JPH0822160B2 - Power plant load adjusting device - Google Patents
[go: Go Back, main page]

JPH0822160B2 - Power plant load adjusting device - Google Patents

Power plant load adjusting device

Info

Publication number
JPH0822160B2
JPH0822160B2 JP61048378A JP4837886A JPH0822160B2 JP H0822160 B2 JPH0822160 B2 JP H0822160B2 JP 61048378 A JP61048378 A JP 61048378A JP 4837886 A JP4837886 A JP 4837886A JP H0822160 B2 JPH0822160 B2 JP H0822160B2
Authority
JP
Japan
Prior art keywords
load
load change
signal
change rate
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP61048378A
Other languages
Japanese (ja)
Other versions
JPS62207200A (en
Inventor
誠逸 二川原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP61048378A priority Critical patent/JPH0822160B2/en
Publication of JPS62207200A publication Critical patent/JPS62207200A/en
Publication of JPH0822160B2 publication Critical patent/JPH0822160B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Control Of Eletrric Generators (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は発電プラントの負荷制御に係り、特に給電所
指令により火力発電プラントが自動運転される場合、プ
ラント機器耐用年数を損うような過度の負荷変動を抑制
しながら給電所指令に負荷追従するに好適な火力発電プ
ラントの負荷調整装置に関する。
Description: TECHNICAL FIELD The present invention relates to load control of a power generation plant, and particularly when a thermal power generation plant is automatically operated by a power supply station command, an excessive amount of life such that the service life of the plant equipment is deteriorated. The present invention relates to a load adjusting device for a thermal power plant that is suitable for following a load to a power supply station command while suppressing the load fluctuation.

〔従来の技術〕[Conventional technology]

ベース負荷を担う原子力発電プラントの建設にともな
い、最近では電力系統の需給バランスを吸収するための
電力調整を火力発電プラントにも求められるようにな
り、これに答えるため中間負荷運用プラントとして負荷
応答性にすぐれたDSS(Daily Start−Up and Shut−dow
n)火力が建設されている。
With the construction of the nuclear power plant that bears the base load, recently, the thermal power plant is also required to adjust the power to absorb the supply and demand balance of the power system. Excellent DSS (Daily Start-Up and Shut-dow
n) Firepower is being built.

従来、火力発電プラントは、給電所からのELD(経済
負荷配分:多数の発電プラントに対し経済的に最適の負
荷配分計算をして各発電プラントに指令される信号で、
指令信号の周期は普通15分以上と長い)信号、およびAF
C(周波数制御:電力系統の周波数を一定にするための
調整負荷指令信号で、指令信号の周期は普通2〜15分と
比較的短かい)信号により自動運転ができるようになつ
ている。これらELD,AFC信号は電力系統運転用の立場か
ら経済性を指標に作られているため、プラントの特性
(負荷応答性など)についてはELD,AFC信号受け入れ側
(プラント側)で制限をかけるなど考慮している。
Conventionally, a thermal power plant is an ELD (economic load distribution) from a power supply station, which is a signal instructed to each power plant by economically optimal load distribution calculation for many power plants.
The command signal cycle is usually as long as 15 minutes or more) signal and AF
C (frequency control: a regulated load command signal for keeping the frequency of the electric power system constant, and the command signal cycle is usually relatively short at 2 to 15 minutes) enables automatic operation. Since these ELD and AFC signals are made with economic efficiency as an index from the viewpoint of power system operation, plant characteristics (load response, etc.) are limited on the ELD and AFC signal receiving side (plant side). I am considering.

第4図は従来技術の一例であるが、給電所からのELD
信号1は出力目標値の手動設定器7による制御との切替
えを行うELD制御入/切切替器3を通り、減算器4、負
荷変化率上下制限器5、および積分器6により目標出力
パターン信号106が作られる。また、給電所からのAFC信
号2はAFC巾(負荷変化巾)の手動設定器15による制限
と自動設定による制限とが切替器16によつて切替えら
れ、負荷変化巾の上下限制器11により制限がかけられる
が、ELD信号と同様に減算機12、負荷変化率上下限制限
器13、および積分器14によつて系統周波数調整のための
調整用負荷パターン信号114が作られ、これが加算器10
によつて前記目標出力パターン信号106に加算され、発
電機出力指令101となつてタービンガバナを制御する。
Fig. 4 shows an example of conventional technology, but the ELD from the power supply station
The signal 1 passes through the ELD control on / off switch 3 that switches between control of the output target value and the manual setting device 7, and the target output pattern signal is output by the subtractor 4, the load change rate up / down limiter 5, and the integrator 6. 106 is made. In addition, the AFC signal 2 from the power supply station is switched between the limit by the manual setting device 15 and the automatic setting of the AFC width (load change width) by the switching device 16, and is limited by the load change width upper / lower limit controller 11. Similarly to the ELD signal, the subtractor 12, the load change rate upper / lower limit limiter 13, and the integrator 14 generate an adjustment load pattern signal 114 for system frequency adjustment, which is added by the adder 10
Is added to the target output pattern signal 106, and the turbine output is controlled by the generator output command 101.

ここで、ELD信号に対する負荷変化率制限は設定器9
による手動設定も可能だが、自動運転の場合は負荷変化
率設定自動/手動切替器8により関数発生器31の信号に
よつて負荷変化率制限がかけられる。この関数発生器31
のF1(X)特性は第5図に示すように発電機出力の関数
になつている。
Here, the load change rate limit for the ELD signal is set by the setter 9.
However, in the case of automatic operation, the load change rate setting automatic / manual switch 8 limits the load change rate by the signal from the function generator 31. This function generator 31
The F 1 (X) characteristic of is a function of the generator output as shown in FIG.

一方、AFC信号に対する負荷変化巾および負荷変化率
の制限は切替器16および18により、関数発生器32および
33の信号によつて自動設定される。
On the other hand, the load change width and load change rate with respect to the AFC signal are limited by the switchers 16 and 18 and the function generator 32 and
Automatically set by 33 signals.

この関数発生器32,33のF2(X),F3(X)特性も第5
図に示すように発電機出力の関数になつている。
The F 2 (X) and F 3 (X) characteristics of the function generators 32 and 33 are also the fifth
As shown, it is a function of the generator output.

なお、AFC制御切替とした場合は負荷変化率上下限制
限器13にゼロ値17が設定される。
When the AFC control is switched, a zero value 17 is set in the load change rate upper / lower limit limiter 13.

このようにして、給電所からのELD信号およびAFC信号
による負荷要求に対し、プラントが許容する、負荷変化
率および負荷変化巾の範囲内で負荷応答できるようにな
つている。
In this way, it is possible to respond to the load demand by the ELD signal and the AFC signal from the power feed station within the range of the load change rate and the load change width that the plant allows.

しかし、ここで云う負荷変化率制限機能は比較的ゆつ
くりした負荷変化(1日2〜4回の大くな負荷変化程度
のもの)に対しては有効であるが、給電指令による高頻
度負荷変化に対しては配慮されていなかつた。
However, the load change rate limiting function mentioned here is effective for a relatively slow load change (a large load change of 2 to 4 times a day), but a high frequency load due to a power supply command. It was never considered change.

なお、この種の装置として関連するものには例えば、
火力原子力発電27巻8号21〜29頁において論じられてい
るもの、および特開昭59−231604号等が挙げられる。
Note that, as a device related to this kind of device, for example,
Thermal power nuclear power generation, Vol. 27, No. 8, pp. 21-29, JP-A-59-231604 and the like.

〔発明が解決しようとする問題点〕[Problems to be solved by the invention]

上記従来技術は、給電所からの負荷変化要求に対し、
発電機出力の関数として一義的に設定された許容負荷変
化率、および許容負荷変化巾により制限されるが、この
制限値は一回の負荷変化に対する許容値であり、大きな
負荷変化が1日に2〜4回程度であれば問題ないが、高
頻度の負荷変化の要求に対してはプラント材器耐用年数
を縮めるのみならず、機器疲労破損にまで至るといつた
大きな問題があつた。
The above conventional technology responds to a load change request from the power supply station,
It is limited by the allowable load change rate and the allowable load change width set uniquely as a function of the generator output. This limit value is the allowable value for one load change, and a large load change is There is no problem as long as it is about 2 to 4 times, but there is a big problem not only shortening the service life of the plant material equipment but also fatigue failure of the equipment in response to a demand for frequent load changes.

第6図は、同じ負荷変化率、負荷変化巾が制限された
場合の負荷運転パターンを示したものだが、負荷パター
ン(A)に対し負荷パターン(B)は負荷変動回数が多
く、これが機器耐用年数にも影響を及ぼすであろうこと
が容易に理解できる。
FIG. 6 shows a load operation pattern when the same load change rate and load change width are limited. The load pattern (B) has a large number of load changes, and this is because the load change pattern is large. It is easy to understand that it will affect the number of years.

本発明の目的は高頻度負荷変化要求に対してもプラン
ト材器耐用年数を維持しながら高い負荷変化率で給電所
指令に負荷追従する発電プラントの負荷調整装置を提供
することにある。
It is an object of the present invention to provide a load adjusting device for a power plant that follows a load station command at a high load change rate while maintaining the service life of the plant equipment even with a high frequency load change request.

〔問題点を解決するための手段〕[Means for solving problems]

上記目的は、負荷変化は時間要求をもつて変化するこ
とに着目し、時間当たりの負荷増減回数(負荷変動率と
呼ぶ)を指標にして許容負荷変化率、および許容負荷変
化巾を決め、給電所からの負荷変化要求を制限すること
により達成される。
The above purpose focuses on the fact that load changes change with time demands, and determines the allowable load change rate and allowable load change range using the load increase / decrease rate per hour (called load change rate) as an index. This is achieved by limiting load change demands from the office.

〔作用〕[Action]

負荷変動率を発電プラントの出力運転時間積算値に対
し、出力運転での負荷増減回数の積算値の比として求め
れば、常に負荷変動率は運転での平均値を示すことにな
る。一方プラント機器耐用年数は負荷変化回数に大きく
依存していることから、この平均化された負荷変動率の
大きさによつて許容負荷変化率を調整することにより、
プラント機器耐用年数を管理した負荷追従制御を行うこ
とができる。
If the load variation rate is calculated as the ratio of the integrated value of the load increase / decrease times in the output operation to the output operation time integrated value of the power plant, the load variation rate always shows the average value in the operation. On the other hand, since the plant equipment service life depends largely on the number of load changes, by adjusting the allowable load change rate according to the averaged load change rate,
It is possible to perform load following control that manages the useful life of plant equipment.

〔実施例〕〔Example〕

以上、本発明の一実施例を第1,2,3図により説明す
る。
An embodiment of the present invention will be described above with reference to FIGS.

第1図は、給電所からの負荷要求指令であるELD信号
1とAFC信号2を受け、発電プラント側装置で発電機出
力指令値を作り出す制御回路を示す。ELD信号1は出力
目標値の手動設定器7による運転との切替えを切替器3
で選択されるが、この信号は減算器4,負荷変化率上下限
制限器5,および積分器6により目標出力パターン信号10
6になる。
FIG. 1 shows a control circuit that receives an ELD signal 1 and an AFC signal 2, which are load request commands from a power supply station, and creates a generator output command value in a power plant side device. The ELD signal 1 switches the output target value to the operation by the manual setting device 7 and the switching device 3
This signal is selected by the subtractor 4, the load change rate upper / lower limit limiter 5, and the integrator 6, and the target output pattern signal 10
Become 6.

また、給電所からのAFC信号2はAFC巾(負荷変化巾)
の手動設定器15による制限と自動設定による制限とが切
替器16によつて選択され制限器11で負荷変化巾が制限さ
れるが、この信号はELD信号と同様に減算器12、負荷変
化率上下限制限器13、および積分器14によつて系統周波
数調整のための調整用負荷パターン信号114になり、こ
れが加算器10によつて前記目標出力パターン信号106に
加算され、発電機出力指令信号101となる。信号101は発
電機実出力102と減算器19でつき合わされ、その偏差信
号103でガバナが調整される。
Also, the AFC signal 2 from the power supply station is the AFC width (load change width)
The limiter 11 selects the limit by the manual setting device 15 and the limiter by the automatic setting by the switching device 16, and the limiter 11 limits the load change range. The upper and lower limiter 13 and the integrator 14 serve as an adjustment load pattern signal 114 for system frequency adjustment, which is added to the target output pattern signal 106 by the adder 10 to generate a generator output command signal. It becomes 101. The signal 101 is matched with the generator actual output 102 by the subtractor 19, and the governor is adjusted by the deviation signal 103.

ここで、ELD信号1に対する負荷変化率制限は切替器
8を通して負荷変化率設定器9から手動設定できるが、
自動的には関数発生器(F1(X))31によつて制限され
るが、さらにこの関数発生器31の信号に負荷変動率によ
る制限係数を制限回路21で求め、これを乗算器23により
掛算して負荷変動率も考慮した負荷変化率制限ができる
ようにしている。このELD負荷変動保護回路91が、従来
にない技術である。
Here, the load change rate limit for the ELD signal 1 can be manually set from the load change rate setter 9 through the switcher 8.
Although it is automatically limited by the function generator (F 1 (X)) 31, the limiting circuit 21 obtains a limiting coefficient for the signal of the function generator 31 according to the load fluctuation rate, and this is multiplied by the multiplier 23. Therefore, the load change rate can be limited in consideration of the load change rate. This ELD load fluctuation protection circuit 91 is a technology that has never existed before.

また、AFC信号2に対する負荷変化巾は関数発生器(F
2(X))32で自動設定され、さらに負荷変化率は関数
発生器(F3(X))33によつて自動設定されるが、これ
ら関数発生器の信号にAFCの負荷変動率による制限係数
を制限回路22で求め、駒れを切替器26を通して掛算して
やることにより、AFCの負荷変動率も考慮した負荷変化
率制限あるいは負荷変化巾制限ができる。切替器26は負
荷変化を優先させるか、負荷変化巾を優先させるかの選
択を可能にしたもので、切替器を設置せず固定してもよ
い。このAFC負荷変動保護回路92が従来にない技術であ
る。
In addition, the load change width for AFC signal 2 is calculated by the function generator (F
2 (X)) 32, and the load change rate is automatically set by the function generator (F 3 (X)) 33, but the signal of these function generators is limited by the AFC load fluctuation rate. By obtaining the coefficient by the limiting circuit 22 and multiplying the frame deviation through the switch 26, the load change rate limit or the load change width limit can be performed in consideration of the AFC load change rate. The switch 26 allows selection of whether the load change is prioritized or the load change width is prioritized, and may be fixed without installing the switch. This AFC load fluctuation protection circuit 92 is a technology that has never existed before.

第2図は制限回路21の機能を示したもので、この回路
は目標出力パターン信号106の信号変化回数をカウント
するカウンター41と出力運転中の運転時間を積算する積
算器42と、カウント数(a)を時間積算値(b)で割算
する除算器43と、この除算結果 により負荷変化率を制限する制限係数(c)を求める関
数発生器44から構成されている。
FIG. 2 shows the function of the limiting circuit 21. This circuit includes a counter 41 for counting the number of signal changes of the target output pattern signal 106, an integrator 42 for integrating the operating time during output operation, and a count number ( The divider 43 that divides a) by the time integrated value (b) and the result of this division The function generator 44 calculates a limiting coefficient (c) for limiting the load change rate.

カウンター41は、信号106が負荷変化率(微分値)が
マイナスからプラスに変わる度毎に1を積算するなどの
方法で、負荷変化の度数をカウントする。また、関数発
生器44の出力信号cはプラント運用の変更に容易に対処
できるよう、無次元化している。
The counter 41 counts the frequency of load change by a method such as integrating 1 each time the load change rate (differential value) of the signal 106 changes from negative to positive. Further, the output signal c of the function generator 44 is made dimensionless so that a change in plant operation can be easily dealt with.

なお、カウンター41では機器寿命消費に影響しない極
く小さな負荷変化はカウントしないよう考慮している。
It should be noted that the counter 41 does not count a very small load change that does not affect the life of the device.

第3図は制限回路22の機能を示したもので、第2図の
制限回路21にほぼ同じであるが、AFCの信号に対する保
護回路であるため、カウンター45では系統周波数調整の
ための調整用負荷パターン信号114の信号変化回数をカ
ウントする。また、積算器46はAFC制御の運転時間のみ
積算する。回路構成はカウンター45と積算器46、カウン
ト数(a′)を時間積算値(b′)で割算する除算器4
3、および除算結果 から負荷変化を制限する係数(c′)を求める関係発生
器47から成つている。
FIG. 3 shows the function of the limiting circuit 22, which is almost the same as the limiting circuit 21 in FIG. 2, but because it is a protection circuit against the AFC signal, the counter 45 is for adjustment for system frequency adjustment. The number of signal changes of the load pattern signal 114 is counted. Also, the integrator 46 integrates only the operating time of AFC control. The circuit configuration is a counter 45, an integrator 46, and a divider 4 that divides the count number (a ') by the time integrated value (b').
3, and the division result From the relation generator 47 for determining the coefficient (c ') for limiting the load change.

カウンター45の積算方法や、関数発生器47の特性につ
いては制限回路21のものと同様の考え方になつている。
The counting method of the counter 45 and the characteristic of the function generator 47 are the same as those of the limiting circuit 21.

上記実施例によれば、運転時間単位の負荷変動回数は
長時間積算(プラント運転中連続積算する)値により求
めているため、プラント機器耐用年数を管理する指標と
して有効に作用する。例えば、機器耐用年数30年(運転
時間240,000時間)でこの間に436,000回の負荷変化回数
を許容する発電プラントの場合について第7,8図を用い
て説明する。
According to the above-described embodiment, the number of load fluctuations in operating time units is obtained by a long-term integrated value (continuously integrated during plant operation), so that it works effectively as an index for managing the service life of plant equipment. For example, a case of a power plant which has a service life of 30 years (operating time of 240,000 hours) and allows a load change frequency of 436,000 during this period will be described with reference to FIGS.

第7図において、負荷変動率1.8回/HR(=436,000/24
0,000)を目標値としてプラントが運転されている時、
現在点で実負荷変動率がAの値であれば、制限領域に極
く近いがプラント機器耐用年数30年が維持されたまま
で、かつ高い負荷変化率で運転継続できる。現在点で実
負荷変動率がBの値であれば、機器耐用年数に余裕があ
るため、負荷変動率が平均1.8回/HRになるまで高い負荷
変化率のまま高頻度負荷変化運用が可能になる。
In Fig. 7, load fluctuation rate 1.8 times / HR (= 436,000 / 24
When the plant is operating with a target value of 0,000),
If the actual load change rate is the value A at the current point, it is possible to continue operation at a high load change rate while the plant equipment service life of 30 years is maintained, although it is very close to the restricted area. If the actual load fluctuation rate is a value of B at the present point, there is a margin for the useful life of the equipment, so high frequency load change operation is possible with a high load change rate until the load fluctuation rate averages 1.8 times / HR. Become.

一方、過去に高頻度負荷変化運転を強いられて現時点
の実負荷変動率がcの値であれば、負荷変化を制限する
領域にあるため、負荷変化回数を抑制し、負荷変動率が
平均1.8回/HRになるまで、負荷変化率(あるいは負荷変
化巾)制限がかけられる。
On the other hand, if the high-frequency load change operation is forced in the past and the actual load change rate at the present time is the value of c, it is in the area where the load change is limited, so the number of load change times is suppressed and the load change rate averages 1.8. The load change rate (or load change width) is limited until the number of times / HR is reached.

なお、高頻度負荷変化要求に対し、負荷変化率制限を
かけることによつて負荷変化回数を抑制できる事実につ
いては、第8図に示す通りである。
Note that the fact that the number of load changes can be suppressed by applying a load change rate limit to a high frequency load change request is as shown in FIG.

〔発明の効果〕〔The invention's effect〕

本発明によれば、負荷変動率によつてプラント機器耐
用年数を維持した負荷運転が可能になり、給電所からの
高頻度負荷変化要求に対しても発電プラントを安全に自
動運転することができる。
According to the present invention, it becomes possible to perform load operation while maintaining the useful life of plant equipment according to the load fluctuation rate, and it is possible to safely and automatically operate the power plant even in response to a high-frequency load change request from the power supply station. .

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明に係る負荷変動率(運転時間当たりの負
荷変化回数)に対する保護回路を有する火力発電プラン
トの制御ブロツク図、第2,3図は第1図の保護回路の機
能を説明した機能図、第4図は、従来の火力発電プラン
トの制御ブロツク図、第5図は第4図に示す関数発生器
の具体例を示す図、第6図は火力発電プラントの負荷パ
ターンを示す図、第7,8図は機能の動作を示した説明図
である。 101……発電機出力指令信号、102……発電機出力値、10
3……タービンガバナ制御信号、106……目標出力パター
ン信号、114……系統周波数調整用負荷パターン信号。
FIG. 1 is a control block diagram of a thermal power plant having a protection circuit against the load fluctuation rate (the number of load changes per operating time) according to the present invention, and FIGS. 2 and 3 explain the function of the protection circuit of FIG. Functional diagram, FIG. 4 is a control block diagram of a conventional thermal power plant, FIG. 5 is a diagram showing a specific example of the function generator shown in FIG. 4, and FIG. 6 is a diagram showing a load pattern of the thermal power plant. , 7 and 8 are explanatory views showing the operation of the function. 101 …… Generator output command signal, 102 …… Generator output value, 10
3 …… Turbine governor control signal, 106 …… Target output pattern signal, 114 …… System frequency adjustment load pattern signal.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】給電所からの負荷要求指令(ELD信号,AFC
信号)と、発電所負荷設定指令を切替器により切替え、
これら指令信号に対して発電プラントの発電機目標出力
を求める回路と、要求負荷指令に対して過大な負荷変化
運転を防止するためプラント起動停止や大きな負荷変化
に対する許容負荷変化率や許容負荷変化巾をもつて指令
信号に制限をかける負荷変化制限回路より成るプラント
出力制御装置において、運転時間単位での負荷変化回数
で表わされる負荷変動率の大きさにより上記許容負荷変
化率や許容負荷変化巾を制限することによつて高頻度負
荷変化運転を可能とする負荷変動保護回路を設けたこと
を特徴とする発電プラントの負荷調整装置。
[Claim 1] Load request command (ELD signal, AFC
Signal) and power plant load setting command are switched by the switch.
A circuit that determines the generator target output of the power plant based on these command signals, and an allowable load change rate and an allowable load change range for plant start / stop and large load changes to prevent excessive load change operation in response to the required load command. In a plant output control device consisting of a load change limiting circuit for limiting the command signal with the above, the allowable load change rate and the allowable load change range are determined by the magnitude of the load change rate represented by the number of load changes in operating time units. A load adjusting device for a power plant, which is provided with a load fluctuation protection circuit that enables a high-frequency load change operation by limiting the load.
JP61048378A 1986-03-07 1986-03-07 Power plant load adjusting device Expired - Lifetime JPH0822160B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61048378A JPH0822160B2 (en) 1986-03-07 1986-03-07 Power plant load adjusting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61048378A JPH0822160B2 (en) 1986-03-07 1986-03-07 Power plant load adjusting device

Publications (2)

Publication Number Publication Date
JPS62207200A JPS62207200A (en) 1987-09-11
JPH0822160B2 true JPH0822160B2 (en) 1996-03-04

Family

ID=12801659

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61048378A Expired - Lifetime JPH0822160B2 (en) 1986-03-07 1986-03-07 Power plant load adjusting device

Country Status (1)

Country Link
JP (1) JPH0822160B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3042066B2 (en) * 1991-09-05 2000-05-15 株式会社日立製作所 Plant control system
FR2799905B1 (en) * 1999-10-18 2001-12-21 Renault METHOD FOR REGULATING A MECHANICAL POWER TAKEN BY AN ALTERNATOR
JP3461495B2 (en) * 2001-04-24 2003-10-27 東京電力株式会社 Wind power output limiting system and method

Also Published As

Publication number Publication date
JPS62207200A (en) 1987-09-11

Similar Documents

Publication Publication Date Title
CN102834606B (en) Dynamic inertia adjustment device
US4064419A (en) Synchronous motor KVAR regulation system
RU2653616C2 (en) Method for controlling wind park
CN108695897B (en) Power control method, device, controller, system and medium for photovoltaic power station
CN109459985A (en) A kind of method of power plant's primary frequency modulation real time monitoring
WO2024082746A1 (en) Frequency response control method and device for wind farm
EP0633641B2 (en) Reactive power compensating apparatus and regulating method for reducing switching losses in steady state operation
JPH0822160B2 (en) Power plant load adjusting device
WO2021172223A1 (en) Power grid stabilization system using communication line
JPS6027403B2 (en) Fault detection device for regulating control equipment
US4593348A (en) Device for the generation of regulated and/or adjustable direct voltages or direct currents
CN110994639A (en) Simulation constant volume method, device and equipment for power plant energy storage auxiliary frequency modulation
JP3461495B2 (en) Wind power output limiting system and method
CN116404668B (en) Flywheel energy storage auxiliary frequency modulation control method and system for improving AGC (automatic gain control) regulation rate
CN116345489B (en) A tertiary frequency modulation regulation method based on primary frequency modulation regulation amount
JPS62207199A (en) Load adjusting device for power plant
EP0641445B1 (en) A method of sensing the rms value of a waveform
JP2902217B2 (en) Output control method and apparatus for nuclear power plant
JPS63124101A (en) Load control device for power plant
US20220195985A1 (en) Estimating of inertial response power of a wind turbine
JPS6311099A (en) Load adjusting device for power plant
KR102132580B1 (en) DC voltage coordinated control method
JP2021052542A (en) Negawatt trading support device and negawatt trading method
CN109980699A (en) Wind power plant internal power method of adjustment and device
JP3907832B2 (en) Power transmission end output control device for thermal power plant