese Patent Laid-Open No. 61-238906 calculates the correction amount of the opening based on the difference between the discharge time of a plurality of charges in the past and the set value, and determines the required opening for the next time. It is corrected to control the opening of the FCG.

また、レザービングホッパー等の排出時間のデータと下
部バンカーでの排出時間のデータとを複数持ち、FCGの
開度毎にこれらの関係を直線回帰し、FCGの開度と上記
ホッパーとの関係を求め、この関係に基づいてこのホッ
パー等の排出時間からのFCGの開度を制御する制御方法
もある(以下フィードフォワード制御という)。
In addition, we have multiple discharge time data such as reserving hopper and discharge time data in the lower bunker, and linearly regress these relationships for each FCG opening to show the relationship between the FCG opening and the above hopper. There is also a control method for obtaining and determining the opening of the FCG from the discharge time of the hopper based on this relationship (hereinafter referred to as feedforward control).

[発明が解決しようとする課題] 上記のような特開昭60-46306号公報に開示されている制
御方法では、高圧操業のための炉体と下部バンカーとが
一体化していること、更に、炉内圧の変化が外乱となる
ために、下部バンカーの高精度な重量計測は困難であ
り、従って十分な制御精度が得られないという問題点が
ある。
[Problems to be Solved by the Invention] In the control method disclosed in Japanese Patent Laid-Open No. 60-46306, the furnace body for high-pressure operation and the lower bunker are integrated, and Since the change in the furnace pressure becomes a disturbance, it is difficult to measure the weight of the lower bunker with high accuracy, and there is a problem that sufficient control accuracy cannot be obtained.

また、特開昭61-238906号公報に開示されている制御方
法では、得られた修正データを次回の制御データに利用
するので、原料の性状変化に伴うFCGの流量特性変化に
追従するのは困難であった。更に、フィードフォワード
制御においては、原料の性状変化に追従できるが、レザ
ービングホッパー等の排出時間とFCG関係式の精度によ
り制御精度が決定され、十分な精度が得られていなかっ
た。
Further, in the control method disclosed in Japanese Patent Laid-Open No. 61-238906, the obtained correction data is used for the next control data, so it is not possible to follow the change in the flow rate characteristics of the FCG due to the change in the properties of the raw material. It was difficult. Further, in feed-forward control, it is possible to follow changes in the properties of the raw material, but the control accuracy is determined by the discharge time of the razor hopper and the accuracy of the FCG relational expression, and sufficient accuracy has not been obtained.

この発明は、かかる問題点を解決するためになされたも
のであり、FCGの開度を高精度に制御し、原料装入開始
点と終了点とを一致させることを可能にした高炉ベルレ
ス装入設備の制御方法を得ることを目的とする。
The present invention has been made in order to solve such a problem, and it is possible to control the opening of the FCG with high accuracy and make it possible to make the raw material charging start point and the end point coincide with each other. The purpose is to obtain a method of controlling equipment.

[課題を解決するための手段] この発明に係る高炉ベルレス装入設備の制御方法は、実
績に基づく装入速度とFCGの開度との関係から基準開度
関数を発生する工程と、今回装入する原料の重量と旋回
シュータによる旋回数とから目標装入速度を求める工程
と、基準開度関数と目標装入速度とからFCGの基準開度
を求める工程とを有する。
[Means for Solving the Problem] A method of controlling a blast furnace bellless charging facility according to the present invention includes a step of generating a reference opening function from a relationship between a charging speed and an opening of an FCG based on a track record, and The method includes a step of obtaining a target charging speed from the weight of the raw material to be charged and the number of turns by the turning shooter, and a step of finding a reference opening of the FCG from a reference opening function and the target charging speed.

更に、前回の装入速度、前回の目標装入速度及び基準開
度関数並びに前回のフィードバック補正量に基づいてフ
ィードバック補正量を求める工程と、実績に基づくホッ
パーからの原料の排出重量と排出時間とから両者の関係
を示す近似式を求める工程と、今回装入される原料のホ
ッパーからの排出重量、排出時間及び前記近似式に基づ
いてフィードフォワード補正量を求める工程とを有す
る。
Further, the step of obtaining a feedback correction amount based on the previous charging speed, the previous target charging speed and the reference opening function, and the previous feedback correction amount, and the discharge weight and discharge time of the raw material from the hopper based on the actual results. From the hopper, and a step of determining the feedforward correction amount based on the discharge weight of the raw material charged this time from the hopper, the discharge time, and the approximate expression.

更に、FCGの基準開度、フィードバック補正量及びフィ
ードフォワード補正量に基づいてFCGの開度指令値を求
め、この開度指令値に基づいてFCGの開度を調整する工
程を有する。
Further, there is a step of obtaining an FCG opening command value based on the FCG reference opening, the feedback correction amount, and the feedforward correction amount, and adjusting the FCG opening based on the opening command value.

[作用] この発明においては、FCGの基準開度を求める他に、過
去の実績に基づいてフィードバック補正量を求めると共
に、今回装入される原料の性状に基づいたフィードフォ
ワード補正量を求めて基準開度を補正してFCGの開度指
令値を求める。そして、このFCGの開度指令値に基づい
てFCGの開度を調整する。このFCGの開度調整により原料
の装入速度が適切に制御される。
[Operation] In the present invention, in addition to obtaining the reference opening of the FCG, the feedback correction amount is obtained based on the past performance, and the feedforward correction amount based on the property of the raw material charged this time is obtained as the reference amount. Correct the opening to obtain the FCG opening command value. Then, the FCG opening is adjusted based on the FCG opening command value. By adjusting the opening of the FCG, the charging rate of the raw material is properly controlled.

[実施例] 第1図はこの発明の一実施例に係る方法を実施した制御
装置及びその関連設備の説明図ある。図において、(1
0)は下部バンカー、(11)は下部バンカー(10)の下
に設けられたFCGである。(12)は高炉の炉頂で、(1
3)は炉内に設けられた旋回シュータである。(14)は
秤量ホッパーであり、秤量ホッパー(14)より排出され
た原料はベルトコンベア(図示せず)により搬送されて
下部バンカー(10)に搬入され、FCG(11)を介して炉
内の旋回シュータ(13)の旋回動作により炉内に装入さ
れる。
[Embodiment] FIG. 1 is an explanatory view of a control device and its associated equipment for carrying out a method according to an embodiment of the present invention. In the figure, (1
0) is the lower bunker, and (11) is the FCG provided under the lower bunker (10). (12) is the top of the blast furnace, and (1
3) is a turning shooter installed in the furnace. (14) is a weighing hopper, and the raw material discharged from the weighing hopper (14) is conveyed by a belt conveyor (not shown) to the lower bunker (10) and is fed into the furnace via the FCG (11). It is loaded into the furnace by the turning operation of the turning shooter (13).

(20)はFCG開度計で、FCG(11)の開度を検出する。
(21)は原料通過センサで、原料装入の開始及び終了を
検出する。(22)はロードセルで、秤量ホッパー(14)
から排出される原料の重量を検出する。
(20) is an FCG opening meter that detects the opening of the FCG (11).
(21) is a raw material passage sensor for detecting the start and end of raw material charging. (22) is a load cell, weighing hopper (14)
Detects the weight of raw material discharged from.

(30)は装入時間計測回路で、原料通過センサ(21)の
出力に基づいて原料の装入時間を計測する。(31)は装
入速度演算回路で、ロードセル(22)からの装入重量及
び装入時間計測回路(30)からの装入時間に基づいて原
料の装入速度を演算する。
The charging time measuring circuit (30) measures the charging time of the raw material based on the output of the raw material passage sensor (21). A charging speed calculation circuit (31) calculates the charging speed of the raw material based on the charging weight from the load cell (22) and the charging time from the charging time measuring circuit (30).

(50)はデータファイルで、装入速度計測回路(31)か
らの装入速度情報及びFCG開度計(20)からの開度情報
を蓄積し、装入速度とFCGの開度との実績データを常時
ファイルしていく。このときのデータファイルの内容は
例えば原料銘柄別それぞれが第2図に示すように設定さ
れたFCG(11)の開度区間(10°)につき0.1°毎にその
装入速度データをファイルしてある。
(50) is a data file that stores charging speed information from the charging speed measurement circuit (31) and opening information from the FCG opening gauge (20), and records the charging speed and FCG opening. Data is always filed. The content of the data file at this time is, for example, for each raw material brand, as shown in Fig. 2, file the charging speed data for every 0.1 ° per opening section (10 °) of the FCG (11). is there.

(51)は演算装置であり、データファイル(50)のデー
タに基づいて、各開度ごとに装入速度の平均値を求め、
次に第3図(A)に示すように、装入速度に対する開度
の散布図を作成し、散布図を第3図(B)に示すように
曲線(例えば3次関数)に近似した基準開度関数を発生
させる。例えば次式に示す関数を発生する。
(51) is an arithmetic unit, which calculates the average value of the charging speed for each opening based on the data in the data file (50),
Next, as shown in FIG. 3 (A), a scatter diagram of the opening degree with respect to the charging speed is created, and the scatter diagram is approximated to a curve (eg, cubic function) as shown in FIG. 3 (B). Generate an opening function. For example, the function shown in the following equation is generated.

θ=av3+bv2+cv+d (1) (32)は目標速度演算回路であり、装入重量と予め設定
された旋回シュータの旋回数に基づいて、vo=装入重量
÷(予定旋回数×1旋回時間)により、目標装入速度vo
を求める。(33)は基準開度演算回路であり、目標装入
速度voと演算装置(51)からの基準開度関数とに基づい
て次式によりFCGの基準開度θoを演算する。
θ = av 3 + bv 2 + cv + d (1) (32) is a target velocity arithmetic circuit, based on the number of turns of the swivel chute set in advance and charged by weight, vo = charged weight ÷ (planned number of turns × 1 Target charging speed vo
Ask for. Reference numeral (33) is a reference opening calculation circuit, which calculates the reference opening θo of the FCG by the following equation based on the target charging speed vo and the reference opening function from the calculation device (51).

θo=avo3+bvo2+cvo+d (2) (35)は切り替えスイッチであり、基準開度演算回路
(33)からの基準開度θoを制御信号として自動制御す
る場合と、自動制御によらず所定のFCGの設定開度によ
って制御する場合とを択一的に選択する。この実施例で
は自動制御が選択されている場合について以下説明す
る。(35)及び(36)はそれぞれバッフアであり、バッ
フア(35)には前回の実績の装入速度が記憶され、バッ
フア(36)には前回の目標装入速度が記憶される。
θo = avo 3 + bvo 2 + cvo + d (2) (35) is a change-over switch, and it can be automatically controlled by using the reference opening θo from the reference opening calculation circuit (33) as a control signal or by a predetermined switch. Select whether to control with the set opening of FCG. In this embodiment, the case where automatic control is selected will be described below. (35) and (36) are buffers, respectively, in which the previous actual charging speed is stored in the buffer (35), and the previous target charging speed is stored in the buffer (36).

(37)はフィードバック補正量演算回路(以下FB補正量
演算回路という)であり、以下の演算によりフィードバ
ック補正量(以下FB補正量という)Δθ1を求める。
Reference numeral (37) is a feedback correction amount calculation circuit (hereinafter referred to as FB correction amount calculation circuit), and the feedback correction amount (hereinafter referred to as FB correction amount) Δθ1 is obtained by the following calculation.

第4図はFB補正量Δθ1を求めるための説明図であり、
先ず前回の同一銘柄の装入時の誤差Δvを、バッフア
(35),(36)からのデータを読み出して次式により求
める。
FIG. 4 is an explanatory diagram for obtaining the FB correction amount Δθ1,
First, the error Δv at the time of loading the same brand last time is obtained by the following equation by reading the data from the buffers (35) and (36).

Δv=前回の実績装入速度 −前回の目標装入速度 (3) そして、このΔvと今回の目標装入速度voに対する基準
開度θo(=f(vo))とから次式により誤差補正後の
基準開度θo′を求める。
Δv = previous actual charging speed−previous target charging speed (3) Then, the error is corrected by the following equation from this Δv and the reference opening θo (= f (vo)) for the current target charging speed vo. The reference opening θo ′ of is calculated.

θo′=f(vo−Δv) (4) 基準開度補正量(理論値)Δθo1を次式により求める。θo ′ = f (vo−Δv) (4) The reference opening correction amount (theoretical value) Δθo1 is calculated by the following formula.

Δθo1=θo′−θo (5) 次に、このΔθo1、補正ゲインG1(0〜1)及び前回の
FB補正量により、FB補正量Δθ1を求める。
Δθo1 = θo′−θo (5) Next, this Δθo1, the correction gain G1 (0 to 1) and the previous
The FB correction amount Δθ1 is obtained from the FB correction amount.

Δθ1=G1×Δθo1+前回FB補正量 (6) (38)は排出時間計測回路であり、ロードセル(22)の
出力に基づいて原料の排出時間を計測する。
Δθ1 = G1 × Δθo1 + previous FB correction amount (6) The discharge time measuring circuit (38) measures the discharge time of the raw material based on the output of the load cell (22).

(52)はデータファイルであり、排出時間測定回路(3
8)からの排出時間情報及びロードセル(22)からの排
出重量情報を格納し、両者の関係についてのデータを蓄
積していく。このときのデータの内容は例えば第5図に
示すとおりであり、原料銘柄別に巻下秤量器の排出重量
−排出時間の関係について、最新のデータが原料銘柄別
に例えば3000個ずつ格納されている。
(52) is a data file, and the discharge time measurement circuit (3
The discharge time information from 8) and the discharge weight information from the load cell (22) are stored, and data on the relationship between the two is accumulated. The contents of the data at this time are, for example, as shown in FIG. 5, and the latest data regarding the relationship between the discharge weight of the unwind weigher and the discharge time for each material brand is stored for each material brand, for example, 3,000 pieces.

(53)は演算回路であり、データファイル(52)のデー
タに基づいて、第6図(A)に示すように重量に対する
排出時間の散布図を作成し、第6図(B)に示すように
散布図を例えば次式に示すように直線近似する。
Reference numeral (53) is an arithmetic circuit. Based on the data in the data file (52), a scatter diagram of the discharge time with respect to the weight is created as shown in FIG. 6 (A), and as shown in FIG. 6 (B). The scatter diagram is linearly approximated as shown in the following equation.

ω=αt+β (7) (39)はフィードフォワード補正量演算回路(以下FF補
正量演算回路という)であり、今回の装入重量ω′及び
排出時間t′に基づいて今回の排出速度α′を次式によ
り求める。
ω = αt + β (7) (39) is a feedforward correction amount calculation circuit (hereinafter referred to as FF correction amount calculation circuit), which determines the discharge speed α ′ of this time based on the charging weight ω ′ of this time and the discharge time t ′. Calculate by the following formula.

α′=(ω′−β)/t′ (8) 次に、この排出速度α′の標準排出速度αに対する割合
α′/αから、今回の目標装入速度voに対する基準開度
θo(=f(vo))で装入した場合の予測される速度
v′を求め、更に予測される速度誤差Δvを求める。
α ′ = (ω′−β) / t ′ (8) Next, from the ratio α ′ / α of the discharge speed α ′ to the standard discharge speed α, the reference opening θo (= The predicted speed v ′ when charging at f (vo)) is calculated, and the predicted speed error Δv is calculated.

v′=vo×α′/α (9) Δv=v′−vo (10) 次に、このΔvからFB補正量演算と同様の演算を行なっ
て補正量(理論値)Δθ02を求め、このΔθ02と補正ゲ
インG2(0〜1)とにより、フィードフォワード補正量
(以下FF補正量という)Δθ2を求める。
v ′ = vo × α ′ / α (9) Δv = v′−vo (10) Next, the same calculation as the FB correction amount calculation is performed from this Δv to obtain the correction amount (theoretical value) Δθ02, and this Δθ02 And the correction gain G2 (0 to 1), the feedforward correction amount (hereinafter referred to as FF correction amount) Δθ2 is obtained.

Δθ2=G2×Δθ02 (11) (40)は演算・制御回路であり、選択スイッチ(34)で
選択された基準開度θoとFB補正量演算回路(37)から
のFB補正量Δθ1とFF補正量演算回路(39)からのFF補
正量Δθ2とを加算して、その加算された信号(=θ0
+θ1+θ2)をFCGの開度指令値としてその駆動装置
(図示せず)に出力する。
Δθ2 = G2 × Δθ02 (11) (40) is a calculation / control circuit, which is the reference opening θo selected by the selection switch (34) and the FB correction amount Δθ1 and FF correction from the FB correction amount calculation circuit (37). The FF correction amount Δθ2 from the amount calculation circuit (39) is added, and the added signal (= θ0
+ Θ1 + θ2) is output to the drive unit (not shown) as the FCG opening command value.

以上のように構成された実施例においては、データファ
イル(50)には装入速度とFCGの開度との関係を示す実
績データが蓄積されており、演算装置(51)はそのデー
タに基づいて(1)式により基準開度関数を求め、基準
開度発生回路(33)はその基準開度関数と目標装入速度
voに基づいて(2)式によりFCG基準開度θoを求め
る。
In the embodiment configured as described above, the data file (50) stores the actual data showing the relationship between the charging speed and the opening degree of the FCG, and the arithmetic unit (51) is based on the data. Then, the reference opening function is calculated by the equation (1), and the reference opening generation circuit (33) determines the reference opening function and the target charging speed.
Based on vo, the FCG reference opening θo is calculated by the equation (2).

FB補正量演算回路(37)はバッフア(37),(38)から
の前回の装入速度及び前回の目標速度との差異を(3)
式より求め、更に(4)〜(6)式によりFB補正量Δθ
1を求める。
The FB correction amount calculation circuit (37) calculates the difference between the previous charging speed from the buffers (37) and (38) and the previous target speed (3).
FB correction amount Δθ obtained from equations (4) to (6)
Ask for 1.

一方、データファイル(52)は秤量ホッパー(14)の排
出重量と排出時間との関係を示す実績データを蓄積して
おり、演算回路(53)はそのデータに基づいて(7)式
により排出時間と排出重量との関係を示す近似式を得
る。そして、FF補正量演算回路(39)は(4),
(5),(8)〜(10)式によりFF補正量Δθ2を求め
る。
On the other hand, the data file (52) stores the actual data showing the relationship between the discharge weight of the weighing hopper (14) and the discharge time, and the arithmetic circuit (53) calculates the discharge time by the formula (7) based on the data. An approximate expression showing the relationship between the weight and the discharged weight is obtained. Then, the FF correction amount calculation circuit (39) is (4),
The FF correction amount Δθ2 is obtained from the equations (5) and (8) to (10).

以上のようにして求められたFCG基準開度θo、FB補正
量Δθ1及びFF補正量Δθ2は演算・制御回路(40)で
加算されて、その加算値はFCG開度指令値としてFCG(1
1)の駆動回路(図示せず)に供給され、FCG(11)の開
度を調整する。
The FCG reference opening θo, the FB correction amount Δθ1 and the FF correction amount Δθ2 obtained as described above are added by the calculation / control circuit (40), and the added value is used as the FCG opening command value FCG (1
It is supplied to the drive circuit (not shown) in 1) to adjust the opening of the FCG (11).

以上のようにして、前回の実績に基づいてFB補正量θ1
を求めてそれによりフィードバック制御を行って過去の
実績による補正を行い、更に、今回装入される原料の性
状に基づいてFF補正量θ2を求めてそれによりフィード
フォワード補正をするようにしたので、原料の装入速度
が適格に制御でき、原料の装入開始点と終了点とを一致
させることができ、原料を均一に装入することができ
る。
As described above, the FB correction amount θ1 based on the previous results
Therefore, the feedback control is performed based on the obtained value, and the correction based on the past results is performed. Further, the FF correction amount θ2 is calculated based on the property of the raw material charged this time, and the feedforward correction is performed based on the FF correction amount θ2. The charging rate of the raw material can be appropriately controlled, the starting point and the ending point of the raw material can be matched, and the raw material can be uniformly charged.

なお、演算回路(51),(53)の出力は毎回出力する必
要はなく、データファイル(50)(52)にある程度新た
なデータが蓄積された段階で出力させればよく、その場
合には適当なタイミングでスイッチ(S1),(S2)を閉
成すればよい。また、FB補正量及びFF補正量による補正
をしない場合には、スイッチ(S3),(S4)を開成す
る。
The outputs of the arithmetic circuits (51) and (53) do not have to be output every time, but may be output when new data is accumulated in the data files (50) and (52) to some extent. The switches (S1) and (S2) may be closed at appropriate timing. Further, when the correction based on the FB correction amount and the FF correction amount is not performed, the switches (S3) and (S4) are opened.

また、上記実施例において、第1図のデータファイル
(50),(52)及び演算回路(51),(53)はプロセス
計算機に含まれ、それ以外は装入制御装置に含まれた構
成にすることができるが、その場合には各演算回路等は
それ自体をハード構成でも実現できるが、コンピュータ
のソフトウェアによっても実現できることはいうまでも
ない。
In the above embodiment, the data files (50) and (52) and the arithmetic circuits (51) and (53) shown in FIG. 1 are included in the process computer, and the rest are included in the charging control device. In this case, each arithmetic circuit or the like can be realized by a hardware configuration itself, but it goes without saying that it can also be realized by software of a computer.

[発明の効果] 以上のようにこの発明によれば、過去の実績に基づいて
FB補正量を求めると共に、今回装入される原料の性状に
基づいたFF補正量を求めて基準開度を補正するようにし
たので、原料の性状に応じた制御が可能になっており、
高精度な制御が可能になっている。
[Effects of the Invention] As described above, according to the present invention, based on past achievements,
Since the FB correction amount is calculated and the FF correction amount based on the property of the raw material to be charged this time is calculated to correct the reference opening, it is possible to control according to the property of the raw material.
Highly accurate control is possible.

【図面の簡単な説明】 第1図はこの発明の一実施例に係る方法を実施した装置
及びその関連設備を示す説明図、第2図はある原料銘柄
におけるFCG開度と装入速度との関係を示したデータフ
ァイルの内容説明図、第3図(A)(B)は平均装入速
度とFCG開度との関係を示した特性図、第4図はFB補正
値を求めるための説明図、第5図は排出重量と排出時間
との関係を示したデータファイルの説明図、第6図
(A)(B)は排出時間と排出重量との関係を示した特
性図、第7図は今回の原料の排出重量と排出時間との関
係を求めるための説明図である。 図において、(10)は下部バンカー、(11)はFCG、(1
3)は旋回シュータ、(14)はホッパーである。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an explanatory view showing an apparatus for carrying out a method according to an embodiment of the present invention and its related equipment, and FIG. 2 shows an FCG opening and a charging speed in a certain material brand. FIG. 3 (A) and FIG. 3 (B) are characteristic diagrams showing the relationship between the average charging speed and the FCG opening, and FIG. 4 is an explanation for obtaining the FB correction value. FIG. 5 is an explanatory diagram of a data file showing the relationship between the discharged weight and the discharged time, FIGS. 6 (A) and 6 (B) are characteristic diagrams showing the relationship between the discharged time and the discharged weight, and FIG. FIG. 4 is an explanatory diagram for obtaining the relationship between the discharge weight of the raw material and the discharge time of this time. In the figure, (10) is the lower bunker, (11) is the FCG, and (1
3) is a turning shooter, and (14) is a hopper.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】実績に基づく装入速度と原料流量調節弁の
開度との関係から基準開度関数を発生する工程と、 今回装入する原料の重量と旋回シュータの設定旋回数と
から目標装入速度を求める工程と、 基準開度関数と目標装入速度とから原料流量調節弁の基
準開度を求める工程と、 前回の装入速度、前回の目標装入速度及び基準開度関数
並びに前回のフィードバック補正量に基づいてフィード
バック補正量を求める工程と、 実績に基づくホッパーからの原料の排出重量と排出時間
とから両者の関係を示す近似式を求める工程と、 今回装入される原料のホッパーからの排出重量、排出時
間及び前記近似式に基づいてフィードフォワード補正量
を求める工程と、 原料流量調節弁の基準開度、フィードバック補正量及び
フィードフォワード補正量に基づいて原料流量調節弁の
開度指令値を求め、この原料流量調節弁の開度指令値に
基づいて原料流量調節弁の開度を調整する工程と を有することを特徴とする高炉ベルレス装入設備の制御
方法。
1. A step of generating a reference opening function based on a relationship between a charging speed based on actual results and an opening of a raw material flow rate control valve, and a target based on a weight of a raw material charged this time and a set number of revolutions of a rotating shooter. The step of obtaining the charging speed, the step of obtaining the reference opening of the raw material flow rate control valve from the reference opening function and the target charging speed, the previous charging speed, the previous target charging speed and the reference opening function, The step of obtaining the feedback correction amount based on the previous feedback correction amount, the step of obtaining an approximate expression showing the relationship between the discharge weight and discharge time of the raw material from the hopper based on the actual results, and the raw material to be charged this time The step of obtaining the feedforward correction amount based on the discharge weight from the hopper, the discharge time, and the above approximate expression, and the reference opening of the raw material flow rate control valve, the feedback correction amount and the feedforward correction amount. Based on the opening command value of the raw material flow rate control valve, and adjusting the opening degree of the raw material flow rate control valve based on the opening command value of the raw material flow rate control valve. Equipment control method.
JP7184889A 1989-03-27 1989-03-27 Blast furnace bellless charging equipment control method Expired - Fee Related JPH079006B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7184889A JPH079006B2 (en) 1989-03-27 1989-03-27 Blast furnace bellless charging equipment control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7184889A JPH079006B2 (en) 1989-03-27 1989-03-27 Blast furnace bellless charging equipment control method

Publications (2)

Publication Number Publication Date
JPH02254111A JPH02254111A (en) 1990-10-12
JPH079006B2 true JPH079006B2 (en) 1995-02-01

Family

ID=13472370

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7184889A Expired - Fee Related JPH079006B2 (en) 1989-03-27 1989-03-27 Blast furnace bellless charging equipment control method

Country Status (1)

Country Link
JP (1) JPH079006B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103555873B (en) * 2013-11-18 2015-03-18 武汉钢铁(集团)公司 Adjusting method of material flow adjusting valve on furnace top
CN103589816B (en) * 2013-11-27 2015-04-29 四川省达州钢铁集团有限责任公司 Control method of material flow proportioning valve at blast furnace top
CN114394445A (en) * 2022-01-13 2022-04-26 青岛杰瑞工控技术有限公司 An intelligent loading and unloading system of port granary based on industrial Internet
CN119585446A (en) * 2022-08-22 2025-03-07 杰富意钢铁株式会社 Raw material discharge control device and raw material loading device
CN116334325B (en) * 2023-03-21 2025-01-21 攀钢集团西昌钢钒有限公司 A method for controlling the opening of a blast furnace material flow valve by weight
CN116606970B (en) * 2023-04-20 2025-04-22 武汉钢铁有限公司 Blast furnace burden distribution method, device, equipment and medium

Also Published As

Publication number Publication date
JPH02254111A (en) 1990-10-12

Similar Documents

Publication Publication Date Title
JPS6250624A (en) Device and method of feeding granular material, such as coaland other bulk material
EP0488318B1 (en) Control method of and apparatus for material charging at top of blast furnace
JPH079006B2 (en) Blast furnace bellless charging equipment control method
JPH02657Y2 (en)
JPH0658243B2 (en) Method for adjusting a differential dosing balance, especially for bulk goods, and differential dosing balance implementing this method
CN119517188B (en) Data processing method and flue gas desulfurization system
JP2005206848A (en) Blast furnace raw material charging control method, program thereof, and blast furnace operation method
JP3739018B2 (en) Raw material charging control method for blast furnace
JPS6148845B2 (en)
JPS6151247B2 (en)
JPH026007B2 (en)
JP2942349B2 (en) Blast furnace feed control method
JPS58123808A (en) Charging method of raw material into blast furnace
JP2699100B2 (en) Quantitative filling method
JPS6043406B2 (en) Control method of raw material control gate
JPS59229407A (en) Method for controlling opening degree of flow regulating gate of bell-less blast furnace
JPH0522811B2 (en)
JPH0438804B2 (en)
JPS5919818A (en) Combination measuring method
JPH095150A (en) Metering device
JP2005298860A (en) Blast furnace conveyor material tracking correction device
JPS6139296Y2 (en)
JP2006265688A (en) Raw material charging control method for blast furnace
SU815516A1 (en) Method of continuous batch weighing of loose materials
JPH01212A (en) How to adjust the opening of the raw material control gate

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees