Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0798251B2 - Method for detecting galling of pressure plunger in pressure casting machine - Google Patents
[go: Go Back, main page]

JPH0798251B2 - Method for detecting galling of pressure plunger in pressure casting machine - Google Patents

Method for detecting galling of pressure plunger in pressure casting machine

Info

Publication number
JPH0798251B2
JPH0798251B2 JP6980890A JP6980890A JPH0798251B2 JP H0798251 B2 JPH0798251 B2 JP H0798251B2 JP 6980890 A JP6980890 A JP 6980890A JP 6980890 A JP6980890 A JP 6980890A JP H0798251 B2 JPH0798251 B2 JP H0798251B2
Authority
JP
Japan
Prior art keywords
plunger
pressure
pressurizing
galling
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP6980890A
Other languages
Japanese (ja)
Other versions
JPH03275264A (en
Inventor
直身 室谷
浩 長谷川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ube Corp
Original Assignee
Ube Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ube Industries Ltd filed Critical Ube Industries Ltd
Priority to JP6980890A priority Critical patent/JPH0798251B2/en
Publication of JPH03275264A publication Critical patent/JPH03275264A/en
Publication of JPH0798251B2 publication Critical patent/JPH0798251B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Injection Moulding Of Plastics Or The Like (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、金型のキャビティ内に溶湯を射出装置により
射出し、加圧プランジャを有した加圧装置により金型内
の溶湯を加圧して鋳造加工品を得るガイキャストマシ
ン、インジェクションモールドマシン等の加圧鋳造機に
おける改良に関し、特に、コンピューター制御により上
記加圧装置の加圧プランジャによる加圧作業をフィード
バック制御する場合に、自動的に加圧プランジャのかじ
りを検出して、マシン本体または加圧プランジャの異常
を警報し得るようにした加圧鋳造機における加圧プラン
ジャのかじり検出方法に関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention is to inject molten metal into a cavity of a mold by an injection device, and pressurize the molten metal in the mold by a pressurizing device having a pressure plunger. For improvement in pressure casting machines such as guy cast machines and injection molding machines to obtain casting products, especially when feedback control of the pressure work by the pressure plunger of the above-mentioned pressure device by computer control is performed automatically. BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for detecting galling of a pressure plunger in a pressure casting machine, which can detect galling of the pressure plunger to warn of an abnormality of the machine body or the pressure plunger.

〔従来技術〕[Prior art]

金型装置のキャビティ内に溶湯を射出装置の射出プラン
ジャにより射出し、他方、加圧プランジャを有した加圧
装置により金型内に射出された溶湯に加圧による押湯効
果を与えながら、加圧プランジャ内に冷却水を流入、通
過させて溶湯を中心部側から冷却効果を与えて加工品内
部に湯ひけによる巣の発生を防止した加圧鋳造法を実現
する加圧鋳造機は既に周知である。
The molten metal is injected into the cavity of the mold device by the injection plunger of the injection device, while the molten metal injected into the mold by the pressure device having a pressure plunger is applied while pressing the molten metal. A pressure casting machine that realizes a pressure casting method that allows cooling water to flow in and out of the pressure plunger to give a cooling effect to the molten metal from the center side and prevents the formation of cavities due to sink marks inside the workpiece is already known. Is.

また、金型内への溶湯射出用の射出装置と金型内に射出
された溶湯の加圧用加圧装置を有した鋳造機において、
加圧装置の加圧プランジャの移動ストロークを同プラン
ジャの作動開始時点からの時間を基準にして経時的にコ
ンピューターを用いて目標軌跡として設定し、その目標
軌跡に倣うように制御し、以て加圧プランジャの移動ス
トロークの最適化を図り、鋳造精度の向上を図った加圧
鋳造機とその制御方法も既に本出願人により特願昭63−
244552号として提案されている。
Further, in a casting machine having an injection device for injecting the molten metal into the mold and a pressurizing device for pressurizing the molten metal injected into the mold,
The moving stroke of the pressure plunger of the pressure device is set as a target trajectory using a computer over time based on the time from the start of the operation of the plunger, and the target trajectory is controlled to follow the target trajectory. A pressure casting machine and a control method thereof, in which the movement stroke of the pressure plunger is optimized to improve the casting accuracy, have already been filed by the applicant of the present application in Japanese Patent Application No. 63-
Proposed as 244552.

一方、ガイキャストマシンにおいて、溶湯を供給された
射出装置の射出スリーブから射出プランジャにより該溶
湯を金型装置のキャビティ内の射出する工程で、射出プ
ランジャの先端チップのかじりを検出することにより、
溶湯射出工程における射出プランジャチップの波打ち動
作に伴うガスの巻き込み、溶湯温度の低下を防止するよ
うに方法は、例えば、本出願人による特公昭60−26626
号公報等に開示されている。この公知のプランジャチッ
プのかじり検出方法では射出プランジャの圧力変化を圧
力検出器で常時、検出し、その検出された圧力変化の微
分値を微分器により求め、比較回路で設定値と比較して
プランジャチップのかじり度合いを検出し、必要に応じ
て警報を発するようにした検出方法が開示されている。
On the other hand, in the guy cast machine, by detecting the galling of the tip of the injection plunger in the step of injecting the molten metal from the injection sleeve of the injection device supplied with the molten metal by the injection plunger into the cavity of the mold device,
A method for preventing gas entrainment and lowering of the molten metal temperature due to the waviness of the injection plunger tip in the molten metal injection process is disclosed in, for example, Japanese Patent Publication No.
It is disclosed in Japanese Patent Publication No. In this known plunger chip galling detection method, the pressure change of the injection plunger is constantly detected by the pressure detector, the differential value of the detected pressure change is obtained by the differentiator, and it is compared with the set value by the comparison circuit to make the plunger A detection method is disclosed in which the degree of chipping of a chip is detected and an alarm is issued if necessary.

〔発明が解決しょうとする課題〕[Problems to be solved by the invention]

然しながら、上述した溶湯射出をおこなう射出装置のプ
ランジャチップにおけるかじり検出を行うためには圧力
検出器、微分器、比較器等の個々のハード回路手段を新
規に加圧鋳造機に設ける必要があり、複雑化する問題が
ある。また、上述のように、金型装置のキャビティ内に
射出された溶湯に対して押湯効果を与える加圧プランジ
ャは、その動作速度が、射出プランジャの動作速度2〜
3(m/sec)よりもかなり遅い速度で、0.5〜1(m/se
c)程度であるから、公知ではないが、最近、パーソナ
ルコンピューター等を用いて、その動作をフィードバッ
ク制御する方式が採られるように成って来ている。従っ
て、コンピューター手段を有効に利用して加圧装置の加
圧プランジャにおけるかじりを検出方法の開発が要望さ
れている。
However, in order to perform the galling detection in the plunger chip of the injection device that performs the above-mentioned molten metal injection, it is necessary to newly provide the pressure casting machine with individual hard circuit means such as a pressure detector, a differentiator, and a comparator. There are complications. Further, as described above, the operating speed of the pressurizing plunger that exerts a feeder effect on the molten metal injected into the cavity of the mold device is 2 to the operating speed of the injection plunger.
The speed is much slower than 3 (m / sec) and 0.5 to 1 (m / se
Since it is about c), it is not publicly known, but recently, a method of using a personal computer or the like to feedback-control its operation has been adopted. Therefore, there is a demand for development of a method for detecting galling in a pressure plunger of a pressure device by effectively utilizing computer means.

〔課題を解決するための手段〕[Means for Solving the Problems]

本発明は、加圧鋳造機における加圧プランジャの動作量
ないしストローク量を予め作動開始時間からの経時的目
標軌跡としてパーソナルコンピューター又はマイクロコ
ンピューターによって構成した加圧プランジャの制御手
段に設定し、この目標軌跡を倣うように加圧プランジャ
の実際のストローク量をフィードバック制御すると共
に、該目標軌跡の遂行に要する経過時間と実際のストロ
ーク量の軌跡の遂行に要した経過時間との大小比較によ
り実際のストローク軌跡の遂行に要した時間が目標軌跡
のそれに対して大きいときは、加圧プランジャの加圧押
湯動作と戻り動作とにかじりを原因として円滑なストロ
ーク動作が達成できなかったものと判断し得ることを加
圧鋳造機に就き、実験的に確認し、かじり検出を行うよ
うにしたものである。
In the present invention, the operation amount or stroke amount of the pressure plunger in the pressure casting machine is set in advance as a time-dependent target locus from the operation start time in the control means of the pressure plunger configured by a personal computer or a microcomputer, and this target is set. The actual stroke amount of the pressurizing plunger is feedback-controlled so as to follow the trajectory, and the actual stroke amount is compared by comparing the elapsed time required to perform the target trajectory with the elapsed time required to perform the trajectory of the actual stroke amount. If the time required to execute the trajectory is longer than that of the target trajectory, it can be determined that a smooth stroke operation could not be achieved due to the galling of the pressurizing and pressing operation and the returning operation of the pressurizing plunger. This was done by using a pressure casting machine and confirming it experimentally to detect galling.

すなわち、本発明によれば、射出装置の作用によって金
型内に溶湯を充填すると共に前記射出装置と対向した加
圧装置の加圧プランジャを突出ストロークさせて金型内
の溶湯を加圧する加圧鋳造機における加圧プランジャの
かじり検出方法において、上記加圧プランジャの金型キ
ャビティ内への突出及び戻りのストローク量を同加圧プ
ランジャの作動開始時点からの目標経時軌跡としてを予
め設定し、上記目標経時軌跡に倣って加圧プランジャが
加圧動作する実際のストローク量を前記加圧装置の駆動
回路を介してフィードバック制御し、加圧プランジャの
上記目標経時軌跡と実際のストローク量の経時軌跡とを
対比し、前者の目標経時軌跡の所要時間と後者の実際の
経時軌跡の所要時間との大小判別から加圧プランジャの
突出、又は後退動作におけるかじりの有無を検出するよ
うにした加圧鋳造機における加圧プランジャのかじり検
出方法を提供するものである。
That is, according to the present invention, the pressurization for filling the molten metal in the mold by the action of the injection device and for pressing the molten metal in the mold by causing the pressurizing plunger of the pressurizing device facing the injection device to make a protruding stroke. In the galling detection method of the pressure plunger in the casting machine, the stroke amount of the protrusion and the return of the pressure plunger into the mold cavity is preset as a target time course from the operation start time of the pressure plunger, and The actual stroke amount of the pressurizing plunger that follows the target temporal locus is feedback-controlled through the drive circuit of the pressurizing device, and the target temporal locus of the pressure plunger and the actual stroke amount temporal locus are obtained. By comparing the time required for the former target time course and the time required for the latter actual time course, the pressure plunger protrudes or retracts. It is intended to provide a galling detection method of the pressure plunger in the casting machines to detect the presence or absence of galling in.

なお、実質的には、上記加圧プランジャの実際の経時軌
跡の時間が、上記目標軌跡の所要時間より大きいときに
かじり検出の警報信号を発するようにする。
It should be noted that, in effect, when the time of the actual trajectory of the pressurizing plunger is longer than the time required for the target trajectory, a gall detection warning signal is issued.

また、上記加圧プランジャの実際の経時軌跡の時間が、
上記目標軌跡の所要時間より大きい回数が所定回数、連
続したとき、かじり検出の警報信号を発するようにした
も良い。
Also, the time of the actual time course of the pressure plunger is
When the number of times longer than the required time of the target locus continues for a predetermined number of times, an alarm signal for galling detection may be issued.

或いは、上記加圧プランジャの実際の経時軌跡の時間
が、目標軌跡の所要時間より大きい場合にその時間差が
所定値以上のときに、かじり検出の警報信号を発するよ
うにしても良い。
Alternatively, when the time of the actual trajectory of the pressurizing plunger is longer than the required time of the target trajectory, a galling detection alarm signal may be issued when the time difference is a predetermined value or more.

〔作用〕[Action]

上述のように、加圧鋳造過程に加圧プランジャの作動開
始時間からのストローク量に就いて、目標経時軌跡の遂
行における所要時間と後者の実際の経時軌跡の所要時間
との大小判別を行い、後者が前者に対して所定時間以上
大きかったり、或いは何度も繰り返して後者が大きくな
る現象が発生しているときは、加圧プランジャが金型装
置を貫通して同型内のキャビティに充填された溶湯中に
突出し、後退する過程でかじりを生じているとしてコン
ピューターから成る加圧プランジャ制御手段により検出
するもので、この検出に応じて警報発信を行うことがで
きるのである。なお、本発明は、加圧プランジャに就
き、コンピューターから成る加圧プランジャ制御手段に
より、同プランジャの経時ストローク量をフィードバッ
ク制御する場合に並行してかじり検出を行うが、溶湯を
金型キャビティ内に射出する射出プランジャの低速域と
高速域における突出動作及び後退動作を同じくコンピュ
ーターから成る制御手段で予め目標軌跡を設定して該目
標軌跡に倣うように追従させる制御を行うときは、上記
同様に射出プランジャ又はその先端チップの動作におけ
るかじり検出を行うように構成することも可能であるこ
とは言うまでもない。以下、本発明を添付図面に示す実
施例に基づいて更に詳細に説明する。
As described above, regarding the stroke amount from the operation start time of the pressure plunger in the pressure casting process, the size of the time required for performing the target time course and the time required for the latter actual time course is determined, When the latter is larger than the former for a predetermined time or more, or when the latter is repeatedly enlarged many times, the pressure plunger penetrates the mold device and is filled in the cavity in the mold. It is detected by the pressurizing plunger control means composed of a computer that the galling occurs in the process of protruding into the molten metal and retreating, and an alarm can be issued in response to this detection. In the present invention, the pressurizing plunger is controlled by the pressurizing plunger control means including a computer in parallel with the feedback control of the stroke amount of the plunger. When controlling the projecting and retracting operations of the injection plunger to eject in the low speed range and the high speed range by setting the target locus in advance by the control means also composed of a computer and following the target locus so as to follow the target locus, It goes without saying that it is also possible to configure so as to detect galling in the operation of the plunger or its tip. Hereinafter, the present invention will be described in more detail with reference to the embodiments shown in the accompanying drawings.

〔実施例〕〔Example〕

第1図は、本発明による加圧プランジャのかじり検出方
法の原理を説明するグラフ図、第2図は、本発明に係る
かじり検出方法が適用される加圧鋳造機の要部の構成を
示したブロック図、第3図は加圧プランジャ制御手段の
カウンター機能を利用して警報発信を行う場合のフロー
チャートである。
FIG. 1 is a graph for explaining the principle of the galling detection method for a pressure plunger according to the present invention, and FIG. 2 shows the configuration of the main part of a pressure casting machine to which the galling detection method according to the present invention is applied. A block diagram and FIG. 3 are flow charts when an alarm is issued by using the counter function of the pressurizing plunger control means.

先ず、第2図を参照すると、金型装置10は、上下に相対
的に開閉可能な上型12および下型14と、上記上型12、下
型14の上下方向の開閉軸線に対して側方から開閉動作す
る中子16とを具備して構成されている。勿論、第2図は
図示されていない型締め機構により金型装置10が型締め
されている状態を示している。これらの上型12、下型1
4、中子16により、鋳造空間であるキャビティ18が形成
され、同キャビティ18には、射出装置20の射出プランジ
ャ22及びプランジャチップ22aの上昇により、射出スリ
ーブ22a内に予め供給された溶湯26が射出され、同キャ
ビティ18を充填する。射出装置20に対する上記溶湯の供
給は、同射出装置20が下方に後退した位置にあるとき、
その後退位置で更に側方に傾け、射出スリーブ22a内に
溶湯供給器により供給する構成等が一般に設けられてい
る。上記射出プランジャ22に対向して、上型12の上方部
には加圧装置の加圧プランジャ30が摺動自在に、しか
も、キャビティ18内に突出可能に配置されている。この
加圧プランジャ30は、図示されていない可動盤に取付け
られている加圧シリンダ28のピストン28cに連結されて
いる。加圧プランジャ30の先端部は、金型キャビティ18
のゲートシール位置、つまり、下型14の中央孔口に侵入
開始する位置まで突出可能に設けられている。加圧シリ
ンダ28の作動は、油圧源34から供給される圧力油を方向
切換弁36を介してシリンダ室28a又は28bに供給すること
により、起動される。このとき、戻り油はタンク38内に
戻る。すなわち、方向切換弁36のソレノイドSOL-Aを励
磁して、油圧源34の圧油を油路42aを経由して加圧シリ
ンダ28の一方のヘッド室28aに導き、同時に、ロッド室2
8bの作動油を油路28bを経てタンク38へ解放すれば、ピ
ストン28cは前進し、加圧プランジャ30の先端部は図示
の如く、金型装置10のキャビティ18内に突出する。ま
た、逆に方向切換弁36のソレノイドSOL-Bを励磁すれ
ば、上記と反対に加圧シリンダ28のピストン28cが上昇
し、加圧プランジャ30の先端部はキャビティ18内から上
型12内に収納されるように戻り動作する。油圧源34の圧
力は、電磁比例自動圧力弁から成る電磁リリーフ弁40に
より、制御し得るように構成されている。つまり、電磁
リリーフ弁40への入力電気信号の大きさに応じて油圧源
34からの圧力リリーフを制御し、以て加圧プランジャ30
の突出圧力を制御できるのである。さて、加圧シリンダ
28のピストン28c、つまり、加圧プランジャ30がキャビ
ティ18に対して突出又は後退する際のストローク位置、
又はストローク量は、例えば、ポテンショメータから成
る位置形成器32で検出可能に構成され、その位置に応じ
て電気信号を出力し得るように成っている。
First, referring to FIG. 2, the mold device 10 includes an upper mold 12 and a lower mold 14 which can be relatively opened and closed relative to each other, and a vertical opening / closing axis of the upper mold 12 and the lower mold 14. And a core 16 that opens and closes from one side. Of course, FIG. 2 shows a state where the mold apparatus 10 is clamped by a mold clamping mechanism (not shown). These upper mold 12, lower mold 1
4, the core 16 forms a cavity 18 which is a casting space, and the molten metal 26 previously supplied into the injection sleeve 22a by the ascent of the injection plunger 22 and the plunger tip 22a of the injection device 20 is formed in the cavity 18. It is injected and fills the same cavity 18. The molten metal is supplied to the injection device 20 when the injection device 20 is at the position retracted downward,
In the retracted position, a structure is generally provided in which the molten metal is supplied to the inside of the injection sleeve 22a by tilting further to the side. A pressure plunger 30 of a pressure device is slidably disposed on the upper portion of the upper mold 12 so as to face the injection plunger 22 and can protrude into the cavity 18. The pressure plunger 30 is connected to a piston 28c of a pressure cylinder 28 attached to a movable plate (not shown). The tip of the pressure plunger 30 is
It is provided so as to be able to project to the gate seal position, that is, the position where it starts entering the center hole of the lower mold 14. The operation of the pressurizing cylinder 28 is started by supplying the pressure oil supplied from the hydraulic pressure source 34 to the cylinder chamber 28a or 28b via the direction switching valve 36. At this time, the return oil returns to the tank 38. That is, the solenoid SOL-A of the direction switching valve 36 is excited to guide the pressure oil of the hydraulic pressure source 34 to the one head chamber 28a of the pressurizing cylinder 28 via the oil passage 42a, and at the same time, the rod chamber 2
When the hydraulic oil of 8b is released to the tank 38 via the oil passage 28b, the piston 28c moves forward, and the tip end portion of the pressure plunger 30 projects into the cavity 18 of the mold apparatus 10 as shown. On the contrary, when the solenoid SOL-B of the direction switching valve 36 is excited, the piston 28c of the pressurizing cylinder 28 rises in the opposite manner to the above, and the tip of the pressurizing plunger 30 moves from the cavity 18 into the upper mold 12. It returns and operates so that it is stored. The pressure of the hydraulic pressure source 34 is configured to be controlled by an electromagnetic relief valve 40 which is an electromagnetic proportional automatic pressure valve. That is, the hydraulic pressure source is changed according to the magnitude of the electric signal input to the electromagnetic relief valve 40.
Control the pressure relief from 34, and thus pressurizing plunger 30
It is possible to control the projecting pressure of. Now, pressurizing cylinder
28 piston 28c, that is, the stroke position when the pressure plunger 30 projects or retracts with respect to the cavity 18,
Alternatively, the stroke amount can be detected by the position forming device 32 including, for example, a potentiometer, and an electric signal can be output according to the position.

他方、マイクロコンピュータやパーソナルコンピュータ
等のコンピュータ手段から成る加圧プランジャ制御手段
50が設けられ、この加圧プランジャ制御手段50は、時間
に対する加圧プランジャ30の金型キャビティ18内への突
出によるストローク量の変化を経時的に目標軌跡T0とし
て設定できる指令信号設定部52、位置検出器32の検出信
号である入力信号と指令信号設定部52からの指令入力信
号を比較、演算し、これらの両方の入力信号の偏差値に
対応した偏差出力信号を送出する偏差演算部54、偏差演
算部54の偏差出力信号を受けて適宜の利得演算処理を行
い、上記偏差出力信号に応じた所定の出力信号を出すゲ
イン設定部56とを具備してなり、指令信号設定部52は、
コンピュータのキーボードやマウスからなる入力手段62
及びメモリー(例えば、ROM及びRAM)によって形成さ
れ、他方、上記偏差演算部54と上記ゲイン設定部56はマ
イクロプロセッサMPUやCPU等の演算手段によって形成さ
れている。そして、上記指令信号設定部52、偏差演算部
54、ゲイン設定部56は加圧プランジャ30を起動する加圧
シリンダ28に対するフィードバック制御器を構成してい
る。従って、ゲイン設定部56の出力は、図示されていな
い所のI/O手段を経て圧力調整弁を成す電磁リリーフ弁4
0のドライバ58に送出される。即ち、ドライバ58はゲイ
ン設定部56からの出力信号の大きさに対応した弁駆動用
電気信号を作成し、電磁リリーフ弁40へ送出する。故
に、加圧シリンダ28は、フィードバック制御器と電磁リ
リーフ弁40、方向切換弁36によりフィードバック制御さ
れて、加圧プランジャ30のストローク量を、目標軌跡S0
に追従するように制御する。
On the other hand, a pressure plunger control means including computer means such as a microcomputer and a personal computer
The pressure plunger control means 50 is provided with a command signal setting unit 52 that can set a change in the stroke amount due to the protrusion of the pressure plunger 30 into the mold cavity 18 with respect to time as the target trajectory T 0 with time. A deviation calculator that compares and calculates an input signal, which is a detection signal of the position detector 32, and a command input signal from the command signal setting unit 52, and outputs a deviation output signal corresponding to the deviation value of both of these input signals. 54, and a gain setting unit 56 that receives the deviation output signal of the deviation calculation unit 54, performs appropriate gain calculation processing, and outputs a predetermined output signal according to the deviation output signal, and the command signal setting unit 52 Is
Input means consisting of computer keyboard and mouse 62
And a memory (for example, a ROM and a RAM), while the deviation calculator 54 and the gain setting unit 56 are formed by a calculator such as a microprocessor MPU or a CPU. Then, the command signal setting unit 52, the deviation calculation unit
The gain setting unit 54 and the gain setting unit 56 constitute a feedback controller for the pressure cylinder 28 that activates the pressure plunger 30. Therefore, the output of the gain setting unit 56 is an electromagnetic relief valve 4 that forms a pressure regulating valve via I / O means (not shown).
0 to the driver 58. That is, the driver 58 creates a valve driving electric signal corresponding to the magnitude of the output signal from the gain setting unit 56 and sends it to the electromagnetic relief valve 40. Therefore, the pressurizing cylinder 28 is feedback-controlled by the feedback controller, the electromagnetic relief valve 40, and the direction switching valve 36, and the stroke amount of the pressurizing plunger 30 is controlled by the target locus S 0.
Control to follow.

いま、第2図に示すように、射出プランジャ20による溶
湯の充填が完了すると、所定の時間間隔をおいて図示し
ないホストコントローラが加圧プランジャ30の作動指令
を加圧プランジャ制御手段50に与えると共に方向切換弁
36のソレノイドSOL-Aを励磁する。加圧プランジャ制御
手段50の指令信号設定部52は、予め、プランジャ作動開
始時点からの時間tに対する加圧プランジャ30のストロ
ーク量Stの所望の軌跡が、上述の目標軌跡S0としてプロ
グラム設定されており、上述した作動指令を受けると目
標軌跡S0のストローク量Stを例えば数ミリ秒毎に時分割
処理して、偏差演算部54に入力する。同偏差演算部54で
は、位置検出器32で検出される加圧プランジャ30の実際
のストローク位置St′との偏差ΔSt(=St−St′)を演
算し、これをゲイン設定部56に入力する。ゲイン設定部
56は、偏差ΔStの結果に基づき、所定の利得(ゲイ
ン)、例えば、P(比例)I(積分)D(微分)ゲイン
を乗算し、ストローク量の偏差量ΔStに対し、制御量で
ある圧力指令値Pcに変換する。上記PIDゲインは、経験
値として設定される。ドライバ58は、圧力指令値Pcが入
力されると、実際に電磁リリーフ弁40を駆動する信号Pr
fに変換し、油圧源34の圧力を制御し、方向切換弁36を
介して加圧シリンダ28に対する油圧力を制御している。
このように、加圧プランジャ30のストローク量における
目標軌跡S0と、実際のストローク量Saとの偏差を基準
に、加圧シリンダ28を作動させる圧力を制御することに
より、加圧プランジャ30の実際のストローク量をフィー
ドバック制御し、その結果、加圧プランジャ30により常
に所要レベルの安定した押湯効果を溶湯26に与えて緻
密、かつ内部にひけ巣等の無い品質良好な鋳造製品を得
るようにしている。なお、上述した加圧プランジャ30の
フィードバック制御の更に詳細な説明は、本出願人によ
る特願昭63-244552号に既に開示されている。実際に
は、指令信号設定部52に設定される目標軌跡S0は、加圧
プランジャ制御手段50に接続されたCRT等のディスプレ
イ装置60上にメニュー表示し、マウス等の入力手段62に
よって縦軸ストロークSt及び横軸時間tのグラフ図を描
くだけで設定可能に構成されている。
Now, as shown in FIG. 2, when the filling of the molten metal by the injection plunger 20 is completed, a host controller (not shown) gives an operation command of the pressure plunger 30 to the pressure plunger control means 50 at a predetermined time interval. Direction switching valve
Energize 36 solenoid SOL-A. In the command signal setting unit 52 of the pressurizing plunger control means 50, a desired locus of the stroke amount St of the pressurizing plunger 30 with respect to the time t from the start of the plunger operation is programmed in advance as the target locus S 0 described above. Therefore, when the above-described operation command is received, the stroke amount St of the target locus S 0 is time-divisionally processed, for example, every few milliseconds, and is input to the deviation calculator 54. The deviation calculating unit 54 calculates a deviation ΔSt (= St−St ′) from the actual stroke position St ′ of the pressure plunger 30 detected by the position detector 32, and inputs this to the gain setting unit 56. . Gain setting section
The reference numeral 56 multiplies a predetermined gain (gain), for example, P (proportional) I (integral) D (derivative) gain based on the result of the deviation ΔSt, and the pressure is a control amount for the deviation amount ΔSt of the stroke amount. Convert to command value Pc. The PID gain is set as an empirical value. When the pressure command value Pc is input, the driver 58 receives the signal Pr that actually drives the electromagnetic relief valve 40.
It is converted into f, the pressure of the hydraulic pressure source 34 is controlled, and the hydraulic pressure to the pressurizing cylinder 28 is controlled via the direction switching valve 36.
In this way, by controlling the pressure for operating the pressurizing cylinder 28 on the basis of the deviation between the target locus S 0 in the stroke amount of the pressurizing plunger 30 and the actual stroke amount S a , The actual stroke amount is feedback-controlled, and as a result, the pressurizing plunger 30 constantly gives the molten metal 26 a required level of stable feeder effect, so that a dense and good-quality cast product with no shrinkage cavities inside can be obtained. I have to. A more detailed description of the above-mentioned feedback control of the pressure plunger 30 has already been disclosed in Japanese Patent Application No. 63-244552 filed by the present applicant. Actually, the target locus S 0 set in the command signal setting unit 52 is displayed as a menu on the display device 60 such as a CRT connected to the pressure plunger control means 50, and the vertical axis is set by the input means 62 such as a mouse. It can be set only by drawing a graph of the stroke St and the horizontal axis time t.

さて、上述のように目標軌跡S0を設定して、フィードバ
ック制御法により加圧プランジャ30のストローク量を制
御する過程で、加圧プランジャ30が実行するストローク
量の実際の経時軌跡Saは目標軌跡S0に一致するようにフ
ィードバック制御されるが、不一致の場合が多々有る。
たとえば、加圧プランジャ30を長期間に渡って使用して
いる過程で、同プランジャ30の表面磨耗や潤滑不良、或
いは固化した溶湯粒がプランジャ表面や同プランジャ30
の摺動する金型装置10の孔表面等に付着している等によ
り、又は外部からの振動伝達等に起因して加圧プランジ
ャ30のストローク行程でかじりを発生する場合がある。
このようなかじりは加圧プランジャによる溶湯押湯作用
に変動を来たし、又は、溶湯の波打ちによりガスの巻き
込み等を来して加圧鋳造品に品質劣化をもたらす原因に
なる。
Now, in the process of setting the target locus S 0 as described above and controlling the stroke amount of the pressurizing plunger 30 by the feedback control method, the actual temporal locus S a of the stroke amount executed by the pressurizing plunger 30 is the target. Feedback control is performed so as to match the trajectory S 0 , but there are many cases where they do not match.
For example, in the process of using the pressure plunger 30 for a long period of time, the surface wear and poor lubrication of the plunger 30, or the solidified molten particles may cause the plunger surface and the plunger 30 to come out.
In some cases, galling may occur in the stroke stroke of the pressure plunger 30 due to attachment to the surface of the hole of the sliding mold apparatus 10 or due to transmission of vibration from the outside.
Such galling may cause fluctuations in the molten metal feeder action by the pressure plunger, or may cause gas entrainment or the like due to the corrugation of the molten metal, resulting in deterioration of the quality of the pressure cast product.

依って、本発明は、斯かるかじりが発生した場合には、
第1図に示すように、上述の加圧プランジャ30の目標軌
跡S0を遂行する総時間TAと実際の経時軌跡Saの遂行に要
する総時間TBとの対比を行ったとき、後者の実際の経時
軌跡Saの遂行に要する総時間TBは、かじりによるプラン
ジャの速度低下により、前者のTAより大きく成ってしま
うことに着目したものである。
Therefore, the present invention, when such galling occurs,
As shown in FIG. 1, when the total time T A for executing the target locus S 0 of the pressurizing plunger 30 and the total time T B required for executing the actual temporal locus S a are compared, It is focused on that the total time T B required to execute the actual time-course locus S a of is larger than the former T A due to the speed reduction of the plunger due to the galling.

即ち、加圧プランジャ30が金型装置10の溶湯を加圧した
後に戻り動作し、作動開始位置まで後退するまでの総時
間TBを計時積算し、予め分かっている目標軌跡S0の総時
間TAとの下記の対比演算を行うのである。
That is, the pressurizing plunger 30 pressurizes the molten metal of the mold apparatus 10 and then returns to operate, and totalizes the total time T B until it retracts to the operation start position, and totalizes the total time of the target trajectory S 0 known in advance. The following comparison calculation with T A is performed.

TB>TA …… (1) TB≦TA …… (2) そして、(1)式が成立している場合には、加圧プラン
ジャ30はかじりを起こしていると検出してかじり発生信
号を送出するのである。
T B > T A …… (1) T B ≦ T A …… (2) And, if the formula (1) is satisfied, it is detected that the pressure plunger 30 is galling, and the galling occurs. The generation signal is sent out.

また、(2)式が成立しているときは、かじりの発生は
未だ無いと検出し、かじり発生信号を送出することはな
いのである。
Further, when the expression (2) is satisfied, it is detected that the galling has not yet occurred, and the galling generation signal is not transmitted.

なお、実勢の経時軌跡Saにおける総時間TBの計測は、第
2図に示した加圧プランジャ制御手段50内の偏差演算部
54を形成するマイクロプロセッサCPUまたはMPUによるタ
イマー機能を利用して実際の加圧プランジャ30のストロ
ーク開始時間から戻り動作して始点位置に戻るまでの時
間計測を行えば良い。
The measurement of the total time T B on the actual trajectory S a is performed by the deviation calculation unit in the pressurizing plunger control means 50 shown in FIG.
The timer function of the microprocessor CPU or MPU forming 54 may be used to measure the time from the actual stroke start time of the pressurizing plunger 30 to the returning operation and returning to the starting point position.

更に、上記(1)式又は(2)式の演算は、上記偏差演
算部54を形成するマイクロプロセッサMPUやCPU等の演算
手段によって簡単に実行することができる。
Further, the calculation of the formula (1) or the formula (2) can be easily executed by the calculating means such as the microprocessor MPU or the CPU forming the deviation calculating section 54.

ここで、上述した実施例は(1)式又は(2)式の演算
を行うだけで加圧プランジャ30のかじり検出を行うよう
にしているが、上述したかじり検出の結果を、第2図の
加圧プランジャ制御手段50の指令信号設定部52を形成す
るメモリー(RAM)に格納し、加圧鋳造行程を複数回繰
り返し行う過程で、連続して所定の複数回に渡り、かじ
り検出が行われたことが、上記MPUやCPU等の演算手段の
カウンター機能でメモリー内に格納されたかじり検出の
回数を計数することにより、判別されたときに、始めて
警報信号を同演算手段の出力部から警報信号を発し、適
宜のI/O手段を介して例えば、警報ランプの点灯等を促
す出力信号として送出するようにしても良い。
Here, in the above-described embodiment, the galling detection of the pressurizing plunger 30 is performed only by performing the calculation of the equation (1) or the equation (2). However, the result of the galling detection described above is shown in FIG. It is stored in the memory (RAM) forming the command signal setting unit 52 of the pressure plunger control means 50, and in the process of repeating the pressure casting process a plurality of times, the galling detection is continuously performed a plurality of predetermined times. However, by counting the number of galling detections stored in the memory by the counter function of the computing means such as the MPU or CPU, when it is determined, an alarm signal is first issued from the output part of the computing means. A signal may be emitted and sent as an output signal for prompting lighting of an alarm lamp or the like via an appropriate I / O means.

第3図は、このような複数回のかじり検出が発生したと
きに警報を発するようにした場合の処理をフローチャー
トで示したものであり、始めに設定値TAと実ストローク
量の値TBとの読込みを行い、両者の大小比較をし、後者
の実ストローク量を大きいときは、カウンターをカウン
トアップし、そのカウント数が所定回数以上になると、
警報発信を行う。また、TBがTAより小なら、かじり無し
と判断し、その前にカウントが行われていれば、カウン
ターをクリアーする。
FIG. 3 is a flow chart showing the processing when an alarm is issued when such galling detection occurs a plurality of times. First, the set value T A and the actual stroke amount value T B are shown. When the actual stroke amount of the latter is large, the counter is counted up, and when the count number becomes a predetermined number or more,
Send an alarm. Also, if T B is smaller than T A , it is determined that there is no galling, and if the count is performed before that, the counter is cleared.

更に、目標経時軌跡S0の総時間TAに就き、それより所定
時間分だけ大きな総時間を示す時間TA′も予め設定値と
して記憶し、実際のストローク量の経時軌跡Saにおける
総時間TBと上記TAとの対比を先ず行い、次々の加圧鋳造
行程における総時間TBが徐々に目標軌跡S0の総時間TA
り増大して遂に、上記TAより大きな時間TA′よりも大き
く成った事態が発生したとき、始めて、警報を発するよ
うにしても良い。
Further, the total time T A of the target time-course locus S 0 , and a time T A ′ indicating a total time longer than the target time-course S 0 by a predetermined time, is also stored as a preset value, and the total time of the actual stroke amount on the time-course locus S a is calculated. T B and performs first a comparison with the T a, finally increases than the total time T a of the total time T B gradually target locus S 0 in pressure casting process successive, the T a larger time than T a The alarm may be issued for the first time when a situation larger than ′ occurs.

〔発明の効果〕〔The invention's effect〕

以上の説明から明らかなように、本発明によれば、加圧
プランジャの加圧、押湯行程におけるストローク量を予
め目標軌跡として設定し、実際の加圧プランジャのスト
ロークは、この目標軌跡に倣うようにフィードバック制
御させると共に目標軌跡と実際のストローク量の経時軌
跡との総時間対比を行い、実際のストローク量の経時軌
跡の総所要時間が目標軌跡の所要総時間より大きいとき
に警報を発するようにしたから、かじり検出が自動化さ
れ、且つ、コンピューター手段の内部で演算処理によ
り、かじり発生を検出し得るようにしたから、かじりに
基づく加圧鋳造機の加圧工程における押湯不良、冷却不
足等に起因して鋳造品内に生ずる巣や割れ等の無い高品
質の鋳造加工品を得ることができるのである。
As is apparent from the above description, according to the present invention, the stroke amount in the pressurization and feeder stroke of the pressurizing plunger is set in advance as the target trajectory, and the actual stroke of the pressurizing plunger follows the target trajectory. In addition to feedback control, the total time of the target trajectory and the actual stroke amount over time is compared, and an alarm is issued when the total required time of the actual stroke amount over time is greater than the total required time of the target trajectory. Therefore, the galling detection is automated, and the occurrence of galling can be detected by the arithmetic processing inside the computer means. As a result, it is possible to obtain a high-quality cast processed product that does not have cavities or cracks in the cast product caused by the above.

【図面の簡単な説明】[Brief description of drawings]

第1図は、本発明による加圧プランジャのかじり検出方
法の原理を説明するグラフ図、第2図は、本発明に係る
かじり検出方法が適用される加圧鋳造機の要部の構成を
示したブロック図、第3図は加圧プランジャ制御手段の
カウンター機能を利用して警報発信を行う場合のフロー
チャート。 10…金型装置、18…キャビティ、26…溶湯、20…射出装
置、22…射出シリンダ、28…加圧装置、30…加圧プラン
ジャ、32…位置検出器、50…加圧プランジャ制御手段。
FIG. 1 is a graph for explaining the principle of the galling detection method for a pressure plunger according to the present invention, and FIG. 2 shows the configuration of the main part of a pressure casting machine to which the galling detection method according to the present invention is applied. FIG. 3 is a flow chart in the case of issuing an alarm using the counter function of the pressure plunger control means. 10 ... Mold device, 18 ... Cavity, 26 ... Molten metal, 20 ... Injection device, 22 ... Injection cylinder, 28 ... Pressurizing device, 30 ... Pressurizing plunger, 32 ... Position detector, 50 ... Pressurizing plunger control means.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】射出装置の作用によって金型内に溶湯を充
填すると共に前記射出装置と対向した加圧装置の加圧プ
ランジャを突出ストロークさせて金型内の溶湯を加圧す
る加圧鋳造機における加圧プランジャのかじり検出方法
において、 前記加圧プランジャの金型キャビティ内への突出及び戻
りのストローク量を同加圧プランジャの作動開始時点か
らの目標経時軌跡としてを予め設定し、 前記目標経時軌跡に倣って前記加圧プランジャが加圧動
作する実際のストローク量を前記加圧装置の駆動回路を
介してフィードバック制御し、 前記加圧プランジャの前記目標軌跡と実際のストローク
量の経時軌跡とを対比し、 前者の目標経時軌跡の所要時間と後者の実際の経時軌跡
の所要時間との大小判別から加圧プランジャの突出、又
は後退動作におけるかじりの有無を検出するようにした
ことを特徴とした加圧鋳造機における加圧プランジャの
かじり検出方法。
1. A pressure casting machine for filling molten metal in a mold by the action of an injection device and pressing the molten metal in the mold by causing a pressurizing plunger of a pressure device facing the injection device to make a protruding stroke. In the method for detecting the galling of the pressure plunger, the stroke amount of the protrusion and the return of the pressure plunger into the mold cavity is preset as a target time course from the start of the operation of the pressure plunger, and the target time course According to the above, the actual stroke amount of the pressurizing operation of the pressurizing plunger is feedback-controlled via the drive circuit of the pressurizing device, and the target trajectory of the pressurizing plunger and the temporal trajectory of the actual stroke amount are compared. However, based on the size comparison between the time required for the former target time-course and the time required for the latter actual time-course, the pressure plunger can be set to project or retract. A method for detecting galling of a pressure plunger in a pressure casting machine, which is characterized in that the presence or absence of galling is detected.
JP6980890A 1990-03-22 1990-03-22 Method for detecting galling of pressure plunger in pressure casting machine Expired - Lifetime JPH0798251B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6980890A JPH0798251B2 (en) 1990-03-22 1990-03-22 Method for detecting galling of pressure plunger in pressure casting machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6980890A JPH0798251B2 (en) 1990-03-22 1990-03-22 Method for detecting galling of pressure plunger in pressure casting machine

Publications (2)

Publication Number Publication Date
JPH03275264A JPH03275264A (en) 1991-12-05
JPH0798251B2 true JPH0798251B2 (en) 1995-10-25

Family

ID=13413425

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6980890A Expired - Lifetime JPH0798251B2 (en) 1990-03-22 1990-03-22 Method for detecting galling of pressure plunger in pressure casting machine

Country Status (1)

Country Link
JP (1) JPH0798251B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4883557B2 (en) * 2006-02-21 2012-02-22 東芝機械株式会社 Method for detecting abnormality of squeeze pin and molding machine
JP7180498B2 (en) * 2019-03-28 2022-11-30 Ubeマシナリー株式会社 Life Prediction Method for Injection Device of Die Casting Machine

Also Published As

Publication number Publication date
JPH03275264A (en) 1991-12-05

Similar Documents

Publication Publication Date Title
US6056902A (en) Method and apparatus for molding a plastic article including injecting based upon a pressure-dominated control algorithm after detecting an indicia of a decrease in the surface area of the melt front
US6060005A (en) Low pressure method and apparatus for injection molding a plastic article
US4610831A (en) Method of controlling cylinder speed in injection molding apparatus
KR100992723B1 (en) Injection device of die cast machine
JP3506800B2 (en) Injection control method and apparatus for die casting machine
KR20040095705A (en) Ejecting device and molding method of diecast machine
KR19980018302A (en) Apparatus and apparatus for manufacturing article having computer readable program code for forming article
KR970005368B1 (en) Casting control method by controlling a movement of fluid-operated cylinder piston and apparatus for carrying out the same
KR20210116565A (en) Die-casting machine, die-casting machine with mold, control device for die-casting machine and die-casting method
JPH0798251B2 (en) Method for detecting galling of pressure plunger in pressure casting machine
JP2704471B2 (en) Pressure stroke control method in pressure casting
JP3538896B2 (en) Control method of injection molding machine
JP2792580B2 (en) Pressure stroke control method in pressure casting
JP2704474B2 (en) Pressure stroke control method in pressure casting
JP2704470B2 (en) Pressure stroke control method in pressure casting
JPH07214611A (en) Control method of suck back operation in injection molding machine
JPH0292446A (en) Pressure casting method and device
JPH03275263A (en) Method for controlling pressurizing stroke in pressurized casting method
JP7600665B2 (en) Die casting machine, control device and program for die casting machine, and casting method
JPH0788621A (en) Method for detecting galling of pressure plunger in pressure casting machine
JP7064353B2 (en) Injection equipment, molding machines and quality control programs
JP3509657B2 (en) Pressure casting method and apparatus
JPS60234760A (en) Method for controlling cylinder speed in injection molding device
JPH0966352A (en) Method for judging completion of mold warm-up in pressure casting machine
GB2368548A (en) Die-casting