- JPH085054B2 JPH085054B2 JP29007987A JP29007987A JPH085054B2 JP H085054 B2 JPH085054 B2 JP H085054B2 JP 29007987 A JP29007987 A JP 29007987A JP 29007987 A JP29007987 A JP 29007987A JP H085054 B2 JPH085054 B2 JP H085054B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- steel pipe
- column
- mortar
- pillar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
- Rod-Shaped Construction Members (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Description
【発明の詳細な説明】 (a).産業上の利用分野 本発明は、内部にリブが設けられていても、密実な状
態のコンクリート・モルタル(本明細書中において、
「コンクリート・モルタル」とは、「コンクリート」又
は「モルタル」の意)を打設することが出来る鋼管コン
クリート柱の製造方法に関する。DETAILED DESCRIPTION OF THE INVENTION (a). INDUSTRIAL APPLICABILITY The present invention relates to concrete mortar (in the present specification, in a solid state) even if ribs are provided inside.
"Concrete mortar" relates to a method for manufacturing a steel pipe concrete column in which "concrete" or "mortar" can be placed.
(b).従来の技術 従来、鋼管コンクリート柱の鋼管内部には、リブ等
の、コンクリート・モルタルを密実に打設する上での障
害となるものは何ら設けられていなかった。(B). 2. Description of the Related Art Conventionally, no ribs or other obstacles for densely placing concrete or mortar have been provided inside the steel pipe of the steel pipe concrete column.
(c).発明が解決しようとする問題点 しかし、鋼管内にこうしたリブを設けることは、梁間
の応力伝達を円滑に行う上で効果は大なるものが有る。
従って、こうしたリブを設けても、鋼管内部にコンクリ
ート・モルタルを密実に打設することが出来る鋼管コン
クリート柱の製造方法の開発が待たれていた。(C). Problems to be Solved by the Invention However, providing such ribs in the steel pipe has a great effect in smoothly transmitting stress between the beams.
Therefore, even if such ribs are provided, the development of a method for manufacturing a steel pipe concrete column that allows solid placement of concrete mortar inside the steel pipe has been awaited.
また、構造物の柱の構築方法としては、所定長さに製
造された状態の鋼管柱を複数個、溶接により直列に接続
することにより構築する方法が知られている。しかし、
こうした工法を用いた場合、鋼管内部にコンクリート・
モルタルを打設した鋼管コンクリート柱を用いると、溶
接による熱により鋼管コンクリート柱内部に打設された
コンクリート・モルタル体が劣化してしまい、所定の設
計強度を発揮出来なくなる危険性が有り、リブを設けた
鋼管内にコンクリート・モルタルを密実に打設したとし
ても、その効果が半減してしまう不都合が生じる。As a method of constructing a pillar of a structure, a method of constructing by connecting a plurality of steel pipe pillars manufactured in a predetermined length in series by welding is known. But,
When such a construction method is used, concrete
When using steel pipe concrete columns with mortar, there is a risk that the heat generated by welding will deteriorate the concrete and mortar bodies placed inside the steel pipe concrete columns, making it impossible to achieve the specified design strength. Even if concrete mortar is cast in the provided steel pipe, its effect is halved.
本発明は、前述の欠点を解消すべく、鋼管内部にリブ
を設けても、鋼管内部にコンクリート・モルタルを密実
に打設することが出来る鋼管コンクリート柱の製造方法
を提供することを目的とするものである。SUMMARY OF THE INVENTION It is an object of the present invention to provide a method for manufacturing a steel pipe concrete column, which is capable of densely placing concrete mortar inside the steel pipe even if ribs are provided inside the steel pipe in order to solve the above-mentioned drawbacks. It is a thing.
また、本発明は、所定長さに製造された状態の鋼管コ
ンクリート柱を複数個、溶接により直列に接続すること
により柱を構築する場合においても、内部のコンクリー
ト・モルタル体が溶接による熱の影響を受けることがな
い鋼管コンクリート柱の製造方法を提供することを別の
目的とするものである。Further, the present invention, even in the case of constructing a column by connecting a plurality of steel pipe concrete columns in a state of being manufactured to a predetermined length in series by welding, the internal concrete mortar body is affected by the heat of welding. Another object of the present invention is to provide a method for manufacturing a steel pipe concrete column that does not receive the damage.
(d).問題点を解決するための手段 即ち、本発明は、構造物の柱の構築現場において、溶
接により直列に接続して行くことにより前記柱を構築す
る際に用いられる、所定長さに形成された鋼管コンクリ
ート柱(1)において、該鋼管コンクリート柱を製造す
る際に、前記所定長さに形成された筒状の柱本体(1a)
の梁接続部位の少なくとも内側にリブ(1d)を設け、該
リブを設けた状態で、前記柱本体を加振しつつ柱本体内
にコンクリート・モルタルを、前記柱本体の下端から所
定距離(L1)上方の位置より、前記柱本体の上端より所
定距離(L1)下方の位置まで注入打設してコンクリート
・モルタル体(3)を形成すると共に、前記柱本体の上
端部及び下端部にコンクリート・モルタルの充填されな
い非充填部を形成するようにして構成される。(D). Means for Solving the Problems That is, the present invention is formed in a predetermined length, which is used when constructing the pillar by connecting in series by welding at the construction site of the pillar of the structure. In a steel pipe concrete column (1), when manufacturing the steel pipe concrete column, a cylindrical column body (1a) formed to have the predetermined length.
A rib (1d) is provided at least on the inside of the beam connection part of the column, and in the state where the rib is provided, concrete mortar is placed in the column body while vibrating the column body, and a predetermined distance (L1 ) A concrete mortar body (3) is formed by pouring from a position above to a position a predetermined distance (L1) below the upper end of the pillar main body, and at the same time, the concrete It is configured to form a non-filled portion of mortar that is not filled.
なお、括弧内の番号等は、図面における対応する要素
を示す、便宜的なものであり、従って、本記述は図面上
の記載に限定拘束されるものではない。以下の
「(e).作用」の欄についても同様である。It should be noted that the numbers in parentheses indicate the corresponding elements in the drawings for the sake of convenience, and thus the present description is not limited to the description in the drawings. The same applies to the section "(e). Action" below.
(e).作用 上記した構成により、本発明は、柱本体(1a)を加振
した状態でコンクリート・モルタルを打設することによ
り、コンクリート・モルタルは空隙を生じることなく柱
本体(1a)内に打設されるように作用する。(E). Action With the above-described structure, according to the present invention, by placing concrete mortar in a state where the column body (1a) is vibrated, the concrete mortar is placed in the column body (1a) without generating voids. Acts like.
また、本発明は、コンクリート・モルタル体(3)の
上下に形成されるコンクリート・モルタルの充填されな
い非充填部(1g)が、溶接の際の熱がコンクリート・モ
ルタル体(3)へ悪影響を与えることを防止するように
作用する。Further, in the present invention, the non-filled portions (1 g) of concrete and mortar, which are formed above and below the concrete and mortar body (3) and are not filled, adversely affect the heat of welding on the concrete and mortar body (3). Acts to prevent that.
(f).実施例 以下、本発明の実施例を図面に基づき説明する。(F). Embodiment An embodiment of the present invention will be described below with reference to the drawings.
第1図は本発明による鋼管コンクリート柱の製造方法
の一実施例を示す鋼管コンクリート柱の製造時の断面
図、 第2図は本発明により製造された鋼管コンクリート柱
の一例を示す断面図、 第3図は第2図の鋼管コンクリート柱の平面図であ
る。FIG. 1 is a cross-sectional view of an embodiment of the method for producing a steel pipe concrete column according to the present invention during production of a steel pipe concrete column, and FIG. 2 is a sectional view showing an example of a steel pipe concrete column produced according to the present invention. FIG. 3 is a plan view of the steel pipe concrete column of FIG.
鋼管コンクリート柱1は、第2図及び第3図に示すよ
うに、鋼管により所定長さの円柱状に形成された柱本体
1aを有しており、柱本体1aの外周部には、8角板状の外
部リブ1bが2枚ずつ、梁2が接続される位置(梁接続部
位)に対応した形で、柱本体1aの周囲を取り囲む形で設
けられている。外部リブ1bには90°ピッチで4個所の梁
接続部1cが設けられており、更に、柱本体1aの内側で、
前記外部リブ1bに対向した位置には円環状に形成された
内部リブ1dが固着されている。内部リブ1dの中央部には
コンクリート流通穴1eが貫通穿設されており、更に鋼管
コンクリート柱1の内面には、コンクリート・モルタル
が充填されたコンクリート・モルタル体3が形成されて
いる。As shown in FIGS. 2 and 3, a steel pipe concrete pillar 1 is a pillar body formed of a steel pipe into a cylindrical shape having a predetermined length.
The column main body 1a is provided with two octagonal plate-shaped external ribs 1b on the outer peripheral portion of the column main body 1a in a shape corresponding to the position where the beam 2 is connected (beam connection site). It is provided so as to surround the circumference of. The outer rib 1b is provided with four beam connection portions 1c at a pitch of 90 °, and further inside the column main body 1a,
An annular internal rib 1d is fixed at a position facing the external rib 1b. A concrete flow hole 1e is formed through the center of the inner rib 1d, and a concrete mortar body 3 filled with concrete mortar is formed on the inner surface of the steel pipe concrete column 1.
なお、鋼管コンクリート柱1を製造する際に用いられ
る、テーブルバイブレータ7は、第1図に示すように、
柱本体1aを搭載するワーク搭載面7aを有しており、ワー
ク搭載面7aには円筒状に形成された高さL1なる突起7bが
設けられている。In addition, as shown in FIG. 1, the table vibrator 7 used when manufacturing the steel pipe concrete pillar 1 is
It has a work mounting surface 7a on which the pillar main body 1a is mounted, and the work mounting surface 7a is provided with a cylindrical projection 7b having a height L1.
鋼管コンクリート柱1は、以上のような構成を有する
ので、鋼管コンクリート柱1を製造する場合には、第1
図に示すように、鋼管からなる柱本体1aの梁接続部位に
外部リブ1b及び内部リブ1dを設けたところで、柱本体1a
をテーブルバイブレータ7上に、突起7bに柱本体1aの下
端部1fを嵌入させる形で設置する。更に柱本体1aの各外
部リブ1b、1b間及び柱本体1a中央部にバイブレータ9を
複数個、設置して、その状態で柱本体1a内にコンクリー
ト・モルタルを注入打設する。すると、該注入されたコ
ンクリート・モルタルは、柱本体1a内の円筒状の空間
を、柱本体1aの下端から距離L1だけ上方に位置する、突
起7bの上面7cから図中上方に向けて充填する形で打設さ
れる。また、この際、テーブルバイブレータ7及びバイ
ブレータ9を駆動することにより、柱本体1aに対して振
動を与え、柱本体1a内に打設されたコンクリート・モル
タルが内部リブ1d近傍を含めて全体的に密実に、空隙を
生じることなく打設されるようにする。こうして、柱本
体1aを加振しつつ、第1図上端部1fから距離L1の位置ま
でコンクリート・モルタルを打設したところで、柱本体
1a内のコンクリート・モルタルを凝固させてコンクリー
ト・モルタル体3を形成し、第3図に示すような、鋼管
コンクリート柱1を製造する。また、テーブルバイブレ
ータ7の突起7bと打設されるコンクリート・モルタルに
より、柱本体1aの上端部及び下端部には、第2図に示す
ように、コンクリート・モルタルが充填されない非充填
部1g、1gが形成される。Since the steel pipe concrete pillar 1 has the above-mentioned structure, when manufacturing the steel pipe concrete pillar 1, the first
As shown in the figure, when the external ribs 1b and the internal ribs 1d are provided at the beam connection portions of the column body 1a made of steel pipe, the column body 1a
Is installed on the table vibrator 7 in such a manner that the lower end 1f of the column main body 1a is fitted into the protrusion 7b. Further, a plurality of vibrators 9 are installed between the outer ribs 1b, 1b of the pillar body 1a and in the central portion of the pillar body 1a, and concrete mortar is poured into the pillar body 1a in that state. Then, the poured concrete mortar fills the cylindrical space in the column main body 1a from the lower end of the column main body 1a upward by a distance L1 from the upper surface 7c of the projection 7b toward the upper side in the figure. It is placed in a shape. In addition, at this time, by driving the table vibrator 7 and the vibrator 9, vibration is applied to the column main body 1a, and the concrete mortar cast in the column main body 1a is totally moved including the vicinity of the internal rib 1d. Make sure that the casting is done without any gaps. Thus, while vibrating the pillar body 1a, when the concrete mortar was placed from the upper end 1f in FIG. 1 to the position of the distance L1, the pillar body 1a
Concrete / mortar in 1a is solidified to form a concrete / mortar body 3 to manufacture a steel pipe concrete column 1 as shown in FIG. Further, as shown in FIG. 2, the non-filled portions 1g and 1g where the concrete mortar is not filled in the upper end portion and the lower end portion of the column main body 1a by the concrete mortar cast on the projection 7b of the table vibrator 7. Is formed.
こうして、コンクリート・モルタル体3が形成された
ところで、当該鋼管コンクリート柱1を、柱の構築現場
にまで運搬し、所定の柱構築位置に立設するが、この際
には、第2図想像線に示すように、既に構築状態の鋼管
コンクリート柱1の先端に、新たに構築すべき鋼管コン
クリート柱1を直列に接続して、その端部1f同士を溶接
して、両柱1、1を一体化する。なお、この際に、コン
クリート・モルタル体3は、第2図に示すように、柱本
体の上端部及び下端部に形成された距離L1なるコンクリ
ート・モルタルが充填されない非充填部1gの存在によ
り、溶接の行われる柱本体1aの端部1fから所定距離L1だ
け離れているので、溶接による熱によって悪影響を受け
ることは無い。In this way, when the concrete / mortar body 3 is formed, the steel pipe concrete pillar 1 is transported to the pillar construction site and erected at a predetermined pillar construction position. As shown in, the steel pipe concrete column 1 to be newly constructed is connected in series to the tip of the steel pipe concrete column 1 that has already been constructed, and the ends 1f are welded to each other so that both columns 1 and 1 are integrated. Turn into. At this time, as shown in FIG. 2, the concrete-mortar body 3 has the non-filled portion 1g not filled with the concrete-mortar having the distance L1 formed at the upper and lower ends of the column main body. Since it is separated from the end 1f of the column main body 1a where welding is performed by a predetermined distance L1, it is not adversely affected by the heat of welding.
鋼管コンクリート柱1、1同士が直列に、第2図上下
方向に接続されたところで、接続された鋼管コンクリー
ト柱1、1の内部に互いに隣接する鋼管コンクリート柱
1、1の非充填部1g、1gにより形成された空間5部分に
コンクリート・モルタル6を圧入して、当該部分をコン
クリート・モルタル6で充填して、1ユニット分の鋼管
コンクリート柱1の構築作業を終える。こうして、次々
に鋼管コンクリート柱1を、既設の鋼管コンクリート柱
1上に接続してゆくことにより、構造物の柱は構築され
る。なお、鋼管コンクリート柱1と梁2との接続は、第
3図に示すように、外部リブ1bに設けられた梁接続部1c
を介して行われる。When the steel pipe concrete columns 1 and 1 are connected in series in the vertical direction in FIG. 2, the unfilled portions 1g and 1g of the steel pipe concrete columns 1 and 1 that are adjacent to each other inside the connected steel pipe concrete columns 1 and 1 Concrete mortar 6 is press-fitted into the space 5 portion formed by, and the portion is filled with the concrete mortar 6 to complete the construction work of the steel pipe concrete pillar 1 for one unit. In this way, the columns of the structure are constructed by successively connecting the steel pipe concrete columns 1 onto the existing steel pipe concrete columns 1. In addition, as shown in FIG. 3, the connection between the steel pipe concrete pillar 1 and the beam 2 is made by connecting the beam connecting portion 1c provided on the outer rib 1b.
Done through.
なお、上述の実施例は、柱本体1aの断面が、第3図に
示すように、円形の場合について述べたが、本発明は、
柱本体1aの少なくとも内側に内部リブ1dを設ける限り、
柱本体1aの断面形状はどのようなものでもよく、例えば
断面が4角形や多角形等でもよいことは勿論である。In the above-mentioned embodiment, the cross section of the pillar main body 1a is circular as shown in FIG. 3, but the present invention is not limited to this.
As long as the inner rib 1d is provided at least inside the pillar body 1a,
Of course, the column main body 1a may have any cross-sectional shape, for example, the cross-section may be quadrangular or polygonal.
(g).発明の効果 以上、説明したように、本発明によれば、構造物の柱
の構築現場において、溶接により直列に接続して行くこ
とにより前記柱を構築する際に用いられる、所定長さに
形成された鋼管コンクリート柱1において、該鋼管コン
クリート柱を製造する際に、前記所定長さに形成された
筒状の柱本体1aの梁接続部位の少なくとも内側に内部リ
ブ1dなどのリブを設け、該リブを設けた状態で、前記柱
本体を加振しつつ柱本体内にコンクリート・モルタル
を、前記柱本体の下端から所定距離L1上方の位置より、
前記柱本体の上端より所定距離L1下方の位置まで注入打
設してコンクリート・モルタル体3を形成すると共に、
前記柱本体の上端部及び下端部にコンクリート・モルタ
ルの充填されない非充填部1g、1gを形成するようにして
構成したので、柱本体1a内へのコンクリート・モルタル
の打設を、内部のリブの存在にもかかわらず、密実な状
態で打設することが可能となる。(G). Effects of the Invention As described above, according to the present invention, at a construction site of a pillar of a structure, the pillar is formed to have a predetermined length which is used when the pillar is constructed by connecting in series by welding. In the steel pipe concrete pillar 1, the ribs such as the internal ribs 1d are provided at least inside the beam connecting portion of the cylindrical pillar body 1a formed in the predetermined length when the steel pipe concrete pillar is manufactured. With the rib provided, concrete mortar in the pillar body while vibrating the pillar body, from a position a predetermined distance L1 above the lower end of the pillar body,
A concrete mortar body 3 is formed by pouring into a position below a predetermined distance L1 from the upper end of the pillar main body,
Since the non-filled portion 1g, which is not filled with concrete mortar, is formed at the upper end and the lower end of the pillar main body, it is configured so that the concrete mortar is cast into the pillar main body 1a by the internal ribs. Despite its existence, it is possible to place it in a solid state.
また、非充填部を形成することにより、鋼管コンクリ
ート柱を溶接により直列に接続する際に、溶接による熱
によりコンクリート・モルタル体が悪影響を受け、その
強度が低下する事態の発生を未然に防止することが出
来、リブを設けた鋼管内にコンクリート・モルタルを密
実に打設可能となることと相俟って信頼性の高い鋼管コ
ンクリート柱の製造方法を提供することが可能となる。Further, by forming the non-filled portion, when the steel pipe concrete columns are connected in series by welding, it is possible to prevent the occurrence of a situation where the strength of the concrete / mortar body is adversely affected by the heat of welding and its strength is reduced. In addition to the fact that concrete mortar can be densely placed in the ribbed steel pipe, it is possible to provide a highly reliable method of manufacturing a steel pipe concrete column.
第1図は本発明による鋼管コンクリート柱の製造方法の
一実施例を示す鋼管コンクリート柱の製造時の断面図、 第2図は本発明により製造された鋼管コンクリート柱の
一例を示す断面図、 第3図は第2図の鋼管コンクリート柱の平面図である。 1……鋼管コンクリート柱 1a……柱本体 1d……リブ(内部リブ) 1g……非充填部 3……コンクリート・モルタル体FIG. 1 is a cross-sectional view of an embodiment of the method for producing a steel pipe concrete column according to the present invention during production of a steel pipe concrete column, and FIG. 2 is a sectional view showing an example of a steel pipe concrete column produced according to the present invention. FIG. 3 is a plan view of the steel pipe concrete column of FIG. 1 …… Steel tube concrete column 1a …… Column body 1d …… Rib (internal rib) 1g …… Unfilled part 3 …… Concrete / mortar
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭61−179948(JP,A) 特開 昭62−101734(JP,A) 特開 昭62−164927(JP,A) 特開 昭60−73961(JP,A) 特公 昭59−39026(JP,B2) 特公 昭62−36107(JP,B2) ─────────────────────────────────────────────────── --- Continuation of the front page (56) References JP-A-61-179948 (JP, A) JP-A-62-101734 (JP, A) JP-A-62-164927 (JP, A) JP-A-60- 73961 (JP, A) JP 59-39026 (JP, B2) JP 62-36107 (JP, B2)
Claims (1)
り直列に接続して行くことにより前記柱を構築する際に
用いられる、所定長さに形成された鋼管コンクリート柱
において、 該鋼管コンクリート柱を製造する際に、 前記所定長さに形成された筒状の柱本体の梁接続部位の
少なくとも内側にリブを設け、 該リブを設けた状態で、前記柱本体を加振しつつ柱本体
内にコンクリート・モルタルを、前記柱本体の下端から
所定距離上方の位置より、前記柱本体の上端より所定距
離下方の位置まで注入打設してコンクリート・モルタル
体を形成すると共に、前記柱本体の上端部及び下端部に
コンクリート・モルタルの充填されない非充填部を形成
するようにして構成した鋼管コンクリート柱の製造方
法。1. A steel pipe concrete column having a predetermined length, which is used when constructing a column by connecting in series by welding at a construction site of a structure column, said steel pipe concrete column. At the time of manufacturing, a rib is provided at least inside the beam connection portion of the cylindrical column body formed to have the predetermined length, and in the state where the rib is provided, the column body is vibrated while vibrating the column body. Concrete mortar is poured from a position above a predetermined distance from the lower end of the pillar body to a position below a predetermined distance from the upper end of the pillar body to form a concrete mortar body, and the upper end of the pillar body is also formed. A method for producing a steel pipe concrete column, wherein a non-filled portion where concrete and mortar are not filled is formed at the lower portion and the lower end portion.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP29007987A JPH085054B2 (en) | 1987-11-17 | 1987-11-17 | Steel tube concrete column manufacturing method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP29007987A JPH085054B2 (en) | 1987-11-17 | 1987-11-17 | Steel tube concrete column manufacturing method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH01130909A JPH01130909A (en) | 1989-05-23 |
| JPH085054B2 true JPH085054B2 (en) | 1996-01-24 |
Family
ID=17751524
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP29007987A Expired - Fee Related JPH085054B2 (en) | 1987-11-17 | 1987-11-17 | Steel tube concrete column manufacturing method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH085054B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114809450A (en) * | 2022-05-25 | 2022-07-29 | 广州大学 | Steel pipe concrete column with steel waist ring plate and construction method |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5939026B2 (en) | 2012-05-15 | 2016-06-22 | 大日本印刷株式会社 | Packaging material and liquid paper container comprising the same |
| JP6236107B2 (en) | 2016-03-09 | 2017-11-22 | 本田技研工業株式会社 | Fuel cell stack |
-
1987
- 1987-11-17 JP JP29007987A patent/JPH085054B2/en not_active Expired - Fee Related
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5939026B2 (en) | 2012-05-15 | 2016-06-22 | 大日本印刷株式会社 | Packaging material and liquid paper container comprising the same |
| JP6236107B2 (en) | 2016-03-09 | 2017-11-22 | 本田技研工業株式会社 | Fuel cell stack |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH01130909A (en) | 1989-05-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3258549B2 (en) | Connection structure between pier reinforcement and footing | |
| KR20020086506A (en) | Composite structural framing system | |
| KR20200061161A (en) | Mold for manufacturing precast concrete double wall standing and manufacturing method of precast concrete double wall using of the same | |
| JP7200048B2 (en) | pile foundation structure | |
| JPH1136449A (en) | Beam-column joint structure | |
| JPH085054B2 (en) | Steel tube concrete column manufacturing method | |
| JPH0674621B2 (en) | Joint structure of concrete pipe, concrete pipe and construction method | |
| JP2883898B2 (en) | PC pillar and PC pillar construction method | |
| JPH066818B2 (en) | Reinforced steel composite column | |
| JPH07292773A (en) | Construction method of frame with steel tube concrete columns | |
| JP4996189B2 (en) | Column / beam joint structure | |
| JPH0813692A (en) | Columnar structure and its construction method | |
| JPH05287802A (en) | Construction method of centrifugal casting pca column | |
| JP2820164B2 (en) | Precast composite column joint structure | |
| JP7200042B2 (en) | pile foundation structure | |
| JPH0562180B2 (en) | ||
| JP7628830B2 (en) | Construction method for column-beam joint structure | |
| JPS59122653A (en) | Construction of flat slab | |
| JP2001152414A (en) | Structural material for concrete pier and its construction method | |
| JP7232660B2 (en) | pile foundation structure | |
| JP2984626B2 (en) | PC pillar construction method and its PC pillar | |
| JP4184538B2 (en) | Column base semi-fixed joint structure, building and building design method | |
| JPH0448136B2 (en) | ||
| JP2000120076A (en) | Foundation structure of steel framed structure and its execution method | |
| JPH0830360B2 (en) | Connection method for columns and beams |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |