How to install a protective net for temporary scaffolding

Info

Publication number
JPH083275B2
JPH083275B2 JP4090601A JP9060192A JPH083275B2 JP H083275 B2 JPH083275 B2 JP H083275B2 JP 4090601 A JP4090601 A JP 4090601A JP 9060192 A JP9060192 A JP 9060192A JP H083275 B2 JPH083275 B2 JP H083275B2
Authority
JP
Japan
Prior art keywords
protective net
temporary
temporary scaffold
scaffold
assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4090601A
Other languages
Japanese (ja)
Other versions
JPH06123175A (en
Inventor
玲子 田辺
禎二 天野
章一 真壁
Original Assignee
株式会社工業技術研究所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社工業技術研究所 filed Critical 株式会社工業技術研究所
Priority to JP4090601A priority Critical patent/JPH083275B2/en
Publication of JPH06123175A publication Critical patent/JPH06123175A/en
Publication of JPH083275B2 publication Critical patent/JPH083275B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Emergency Lowering Means (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、既設の建物の壁面を
補修する際に該壁面に沿って組み立てる仮設足場に防護
ネットを張設する方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of tensioning a protective net on a temporary scaffold to be assembled along the wall of an existing building when repairing the wall.

【0002】[0002]

【従来の技術】従来は、防護ネットを張設する場合、仮
設足場を下層から最上層まで建物の壁面に沿って組み立
てた後に、仮設足場の外側から該足場に防護ネットを張
設している。
2. Description of the Related Art Conventionally, when a protective net is stretched, the temporary scaffold is assembled from the lower layer to the uppermost layer along the wall surface of the building, and then the protective net is stretched from the outer side of the temporary scaffold to the scaffold. .

【0003】[0003]

【発明が解決しようとする課題】ところで、前記のよう
な従来の防護ネットの張設の場合、防護ネットの張設前
の仮設足場の組み立ての際に、組み立てに使用する工具
や足場構成部品などがネットの張られていない仮設足場
の外側から地上に落下し、地上にいる作業者や通行人等
に思わぬ怪我をさせてしまうという問題があった。
By the way, in the case where the conventional protective net is stretched as described above, when assembling the temporary scaffold before the protective net is stretched, tools and scaffold components used for the assembly are used. However, there was a problem that it would fall to the ground from the outside of the temporary scaffold without the net, which could cause unexpected injuries to workers and passers-by on the ground.

【0004】そこでこの発明は、前記のような従来の問
題点を解決し、仮設足場の組み立ての際に、組み立てに
使用する工具や足場構成部品などの地上への落下を防止
でき、作業の安全を図ることができる仮設足場用防護ネ
ットの張設方法を提供することを目的とする。
Therefore, the present invention solves the above-mentioned conventional problems and prevents the tools, scaffolding components, etc. used for the assembly from falling onto the ground during the assembly of the temporary scaffolding, thus ensuring work safety. It is an object of the present invention to provide a method for tensioning a protective net for temporary scaffolds that can achieve the above.

【0005】[0005]

【0006】[0006]

【課題を解決するための手段】前記目的を達成するた
め、請求項1の発明は、仮設足場を1層又は数層組み立
てるとともに、防護ネットを該仮設足場の外側の上方又
は下方から配置し、この防護ネットをまず前記仮設足場
に結い付けて張設し、次に持送金具を前記仮設足場から
外方に突出させて取付けて前記仮設足場と防護ネットと
の間をその上方において所定の空間が形成されるように
した上でさらに仮設足場を組み立てて行き、仮設足場が
最上層に達したら前記持送金具を取り外して前記仮設足
場より上方の仮設足場に防護ネットを結い付けて張設す
ることを特徴とする。
In order to achieve the above-mentioned object, the invention of claim 1 assembles one or several layers of temporary scaffold, and arranges a protective net from outside or above the outside of the temporary scaffold, The protective net is first connected to the temporary scaffold and stretched, and then the carrying metal fitting is attached to the temporary scaffold so as to project outward from the temporary scaffold, and a predetermined space is provided between the temporary scaffold and the protective net above the temporary scaffold. After assembling the temporary scaffold, when the temporary scaffold reaches the uppermost layer, the carrying metal fitting is removed, and a protective net is connected to the temporary scaffold above the temporary scaffold and stretched. It is characterized by

【0007】請求項2の発明は、仮設足場を1層又は数
層組み立てるとともに、防護ネットを該仮設足場の外側
の上方又は下方から配置し、この防護ネットをまず前記
仮設足場に結い付けて張設し、次に持送金具を前記仮設
足場から外方に突出させて取付けて前記仮設足場と防護
ネットとの間をその上方に所定の空間が形成されるよう
にした上でさらに前記仮設足場の上に仮設足場を1層又
は数層組み立て、組み立て後に前記持送金具を取り外し
てこの組み立てた仮設足場に前記防護ネットを結い付け
て張設し、同様にして持送金具の取り付けによる所定の
空間の形成と仮設足場の組み立て、および前記持送金具
の取り外しと防護ネットの結い付け張設を最上層の仮設
足場まで順次繰り返すことを特徴とする。
According to a second aspect of the present invention, the temporary scaffold is assembled in one layer or several layers, a protective net is arranged from above or below the outside of the temporary scaffold, and the protective net is first connected to the temporary scaffold and stretched. The temporary scaffolding is further installed, and then the carrying metal fitting is projected outward from the temporary scaffolding to be attached so that a predetermined space is formed between the temporary scaffolding and the protective net above the temporary scaffolding. Assemble one or several layers of temporary scaffolding on top of the above, remove the carrying bracket after assembly, tie the protective net to the assembled temporary scaffold and stretch it, and in the same manner, install the carrying bracket to a predetermined position. It is characterized in that the formation of the space, the assembling of the temporary scaffold, the removal of the carrying metal fitting, and the connection and tensioning of the protective net are sequentially repeated up to the uppermost temporary scaffold.

【0008】[0008]

【作用】請求項1,2のいずれの発明においても、仮設
足場を下層から最上層まで組み立てていく段階で、すな
わち仮設足場の組み立てと並行して防護ネットを仮設足
場の外側から該仮設足場に張設するので、仮設足場の組
み立ての際に、組み立てに使用する工具や足場構成部品
などはこの防護ネットによりその落下が防止される。
In any of the first and second aspects of the invention, at the stage of assembling the temporary scaffold from the lower layer to the uppermost layer, that is, in parallel with the assembly of the temporary scaffold, the protective net is provided from the outside of the temporary scaffold to the temporary scaffold. Since the cables are stretched, tools and scaffold components used for the assembly are prevented from falling by the protective net when the temporary scaffold is assembled.

【0009】[0009]

【実施例】図1はこの発明の一実施例を示し、仮設足場
に防護ネットを張設している途中の側面図、図2はその
一部の平面図、図3は要部の一部省略の側面図である。
これらの図において1は建物、2は仮設足場、3は防護
ネット、4は壁継ぎ金具、5は持送り金具、6は自在突
梁である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 shows an embodiment of the present invention, which is a side view of a temporary scaffold while a protective net is being stretched, FIG. 2 is a plan view of a part thereof, and FIG. 3 is a part of a main part thereof. It is an abbreviated side view.
In these figures, 1 is a building, 2 is a temporary scaffolding, 3 is a protective net, 4 is a wall joint fitting, 5 is a carrying fitting, and 6 is a universal projecting beam.

【0010】この実施例による仮設足場2の組み立てと
該足場に対する防護ネット3の張設方法を説明する。ま
ず、建物1の補修しようとする壁面に沿って仮設足場2
を3層組み立てる。この際、足場2と建物1の壁面の間
に所定の間隔X(例えば25cm以下)をとる。足場2は建
物1の壁面に打ち込まれた壁継ぎ金具4でしっかり固定
する。この例では足場2を3層組み立てたが、1層又は
2,4層など数層でもよい。
A method of assembling the temporary scaffold 2 and a method of tensioning the protective net 3 on the scaffold according to this embodiment will be described. First, the temporary scaffold 2 along the wall surface of the building 1 to be repaired
Assemble 3 layers. At this time, a predetermined space X (for example, 25 cm or less) is set between the scaffold 2 and the wall surface of the building 1. The scaffold 2 is firmly fixed by a wall joint metal fitting 4 which is driven into the wall surface of the building 1. In this example, the scaffold 2 is assembled in three layers, but it may be one layer or several layers such as 2,4 layers.

【0011】しかる後、建物1の笠木部分7に図2に示
すように間隔をおいて複数個の自在突梁6をセットし、
この各突梁6を利用して図4に示すようにワイヤロープ
8を地上に降ろし、ワイヤロープ8の下端部を足場根が
らみパイプ9に締結する(図3)。
Thereafter, a plurality of flexible projecting beams 6 are set on the head part 7 of the building 1 at intervals as shown in FIG.
Using each of these projecting beams 6, the wire rope 8 is lowered to the ground as shown in FIG. 4, and the lower end portion of the wire rope 8 is fastened to the scaffolding root-engaging pipe 9 (FIG. 3).

【0012】次に、建物1の屋上からポリエチレン製の
メッシユシート11を各突梁6間に位置させて地上に降ろ
し、該シートの下端部を同様に足場根がらみパイプ9に
締結する。メッシュシュート11を上から降ろす場合は風
などの影響を受けやすいため、このような場合にはメッ
シュシート11を地上から引き上げてもよい。そして、足
場2が組み立てられている高さまで、すなわちこの例で
は3層までの足場2まで、各隣接するメッシュシート11
とメッシュシート11、およびワイヤロープ8を図5に示
すようにひも13等で結い付けて足場2に締結する。前記
のようなひも13等で結い付けが終了したメッシュシート
11とワイヤロープ8で防護ネット3が構成されることと
なる。
Next, a mesh sheet 11 made of polyethylene is placed between the projecting beams 6 from the roof of the building 1 and lowered onto the ground, and the lower end portion of the sheet is similarly fastened to the scaffolding root-entangling pipe 9. When the mesh chute 11 is lowered from the top, it is easily affected by wind and the like. In such a case, the mesh sheet 11 may be pulled up from the ground. Then, up to the height at which the scaffold 2 is assembled, that is, up to three layers of scaffolds 2 in this example, each adjacent mesh sheet 11
As shown in FIG. 5, the mesh sheet 11 and the wire rope 8 are connected with a string 13 or the like and fastened to the scaffold 2. A mesh sheet that has been tied with the above-mentioned string 13 etc.
11 and the wire rope 8 constitute the protective net 3.

【0013】次に、先きに組み立てた3層目の足場2に
持送り金具5を図3に示すように足場2の外側に所定の
長さ突出させて取り付け、足場2と防護ネット3との間
をその上方に所定の空間Y(例えば20〜30cm位)が形成
されるようにする。そして、この持送り金具5で持送ら
れた状態で、足場2の作業床15より可能な限りの高さま
で、前記と同様にメッシュシート11とメッシュシート1
1、およびワイヤロープ8をひも13等で結い付ける。し
かる後、その内部でさらに足場2を2〜3層組み立て
る。
Next, as shown in FIG. 3, the carrying member 5 is attached to the scaffold 2 of the third layer assembled previously so as to protrude outside the scaffold 2 by a predetermined length, and the scaffold 2 and the protective net 3 are attached. A predetermined space Y (for example, about 20 to 30 cm) is formed above the space. Then, in the state of being carried by the carrying metal fitting 5, the mesh sheet 11 and the mesh sheet 1 are carried out to the highest possible height from the work floor 15 of the scaffolding 2 as described above.
Tie the wire rope 1 and the wire rope 8 with the string 13 etc. After that, scaffold 2 is further assembled in a few layers inside thereof.

【0014】以後、同じ手順で最上層の足場2の近くま
で両メッシュシート11とワイヤロープ8のひも13等によ
る結い付けと、足場2の組み立てを交互に行なう。
After that, by the same procedure, the binding of both mesh sheets 11 and the wire rope 8 by the string 13 and the like to the vicinity of the uppermost scaffold 2 and the assembly of the scaffold 2 are alternately performed.

【0015】そして、笠木部分7に到達したら、ここに
セットした突梁6を取り外し、最上層の足場2を組み立
てる。
Then, when the head portion 7 is reached, the projecting beam 6 set here is removed and the scaffold 2 of the uppermost layer is assembled.

【0016】最上層の足場2の組み立てが終了したら、
持送り金具5を取り外して該金具より上方の防護ネット
3を足場2に密着させて締結する。しかる後、全体的に
ネット3の張り具合を調節して作業を終了する。図6は
その状態を示す。
After the top scaffold 2 is assembled,
The carrying metal fitting 5 is removed, and the protective net 3 above the metal fitting is brought into close contact with the scaffold 2 and fastened. After that, the tension of the net 3 is adjusted as a whole to finish the work. FIG. 6 shows the state.

【0017】この実施例は好ましい一例を示したにすぎ
ず、細部の手順、例えばメッシュシート11とワイヤロー
プ8を事前にネット3化しておき、これを仮設足場2の
外側に配置して締結する等は、請求項に記載した発明の
要旨を変えない範囲で種々に変更することが可能であ
る。
This embodiment is only a preferable example, and the detailed procedure, for example, the mesh sheet 11 and the wire rope 8 are made into a net 3 in advance, and the net 3 is arranged and fastened outside the temporary scaffold 2. Etc. can be variously modified without changing the gist of the invention described in the claims.

【0018】[0018]

【発明の効果】請求項1,2の発明は前記のようである
ため、仮設足場の組み立ての際に、組み立てに使用する
工具や足場構成部品などの地上への落下を防護ネットに
より防止でき、作業の安全を図ることができるという優
れた効果がある。
Since the inventions of claims 1 and 2 are as described above, at the time of assembling the temporary scaffold, it is possible to prevent the tools and scaffolding components used for the assembly from falling to the ground by the protective net, There is an excellent effect that work safety can be achieved.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の一実施例を示し、仮設足場に防護ネ
ットを張設している途中の側面図である。
FIG. 1 is a side view showing an embodiment of the present invention while a protective net is being stretched on a temporary scaffold.

【図2】同上の一部の平面図である。FIG. 2 is a plan view of a part of the above.

【図3】要部の一部省略の側面図である。FIG. 3 is a side view with a part of a main part omitted.

【図4】ワイヤロープとメッシユシートの結い付け作業
の一例を示す部分正面図である。
FIG. 4 is a partial front view showing an example of a work of binding a wire rope and a mesh sheet.

【図5】図4の部分横断面図である。5 is a partial cross-sectional view of FIG.

【図6】仮設足場の組み立てと該足場に対する防護ネッ
トの張設を終了した状態の側面図である。
FIG. 6 is a side view showing a state in which the assembly of the temporary scaffold and the tensioning of the protective net on the scaffold have been completed.

【符号の説明】[Explanation of symbols]

1 建物 2 仮設足場 3 防護ネット 5 持送金具 6 突梁 7 笠木部分 8 ワイヤロープ 9 足場根がらみパイプ 11 メッシユシート 13 ひも 15 作業床 1 Building 2 Temporary scaffolding 3 Protective net 5 Carrying metal fittings 6 Projecting beam 7 Kasagi part 8 Wire rope 9 Scaffolding root-like pipe 11 Mesh sheet 13 String 15 Working floor

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 建物の壁面に沿って組み立てる仮設足場
に防護ネットを張設する方法において、仮設足場を1層
又は数層組み立てるとともに、防護ネットを該仮設足場
の外側の上方又は下方から配置し、この防護ネットをま
ず前記仮設足場に結い付けて張設し、次に持送金具を前
記仮設足場から外方に突出させて取付けて前記仮設足場
と防護ネットとの間をその上方において所定の空間が形
成されるようにした上でさらに仮設足場を組み立てて行
き、仮設足場が最上層に達したら前記持送金具を取り外
して前記仮設足場より上方の仮設足場に防護ネットを結
い付けて張設することを特徴とする仮設足場用防護ネッ
トの張設方法。
1. A method of stretching a protective net on a temporary scaffold to be assembled along a wall surface of a building, wherein one or several layers of the temporary scaffold are assembled and the protective net is arranged from above or below the outside of the temporary scaffold. First, the protective net is connected to the temporary scaffold and stretched, and then the carrying metal fitting is attached to the temporary scaffold by projecting outward from the temporary scaffold and a predetermined distance between the temporary scaffold and the protective net. After constructing a space, the temporary scaffolding is assembled, and when the temporary scaffold reaches the uppermost layer, the carrying metal fittings are removed and a protective net is connected to the temporary scaffold above the temporary scaffold and stretched. A method for tensioning a protective net for temporary scaffolds, characterized by:
【請求項2】 建物の壁面に沿って組み立てる仮設足場
に防護ネットを張設する方法において、仮設足場を1層
又は数層組み立てるとともに、防護ネットを該仮設足場
の外側の上方又は下方から配置し、この防護ネットをま
ず前記仮設足場に結い付けて張設し、次に持送金具を前
記仮設足場から外方に突出させて取付けて前記仮設足場
と防護ネットとの間をその上方に所定の空間が形成され
るようにした上でさらに前記仮設足場の上に仮設足場を
1層又は数層組み立て、組み立て後に前記持送金具を取
り外してこの組み立てた仮設足場に前記防護ネットを結
い付けて張設し、同様にして持送金具の取り付けによる
所定の空間の形成と仮設足場の組み立て、および前記持
送金具の取り外しと防護ネットの結い付け張設を最上層
の仮設足場まで順次繰り返すことを特徴とする仮設足場
用防護ネットの張設方法。
2. A method of tensioning a protective net on a temporary scaffold to be assembled along a wall surface of a building, wherein one or several layers of the temporary scaffold are assembled and the protective net is arranged from above or below the outside of the temporary scaffold. First, the protective net is first connected to the temporary scaffold and stretched, and then the carrying metal fitting is projected outward from the temporary scaffold to be attached so that the space between the temporary scaffold and the protective net is predetermined above the temporary scaffold. After a space is formed, one or several layers of temporary scaffolding are assembled on the temporary scaffolding, the carrying metal fittings are removed after the assembly, and the protective net is connected to the assembled temporary scaffolding and stretched. In the same way, a predetermined space is formed by attaching the carrying metal fittings and the temporary scaffold is assembled, and the removal of the carrying metal fitting and the connection of the protective net are tensioned up to the temporary scaffold at the top layer. A method for tensioning a protective net for temporary scaffolds characterized by repeating.
JP4090601A 1992-04-10 1992-04-10 How to install a protective net for temporary scaffolding Expired - Fee Related JPH083275B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4090601A JPH083275B2 (en) 1992-04-10 1992-04-10 How to install a protective net for temporary scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4090601A JPH083275B2 (en) 1992-04-10 1992-04-10 How to install a protective net for temporary scaffolding

Publications (2)

Publication Number Publication Date
JPH06123175A JPH06123175A (en) 1994-05-06
JPH083275B2 true JPH083275B2 (en) 1996-01-17

Family

ID=14002997

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4090601A Expired - Fee Related JPH083275B2 (en) 1992-04-10 1992-04-10 How to install a protective net for temporary scaffolding

Country Status (1)

Country Link
JP (1) JPH083275B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6312109B1 (en) * 2017-09-15 2018-04-18 株式会社小林組 Safety device for temporary scaffold
JP7317413B1 (en) * 2022-12-13 2023-07-31 株式会社サンエス Scaffolding installation and dismantling method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS563761A (en) * 1979-06-22 1981-01-16 Nippon Biso Kk Device for working peripheral wall surface of building
JPS62141259A (en) * 1985-12-16 1987-06-24 三井建設株式会社 Safety net apparatus for construction of balcony
JPS637471A (en) * 1986-06-27 1988-01-13 工研ゴンドラ株式会社 Ageing net raising and lowering apparatus

Also Published As

Publication number Publication date
JPH06123175A (en) 1994-05-06

Similar Documents

Publication Publication Date Title
JP6312109B1 (en) Safety device for temporary scaffold
JPH083275B2 (en) How to install a protective net for temporary scaffolding
JP2012067585A (en) Lining reinforcing bar
CN209780190U (en) Hanging platform for large-span beam string beam daylighting roof construction
JP4914527B1 (en) Building equipment for building and building construction method for building
JP2006265899A (en) Scaffolding construction method
JP2664643B2 (en) Side protection wall assembling method for hanging scaffold and side protection panel for hanging scaffold used for it
JP3238068U (en) Oya stone structure
JPH0444054B2 (en)
JP7224591B1 (en) Preceding handrail and preemptive net type scaffolding curing system, and scaffolding curing method using the same
JPH07229110A (en) Suspension floor assembly for cable suspension
JP3019509U (en) Frame scaffolding roof
AU2010100459A4 (en) Fabric for use in hoarding
JP2006161336A (en) Constructing and curing tent
JP3223960U (en) Scaffold protection plate
JP7443279B2 (en) A roof frame for curing external framework scaffolding and a rain protection device for external framework scaffolding using a roof frame for curing external framework scaffolding.
JP3003372U (en) Rain shield for exterior wall finishing work
JP2549053B2 (en) Curtain wall panel support structure and curtain wall construction method using the panel support structure
JPS5944444B2 (en) Bridge construction method
JPS6070207A (en) Coil-shaped floor assembly for scaffold
JP2026026361A (en) Support frame installation structure
JPH0133717Y2 (en)
WO2015190176A1 (en) Suspended scaffold for bridge maintenance and method for installing same
JP2003020614A (en) Temporary roof
JPH08109722A (en) Roofing method

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19960723

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090117

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090117

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100117

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100117

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110117

Year of fee payment: 15

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120117

Year of fee payment: 16

LAPS Cancellation because of no payment of annual fees