JPH0791946B2 - Tunnel and tunnel construction method - Google Patents
[go: Go Back, main page]

JPH0791946B2 - Tunnel and tunnel construction method - Google Patents

Tunnel and tunnel construction method

Info

Publication number
JPH0791946B2
JPH0791946B2 JP2043556A JP4355690A JPH0791946B2 JP H0791946 B2 JPH0791946 B2 JP H0791946B2 JP 2043556 A JP2043556 A JP 2043556A JP 4355690 A JP4355690 A JP 4355690A JP H0791946 B2 JPH0791946 B2 JP H0791946B2
Authority
JP
Japan
Prior art keywords
tunnel
ground
vibration energy
lining
energy absorption
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2043556A
Other languages
Japanese (ja)
Other versions
JPH03247896A (en
Inventor
一郎 深井
昭博 森吉
幹雄 竹内
芳昭 井戸田
健一郎 大野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumura Corp
Original Assignee
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumura Corp filed Critical Okumura Corp
Priority to JP2043556A priority Critical patent/JPH0791946B2/en
Publication of JPH03247896A publication Critical patent/JPH03247896A/en
Publication of JPH0791946B2 publication Critical patent/JPH0791946B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は減震構造を有するトンネル及びその築造方法に
関するものである。
TECHNICAL FIELD The present invention relates to a tunnel having a seismic reduction structure and a method for constructing the tunnel.

〔従来の技術〕[Conventional technology]

近年、シールド工法の目覚ましい進歩により10メートル
以上の大口径のトンネルが構築されるようになった。
In recent years, due to the remarkable progress of the shield construction method, a tunnel with a large diameter of 10 meters or more has been constructed.

このような大口径のトンネルを構築するシールド工法と
しては、従来から、シールド掘削機によって地盤を掘削
しながら、その掘進に従ってシールド掘削機のテール部
後方にセグメントを組立てていくと共に掘削された壁面
とセグメント間に生じる空隙部にトンネル内からモルタ
ル等の裏込材料を注入、固化させてセグメントによるト
ンネル覆工と掘削地盤との一体化を計り、且つその裏込
材料によって地盤の崩壊を防止すると共に地盤からトン
ネル内に地下水等の浸入を防止することが行われてい
る。
As a shield construction method for constructing such a large-diameter tunnel, conventionally, while excavating the ground with a shield excavator, assembling a segment behind the tail part of the shield excavator along with the excavation and the excavated wall surface and The lining material such as mortar is poured into the voids between the segments from the inside of the tunnel and solidifies to solidify the tunnel lining by the segment and the excavated ground, and the backing material prevents the ground from collapsing. Groundwater is prevented from entering the tunnel from the ground.

〔発明が解決しようとする課題〕[Problems to be Solved by the Invention]

しかしながら、世界有数の地震国である我が国において
は、当然のことながらトンネルを高い耐震構造にして安
全性を確保しなければならないが、上記したような従来
のトンネル構造によれば、トンネル自体に耐震性を付与
しているにすぎないために、軟質地盤や地盤急変部、特
に、海底トンネルのように陸地部から海底部へと地質の
異なる層に亘ってトンネルを築造する場合には、地震が
発生した際に、異なる地層の変形量に大きな差異が生じ
てその境界部では変形量の差に応じた応力がトンネル構
造体に作用し、そのため、トンネルが破壊する虞れがあ
るという問題点を有する。
However, in Japan, which is one of the most earthquake-prone countries in the world, it is natural that tunnels must have a high earthquake-resistant structure to ensure safety. However, when a tunnel is built over a layer of different geology from the land to the seabed, such as a seabed tunnel, an earthquake will occur because When it occurs, a large difference occurs in the deformation amount of different formations, and the stress corresponding to the difference in the deformation amount acts on the tunnel structure at the boundary, which may cause the tunnel to be destroyed. Have.

又、掘削された壁面とセグメント間に注入する裏込材料
はセメント系であるから、地震動等によってクラックが
生じ易く、トンネル内に漏水が発生することになる。
In addition, since the backfill material injected between the excavated wall surface and the segment is cement-based, cracks are likely to occur due to earthquake motion, etc., and water leakage will occur in the tunnel.

本発明はこのような問題点を解消したトンネル及びトン
ネルの築造方法の提供を目的とするものである。
An object of the present invention is to provide a tunnel and a method of constructing a tunnel in which such problems are solved.

〔課題を解決するための手段〕[Means for Solving the Problems]

上記目的を達成するために、本発明のトンネル構造は、
掘削地盤とトンネル覆工外周面との間に地盤よりも柔軟
で粘性及び弾性を有する振動エネルギー吸収層を設けた
ものであり、このような振動エネルギー吸収層としては
アスファルト乳剤とセメント、及び必要に応じてベント
ナイトやポリマー等の増粘剤を混在させて固化させた層
(以下常温水中硬化型アスファルトと称する)が望まし
い。
In order to achieve the above object, the tunnel structure of the present invention comprises
A vibration energy absorption layer that is softer, more viscous, and elastic than the ground is provided between the excavated ground and the outer circumferential surface of the tunnel lining.As such a vibration energy absorption layer, asphalt emulsion and cement, and if necessary Accordingly, a layer in which a thickening agent such as bentonite or a polymer is mixed and solidified (hereinafter referred to as room temperature water-curable asphalt) is desirable.

又、このようなトンネルの築造方法としては、シールド
掘削機によって地盤を掘削すると共に該シールド掘削機
のテール部後方に掘進に従ってセグメントを組立てるこ
とによりトンネル覆工を形成していく際に、シールド掘
削機のテール部の後端又はセグメントの適所から掘削地
盤と覆工外周面との隙間に常温硬化型アスファルトの裏
込材料を注入し、該裏込材料の固化によって地盤よりも
柔らかい振動エネルギー吸収層を形成することを特徴と
するものである。
In addition, as a method of constructing such a tunnel, shield excavation is performed when excavating the ground with a shield excavator and assembling segments behind the tail portion of the shield excavator according to the excavation to form a tunnel lining. A backing material of room temperature curing asphalt is injected into the gap between the excavated ground and the outer surface of the lining from the tail end of the machine tailor or in an appropriate place on the segment, and the vibration energy absorption layer softer than the ground by solidifying the backing material. Is formed.

〔作用〕[Action]

上記のように構成したトンネルの構造によれば、地震が
発生した場合、地盤が変位するが、その変動量に応じて
振動エネルギー吸収層が圧縮し、トンネル覆工に作用す
る地震動を減震させてトンネル覆工に発生する応力を低
下させる。
According to the structure of the tunnel configured as described above, when an earthquake occurs, the ground is displaced, but the vibration energy absorption layer is compressed according to the amount of fluctuation, reducing the earthquake motion that acts on the tunnel lining. Reduces the stress generated in the tunnel lining.

このような減震作用は、海底トンネルのように地質の異
なる層に亘って築造されたトンネルの場合において効果
的に行われ、両地層の変位量が異なってもこれらの両地
層間に亘って一連に設けた振動エネルギー吸収層により
両地層からの振動エネルギーが平均化されるように吸収
され、トンネル覆工の長さ方向に亘って発生する応力を
均一的に低下させて地層境界部における局部的な応力発
生をなくするものである。
Such a seismic reduction effect is effectively performed in the case of a tunnel constructed over layers of different geology, such as an undersea tunnel, and even if the amount of displacement of both layers is different, it will extend across both layers. The vibration energy absorption layers provided in series absorb the vibration energy from both formations so that they are averaged, and evenly reduce the stress generated along the length of the tunnel lining to locally reduce the stress at the boundary of formations. It eliminates the occurrence of specific stress.

又、トンネル断面の上部と下部とで地盤が急変する場所
においても同様な作用効果を奏するものである。
In addition, the same effect can be obtained even in a place where the ground changes suddenly between the upper part and the lower part of the tunnel cross section.

トンネルの外周部にこのような地盤よりも柔らかい振動
エネルギー吸収層を形成するには、トンネルを構築する
際に、シールド掘削機のテール部の後端又はセグメント
の適所から掘削地盤と覆工外周面との隙間に常温水中硬
化型アスファルトよりなる裏込材料を注入し、該裏込材
料の固化によって容易に形成でき、この際、セグメント
の外周と掘削地盤間をスペーサ部材によって所望間隔を
存した状態に保持し、この間隔部に上記裏込材料を注入
することによってトンネル覆工外周に均一な厚みを有す
る振動エネルギー吸収層を形成することができる。
In order to form a vibration energy absorption layer that is softer than such ground on the outer circumference of the tunnel, when constructing the tunnel, the excavated ground and the lining outer surface from the appropriate position of the tail end or segment of the shield excavator. It can be easily formed by injecting a backfill material consisting of room-temperature underwater-curing asphalt into the gap between and and solidifying the backfill material. And the backfilling material is injected into this space to form a vibration energy absorption layer having a uniform thickness on the outer circumference of the tunnel lining.

〔実施例〕〔Example〕

本発明の実施例を図面について説明すると、(1)は陸
地の地盤であって剛性の高い地質を有し、(2)は海底
部の軟弱地盤であって剛性の小さい堆積層から成ってい
る。
An embodiment of the present invention will be described with reference to the drawings. (1) is a ground on the ground having a high rigidity, and (2) is a soft ground on the seabed, which is composed of a sedimentary layer having a low rigidity. .

(3)は陸地の剛性地盤(1)から海底部の軟質地盤
(2)に亘って築造された海底トンネルで、その覆工
(4)の外周と地盤(1)(2)との間隙部に所望厚さ
を有する振動エネルギー吸収層(5)がトンネル(3)
の全長に亘って略均一な厚みで形成されてある。
(3) is an undersea tunnel constructed from the rigid ground (1) on land to the soft ground (2) on the seabed, and the gap between the outer circumference of the lining (4) and the ground (1) (2). The vibration energy absorption layer (5) having a desired thickness is formed in the tunnel (3).
Is formed with a substantially uniform thickness over the entire length thereof.

この振動エネルギー吸収層(5)は、地層(1)(2)
よりも柔らかい粘性及び弾性を有する材料からなり、こ
のような振動エネルギー吸収層としては、アスファルト
乳剤とセメント、及び、必要に応じてベントナイトやポ
リマー等の増粘剤を混在させてなる常温水中硬化型アス
ファルトの固化した層が好ましい。
This vibration energy absorption layer (5) is the formation (1) (2)
The vibration energy absorbing layer is made of a material having a softer viscosity and elasticity than that of the asphalt emulsion and cement, and if necessary, a thickening agent such as bentonite or polymer is mixed in a room temperature underwater curing type. A solidified layer of asphalt is preferred.

(6)はトンネルの掘削地盤とトンネル覆工外周面との
間の間隔部において、周方向及び長さ方向に所定間隔毎
に配設した複数個のスペーサ部材で、上記振動エネルギ
ー吸収層(5)を形成するための間隔を保持すると共に
地震時における地盤変位がトンネルに伝達される量を減
少させる目的で設けられてある。
(6) is a plurality of spacer members arranged at predetermined intervals in the circumferential direction and the length direction at intervals between the excavated ground of the tunnel and the outer peripheral surface of the tunnel lining. ) Is maintained and the amount of ground displacement during an earthquake is reduced to reduce the amount transmitted to the tunnel.

このスペーサ部材(6)は、トンネル覆工を形成するセ
グメント(4a)に内外周面間に螺通した前後一対の螺筒
(4b)と、該螺筒(4b)に内装したスプリング(図示せ
ず)の先端部に連結して該スプリングにより常時弾圧さ
れているピン(4c)と、該ピン(4c)(4c)間に架設状
態で固着した当接板(4d)とからなり、セグメント(4
a)の内側から螺筒(4b)を螺進させることにより当接
板(4d)を掘削地盤の内周壁面に押接させているもので
ある。
The spacer member (6) includes a pair of front and rear screw cylinders (4b) threaded between the inner and outer peripheral surfaces of a segment (4a) forming a tunnel lining, and a spring (not shown) installed in the screw cylinder (4b). The pin (4c) connected to the tip of the spring (4c) and constantly pressed by the spring, and the contact plate (4d) fixed between the pins (4c) and (4c) in the erected state. Four
The contact plate (4d) is pressed against the inner peripheral wall surface of the excavated ground by screwing the screw cylinder (4b) from the inside of (a).

このようなトンネルを築造するには、シールド掘削機
(7)によって例えば、陸地の剛性地盤(1)から海底
部の軟質地盤(2)に向かって掘進していくものである
が、シールド掘削機(7)による地盤の掘削と共にシー
ルド掘削機(7)のテール部内でセグメント(4a)(4
a)・・・(4a)を円環状に組立て、組立てたセグメン
トに反力を受止させてシールド掘削機(7)を推進、掘
削させ、この掘進により組立てたセグメントはテール部
内から掘削地盤側に露出する。このように、セグメント
(4a)の組立てとシールド掘削機(7)の掘進とを繰り
返し行って掘削地盤に組立てセグメントによるトンネル
覆工(4)を形成していくものである。
To construct such a tunnel, for example, a shield excavator (7) is used to excavate from a rigid ground (1) on land to a soft ground (2) on the seabed. While excavating the ground by (7), segments (4a) (4
a) ・ ・ ・ (4a) is assembled into an annular shape, the assembled segment receives the reaction force and the shield excavator (7) is propelled and excavated, and the segment assembled by this excavation is from the tail to the excavated ground side. Exposed to. In this way, the assembly of the segment (4a) and the excavation of the shield excavator (7) are repeated to form the tunnel lining (4) by the assembled segment on the excavated ground.

この際、シールド掘削機(7)の前進によってテール部
内から掘削地盤側に位置させられたセグメント(4a)の
外周面と掘削地盤間には隙間が生じるので、セグメント
(4a)に配設している複数個の螺筒(4b)をセグメント
(4a)の内側から螺進させることにより当接板(4d)を
掘削地盤の内周壁面に押接させ、セグメント(4a)の外
周面と掘削地盤間に所定の間隔(8)を設けた状態で円
環状に組立てたセグメント(4a)を固定する。
At this time, due to the forward movement of the shield excavator (7), a gap is created between the outer peripheral surface of the segment (4a) located on the excavation ground side from the tail portion and the excavation ground, so that the segment (4a) should be installed on the segment (4a). The contact plate (4d) is pressed against the inner peripheral wall surface of the excavated ground by screwing the plurality of screw cylinders (4b) from the inside of the segment (4a), and the outer peripheral surface of the segment (4a) and the excavated ground. The segment (4a) assembled in an annular shape is fixed with a predetermined space (8) provided therebetween.

次いで、該セグメント(4a)の適所に予め内外周面間に
亘って貫設しておいた注入孔(9)(9)から前記掘削
地盤との間隔部(8)に裏込材料として常温水中硬化型
アスファルト(22)を注入する。
Then, as a backfill material, room temperature water is used as a backfill material from the injection hole (9) (9) that has been previously provided in a proper place in the segment (4a) so as to extend between the inner and outer peripheral surfaces to the space (8) with the excavated ground. Inject hardening asphalt (22).

この常温水中硬化型アスファルト(22)は、乳化剤を含
む水にアスファルトを分散させたアスファルト乳剤(1
0)にセメント(14)を混合し、これに増粘剤(17)と
して高吸水性ポリマーを加えて固化したもので、固化後
は柔らかい弾性を有し、且つ適度の粘性を有する層を形
成するものである。
This room-temperature water-curable asphalt (22) is an asphalt emulsion (1 that has asphalt dispersed in water containing an emulsifier.
Cement (14) is mixed with 0), and a super absorbent polymer is added to this as a thickener (17) to solidify. After solidification, it forms a layer with soft elasticity and moderate viscosity. To do.

このような層を形成する手段としては、第2図に示すよ
うに、アスファルト乳剤(10)を貯溜タンク(11)内か
ら、セメント(14)を貯蔵タンク(13)からそれぞれ必
要量、混合タンク(12)に供給し、該タンク(12)内に
配置した攪拌翼(15)を回転させることによりアスファ
ルト乳剤(10)とセメント(14)を混合し、均一に混合
した後、上記注入孔(9)(9)に向けて圧送ポンプ
(16)で配管(23)に送り出す。一方、増粘剤(17)を
貯溜タンク(18)から必要量取り出し、圧送ポンプ(1
9)で圧送してY字管(20)の位置で前記配管(23)内
に供給し、アスファルト乳剤(10)とセメント(14)の
混合物に混合させる。さらに、混合促進機(21)で均一
に混合し、上記注入孔(9)(9)からセグメントと掘
削地盤との間隔部(8)に圧送する手段を採用すること
ができる。
As a means for forming such a layer, as shown in FIG. 2, the required amount of asphalt emulsion (10) from the storage tank (11) and cement (14) from the storage tank (13) and the mixing tank, respectively. The asphalt emulsion (10) and the cement (14) are mixed by supplying to (12) and rotating a stirring blade (15) arranged in the tank (12), and after uniformly mixing, the injection hole ( 9) The pressure pump (16) is sent to the pipe (23) toward (9). On the other hand, the required amount of thickener (17) is taken out from the storage tank (18), and the pressure pump (1
It is pressure-fed by 9) and is fed into the pipe (23) at the position of the Y-tube (20) and mixed with the mixture of asphalt emulsion (10) and cement (14). Furthermore, means for uniformly mixing with a mixing accelerator (21) and forcing the mixture from the injection holes (9) (9) to the space (8) between the segment and the excavated ground can be employed.

なお、振動エネルギー吸収層(5)は、セグメント(4
a)に設けている注入孔(9)からの間隔部(8)への
供給により形成する以外に、シールド掘削機のテール部
の後端部分に間隔部(8)に向かって開口した注入孔
(図示せず)を設けておき、この注入孔から間隔部
(8)に裏込材料を圧送することによって形成してもよ
い。
The vibration energy absorption layer (5) is composed of the segments (4
An injection hole opened toward the gap (8) at the rear end of the tail part of the shield excavator, in addition to being formed by supplying the gap (8) from the injection hole (9) provided in a). (Not shown) may be provided, and the backfill material may be pressure-fed from the injection hole to the gap portion (8).

こうしてセグメントにより形成されたトンネル覆工
(4)の外周面と掘削地盤間の間隔部(8)に供給され
た常温水中硬化型アスファルト(22)はアスファルト乳
剤(10)とセメント(14)との反応によって徐々に固化
し、上記振動エネルギー吸収層(5)を形成するもので
ある。
The room temperature underwater hardening type asphalt (22) supplied to the space (8) between the outer peripheral surface of the tunnel lining (4) thus formed by the segment and the excavated ground is composed of the asphalt emulsion (10) and the cement (14). The reaction energy is gradually solidified to form the vibration energy absorption layer (5).

トンネル覆工(4)の外周をこのような振動エネルギー
吸収層(5)によって全面的に被覆しておくと、地震が
生じた場合には、上記剛性地盤(1)と軟質地盤(2)
との変位量の差(ひずみ)を吸収すると共に振動エネル
ギーを吸収してトンネルに伝達される地震動を減じさせ
ることができるものである。
If the outer circumference of the tunnel lining (4) is entirely covered with such a vibration energy absorption layer (5), in the event of an earthquake, the rigid ground (1) and the soft ground (2) will be described.
It is possible to absorb the difference in the amount of displacement (strain) and to absorb the vibration energy and reduce the seismic motion transmitted to the tunnel.

なお、振動エネルギー吸収層(5)は、剛性地盤(1)
と軟質地盤(2)間に設けたトンネルに限定されること
なく、このようなトンネル以外、例えば、剛性地盤
(1)中のトンネルや軟質地盤(2)中のトンネルにお
いても、或いは、トンネル断面の上部と下部で地盤が急
変する場所でも、地震に対する減震効果を発揮すること
ができるものである。
In addition, the vibration energy absorption layer (5) is a rigid ground (1).
Is not limited to the tunnel provided between the soft ground (2) and the soft ground (2), and other than such a tunnel, for example, in a tunnel in the rigid ground (1) or a tunnel in the soft ground (2), or a tunnel cross section. Even in places where the ground changes suddenly above and below, it is possible to exert a seismic reduction effect against earthquakes.

〔発明の効果〕〔The invention's effect〕

以上のように本発明のトンネル構造によれば、掘削地盤
とトンネル覆工外周面との間に地盤よりも柔軟で粘性及
び弾性を有する振動エネルギー吸収層を設けているの
で、地震が発生して地盤が変位した場合、その変動量に
応じて振動エネルギー吸収層が圧縮し、トンネル覆工に
作用する震動を減震させてトンネル覆工に発生する応力
を低下させることができ、地震に対して安全なトンネル
を提供することができるものであり、特に、海底トンネ
ルのように地質の異なる層に亘って築造されたトンネル
の場合においては、両地層の変位量が異なってもこれら
の両地層間に亘って一連に設けた振動エネルギー吸収層
により両地層からの振動エネルギーを平均的に吸収し、
トンネル覆工の長さ方向に亘って発生する応力を均一的
に低下させて地層境界部における局部的な応力発生をな
くすることができるものである。
As described above, according to the tunnel structure of the present invention, since the vibration energy absorption layer which is softer, more viscous and elastic than the ground is provided between the excavated ground and the outer circumferential surface of the tunnel lining, an earthquake occurs. When the ground is displaced, the vibration energy absorption layer is compressed according to the amount of fluctuation, and the vibration acting on the tunnel lining can be dampened to reduce the stress generated in the tunnel lining. It can provide a safe tunnel, especially in the case of a tunnel built over different geological layers such as an undersea tunnel, even if the displacement amount of both geological layers is different. By absorbing the vibration energy from both formations on average by the vibration energy absorption layer provided in series over,
The stress generated over the length of the tunnel lining can be uniformly reduced to eliminate the local stress generation at the boundary of the stratum.

又、このようなトンネルの築造方法としては、シールド
掘削機によって地盤を掘削すると共に該シールド掘削機
のテール部後方に掘進に従ってセグメントを組立てるこ
とによりトンネル覆工を形成していく際に、シールド掘
削機のテール部の後端又はセグメントの適所から掘削地
盤と覆工外周面との隙間に常温水中硬化型アスファルト
の裏込材料を注入し、該裏込材料の固化によって地盤よ
りも柔らかい振動エネルギー吸収層を形成するものであ
るから、トンネルを築造しながら容易に振動エネルギー
吸収層を形成することができるものである。
In addition, as a method of constructing such a tunnel, shield excavation is performed when excavating the ground with a shield excavator and assembling segments behind the tail portion of the shield excavator according to the excavation to form a tunnel lining. The room temperature water-curable asphalt backing material is injected into the gap between the excavated ground and the outer surface of the lining from the tail end of the machine or in an appropriate position on the segment, and the solidification of the backing material absorbs vibration energy that is softer than the ground. Since the layer is formed, it is possible to easily form the vibration energy absorption layer while constructing the tunnel.

このような振動エネルギー吸収層としては、常温水中硬
化型アスファルトの層を採用することにより、減震を効
果的に行わせることができる適度な弾性と粘性とを有す
る層を形成することができ、従って、クラックが入るこ
とがないから地下水がトンネル内に漏水する虞れもなく
することができ、さらに、掘削地盤とトンネル覆工外周
面との間の複数個所に弾性スペーサ部材を介在させるこ
とによって、トンネル覆工外周に均一な厚みを有する振
動エネルギー吸収層を形成することができる。
As such a vibration energy absorption layer, by adopting a layer of room-temperature water-curable asphalt, it is possible to form a layer having appropriate elasticity and viscosity that can effectively reduce vibration. Therefore, since there is no crack, it is possible to prevent the groundwater from leaking into the tunnel. Furthermore, by interposing elastic spacer members at a plurality of places between the excavated ground and the outer surface of the tunnel lining. The vibration energy absorption layer having a uniform thickness can be formed on the outer circumference of the tunnel lining.

【図面の簡単な説明】[Brief description of drawings]

図面は本発明の実施例を示すもので、第1図はトンネル
の簡略縦断側面図、第2図はシールド掘削機によってト
ンネルを築造している状態の縦断側面図、第3図及び第
4図は第2図A−A線、B−B線における縦断正面図で
ある。 (1)(2)…地盤、(3)…トンネル、(4)…トン
ネル覆工、(5)…振動エネルギー吸収層、(6)…ス
ペーサ部材、(7)…シールド掘削機、(8)…間隔
部、(10)…アスファルト乳剤、(14)…セメント。
The drawings show an embodiment of the present invention. FIG. 1 is a simplified vertical sectional side view of a tunnel, and FIG. 2 is a vertical sectional side view of a state in which a tunnel is being built by a shield excavator, FIG. 3 and FIG. FIG. 2 is a vertical sectional front view taken along the lines AA and BB in FIG. (1) (2) ... Ground, (3) ... Tunnel, (4) ... Tunnel lining, (5) ... Vibration energy absorption layer, (6) ... Spacer member, (7) ... Shield excavator, (8) … Spacing, (10)… asphalt emulsion, (14)… cement.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 森吉 昭博 北海道札幌市豊平区清田二条1丁目9番地 10号 (72)発明者 竹内 幹雄 大阪府大阪市阿倍野区松崎町2丁目2番2 号 株式会社奥村組内 (72)発明者 井戸田 芳昭 大阪府大阪市阿倍野区松崎町2丁目2番2 号 株式会社奥村組内 (72)発明者 大野 健一郎 大阪府大阪市阿倍野区松崎町2丁目2番2 号 株式会社奥村組内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Akihiro Moriyoshi 1-9-10 Kiyota Nijo, Toyohira-ku, Sapporo-shi, Hokkaido (72) Inventor Mikio Takeuchi 2-2-2 Matsuzaki-cho, Abeno-ku, Osaka-shi, Osaka Okumura Group (72) Inventor Yoshiaki Iwada 2-2-2 Matsuzaki-cho, Abeno-ku, Osaka City, Osaka Prefecture Okumura Group Inc. (72) Inventor Kenichiro Ohno 2-2 Matsuzaki-cho, Abeno-ku, Osaka City, Osaka Prefecture Co., Ltd. Okumura group

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】掘削地盤とトンネル覆工外周面との間にア
スファルト乳剤とセメントを混在させて固化させた振動
エネルギー吸収層を設けてなることを特徴とするトンネ
ル。
1. A tunnel characterized in that a vibration energy absorption layer is provided between the excavated ground and the outer peripheral surface of the tunnel lining, and a solidified mixture of asphalt emulsion and cement is provided.
【請求項2】掘削地盤とトンネル覆工外周面との間にア
スファルト乳剤とセメントと増粘剤を混在させて固化さ
せた振動エネルギー吸収層を設けてなることを特徴とす
るトンネル。
2. A tunnel characterized in that a vibration energy absorbing layer is provided between the excavated ground and the outer peripheral surface of the tunnel lining, and a solidified mixture of asphalt emulsion, cement and thickener is provided.
【請求項3】シールド掘削機によって地盤を掘削すると
共に該シールド掘削機のテール部後方に掘進に従ってセ
グメントを組立てることによりトンネル覆工を形成して
いくトンネルの築造方法において、シールド掘削機のテ
ール部の後端又はセグメントの適所から掘削地盤と覆工
外周面との隙間にアスファルト乳剤とセメントを混在さ
せた常温水中硬化型アスファルトよりなる裏込材料を注
入し、該裏込材料の固化によって地盤よりも柔らかい振
動エネルギー吸収層を形成することを特徴とするトンネ
ルの築造方法。
3. A method of constructing a tunnel, wherein a tunnel lining is formed by excavating the ground by a shield excavator and assembling segments behind the tail portion of the shield excavator according to the excavation. Inject a backing material consisting of asphalt emulsion and cement mixed normal temperature underwater curing type asphalt in the gap between the excavated ground and the outer surface of the lining from the appropriate position of the rear end or segment, and solidify the backing material to remove it from the ground. A method of constructing a tunnel characterized by forming a soft vibration energy absorption layer.
JP2043556A 1990-02-24 1990-02-24 Tunnel and tunnel construction method Expired - Lifetime JPH0791946B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2043556A JPH0791946B2 (en) 1990-02-24 1990-02-24 Tunnel and tunnel construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2043556A JPH0791946B2 (en) 1990-02-24 1990-02-24 Tunnel and tunnel construction method

Publications (2)

Publication Number Publication Date
JPH03247896A JPH03247896A (en) 1991-11-06
JPH0791946B2 true JPH0791946B2 (en) 1995-10-09

Family

ID=12667027

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2043556A Expired - Lifetime JPH0791946B2 (en) 1990-02-24 1990-02-24 Tunnel and tunnel construction method

Country Status (1)

Country Link
JP (1) JPH0791946B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5294109B2 (en) * 2008-02-08 2013-09-18 清水建設株式会社 Radioactive waste disposal tunnel
CN104806265B (en) * 2015-03-31 2017-01-25 辽宁工程技术大学 A method for anti-shock ground pressure of all-coal roadway
CN111927492A (en) * 2020-09-17 2020-11-13 成都理工大学 Tunnel energy-absorbing fabricated lining structure and construction method thereof
CN114810127B (en) * 2022-05-06 2023-04-14 中国水利水电科学研究院 Composite lining structure of tunnel surrounding rock with internal repair ability

Also Published As

Publication number Publication date
JPH03247896A (en) 1991-11-06

Similar Documents

Publication Publication Date Title
CN107165645B (en) Major diameter slurry shield tunnel starts entrance to a cave sealing device
JP4955621B2 (en) Joining method between shield tunnel and shaft
JPH0791946B2 (en) Tunnel and tunnel construction method
JPH0663433B2 (en) Tunnel structure
JP3273495B2 (en) Flexible joint for earthquake resistance of shield segment and its construction method
Grunicke et al. Pre‐stressed tunnel lining–pushing traditional concepts to new frontiers/Neue Grenzen für passiv vorgespannte Druckstollenauskleidungen
JP3392575B2 (en) Connection method of adjacent shield tunnel and construction method of underground space
JP3499005B2 (en) Tail seal structure and shield method
CN202039370U (en) Composite anchor pole foundation pit enclosing structure
JP2001011849A (en) Soil liquefaction prevention structure, its construction method and ground improvement method
JPH0821183A (en) Method for starting tunnel excavation
Finamore et al. TBM steering difficulties. Innovative equipments: Strand jack and self retaining systems
CN221322431U (en) A flexible connection structure between shield tunnel and working shaft
JPH06322748A (en) Construction method of underground continuous wall
JP3583020B2 (en) Underground barrier plate construction method
JP2008202344A (en) Tunnel support structure and tunnel support method
JP2607915B2 (en) Starter construction structure of shield machine
JPH0216440B2 (en)
JP2002004763A (en) Earthquake-resisting elastic sealing construction method of entrance
JP2898577B2 (en) Starting shaft of shield machine and start method of shield machine
JPS637491A (en) Method of consolidation construction of base rock
CN118774841A (en) A dislocation-resistant joint for a TBM tunnel of an oil and gas pipeline crossing an active fault zone
JP2018012984A (en) Open shield method and concrete box used for it
GB2192419A (en) Method of producing a pile or a diaphragm wall
CN120759609A (en) Construction methods for shock-absorbing support structures, tunnel segments, and lining structures

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101009

Year of fee payment: 15

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101009

Year of fee payment: 15