Kim et al., 2014 - Google Patents

Tunnel design underneath the operating runway of Incheon airport

Kim et al., 2014

Document ID
12941217059527253671
Author
Kim S
Choi D
Ahn C
Jung M
Moon H
Kim Y
Publication year
Publication venue
Geotechnical Aspects of Underground Construction in Soft Ground

External Links

Snippet

Expansion plans of Incheon International Airport have been developed in phases since its opening. Construction of a new passenger terminal required a railroad connection to link the existing terminal to a new terminal. Since the alignment of railroad connection was chosen …
Continue reading at books.google.com (other versions)

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/046Directional drilling horizontal drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Lay-outs therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C47/00Machines for obtaining or the removal of materials in open-pit mines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • E02D7/12Drivers with explosion chambers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B37/00Making, maintaining, renewing, or taking-up the ballastway or the track, not provided for in a single one of groups E01B27/00 - E01B35/00
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B35/00Applications of measuring apparatus or devices for track-building purposes

Similar Documents

Publication Publication Date Title
Zhang et al. Construction of a large-section long pedestrian underpass using pipe jacking in muddy silty clay: A case study
Fang et al. Double-O-tube shield tunneling for Taoyuan international airport access MRT
Ocak Environmental effects of tunnel excavation in soft and shallow ground with EPBM: the case of Istanbul
Stirbys et al. Los Angeles metro rail project–geologic and geotechnical design and construction constraints
Kim et al. Tunnel design underneath the operating runway of Incheon airport
Miwa et al. Tunnelling through an embankment using all ground fasten method
Palomba et al. Chenani-Nashri Tunnel, the longest road tunnel in India: a challenging case for design-optimization during construction
Bilotta et al. Ground movements induced by tunnel boring in Naples
Burden et al. Synthesis of trenchless technologies.
Zhang Options selection and impact study of intercity railway tunnel construction under airport interzone
Kamemura Seismic response and stability of rock tunnels—Its history and problems today
Syomik et al. Beneath the city: Tunnelling challenges and solutions for the Metro Line 2 viaduct undercrossing in Lima
Likar et al. New evaluation methods in pipe roof supported tunnels and its influence on design during construction
Mok et al. Trenchless construction of Phase IIIA district cooling system (DCS) by TBM pipejacking and hand-dug tunnelling on Kai Tak Development: part I–design and construction considerations
Barovero et al. North-West road bypass of Merano-South Tyrol-Italy
Balasubramanian Geotechnical investigations for tunnelling
Grothen et al. TBM Excavation in Himalayan Geology: Over 1, 200 Meters per Month at the Bheri Babai Diversion Multipurpose Project
Singh et al. Challenges faced during conventional tunneling in urban environment–Mumbai Metro Line 3
Romani et al. The T3 stretch of Line C in Rome: TBM excavation
Azali et al. Engineering Geological Hazards Along Doroud-KhorramAbad Railway Rock NATM Tunnels
Gagné et al. Tunnel Boring below Montreal: A Case Study of Urban Tunneling through Hard Limestone
Alonso et al. High speed railway tunnel crossing of downtown Barcelona: design, construction and performance
Tanzini et al. Tunnels along the new high-speed Brescia-Verona Railway Line–Design, Construction, Performance and Challenges
McFeat-Smith Environmental and geotechnical considerations for the use of bored tunnels
Allenby et al. Creating underground space at shallow depth beneath our cities using jacked box tunnelling