van Oort et al., 2018 - Google Patents
Thermal wellbore strengthening through managed temperature drilling–Part I: Thermal model and simulationvan Oort et al., 2018
- Document ID
- 14792822683775529697
- Author
- van Oort E
- Incedalip O
- Vajargah A
- Publication year
- Publication venue
- Journal of Natural Gas Science and Engineering
External Links
Snippet
This paper is the first part of a two-part series introducing a new and innovative managed temperature drilling technique for strengthening the wellbores of challenging oil and gas wells. This technique relies on heat generation within the borehole to increase the effective …
- 238000005728 strengthening 0 title abstract description 22
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
- E21B43/103—Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/1015—Locating fluid leaks, intrusions or movements using tracers: using radioactivity
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
- E21B47/065—Measuring temperature
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| van Oort et al. | Thermal wellbore strengthening through managed temperature drilling–Part I: Thermal model and simulation | |
| Lin et al. | Calculation Analysis of Pressure Wave Velocity in Gas and Drilling Mud Two‐Phase Fluid in Annulus during Drilling Operations | |
| Chen et al. | The maximum-allowable well depth while performing ultra-extended-reach drilling from shallow water to deepwater target | |
| Singh et al. | Comparative study on heat extraction from Soultz-sous-Forêts geothermal field using supercritical carbon dioxide and water as the working fluid | |
| Chen et al. | Fluid flow and heat transfer modeling in the event of lost circulation and its application in locating loss zones | |
| Chen et al. | Accurate prediction wellbore transient temperature profile under multiple temperature gradients: finite difference approach and case history | |
| Ichim et al. | Investigations on the surface well cement integrity induced by thermal cycles considering an improved overall transfer coefficient | |
| Shao et al. | Environmentally friendly, rheoreversible, hydraulic-fracturing fluids for enhanced geothermal systems | |
| Bahonar et al. | Two issues in wellbore heat flow modelling along with the prediction of casing temperature in the steam injection wells | |
| Sun et al. | A new comprehensive numerical model for fracture diagnosis with distributed temperature sensing DTS | |
| Espinosa-Paredes et al. | Application of a proportional-integral control for the estimation of static formation temperatures in oil wells | |
| Sau et al. | Advanced Completion and Stimulation Design Model for Maximum Reservoir Contact Wells | |
| Forouzanfar et al. | Formulation of a transient multi-phase thermal compositional wellbore model and its coupling with a thermal compositional reservoir simulator | |
| Mahdiyar et al. | New correlations for etched fracture width and half-length of acid-fractured wells | |
| Chen et al. | Hidden impact of mud loss on wellbore state of stresses disclosed by thermal-poro-elastic modeling | |
| US20180308034A1 (en) | New Foamed Diverter/Sand Control Model for Fluid Diversion in Integrated Wellbore-Reservoir System | |
| Kalia et al. | Wellbore Monitoring in Unconventional Reservoirs: Value of Accurate DTS Interpretation and Risks Involved | |
| Moghadam et al. | Quantitative assessment of well leakage, part II: Case studies for CCS | |
| Cayeux et al. | Automatic performance analysis and estimation of risk level embedded in drilling operation plans | |
| Jiang et al. | Transient temperature impact on deep reservoir fracturing | |
| Rostami et al. | New Generation of MPD Drilling Software-From Quantifying to Control | |
| Hoxha et al. | Thermal wellbore strengthening: system design, testing, and modeling | |
| Li et al. | Modeling progressive wellbore breakouts with dynamic Wellbore Hydraulics | |
| Zhang et al. | Analysis of Three Methods to Reduce Bottom Hole Temperature While Drilling in Deep Shale Gas Well: Circulation, Ground Cooling, and Mud Density Reduction | |
| Liu et al. | Development of a transient method on predicting multi-annuli temperature of subsea wells |