      Expansion tunnel and existing construction method using existing tunnel constructed under rocky condition Download PDF

Info

Publication number
KR100548810B1
KR100548810B1 KR1020030018561A KR20030018561A KR100548810B1 KR 100548810 B1 KR100548810 B1 KR 100548810B1 KR 1020030018561 A KR1020030018561 A KR 1020030018561A KR 20030018561 A KR20030018561 A KR 20030018561A KR 100548810 B1 KR100548810 B1 KR 100548810B1
Authority
KR
South Korea
Prior art keywords
tunnel
excavation
expansion
existing
housing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR1020030018561A
Other languages
Korean (ko)
Other versions
KR20040083876A (en
Inventor
최용기
박경욱
Original Assignee
대원토질 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대원토질 주식회사 filed Critical 대원토질 주식회사
Priority to KR1020030018561A priority Critical patent/KR100548810B1/en
Publication of KR20040083876A publication Critical patent/KR20040083876A/en
Application granted granted Critical
Publication of KR100548810B1 publication Critical patent/KR100548810B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/01Methods or apparatus for enlarging or restoring the cross-section of tunnels, e.g. by restoring the floor to its original level
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/16Machines for digging other holes in the soil
    • E02F5/18Machines for digging other holes in the soil for horizontal holes or inclined holes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

본 발명은 암반으로 이루어진 지반조건에 건설된 기존 터널의 확장 기술 및 이의 시공방법에 관한 것으로서, 기존 터널의 라이닝을 따라 일정간격을 두고 하우징을 설치하고 하우징에 오거 굴착기가 장착된 굴착장비를 설치하여 단계적으로 일정크기의 단위 굴착공을 천공하고 굴착공내에 철근을 배근한 후에 콘크리트를 타설양생하여 확장터널 굴착공벽체를 형성한 후에 기존 터널 라이닝과 확장터널 굴착공벽체 사이의 암반을 굴착 제거하여 설치하는 확장터널이다. The present invention relates to an extension technology of a conventional tunnel constructed in rocky ground conditions, and a construction method thereof, by installing a housing at regular intervals along the lining of an existing tunnel, and installing an auger equipped with an auger excavator in the housing. After drilling a drill of unit size in a step size and reinforcing the reinforcing bars in the excavation hole, concrete is laid to form an expansion tunnel excavation wall, and then excavated and removed the rock between the existing tunnel lining and the expansion tunnel excavation wall. It is an extension tunnel.

이의 시공방법은 기존 터널의 라이닝과 일정간격을 두고 일정길이의 하우징을 설치하고 유압잭으로 서서히 진입시켜 전체 하우징 길이의 반이 기존 터널의 라이닝 상부의 암반에 굴진하도록하여 하우징을 설치하는 단계;The construction method includes installing a housing having a predetermined length at a predetermined distance from a lining of an existing tunnel and gradually entering the hydraulic jack so that half of the entire housing length is excavated at a rock above the lining of the existing tunnel;

상기 전체 하우징 길이중 반은 기존 터널입구에 돌출되도록 한 라이닝 상부에 오거 굴착기가 장착된 굴착장비를 설치하고 단계적으로 단위 굴착공을 천공하여 확장터널 굴착공벽체를 설치하는 단계;Installing an excavation equipment equipped with an auger excavator on the upper part of the lining to protrude to the existing tunnel entrance and installing an expansion tunnel excavation wall wall by drilling a unit excavation hole stepwise;

상기 단위 굴착공내에 철근을 조립설치하고 콘크리트를 타설양생하는 작업을 확장터널 굴착공벽체에 걸쳐 시공하여 확장터널 굴착공벽체를 형성하는 단계;Assembling and installing reinforcing bars in the unit excavation hole and constructing concrete for spreading the expansion tunnel excavation cavity wall to form an expansion tunnel excavation cavity wall;

상기 기존터널 라이닝과 확장터널 굴착공벽체사이의 암반을 굴착하여 제거하는 단계;Digging and removing the rock between the existing tunnel lining and the expansion tunnel drilling cavity wall;

상기 하우징을 다음굴착을 위하여 이동하여 상기 하우징에 설치된 굴착장비를 이용하여 상기 단계를 반복적으로 하여 확장터널 굴착공벽체를 형성하여 확장터널의 시공을 종료하는 단계; 및Moving the housing for the next excavation and repeating the steps by using the excavation equipment installed in the housing to form an expansion tunnel excavation hole wall to finish construction of the expansion tunnel; And

시공완료된 확장터널의 교통을 소통시키기 위하여 노면을 정리 포장하고 터널내의 조명등의 시설을 설치하여 터널을 이용할 수 있게 하는 것이다.In order to communicate the traffic of the completed expansion tunnel, the road surface should be arranged and paved, and the facilities such as lighting inside the tunnel will be used so that the tunnel can be used.

Description

암반으로 이루어진 지반조건에 건설된 기존터널을 이용한 확장터널 및 이의 시공방법 {The expanding tunnel and constructing method of the existing tunnel which was constructed in rock masses}      {Expanding tunnel and constructing method of the existing tunnel which was constructed in rock masses}

도 1은 본 발명의 터널확장 시공방법을 보여주는 도면.        1 is a view showing a tunnel extension construction method of the present invention.

도 2는 본 발명의 터널확장 시공방법의 단면을 보여주는 단면도.       Figure 2 is a cross-sectional view showing a cross section of the tunnel extension construction method of the present invention.

도 3은 본 발명의 터널 확장을 위하여 기존 터널 상부에 하우징을 설치한 것을 보여주는 도면.Figure 3 is a view showing a housing installed on top of the existing tunnel for tunnel expansion of the present invention.

도 4는 본 발명의 기존터널에 하우징을 설치하고 터널확장을 위하여 단계적으로 단위 굴착공을 시공하는 것을 보여주는 도면.4 is a view showing the installation of the housing unit in the existing tunnel of the present invention and constructing the unit excavation step by step for the expansion of the tunnel.

도 5는 본 발명의 기존터널에 설치한 하우징상에 굴착장비를 설치하여 확장터널 굴착공벽체를 시공한 것을 보여주는 도면.5 is a view showing the construction of the expansion tunnel excavation cavity by installing the excavation equipment on the housing installed in the existing tunnel of the present invention.

도 6은 본 발명의 터널확장을 완료한 것을 보여주는 도면.Figure 6 shows the completion of the tunnel expansion of the present invention.

도 7은 본 발명의 터널확장을 위하여 단위 굴착공을 단계적으로 천공시공하는 순서를 보여주는 도면.Figure 7 is a view showing a step of drilling a unit excavation step by step for the tunnel expansion of the present invention.

도 8은 본 발명의 단위 굴착공을 시공하기 위하여 사용하는 굴착장비에 장착된 오거굴착기를 보여주는 도면.8 is a view showing an auger excavator mounted on the excavation equipment used to construct the unit excavation hole of the present invention.

도 9는 본 발명의 굴착장비를 이용하여 단위 굴착공을 시공하는 상태를 보여주는 도면.9 is a view showing a state in which the construction of the unit excavation hole using the excavation equipment of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10.... 기존터널 20... 확장터널 10 .... Existing Tunnel 20 ... Expansion Tunnel

30... 확장터널 굴착공벽체 40... 굴착장비30 ... Expansion Tunnel Excavation Wall 40 ... Excavation Equipment

50... 콘크리트 펌프차 60... 하우징50 ... concrete pump car 60 ... housing

61... 지지대61 ... Support

70... 오거 굴착기 71... 오거 70 ... Auger Excavator 71 ... Auger

72... 케이싱 72 ... Casing

80.... 단위 굴착공 81... 천공순서(1,2,3...)80 .... Unit Excavator 81 ... Drilling order (1,2,3 ...)

82... 겹침부82 ... overlap

본 발명은 암반으로 이루어진 지반조건에 건설된 기존 터널을 이용한 확장터널 및 이의 시공방법에 관한 것으로서, 기존 터널의 라이닝을 따라 일정간격을 두고 하우징을 설치하고 하우징에 오거 굴착기가 장착된 굴착장비를 설치하여 단계적으로 일정크기의 단위 굴착공을 천공하고 굴착공내에 철근을 배근한 후에 콘크리트를 타설양생하여 확장터널 굴착공 벽체를 형성한 후에 기존 터널 라이닝과 확장터널 굴착공 벽체 사이의 암반을 굴착 제거하여 설치하는 확장터널이다.        The present invention relates to an expansion tunnel using an existing tunnel constructed in the ground conditions consisting of rock and its construction method, the housing is installed at regular intervals along the lining of the existing tunnel and the excavation equipment equipped with an auger excavator is installed in the housing. After drilling a unit drill hole of a certain size step by step and reinforcing the reinforcing bars in the excavation hole, after the concrete is laid to form the expansion tunnel excavation wall wall excavation and removal of the rock between the existing tunnel lining and expansion tunnel excavation wall Extension tunnel to install.

이의 시공방법은 기존 터널의 라이닝과 일정간격을 두고 일정길이의 하우징을 설치하고 유압잭으로 서서히 진입시켜 전체 하우징 길이의 반이 기존 터널의 라이닝 상부의 토사에 굴진하도록하여 하우징을 설치하는 단계와 상기 전체 하우징 길이중 반은 기존 터널입구에 돌출되도록 한 라이닝 상부의 지지대에 오거 굴착기가 장착된 굴착장비를 설치하고 단계적으로 단위 굴착공을 천공하여 확장터널 굴착공벽체를 설치하는 단계와 상기 단위 굴착공내에 철근을 조립설치하고 콘크리트를 타설양생하는 작업을 확장터널 굴착공벽체에 걸쳐 시공하여 확장터널 굴착공벽체를 형성하는 단계와 상기 기존터널 라이닝과 확장터널 굴착공벽체사이의 암반을 굴착하여 제거하는 단계와 상기 하우징을 다음굴착을 위하여 이동하여 상기 하우징에 설치된 굴착장비를 이용하여 상기 단계를 반복적으로 하여 확장터널 굴착공벽체를 형성하여 확장터널의 시공을 종료하는 단계와 시공완료된 확장터널의 교통을 소통시키기 위하여 노면을 정리 포장하고 터널내의 조명등의 시설을 설치하는 단계로 시공을 하여 터널을 확장하는 것이다.The construction method is to install a housing of a certain length at a predetermined distance from the lining of the existing tunnel, and gradually enters the hydraulic jack so that half of the entire housing length is excavated in the soil of the upper part of the lining of the existing tunnel and the whole housing is installed. Half of the length of the housing is to install the excavation equipment equipped with auger excavator on the support of the upper lining so as to protrude into the existing tunnel entrance, and to install the expansion tunnel excavation wall wall by drilling the unit excavation step by step and in the unit excavation hole Assembling and installing reinforcing bars and laying concrete for the expansion tunnel drilling masonry to form the expansion tunnel drilling cavities, and excavating and removing the rock between the existing tunnel lining and the expansion tunnel drilling cavities. And excavation installed in the housing by moving the housing for the next excavation Repeating the above steps using rain to terminate the construction of the expansion tunnel by repeating the construction of the expansion tunnel, and paving the road surface to communicate the traffic of the completed expansion tunnel, and installing the lighting and other facilities in the tunnel. It is to expand the tunnel by constructing it in stages.

본 발명의 목적은 교통량등의 증가로 인하여 기존 터널의 교통량 처리용량이 초과되어 기존 터널이외에 터널을 증설하기 위하여 제안된 것으로서, 특히 기존 터널을 이루고 있는 토질이 풍화암과 같은 암반으로 이루어진 터널에 적용할 수 있다.       The purpose of the present invention is to increase the traffic capacity of the existing tunnel due to the increase in traffic volume, etc., and is proposed to expand the tunnel in addition to the existing tunnel, and in particular, the soil that forms the existing tunnel is applicable to a tunnel composed of rock such as weathered rock. Can be.

암반으로 이루어진 기존 터널의 라이닝 상부를 따라 일정길이의 하우징을 설치하여 일부는 토사에 굴진시키고 남은 일부의 하우징에 오거 굴착기가 장착된 굴착장비를 설치하여 단계적으로 일정한 순서에 따라 일정크기의 단위 굴착공을 천공하여 철근을 배치한 후에 콘크리트를 타설양생하여 확장터널 굴착공벽체를 형성하면서 기존 터널 라이닝과 확장터널 굴착공벽체사이의 암반을 굴착 제거하여 단계적으로 설치하는 확장터널의 시공에 관한 방법이다.       Install a certain length of housing along the upper lining of the existing tunnel made of rock and install some excavation equipment equipped with an auger excavator in some of the housings. It is a method for the construction of expansion tunnels in which the rock between the existing tunnel lining and the expansion tunnel drilling cavities is excavated and installed step by step while forming the expansion tunnel drilling cavities by placing concrete after laying reinforcing bars.

이렇게 설치된 확장터널의 시공방법은 암반으로 이루어진 지반조건에 적합한 굴착기를 이용하여 설치하므로 작업속도가 빠르며, 또한 기존 터널을 이용하여 설치하므로서 기존 터널의 교통을 차단하지 않고 교통을 소통시키면서 터널을 확장하므로 교통소통에 대한 별도의 대책을 세울 필요가 없으며, 기존 터널의 좌우측 부분을 확장터널로 이용하므로 용지매수에 대한 비용 및 매수기간이 절대적으로 감소될 수 있어, 지금까지 터널을 확장할 때 별도의 터널을 설치하는데 따른 용지매수 기간과 매수비용 및 터널을 확장하는데 소요되는 공사비용등이 과다하게 소요되는 문제점을 해소할 수 있는 시공방법을 제공하는데 있다. The construction method of the expansion tunnel installed in this way is installed by using an excavator suitable for the ground conditions composed of rock, so the work speed is fast, and by using the existing tunnel, it expands the tunnel while communicating traffic without blocking traffic of the existing tunnel. There is no need to take any countermeasures for traffic communication.Because the left and right parts of the existing tunnel are used as expansion tunnels, the cost and purchase period for land purchases can be absolutely reduced. To provide a construction method that can solve the problem of excessive land purchase period, purchase cost, and construction cost to expand the tunnel.

종래에는 터널을 확장할 필요가 있을 경우, 기존 터널옆에 별도의 터널을 증설하는 방법으로 터널을 설치하여 왔는데 이러한 방법은 확장 터널에 소요되는 부지의 용지매입을 위한 기간과 비용이 매우 많이 소요되는 점과 이렇게 시공되는 터널의 시공시 많은 공사비용과 공사기간이 소요되는 점과 별도의 터널을 설치하여야 하므로 자연을 훼손하는 문제점이 상존하여 왔다.Conventionally, when it is necessary to extend the tunnel, the tunnel has been installed by adding a separate tunnel next to the existing tunnel. This method requires a very long period and cost for land purchase of the site required for the expansion tunnel. The problem of damaging nature has always existed because it requires a lot of construction costs and construction periods and a separate tunnel to be installed.

또한, 일반적인 토사가 아닌 풍화암 및 연암과 같은 암반으로 이루어진 지반조건에 대하여 터널을 별도로 설치할 경우에는 발파 또는 굴착기와 같은 장비를 이용하여 터널을 시공하므로서 소요되는 발파비용 및 발파시 발생되는 발파소음으로 인한 소음공해와 대형 굴착장비를 이용하므로서 발생되는 소음 및 굴착시 발생되는 슬러지와 같은 분진으로 인하여 주변의 환경에 악영향을 주고 있는 문제점이 있다.  In addition, when the tunnel is separately installed for ground conditions consisting of weathered rock and soft rock, which are not general earth and sand, due to the blasting cost and blasting noise generated when the tunnel is constructed using equipment such as blasting or excavator There is a problem that adversely affects the surrounding environment due to noise generated by the noise pollution and large excavation equipment, and dust such as sludge generated during excavation.

본 발명은 이상과 같은 사항을 감안하여 제안된 것으로서, 기존 터널의 라이닝 상부를 따라 일정길이의 하우징을 설치하고 하우징에 오거 굴착기가 장착된 굴착장비를 설치하여 단계적으로 일정크기의 단위 굴착공을 천공하여 철근을 배치한 후에 콘크리트를 타설양생하여 확장터널 굴착공벽체를 형성하면서 기존 터널의 라이닝과 확장터널 굴착공 벽체사이의 암반을 굴착 제거하는 작업을 단계적으로 하여 설치하는 확장터널의 시공에 관한 방법으로서, 암반으로 이루어진 기존터널의 지반조건에 적합한 굴착기를 적용하므로서 작업능률이 향상되며, 기존 터널을 이용하여 터널을 확장하면서도 기존 터널의 교통소통에는 전혀 방해를 주지 않음으로 터널 확장에 따른 별도의 교통소통에 대한 대책이 필요없으며, 기존 터널을 이용하므로 용지매수비용이 절감되며, 이로인한 공사비 및 공사기간의 대폭적인 절감을 가져올 수 있는 시공방법을 제공하는데 있다.        The present invention has been proposed in view of the above matters, and a predetermined length of housings are installed along the upper linings of existing tunnels, and drilling equipment equipped with auger excavators in the housings is drilled step by step in a predetermined size. Method of construction of expansion tunnel installed by laying excavation and removal of rock between existing tunnel lining and expansion tunnel drilling hole wall by forming concrete tunneling hole after placing rebar As a result, the work efficiency is improved by applying the excavator suitable for the ground conditions of the existing tunnel made of rock, and it is possible to expand the tunnel by using the existing tunnel and do not interfere with the traffic communication of the existing tunnel. No countermeasures for communication are needed, and the land purchase costs are due to using existing tunnels. It is easy to reduce the cost, thereby providing a construction method that can bring a significant reduction in construction costs and construction period.

상기의 목적을 달성하기 위하여, 본 발명은 암반으로 이루어진 지반조건에 건설된 기존 터널을 이용한 확장터널 및 이의 시공방법에 관한 것으로서, 기존 터널(10)의 라이닝 상부를 따라 일정길이의 하우징(60)을 설치하고 하우징에 오거 굴착기(70)가 장착된 굴착장비(40)를 설치하여 단계적으로 일정크기의 단위 굴착공(80)을 천공하여 철근을 배치한 후에 콘크리트를 타설양생하여 확장터널 굴착공벽체(30)를 형성하면서 기존 터널(10) 라이닝과 확장터널 굴착공벽체(30)사이의 암반을 굴착 제거하여 단계적으로 설치한 확장터널(20)이다.        In order to achieve the above object, the present invention relates to an expansion tunnel using an existing tunnel constructed in the ground conditions consisting of rock and its construction method, the housing 60 of a predetermined length along the upper lining of the existing tunnel (10) And install the excavation equipment 40 equipped with the auger excavator 70 in the housing, and drill the unit drilling holes 80 of a predetermined size step by step to place the reinforcing bars and then pour concrete to expand the tunnel tunnel Forming 30 is an expansion tunnel 20 installed in stages by excavating and removing the rock between the existing tunnel 10 lining and expansion tunnel excavation cavity wall 30.

이의 시공방법은 다음과 같다.Its construction method is as follows.

기존 터널(10) 라이닝과 일정간격을 두고 일정길이의 하우징(60)을 설치하고 유압잭으로 서서히 진입시켜 전체 하우징(60) 길이의 반이 기존 터널(10)의 라이닝 상부의 토사에 굴진하도록하여 하우징(60)을 설치하는 단계와 상기 전체 하우징(60) 길이중 반은 기존 터널(10)입구에 돌출되도록 한 라이닝 상부의 지지대(61)에 오거 굴착기(70)가 장착된 굴착장비(40)를 설치하고 단계적으로 단위 굴착공(80)을 천공하여 확장터널 굴착공벽체(30)를 설치하는 단계와 상기 단위 굴착공(80)내에 철근을 조립설치하고 콘크리트를 타설양생하는 작업을 하여 확장터널 굴착공벽체(30)를 형성하는 단계와 상기 기존 터널(10) 라이닝과 확장터널 굴착공벽체(30)사이의 암반을 굴착하여 제거하는 단계와 상기 하우징(60)을 다음굴착을 위하여 이동하여 상기 하우징(60)에 설치된 굴착장비(40)를 이용하여 상기 단계를 반복적으로 하여 확장터널 굴착공벽체(30)를 형성하여 확장터널(20)의 시공을 종료하는 단계와 시공완료된 확장터널(20)의 교통을 소통시키기 위하여 노면을 정리 포장하고 터널내의 조명등의 시설을 설치하는 것에 특징이 있다.
이하 본 발명의 구성 및 작용을 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.
The housing 60 of a certain length is installed with a predetermined distance from the existing tunnel 10 lining and gradually enters the hydraulic jack so that half of the length of the entire housing 60 is excavated in the soil of the upper part of the lining of the existing tunnel 10. Step (60) and half of the length of the entire housing (60) is excavating equipment 40 equipped with an auger excavator (70) on the support (61) of the upper lining so as to protrude to the entrance of the existing tunnel (10) Install and install the expansion tunnel excavation hole wall 30 by drilling the unit excavation hole 80 step by step and assembling and installing reinforcing bars in the unit excavation hole 80 and curing the expansion tunnel Forming an empty wall body 30, excavating and removing a rock between the existing tunnel 10 lining and the expansion tunnel drilling cavity wall 30, and moving the housing 60 for the next drilling; Oysters installed at 60 Repeating the above steps using the equipment 40 to form the expansion tunnel excavation hole wall 30 to terminate the construction of the expansion tunnel 20 and the road surface to communicate the traffic of the completed expansion tunnel 20 It is characterized by arranging and packaging the facilities and installing facilities such as lighting in the tunnel.
Hereinafter, the configuration and operation of the present invention will be described in detail with reference to the accompanying drawings.

삭제delete

도 1은 본 발명의 터널확장 시공방법을 보여주는 도면으로서, 기존 터널(10)의 라이닝 상부에 일정길이의 하우징(60)을 설치하고, 유압잭으로 서서히 진입시켜 전체길이의 반의 하우징(60)을 라이닝 상부의 토사에 굴진시키고, 나머지 반은 기존 터널(10)입구에 돌출되게 한 후에 오거 굴착기(70)가 장착된 굴착장비(40)를 지지대(61)위에 설치하여 확장터널(20)의 단면을 형성하기 위하여 상기 오거 굴착기(70)를 이용하여 단계적으로 단위 굴착공(80)을 천공하고, 상기 단위 굴착공(80)에 철근을 조립설치하여 콘크리트를 타설양생하여 순차적으로 확장터널 굴착공벽체(30)를 형성한 후에 기존 터널(10) 라이닝과 확장터널 굴착공벽체(30) 사이의 암반을 굴착하여 제거한 후에 상기 하우징(60)을 다음천공을 위하여 이동하여 상기 하우징(60)에 설치된 굴착장비(40)를 이용하여 단위 굴착공(80)을 천공하여 철근을 설치하고 콘크리트를 타설양생하여 확장터널 굴착공벽체(30)를 형성하고 상기 기존 터널(10) 라이닝과 확장터널 굴착공 벽체(30) 사이의 암반을 굴착하는 작업을 순차적으로 반복적으로 하는 것을 일괄하여 보여주는 도면이다.       1 is a view showing a tunnel extension construction method of the present invention, a predetermined length of the housing 60 is installed on the upper lining of the existing tunnel 10, and gradually enters the hydraulic jack lining the housing 60 of the full length Excavate in the upper soil, and the other half is projected to the entrance of the existing tunnel (10) and then install the excavation equipment 40 equipped with the auger excavator 70 on the support 61 to cross-section the expansion tunnel 20 In order to form a perforated unit excavation hole 80 step by step using the auger excavator 70, assembling and installing reinforcing bars in the unit excavation hole 80 to cure concrete in order to sequentially expand the tunnel excavation wall ( After forming 30), the excavation equipment installed in the housing 60 by moving the housing 60 for the next drilling after excavating and removing the rock between the existing tunnel 10 lining and the expansion tunnel excavation cavity wall 30 40 teeth Perforated unit excavation hole (80) to install the reinforcing bars and pour concrete to form the expansion tunnel excavation hole wall 30 and the rock between the existing tunnel (10) lining and expansion tunnel excavation hole wall (30) It is a figure which shows collectively the excavation work sequentially and repeatedly.

상기 굴착장비(40)에는 케이싱(72)내에 설치된 오거 굴착기(70)와 콘크리트 펌핑을 위한 콘크리트 펌프차(50)가 연결되어 있어 길이 12m정도의 길이를 갖는 오거 굴착기(70)와 케이싱(72)에 의해 굴착되는 원형의 단위 굴착공(80)은 12m 정도의 길이를 갖는 단위 굴착공(80)을 형성하게 되는데 이렇게 형성된 원형의 단위 굴착공(80)에 철근을 설치하고 상기 콘크리트 펌프차(50)를 이용하여 콘크리트를 타설하게 된다.       The auger excavator 70 installed in the casing 72 and the concrete pump vehicle 50 for concrete pumping are connected to the excavating equipment 40 to the auger excavator 70 and the casing 72 having a length of about 12 m. The circular unit excavation hole 80 to be excavated forms a unit excavation hole 80 having a length of about 12 m. The reinforcing bar is installed in the circular unit excavation hole 80 and the concrete pump vehicle 50 is formed. Concrete is poured.

상기 오거 굴착기(70)에 의해 순차적으로 단위 굴착공(80)을 확장터널 계획단면을 따라 천공하면 확장터널 굴착공벽체(30)를 설치하게되는데 이의 천공순서(81)는 도 7에서 설명하는 것과 같이 한 굴착공을 건너뛰어 천공하고 다음에는 건너뛴 부분에 굴착공을 형성하는 방법으로 확장터널의 계획단면을 따라 반복적으로 형성하여 확장터널 굴착공벽체(30)를 설치하는 것이다. 도 7에서 보여주는 부호에따라 설명하면, 천공순서(81) 1번 굴착공을 천공하고 다음에는 건너뛰어 천공순서(81) 2번 굴착공을 천공하고 다음에는 천공순서(81) 1번 굴착공과 2번 굴착공 사이에 천공순서(81) 3번 굴착공을 형성하는 과정을 확장터널 계획단면을 따라 반복적으로 천공설치하는 것이다.        When the auger excavator 70 sequentially drills the unit excavation hole 80 along the expansion tunnel plan cross section, an expansion tunnel excavation hole wall 30 is installed, and the drilling sequence 81 thereof is described with reference to FIG. 7. As a method of forming a drilling hole in the skipped portion, and then drilled by skipping the excavation hole as described above, by repeatedly forming along the plan cross section of the expansion tunnel to install the expansion tunnel excavation hole wall (30). Referring to the sign shown in Figure 7, the drilling sequence 81 drilled the first drilling hole, and then skipped the drilling sequence 81 drilled the second drilling hole and then the drilling sequence 81 first drilled hole and 2 Drilling procedure (81) between the three drilling holes forming the three drilling holes is to repeatedly install the drilling along the planar tunnel cross section.

상기 확장터널 굴착공벽체(30)를 설치하기 위하여 단위 굴착공(80)을 단계적으로 천공하게 되는데 이때 도 9에서 설명하는 바와 같이 확장터널(20) 벽에서 약간 벽내부 쪽으로 깔대기 형상이 되도록 천공하는 작업을 단계적으로 확장터널(20)의 계획단면을 따라 천공한 후에 다음단계로 넘어 가도록하는 작업을 반복적으로 하는 것이다.         In order to install the expansion tunnel excavation hole wall 30, the unit excavation hole 80 is drilled step by step, and as shown in FIG. After drilling the work step by step along the plan section of the expansion tunnel 20 is to repeat the work to proceed to the next step.

또한, 기존 터널(10)의 라이닝 상부에 설치되는 하우징(60)은 유압잭에 의해 기존 터널(10) 상부의 토사내로 굴진하게 하기 위하여 철판을 기존 터널(10)의 라이닝 형상으로 제작하여 설치하되 중앙부에는 H빔등의 강재를 설치하여 상기 굴착장비(40)가 장착될 수 있게 지지대(61)를 설치한 것이다. 상기 하우징(60)의 총 길이는 40m정도로서 기존 터널(10)입구 측에는 20m정도의 하우징(60)이 돌출되도록 하여 기존 터널(10)을 통과하는 차량에 방해를 주지 않게 하기 위함이다.         In addition, the housing 60 is installed on the upper lining of the existing tunnel 10 is manufactured by installing a steel plate in the lining shape of the existing tunnel 10 in order to be excavated into the earth and sand of the upper portion of the existing tunnel 10 by a hydraulic jack, In the center portion is installed a support 61 so that the drilling equipment 40 can be mounted by installing a steel, such as H beam. The total length of the housing 60 is about 40m, so that the housing 60 of about 20m protrudes from the entrance side of the existing tunnel 10 so as not to disturb the vehicle passing through the existing tunnel 10.

상기 확장터널 굴착공벽체(30)가 완성되었을시 단위 굴착공(80)을 깔때기 형상으로 단계적으로 확장터널(20) 계획단면을 따라 형성하므로 확장터널 굴착공벽체(30)에 굴곡이 있어 미관이나 교통안전에도 악영향을 미치게되므로 외관을 미려하게 하기위하여 프리캐스트 판넬을 확장터널 굴착공벽체(30)에 부착하여 사용할 수도 있으며, 이때 확장터널 굴착공벽체(30)와 프리캐스트 판넬사이에는 콘크리트를 충전시켜 밀착도를 증강시킨다.        When the expansion tunnel excavation hole wall 30 is completed, the unit excavation hole 80 is formed along the planar cross section of the expansion tunnel 20 stepwise in a funnel shape, so that the expansion tunnel excavation hole wall 30 has a bend. In addition, the precast panel may be attached to the expansion tunnel excavation wall 30 in order to have a beautiful appearance because it adversely affects traffic safety. In this case, the concrete is filled between the expansion tunnel excavation wall 30 and the precast panel. To enhance adhesion.

도 2는 본 발명의 터널확장 시공방법의 단면을 보여주는 단면도로서 오거 굴착기(70)가 장착된 굴착장비(40)가 하우징(60)에 설치되어 확장터널(20) 계획단면을 따라 천공하는 것을 보여주는 것이다.       2 is a cross-sectional view showing a cross-section of the tunnel extension construction method of the present invention showing that the drilling equipment 40 equipped with the auger excavator 70 is installed in the housing 60 and drilled along the planar cross section of the expansion tunnel 20. will be.

도 3은 본 발명의 터널 확장을 위하여 기존 터널에 하우징을 설치한 것을 보여주는 도면으로서, 기존 터널(10)의 라이닝 상부에 하우징(60)을 설치한 것이다. 이렇게 40m정도의 길이를 갖는 하우징(60)의 20m정도는 기존 터널(10)의 입구에 돌출되도록 하여 기존 터널(10)을 이용하는 차량에 장애를 주지 않게 하고, 나머지 20m 정도에는 오거 굴착기(70)가 장착된 굴착장비(40)를 설치하고, 기존 터널(10)입구에서 유압잭을 이용하여 하우징(60)을 기존 터널(10)의 라이닝 상부의 토사내로 굴진시킨 후에 오거 굴착기(70)를 이용하여 확장터널 굴착공벽체(30)를 형성하고 다음단계로 이동하여 다시 오거 굴착기(70)를 이용하여 확장터널 굴착공벽체(30)를 형성하는 작업을 반복적이며 단계적으로 한다. 3 is a view showing the housing installed in the existing tunnel for the tunnel expansion of the present invention, the housing 60 is installed on the lining of the existing tunnel (10). Thus 20m of the housing 60 having a length of about 40m to protrude at the entrance of the existing tunnel 10 so as not to interfere with the vehicle using the existing tunnel 10, the auger excavator 70 in the remaining 20m Install the excavation equipment 40 is installed, and using the hydraulic jack at the entrance of the existing tunnel 10 to excavate the housing 60 into the soil of the upper lining of the existing tunnel 10, using the auger excavator 70 By forming the expansion tunnel excavation cavities 30 and moving to the next step again to form the expansion tunnel excavation cavities 30 by using the auger excavator 70 iteratively and step by step.

도 4와 도 5는 본 발명의 기존터널에 하우징을 설치하고 터널확장을 위하여 단계적으로 단위 굴착공을 천공하여 확장터널 계획단면을 따라 형성된 확장터널 굴착공벽체를 보여주는 도면이다.4 and 5 is a view showing an expansion tunnel drilling cavities formed along the planar tunnel cross-section by installing a housing in the existing tunnel of the present invention and perforated the unit drilling holes for the expansion of the tunnel.

상기 하우징(60)에 설치된 지지대(61)상에 장착된 굴착장비(40)의 오거 굴착기(70)를 이용하여 확장터널 계획단면을 따라 순차적으로 천공하여 확장터널 굴착공벽체(30)를 형성하는 것이다. By using the auger excavator 70 of the excavating equipment 40 mounted on the support 61 installed in the housing 60 to sequentially drill along the planar end section of the expansion tunnel to form an expansion tunnel excavation cavity wall 30 will be.

도 6은 본 발명의 터널확장을 완료한 것을 보여주는 도면으로서 확장터널(20)의 단면이 완전히 형성되어 기존 터널(10)을 제거하여 터널을 완전히 확장한 것을 보여주는 것이다.6 is a view showing that the tunnel expansion of the present invention is completed, the cross section of the expansion tunnel 20 is completely formed to show that the tunnel is completely expanded by removing the existing tunnel 10.

도 7은 본 발명의 터널확장을 위하여 단위 굴착공을 단계적으로 천공시공하는 순서를 보여주는 도면이다.7 is a view showing a step of drilling a unit excavation step by step for the expansion of the tunnel of the present invention.

상기 확장터널 굴착공벽체(30)를 확장터널 계획단면을 따라 형성하기 위하여 단위 굴착공(80)을 천공하게 되는데 천공순서(81)는 한 굴착공을 건너뛰어 굴착하고 다음에는 천공할 부분의 한 부분을 건너뛴 부분에 굴착공을 형성하는 방법으로서 부호에따라 설명하면, 천공순서(81) 1번 굴착공을 천공하고 다음에는 건너뛰어 천공순서(81) 2번 굴착공을 천공하고 다음에는 천공순서(81) 1번 굴착공과 2번 굴착공 사이에 천공순서(81) 3번 굴착공을 형성하는 과정을 확장터널(20) 계획단면을 따라 반복적으로 천공설치하는 것이다.In order to form the expansion tunnel excavation hole wall 30 along the expansion tunnel plan cross-section, the drilling unit 80 is drilled, and the drilling sequence 81 drills by skipping one excavation hole and then one of the portions to be drilled. When explaining according to the sign as a method of forming the excavation hole in the portion skipped, drill the drill sequence (81) No. 1 excavation hole, and then skip to drill the drilling sequence (81) No. 2 excavation hole, and then drill Step (81) The process of forming the drill hole (81) and the third drill hole between the first drill hole and the second drill hole is to repeatedly drill the installation along the plan section of the expansion tunnel (20).

상기 각각의 천공작업이 종료될때마다 각각의 굴착공내에 철근을 조립배치하고 콘크리트를 타설양생하는 작업을 반복하게 된다. 즉 도면에 부여되어 있는 천공 순서에 의해 시공하게 된다. Each time the drilling operation is completed, the reinforcing and assembling the reinforcing bar in each of the excavation hole and repeat the work of pouring concrete. In other words, the construction is performed by the drilling procedures given in the drawings.

도 8은 본 발명의 확장터널 단위 굴착공을 시공하기 위하여 사용하는 굴착장치에 장착된 오거 굴착기를 보여주는 도면으로서, 기존 터널(10)의 라이닝 상부에 설치된 굴착장비(40)에 장착된 오거 굴착기(70)를 보여주는 것이다. 상기 오거 굴착기(70)는 길이가 12m정도로서 케이싱(72)내에 오거가 설치된 굴착기가 설치되어 오거가 회전하면서 토사내로 굴진하면 케이싱(72)이 굴착공내로 진입하여 단위 굴착공(80)이 형성되는 것이다. 이러한 장비를 이용할 수 있는 지반은 풍화암 및 연암 파쇄대와 같이 암반으로 구성된 지반에 적용한다. 8 is a view showing an auger excavator mounted on an excavation apparatus used to construct an expansion tunnel unit excavation hole of the present invention, an auger excavator mounted on an excavation equipment 40 installed on the lining of the existing tunnel 10 ( 70). The auger excavator 70 has a length of about 12 m, and an auger installed in the casing 72 is installed. When the auger rotates and excavates into the soil, the casing 72 enters the excavation hole and the unit excavation hole 80 is formed. Will be. Soils where such equipment is available are applied to soils composed of rock, such as weathered rock and soft rock crushing zones.

도 9는 본 발명의 굴착장비를 이용하여 단위 굴착공을 시공하는 상태를 보여주는 도면으로서, 도 7에서 설명한 상기 확장터널 굴착공벽체(30)를 확장터널 계획단면을 따라 형성하기 위하여 단위 굴착공(80)은 천공순서(81)에 따라 천공하게 되는데 이러한 확장터널 굴착공벽체(30)를 형성하기 위하여 본 도에서 보여주는 바와 같이 깔때기 형상으로 단위 굴착공(80)을 천공하는 과정을 거쳐 확장터널 굴착공벽체(30)를 설치하게 된다. 이러한 확장터널 굴착공벽체(30)의 작업을 단계적으로 실시하여 확장터널(20)을 설치하게 된다. 이때 각각의 단위 굴착공(80)의 깊이는 12m이며 깔때기 형상으로 상기 단위 굴착공(80)을 천공할 때 도 9에서 보는 바와 같이 단위 굴착공(80)과 인접한 다른 단위 굴착공(80)을 확장터널(20) 계획단면을 따라 천공할 때 단위 굴착공(80)의 입구가 인접한 다른 단위 굴착공(80)의 끝단부와 상호 겹치도록 굴착장의 약 3m정도(82)가 중첩되도록 천공한다. 이렇게 천공하는 것은 각각의 단위 굴착공(80) 입구에서 오거 굴착기(70)에 의해 천공이 시작될 때 토사가 교란되어 지내력이 약해지게되어 무너지는 것을 방지하기 위함이다. 9 is a view showing a state in which the construction of the unit excavation hole using the excavation equipment of the present invention, in order to form the expansion tunnel excavation ball wall 30 described in Figure 7 along the expansion tunnel plan section (unit excavation hole ( 80 is to be perforated according to the drilling sequence 81. To form such an extended tunnel excavation hole wall (30) through the process of drilling the unit excavation hole 80 in a funnel shape as shown in this figure through the expansion tunnel excavation The empty wall 30 is installed. The expansion tunnel 20 is installed by performing the operation of the expansion tunnel drilling pit wall 30 step by step. At this time, the depth of each unit excavation hole (80) is 12m and when drilling the unit excavation hole 80 in a funnel shape as shown in Figure 9 the other unit excavation hole 80 adjacent to the unit excavation hole 80 When drilling along the planar section of the expansion tunnel 20, the inlet of the unit excavation hole 80 is drilled so that about 3m 82 of the excavation site overlaps with each other at the end of the adjacent unit excavation hole 80. This drilling is to prevent the soil from being disturbed and the bearing strength is weakened and collapsed when the drilling is started by the auger excavator 70 at the inlet of each unit drilling hole 80.

이상의 설명에서와 같이, 본 발명은 기존 터널을 이용하여 터널을 확장하는 시공방법에 관한 것으로서, 기존터널을 이용하여 터널을 확장하는 방법을 사용하면 별도의 터널을 확장할 시 요구되는 용지의 보상과 매입에 소요되는 노력과 비용을 절감할 수 있으며, 확장에 따른 별도의 교통소통대책을 수립할 필요가 없으며, 별도의 터널을 확장할때에 소요되는 공사비용과 공사기간에 비하여 기존의 터널을 이용하여 확장하므로서 공사비용 및 공사기간이 획기적으로 절감될 수 있는 매우 경제적인 시공방법이며, 또한, 기존 터널을 이용하여 확장할 시에는 자연의 파괴를 최소화할 수 있는 친환경적인 시공방법인 것이다.       As described above, the present invention relates to a construction method for extending a tunnel by using an existing tunnel, and using a method of expanding a tunnel by using an existing tunnel, compensation of paper required when extending a separate tunnel and It can reduce the effort and cost of the purchase, and does not need to establish a separate traffic communication plan according to the expansion, and uses the existing tunnel compared to the construction cost and construction period required when expanding the separate tunnel. It is a very economical construction method that can significantly reduce the construction cost and construction period by expanding, and is an environmentally friendly construction method that can minimize the destruction of nature when expanding by using existing tunnels.

Claims (8)

기존 터널의 차량통행에 지장을 주지 않으면서 기존 터널의 폭을 확장하는 확장터널에 있어서 기존 터널의 라이닝 상부에 일정길이의 하우징을 설치하고 하우징에 설치된 지지대에 오거 굴착기가 장착된 굴착장비를 설치하여 단계적으로 일정크기의 단위 굴착공을 천공하여 철근을 배치한 후에 콘크리트를 타설양생하여 확장터널 굴착공벽체를 형성하면서 기존 터널의 라이닝과 확장터널 굴착공벽체사이의 토사를 굴토제거하는 작업을 순차적으로 하여 확장터널을 설치하는 것을 특징으로 하는 암반으로 이루어진 지반조건에 건설된 기존 터널을 이용한 확장터널.       In the expansion tunnel that expands the width of the existing tunnel without affecting the traffic of the existing tunnel, the housing of a certain length is installed on the lining of the existing tunnel, and the excavation equipment equipped with the auger excavator is installed on the support installed in the housing. Step by step drilling the unit drilling holes of a certain size, after laying the reinforcing bars to squeeze concrete to form the expansion tunnel excavation wall wall, and to excavate the soil between the lining of the existing tunnel and the expansion tunnel excavation wall wall sequentially. Expansion tunnel using an existing tunnel constructed in the ground conditions consisting of rock, characterized in that to install the expansion tunnel. 제 1항에 있어서,       The method of claim 1, 상기 하우징은 기존 터널의 라이닝 상부를 따라 유압잭에 의해 굴진 설치하게 되는데 하우징은 철판을 기존 터널의 라이닝의 형상으로 하고 상기 하우징의 중간부에는 H빔을 설치하여 굴착장비를 장착할 지지대를 설치하는 것을 특징으로 하는 암반으로 이루어진 지반조건에 건설된 기존 터널을 이용한 확장터널.        The housing is installed by the hydraulic jack along the upper lining of the existing tunnel, the housing is to form a steel plate lining of the existing tunnel and to install the support to mount the drilling equipment by installing the H beam in the middle of the housing An extended tunnel using an existing tunnel constructed under ground conditions consisting of rock. 제 1항 또는 제 2항에 있어서,       The method according to claim 1 or 2, 상기 하우징은 터널입구쪽에 상기 하우징의 일부가 돌출되도록 설치하고 나머지에는 굴착장비가 설치되고, 상기 하우징의 앞부분은 기존 터널의 라이닝 상부지반내로 굴진되도록 하는 것을 특징으로 하는 암반으로 이루어진 지반조건에 건설된 기존 터널을 이용한 확장터널.       The housing is installed in the ground condition consisting of a rock, characterized in that the installation part so as to protrude to the tunnel inlet side and the excavation equipment is installed in the rest, the front portion of the housing to be excavated into the upper ground lining of the existing tunnel Expansion tunnel using existing tunnel. 제 1항 내지 제3항중의 어느 한 항에 있어서,        The method according to any one of claims 1 to 3, 상기 하우징의 길이는 40m 이며, 하우징의 절반 정도는 터널입구측에 돌출되도록 설치하고, 중앙부에는 오거 굴착기가 장착된 굴착장비를 설치할 지지대위에 굴착장비를 장착한 것을 특징으로 하는 암반으로 이루어진 지반조건에 건설된 기존 터널을 이용한 확장터널.        The length of the housing is 40m, and about half of the housing is installed so as to protrude at the tunnel inlet side, and in the center of the ground conditions consisting of rock drilling equipment, characterized in that the drilling equipment is mounted on the support to install the drilling equipment equipped with auger excavator Expansion tunnel using existing tunnel. 제 1항에 있어서,       The method of claim 1, 상기 단위 굴착공은 확장터널 계획단면을 따라 상기 오거 굴착기에 의해 천공되어 설치되는 것으로서, 천공 길이는 12m이며, 천공이 완료되면 철근을 상기 단위 굴착공내에 조립설치하고 콘크리트를 타설 양생하여 확장터널 계획단면을 따라 설치하여 확장터널 굴착공벽체를 설치하는 것을 특징으로 하는 암반으로 이루어진 지반조건에 건설된 기존 터널을 이용한 확장터널.       The unit excavation hole is to be drilled and installed by the auger excavator along the expansion tunnel plan cross section, the drilling length is 12m, when the drilling is completed, the reinforcing bars are installed in the unit excavation hole and concrete is laid to expand the expansion tunnel plan Expansion tunnels using existing tunnels constructed on the ground conditions consisting of rock, characterized in that the installation along the cross section to install the expansion tunnel excavation wall. 제 1항 또는 제 5항에 있어서,       The method according to claim 1 or 5, 상기 확장터널 굴착공벽체는 확장터널 계획단면을 따라 오거 굴착기를 이용하여 천공설치하는 단위 굴착공의 조합에 의하여 설치되는 것으로서 그 천공순서는 한 굴착공을 건너뛰어 굴착하고 다음에는 천공할 부분의 한 부분을 건너뛴 부분에 굴착공을 형성하는 방법으로서, 시공순서 1번 굴착공을 천공하고 다음에는 건너뛰어 시공순서 2번 굴착공을 천공하고 다음에는 시공순서 1번 굴착공과 2번 굴착공 사이에 시공순서 3번 굴착공을 형성하는 과정을 반복적으로 하여 형성하여 각각의 단위 굴착공을 천공할 때마다 철근을 조립배치하고 콘크리트를 타설양생하는 작업을 반복적으로 하여 설치하는 것을 특징으로 하는 암반으로 이루어진 지반조건에 건설된 기존 터널을 이용한 확장터널.       The expansion tunnel excavation wall is installed by a combination of unit excavation holes drilled using an auger excavator along the plan section of the expansion tunnel, and the drilling sequence is excavated by skipping one excavation hole, and then one of the parts to be drilled next. As a method of forming an excavation hole in the part skipped, drill the excavation hole No. 1 in the construction order, and then drill the excavation hole No. 2 in the construction order, and then between the excavation hole No. 1 and the excavation no. Construction sequence Formed by repeating the process of forming three excavation holes, each time to drill a unit excavation hole is made of a rock characterized in that the reinforcement of the reinforcement of the reinforcement and install the concrete repetitive work Expansion tunnel using existing tunnel constructed under ground condition. 제 1항 또는 제 6항에 있어서,       The method according to claim 1 or 6, 상기 확장터널 굴착공벽체를 형성하기 위하여 확장터널 계획단면을 따라 깔때기 형상으로 단계적으로 단위 굴착공을 형성하며 단위 굴착공의 길이는 12m로 하되, 상기 깔때기 형상으로 천공시 먼저 천공된 단위 굴착공의 끝단부와 인접하여 천공되는 단위 굴착공의 입구의 일정길이를 상호 겹치게 하는 굴착장의 중첩길이를 3m 로 하여 확장터널 굴착공벽체를 설치하는 것을 특징으로 하는 암반으로 이루어진 지반조건에 건설된 기존 터널을 이용한 확장터널.       In order to form the expansion tunnel excavation wall, the unit drill hole is formed stepwise in the shape of a funnel along the planar cross section of the expansion tunnel, and the length of the unit excavation hole is 12 m. Existing tunnels constructed on rocky ground conditions are characterized by installing an extended tunnel excavation wall with an overlapping length of the excavation site, which overlaps a certain length of the entrance of the unit excavation hole, which is drilled adjacent to the end portion, to 3m. Extended tunnel. a) 기존 터널의 라이닝 상부에 하우징을 설치하고 유압잭으로 서서히 기존 터널의 라이닝상의 토사내로 진입시켜 하우징을 라이닝 상부에 설치하는 단계;a) installing the housing on the lining top by installing the housing on the lining top of the existing tunnel and slowly entering the soil on the lining of the existing tunnel with a hydraulic jack; b) 상기 하우징에 오거 굴착기가 장착된 굴착장비를 설치하고 단계적으로 단위 굴착공을 천공하는 단계;b) installing an excavation equipment equipped with an auger excavator in the housing and drilling a unit drilling hole step by step; c) 상기 단위 굴착공에 철근을 조립설치하고 콘크리트를 타설양생하여 확장터널 굴착공벽체를 형성하는 단계;c) assembling and installing reinforcing bars in the unit excavation hole and pouring concrete to form an expansion tunnel excavation hole wall; d) 상기 기존 터널 라이닝과 확장터널 굴착공벽체사이의 암반을 굴착하여 제거하는 단계;d) digging and removing rock between the existing tunnel lining and the expansion tunnel excavation wall; e) 상기 하우징을 다음굴착을 위하여 전진이동하여 상기 하우징에 설치된 굴착장비를 이용하여 단위 굴착공을 천공하여 철근을 설치하고 콘크리트를 타설양생하여 확장터널 굴착공벽체를 형성하고, 상기 기존 터널의 라이닝과 확장터널 굴착공벽체사이의 암반을 굴착 제거하는 것을 반복적으로 하여 터널의 확장작업을 종료하는 단계; 및e) The housing is moved forward for the next excavation, using the excavation equipment installed in the housing to drill the unit excavation hole to install reinforcing bars and to pour concrete to form the expansion tunnel excavation cavity wall, lining of the existing tunnel Repeating the excavation and removal of the rock between the expansion tunnel excavation cavity wall and terminating the expansion of the tunnel; And f) 시공 완료된 확장터널의 교통을 소통시키기 위하여 노면을 정리 포장하고 터널내의 조명등의 시설을 설치하여 터널을 이용할 수 있게 하는 단계를 포함하는 것을 특징으로 하는 암반으로 이루어진 지반조건에 건설된 기존 터널을 이용하여 확장한 확장터널 시공방법.f) Existing tunnels constructed on rocky ground conditions comprising the steps of arranging and paving the road surface to communicate the traffic of the completed expansion tunnel and installing a facility such as lighting in the tunnel to use the tunnel. Extended tunnel construction method
KR1020030018561A 2003-03-25 2003-03-25       Expansion tunnel and existing construction method using existing tunnel constructed under rocky condition Expired - Fee Related KR100548810B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030018561A KR100548810B1 (en) 2003-03-25 2003-03-25       Expansion tunnel and existing construction method using existing tunnel constructed under rocky condition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030018561A KR100548810B1 (en) 2003-03-25 2003-03-25       Expansion tunnel and existing construction method using existing tunnel constructed under rocky condition

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0008913U Division KR200316681Y1 (en) 2003-03-25 2003-03-25 The expanding tunnel and constructing method of the existing tunnel

Publications (2)

Publication Number Publication Date
KR20040083876A KR20040083876A (en) 2004-10-06
KR100548810B1 true KR100548810B1 (en) 2006-02-09

Family

ID=37367522

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030018561A Expired - Fee Related KR100548810B1 (en) 2003-03-25 2003-03-25       Expansion tunnel and existing construction method using existing tunnel constructed under rocky condition

Country Status (1)

Country Link
KR (1) KR100548810B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421311A (en) * 2015-10-24 2016-03-23 江南水利水电工程公司 Reinforcing method for underwater concrete for blocking gate of hydropower station diversion tunnel

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115434714A (en) * 2022-08-31 2022-12-06 中铁十六局集团路桥工程有限公司 A Method for Expansion of Long-span Tunnel Using Existing Lining

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421311A (en) * 2015-10-24 2016-03-23 江南水利水电工程公司 Reinforcing method for underwater concrete for blocking gate of hydropower station diversion tunnel

Also Published As

Publication number Publication date
KR20040083876A (en) 2004-10-06

Similar Documents

Publication Publication Date Title
JP5843413B1 (en) Lowering method of existing tunnel
KR20070076553A (en) Construction method of underground structure using packed steel pipe loop and concrete wall
JP6460712B2 (en) Construction method of underground continuous wall
KR100794609B1 (en) Construction method of underground structure using packed steel pipe loop and concrete wall
JP3893056B2 (en) Construction method of underground structure
JP2019124019A (en) Invert construction method to existing tunnel
KR100805189B1 (en) Underground structure construction method that combines wall construction and excavation
KR100548810B1 (en)       Expansion tunnel and existing construction method using existing tunnel constructed under rocky condition
KR102610909B1 (en) Method and structure of steel pipe propulsion using anchor installation inside steel pipe to prevent sinking
KR100432782B1 (en) Supporting structure for tunnel and underground tunnel construction method using the same
KR200316681Y1 (en) The expanding tunnel and constructing method of the existing tunnel
KR100476839B1 (en) Construction method for installing concrete underground structures
KR102424585B1 (en) Slurry wall construction method for seismic reinforcement
KR200296444Y1 (en) Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method
KR102314838B1 (en) Non-Open Cut Construction Method For A Tunnel
KR100573014B1 (en) Tunnel expansion construction device using existing tunnel and tunnel expansion construction method using the same
KR102243586B1 (en) Two-side semicircle arch type leading pipe and structure of non-excavation type tunnel using thereof and method of constructing thereof
JP4243069B2 (en) Construction method of earth retaining wall
KR20040023915A (en) Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method and construction method thereof
KR102243585B1 (en) Structure of constructing non-excavation type tunnel using steel pipe loof and leading pipe
KR200326698Y1 (en) Apparatus for extension work of tunnel using the existing tunnel
KR100990430B1 (en) Non-adhesive Underground Construction Method
CN100491696C (en) Method and device for constructing tunnel by propulsion of underground box
JP4319122B2 (en) Branch and junction structure of branching tunnel and its construction method
JP4180347B2 (en) Construction method of underground continuous wall and underground continuous wall

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

PG1501 Laying open of application

St.27 status event code: A-1-1-Q10-Q12-nap-PG1501

E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

St.27 status event code: A-1-2-D10-D21-exm-PE0902

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

R18-X000 Changes to party contact information recorded

St.27 status event code: A-3-3-R10-R18-oth-X000

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 4

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 5

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 6

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 7

FPAY Annual fee payment

Payment date: 20130125

Year of fee payment: 8

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 8

FPAY Annual fee payment

Payment date: 20140127

Year of fee payment: 9

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 9

FPAY Annual fee payment

Payment date: 20150106

Year of fee payment: 10

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 10

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 11

FPAY Annual fee payment

Payment date: 20170104

Year of fee payment: 12

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 12

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

FPAY Annual fee payment

Payment date: 20180105

Year of fee payment: 13

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 13

FPAY Annual fee payment

Payment date: 20190104

Year of fee payment: 14

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 14

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

FPAY Annual fee payment

Payment date: 20200114

Year of fee payment: 15

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 15

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-PC1903

Not in force date: 20210126

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

PC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-PC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 20210126

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000