JPH07904B2 - Precast concrete cloth foundation assembly method - Google Patents
Precast concrete cloth foundation assembly methodInfo
- Publication number
- JPH07904B2 JPH07904B2 JP12734989A JP12734989A JPH07904B2 JP H07904 B2 JPH07904 B2 JP H07904B2 JP 12734989 A JP12734989 A JP 12734989A JP 12734989 A JP12734989 A JP 12734989A JP H07904 B2 JPH07904 B2 JP H07904B2
- Authority
- JP
- Japan
- Prior art keywords
- reinforcing bar
- beam member
- cloth foundation
- shaped
- mesh
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Foundations (AREA)
Description
【発明の詳細な説明】 [産業上の利用分野] 本発明はプレキャストコンクリート(以下、PCコンクリ
ートという。)布基礎の組立工法に関する。DETAILED DESCRIPTION OF THE INVENTION [Industrial application] The present invention relates to a method for assembling a precast concrete (hereinafter referred to as PC concrete) cloth foundation.
[従来の技術] 布基礎を施工するには、現場で型枠を組んでコンクリー
トを打設する方法が最も一般的であるが、製品精度が低
く、品質のばらつきが大きいという問題がある。[Prior Art] The most common method for constructing a cloth foundation is to assemble a formwork and pour concrete on site, but there are problems in that the product accuracy is low and the quality varies greatly.
そこで、上記問題を解決するため、梁部材とフーチング
部とが一体化されたPCコンクリート布基礎部材を工場で
製造し、複数個の該PCコンクリート布基礎部材を現場の
施工床に載置した後、互いに接合する据付工法が普及し
てきた。しかし、この一体物のPCコンクリート布基礎部
材は重量が大きいため運搬等の取扱いが大変であった。Therefore, in order to solve the above problem, after manufacturing the PC concrete cloth foundation member in which the beam member and the footing part are integrated, and placing a plurality of the PC concrete cloth foundation members on the construction floor at the site The installation method of joining to each other has become popular. However, since this one-piece PC concrete cloth foundation member is heavy, handling such as transportation was difficult.
そこで、最近では梁部だけのPCコンクリート梁部材を工
場で製造し、該PCコンクリート梁部材を施工床にスペー
サを介して載置することにより該梁部材の下端面を施工
床から浮かせて支持し、該施工床から該梁部材の下部に
かけてコンクリート又はモルタルを打設することにより
フーチング部を形成する組立工法が行わえるようになっ
た。Therefore, recently, a PC concrete beam member with only a beam portion is manufactured in a factory, and the PC concrete beam member is placed on the construction floor via a spacer so that the lower end surface of the beam member is floated from the construction floor and supported. As a result, an assembling method for forming a footing portion by casting concrete or mortar from the construction floor to the lower part of the beam member can be performed.
ここで、施工床とはPCコンクリート梁部材を配置する面
をいい、通常は根切りに撒かれた栗石や砂利の上面又は
捨てコンクリートの上面であるが、根切り底がそのまま
施工床になる場合もある(本明細書を通して同じ)。Here, the construction floor refers to the surface on which the PC concrete beam members are placed, and is usually the top surface of the rubble or gravel sprinkled for root cutting or the top surface of discarded concrete, but when the root cutting bottom is the construction floor (Same throughout this specification).
上記組立工法としては、次の二つの従来例が知られてい
る。The following two conventional examples are known as the assembly method.
第7図に示すように梁部材21から下方へ突き出した
フック状の突出し鉄筋22にフーチング部23を補強するた
めの長手方向に延びる長手鉄筋24を据付現場にて固定
し、その後コンクリートを打設してフーチング部23を形
成する工法。As shown in FIG. 7, a longitudinal reinforcing bar 24 extending in the longitudinal direction for reinforcing the footing part 23 is fixed to a hook-shaped protruding reinforcing bar 22 protruding downward from the beam member 21 at the installation site, and then concrete is poured. To form the footing portion 23.
第8図に示すように梁部材21から下方へ突き出しか
つ梁部材の長手方向に開口するループ状の突出し鉄筋26
に前記長手鉄筋24を、同長手方向から挿入して固定し、
その後同様のフーチング部23を形成する工法。As shown in FIG. 8, a projecting rebar 26 in a loop shape protruding downward from the beam member 21 and opening in the longitudinal direction of the beam member 26.
The longitudinal rebar 24 is inserted into and fixed from the same longitudinal direction,
After that, the same method for forming the footing portion 23.
[発明が解決しようとする課題] ところが、上記組立工法の従来例において長手鉄筋24は
長尺であるあるため、現場の狭い根切り内においてフッ
ク状の突出し鉄筋22に掛止したり、ループ状の突出し鉄
筋26に挿入して固定したりする仕組み作業は非常に困難
であった。また、梁部材21に横方向の力が作用した場合
の強度向上のため、長手鉄筋24に直交方向に延びる複数
本の直交鉄筋を交差させる場合もあるが、現場で長手鉄
筋24と直交鉄筋とを固定する仕組み作業は大変手間がか
かるものであった。[Problems to be Solved by the Invention] However, in the conventional example of the above-mentioned assembly method, since the longitudinal reinforcing bars 24 are long, they are hooked on the hook-shaped protruding reinforcing bars 22 or looped in a narrow root cutting at the site. It was extremely difficult to perform a mechanism work for inserting and fixing the projecting rebar 26 in. Further, in order to improve the strength when a lateral force is applied to the beam member 21, there may be a case where a plurality of orthogonal reinforcing bars extending in the orthogonal direction are intersected with the longitudinal reinforcing bars 24. It was very troublesome to work to fix the.
本発明の目的は、上記問題点を解決し、現場での鉄筋の
仕組み作業が容易でかつ強度的にも優れた布基礎を組み
立てることができる新規なPCコンクリート布基礎の組立
工法を提供することにある。An object of the present invention is to solve the above problems and provide a new PC concrete cloth foundation assembling method capable of assembling a cloth foundation which is easy in mechanical work of reinforcing bars in the field and excellent in strength. It is in.
[課題を解決するための手段] 上記目的を達成するために、本発明のPCコンクリート布
基礎の組立工法においては、基礎の施工床に既成のメッ
シュ状鉄筋を水平に浮かせて保持する工程と、前記メッ
シュ状鉄筋の上方にプレキャストコンクリート梁部材を
垂直に保持するとともに、同梁部材の下端面から突き出
しかつ同梁部材の直交方向に開口するループ状の突出し
鉄筋を前記メッシュ状鉄筋9)に交差させる工程と、前
記梁部材の直交方向に延びる挿入鉄筋を前記ループ状の
突出し鉄筋に挿入するとともに前記メッシュ状鉄筋に固
定する工程と、前記メッシュ状鉄筋及び突出し鉄筋を埋
設するように前記施工床から梁部材の下部にかけてコン
クリート又はモルタルを打設することによりフーチング
部を形成する工程とから構成をした。[Means for Solving the Problem] In order to achieve the above object, in the method for assembling a PC concrete cloth foundation of the present invention, a step of horizontally floating and holding an existing mesh-shaped reinforcing bar on the construction floor of the foundation, A precast concrete beam member is vertically held above the mesh-shaped reinforcing bar, and a loop-shaped protruding reinforcing bar protruding from the lower end surface of the beam member and opening in the orthogonal direction of the beam member intersects with the mesh-shaped reinforcing bar 9). And a step of inserting the reinforcing bars extending in the orthogonal direction of the beam member into the loop-shaped protruding reinforcing bars and fixing the mesh-shaped reinforcing bars together with the mesh-shaped reinforcing bars and protruding reinforcing bars To a lower part of the beam member, a step of forming a footing portion by casting concrete or mortar is performed.
[作用] 上記PCコンクリート布基礎の組立工法では、既成のメッ
シュ状鉄筋を使用するので、現場での仕組み作業が簡略
化される。[Operation] In the above-mentioned construction method of the PC concrete cloth foundation, since the existing mesh-shaped reinforcing bars are used, the mechanical work on the site is simplified.
また、PCコンクリート梁部材の直交方向に開口したルー
プ状の突出し鉄筋に、同じく直交方向に延びる短い挿入
鉄筋を挿入すればよいので、据付現場の狭い根切り内で
あっても容易に同挿入作業を行うことができる。また、
挿入鉄筋とメッシュ状鉄筋とを固定するため、その後フ
ーチング部を形成すれば、強度の向上した布基礎が完成
する。In addition, it is only necessary to insert a short insertion rebar that also extends in the orthogonal direction into the loop-shaped protruding rebar that opens in the orthogonal direction of the PC concrete beam member, so that the insertion work can be performed easily even within the narrow root cutting at the installation site. It can be performed. Also,
Since the inserted reinforcing bars and the mesh-shaped reinforcing bars are fixed to each other, if a footing portion is subsequently formed, a cloth foundation having improved strength is completed.
[実施例] 以下、本発明を具体化したPCコンクリート布基礎の組立
工法の実施例について、第1図〜第6図を参照して説明
する。[Example] An example of an assembling method of a PC concrete cloth foundation embodying the present invention will be described below with reference to FIGS. 1 to 6.
この布基礎の組立工法は、工場において製造された第1
図に示すようなPCコンクリート梁部材2と、同じく工場
において製作された、第1図に示すようなフーチング部
3補強用のメッシュ状鉄筋9とを使用して行う。This cloth foundation assembly method is the first
The PC concrete beam member 2 as shown in the figure and the mesh-shaped reinforcing bar 9 for reinforcing the footing portion 3 as shown in FIG.
まず、前記PCコンクリート梁部材2の詳細を説明する
と、その内部には第4図に示すように長手方向に伸びる
複数本(本実施例では四本)の主筋4と同主筋4に上下
方向に交差して固定された複数本(本実施例では九本)
の配力筋5とが埋設されている。さらに、前記梁部材2
の下端には下方へループ状に突き出す突出し鉄筋7が設
けられ、同突出し鉄筋7は前記配力筋5を一つ置きに挾
むようにして前記主筋4の下方の二本に溶接されてい
る。前記突出し鉄筋7の突き出したループは梁部材2の
長手方向に直交する方向(以下、単に直交方向とい
う。)に開口するように形成されている。また、前記梁
部材2の上端面にはアンカー部材6がその開口部を露出
させて埋設されている。First, the details of the PC concrete beam member 2 will be described. Inside thereof, as shown in FIG. 4, a plurality of (four in this embodiment) main bars 4 extending in the longitudinal direction and the main bars 4 in the vertical direction. Plural lines that are fixed by crossing (nine lines in this embodiment)
And the distribution muscles 5 are embedded. Further, the beam member 2
A projecting rebar 7 is provided at the lower end of the projecting bar so as to project downward in a loop shape. The projecting rebar 7 is welded to the lower two bars of the main bar 4 so as to sandwich the force distributing bar 5 between every other. The protruding loop of the protruding reinforcing bar 7 is formed so as to open in a direction orthogonal to the longitudinal direction of the beam member 2 (hereinafter, simply referred to as an orthogonal direction). An anchor member 6 is embedded in the upper end surface of the beam member 2 with its opening exposed.
次に、前記メッシュ状鉄筋9は長手方向に延びる複数本
(本実施例では五本)の長手鉄筋10と、同長手鉄筋10に
直交する複数本(本実施例では八本)の短い直交鉄筋12
とにより構成されている。この直交鉄筋12は予め工場で
前記長手鉄筋10に溶接されるもので、第5図に示すよう
に空き部16をおいて配設されている。Next, the mesh-shaped reinforcing bars 9 are a plurality of longitudinal reinforcing bars 10 (five in this embodiment) extending in the longitudinal direction, and a plurality of short rectangular reinforcing bars (eight in this embodiment) orthogonal to the longitudinal reinforcing bars 10. 12
It is composed of and. This orthogonal reinforcing bar 12 is pre-welded to the longitudinal reinforcing bar 10 in a factory, and is provided with an empty portion 16 as shown in FIG.
前記空き部16には、施工現場で前記突き出し鉄筋7に直
交方向から挿入する短い挿入鉄筋13が固定されるように
なっている。A short insertion rebar 13 to be inserted into the protruding rebar 7 from the orthogonal direction at the construction site is fixed to the empty portion 16.
次に、上記布基礎の据付工法について、一般的な工程順
に従って説明する。Next, the method of installing the cloth foundation will be described in the order of general steps.
先ず、根切り底17に栗石15を撒いてなる施工床14の
上に、前記既成のメッシュ状鉄筋9を図示しないスペー
サ等により水平に浮かせて保持する。このように、本実
施例ではメッシュ状鉄筋9が既成であるため、現場での
仕組作業が簡略化される。First, the existing mesh-shaped reinforcing bars 9 are horizontally floated and held by a spacer or the like (not shown) on the construction floor 14 in which the root cutting bottoms 17 are sprinkled with the crushed stones 15. As described above, in this embodiment, since the mesh-shaped reinforcing bar 9 is already formed, the on-site structuring work is simplified.
PCコンクリート梁部材2を吊り上げて突出し鉄筋7
をメッシュ状鉄筋9の前記空き部16に合わせて両鉄筋8,
9を交差させるとともに、同梁部材2を図示しないスペ
ーサ等により垂直に保持する。The PC concrete beam member 2 is lifted and protruded.
Aligning the empty space 16 of the mesh-shaped reinforcing bar 9 with both reinforcing bars 8,
9 are crossed and the beam member 2 is held vertically by a spacer or the like not shown.
挿入鉄筋13を梁部材2の直交方向から前記長手鉄筋
10の下方を通して、前記ループ状の突出し鉄筋7内に挿
入する。従って、従来のように長手方向から挿入する鉄
筋と比べて、長さの短い挿入鉄筋13を使用することでき
るため、その挿入作業を狭い根切り内であっても容易に
行うことができる。Insert the reinforcing bar 13 from the direction perpendicular to the beam member 2 to the longitudinal reinforcing bar.
It is inserted through the lower part of 10 into the loop-shaped protruding reinforcing bar 7. Therefore, compared to the conventional rebar that is inserted from the longitudinal direction, it is possible to use the rebar 13 that is shorter in length, so that the insertion work can be easily performed even within a narrow root cutting.
続いて、挿入鉄筋13と長手鉄筋10とを溶接又は針金
結束により固定する。挿入鉄筋13は長手鉄筋10の下方で
固定されており、突出し鉄筋7により上方に引っ張られ
ても溶接金属や針金に直接引張力が働かないので大変丈
夫に繋ぐことができる。Subsequently, the inserted reinforcing bar 13 and the longitudinal reinforcing bar 10 are fixed by welding or wire binding. The inserted reinforcing bar 13 is fixed below the longitudinal reinforcing bar 10, and even if it is pulled upward by the projecting reinforcing bar 7, no tensile force directly acts on the weld metal or the wire, so that it can be connected very robustly.
次に、メッシュ状鉄筋9及び突出し鉄筋7を埋設す
るように前記施工床14から梁部材2の下部にかけてコン
クリート又はモルタルを打設することによりフーチング
部3を形成して梁部材2に一体化すれば布基礎が完成す
る。Next, by placing concrete or mortar from the construction floor 14 to the lower part of the beam member 2 so as to embed the mesh-shaped reinforcing bar 9 and the protruding reinforcing bar 7, the footing portion 3 is formed and integrated with the beam member 2. The cloth foundation is completed.
上記梁部材2は工場におけるプレキャストにより既に十
分な強度を持っているので、フーチング部3が一応硬化
すればその養生を待つまでもなく次の工程に早く移るこ
とができる。Since the beam member 2 already has sufficient strength by precasting in the factory, once the footing portion 3 is hardened, it is possible to quickly proceed to the next step without waiting for its curing.
なお、本発明は前記実施例の構成に限定されるものでは
なく、例えば以下のように発明の趣旨から逸脱しない範
囲で任意に変更して具体化することもできる。The present invention is not limited to the configurations of the above-described embodiments, but may be embodied by being arbitrarily modified within the scope of the gist of the invention as follows, for example.
(1) メッシュ状鉄筋9は完全な矩形状の格子に限定
されず、フーチング部の形状に合わせて適宜変形した格
子でもよい。(1) The mesh-shaped reinforcing bar 9 is not limited to a perfect rectangular grid, and may be a grid that is appropriately deformed according to the shape of the footing portion.
(2) 突出し鉄筋7は必ずしも湾曲した棒状の鉄筋に
限らず、梁部材2の直交方向に開口を有していれば例え
ば穴付き鉄板でもよい。(2) The protruding reinforcing bar 7 is not necessarily a curved rod-shaped reinforcing bar, and may be, for example, a perforated iron plate as long as it has an opening in the direction orthogonal to the beam member 2.
[発明の効果] 本発明のPCコンクリート布基礎の組立工法は、上記の通
り構成されているので、組立時においては、鉄筋の仕組
み作業が簡略化され狭い根切りにおいても同作業を容易
に行うことができ、組立後においては優れた強度を発揮
する。[Effect of the Invention] Since the method for assembling the PC concrete cloth foundation of the present invention is configured as described above, at the time of assembly, the mechanical work of the reinforcing bar is simplified and the same work is easily performed even in narrow root cutting. And exhibits excellent strength after assembly.
第1〜6図は本発明を具体化したPCコンクリート布基礎
の組立工法の実施例を示し、第1図は布基礎の組立途中
を示す斜視図、第2図は同布基礎のフーチング部の構造
を示す側面からの部分断面図、第3図は同じく正面から
の部分断面図、第4図は同布基礎の梁部材の斜視図、第
5図は同布基礎のメッシュ状鉄筋の斜視図、第6図は同
布基礎の梁部材とメッシュ状鉄筋とを繋ぐ工程を示す斜
視図、第7図は従来例の側面からの断面図、第8図は別
の従来例の斜視図である。 2……PCコンクリート梁部材、3……フーチング部、7
……突出し鉄筋、9……メッシュ状鉄筋、13……挿入鉄
筋、14……施工床。1 to 6 show an embodiment of a method for assembling a PC concrete cloth foundation embodying the present invention, FIG. 1 is a perspective view showing an assembling process of the cloth foundation, and FIG. 2 is a footing portion of the cloth foundation. Partial sectional view from the side showing the structure, FIG. 3 is a partial sectional view from the same front, FIG. 4 is a perspective view of a beam member of the same cloth foundation, and FIG. 5 is a perspective view of mesh-shaped rebar of the same cloth foundation. FIG. 6 is a perspective view showing a step of connecting a beam member and a mesh-shaped rebar of the same cloth foundation, FIG. 7 is a side sectional view of a conventional example, and FIG. 8 is a perspective view of another conventional example. . 2 ... PC concrete beam member, 3 ... footing part, 7
...... Protruding rebar, 9 ...... Mesh shaped rebar, 13 …… Insert rebar, 14 …… Construction floor.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 谷本 広 大阪府大阪市北区中之島6丁目2番27号 積水ハウス株式会社内 (72)発明者 村瀬 廣行 岐阜県岐阜市奥237番地 (56)参考文献 特開 平2−300420(JP,A) 特公 昭59−16055(JP,B2) 実公 昭46−9016(JP,Y1) 実公 昭54−15447(JP,Y2) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Hiro Hiroshi Tanimoto 6-27 Nakanoshima, Kita-ku, Osaka City, Osaka Prefecture Sekisui House Co., Ltd. (72) Hiroyuki Murase 237, Oku, Gifu City, Gifu Prefecture (56) Reference Documents JP-A-2-300420 (JP, A) JP 59-16055 (JP, B2) JK 46-9016 (JP, Y1) JK 54-15447 (JP, Y2)
Claims (1)
鉄筋(9)を水平に浮かせて保持する工程と、 前記メッシュ状鉄筋(9)の上方にプレキャストコンク
リート梁部材(2)を垂直に保持するとともに、同梁部
材(2)の下端面から突き出しかつ同梁部材(2)の直
交方向に開口するループ状の突出し鉄筋(7)を前記メ
ッシュ状鉄筋(9)に交差させる工程と、 前記梁部材(2)の直交方向に延びる挿入鉄筋(13)を
前記ループ状の突出し鉄筋(7)に挿入するとともに前
記メッシュ状鉄筋(9)に固定する工程と、 前記メッシュ状鉄筋(9)及び突出し鉄筋(7)を埋設
するように前記施工床(14)から梁部材(2)の下部に
かけてコンクリート又はモルタルを打設することにより
フーチング部(3)を形成する工程とからなるプレキャ
ストコンクリート布基礎の組立工法。1. A step of horizontally suspending and holding an existing mesh-shaped reinforcing bar (9) on a cloth foundation construction floor (14), and a precast concrete beam member (2) above the mesh-shaped reinforcing bar (9). A step of holding a vertical shape and intersecting the mesh-shaped reinforcing bar (9) with a loop-shaped protruding reinforcing bar (7) protruding from a lower end surface of the beam member (2) and opening in a direction orthogonal to the beam member (2). And a step of inserting an insertion reinforcing bar (13) extending in a direction orthogonal to the beam member (2) into the loop-shaped projecting reinforcing bar (7) and fixing the reinforcing bar to the mesh-shaped reinforcing bar (9). 9) and a step of forming a footing part (3) by driving concrete or mortar from the construction floor (14) to the lower part of the beam member (2) so as to bury the protruding reinforcing bar (7). Assembly method of the turbocharger strike concrete cloth foundation.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP12734989A JPH07904B2 (en) | 1989-05-20 | 1989-05-20 | Precast concrete cloth foundation assembly method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP12734989A JPH07904B2 (en) | 1989-05-20 | 1989-05-20 | Precast concrete cloth foundation assembly method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH02308010A JPH02308010A (en) | 1990-12-21 |
| JPH07904B2 true JPH07904B2 (en) | 1995-01-11 |
Family
ID=14957731
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP12734989A Expired - Fee Related JPH07904B2 (en) | 1989-05-20 | 1989-05-20 | Precast concrete cloth foundation assembly method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH07904B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH05321278A (en) * | 1992-05-18 | 1993-12-07 | Mikio Umeoka | Foundation block for building and method of constructing foundation with concrete block |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5916055B2 (en) | 2011-07-04 | 2016-05-11 | ダイハツ工業株式会社 | Ignition device for spark ignition internal combustion engine |
-
1989
- 1989-05-20 JP JP12734989A patent/JPH07904B2/en not_active Expired - Fee Related
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5916055B2 (en) | 2011-07-04 | 2016-05-11 | ダイハツ工業株式会社 | Ignition device for spark ignition internal combustion engine |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH02308010A (en) | 1990-12-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH07904B2 (en) | Precast concrete cloth foundation assembly method | |
| JP2510738B2 (en) | Reinforcing member for concrete plate and concrete plate using the same | |
| JP2737099B2 (en) | Construction method of underground beam reinforcing bars and underground beams | |
| JP3161886B2 (en) | Foundation for small buildings | |
| JPH0693675A (en) | Pca earthquake resisting wall and connecting method of the same pca earthquake resisting wall and cast-in-place post or pca post | |
| JPS59192145A (en) | Fixing of iron pillar | |
| JPH04261915A (en) | Slope frame constructing block and method for constructing slope frame thereof | |
| JPH1150468A (en) | Pc concrete strip footing and installation method thereof | |
| JP2542279B2 (en) | Joining method of main bar in wall type frame method | |
| JP2651322B2 (en) | Construction method of wall type rigid frame structure | |
| JP3415528B2 (en) | Slope reinforcement method | |
| JP2952823B2 (en) | Construction method of greening method frame | |
| JPH04111813A (en) | Retaining wall structure and its construction | |
| JPH038954A (en) | Concrete panel for wall, and constructing method for wall using concrete panel | |
| JPH02120446A (en) | Precast version | |
| JPS6035638Y2 (en) | panel foundation | |
| JP3002026B2 (en) | Structure of residential continuous foundation | |
| JPH0558704U (en) | Precast reinforced concrete structure | |
| JPH0261237A (en) | How to join half precast concrete beams to cast-in-place concrete beams | |
| JP2651321B2 (en) | Anchoring method of beam in wall type rigid frame structure | |
| JPH0718681A (en) | How to join precast concrete columns and foundations | |
| JP2022109760A (en) | Reinforced concrete column beam connection structure | |
| JPH0557107U (en) | Reinforcement structure of column-beam joints | |
| JPH0437903B2 (en) | ||
| JPS62288244A (en) | Construction of rc outer wall using pc panel |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |