JPH0814206B2 - Lining tank and lining tank construction method - Google Patents
Lining tank and lining tank construction methodInfo
- Publication number
- JPH0814206B2 JPH0814206B2 JP63128421A JP12842188A JPH0814206B2 JP H0814206 B2 JPH0814206 B2 JP H0814206B2 JP 63128421 A JP63128421 A JP 63128421A JP 12842188 A JP12842188 A JP 12842188A JP H0814206 B2 JPH0814206 B2 JP H0814206B2
- Authority
- JP
- Japan
- Prior art keywords
- tank
- construction
- lining
- ceiling
- floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【発明の詳細な説明】 〔発明の目的〕 (産業上の利用分野) 本発明は、ライニング槽及びライニング槽の施工方法
に関する。DETAILED DESCRIPTION OF THE INVENTION Object of the Invention (Field of Industrial Application) The present invention relates to a lining tank and a method for constructing a lining tank.
(従来の技術) 原子力プラントにおいて、ライニング槽は、例えば第
2図に示す水平断面図のように配置されている。原子力
プラントの建屋1は、コンクリート壁2で形成されてい
る。ライニング槽3は、コンクリート壁2にステンレス
製のライニング板4が施されて形成されている。(Prior Art) In a nuclear power plant, a lining tank is arranged, for example, as shown in the horizontal sectional view of FIG. A building 1 of a nuclear power plant is formed by a concrete wall 2. The lining tank 3 is formed by applying a stainless steel lining plate 4 to the concrete wall 2.
第3図は従来のライニング槽の縦断面図である。ライ
ニング槽3は、上部蓋10により槽上部室11とライニング
12に分離されている。ライニング槽3の上方には、プラ
ントに必要な盤13やファン14などの制御設備が設置され
る槽上部階15が形成されている。この槽上部階15は、ラ
イニング12の工事用資材及び機材の仮置きスペースに利
用され、槽上部階天井16には搬出・搬入用のモノレール
17を仮設備として準備するのが一般的である。ライニン
グ12には、決められた寸法、例えば3000L×1500Wのステ
ンレス製のライニング板4が溶接で継ぎ合わされ側壁部
18、床部19を形成している。側壁部18や床部19の内部に
は、ライニング板4を溶接で固定する為の下地材20が埋
設されている。この下地材20には通常H鋼が使用されて
いる。FIG. 3 is a vertical sectional view of a conventional lining tank. The lining tank 3 is lined with the tank upper chamber 11 by the upper lid 10.
It is divided into 12. Above the lining tank 3, a tank upper floor 15 in which control equipment such as a board 13 and a fan 14 required for the plant are installed is formed. This tank upper floor 15 is used as a temporary storage space for construction materials and equipment for the lining 12, and the monorail for carrying in and out is installed on the tank upper floor ceiling 16.
It is common to prepare 17 as temporary equipment. The lining 12 is welded to the lining plate 4 made of stainless steel having a predetermined size, for example, 3000L × 1500W, and the side wall portion is joined.
18 and a floor 19 are formed. A base material 20 for fixing the lining plate 4 by welding is embedded inside the side wall portion 18 and the floor portion 19. The base material 20 is usually H steel.
従来のライニング槽の施工方法について説明する。 A conventional method for constructing a lining tank will be described.
ライニング槽3の工事は、第2図の建屋1の構築に合
わせて下地材20を据付る一期工事と、建屋1の構築後ラ
イニング板4を取り付る二期工事に分けられる。The construction of the lining tank 3 is divided into a first-stage construction in which the base material 20 is installed according to the construction of the building 1 shown in FIG. 2 and a second-stage construction in which the lining board 4 is attached after the construction of the building 1.
床部19の配筋21の設定が済んだならば、H鋼で井桁に
組まれた床下地材20aを据付し、コンクリートを打設し
て床部19の工事が終了する。次にライニング槽3の側壁
部18の配筋21を設定し、床部19と同様に壁下地材20bの
据付を行なう。この壁下地材20bは、コンクリート打設
レベルに合わせて2〜3段に分けて据付られる。この様
にして、側壁部18の工事が済んだならば、槽天井22の施
工に引き続き槽上部階壁23、槽上部階天井16の順で施工
し一連の一期工事が終了する。After the setting of the bar arrangement 21 of the floor portion 19 is completed, the floor base material 20a assembled to the cross girder of H steel is installed, concrete is poured, and the construction of the floor portion 19 is completed. Next, the bar arrangement 21 of the side wall portion 18 of the lining tank 3 is set, and the wall base material 20b is installed in the same manner as the floor portion 19. The wall base material 20b is installed in two or three stages according to the level of concrete pouring. In this way, after the construction of the side wall portion 18 is completed, the construction of the tank ceiling 22 is followed by the construction of the tank upper floor wall 23 and the tank upper floor ceiling 16 in this order, and a series of one-phase construction is completed.
また、二期工事のライニング板4の取り付け工事の早
期着手を目的に、槽天井22と槽上部階天井16にデッキプ
レート工法を採用するのが一般的である。In addition, it is general to adopt the deck plate construction method for the tank ceiling 22 and the tank upper floor ceiling 16 for the purpose of early start of the installation work of the lining plate 4 in the second phase construction.
ここで、デッキプレート工法とは、槽天井22と槽上部
階天井16のコンクリート2a,2bの養生期間中、デッキプ
レート24a,24b及びビーム25a,25bでコンクリート2a,2b
を支える工法である。支保工で下から支える工法に比べ
て、養成期間中も下で作業ができ、支保工と型枠の解体
・撤去作業を削除できるので、工期を約2カ月短縮でき
る。Here, the deck plate construction method means that during the curing period of the concrete 2a, 2b of the tank ceiling 22 and the upper ceiling 16 of the tank, the concrete 2a, 2b is constructed by the deck plates 24a, 24b and the beams 25a, 25b.
Is a construction method that supports Compared with the method of supporting from below by supporting work, the work can be done under training and the work of dismantling and removing the formwork can be deleted, so the construction period can be shortened by about 2 months.
二期工事は、デッキプレート工法が採用されているの
で槽上部階天井16のコンクリート2b打設一カ月後に開始
される。Since the deck plate construction method has been adopted, the second phase construction will start one month after the concrete 2b is placed on the ceiling 16 of the upper floor of the tank.
二期工期で使用する溶接機(図示せず)、ライニング
板4、及び工事用足場25などをライニング槽3内へ搬出
入する為、槽天井22に仮開口26を設けておく。また、二
期工事着手に先立ち、槽上部階天井16のデッキプレート
工法のビーム25bを利用してモノレール17を取り付け
る。A temporary opening 26 is provided in the tank ceiling 22 in order to carry in and out the welding machine (not shown), the lining plate 4, the construction scaffolding 25, etc. used in the second construction period into the lining tank 3. Also, prior to the start of the second phase construction, the monorail 17 is attached using the beam 25b of the deck plate construction method on the ceiling 16 of the upper floor of the tank.
これら準備が整ったならば、二期工事を実施する。二
期工事は、ライニング槽3内に工事用足場25を設定し、
壁ライニング板4aの取付け、上部蓋10の設置、工事用足
場25の解体・搬出、床ライニング板4bの取付け、仮開口
26復旧の手順で実施される。仮開口26の復旧が終了した
ならば、槽上部階15において盤13やファン14などの据付
が開始される。When these preparations are completed, the second phase construction will be implemented. For the second construction, set scaffolding 25 for construction in lining tank 3,
Installation of wall lining board 4a, installation of upper lid 10, dismantling / carrying out scaffolding 25 for construction, installation of floor lining board 4b, temporary opening
26 It will be implemented according to the restoration procedure. When the restoration of the temporary opening 26 is completed, the installation of the panel 13, the fan 14, etc. is started on the upper floor 15 of the tank.
(発明が解決しようとする課題) ところで、このようなライニング槽及びライニング槽
の施工方法では、二期工期の着手が槽上部階天井施工1
ヵ月後であり、建設工期長期化の要因になっていた。(Problems to be solved by the invention) By the way, in such a lining tank and a method of constructing a lining tank, the start of the second construction period is the ceiling upper floor ceiling construction 1
It was a month later, which was a factor in extending the construction period.
本発明の目的は、建設工期を短縮できるライニング槽
及びライニング槽の施工方法を得ることにある。An object of the present invention is to obtain a lining tank and a method for constructing a lining tank that can shorten the construction period.
(課題を解決するための手段) 上記目的を達成するために、本発明においては、コン
クリート壁にライニングが施されて液体が貯留され、上
方に槽天井を介してプラントに必要な制御設備を有する
槽上部階を形成するライニング槽において、前記槽天井
に工事用仮開口を形成せず、かつ前記コンクリート壁の
側壁部上部に工事時に人及び資材の出入可能な開口部を
形成し、この開口部には前記プラントに必要な制御設備
に接続されるプラント設備が配設されて成ることを特徴
とするライニング槽、および、上方に形成されたプラン
トに必要な制御設備を有する槽上部階とを仕切る槽天井
部と床部と側壁部とから成るコンクリート壁を形成し、
この槽天井部に工事用仮開口を形成せずに前記側壁部上
部に形成された開口部から資材と機材を搬入し、この資
材と機材を使用して前記コンクリートの床部と側壁部に
ライニングを施し、その後前記開口部に前記槽天井部の
上方に配設されたプラントの必要な制御設備に接続され
るプラント設備を配設して成ることを特徴とするライニ
ング槽の施工方法を提供する。(Means for Solving the Problem) In order to achieve the above object, in the present invention, a concrete wall is lined to store a liquid, and a control facility necessary for a plant is provided above a tank ceiling. In the lining tank forming the upper floor of the tank, a temporary opening for construction is not formed in the ceiling of the tank, and an opening through which people and materials can enter and leave at the time of construction is formed in the upper part of the side wall of the concrete wall. Separates the lining tank, which is characterized in that plant equipment connected to the control equipment required for the plant is provided, and the tank upper floor having the control equipment required for the plant formed above Forming a concrete wall consisting of the tank ceiling, floor and side walls,
Material and equipment are carried in from the opening formed in the upper part of the side wall without forming a temporary opening for construction on the ceiling of the tank, and the material and the equipment are used to line the concrete floor and side wall. And a plant equipment connected to necessary control equipment of the plant arranged above the tank ceiling portion are provided in the opening, and a lining tank construction method is provided. .
(作用) このようなライニング槽及びライニング槽の施工方法
においては、槽天井に工事用仮開口を形成せずにライニ
ング槽の側壁部上部に形成された開口部から二期工事に
必要な資材と機材を搬入するので、槽上部階の壁及び天
井の施工を待たずに二期工事の早期着手が可能となり、
また、槽天井の仮開口復旧工事を削除できるので槽上部
階の室内工事の早期着手が可能となる。(Operation) In such a lining tank and the method for constructing the lining tank, the material necessary for the second-stage construction is provided from the opening formed in the upper part of the side wall of the lining tank without forming the temporary opening for construction on the tank ceiling. Since the equipment is brought in, it is possible to start the second phase early without waiting for the wall and ceiling on the upper floor of the tank.
In addition, since the restoration work of the temporary opening of the tank ceiling can be deleted, it is possible to start the indoor construction on the upper floor of the tank early.
(実施例) 以下、本発明に係るライニング槽及びライニング槽の
施工方法の一実施例を第1図を参照して説明する。(Example) Hereinafter, one example of a lining tank and a method for constructing a lining tank according to the present invention will be described with reference to FIG.
第1図は、ライニング槽の縦断面図である。ライニン
グ槽30は、上部蓋31により槽上部室32とライニング33に
分離されている。ライニング槽30の上方は、プラントに
必要な制御設備である盤34やファン35が設置される槽上
部階36が形成されている。ライニング槽30は、床部37、
側壁部38、及び天井部である槽天井39から成るコンクリ
ート壁で形成されている。槽上部階36は、槽上部階36の
床である槽天井39、槽上部階壁40、及び槽上部階天井41
から成るコンクリート壁で形成されている。これらのコ
ンクリート壁の内部には配筋42が設定されている。床部
37及び側壁部38には、ライニング板43が施されている。
このライニング板43は、例えば3000L×1500Wの寸法のス
テンレス製の板である。ライニング33は、このライニン
グ板43を下地材44に固着して形成されている。側壁部38
の上部には、開口部45が形成されている。この開口部45
には、空調ダクトやケーブルトレーなどのプラント設備
46が貫通している。槽天井39は、デッキプレート工法が
実施されており、デッキプレート47及びビーム48が設置
されている。上部蓋31は、ビーム48に取着されている。FIG. 1 is a vertical sectional view of a lining tank. The lining tank 30 is separated by a top lid 31 into a tank upper chamber 32 and a lining 33. Above the lining tank 30, a tank upper floor 36 in which a panel 34 and a fan 35, which are control equipment necessary for the plant, are installed is formed. The lining tank 30 has a floor 37,
It is formed of a concrete wall including a side wall portion 38 and a tank ceiling 39 which is a ceiling portion. The tank upper floor 36 includes a tank ceiling 39, which is the floor of the tank upper floor 36, a tank upper floor wall 40, and a tank upper floor ceiling 41.
It is made of concrete walls. Bars 42 are set inside these concrete walls. Floor
A lining plate 43 is provided on the side wall portion 37 and the side wall portion 38.
The lining plate 43 is, for example, a stainless steel plate having dimensions of 3000 L × 1500 W. The lining 33 is formed by fixing the lining plate 43 to the base material 44. Side wall 38
An opening 45 is formed in the upper part of the. This opening 45
Includes plant equipment such as air conditioning ducts and cable trays.
46 penetrates. A deck plate construction method is applied to the tank ceiling 39, and a deck plate 47 and a beam 48 are installed. The upper lid 31 is attached to the beam 48.
次にライニング槽の施工方法について説明する。床部
37の配筋42の設定が済んだならば、H鋼で井桁に組まれ
た床下地材44aを据付し、コンクリートを打設する。Next, the construction method of the lining tank will be described. Floor
After the setting of 37 reinforcements 42, the floor base material 44a assembled to the girder of H steel is installed, and concrete is poured.
次に、ライニング槽30の側壁部38の配筋42を設定し、
床部37と同様に壁下地材44bの据付を行なう。この壁下
地材44bは、コンクリート打設レベルに合わせて2〜3
段に分けて据付られる。次に、槽天井39をデッキプレー
ト工法で施工する。Next, set the bar arrangement 42 of the side wall portion 38 of the lining tank 30,
The wall base material 44b is installed similarly to the floor portion 37. This wall base material 44b is 2 to 3 depending on the concrete pouring level.
It is installed in stages. Next, the tank ceiling 39 is constructed by the deck plate construction method.
二期工事に先立ち、開口部45から資材及び機材を搬入
するため、揚重機49及びステージ50等を準備する。Prior to the second phase of construction, a lifting machine 49, stage 50, etc. will be prepared to carry in materials and equipment through the opening 45.
二期工事は、槽天井39施工完了1ヵ月後から、槽上部
階壁40及び槽上部階天井41の施工と並行して行なう。二
期工事は、工事用足場51を設定し、壁ライニング板43a
の取付け、上部蓋31の設置、工事用足場51の解体・搬
出、床ライニング板43bの取付け、の手順で実施され
る。The second phase construction will be carried out in parallel with the construction of the tank upper floor 40 and the tank upper ceiling 41 one month after the completion of the tank ceiling 39 construction. For the second phase construction, set up scaffolding 51 for construction and wall lining board 43a
Are installed, the upper lid 31 is installed, the scaffold 51 for construction is disassembled and carried out, and the floor lining plate 43b is installed.
この後、開口部45に空調ダクト、ケーブルトレー等の
プラント設備46を据付し工事を終了する。Then, the plant equipment 46 such as an air conditioning duct and a cable tray is installed in the opening 45, and the construction is completed.
この実施例においては、槽天井に工事用仮開口が形成
されていないので、雨水の侵入を防ぐことができ、工事
中の環境を良好にでき、品質を向上できる。In this embodiment, since the construction temporary opening is not formed in the tank ceiling, it is possible to prevent rainwater from entering, improve the environment during construction, and improve the quality.
工事用仮開口の復旧工事が発生しないので、清浄度を
維持でき、品質を向上できる。また、槽上部階の室内工
事の早期着手ができる。Since restoration work of the temporary opening for construction does not occur, cleanliness can be maintained and quality can be improved. In addition, it is possible to start the indoor construction on the upper floor of the tank early.
槽上部階をライニング二期工事のアクセス用に期待し
ていないので、デッキプレート工法の採用範囲を縮小で
きる。すなわち、デッキプレート工法を採用しない場
合、工事終了後、厚さ約75mmあるデッキプレートと厚さ
約150mmあるビームが残らないので、空間スペースが有
効に活用できる。The upper floor of the tank is not expected to be used for access during the second lining work, so the range of adoption of the deck plate method can be reduced. That is, if the deck plate construction method is not adopted, after the construction is completed, the deck plate having a thickness of about 75 mm and the beam having a thickness of about 150 mm do not remain, so that the space space can be effectively utilized.
通常、通路に付設される空調ダクトやケーブルトレー
等のプラント設備が開口部を貫通して設置されているの
で、プラントの空間スペースを有効活用できる。Usually, plant facilities such as air-conditioning ducts and cable trays attached to passages are installed through the openings, so that the space space of the plant can be effectively utilized.
尚、工事の状況により槽上部階天井にデッキプレート
工法を採用してもかまわないことはもちろんである。Of course, the deck plate construction method may be adopted for the ceiling of the upper floor of the tank depending on the construction situation.
本発明によれば、槽天井に工事用仮開口が形成されて
いないので、雨水の侵入を防ぐことができ、工事中の環
境を良好に保つことができるので、品質を向上させるこ
とができる。According to the present invention, since the temporary opening for construction is not formed on the ceiling of the tank, it is possible to prevent rainwater from entering and to maintain a good environment during construction, so that the quality can be improved.
さらには、工事用仮開口の復旧工事が発生しないので
清浄度を維持でき、品質を向上させることができる。そ
して、槽上部階の室内工事の早期着手を行なうことがで
きるので、建設工期を短縮することができる。Furthermore, since the restoration work of the temporary opening for construction does not occur, the cleanliness can be maintained and the quality can be improved. Further, since it is possible to quickly start the indoor construction on the upper floor of the tank, the construction period can be shortened.
第1図は本発明に係るライニング槽の一実施例を示す縦
断面図、第2図は従来の建屋の水平断面図、第3図は従
来のライニング槽を示す縦断面図である。 30……ライニング槽、37……床部 38……側壁部、39……槽天井 43……ライニング板、43a……壁ライニング板 43b……床ライニング板、45……開口部 46……プラント設備FIG. 1 is a vertical sectional view showing an embodiment of a lining tank according to the present invention, FIG. 2 is a horizontal sectional view of a conventional building, and FIG. 3 is a vertical sectional view showing a conventional lining tank. 30 …… lining tank, 37 …… floor 38 …… side wall, 39 …… tank ceiling 43 …… lining plate, 43a …… wall lining plate 43b …… floor lining plate, 45 …… opening 46 …… plant Facility
Claims (2)
体が貯留され、上方に槽天井を介してプラントに必要な
制御設備を有する槽上部階を形成するライニング槽にお
いて、前記槽天井に工事用仮開口を形成せず、かつ前記
コンクリート壁の側壁部上部に工事時に人及び資材の出
入可能な開口部を形成し、この開口部には前記プラント
に必要な制御設備に接続されるプラント設備が配設され
て成ることを特徴とするライニング槽。1. A lining tank in which a concrete wall is lined to store a liquid, and a tank upper floor having a control facility required for a plant is formed above the tank ceiling, in which the temporary ceiling for construction is provided on the tank ceiling. Without forming an opening, an opening is formed in the upper part of the side wall of the concrete wall where people and materials can enter and leave during construction, and plant equipment connected to the control equipment necessary for the plant is arranged in this opening. A lining tank characterized by being installed.
備を有する槽上部階とを仕切る槽天井部と床部と側壁部
とから成るコンクリート壁を形成し、この槽天井部に工
事用仮開口を形成せずに前記側壁部上部に形成された開
口部から資材と機材を搬入し、この資材と機材を使用し
て前記コンクリートの床部と側壁部にライニングを施
し、その後前記開口部に前記槽天井部の上方に配設され
たプラントに必要な制御設備に接続されるプラント設備
を配設して成ることを特徴とするライニング槽の施工方
法。2. A concrete wall composed of a tank ceiling and a floor and a side wall partitioning a tank upper floor having control equipment necessary for a plant formed above is formed, and a temporary construction wall is constructed on the tank ceiling. Material and equipment are carried in through the opening formed in the upper part of the side wall without forming an opening, and the floor and side wall of the concrete are lined with the material and equipment, and then the opening is formed in the opening. A method for constructing a lining tank, characterized in that plant equipment connected to necessary control equipment is provided in the plant arranged above the tank ceiling.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63128421A JPH0814206B2 (en) | 1988-05-27 | 1988-05-27 | Lining tank and lining tank construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63128421A JPH0814206B2 (en) | 1988-05-27 | 1988-05-27 | Lining tank and lining tank construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH01299950A JPH01299950A (en) | 1989-12-04 |
| JPH0814206B2 true JPH0814206B2 (en) | 1996-02-14 |
Family
ID=14984348
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP63128421A Expired - Lifetime JPH0814206B2 (en) | 1988-05-27 | 1988-05-27 | Lining tank and lining tank construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0814206B2 (en) |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3009826C2 (en) * | 1980-03-14 | 1986-05-28 | Hochtemperatur-Reaktorbau GmbH, 4600 Dortmund | Containers, in particular prestressed concrete pressure vessels for nuclear reactor plants |
| JPS5862253A (en) * | 1981-10-07 | 1983-04-13 | 川崎重工業株式会社 | Execution of double shell tank having pc outer tank |
-
1988
- 1988-05-27 JP JP63128421A patent/JPH0814206B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH01299950A (en) | 1989-12-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0814206B2 (en) | Lining tank and lining tank construction method | |
| JP3225456B2 (en) | How to build a building | |
| JPS6335931A (en) | Construction of building of atomic power plant | |
| JPH0642184A (en) | Method of constructing a skeleton using half-PC floorboard | |
| JP2879652B2 (en) | Box type building structure and its construction method | |
| JP2797023B2 (en) | Construction method of beam | |
| US2489808A (en) | Method of erecting concrete floor forms | |
| RU97110919A (en) | METHOD FOR REPAIR OF OVERLAPS ON METAL BEAMS | |
| JPS6349773B2 (en) | ||
| JPS62228975A (en) | Method of construction of nuclear plant | |
| JPH03197734A (en) | Lift up method by replacement of scaffold body | |
| JPH0415857B2 (en) | ||
| JPH0784092A (en) | Lining tank and its construction method | |
| JPH08109678A (en) | Execution method of large-sized roof | |
| JPH0437893B2 (en) | ||
| JPH0571743B2 (en) | ||
| JPH0519959B2 (en) | ||
| JPH03237391A (en) | Storage container constructing method for nuclear power plant | |
| JPH051471A (en) | Construction method of floor slab using the ground floor slab formwork. | |
| JPH0447072A (en) | Construction method for multistory building and its device | |
| JPH0913510A (en) | Construction method for building | |
| JPH0797865A (en) | Assembly of beam steel reinforcement | |
| JPH09273302A (en) | Large formwork device | |
| JP2001032376A (en) | Floor slab frame and construction method for skeleton | |
| JPS6389748A (en) | Execution of dome |