JPH0820117B2 - Centralized control hot water storage type electric water heater - Google Patents
Centralized control hot water storage type electric water heaterInfo
- Publication number
- JPH0820117B2 JPH0820117B2 JP5919390A JP5919390A JPH0820117B2 JP H0820117 B2 JPH0820117 B2 JP H0820117B2 JP 5919390 A JP5919390 A JP 5919390A JP 5919390 A JP5919390 A JP 5919390A JP H0820117 B2 JPH0820117 B2 JP H0820117B2
- Authority
- JP
- Japan
- Prior art keywords
- energization
- control command
- heater
- time
- hot water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims description 123
- 238000012545 processing Methods 0.000 claims description 72
- 238000004364 calculation method Methods 0.000 claims description 34
- 230000006870 function Effects 0.000 description 17
- 238000012546 transfer Methods 0.000 description 13
- 238000009835 boiling Methods 0.000 description 9
- 238000004891 communication Methods 0.000 description 8
- 238000001514 detection method Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 5
- 238000011084 recovery Methods 0.000 description 4
- 230000004044 response Effects 0.000 description 4
- 230000004913 activation Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Landscapes
- Heat-Pump Type And Storage Water Heaters (AREA)
Description
【発明の詳細な説明】 [産業上の利用分野] 本発明は、複数台の電気温水器を1台の中央処理装置
によって制御する貯湯式電気温水器集中制御システムに
用いるのに好適な集中制御型貯湯式電気温水器に関する
ものである。DETAILED DESCRIPTION OF THE INVENTION [Industrial field of application] The present invention relates to a centralized control suitable for use in a hot water storage type electric water heater centralized control system in which a plurality of electric water heaters are controlled by a single central processing unit. Type hot water storage type electric water heater.
[従来の技術] 近年、深夜電力時間帯における電力負荷の一時的低下
をできるだけ防止し且つ平準化するために、深夜電力時
間帯における複数台の電気温水器の通電制御を電力会社
等に配置した中央処理装置で制御する貯湯式電気温水器
集中制御システムが開発され、一部において試験運転が
開始されている。この集中制御システムの一例及びこの
システムで用いる貯湯式電気温水器の一例が、特開昭64
−23057号公報に記載されている。このシステムでは、
複数台の貯湯式電気温水器で必要通電時間を演算して中
央処理装置にその演算結果を送信する。中央処理装置
は、送信されてきた各電気温水器の必要通電時間に基い
て、深夜電力時間帯における電力負荷の一時的な低下を
防止し且つ平準化するように各貯湯式電気温水器の通電
開始時刻を演算し各貯湯式電気温水器に通電開始のため
に必要な制御指令を送る。そして従来の集中制御型貯湯
式電気温水器では、中央処理装置から通電開始時刻につ
いての制御指令を受信すると指定された時刻にヒータへ
の通電を開始し適宜にヒータへの通電を行って湯を沸き
上げている。[Prior Art] In recent years, in order to prevent as much as possible a temporary reduction of the power load in the midnight power time zone and level the power load, a power company or the like is provided with energization control of a plurality of electric water heaters in the midnight power time zone. A centralized control system for hot water storage type electric water heaters, which is controlled by a central processing unit, has been developed, and test operation has been started in some parts. An example of this centralized control system and an example of a hot water storage type electric water heater used in this system are disclosed in JP-A-64
-23057. In this system,
The required energization time is calculated by a plurality of hot water storage type electric water heaters and the calculation result is transmitted to the central processing unit. The central processing unit, based on the required energization time of each electric water heater transmitted, energizes each hot water storage electric water heater so as to prevent and level the power load temporarily during the midnight power time period. The start time is calculated and a control command necessary for starting energization is sent to each hot water storage type electric water heater. In the conventional central control hot water storage type electric water heater, when the control command for the energization start time is received from the central processing unit, the energization of the heater is started at the designated time, and the heater is energized as appropriate. It is boiling.
[発明が解決しようとする課題] 従来の集中制御型貯湯式電気温水器では、中央処理装
置から通電開始時刻についての制御指令が来なければヒ
ータへの通電制御を行わない。従って従来の集中制御型
貯湯式電気温水器では、中央処理装置の故障や通信回線
の故障により中央処理装置からの制御指令が電気温水器
に入力されない事態が発生すると、深夜電力を利用して
貯湯することができなくなるという問題が生じる。[Problems to be Solved by the Invention] In the conventional centralized control hot water storage type electric water heater, power supply to the heater is not controlled unless a control command regarding the power supply start time is received from the central processing unit. Therefore, in the conventional central control hot water storage type electric water heater, if a situation occurs in which the control command from the central processing unit is not input to the electric water heater due to a failure of the central processing unit or a failure of the communication line, the hot water is used to store hot water at midnight. The problem arises that you cannot do it.
本発明の目的は、事故が発生して所定の制限時刻まで
に中央処理装置から制御指令が入力されない場合でも、
自己の判断で湯を沸き上げることができる集中制御型貯
湯式電気温水器を提供することにある。The object of the present invention is, even if the control command is not input from the central processing unit by the predetermined time limit due to an accident,
It is to provide a centralized control hot water storage type electric water heater that can boil hot water at its own discretion.
本発明の他の目的は、事故回復後には中央処理装置か
らの制御指令を優先させて、システムを迅速に回復させ
ることができる集中制御型貯湯式電気温水器を提供する
ことにある。Another object of the present invention is to provide a centralized control hot water storage type electric water heater capable of promptly recovering the system by prioritizing control commands from the central processing unit after recovery from an accident.
[課題を解決するための手段] 本発明の集中制御型貯湯式電気温水器は、従来の電気
温水器と同様に、タンクやヒータを備えていることは勿
論のこととして、残湯量等に基いてヒータの必要通電時
間を演算する必要通電時間演算手段と、必要通電時間演
算手段の演算結果を中央処理装置に送信し且つ中央処理
装置から制御指令を受信するインターフェース部と、制
御指令に従ってヒータへの通電を制御する通電制御装置
とを備えている。本発明では、更に中央処理装置からの
制御指令の有無を判定する制御指令判定手段と、深夜電
力時間開始後の制限時刻までに制御指令が送信されて来
ない場合には、必要通電時間演算手段の演算結果に基い
てヒータに通電を行うために必要な自己制御指令を通電
制御装置に与える自己制御指令発生手段とを具備してい
る。[Means for Solving the Problems] The central control type hot water storage type electric water heater of the present invention, like the conventional electric water heater, is of course provided with a tank and a heater, and is based on the amount of remaining hot water and the like. Required energizing time calculating means for calculating the required energizing time of the heater, an interface section for transmitting the calculation result of the necessary energizing time calculating means to the central processing unit and receiving a control command from the central processing unit, and to the heater according to the control command And an energization control device for controlling energization of the. In the present invention, further, a control command determining means for determining the presence or absence of a control command from the central processing unit, and a required energizing time calculating means if the control command is not transmitted by the time limit after the start of the midnight power time And a self-control command generating means for giving a self-control command necessary for energizing the heater to the energization control device based on the calculation result of.
また請求項2の発明では、通電制御装置が、自己制御
指令が入力された後に中央処理装置から制御指令が入力
されると、以後制御指令に従ってヒータへの通電を制御
することを特徴とする。Further, in the invention of claim 2, when the energization control device inputs a control command from the central processing unit after the self-control command is input, the energization control device thereafter controls energization to the heater according to the control command.
[作 用] 本発明では、中央処理装置の故障及び通信回線の故障
によって、制御指令が入力されないことを制御指令判定
手段で検出する。制限時刻までに制御指令が送信されて
来なかった場合には、自己制御指令発生手段は必要通電
時間演算手段の演算結果に基いてヒータに通電を行うた
めに必要な自己制御指令を通電制御装置に与える。従っ
て本発明の装置によれば、中央処理装置の故障及び回線
故障が発生しても、所定の時間帯内に湯を所望の温度ま
で沸き上げることができる。特に本発明によれば、深夜
電力時間開始後の制限時刻までに制御指令が送信されて
来ない場合にだけ、自己制御指令発生手段が自己制御指
令を通電制御装置に与えるため、深夜電力時間開始後か
ら制限時刻になるまでの間に事故が復旧した場合には、
速やかに集中制御システムの回復を図ることができる。[Operation] In the present invention, the control command determination means detects that the control command is not input due to a failure of the central processing unit and a failure of the communication line. If the control command is not transmitted by the time limit, the self-control command generating means supplies the self-control command necessary for energizing the heater based on the calculation result of the necessary energization time calculating means. Give to. Therefore, according to the device of the present invention, even if a failure of the central processing unit and a line failure occur, the hot water can be boiled up to a desired temperature within a predetermined time period. In particular, according to the present invention, the self-control command generating means gives the self-control command to the energization control device only when the control command is not transmitted by the time limit after the start of the midnight power time. If the accident is recovered afterwards until the time limit is reached,
The centralized control system can be promptly restored.
請求項2の発明では、自己制御指令によって通電制御
装置が運転を行っていても、事故の復旧により中央処理
装置から制御指令が送信されてきた場合には、中央処理
装置からの制御指令に従って電気温水器を制御する。従
って事故の回復後速やかにシステムの回復を図ることが
できる。なお請求項2の発明は、特に中央処理装置がヒ
ータへの通電のオン時間(通電開始時間)だけでなくオ
フ時間(通電停止時間)をも指令する場合に効果を発揮
する。According to the second aspect of the invention, even if the energization control device is operating according to the self-control command, if the control command is transmitted from the central processing unit due to the recovery of the accident, the electric power is controlled according to the control command from the central processing device. Control the water heater. Therefore, the system can be promptly recovered after the accident is recovered. The invention of claim 2 is particularly effective when the central processing unit commands not only the on-time (energization start time) of energization to the heater but also the off-time (energization stop time).
[実施例] 以下図面を参照して本発明の実施例を詳細に説明す
る。Embodiments Embodiments of the present invention will be described in detail below with reference to the drawings.
第1図は、本発明の貯湯式電気温水器を集中制御シス
テムに適用する場合のシステムの概略構成を示す図であ
る。同図において1は貯湯式電気温水器、2は温水タン
ク、3は給湯口、4はヒータ、5は水温検出用センサ、
6は残湯量検出センサ、7は給水口である。ヒータ4に
は制御指令に応じて開閉する開閉器8を介して電源9か
ら電力が通電される。10は内部にマイクロコンピュータ
を備えてなる温水器制御装置である。温水器制御装置10
内には、水温検出用センサ5で検出した給水水温、残湯
量検出センサ6で検出した残湯量、沸上温度設定器11に
より設定した沸き上げ温度等を条件としてタンク2内の
湯を所定温度まで沸き上げるのに必要なヒータ4の通電
時間を演算する必要通電時間演算手段と、インターフェ
ース部12を介して中央処理装置13から送信されてきた制
御指令に従って開閉器8の開閉を制御してヒータ4への
通電を制御する通電制御装置と、後述する制御指令判定
手段と、自己制御指令発生手段とが構成されている。イ
ンターフェース部12は、温水器制御装置10で演算した必
要通電時間を中央処理装置13に送信し、また中央処理装
置13から送信されてくる制御指令を温水器制御装置10に
伝達する機能を果たす。中央処理装置13には、通信回線
を介して複数台の温水器1…から必要通電時間のデータ
が送信される。中央処理装置13は、これらのデータに基
いて各温水器の通電開始時刻を演算し、各温水器に通電
開始のために必要な制御指令を送信する。FIG. 1 is a diagram showing a schematic configuration of a system when the hot water storage type electric water heater of the present invention is applied to a centralized control system. In the figure, 1 is a hot water storage type electric water heater, 2 is a hot water tank, 3 is a hot water inlet, 4 is a heater, 5 is a water temperature detecting sensor,
6 is a remaining hot water amount detection sensor, and 7 is a water supply port. Electric power is supplied to the heater 4 from a power source 9 via a switch 8 that opens and closes according to a control command. Reference numeral 10 is a water heater controller having a microcomputer therein. Water heater controller 10
The temperature of the hot water in the tank 2 is set to a predetermined temperature by the conditions such as the feed water temperature detected by the water temperature detection sensor 5, the remaining hot water amount detected by the remaining hot water amount detection sensor 6, and the boiling temperature set by the boiling temperature setting device 11. Heater for controlling the opening / closing of the switch 8 in accordance with the required energization time calculation means for calculating the energization time of the heater 4 required to boil up to the temperature and the control command transmitted from the central processing unit 13 via the interface section 12. An energization control device for controlling the energization to No. 4, a control command determining means, which will be described later, and a self-control command generating means. The interface unit 12 has a function of transmitting the required energization time calculated by the water heater controller 10 to the central processing unit 13 and also transmitting a control command transmitted from the central processing unit 13 to the water heater controller 10. Data of the required energization time is transmitted to the central processing unit 13 from a plurality of water heaters 1 ... Through a communication line. The central processing unit 13 calculates the energization start time of each water heater on the basis of these data, and sends a control command necessary for starting energization to each water heater.
中央処理装置13から送信される制御指令の指令内容及
び指令の数は、温水器制御装置10の制御モードによって
異なる。例えば内部に時計機能を有する温水器制御装置
10では、自ら所定の時刻になると必要通電時間を演算し
て演算結果を中央処理装置13に送信し、中央処理装置13
から通電開始時刻が指定されると、その時刻にヒータへ
の通電を開始し、その後は自ら通電を停止する制御モー
ドを採用する場合がある。この場合には、中央処理装置
13は基本的に通電開始時刻を指令する制御指令だけを送
信する。これに対して、内部に時計機能を有しない温水
器制御装置10では、中央処理装置13からのデータ転送指
令に応じて必要通電時間を演算して演算結果を送信し、
また中央処理装置13からの通電開始指令に応じてヒータ
4への通電を開始し、通電停止指令に応じてヒータ4へ
の通電を停止するものもある。本発明は、どのような制
御モードで運転される温水器にも適用できるものであ
る。The command content and the number of commands of the control command transmitted from the central processing unit 13 differ depending on the control mode of the water heater controller 10. For example, a water heater controller with a clock function inside
At 10, when the predetermined time comes, the necessary energizing time is calculated and the calculation result is transmitted to the central processing unit 13, and the central processing unit 13
When the energization start time is designated by, the control mode in which energization to the heater is started at that time and energization is stopped thereafter may be adopted. In this case, the central processing unit
13 basically transmits only a control command for instructing the energization start time. On the other hand, in the water heater control device 10 that does not have a clock function inside, the necessary energization time is calculated according to the data transfer command from the central processing unit 13, and the calculation result is transmitted,
Further, there is also one that starts energization to the heater 4 in response to an energization start command from the central processing unit 13 and stops energization to the heater 4 in response to an energization stop command. The present invention can be applied to a water heater operated in any control mode.
第2図は、本発明の温水器の実質的なクレーム対応図
である。ここで必要通電時間演算手段101での演算方法
は、公知の演算方法を用いればよいが、例えば沸上温度
設定器11で設定した温度と水温検出センサ5で検出した
水温とから必要な温度差を求め、水温検出センサ5で検
出した水温と残湯量検出センサで検出したタンク各部に
おける湯温とからタンク内の残湯量を演算し、温度差と
残湯量とから必要な熱カロリーを求め、ヒータの容量と
熱カロリーから必要通電時間を演算してもよい。制御指
令判定手段102は、インターフェース12を介して入力さ
れる制御指令の有無を判定するものであり、所定の制御
指令が入力されるとその指令を通電制御装置103に伝達
する。また制御指令判定手段102は、制限時刻までに所
定の制御指令が入力されないことを判定すると、自己制
御指令発生手段104を作動させる。自己制御指令発生手
段104は、中央処理装置13からの制御指令がない場合
に、必要通電時間演算手段101で演算した演算結果に基
いてヒータ4への通電を行うのに必要な自己制御指令を
通電制御装置103に出力する。ここで「必要な自己制御
指令」とは、制御モードによって異なるが中央処理装置
から送信されてくる予定の制御指令(データ転送指令、
深夜電力時間開始指令、ヒータ通電開始指令、ヒータ通
電停止指令、深夜電力時間終了指令等)が送信されて来
ない場合に、必要通電時間演算手段101で演算した演算
結果に基いてヒータ4への通電制御を行うのに必要なす
べての指令を意味する。なお自己制御指令発生手段104
が作動を開始した後に、中央処理装置13からの制御指令
が入力されたときには、以後中央処理装置13からの制御
指令に従って通電制御装置103を制御するようにしても
よい。FIG. 2 is a diagram substantially corresponding to claims of the water heater of the present invention. Here, the required energization time calculating means 101 may use a known calculation method, for example, a necessary temperature difference from the temperature set by the boiling temperature setting device 11 and the water temperature detected by the water temperature detection sensor 5. Then, the residual hot water amount in the tank is calculated from the water temperature detected by the water temperature detection sensor 5 and the hot water temperature in each part of the tank detected by the residual hot water amount detection sensor, and the required thermal calorie is calculated from the temperature difference and the residual hot water amount. The required energization time may be calculated from the capacity and the heat calorie. The control command determination means 102 determines the presence or absence of a control command input via the interface 12, and when a predetermined control command is input, transmits the command to the energization control device 103. If the control command determination means 102 determines that the predetermined control command is not input by the time limit, the control command determination means 102 activates the self-control command generation means 104. When there is no control command from the central processing unit 13, the self-control command generating means 104 generates a self-control command necessary to energize the heater 4 based on the calculation result calculated by the necessary energization time calculating means 101. Output to the energization control device 103. Here, the "necessary self-control command" means a control command (data transfer command, data transfer command, which is scheduled to be transmitted from the central processing unit, although it depends on the control mode.
If no midnight power time start command, heater energization start command, heater energization stop command, midnight power time end command, etc.) is sent, the heater 4 is sent to the heater 4 on the basis of the calculation result calculated by the necessary energization time calculation means 101. It means all commands required to control the energization. The self-control command generating means 104
When a control command is input from the central processing unit 13 after the start of the operation, the energization control device 103 may be controlled thereafter according to the control command from the central processing unit 13.
第3図は、温水器制御装置10が内部に時計機能を有
し、自ら所定の時刻になると必要通電時間を演算して演
算結果を中央処理装置13に送信し、中央処理装置13から
通電開始時刻が指定されると、その時刻にヒータへの通
電を開始し、湯の温度が設定温度に達すると自ら通電を
停止する制御モードで運転される温水器に本発明を適用
する実施例のフローチャートである。この実施例では、
温水器制御装置10の内部に時計機能を有しているため、
深夜電力時間が開始されると(ステップST3−1)、必
要通電時間演算手段101はヒータ4への必要通電時間を
演算する(ステップST3−2)。そして自動的に演算結
果はインターフェース部12を介して中央処理装置13に送
信される(ステップST3−3)。中央処理装置13は、複
数台の電気温水器から送信されてきた必要通電時間に基
いて、各電気温水器の通電開始時刻を演算し、各電気温
水器に通電開始時刻を指令する制御指令を送信する(ス
テップST3−4,3−5)。この例では制御指令判定手段10
2は、予め定めた制限時刻までに制御指令が送信されて
来たか否かを判定する(ステップST3−6)。本実施例
では制御装置の内部に時計を有しているため、この制限
時刻の判定は、この時計を用いて行う。正常時には、制
限時刻までに制御指令が送信され、この制御指令は通電
制御装置103に入力される。この場合の通電制御装置103
は、指令された通電開始時刻になると開閉器8にオン信
号を出力して開閉器8をオン状態とする機能と、後述す
る自己制御指令発生手段104から自己制御指令が入力さ
れると開閉器8にオン信号を出力する機能とを有してい
る。開閉器8がオン状態になると、ヒータ4への通電が
行われる(ステップST3−8,3−9)。ヒータ4への通電
は、湯温が設定温度に達したことを温度センサが検出す
るまで継続され、湯温が設定温度に達すると通電制御装
置103は開閉器8にオフ信号を出力して開閉器8をオフ
状態とし、ヒータ4への通電を停止させる(ステップST
3−10,3−11)。なおヒータ4への通電を停止するため
に湯温を検出する温度センサとしては、水温検出用セン
サ5や残湯量検出センサ6に用いる温度センサを用いる
ことができる。In FIG. 3, the water heater control device 10 has a clock function inside, and at a predetermined time itself, calculates the required energization time and sends the calculation result to the central processing unit 13, and the central processing unit 13 starts energization. A flow chart of an embodiment in which the present invention is applied to a water heater operated in a control mode in which when a time is designated, energization of a heater is started at that time and energization is stopped when the temperature of hot water reaches a set temperature. Is. In this example,
Since it has a clock function inside the water heater controller 10,
When the midnight power time is started (step ST3-1), the required energization time calculation means 101 calculates the required energization time to the heater 4 (step ST3-2). Then, the calculation result is automatically transmitted to the central processing unit 13 via the interface unit 12 (step ST3-3). The central processing unit 13 calculates the energization start time of each electric water heater based on the required energization time transmitted from a plurality of electric water heaters, and outputs a control command to instruct each electric water heater of the energization start time. It is transmitted (steps ST3-4, 3-5). In this example, the control command determination means 10
2 determines whether or not the control command is transmitted by the predetermined time limit (step ST3-6). In this embodiment, since the control device has a clock inside, the time limit is determined using this clock. Under normal conditions, a control command is transmitted by the time limit, and this control command is input to the energization control device 103. Energization control device 103 in this case
Has a function of outputting an ON signal to the switch 8 to turn on the switch 8 at the instructed energization start time, and a switch when the self-control command is input from the self-control command generating means 104 described later. 8 has a function of outputting an ON signal. When the switch 8 is turned on, the heater 4 is energized (steps ST3-8, 3-9). Energization of the heater 4 is continued until the temperature sensor detects that the hot water temperature has reached the set temperature, and when the hot water temperature reaches the set temperature, the energization control device 103 outputs an off signal to the switch 8 to open / close the switch. Turn off the heater 8 and stop energizing the heater 4 (step ST
3-10, 3-11). As the temperature sensor for detecting the hot water temperature to stop the energization of the heater 4, a temperature sensor used for the water temperature detecting sensor 5 or the remaining hot water amount detecting sensor 6 can be used.
中央処理装置13の故障または通信回線の故障により制
限時刻までに制御指令が送信されて来ない場合には、制
御指令判定手段102が自己制御指令発生手段104に起動信
号を出力する。起動信号が入力されると自己制御指令発
生手段104は、必要通電時間演算手段101に演算を指令
し、必要通電時間演算手段101の演算結果に基いてヒー
タ4に通電を行うために必要な自己制御指令を通電制御
装置103に出力する。この場合の自己制御指令発生手段1
04は、深夜電力の残り時間を演算する残り時間演算機能
と、必要通電時間演算手段101で演算した必要通電時間
が深夜電力残り時間に等しくなるか又はそれより長いか
否かを判定する判定機能とを有している。自己制御指令
発生手段104は、必要通電時間が深夜電力残り時間に等
しくなるか又はそれより長い場合に、自己制御指令を出
力する(ステップST3−7)。通電制御装置103は、自己
制御指令が入力されると開閉器8にオン信号を出力して
開閉器8をオン状態として、ヒータ4への通電を行う
(ステップST3−9)。以後の動作は、正常な場合と同
じである。When the control command is not transmitted by the time limit due to the failure of the central processing unit 13 or the failure of the communication line, the control command determining means 102 outputs a start signal to the self-control command generating means 104. When the activation signal is input, the self-control command generation means 104 commands the required energization time calculation means 101 to perform calculation, and based on the calculation result of the required energization time calculation means 101, the self-control command generation means 104 performs the self-control The control command is output to the energization control device 103. Self-control command generator 1 in this case
04 is a remaining time calculation function for calculating the remaining time of the midnight power, and a determination function for determining whether the required energization time calculated by the required energization time calculation means 101 is equal to or longer than the remaining nighttime power remaining time. And have. The self-control command generating means 104 outputs a self-control command when the required energization time is equal to or longer than the midnight power remaining time (step ST3-7). When the self-control command is input, the energization control device 103 outputs an ON signal to the switch 8 to turn on the switch 8 and energize the heater 4 (step ST3-9). The subsequent operation is the same as in the normal case.
このように本実施例によれば、中央処理装置13又は通
信回線で故障が発生した場合でも、深夜電力を利用して
湯を所定の沸き上げ温度まで沸き上げることができる。As described above, according to this embodiment, even when a failure occurs in the central processing unit 13 or the communication line, the hot water can be boiled up to a predetermined boiling temperature by using the midnight power.
なおこの実施例の変形例としては、中央処理装置13か
らの制御指令が入力されないときに、自己制御指令手段
104で判定に用いる必要通電時間として、中央処理装置1
3へ送信される必要通電時間を適宜のメモリに記憶させ
ておき、この記憶させた必要通電時間を用いるようにす
ることもできる。また通電制御装置103に、必要通電時
間のカウント機能を付加し、ヒータ4への通電を開始し
てから必要通電時間のカウントを開始してカウントが終
了た時点で、開閉器8にオフ信号を出力するように通電
制御装置103を構成してもよい。また自己制御指令発生
手段104を、制御指令判定手段102から起動信号が入力さ
れた時点で直ちに自己制御指令を出力するように構成し
てもよい。As a modified example of this embodiment, when the control command from the central processing unit 13 is not input, the self-control command means
As the required energizing time used for determination in 104, the central processing unit 1
It is also possible to store the required energization time transmitted to 3 in an appropriate memory and use the stored required energization time. Further, a function of counting the required energization time is added to the energization control device 103, and after the energization of the heater 4 is started, the counting of the required energization time is started and when the counting is finished, an OFF signal is given to the switch 8. The energization control device 103 may be configured to output. Further, the self-control command generating means 104 may be configured to output the self-control command immediately when the activation signal is input from the control command determining means 102.
更に上記実施例において、制御指令判定手段102は制
御指令の有無だけを判定するようにして、自己制御指令
発生手段104に制限時刻までに所定の制御指令が入力さ
れているか否かを判定する機能を持たせてもよい。この
場合には上記実施例と異なって、制御指令判定手段102
から起動信号が出力されることはなく、制御指令判定手
段102は制御指令の入力状態を自己制御指令発生手段104
に指示する。Further, in the above embodiment, the control command determining means 102 determines whether or not there is a control command, and determines whether or not a predetermined control command has been input to the self-control command generating means 104 by the time limit. May be given. In this case, unlike the above embodiment, the control command determination means 102
No activation signal is output from the control command determining means 102, and the control command determining means 102 changes the control command input state to the self-control command generating means 104.
Instruct.
次に温水器制御装置10の内部機能を時計を有しておら
ず、中央処理装置13からの指令によって、中央処理装置
13へのデータの転送、深夜電力時間開始の確認、ヒータ
4への通電開始、ヒータへの通電停止、深夜電力時間終
了の確認のそれぞれを行う制御モードで運転される集中
制御型貯湯式電気温水器に本発明を適用する場合の実施
例について説明する。中央処理装置13から出力される制
御指令は、必要通電時間の演算及び転送を指令するデー
タ転送指令と、深夜電力時間が始まったことを知らせる
深夜電力時間開始指令と、ヒータへの通電の開始を指令
するヒータ通電開始指令と、ヒータへの通電の停止を指
令するヒータ通電停止指令と、深夜電力時間が終了した
ことを指令する深夜電力時間終了指令とである。第4図
は、この実施例のフローチャートを示している。この実
施例を実施するためには、第2図に示したクレーム対応
図の制御指令判定手段102に、中央処理装置13からの複
数の制御指令(データ転送指令,深夜電力時間開始指
令、ヒータ通電開始指令、ヒータ通電停止指令、深夜電
力時間終了指令)の有無を判定する機能と、中央処理装
置13からデータ転送指令が入力されたときに、必要通電
時間演算手段101にデータの転送の指令を与える機能と
を持たせる。また必要通電時間演算手段101には、制御
指令判定手段102からの転送指令に応じて演算結果を中
央処理装置13に転送する機能を持たせる。更に自己制御
指令発生手段104には、自己タイマを設ける。この自己
タイマは、深夜電力時間開始指令によってリセットされ
て0時間を初期値として時間の計数を開始し、また深夜
電力時間開始指令の入力がない場合には、自己タイマが
25時間(前日の24時間+1時間)をカウントするとリセ
ットされて1時間を初期値として時間の係数を開始す
る。またこの実施例で自己制御指令発生手段104は、中
央処理装置13からヒータ通電開始指令が入力されない場
合に、ヒータへの通電を開始するための自己制御指令を
通電制御装置に出力する機能の他に、中央処理装置1か
らヒータ通電停止指令が入力されない場合に、ヒータへ
の通電を停止させるための自己制御指令を通電制御装置
に出力する機能を備えている。Next, the internal function of the water heater control device 10 does not have a clock, and the central processing unit 13 is instructed by a command from the central processing unit 13.
Centralized control hot water storage type electric hot water operated in control modes of transferring data to 13, confirming start of midnight power time, starting energization of heater 4, stopping energization of heater, and confirming end of midnight power time An example in which the present invention is applied to a container will be described. The control command output from the central processing unit 13 is a data transfer command for instructing calculation and transfer of the required energization time, a midnight power time start command notifying that the midnight power time has started, and a start of energization to the heater. A heater energization start command for instructing, a heater energization stop command for instructing to stop energization of the heater, and a midnight power time end command for instructing the end of the midnight power time. FIG. 4 shows a flow chart of this embodiment. In order to carry out this embodiment, a plurality of control commands (data transfer command, midnight power time start command, heater energization) are sent from the central processing unit 13 to the control command determination means 102 of the claim correspondence diagram shown in FIG. (Start command, heater energization stop command, midnight power time end command), and a data transfer command to the required energization time calculation means 101 when a data transfer command is input from the central processing unit 13. It has the function to give. Further, the required energization time calculation means 101 is provided with a function of transferring the calculation result to the central processing unit 13 in response to the transfer command from the control command determination means 102. Further, the self-control command generating means 104 is provided with a self-timer. This self-timer is reset by the midnight power time start command, starts counting the time with 0 hours as an initial value, and when the midnight power time start command is not input, the self timer starts.
When 25 hours (24 hours on the previous day + 1 hour) are counted, they are reset and the hour coefficient is started with 1 hour as the initial value. Further, in this embodiment, the self-control command generation means 104 has a function of outputting a self-control command for starting energization of the heater to the energization control device when the heater energization start command is not input from the central processing unit 13. In addition, when the heater energization stop command is not input from the central processing unit 1, a function of outputting a self-control command for stopping energization of the heater to the energization control device is provided.
第4図のフローチャートに基いてこの実施例を説明す
る。この例では、必要通電時間演算手段101が常時必要
通電時間を演算している。そして制御指令判定手段102
がデータ転送指令の有無を判定し、中央処理装置13から
データ転送指令が送信されたことを判定すると、必要通
電時間演算手段101は演算結果(必要通電時間)を中央
処理装置に転送する(ステップST4−1,4−2,4−3)。
故障の発生により、データ転送指令が来なかった場内に
は、先のステップに進む。次に制御指令判定手段102が
深夜電力時間開始指令の入力を判定すると、制御指令判
定手段102は自己制御指令発生手段104に内蔵された自己
タイマを0時間にリセットする(ステップST4−4,4−
5)。なお現在の深夜電力供給体制では、深夜電力時間
開始指令は23時(午後11時)に中央処理装置から送信さ
れる。深夜電力時間開始指令が第1の制限時刻(前日か
らの時間の計数を行っている自己タイマが25時間を計数
する時刻)になるまでに制御指令判定手段102に入力さ
れないときにはステップST4−1〜4−4を繰り返す
(ステップST4−6)。また深夜電力時間開始指令が第
1の制限時刻になっても制御指令判定手段102に入力さ
れないときには、自己タイマは初期値を1時間として計
数を開始するようにリセットされて第2の制限時刻が設
定される(ステップST4−6,4−7)。これは23時(午後
11時)から午前0時までの1時間を、中央処理装置13又
は通信回線の事故の回復を待つ時間とするための工夫で
ある。この1時間の間に事故が回復して、中央処理装置
13から深夜電力時間開始指令が入力されたことを制御指
令判定手段102が判定すると、以後中央処理装置13の指
令に従って制御が行われる。なおこの場合、自己タイマ
は0時間にリセットされるが、正常な動作が行われれば
翌日の深夜電力時間開始指令の入力により正常な状態に
戻るので支障はない。なお上記の動作において、深夜電
力時間開始指令が制限時刻までに入力されなかった場合
には、自己制御指令発生手段104が内蔵する自己タイマ
から深夜電力時間帯内に入っていることを検知している
と考えることができる。This embodiment will be described with reference to the flowchart of FIG. In this example, the required energization time calculation means 101 constantly calculates the required energization time. Then, the control command determination means 102
Determines whether there is a data transfer command and determines that the data transfer command has been transmitted from the central processing unit 13, the required energization time calculation means 101 transfers the calculation result (required energization time) to the central processing unit (step ST4-1, 4-2, 4-3).
If the data transfer command does not arrive due to the occurrence of a failure, proceed to the previous step. Next, when the control command determination means 102 determines the input of the midnight power time start command, the control command determination means 102 resets the self timer built in the self control command generation means 104 to 0 hours (steps ST4-4, 4). −
5). In the current midnight power supply system, the midnight power time start command is transmitted from the central processing unit at 23:00 (11:00 pm). When the midnight power time start command is not input to the control command determination means 102 before the first time limit (the time at which the self-timer counting the time from the previous day counts 25 hours) is reached, steps ST4-1 to ST4-1 Repeat 4-4 (step ST4-6). Further, when the midnight power time start command is not input to the control command determination means 102 even when the first time limit is reached, the self-timer is reset to start counting with the initial value as one hour, and the second time limit is set. It is set (steps ST4-6, 4-7). This is 23:00 (pm
This is a device for making 1 hour from 11:00) to midnight the time to wait for the recovery of the accident of the central processing unit 13 or the communication line. The accident recovered within the last hour, and the central processing unit
When the control command determination means 102 determines that the midnight power time start command is input from 13, the control is performed in accordance with the command from the central processing unit 13 thereafter. In this case, the self-timer is reset to 0 hour, but if the normal operation is performed, it returns to the normal state by the input of the midnight power time start command on the next day, so there is no problem. In the above operation, when the midnight power time start command is not input by the time limit, the self-control command generation means 104 detects that the self-timer is in the midnight power time zone. Can be considered
ヒータ通電開始指令が入力されたことを制御指令判定
手段102が判定すると、通電制御装置103は開閉器8をオ
ン状態にするオン信号を出力する(ステップST4−
8)。When the control command determination means 102 determines that the heater energization start command has been input, the energization control device 103 outputs an ON signal for turning on the switch 8 (step ST4-
8).
第3の制限時刻までに、ヒータ通電開始指令が入力さ
れない場合には、自己制御指令発生手段104は通電開始
のための自己制御指令を出力する(ステップST4−
9)。ここでの第3の制限時刻は、自己制御指令発生手
段104内で決定される。即ち自己制御指令発生手段104
は、自己タイマの計数時間を時刻として深夜電力の残り
時間を演算し、必要通電時間演算手段101で演算した必
要通電時間が深夜電力残り時間に等しくなったとき又は
それより長いことを検出したときを第3の制限時刻と決
定して、そのときまでにヒータ通電開始指令が入力され
ない場合には、通電開始のための自己制御指令を出力す
る(ステップST4−9)。通電制御装置103は、この自己
制御指令が入力されると開閉器8にオン信号を出力して
開閉器8をオン状態として、ヒータ4への通電を行う
(ステップST4−10)。If the heater energization start command is not input by the third time limit, the self-control command generation means 104 outputs a self-control command for starting energization (step ST4-
9). The third time limit here is determined in the self-control command generation means 104. That is, the self-control command generating means 104
Is calculated when the remaining time of the midnight power is calculated with the counting time of the self-timer as the time, and when the required energization time calculated by the required energization time calculation means 101 becomes equal to the remaining nighttime power remaining time or when it is detected that it is longer. Is determined as the third time limit, and if the heater energization start command is not input by that time, the self-control command for energization start is output (step ST4-9). When the self-control command is input, the energization control device 103 outputs an ON signal to the switch 8 to turn on the switch 8 and energize the heater 4 (step ST4-10).
次に中央処理装置13からヒータ通電停止指令が入力さ
れたか否かを制御指令判定手段102が判定する。この時
点で中央処理装置13又は通信回線での故障が回復してい
れば、制御指令制御手段102からの指令に応じて通電制
御装置103は開閉器8にオフ信号を出力し、開閉器8が
オフ状態になってヒータ4への通電が停止される(ステ
ップST4−11,4−13)。制御指令判定手段102がヒータ通
電停止指令の入力がないことを示す信号を自己制御指令
発生手段104に出力している場合には、自己制御指令発
生手段104は湯温と沸き上げ設定温度とを比較し、湯温
が沸き上げ設定温度に達したときに、ヒータへの通電を
停止せるための自己制御信号を通電制御装置103に出力
する。通電制御装置103は、この自己制御信号が入力さ
れると開閉器8にオフ信号を出力して開閉器8をオフ状
態とし、ヒータ4への通電を停止させる(ステップST4
−12,4−13)。ヒータ4への通電を停止するために湯温
を検出する温度センサとしては、水温検出用センサ5や
残湯量検出センサ6に用いる温度センサを用いることが
できる。もちろんヒータ4へと通電を停止させるための
自己制御指令が出力される前に、中央処理装置13からヒ
ータ通電停止指令が入力されると、この指令に従ってヒ
ータ4への通電は停止される。Next, the control command determination means 102 determines whether or not a heater energization stop command has been input from the central processing unit 13. At this time, if the failure in the central processing unit 13 or the communication line is recovered, the energization control device 103 outputs an OFF signal to the switch 8 in response to the command from the control command control means 102, and the switch 8 is switched. The heater 4 is turned off and the power supply to the heater 4 is stopped (steps ST4-11, 4-13). When the control command determination means 102 outputs a signal indicating that the heater energization stop command is not input to the self-control command generation means 104, the self-control command generation means 104 determines the hot water temperature and the boiling set temperature. By comparison, when the hot water temperature reaches the boiling set temperature, a self-control signal for stopping the power supply to the heater is output to the power supply control device 103. When the self-control signal is input, the energization control device 103 outputs an off signal to the switch 8 to turn off the switch 8 and stop energizing the heater 4 (step ST4
-12, 4-13). As the temperature sensor for detecting the hot water temperature to stop the energization of the heater 4, a temperature sensor used for the water temperature detecting sensor 5 or the remaining hot water amount detecting sensor 6 can be used. Of course, if a heater energization stop command is input from the central processing unit 13 before the self-control command for stopping energization to the heater 4 is output, energization to the heater 4 is stopped according to this command.
なお中央処理装置13から深夜電力時間終了指令が入力
されると、スタートに戻る(ステップST4−14)。深夜
電力時間終了指令が入力されないときには、自己制御指
令発生手段104の自己タイマが9時間(深夜電力時間の
8時間+自己タイマの初期値1時間)を計数するスター
トに戻る(ステップST4−15)。言い替えると自己制御
指令発生手段104は、深夜電力時間終了指令が入力され
ないときに深夜電力時間の終了を示す自己制御制御指令
を出力する。When the midnight power time end command is input from the central processing unit 13, the process returns to the start (step ST4-14). When the midnight power time end command is not input, the self-timer of the self-control command generating means 104 returns to the start of counting 9 hours (8 hours of midnight power time + initial value of self timer) (step ST4-15). . In other words, the self-control command generating means 104 outputs a self-control control command indicating the end of the midnight power time when the midnight power time end command is not input.
第4図のフローチャートに従って動作する上記実施例
によれば、中央処理装置13又は通信回線で発生した故障
が深夜電力時間帯で回復した場合には、中央処理装置13
からの制御指令に従って温水器の運転が行われるため、
集中制御システムの迅速な回復を図ることができる。According to the above-described embodiment operating according to the flow chart of FIG. 4, when the failure occurred in the central processing unit 13 or the communication line is recovered in the midnight power time zone, the central processing unit 13
Since the water heater is operated according to the control command from
The centralized control system can be quickly restored.
上記実施例においては、自己制御指令発生手段104に
沸き上げ温度が設定温度に達したときにヒータ4への通
電停止を停止させるための自己制御指令を出力する機能
を持たせているが、自己制御指令発生手段104に必要通
電時間のカウント機能を付加し、ヒータ4への通電を開
始してから必要通電時間のカウントを開始してカウント
が終了した時点で、ヒータ4への通電を停止させるため
の自己制御指令を出力するように自己制御指令発生手段
104を構成することもできる。In the above embodiment, the self-control command generating means 104 has a function of outputting a self-control command for stopping the stop of energization of the heater 4 when the boiling temperature reaches the set temperature. A function for counting the required energization time is added to the control command generation means 104 so that energization of the heater 4 is stopped when the energization of the heater 4 is started and then the counting of the required energization time is started. Self-control command generating means for outputting self-control command for
104 can also be configured.
[発明の効果] 本発明によれば、中央処理装置の故障及び回線故障に
よって、制御指令が入力されないことを制御指令判定手
段で検出し、制限時刻までに制御指令が送信されて来な
かった場合には、自己制御指令発生手段が必要通電時間
演算手段の演算結果に基いてヒータに通電を行うために
必要な自己制御指令を通電制御装置に与えるため、中央
処理装置の故障及び回線故障が発生しても、所定の時間
帯内に湯を所望の温度まで沸き上げることができる。EFFECTS OF THE INVENTION According to the present invention, when the control command determination means detects that the control command is not input due to the failure of the central processing unit and the line failure, and the control command is not transmitted by the time limit. , The self-control command generation means gives the self-control command necessary for energizing the heater to the energization control device based on the calculation result of the required energization time calculation means, so that the central processing unit failure and the line failure occur. Even so, hot water can be boiled up to a desired temperature within a predetermined time period.
特に本発明によれば、深夜電力時間開始後の制限時刻
までに制御指令が送信されて来ない場合にだけ、自己制
御指令発生手段が自己制御指令を通電制御装置に与える
ため、深夜電力時間開始後から制限時刻になるまでの間
に事故が復旧した場合には、速やかに集中制御システム
の回復を図ることができる。In particular, according to the present invention, the self-control command generating means gives the self-control command to the energization control device only when the control command is not transmitted by the time limit after the start of the midnight power time. If the accident is recovered after the time reaches the time limit, the central control system can be promptly recovered.
また請求項2の発明によれば、自己制御指令によって
通電制御装置が運転を行っていても、事故の復旧により
中央処理装置から制御指令が送信されてきた場合には、
中央処理装置からの制御指令に従って電気温水器を制御
するので、事故の回復後速やかにシステムの回復を図る
ことができる利点がある。According to the invention of claim 2, even if the energization control device is operating by the self-control command, if the control command is transmitted from the central processing unit due to the recovery of the accident,
Since the electric water heater is controlled according to the control command from the central processing unit, there is an advantage that the system can be promptly recovered after the accident is recovered.
第1図は本発明の集中制御型貯湯式電気温水器を集中制
御システムに適用した場合のシステムの概略構成図、第
2図は本発明の集中制御型貯湯式電気温水器のクレーム
対応図、第3図は第1の実施例を実施する場合の制御の
フローチャート図、第4図は第2の実施例を実施する場
合の制御のフローチャート図である。 1……貯湯式電気温水器、2……温水タンク、3……給
湯口、4……ヒータ、5……水温検出用センサ、6……
残湯量検出センサ、7……給水口、8……開閉器、9…
…電源、10……温水器制御装置、11……沸上温度設定器
11、12……インターフェース部、13……中央処理装置、
101……必要通電時間演算手段、102……制御指令判定手
段、103……通電装置、104……自己制御指令発生手段。FIG. 1 is a schematic configuration diagram of a system when the central control type hot water storage type electric water heater of the present invention is applied to a central control system, and FIG. 2 is a diagram corresponding to claims of the central control type hot water storage type electric water heater of the present invention, FIG. 3 is a flowchart of control when the first embodiment is carried out, and FIG. 4 is a flowchart of control when the second embodiment is carried out. 1 ... Hot water storage type electric water heater, 2 ... Hot water tank, 3 ... Hot water supply port, 4 ... Heater, 5 ... Water temperature detection sensor, 6 ...
Remaining hot water amount detection sensor, 7 ... Water supply port, 8 ... Switch, 9 ...
… Power supply, 10 …… Water heater controller, 11 …… Boiling temperature setting device
11, 12 …… Interface section, 13 …… Central processing unit,
101 ... Necessary energizing time calculating means, 102 ... Control command determining means, 103 ... Energizing device, 104 ... Self-control command generating means.
Claims (2)
ヒータの必要通電時間に基いて各貯湯式電気温水器の通
電開始時刻を演算し各貯湯式電気温水器に通電開始のた
めに必要な制御指令を送る中央処理装置からの前記制御
指令に従ってヒータの通電を制御する集中制御型貯湯式
電気温水器において、 水温、残湯量湯に基いて前記ヒータの必要通電時間を演
算する必要通電時間演算手段と、 前記必要通電時間演算手段の演算結果を前記中央処理装
置に送信し、前記中央処理装置から前記制御指令を受信
するインターフェース部と、 入力される指令に従って前記ヒータへ通電を制御する通
電制御装置と、 前記中央処理装置からの前記制御指令の有無を判定する
制御指令判定手段と、 深夜電力時間開始後の制限時刻までに前記制御指令が送
信されて来ない場合には前記必要通電時間演算手段の演
算結果に基いて前記ヒータに通電を行うために必要な自
己制御指令を前記通電制御装置に与える自己制御指令発
生手段とを具備してなる集中制御型貯湯式電気温水器。1. An energization start time for each hot water storage type electric water heater is calculated based on the required energization time of heaters transmitted from a plurality of hot water storage type electric water heaters to start the energization of each hot water storage type electric water heater. In a centralized control hot water storage type electric water heater that controls the energization of the heater in accordance with the control command from the central processing unit that sends the necessary control command, the required energization that calculates the required energization time of the heater based on the water temperature and the amount of hot water remaining. A time calculation unit, an interface unit that transmits the calculation result of the required energization time calculation unit to the central processing unit and receives the control command from the central processing unit, and controls energization to the heater according to an input command. An energization control device, a control command determination unit that determines the presence or absence of the control command from the central processing unit, and the control command is transmitted by a time limit after the start of the midnight power time. If not, it comprises self-control command generating means for giving the self-control command to the energization control device, which is required to energize the heater based on the calculation result of the necessary energization time calculating means. Centralized control hot water storage type electric water heater.
入力された後に前記中央処理装置から前記制御指令が入
力されると、以後前記制御指令に従って前記ヒータへの
通電を制御する請求項1に記載の集中制御型貯湯式電気
温水器。2. The energization control device controls energization to the heater according to the control command when the control command is input from the central processing unit after the self-control command is input. Centralized control hot water storage type electric water heater described in.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5919390A JPH0820117B2 (en) | 1990-03-09 | 1990-03-09 | Centralized control hot water storage type electric water heater |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5919390A JPH0820117B2 (en) | 1990-03-09 | 1990-03-09 | Centralized control hot water storage type electric water heater |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH03260553A JPH03260553A (en) | 1991-11-20 |
| JPH0820117B2 true JPH0820117B2 (en) | 1996-03-04 |
Family
ID=13106339
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP5919390A Expired - Fee Related JPH0820117B2 (en) | 1990-03-09 | 1990-03-09 | Centralized control hot water storage type electric water heater |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0820117B2 (en) |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS58150747A (en) * | 1982-03-03 | 1983-09-07 | Mitsubishi Electric Corp | Controller for hot-water storage type electric water heater |
| JPS63113253A (en) * | 1986-10-28 | 1988-05-18 | Mitsubishi Electric Corp | Control device for electric water heater |
-
1990
- 1990-03-09 JP JP5919390A patent/JPH0820117B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH03260553A (en) | 1991-11-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0355732B2 (en) | ||
| JPH0820117B2 (en) | Centralized control hot water storage type electric water heater | |
| JP2010144955A (en) | Hot water storage hot water supply system | |
| JP2834262B2 (en) | Centralized control type hot water storage type electric water heater and its control method | |
| JPH04288446A (en) | electric water heater system | |
| JP3631363B2 (en) | Electric water heater | |
| JP3128389B2 (en) | Electric water heater | |
| JP2966251B2 (en) | Hot water storage type electric water heater | |
| KR101636130B1 (en) | Device for supplying hot water | |
| JP2001349607A (en) | Hot water supply device data complementing method and hot water supply device | |
| JP4036264B2 (en) | Electric water heater and heating method program | |
| JPS6030943A (en) | Control device of hot-water storage type electric hot-water heater | |
| JPS6030929A (en) | Control device for hot water storage type electric water heater | |
| JPH07104044B2 (en) | Central control device for midnight power water heater | |
| JPS6111552A (en) | Hot water storage type electric water heater | |
| JPH05215400A (en) | Controller for hot water storage type electric warm water oven | |
| JPS58105272A (en) | Temperature controller of fixation device in copying machine | |
| JPS61110840A (en) | Controlling device for electric water heater | |
| JPH07167499A (en) | Electric water heater | |
| JPH04143545A (en) | Hot water storing electric hot well | |
| JP3330437B2 (en) | Hot water storage type electric water heater control device | |
| JPS6039701Y2 (en) | Air conditioning control device | |
| JPS6186531A (en) | Control device for electric water heater | |
| JPH05141778A (en) | Boil-up controller for electric water heater | |
| JPH02197757A (en) | Electric power supply control device for electric water heater |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313532 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080304 Year of fee payment: 12 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090304 Year of fee payment: 13 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100304 Year of fee payment: 14 |
|
| LAPS | Cancellation because of no payment of annual fees |