JPH0826746B2 - Shield excavator and soil improvement method for shield construction method - Google Patents
Shield excavator and soil improvement method for shield construction methodInfo
- Publication number
- JPH0826746B2 JPH0826746B2 JP1038295A JP3829589A JPH0826746B2 JP H0826746 B2 JPH0826746 B2 JP H0826746B2 JP 1038295 A JP1038295 A JP 1038295A JP 3829589 A JP3829589 A JP 3829589A JP H0826746 B2 JPH0826746 B2 JP H0826746B2
- Authority
- JP
- Japan
- Prior art keywords
- soil
- shield
- screw conveyor
- earth
- sand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
【発明の詳細な説明】 (産業上の利用分野) この発明はシールド掘進機により掘削された土砂を運
搬しやすいように改良する土質改良方法に関する。Description: TECHNICAL FIELD The present invention relates to a soil improvement method for improving the soil excavated by a shield machine so as to be easily transported.
(従来の技術) 従来切羽とシールド本体の先端部に泥水を注入して水
の噴発などを防止しながら掘進する土圧バランス式シー
ルド掘削機においては,掘削した土砂を泥水とともにシ
ールド本体内へ取込んだ後,スクリュウコンベヤなどの
土砂搬送手段で後方へ搬出しているが,搬出された土砂
が塑性流動化されているため,取扱いにくく,かつ運搬
しにくいと共に,廃棄する場所も得にくいなどの不具合
があった。(Prior Art) In a conventional earth pressure balance type shield excavator that advances mud while injecting mud into the face of the face and the shield body to prevent water spouting, the excavated earth and sand enter the shield body together with the mud. After being taken in, it is carried out to the rear by means of earth and sand, such as a screw conveyor, but because the earth and sand that has been carried out is plasticized, it is difficult to handle and to transport, and it is also difficult to obtain a place to discard it. There was a problem.
このため従来では,発進立坑付近の地上に泥水タンク
を設置して,この泥水タンクに一旦溜めた後土質改良剤
を加えて固形化し,運搬廃棄している。For this reason, in the past, a muddy water tank was installed on the ground near the starting shaft, and once stored in this muddy water tank, a soil conditioner was added to solidify it, and it was transported and discarded.
しかし上記従来の方法では,発進立坑の付近に泥水タ
ンクを設置する場所を必要とするため,場所が確保でき
ない場合施工が困難であると共に,土質改良剤を注入す
るのに機械や人力を必要として省力化が図れないなどの
不具合があった。However, the above-mentioned conventional method requires a place for installing a mud tank near the starting shaft, so that it is difficult to construct if a place cannot be secured, and it requires a machine and manpower to inject the soil improvement agent. There were problems such as labor saving.
また掘削されて排土用スクリュウコンベヤにより排出
された土砂をトロッコなどの運搬車両やベルトコンベヤ
などに山積して搬出できないため搬送効率が悪く,かつ
搬出手段にも制限を受けるなどの不具合もあった。In addition, since the earth and sand excavated and discharged by the soil discharge screw conveyor cannot be carried out by piled up on a transport vehicle such as a truck or a belt conveyor, the transport efficiency is poor, and there is also a problem that the transport means is limited. .
この発明は上記不具合を改善する目的でなされたもの
で,シールド本体内に設置されたスクリュウコンベヤに
より土砂を搬送している間に土質の改良を行うようにし
た土質改良方法を提供しようとするものである。The present invention has been made for the purpose of improving the above problems, and an object of the present invention is to provide a soil improvement method for improving the soil quality while the soil is being conveyed by the screw conveyor installed in the shield body. Is.
(課題を解決するための手段及び作用) この発明は (1)土圧バランス式シールド工法により、地中を掘進
するシールド掘進機において、排土用スクリュウコンベ
ヤの上部に土砂取り込み口を持った薬剤混合用スクリュ
ウコンベヤを設け、前記薬剤混合用スクリュウコンベヤ
に土質改良剤投入口を設けたことを特徴とするシールド
掘進機である。(Means and Actions for Solving Problems) (1) A shield excavator for excavating the ground by a soil pressure balance type shield construction method, which has a earth and sand intake port above a screw conveyor for earth discharge. A shield machine having a screw conveyor for mixing, and a soil-improving agent input port provided on the screw conveyor for mixing chemicals.
この発明はまた (2)シールド掘進機によって地中を掘進する土圧バラ
ンス式シールド工法においてカッタヘッドにより掘削さ
れて、シールドチャンバ内へ取り込まれた塑性流動状土
砂を、薬剤混合用スクリュウコンベヤに取り込み、薬剤
混合用スクリュウコンベヤに設けられた土質改良剤投入
口から土質改良剤を投入し、薬剤混合用スクリュウコン
ベヤによって、塑性流動状土砂と土質改良剤とを混合し
た後、排土用スクリュウコンベヤに取り込み排土するシ
ールド工法の土質改良方法である。(2) In the earth pressure balance type shield construction method of excavating the ground by a shield excavator, the plastic fluidized earth and sand that is excavated by the cutter head and taken into the shield chamber is taken into the drug mixing screw conveyor. , The soil improvement agent is input from the soil improvement agent input port provided on the chemical mixing screw conveyor, and the plastic fluidized sand and the soil improvement agent are mixed by the chemical mixing screw conveyor, and then the soil mixing screw conveyor is discharged. This is a soil improvement method of the shield method that takes in and removes soil.
従って1段目の薬剤混合用スクリュウコンベヤに土砂
改良剤を注入し、薬剤混合用スクリュウコンベヤから2
段目の排土用スクリュウコンベヤに土砂が搬送される時
に流れが混乱し、このため塑性流動状土砂と土砂改良剤
が混合され、2段の搬送用スクリュウコンベヤの搬送中
に土質改良剤が反応し、改良された土砂が排土口から排
出される。Therefore, inject the sediment improver into the first-stage chemical mixing screw conveyor,
The flow is confused when the earth and sand is conveyed to the second-stage discharge screw conveyor, which causes the plastic fluidized sand and the earth and sand modifier to mix, and the soil modifier reacts during the conveyance of the two-stage screw conveyor. However, the improved earth and sand is discharged from the soil discharge port.
(実施例) この発明の一実施例を図面を参照して詳述する。図に
おいて1は土圧バランス式シールド掘削機のシールド本
体で,前部にカッタヘッド2が回転自在に設けられてい
ると共に,カッタヘッド2で掘削された塑性流動状土砂
はシールド本体1の前部を気密壁1aにより区割すること
により形成されたシールドチャンバ1b内に取込まれるよ
うになっている。Embodiment An embodiment of the present invention will be described in detail with reference to the drawings. In the figure, 1 is a shield body of a soil pressure balance type shield excavator, in which a cutter head 2 is rotatably provided in the front part, and the plastic fluidized earth and sand excavated by the cutter head 2 is in the front part of the shield body 1. Is enclosed by the airtight wall 1a and is taken into the shield chamber 1b formed.
上記シールドチャンバ1b内には図示しない送泥管を介
して圧送されてきたベントナイトや粘土などが混入され
た泥水が注入されて切羽側の土圧とシールドチャンバ1b
内の圧力がバランスするようになっている。Into the shield chamber 1b, mud water mixed with bentonite, clay, etc., which has been pressure-fed through a mud pipe (not shown), is injected, and the earth pressure on the face side and the shield chamber 1b.
The pressure inside is balanced.
そして塑性流動状土砂は排土用スクリュウコンベヤ3
により、シールドチャンバ1b内よりシールド本体1内へ
取り込まれるようになっている。And the plastic fluidized earth and sand is discharged by the screw conveyor 3
Thus, it is taken into the shield body 1 from inside the shield chamber 1b.
上記排土用スクリュウコンベヤ3は円筒状のケース3a
内にスクリュウ軸3bを設けた構造で、ケース3aの前端
は、シールドチャンバ1b内に設けられた薬剤混合用スク
リュウコンベヤ4のケース4aに接続されている。The soil discharging screw conveyor 3 is a cylindrical case 3a.
With the structure in which the screw shaft 3b is provided, the front end of the case 3a is connected to the case 4a of the drug mixing screw conveyor 4 provided in the shield chamber 1b.
上記ケース4aは第3図に示すようにほぼ逆三角形に形
成されていて,下部に上記排土用スクリュウコンベヤ3
のスクリュウ軸3b先端が突出されていると共に,このス
クリュウ軸3bの上方には,これと平行するよう薬剤混合
用スクリュウコンベヤ4のスクリュウ軸4b,4cが互に水
平方向に離間して2本設けられている。As shown in FIG. 3, the case 4a is formed in an almost inverted triangle, and the screw conveyor 3 for earth removal is provided at the bottom.
The tip end of the screw shaft 3b is protruded, and two screw shafts 4b and 4c of the drug mixing screw conveyor 4 are provided above the screw shaft 3b so as to be parallel to the screw shaft 3b and are horizontally separated from each other. Has been.
そしてこれらスクリュウ軸4b,4cは基端側に設けられ
た駆動モータ5により反対方向へ回転されるようになっ
ていると共に,各スクリュウ軸4b,4cの先端側はケース4
aの前側上部に開口された開口部4d側へ突出されてい
て,シールドチャンバ1b内の塑性流動状土砂をケース4a
内へ取込むようになっている。The screw shafts 4b, 4c are adapted to be rotated in opposite directions by a drive motor 5 provided on the base end side, and the tip ends of the screw shafts 4b, 4c are mounted on the case 4
The plastic fluidized earth and sand in the shield chamber 1b is projected to the side of the opening 4d that is open to the upper front side of the case 4a.
It is designed to be taken in.
一方上記ケース4aの上側には各スクリュウ軸4b,4cの
先端側へそれぞれ薬剤を噴射する薬剤注入口6が設けら
れている。On the other hand, on the upper side of the case 4a, a drug injection port 6 for injecting a drug to the tip side of each screw shaft 4b, 4c is provided.
そしてこれら薬剤注入口6はシールド本体1内に設け
られた薬剤投入装置7に管路8を介して接続されてい
て,薬剤投入装置7より投入された土質改良剤が上記薬
剤注入口6より,スクリュウ軸4b,4cにより取込まれた
流動状土砂へ注入されるようになっている。These drug injection ports 6 are connected to a drug injection device 7 provided in the shield body 1 through a pipe line 8, and the soil conditioner injected from the drug injection device 7 is discharged from the drug injection port 6 by It is designed to be injected into the fluidized earth and sand taken up by the screw shafts 4b, 4c.
次に上記構成されたシールド掘進機による土質改良方
法を説明すると,シールド本体1の推進に伴いカッタヘ
ッド2により掘削された土砂は,シールドチャンバ1b内
に注入された泥水と混合されて塑性流動化される。Next, the soil improvement method using the shield machine configured as described above will be explained. The earth and sand excavated by the cutter head 2 along with the propulsion of the shield body 1 is mixed with the muddy water injected into the shield chamber 1b to be plasticized. To be done.
その後薬剤混合用スクリュウコンベヤ4の各スクリュ
ウ軸4b,4cによりケース4a内へ取込まれると共に,各ス
クリュウ4b,4cは駆動モータ5により互に反対の方向へ
回転されることにより,取込んだ塑性流動状土砂を掻き
混ぜながらケース4aの奥方へと送り込む。After that, the screw shafts 4b, 4c of the screw conveyor 4 for mixing the medicine are taken into the case 4a, and the screws 4b, 4c are rotated in opposite directions by the drive motor 5, so that the plasticity taken in is increased. While stirring the fluidized earth and sand, send it into the interior of the case 4a.
そしてこのとき薬剤注入口6より注入された土質改良
剤と塑性流動状の土砂が効率よく混合される。Then, at this time, the soil conditioner injected from the chemical injection port 6 and the plastic fluidized sand are efficiently mixed.
上記土質改良剤は塑性流動状の土砂を固形化するもの
で,上記混合動作により塑性流動状土砂の固形化,すな
わち土質の改良が効率よく行われると共に,十分に土質
が改良された土砂は排土用スクリュウコンベヤ3のスク
リュウ軸3bによりシールド本体1内のケース3a内へ取込
まれ,ケース3a内を搬送されている間にさらに攪拌混合
されて固形化が促進され,ケース3aの後端に達する。そ
してケース3aの後端側下部に設けられた排土口3cよりシ
ールド本体1内へ排出された後,トロッコなどの運搬車
両10やベルトコンベヤなどの搬送手段に積込まれてシー
ルド本体1の後方へと搬出される。The soil conditioner solidifies the plastic fluidized sand and sand. The mixing operation allows the plastic fluidized sand and sand to be solidified effectively, that is, the soil quality can be efficiently improved, and the soil whose soil quality has been sufficiently improved is discharged. It is taken into the case 3a in the shield body 1 by the screw shaft 3b of the earth screw conveyor 3 and further stirred and mixed while being conveyed in the case 3a to promote solidification, and to the rear end of the case 3a. Reach Then, after being discharged into the shield body 1 from a soil discharge port 3c provided at the lower part of the rear end side of the case 3a, it is loaded on a transportation vehicle 10 such as a dolly or a conveyor means such as a belt conveyor, and behind the shield body 1. Be transported to.
なお上記実施例ではシールドチャンバ1b内より排土用
スクリュウコンベヤ3へ取込まれる土砂に土質改良剤を
注入するようにしたが,排土用スクリュウコンベヤ3に
より搬送中に土砂に土質改良剤を注入して,土砂搬送中
に土質の改良,すなわち塑性流動状土砂の固形化を行う
ようにしてもよい。In the above-mentioned embodiment, the soil improving agent is injected into the earth and sand taken into the soil discharging screw conveyor 3 from the shield chamber 1b. However, the soil improving agent is injected into the earth and sand during transportation by the earth discharging screw conveyor 3. Then, the soil quality may be improved during the transportation of the sediment, that is, the plastic fluidized sediment may be solidified.
また薬剤混合用スクリュウ4は,シールドチャンバ1b
内の土砂を取込む際には軸付きのスクリュウを,そして
搬送途中はパッドタイプのスクリュウを用いるようにし
てもよいと共に,スクリュウ軸4b,4cの位置は,排土用
スクリュウ3の下方や左右方向であっても勿論よい。In addition, the screw 4 for mixing medicines is a shield chamber 1b.
A screw with a shaft may be used to take in the sand and sand, and a pad type screw may be used during transportation, and the positions of the screw shafts 4b and 4c may be set below or to the left and right of the screw 3 for discharging soil. Of course, it may be the direction.
(発明の効果) この発明は以上詳述したように,薬剤混合用スクリュ
ウコンベヤより塑性流動状土砂に土質改良剤を注入した
後、排土用スクリュウコンベヤに取り込むようにしたも
のであり、従って1段目の薬剤混合用スクリュウコンベ
ヤに土砂改良剤を注入し、薬剤混合用スクリュウコンベ
ヤから2段目の排土用スクリュウコンベヤに土砂が搬送
される時に流れが混乱し、このため塑性流動状土砂と土
砂改良剤が混合され、2段目の搬送用スクリュウコンベ
ヤの搬送中に土質改良剤が反応し、改良された土砂が排
土口から排出される。(Effects of the Invention) As described in detail above, the present invention is one in which a soil conditioner is injected into a plastic fluidized soil from a drug mixing screw conveyor and then taken into an earth discharging screw conveyor. When the sediment improver is injected into the chemical mixing screw conveyor of the second stage and the sediment is conveyed from the chemical mixing screw conveyor to the second discharging screw conveyor, the flow is confused. The sediment improver is mixed, the soil improver reacts during the transportation of the second-stage transfer screw conveyor, and the improved sediment is discharged from the discharge port.
そして排土用コンベヤよりシールド本体内に排出され
る土砂は、固形化されて取扱やすいものとなる。Then, the earth and sand discharged from the earth discharging conveyor into the shield body is solidified and becomes easy to handle.
これによってトロッコなどの運搬車両やベルトコンベ
ヤなどの搬送手段によりシールド本体の後方へ搬出でき
るため,従来の汚泥状態で搬出するものに比べて土砂の
搬出が能率よく行えると共に,掘削されたトンネル内が
流動化された土砂により汚損されることがないためトン
ネル内を清潔に保ことができる。As a result, since it can be carried out to the rear of the shield body by a transportation vehicle such as a truck or a conveyor such as a belt conveyor, the sediment can be carried out more efficiently and the inside of the excavated tunnel is The inside of the tunnel can be kept clean because it is not polluted by the fluidized soil.
また本工法を採用することによって土質改良効果は高
まると共に、土質改良剤を投入するための特別な装置や
人力を必要としないため,設備費の節減や省力化なども
図れるようになる。In addition, by adopting this method, the soil improvement effect will be enhanced, and since no special equipment or manpower is required for introducing the soil improvement agent, it will be possible to reduce equipment costs and labor.
さらに発進立坑付近にタンクなどの泥水処理装置を設
置する必要がないため,発進立坑付近が狭小であっても
容易に施工できるようになる。Furthermore, since it is not necessary to install a muddy water treatment device such as a tank near the starting shaft, it will be possible to easily perform construction even if the area around the starting shaft is small.
第1図はこの発明の土質改良工法に使用するシールド掘
進機の一実施例を示す断面図,第2図は薬剤投入装置付
近の拡大断面図,第3図は第2図III−III線に沿う断面
図である。 1……シールド本体,1b……シールドチャンバ,2……カ
ッタヘッド,3……排土用スクリュウコンベヤ,4……薬剤
混合用スクリュウコンベヤ。FIG. 1 is a sectional view showing an embodiment of a shield machine used in the soil improvement method of the present invention, FIG. 2 is an enlarged sectional view in the vicinity of a chemical feeding device, and FIG. FIG. 1 ... Shield main body, 1b ... Shield chamber, 2 ... Cutter head, 3 ... Soil discharging screw conveyor, 4 ... Medicine mixing screw conveyor.
Claims (2)
を掘進するシールド掘進機において、排土用スクリュウ
コンベヤの上部に土砂取り込み口を持った薬剤混合用ス
クリュウコンベヤを設け、前記薬剤混合用スクリュウコ
ンベヤに土質改良剤投入口を設けたことを特徴とするシ
ールド掘進機。1. In a shield machine for excavating the ground by the earth pressure balance type shield method, a screw conveyor for mixing chemicals having a sediment intake port is provided above the screw conveyor for discharging soil, and the screw for mixing chemicals is provided. A shield machine with a soil improvement agent inlet on the conveyor.
圧バランス式シールド工法においてカッタヘッドにより
掘削されて、シールドチャンバ内へ取り込まれた塑性流
動状土砂を、薬剤混合用スクリュウコンベヤに取り込
み、薬剤混合用スクリュウコンベヤに設けられた土質改
良剤投入口から土質改良剤を投入し、薬剤混合用スクリ
ュウコンベヤによって、塑性流動状土砂と土質改良剤と
を混合した後、排土用スクリュウコンベヤに取り込み排
土するシールド工法の土質改良方法。2. The plastic fluidized earth and sand excavated by the cutter head in the earth pressure balance type shield construction method of excavating the ground by the shield excavator and taken into the shield chamber is taken into the screw conveyor for mixing the chemicals. The soil conditioner is introduced from the soil conditioner input port provided on the mixing screw conveyor, and the plastic fluidized sand and soil and the soil conditioner are mixed by the drug mixing screw conveyor, and then taken into the soil discharging screw conveyor. Soil improvement method of soil shield method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1038295A JPH0826746B2 (en) | 1989-02-20 | 1989-02-20 | Shield excavator and soil improvement method for shield construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1038295A JPH0826746B2 (en) | 1989-02-20 | 1989-02-20 | Shield excavator and soil improvement method for shield construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH02217595A JPH02217595A (en) | 1990-08-30 |
| JPH0826746B2 true JPH0826746B2 (en) | 1996-03-21 |
Family
ID=12521320
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1038295A Expired - Lifetime JPH0826746B2 (en) | 1989-02-20 | 1989-02-20 | Shield excavator and soil improvement method for shield construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0826746B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104632245A (en) * | 2015-02-04 | 2015-05-20 | 北京市政建设集团有限责任公司 | Method using multi-pilot-tunnel expanding excavation large-diameter shield tunnel for building subway station |
| CN110259463B (en) * | 2019-06-13 | 2024-03-29 | 孔德玲 | One-step casting molding shield all-in-one machine for tunnel supporting body |
| CN113417657A (en) * | 2021-06-25 | 2021-09-21 | 广州轨道交通建设监理有限公司 | Soil bin deslagging method and screw machine |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS61216994A (en) * | 1985-03-19 | 1986-09-26 | 大豊建設株式会社 | Discharge soil improving method |
-
1989
- 1989-02-20 JP JP1038295A patent/JPH0826746B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH02217595A (en) | 1990-08-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2867235B2 (en) | Self-propelled soil improvement machine | |
| JP2000355954A (en) | Self-propelled soil improvement machine | |
| JPH11131983A (en) | Unloading device for tunnel machine | |
| JPH0826746B2 (en) | Shield excavator and soil improvement method for shield construction method | |
| JPH0739994Y2 (en) | Shield excavator drug mixing device | |
| JP2000345578A (en) | Apparatus and method for producing fluidized soil | |
| CN115366255A (en) | Multi-mixer type fluidization processing device | |
| JP3149593B2 (en) | Sludge treatment method and sludge treatment plant | |
| JPH07113318B2 (en) | Soil improvement method | |
| JPH0615776B2 (en) | Dredging device | |
| JP2000234495A (en) | Mud concentration type excavation propelling machine | |
| JPH07113319B2 (en) | Method for preventing soil discharge from a shield moat machine | |
| JPS6340554Y2 (en) | ||
| JPH0988118A (en) | Multi-mixer fluidization processor | |
| JPH0223676Y2 (en) | ||
| JPS6040713Y2 (en) | Shield excavator sludge conveying device | |
| JP2002285789A (en) | Shield excavator | |
| JP2946110B2 (en) | Soil improvement method using shield machine for soil improvement | |
| JPH09264037A (en) | Sediment transporting and reforming system | |
| JP2003003791A (en) | Shield machine | |
| JPH0441897A (en) | Discharging process of excavated earth and sand and device thereof for earth pressure type shield tunneling method | |
| JP2000008773A (en) | Method for propelling muddy water pressurizing buried pipe | |
| JPS61137930A (en) | Slurry sludge treater having quantitative sludge discharger | |
| WO2000075435A1 (en) | Mobile soil improving machine | |
| JPH053598Y2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080517 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 9 Free format text: PAYMENT UNTIL: 20110517 |
|
| LAPS | Cancellation because of no payment of annual fees |