JPH086548B2 - Tunnel shaft structure - Google Patents
Tunnel shaft structureInfo
- Publication number
- JPH086548B2 JPH086548B2 JP3119443A JP11944391A JPH086548B2 JP H086548 B2 JPH086548 B2 JP H086548B2 JP 3119443 A JP3119443 A JP 3119443A JP 11944391 A JP11944391 A JP 11944391A JP H086548 B2 JPH086548 B2 JP H086548B2
- Authority
- JP
- Japan
- Prior art keywords
- materials
- tunnel
- spiral
- shaft
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000000463 material Substances 0.000 claims description 53
- 230000002093 peripheral effect Effects 0.000 claims description 11
- 238000010276 construction Methods 0.000 description 4
- 230000002411 adverse Effects 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明はシールド工法によってト
ンネルを築造する際に、予め、地上から地中の適宜深さ
まで掘削形成された立坑の構造に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure of a vertical shaft which is excavated from the ground to an appropriate depth in advance when a tunnel is constructed by a shield method.
【0002】[0002]
【従来の技術】従来から、シールド工法における立坑の
役割は、シールド掘削機の発進、到達基地として使用す
ることを主たる目的としており、掘削期間中において
は、地上からトンネル内にセグメントレール、枕木等の
各種資材、機材を搬入する通路として使用されている。
そして、このような資機材は地上の適所に設けられた貯
留ヤードに平面的に仮り置きされ、必要に応じて坑内に
搬入される。2. Description of the Related Art Conventionally, the role of the shaft in the shield construction method has been mainly to use it as a starting and reaching base for a shield excavator, and during excavation, segment rails, sleepers, etc. from the ground into the tunnel. It is used as a passage for various materials and equipment.
Then, such equipment and materials are temporarily placed on a flat surface in a storage yard provided at an appropriate place on the ground and carried into the mine as needed.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、各種資
機材を地上に仮り置きしておくための貯留ヤードの確保
は、都市部においては年々困難な度合を増しつゝあり、
又、立坑内への資機材の搬入は、地上から天井クレーン
や門型クレーンなどの荷役機械を作業員が操作してワイ
ヤーで吊り下ろすという作業により行っているために、
多大な危険を伴うと共に作業時間と労力を要するという
問題点がある。[Problems to be Solved by the Invention] However, securing a storage yard for temporarily placing various materials and equipment on the ground is becoming increasingly difficult in urban areas.
Also, because the equipment and materials are carried into the vertical shaft by the operator operating the cargo handling machine such as an overhead crane or a gate crane from the ground and hanging it with a wire,
There is a problem that it requires a lot of work time and labor as well as enormous risk.
【0004】さらに、狭隘な立坑内では余分な資機材を
貯留しておくことが困難であるために、立坑内からトン
ネル内に運搬する台車への資機材の積み込み作業時以外
には地上からの荷下ろし作業ができなく、トンネル築造
のサイクルタイムに悪影響を及ぼし、作業能率が低下す
るという問題点がある。本発明はこのような問題点に鑑
みてなされてもので、各種資機材の貯留並びに搬送を可
能にしたトンネル立坑構造の提供を目的とするものであ
る。Furthermore, since it is difficult to store extra materials and equipment in a narrow shaft, it is necessary to store the materials and materials from above the ground except when loading the materials and equipment into the truck that is transported from the shaft to the tunnel. There is a problem that the unloading work cannot be performed, the cycle time of tunnel construction is adversely affected, and the work efficiency decreases. The present invention has been made in view of the above problems, and an object thereof is to provide a tunnel shaft structure capable of storing and transporting various materials and equipment.
【0005】[0005]
【課題を解決するための手段】上記目的を達成するため
に、本発明のトンネル立坑構造は、立坑の周壁に沿って
該立坑の上端開口部から立坑下方に向かってトンネル資
機材を滑動させる螺旋スロープを設けていることを特徴
とするものである。そして、上記螺旋スロープには、資
機材を移動させる多数のローラを配設しておくと共に資
機材よりもやゝ長い間隔毎にストッパ手段を設けておく
ことが望ましい。In order to achieve the above object, the tunnel shaft structure of the present invention is a spiral which slides tunnel equipment from the upper end opening of the shaft toward the lower part of the shaft along the peripheral wall of the shaft. It is characterized by having a slope. It is desirable that the spiral slope be provided with a large number of rollers for moving the materials and equipment and that stopper means be provided at intervals slightly longer than the materials and equipment.
【0006】[0006]
【作用】資機材の単なる搬入路であった立坑を、その周
壁に設けた螺旋スロープによって資機材の立体的な貯留
室として有効に利用し、地上における資機材の貯留ヤー
ドの確保をなくする。さらに、立坑の開口上端から該螺
旋スロープ上に資機材を供給すると、資機材は該螺旋ス
ロープ上を立坑の下端に向かって自動的に滑動して螺旋
スロープ上に多数の資機材が貯留されると共に、スロー
プの下傾端部において資機材を取り出してトンネル内へ
の資機材の搬入が容易に行え、地上から立坑を介してン
ネル内への資機材の搬送作業がシステム式に能率よく行
える。[Operation] The vertical shaft, which was simply a loading path for materials and equipment, is effectively used as a three-dimensional storage room for materials and equipment by means of a spiral slope provided on the peripheral wall thereof, thereby eliminating the need to secure a storage yard for materials and equipment on the ground. Further, when the materials and materials are supplied onto the spiral slope from the upper end of the opening of the vertical shaft, the materials and materials automatically slide on the spiral slope toward the lower end of the vertical shaft, and a large number of the materials and materials are stored on the spiral slope. At the same time, it is possible to easily take out the materials and equipment into the tunnel by taking out the materials and equipment at the lower end of the slope, and to efficiently perform the work of transferring the materials and equipment into the tunnel from the ground through the shaft.
【0007】[0007]
【実施例】本発明の実施例を図面について説明すると、
1は地上から適宜深さまで掘削された立坑で、その掘削
周壁面2に互いに並行した2条の螺旋スロープ3、4を
立坑1の上端開口部から下端部にまで連続的に設けてあ
る。これらの螺旋スロープ3、4は、一定幅を有する帯
状床材3a、4aを一定の傾斜度でもって立坑1の周壁面2
にその外側端面を当接させた状態で螺旋状に配設され、
該周壁面に一定間隔毎に固着した支持フレーム5上に固
定、支持されてなるものである。Embodiments of the present invention will now be described with reference to the drawings.
A vertical shaft 1 is excavated from the ground to an appropriate depth, and two spiral slopes 3 and 4 parallel to each other are continuously provided on the peripheral wall surface 2 of the vertical shaft from the upper end opening to the lower end of the vertical shaft 1. These spiral slopes 3 and 4 are strip-shaped floor materials 3a and 4a having a constant width with a constant inclination and the peripheral wall surface 2 of the vertical shaft 1.
It is arranged in a spiral shape with its outer end surface in contact with
It is fixed and supported on a support frame 5 fixed to the peripheral wall surface at regular intervals.
【0008】さらに、螺旋スロープ3、4の床材3a、4a
の内外両側壁板3b、3b間、及び4b、4b間には、該床面の
幅方向に長いローラ6、6・・・6がその上周部を床面
から突出させた状態でスロープの長さ方向に小間隔毎に
回転自在に軸支されてあり、螺旋スロープ3、4上に供
給される資機材(以下、セグメント7とする)をその自
重によって下方に滑動、搬送させるように構成してあ
る。Further, floor materials 3a and 4a of the spiral slopes 3 and 4
Between the inner and outer both side wall plates 3b, 3b and between 4b, 4b, rollers 6, 6, ... 6 which are long in the width direction of the floor surface of the slope are formed with their upper peripheral portions protruding from the floor surface. It is rotatably supported at small intervals in the length direction, and is configured to slide and convey the equipment (hereinafter referred to as segment 7) supplied on the spiral slopes 3 and 4 downward by its own weight. I am doing it.
【0009】又、螺旋スロープ3、4の上端部は、立坑
1の開口端壁面に沿って1つのセグメント7が載置可能
な水平供給部11に形成されていると共に、立坑1の下端
一側に開口しているトンネル10の上方近傍部に達する螺
旋スロープ3、4の下端部も1つのセグメント7が定置
可能な水平取出部12に形成してある。8は螺旋スロープ
3、4の床材3a、4aの内側端部上面から上方に突設した
一定高さを有する脱落防止柵体である。Further, the upper ends of the spiral slopes 3 and 4 are formed on a horizontal supply portion 11 along which the one segment 7 can be placed along the wall surface of the open end of the vertical shaft 1 and at the lower end one side of the vertical shaft 1. The lower ends of the spiral slopes 3 and 4 reaching the upper vicinity of the tunnel 10 that is open to the bottom are also formed in the horizontal take-out portion 12 in which one segment 7 can be placed. Reference numeral 8 denotes a fall prevention fence having a certain height and protruding upward from the upper surfaces of the inner end portions of the floor materials 3a and 4a of the spiral slopes 3 and 4.
【0010】上記床材3a、4aの両側壁板3b、3b間、及び
4b、4b間の空間部には図4に示すように、セグメント7
の長さよりもやゝ長い間隔毎にストッパ手段9が設けら
れている。このストッパ手段9は、L字状のレバー9aの
基端部を床材の両側壁板間に回動自在に軸支すると共に
中間部を同じく該両側壁板間に配設された流体圧シリン
ダー9bのロッド端に連結させて該シリンダー9bの作動に
より、レバー9aの上端ストッパー部9cを床面から出没さ
せるように構成してなるものである。Between the side wall plates 3b and 3b of the floor members 3a and 4a, and
In the space between 4b and 4b, as shown in FIG.
Stopper means 9 are provided at intervals that are slightly longer than the length. The stopper means 9 is a fluid pressure cylinder in which a base end portion of an L-shaped lever 9a is rotatably supported between both side wall plates of a floor material and an intermediate portion is also disposed between the both side wall plates. The upper end stopper portion 9c of the lever 9a is configured to be projected and retracted from the floor by being connected to the rod end of 9b and operating the cylinder 9b.
【0011】次に、螺旋スロープ3、4の下端水平取出
部12からセグメント7をトンネル10内に搬入する手段を
述べると、13は立坑1の内底面に設置したスタッカクレ
ーンで、トンネル10の開口端に近傍する立坑1の内底面
に支持台14を固定し、この支持台14の両側部上にトンネ
ル10の両側方から前記螺旋スロープ3、4の水平取出部
12の上方部に達する垂直ガイド柱15、15を立設し、この
垂直ガイド柱15、15に資機材キャリッジ16を昇降自在に
配設してなるものである。Next, the means for loading the segment 7 into the tunnel 10 from the horizontal lower ends 12 of the spiral slopes 3 and 4 is described. Reference numeral 13 is a stacker crane installed on the inner bottom surface of the vertical shaft 1, which is an opening of the tunnel 10. A support 14 is fixed to the inner bottom surface of the vertical shaft 1 near the end, and the horizontal take-out portions of the spiral slopes 3 and 4 are provided on both sides of the support 14 from both sides of the tunnel 10.
Vertical guide columns 15 and 15 reaching the upper part of 12 are provided upright, and a material / material carriage 16 is arranged on the vertical guide columns 15 and 15 so as to be vertically movable.
【0012】この構造をさらに詳しく述べると、図5、
図6に示すように、キャリッジ16の両端ガイド部17、17
をガイド柱15、15に上下摺動自在に被嵌していると共
に、キャリッジ16には互いに平行な左右一対のフォーク
部材18、18がトンネル開口部及び螺旋スロープ3、4の
下端水平取出部12に向かって水平方向に出没自在に配設
されてある。The structure will be described in more detail with reference to FIG.
As shown in FIG. 6, both end guide portions 17, 17 of the carriage 16 are
The pair of left and right fork members 18, 18 parallel to each other are fitted on the guide columns 15, 15 so as to be slidable in the vertical direction, and the carriage 16 is provided with a pair of left and right fork members 18, 18 at the lower end horizontal take-out portion 12 of the spiral slopes 3, 4. It is arranged so that it can appear and disappear in the horizontal direction toward.
【0013】これらのフォーク部材18、18の駆動手段
は、キャリッジ16に並設したガイド溝19、19内にフォー
ク部材18、18の下半部を夫々摺動自在に挿嵌すると共に
該キャリッジ16の下面にモータ20を配設してその回転軸
に固着したピニオン21をガイド溝19の溝底から露出して
いるフォーク部材18の下面に形成したラック22に噛合さ
せてなるものである。又、支持台14上の適所にウインチ
23を設置すると共に垂直ガイド柱15、15の上端間に架設
状態で固着した上枠材24にシーブ24を回転自在に軸支
し、このシーブ24に該ウインチ23に巻回しているワイヤ
ロープ25を掛け渡してその先端をキャリッジ16のガイド
部17に連結してある。The driving means for these fork members 18, 18 are such that the lower halves of the fork members 18, 18 are slidably fitted in the guide grooves 19, 19 provided side by side in the carriage 16 and the carriage 16 is moved. The motor 20 is disposed on the lower surface of the rack, and the pinion 21 fixed to the rotation shaft of the motor is meshed with the rack 22 formed on the lower surface of the fork member 18 exposed from the groove bottom of the guide groove 19. In addition, the winch is placed in the proper position on the support base 14.
The sheave 24 is rotatably supported on the upper frame member 24 fixedly installed between the upper ends of the vertical guide columns 15 and 15 and the wire rope 25 wound around the winch 23 is wound around the sheave 24. And the tip thereof is connected to the guide portion 17 of the carriage 16.
【0014】26は立坑1に連通したトンネル開口端内に
配設されているターンテーブルで、図1に示すように、
トンネル10内に敷設した軌条27上を走行する資機材搬送
台車28を資機材載置後に方向転換させるものである。Numeral 26 is a turntable provided in the opening end of the tunnel communicating with the vertical shaft 1, and as shown in FIG.
The material / material transport carriage 28 running on the rail 27 laid in the tunnel 10 is turned after the material / material is placed.
【0015】このように構成したので、立坑1の周壁面
に設けた螺旋スロープ3、4上にセグメント7を仮置き
状態に貯留するには、地上から立坑1の開口端に露出し
ている螺旋スロープ3、4の上端水平供給部11、11に夫
々セグメント7を一端載置したのち、夫々の供給部11に
連なる螺旋スロープ3、4の上傾端に送り出すと、該セ
グメント7は螺旋スロープ3、4の床面から突出した多
数のローラ6上を自重によって滑動し、螺旋スロープ
3、4の下傾端に達した時に最下端側のストッパ手段9
の起立によってセグメント7の下面をストッパ部9cで受
止してその位置に仮貯留される。With this structure, in order to store the segments 7 in a temporarily placed state on the spiral slopes 3 and 4 provided on the peripheral wall of the shaft 1, the spiral exposed from the ground to the open end of the shaft 1 can be stored. After the segments 7 are mounted on the upper end horizontal supply parts 11 and 11 of the slopes 3 and 4, respectively, and then sent out to the upper inclined ends of the spiral slopes 3 and 4 connected to the respective supply parts 11, the segment 7 is formed. 4 slides on a large number of rollers 6 projecting from the floor surface by its own weight, and when it reaches the downward inclination end of the spiral slopes 3, 4, the stopper means 9 on the lowermost end side
As a result, the lower surface of the segment 7 is received by the stopper portion 9c and is temporarily stored at that position.
【0016】なお、螺旋スロープ3、4の下端までセグ
メント7を供給する際に、セグメント7の自走速度が早
くなるので、途中において適宜ストッパ手段9を出没さ
せることにより緩速度となるように調整する。When the segment 7 is supplied to the lower ends of the spiral slopes 3 and 4, the self-propelled speed of the segment 7 becomes faster. Therefore, the stopper means 9 may be appropriately retracted during the adjustment so that the slow speed is achieved. To do.
【0017】1個のセグメント7を供給したのち、次の
セグメント7を螺旋スロープ3、4に送り出し、このよ
うにセグメント7を次々と送り出して螺旋スロープ3、
4に一定間隔毎に配設したストッパ手段9に順次、受止
させてその位置で仮貯留させておく。この場合、上記の
ように2条の螺旋スロープ3、4上に、例えば異形セグ
メントと標準セグメントのように形状の異なるセグメン
トを夫々貯留させておくようにしているが、1条の螺旋
スロープのみを立坑1の周壁に沿って設けておいてもよ
いのは勿論である。After supplying one segment 7, the next segment 7 is sent out to the spiral slopes 3 and 4, and the segments 7 are successively sent out in this way, and the spiral slope 3,
4 are sequentially received by the stopper means 9 arranged at regular intervals and temporarily stored at that position. In this case, as described above, the segments having different shapes such as, for example, the deformed segment and the standard segment are stored on the two spiral slopes 3 and 4, respectively, but only one spiral slope is stored. Of course, it may be provided along the peripheral wall of the vertical shaft 1.
【0018】次に、螺旋スロープ3、4からセグメント
7を取り出してトンネル10側に搬送するには、まず、螺
旋スロープ3、4の最下傾端部に貯留されているセグメ
ント7の受止をストッパ手段9のストッパ部材9cを床面
下に没入させることにより解いて水平取出部12上に移送
させておく。この移送中、或いは移送後にスタッカクレ
ーン13のキャリッジ16をウインチ23の作動によって螺旋
スロープ3、4のいずれかの水平取出部12まで上昇さ
せ、その位置で停止させる。Next, in order to take out the segments 7 from the spiral slopes 3 and 4 and convey them to the tunnel 10 side, first, the segments 7 stored at the lowermost inclined ends of the spiral slopes 3 and 4 are received. The stopper member 9c of the stopper means 9 is unfolded below the floor surface to be unraveled and transferred onto the horizontal take-out portion 12. During or after this transfer, the carriage 16 of the stacker crane 13 is moved up to the horizontal take-out portion 12 of any of the spiral slopes 3 and 4 by the operation of the winch 23, and stopped at that position.
【0019】しかるのち、キャリッジ16のフォーク部材
18、18を水平取出部12まで突出させることにより、セグ
メント7の下面側空間に該フォーク部材18を挿入し、キ
ャリッジ16をやゝ上昇させることによってセグメント7
をこれらのフォーク部材18、18に移載させたのち、フォ
ーク部材18を適宜長さだけ収縮させる。After that, the fork member of the carriage 16
By projecting 18 and 18 to the horizontal take-out portion 12, the fork member 18 is inserted into the space on the lower surface side of the segment 7 and the carriage 16 is slightly lifted to bring up the segment 7.
After being transferred to these fork members 18, 18, the fork member 18 is contracted by an appropriate length.
【0020】次いで、キャリッジ16を降下させてトンネ
ル10の開口端に対向させ、フォーク部材18を伸長させて
ターンテーブル26上の待機している資機材搬送台車28上
に移載し、該台車28をトンネル覆工作業部まで走行させ
るものである。また、この台車28へのセグメント積み込
み作業の合間を縫って螺旋スロープ3、4上に貯留して
いる次のセグメント7を水平取出部12上に供給する。Next, the carriage 16 is lowered to face the opening end of the tunnel 10, the fork member 18 is extended, and the carriage 16 is transferred onto a waiting material / material carrier 28 on the turntable 26. To run to the tunnel lining work section. In addition, the next segment 7 stored on the spiral slopes 3 and 4 is sewn between the segment loading operations on the trolley 28 and is supplied to the horizontal take-out portion 12.
【0021】こうして、螺旋スロープ3、4上に貯留さ
れているセグメント7を次々と水平取出部12に送り出す
と共にそれに同調してキャリッジ16を昇降させながらセ
グメント7を螺旋スロープ3、4側からトンネル10側に
搬送する。一方、螺旋スロープ3、4上には新たなセグ
メント7を水平供給部11から補充するものである。In this way, the segments 7 stored on the spiral slopes 3 and 4 are successively sent out to the horizontal take-out section 12 and the carriage 16 is moved up and down in synchronization with the same to move the segments 7 from the spiral slopes 3 and 4 side to the tunnel 10. To the side. On the other hand, a new segment 7 is replenished from the horizontal supply unit 11 on the spiral slopes 3 and 4.
【0022】[0022]
【発明の効果】以上のように本発明のトンネル立坑構造
によれば、立坑の周壁に沿って該立坑の上端開口部から
立坑下方に向かってトンネル資機材を滑動させる螺旋ス
ロープを設けているので、従来からセグメントやレー
ル、枕木等のトンネル築造に要する資機材の単なる搬入
路であった立坑を、その周壁に設けた螺旋スロープによ
って資機材の立体的な貯留空間として有効に利用するこ
とができ、該螺旋スロープ上に多量の資機材を予め貯留
しておくことができて地上における資機材の貯留ヤード
の確保を殆ど不必要にすることができ、都市部における
トンネル構築作業が容易に可能となるものである。As described above, according to the tunnel shaft structure of the present invention, the spiral slope for sliding the tunnel material is provided along the peripheral wall of the shaft from the upper end opening of the shaft toward the lower part of the shaft. The vertical shaft, which has been a mere loading path for materials and equipment required for building tunnels such as segments, rails, sleepers, etc., can be effectively used as a three-dimensional storage space for materials and equipment by the spiral slope provided on the peripheral wall. Since a large amount of materials and equipment can be stored in advance on the spiral slope, it is almost unnecessary to secure a storage yard for materials and equipment on the ground, and tunnel construction work in urban areas can be easily performed. It will be.
【0023】さらに、立坑の開口上端から該螺旋スロー
プ上に資機材を供給することによって、該資機材を立坑
の下端に向かって自動的に滑動させながら螺旋スロープ
上に多数の資機材を貯留することができると共に、スロ
ープの下傾端部において資機材を取り出してトンネル内
への資機材の搬入が円滑に行える。Further, by supplying the materials and equipment onto the spiral slope from the upper end of the opening of the vertical shaft, a large number of materials and materials are stored on the spiral slope while automatically sliding the materials and equipment toward the lower end of the vertical shaft. At the same time, it is possible to take out the materials and equipment at the lower end of the slope and smoothly carry the materials and materials into the tunnel.
【0024】従って、地上から立坑を介してンネル内へ
の資機材の搬送作業の自動システム化が可能となり、作
業能率の向上を図ることができると共に大深度の立坑に
おける危険な荷役作業から作業員を開放することがで
き、トンネル築造作業が円滑且つ能率良く行えるもので
ある。Therefore, it becomes possible to make an automatic system for the transfer work of the materials and equipment from the ground to the inside of the tunnel through the vertical shaft, and it is possible to improve the working efficiency and to carry out the dangerous cargo handling work in the deep shaft. Therefore, the tunnel construction work can be performed smoothly and efficiently.
【図1】立坑の簡略縦断正面図、FIG. 1 is a simplified vertical front view of a shaft,
【図2】その展開側面図、FIG. 2 is a side view of its development,
【図3】トンネルと立坑下端部の横断面図、FIG. 3 is a cross-sectional view of the tunnel and the lower end of the shaft,
【図4】螺旋スロープの一部側面図、FIG. 4 is a partial side view of the spiral slope,
【図5】スタッカクレーンの正面図、FIG. 5 is a front view of a stacker crane,
【図6】その要部の側面図。FIG. 6 is a side view of the main part.
1 立坑 2 周壁面 3、4 螺旋スロープ 7 セグメント 9 ストッパ手段 10 トンネル 13 スタッカクレーン 16 キャリッジ 18 フォーク部材 1 Vertical shaft 2 Circumferential wall surface 3, 4 Spiral slope 7 Segment 9 Stopper means 10 Tunnel 13 Stacker crane 16 Carriage 18 Fork member
Claims (2)
から立坑下方に向かってトンネル資機材を滑動させる螺
旋スロープを設けていることを特徴とするトンネル立坑
構造。1. A tunnel shaft structure comprising a spiral slope for sliding a tunnel material from an upper end opening of the shaft toward a lower part of the shaft along a peripheral wall of the shaft.
る多数のローラが配設されていると共に資機材よりもや
ゝ長い間隔毎にストッパ手段が設けられていることを特
徴とする請求項1のトンネル立坑構造。2. The spiral slope is provided with a large number of rollers for moving materials and materials, and stopper means is provided at intervals slightly longer than the materials and materials. Tunnel shaft structure.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3119443A JPH086548B2 (en) | 1991-04-22 | 1991-04-22 | Tunnel shaft structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3119443A JPH086548B2 (en) | 1991-04-22 | 1991-04-22 | Tunnel shaft structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH04323495A JPH04323495A (en) | 1992-11-12 |
| JPH086548B2 true JPH086548B2 (en) | 1996-01-24 |
Family
ID=14761535
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP3119443A Expired - Lifetime JPH086548B2 (en) | 1991-04-22 | 1991-04-22 | Tunnel shaft structure |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH086548B2 (en) |
-
1991
- 1991-04-22 JP JP3119443A patent/JPH086548B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH04323495A (en) | 1992-11-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US3114425A (en) | Stepper-type tramming support for mining equipment | |
| US4194864A (en) | Three-dimensional automatic warehouse equipment | |
| JP3892976B2 (en) | Transport system for lining materials for tunnel construction | |
| US3219199A (en) | Method for loading mine cars and loading apparatus therefor | |
| JP3884825B2 (en) | Carrying system for lining segments for tunnel construction | |
| JPH086548B2 (en) | Tunnel shaft structure | |
| JP3897514B2 (en) | How to load a segment | |
| JP2524904B2 (en) | Tunnel shaft structure | |
| JP2001193400A (en) | Outgoing equipment for 3D automatic warehouse | |
| JPH0220319Y2 (en) | ||
| JPH0818648B2 (en) | Temporary storage / import facility for tunnel segment | |
| JP3592933B2 (en) | Material stock equipment | |
| US3177027A (en) | Box loader | |
| JPH02194297A (en) | Automatic material transport method in shield construction method | |
| JPH08192925A (en) | Horizontal main girder type continuous unloader | |
| JPH05118200A (en) | Setter of sleeper and rail in shield tunneling work | |
| JP4612283B2 (en) | Segment assembling apparatus and segment assembling method | |
| JP2001151106A (en) | Underground transport trolley and rear trolley | |
| US3990746A (en) | Apparatus for and a method of storing and transporting lining sections in an underground tunnel driving installation | |
| JP3765128B2 (en) | Segment transport device | |
| JPH0220320Y2 (en) | ||
| US3291534A (en) | Skids used on deep mine auger machines | |
| JP2000211707A (en) | Article storage device | |
| JPH0724480Y2 (en) | Segment carry-in equipment | |
| JP4331058B2 (en) | Segment transshipment transport apparatus and transport method for shield tunnel |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110124 Year of fee payment: 15 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110124 Year of fee payment: 15 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120124 Year of fee payment: 16 |
|
| EXPY | Cancellation because of completion of term | ||
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120124 Year of fee payment: 16 |