JP2501981B2 - Operation control device for heat source equipment - Google Patents
Operation control device for heat source equipmentInfo
- Publication number
- JP2501981B2 JP2501981B2 JP3247238A JP24723891A JP2501981B2 JP 2501981 B2 JP2501981 B2 JP 2501981B2 JP 3247238 A JP3247238 A JP 3247238A JP 24723891 A JP24723891 A JP 24723891A JP 2501981 B2 JP2501981 B2 JP 2501981B2
- Authority
- JP
- Japan
- Prior art keywords
- heat source
- heat
- data
- equipment
- operation plan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Air Conditioning Control Device (AREA)
- Feedback Control In General (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は蓄熱槽を有する冷暖房用
蓄熱プラントにおいて、熱源機器を運転するための熱源
機器の運転制御装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a heat source equipment operation control device for operating a heat source equipment in a heat storage plant for cooling and heating having a heat storage tank.
【0002】[0002]
【従来の技術】蓄熱槽を有する冷暖房用蓄熱プラントで
は、ヒートポンプ等の熱源機器によって温水、冷水を生
成してこれを蓄熱槽に蓄え、必要に応じて熱負荷機器に
供給している。従来、蓄熱プラントの熱源機器を運転す
る制御装置としては、例えば特公昭62−134438
号公報に見られるような構成のものが知られている。2. Description of the Related Art In a heat storage plant for cooling and heating having a heat storage tank, hot water or cold water is generated by a heat source device such as a heat pump, stored in the heat storage tank, and supplied to a heat load device as necessary. Conventionally, as a control device for operating a heat source device of a heat storage plant, for example, Japanese Patent Publication No. 62-134438.
There is known a structure as seen in Japanese Patent Publication.
【0003】図10はかかる蓄熱冷暖房装置の運転制御
装置の構成を示すブロック図である。この蓄熱冷暖房装
置の運転制御装置は、図10に示すように熱源機器31
より熱エネルギが供給される蓄熱槽32に蓄えられた蓄
熱量を温度センサ33および圧力センサ34により検出
してこれらを熱負荷演算部35に入力し、また記憶部3
6に時刻毎の負荷残量パターンとして記憶された負荷計
算により求められる一日の負荷パターンを熱負荷演算部
35に入力して、これら蓄熱量と負荷残量パターンの入
力データとの比較により熱源機器31の運転、停止を判
断し、この判断に基づいて出力部37より熱源機器31
に運転制御信号を出力するようにしている。この場合、
各センサで検出される蓄熱量と時刻毎の負荷残量とが逐
次比較され、熱源機器31が運転制御される。FIG. 10 is a block diagram showing the configuration of an operation control device for such a heat storage cooling / heating device. As shown in FIG. 10, the operation control device of the heat storage cooling / heating device has a heat source device 31.
The amount of heat stored in the heat storage tank 32 to which more heat energy is supplied is detected by the temperature sensor 33 and the pressure sensor 34, and these are input to the heat load calculation unit 35, and the storage unit 3
The load pattern for one day obtained by load calculation stored as the load residual amount pattern at each time in 6 is input to the heat load calculation unit 35, and the heat source is compared by the heat storage amount and the input data of the load residual amount pattern. It is determined whether to operate or stop the device 31, and the heat source device 31 is output from the output unit 37 based on this determination.
The operation control signal is output to. in this case,
The heat storage amount detected by each sensor and the remaining load amount at each time are sequentially compared, and the heat source device 31 is operation-controlled.
【0004】[0004]
【発明が解決しようとする課題】しかし、このような熱
源機器の運転制御装置では、熱源機器の起動、停止時刻
や最適蓄熱量を熱負荷演算部35により求めているが、
この熱負荷演算部35で用いられている演算方式とプラ
ントの設備構成に関する情報が明確に分離されていな
い。つまり、熱源機器の運転計画を立てるための演算方
式に設備データを含めたアルゴリズムを用い、これに基
づいて演算を実行するようにしていた。従って、設備構
成に変更が生じる度に演算部そのものに大幅な変更が必
要になる。本発明は、プラントの設備諸元、設備構成の
変更に柔軟に対応できる熱源機器の運転制御装置を提供
することを目的とする。However, in such an operation control device for a heat source device, the heat load computing section 35 determines the start and stop times of the heat source device and the optimum heat storage amount.
The calculation method used by the heat load calculation unit 35 and the information on the plant equipment configuration are not clearly separated. That is, an algorithm including equipment data is used as a calculation method for making an operation plan of the heat source device, and the calculation is executed based on the algorithm. Therefore, every time there is a change in the equipment configuration, it is necessary to drastically change the arithmetic unit itself. An object of the present invention is to provide an operation control device for a heat source device that can flexibly respond to changes in plant equipment specifications and equipment configurations.
【0005】[0005]
【課題を解決するための手段】本発明は、上記の目的を
達成するため、冷暖房用熱源プラントのプロセス量を収
集し、且つ蓄熱プラントにおける熱源機器の発停を制御
する熱源機器制御装置に運転計画データを与えて熱源機
器を運転制御する運転制御装置において、気温等の気象
情報やプラントの設備構成等の情報を入力するマンマシ
ン入力手段と、前記熱源機器制御装置に収集されたプロ
セス量を入力しデータ処理に必要なプロセスデータに変
換する入力手段と、この入力手段により取込まれたプロ
セスデータおよび前記マンマシン入力手段より入力され
る気象情報に基づいて予定時間先までの負荷を予測する
負荷予測手段と、前記入力手段より取込まれるプロセス
データを監視して前記熱源機器の現在の運転計画と比較
することにより熱の安定供給および前記蓄熱プラントの
運用効率の程度を判定し必要に応じて計画修正を要求可
能な監視手段と、前記マンマシン入力手段より入力され
るプラントの設備構成等の情報から設備情報を作成する
設備情報編集手段と、この設備情報編集手段により作成
された設備情報を格納する設備データ記憶手段と、予め
定められた時刻または前記監視手段によって計画修正の
要求を受けると、前記負荷予測手段で予測された負荷予
測値、前記入力手段で取込まれたプロセスデータ、前記
設備データ記憶手段に格納された設備情報および現状の
運転計画を用いて予定時間先までの熱源機器の運転計画
を作成する運転計画作成手段と、この運転計画作成手段
で作成された運転計画を前記熱源機器制御装置に出力す
る出力手段とを備え、前記設備情報編集手段は、入力さ
れた情報のうち、前記蓄熱槽については、複数の蓄熱槽
に関する諸元を統合してそれぞれ一つの論理的温水蓄熱
槽データ及び論理的冷水蓄熱槽データを作成し、また複
数の熱源機器については、それらの諸元から各熱源機器
が果たし得る冷水モード・温水モード等のモードを調
べ、各熱源機器毎にモード別の論理的な熱源機器データ
を作成し、これら論理的な熱源機器データ毎に、プラン
ト状態に対応してどのモードが適用可能かの情報を付加
し、これらの各作成データを前記設備データ記憶手段に
格納させる機能を有するものである。In order to achieve the above-mentioned object, the present invention operates a heat source equipment control device for collecting process quantities of a heat source plant for cooling and heating and controlling start / stop of heat source equipment in a heat storage plant. In the operation control device for operation control of the heat source device by giving the plan data, the man-machine input means for inputting weather information such as temperature and facility configuration information of the plant, and the process amount collected in the heat source device control device. Input means for inputting and converting into process data necessary for data processing, and predicting the load up to the scheduled time based on the process data taken in by this input means and the weather information input from the man-machine input means The load predicting means and the process data acquired from the input means are monitored to compare with the current operation plan of the heat source equipment so that the heat Equipment information is created from monitoring means capable of determining the degree of stable supply and operation efficiency of the heat storage plant and requesting a plan correction if necessary, and information such as the equipment configuration of the plant input from the man-machine input means. Equipment information editing means, equipment data storing means for storing equipment information created by this equipment information editing means, and a load correction means for predicting a predetermined time or a plan correction request by the monitoring means. Operation for creating an operation plan of the heat source equipment up to the scheduled time by using the predicted load value, the process data taken in by the input means, the equipment information stored in the equipment data storage means, and the current operation plan. comprising a planning unit, and output means for output and the operation plan created in this operation plan creating means to said heat source device control apparatus, the facility information Collecting means, is input
Of the stored information, for the heat storage tank,
Integrating specifications for each, one logical hot water heat storage
Create tank data and logical cold water storage tank data, and
For the number of heat source devices,
Control the cold water mode, hot water mode, etc.
The logical heat source device data for each heat source device by mode
To create a plan for each of these logical heat source device data.
Add information about which mode is applicable depending on the status
Then, each of these created data is stored in the equipment data storage means.
It has a function of storing .
【0006】[0006]
【作用】従って、このような構成の熱源機器の運転制御
装置にあっては、プロセス値を用いて蓄熱プラントの状
態を監視する監視手段より計画修正の要求が運転計画作
成手段に出されると、この運転計画作成手段では設備情
報編集手段により作成されて設備データ記憶手段に格納
された設備情報、つまり蓄熱槽については複数の蓄熱槽
に関する諸元を統合して作成されたそれぞれ一つの論理
的温水蓄熱槽データ及び論理的冷水蓄熱槽データ、また
複数の熱源機器についてはそれらの諸元から各熱源機器
が果たし得る冷水モード・温水モード等のモードを調
べ、且つプラント状態に対応してどのモードが適用可能
かの情報を付加して作成された各熱源機器毎にモード別
の論理的な熱源機器データと、負荷予測値、プロセスデ
ータおよび現状の運転計画とを用いて予定時間先までの
熱源機器の運転計画を作成すればよいので、プラントの
設備諸元、設備構成に変更が生じても設備情報編集手段
を用いて設備情報を変更することが可能となり、運転計
画作成部を変更することなく変更後の蓄熱プラントの運
転計画を容易に作成することができる。Therefore, in the operation control device of the heat source device having such a configuration, when a request for plan correction is issued to the operation plan creation means from the monitoring means for monitoring the state of the heat storage plant using the process value, In this operation plan creating means, the equipment information created by the equipment information editing means and stored in the equipment data storage means , that is, a plurality of heat storage tanks for the heat storage tank
One logic created by integrating specifications related to
Hot water heat storage tank data and logical cold water heat storage tank data, and
For multiple heat source devices, refer to the specifications of each heat source device.
Control the cold water mode, hot water mode, etc.
And which mode can be applied depending on the plant state
Mode for each heat source device created by adding information
Since it is only necessary to create an operation plan for the heat source equipment up to the scheduled time using the logical heat source equipment data of , the predicted load value, the process data, and the current operation plan, it is possible to specify the plant specifications and equipment configuration. Even if a change occurs, it is possible to change the facility information by using the facility information editing means, and it is possible to easily create the changed operation plan of the heat storage plant without changing the operation plan creation unit.
【0007】従って、季節の変わり目で蓄熱槽の割当に
変化が生じた場合や、熱源機器の運転モードを切換える
場合、さらには熱源プラントの設備構成が変更されて
も、運転計画作成部の処理に何等手を加えることなく容
易に対処することができので、変更後の蓄熱プラントの
熱源機器の運転計画を容易に作成することができる。 Therefore, when the season changes, heat storage tanks are allocated.
When a change occurs or the heat source equipment operation mode is switched
If the equipment configuration of the heat source plant has changed
The operation plan creation section without any modification.
Since it can be dealt with easily,
The operation plan of the heat source equipment can be easily created.
【0008】[0008]
【実施例】以下本発明の一実施例を図面を参照して説明
する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings.
【0009】図1は本発明による熱源機器の運転制御装
置のブロック構成例を示す。同図において、蓄熱プラン
ト19は図示していないが、熱を生成するためのヒート
ポンプ等の熱源機器と、この熱源機器で生成された熱を
蓄える蓄熱槽と、熱源機器により生成された熱や蓄熱槽
に蓄えられている熱を需要家に供給するための供給系統
とから構成されている。熱源機器運転制御装置17は、
入力装置1および出力装置2と結合し、且つ熱源機器制
御装置18と図示しない伝送装置を介して結合されてい
る。FIG. 1 shows an example of a block configuration of an operation control device for heat source equipment according to the present invention. Although the heat storage plant 19 is not shown in the figure, a heat source device such as a heat pump for generating heat, a heat storage tank for storing the heat generated by the heat source device, and heat generated by the heat source device or heat storage device. It is composed of a supply system for supplying heat stored in the tank to customers. The heat source device operation control device 17,
It is connected to the input device 1 and the output device 2, and is also connected to the heat source device control device 18 via a transmission device (not shown).
【0010】この熱源機器運転制御装置17は、熱源機
器制御装置18との間で伝送装置を介してデータを取込
む入力部15およびデータを送出する出力部16と、入
力装置1からの情報を受取るマンマシン入力部3および
出力装置2へ情報を出力するマンマシン出力部4とを有
する。The heat source equipment operation control device 17 receives information from the input device 1 and an input portion 15 for taking in data with the heat source equipment control device 18 via a transmission device and an output portion 16 for sending out data. It has a man-machine input unit 3 for receiving and a man-machine output unit 4 for outputting information to an output device 2.
【0011】入力部15によって得られた蓄熱プラント
19のプロセス量は一部演算、統計処理されてプロセス
データとしてプロセス値記憶部11に格納され、また入
力装置1よりマンマシン入力部3を通して気象情報が気
象情報記憶部5に格納され、これら記憶部5,11に格
納された気象情報およびプロセスデータは負荷予測部8
に取込まれる。この負荷予測部8は、これら気象情報お
よびプロセスデータとカレンダ6より得られる情報を基
に熱需要予測の演算を実行し、その結果得られる負荷予
測値は負荷予測値記憶部9に格納される。The process amount of the heat storage plant 19 obtained by the input unit 15 is partially calculated and statistically processed and stored in the process value storage unit 11 as process data, and the weather information is input from the input device 1 through the man-machine input unit 3. Is stored in the weather information storage unit 5, and the weather information and process data stored in these storage units 5 and 11 are stored in the load prediction unit 8
Be taken into. The load prediction unit 8 executes a calculation of heat demand prediction based on the weather information and the process data and the information obtained from the calendar 6, and the load predicted value obtained as a result is stored in the load predicted value storage unit 9. .
【0012】また、蓄熱プラント19の設備諸元や構成
の設備情報は、入力装置1よりマンマシン入力部3を通
して設備情報編集部7に取込まれ、ここで編集された設
備情報は設備データ記憶部10に格納される。Further, the equipment information of the equipment specifications and configuration of the heat storage plant 19 is taken in from the input device 1 to the equipment information editing unit 7 through the man-machine input unit 3, and the equipment information edited here is stored in the equipment data. It is stored in the unit 10.
【0013】プロセス値記憶部11に格納されたプロセ
スデータ、負荷予測値記憶部9に格納された負荷予測値
および設備データ記憶部10に格納された設備データ
は、運転計画作成部13にそれぞれ取込まれ、ここで作
成された運転計画や現状の運転計画を運転計画データと
して運転計画データ記憶部14に格納される。The process data stored in the process value storage unit 11, the predicted load value stored in the predicted load value storage unit 9 and the facility data stored in the facility data storage unit 10 are transferred to the operation plan creation unit 13, respectively. The operation plan created here and the current operation plan are stored in the operation plan data storage unit 14 as operation plan data.
【0014】この運転計画作成部13は、プロセス値記
憶部11より取込んだプロセスデータからプラント設備
の運転計画で熱源機器を運転した場合の運用を監視する
監視部12からの要求により運転計画の修正が行えるよ
うになっている。The operation plan creating unit 13 prepares the operation plan according to a request from the monitoring unit 12 which monitors the operation when the heat source equipment is operated in the operation plan of the plant equipment from the process data taken from the process value storage unit 11. It can be modified.
【0015】また運転計画データ記憶部14に格納され
た運転計画データは、出力部16より伝送装置を介して
熱源機器制御装置18と、マンマシン出力部4により出
力装置2にそれぞれ出力される。次にこのように構成さ
れた熱源機器の運転制御装置の作用について述べる。The operation plan data stored in the operation plan data storage unit 14 is output from the output unit 16 to the heat source device control device 18 via the transmission device and the man-machine output unit 4 to the output device 2. Next, the operation of the heat source device operation control device configured in this manner will be described.
【0016】まず、入力部15によって熱源プラント1
9のプロセス計測値を入力し、必要に応じて演算、統計
処理がなされてプロセス値記憶部11に格納する。ま
た、入力装置1よりマンマシン入力部3を通して入力さ
れたN時間先までの気象に関する情報を気象情報記憶部
5に格納する。First, the heat source plant 1 is operated by the input unit 15.
The process measurement value 9 is input, and if necessary, calculation and statistical processing are performed and stored in the process value storage unit 11. In addition, the weather information storage unit 5 stores information about the weather up to N hours ahead, which is input from the input device 1 through the man-machine input unit 3.
【0017】このように各記憶部にデータが格納される
と負荷予測部8、監視部12、運転計画作成部13およ
び設備情報編集部7は、各データを基に以下に述べるよ
うな処理が実行される。 (1)負荷予測部8での処理When the data is stored in each storage unit in this way, the load predicting unit 8, the monitoring unit 12, the operation plan creating unit 13, and the facility information editing unit 7 perform the following processing based on each data. To be executed. (1) Processing in the load prediction unit 8
【0018】負荷予測部8は、気象情報、カレンダ6よ
り得られる情報およびプロセスデータを用いてN時間
(例えば24時間)先までの需要家の熱需要量を予測
し、その結果を負荷予測値として負荷予測値記憶部9に
格納する。この場合、熱需要家の需要量は曜日や天候な
どによっていくつかのパターンに分類されることが多
く、そのパターンを基に前日、前々日の実績、その日の
最低気温や最高気温、天候等により微調整して負荷値を
予測する。 (2)監視部12での処理The load predicting unit 8 predicts the heat demand of the customer up to N hours (for example, 24 hours) ahead using the weather information, the information obtained from the calendar 6 and the process data, and the result is the predicted load value. Is stored in the predicted load value storage unit 9. In this case, the demand of heat consumers is often classified into several patterns depending on the day of the week, the weather, etc. Based on that pattern, the results of the day before, the day before the day, the minimum and maximum temperatures of the day, the weather, etc. To fine tune and predict the load value. (2) Processing in the monitoring unit 12
【0019】監視部12は一定周期で起動され、プロセ
スデータを用いてプラント設備の状態や現状の運転計画
のまま熱源機器を運転した場合に安定供給と熱源プラン
トの効率的な運用ができるかどうかを判断し、必要があ
れば現状の運転計画の修正を運転計画作成部13に要求
する。The monitoring unit 12 is activated at regular intervals, and whether stable supply and efficient operation of the heat source plant can be performed when the heat source equipment is operated with the state of the plant equipment and the current operation plan using the process data. If necessary, the operation plan creation unit 13 is requested to correct the current operation plan.
【0020】ここで、監視部12の処理の流れを図2お
よび図3に示すフローチャートを参照しながら説明す
る。まず、図2において、起動が開始されると、ステッ
プST1では熱負荷予測値、残蓄熱量、現状の運転計画
を入力し、これらに基づき冷温水蓄熱容量、熱源熱生産
能力、蓄熱目標、目標許容誤差をパラメータとして現在
から22:00 までの予想蓄熱量において、不具合量(熱の
過不足)の有無を判定し、計画修正が必要なときその要
求を行う。また、蓄熱、放熱運転において毎正時の蓄熱
量実績と計画蓄熱量との誤差が許容誤差異常の時、不具
合情報(不具合量、不具合発生予想時刻)のメッセージ
を出力する。Here, the flow of processing of the monitoring unit 12 will be described with reference to the flow charts shown in FIGS. First, in FIG. 2, when the activation is started, in step ST1, the predicted heat load value, the residual heat storage amount, and the current operation plan are input, and based on these, the cold / hot water heat storage capacity, the heat source heat production capacity, the heat storage target, and the target. The allowable error is used as a parameter to determine whether there is a defect amount (heat excess or deficiency) in the predicted heat storage amount from the present to 22:00, and request it when the plan needs to be revised. In addition, when the error between the actual heat storage amount and the planned heat storage amount at every hour in the heat storage and heat radiation operation is an allowable error abnormality, a message of failure information (failure amount, predicted time of failure) is output.
【0021】ステップST1で計画修正要求が出された
後、又は不具合量がないと判定されると、ステップST
2では蓄熱槽内の温度蓄熱槽の冷温切換状態を入力して
温度プロフィールの異常(勾配の逆転)があるかどうか
を判定し、異常がなければステップST3に直接進み、
異常があればワーニングメッセージを出力してステップ
ST3に進む。After the plan correction request is issued in step ST1 or when it is determined that there is no defect amount, step ST1
In 2, the cold temperature switching state of the temperature storage tank in the heat storage tank is input to determine whether there is an abnormality in the temperature profile (inversion of the gradient). If there is no abnormality, the process directly proceeds to step ST3,
If there is an abnormality, a warning message is output and the process proceeds to step ST3.
【0022】ステップST3では、熱源出入口温度、熱
源運転状態、蓄熱量、運転計画および熱負荷予測値を入
力し、冷温水蓄熱容量、熱源熱生産能力、トリップ警戒
温度をパラメータとして熱源入口温度(または出口温
度)がトリップ警戒温度に達したかどうかを判定し、ト
リップ警戒温度に達していなければ直接ステップST4
に進み、達していればアラームやメッセージ警報を出力
してステップST4に進む。In step ST3, the heat source inlet / outlet temperature, the heat source operating state, the heat storage amount, the operation plan and the predicted heat load value are input, and the heat source inlet temperature (or the heat source inlet temperature (or the heat alarm heat production capacity, trip warning temperature) is used as a parameter. (Exit temperature) has reached the trip warning temperature, and if it has not reached the trip warning temperature, a direct step ST4
If so, an alarm or message warning is output and the process proceeds to step ST4.
【0023】ステップST4では、熱源出入口温度、熱
源運転状態を入力し、送水規定温度をパラメータとして
熱生産した送水規定温度に満たない場合、または送水規
定温度に満たないと予想される場合には出側温度異常あ
りと判定し、アラームやメッセージ警報を出力してステ
ップST5に進み、また異常がなければ直接ステップS
T5に進む。In step ST4, the heat source inlet / outlet temperature and the heat source operating state are input, and if the prescribed water supply temperature is not used as a parameter, the prescribed water supply temperature is not reached, or if it is predicted that the water supply prescribed temperature is not reached. It is determined that there is an abnormality in the side temperature, an alarm or a message alarm is output, and the process proceeds to step ST5.
Proceed to T5.
【0024】ステップST5では、熱源故障状況、熱源
運転状態および運転計画を入力して計画運転実施中にト
リップまたは故障状態の熱源を検出したかどうかを判定
し、トリップまたは故障状態の熱源を検出した場合には
アラームやメッセージ警報を出力して図3に示すステッ
プST6に進み、また検出しなければ直接ステップST
6に進む。In step ST5, the heat source failure status, the heat source operating status, and the operation plan are input to determine whether or not a tripped or failed heat source is detected during the planned operation, and a tripped or failed heat source is detected. In this case, an alarm or message warning is output and the process proceeds to step ST6 shown in FIG.
Proceed to 6.
【0025】ステップST6では、送水温度および還水
温度を入力し、送水警戒温度、還水警戒温度および送水
規定温度をパラメータとして各系統の送水温度と蓄熱槽
出側温度に異常があるかどうかを判定し、異常がなけれ
ば直接ステップST7に進み、異常があればワーニング
メッセージ警報を出力してステップST7に進む。In step ST6, the water supply temperature and the return water temperature are input, and whether or not there is an abnormality in the water supply temperature and the heat storage tank outlet side temperature of each system using the water supply warning temperature, the return water warning temperature, and the specified water supply temperature as parameters. If there is no abnormality, the process directly proceeds to step ST7, and if there is an abnormality, a warning message warning is output and the process proceeds to step ST7.
【0026】ステップST7では消費電力量を入力し、
デマンド契約電力量をパラメータとして消費電力量(30
分または1時間積算値)がデマンド電力の95% を越えて
いるかどうかを判定し、越えている場合にはアラームや
メッセージ警報を出力してステップST8に進み、越え
ていなければ直接ステップST8に進む。In step ST7, the power consumption is input,
Power consumption (30
It judges whether or not the minute or integrated value for one hour exceeds 95% of the demand power. If it exceeds, it outputs an alarm or a message warning and goes to step ST8. If it does not, go directly to step ST8. .
【0027】ステップST8では2次送水流量、2次送
水流量の変化量を入力し、変化量しきい値をパラメータ
として負荷立上がり時刻付近での送水流量が急変したか
どうかを判定し、急変していればアラームやメッセージ
警報を出力し、急変していなければ監視部12の処理を
終了する。 (3)運転計画作成部13での処理In step ST8, the amount of change in the secondary water flow rate and the amount of change in the secondary water flow rate are input, and it is determined whether or not the amount of water flow near the load rise time suddenly changes by using the amount of change threshold value as a parameter, and the sudden change occurs. If so, an alarm or a message alarm is output, and if there is no sudden change, the processing of the monitoring unit 12 is terminated. (3) Processing in operation plan creation unit 13
【0028】運転計画作成部13は、予め定められた時
刻あるいは監視部12から計画の修正要求を受けたとき
に起動され、負荷予測値、プロセス値、設備データ、現
状の運転計画を用いて、 夜間電力の利用向上 蓄熱槽の効率的な運用 熱生産コストの低減The operation plan creation unit 13 is activated at a predetermined time or when a plan correction request is received from the monitoring unit 12, and uses the predicted load value, the process value, the facility data, and the current operation plan, Improve use of nighttime electricity Efficient operation of heat storage tank Reduce heat production cost
【0029】等の主旨に従い、運転計画の作成、修正を
行う。ここで作成された運転計画はマンマシン出力部4
により出力装置2に表示されると共に、出力部16より
熱源機器制御装置18に伝送される。この場合、運転計
画の作成に用いられる設備データは蓄熱プラントの諸設
備、プラント構成を用いて詳細を後述する設備情報編集
無7により処理されたもので、運転計画作成処理は設備
データとは分離されているため、設備データに変更が生
じても運転計画作成処理を変更する必要はない。ここ
で、運転計画作成部13において、まず、予め定められ
た時刻に計画を作成する際の処理内容を図4に示すフロ
ーチャートにより説明する。The operation plan is created and modified in accordance with the main points such as the above. The operation plan created here is the man-machine output unit 4
Is displayed on the output device 2 and transmitted from the output unit 16 to the heat source device control device 18. In this case, the equipment data used to create the operation plan is processed by the equipment of the heat storage plant and the plant configuration, which is processed without editing the equipment information 7, and the operation plan creation processing is separated from the equipment data. Therefore, even if the equipment data is changed, it is not necessary to change the operation plan creation process. Here, in the operation plan creating unit 13, first, the processing contents when creating a plan at a predetermined time will be described with reference to the flowchart shown in FIG.
【0030】図4において、運転計画作成部13が起動
されると、ステップST9では、負荷予測値、プロセス
値、現状の運転計画、設備データ等を各記憶部から読込
み、ステップST10に進む。In FIG. 4, when the operation plan creation unit 13 is activated, the load prediction value, the process value, the current operation plan, the equipment data, etc. are read from each storage unit in step ST9, and the process proceeds to step ST10.
【0031】このステップST10では、熱源予測値を
取込んで熱源−蓄熱槽の接続関係、冷温水蓄熱容量、熱
源熱生産能力をパラメータとして蓄熱推移が昼間の運転
開始時刻に最大、1日の運転終了時刻に最小となるよう
に冷温水の蓄熱目標および各時間帯の蓄熱、放熱主導運
転指標を決定してこれらを夜間蓄熱計画データとして出
力し、また続いてステップST11により蓄熱推移が目
標を達成するために必要な熱生産目標を決定し、これを
残熱量制御計画データとして出力してステップST12
に進む。In this step ST10, the predicted value of the heat source is taken in, and the heat storage transition is maximum at the daytime operation start time with the heat source-heat storage tank connection relationship, cold / hot water heat storage capacity, and heat source heat production capacity as parameters. Decide the heat storage target of cold and hot water and the heat storage of each time zone, the heat radiation initiative operation index so as to be the minimum at the end time, and output these as nighttime heat storage plan data. Then, in step ST11, the heat storage transition achieves the target. To determine the heat production target required to output, and output this as residual heat control plan data, and step ST12
Proceed to.
【0032】ステップST12では、熱源予測値を取込
んで熱源生産能力をパラメータとして蓄熱目標を達成す
るために必要な熱生産目標をオープン系熱源とクローズ
系熱源に分配し、これらを熱供給計画データとして出力
してステップST13に進む。In step ST12, the heat production target necessary for achieving the heat storage target by taking in the heat source predicted value and using the heat source production capacity as a parameter is distributed to the open system heat source and the closed system heat source, and these are supplied to the heat supply plan data. Is output and the process proceeds to step ST13.
【0033】ステップST13では、熱生産目標、蓄熱
目標を取込んで熱源熱生産能力、冷温水蓄熱容量をパラ
メータとして熱回収運転を効率良く行うために冷専/温
専/熱回収熱源の運転指標として冷温水主導運転指標を
決定し、これらを冷温水管理計画データとして出力して
ステップST14に進む。In step ST13, in order to efficiently perform the heat recovery operation by taking in the heat production target and the heat storage target and using the heat source heat production capacity and the cold / hot water heat storage capacity as parameters, the operation index of the cold / heat / heat recovery heat source. As a result, the cold / hot water initiative operation indexes are determined, and these are output as cold / hot water management plan data, and the process proceeds to step ST14.
【0034】ステップST14では、熱負荷予測値を取
込み、冷温水蓄熱容量、熱源熱生産能力、定時調整時間
をパラメータとして定時調整契約時間帯の熱生産目標量
と時間帯の開始、終了時刻における蓄熱目標を決定し、
これらを定時調整契約運転指針設定データとして出力
し、次のステップST15に進む。In step ST14, the predicted heat load value is taken in, and the cold and hot water heat storage capacity, the heat source heat production capacity, and the scheduled adjustment time are used as parameters, and the heat production target amount in the scheduled adjustment contract time zone and the heat storage at the start and end times of the time zone are stored. Set goals,
These are output as scheduled adjustment contract operation guideline setting data, and the process proceeds to the next step ST15.
【0035】ステップST15では、熱負荷予測値、蓄
熱目標、蓄熱、放熱主導運転指標、冷温水主導運転指標
を取込み、熱源熱生産能力、冷温水蓄熱容量、契約電力
をパラメータとして熱源の運転パターンをヒューリステ
ィクスにより、1時間単位の熱源運転スケジュールを発
生させる。そして、これらのスケジュールを平準化(ピ
ークカット、定時調整契約等)、連続運転(起動ロスの
低減)、冷温水管理(熱回収効率向上)に関して評価
し、最も方針に適合するスケジュールを選定して熱源運
転スケジュール(1時間単位)を出力し、ステップST
16に進む。In step ST15, the heat load prediction value, the heat storage target, the heat storage, the heat radiation driven operation index, and the cold / hot water driven operation index are taken in, and the heat source heat production capacity, the cold / hot water heat storage capacity, and the contracted power are used as parameters to set the heat source operation pattern. The hourly heat source operation schedule is generated by heuristics. Then, these schedules are evaluated for leveling (peak cut, scheduled adjustment contract, etc.), continuous operation (reduction of start-up loss), and cold / hot water management (improvement of heat recovery efficiency), and the schedule that best fits the policy is selected. Output the heat source operation schedule (1 hour unit), and step ST
Proceed to 16.
【0036】ステップST16では、熱源運転スケジュ
ール(1時間単位)、蓄熱目標、熱負荷予測値を取込
み、熱源熱生産能力、冷温水蓄熱容量、運転方法をパラ
メータとして1時間単位の熱源運転スケジュールで運転
したときの予想蓄熱量を計算し、運用指針で作成された
蓄熱目標とのずれをM分単位の修正により吸収する。こ
のとききめ細かいノウハウを用いてスケジュールの短
縮、延長、連続化を行い、この微調整された熱源運転ス
ケジュール(M分単位)を出力して運転作成計画を終了
する。次に監視部12からの計画の修正要求を受けたと
きの処理内容を図5乃至図9に示すフローチャトにより
説明する。In step ST16, the heat source operation schedule (in units of 1 hour), the heat storage target, and the predicted value of the heat load are fetched, and the heat source operation schedule is set in units of 1 hour using the heat source heat production capacity, the cold / hot water storage capacity, and the operation method as parameters. The expected heat storage amount at that time is calculated, and the deviation from the heat storage target created in the operation guideline is absorbed by correction in units of M minutes. At this time, the fine-tuned know-how is used to shorten, extend, and make the schedule continuous, and the finely adjusted heat source operation schedule (in units of M minutes) is output to end the operation preparation plan. Next, the processing contents when the plan correction request from the monitoring unit 12 is received will be described with reference to the flow charts shown in FIGS.
【0037】図5において、監視部12からの計画修正
要求により起動されると、ステップST17により負荷
予測値、プロセス値、現状の運転計画、設備データ等を
各記憶部から読取り、ステップST18に進む。In FIG. 5, when it is activated by a plan correction request from the monitoring unit 12, the load prediction value, the process value, the current operation plan, the equipment data, etc. are read from each storage unit in step ST17, and the process proceeds to step ST18. .
【0038】このステップST18では、蓄熱量、残熱
量を取込み、熱源−蓄熱槽の接続関係、蓄熱量上下限
値、残熱目標値をパラメータとして監視結果から、現在
のプラントの不具合項目をチェックし、不具合項目がな
ければステップST20に進み、不具合項目があれば蓄
熱制御量、残熱量偏差を出力してステップST19に進
む。In this step ST18, the heat storage amount and the residual heat amount are taken in, and the defective item of the present plant is checked from the monitoring results using the heat source-heat storage tank connection relationship, the heat storage amount upper and lower limit values, and the residual heat target value as parameters. If there is no defective item, the process proceeds to step ST20. If there is a defective item, the heat storage control amount and the residual heat amount deviation are output, and the process proceeds to step ST19.
【0039】このステップST19では故障不動作熱源
番号、運転計画、熱負荷予測値を取込み、熱源熱生産能
力をパラメータとして、ステップST18で故障や不動
作が検出された熱源の運転をすべて取消し、合わせて蓄
熱予想量を計算し直して修正運転計画、蓄熱予想量を出
力する。図6はこのステップST19を詳細に示すフロ
ーチャートである。図6において、熱源の故障や不動作
対応は、まずステップST19−1で故障熱源があるか
どうかを判定し、故障熱源がなければステップST19
−3に進み、故障熱源があればステップST19−2に
より故障熱源計画を取消してステップST19−3に進
む。このステップST19−3では、不動作熱源がある
かどうかを判定し、不動作熱源がなければステップST
19−5に進み、不動作熱源があればステップST19
−4により不動作熱源計画を変更してステップST19
−5に進む。このステップST19−5では、蓄熱予想
量の再計算を行う。In this step ST19, the failure / non-operation heat source number, the operation plan, and the predicted heat load value are fetched, and the operation of the heat source in which the failure or non-operation is detected in step ST18 is canceled by using the heat source heat production capacity as a parameter. The estimated heat storage amount is recalculated to output the corrected operation plan and the estimated heat storage amount. FIG. 6 is a flowchart showing this step ST19 in detail. In FIG. 6, in order to deal with a failure or non-operation of the heat source, it is first determined in step ST19-1 whether there is a failure heat source, and if there is no failure heat source, step ST19
-3, if there is a failure heat source, the failure heat source plan is canceled in step ST19-2 and the operation proceeds to step ST19-3. In this step ST19-3, it is determined whether or not there is a non-operating heat source, and if there is no non-operating heat source, the step ST19
19-5, if there is an inoperative heat source, step ST19
-4 to change the non-operating heat source plan, and step ST19
Go to -5. In this step ST19-5, the estimated heat storage amount is recalculated.
【0040】このようにステップST19で故障不動作
対応が取られた後、またはステップST18で現在の監
視結果から、現在のプラントに不具合項目がないと判定
されると、ステップST20では蓄熱不具合があるかど
うかを判定し、蓄熱不具合があると判定された場合には
ステップST21に進む。After the failure / non-operation countermeasure is taken in step ST19 as described above, or when it is determined in step ST18 that there is no defective item in the current plant from the current monitoring result, there is a heat storage defect in step ST20. If it is determined that there is a heat storage problem, the process proceeds to step ST21.
【0041】このステップST21では、運転計画、蓄
熱予想量、蓄熱目標、電力デマンド、熱負荷予測値、残
熱量偏差を取込み、熱源熱生産能力、蓄熱量上下限値を
パラメータとして次のような処理を行う。即ち、蓄熱目
標が設定されている時刻における蓄熱予想量が許容誤差
以上に目標からずれることが予想されるときは、現状の
運転計画の起動、停止時刻を調整することにより修正す
る。また、現状の計画の起動、停止時刻の調整だけでは
異常量を解消できないときは、現状の計画の起動をご破
算して「予め定められた時刻に起動されたとき」の運転
計画作成処理に従って計画を立て直し、修正運転計画デ
ータ、蓄熱予想量を出力する。図7および図8は、この
ステップST21を詳細に示すフローチャートである。
図7において、蓄熱量の異常対応は、まずステップST
21−1で蓄熱量のチェックを行い、ステップST21
−2で蓄熱に不具合があるかどうかが判定され、不具合
がなければ次の蓄熱量の異常対応に備え、不具合がある
と判定されるとステップST21−3に進み、ここで蓄
熱不具合の解消処理が行われ、ステップST21−4に
進む。ステップST21−4では、不具合が解消された
かどうかを判定し、解消されていなければステップST
21−1に戻り、解消されていればステップST21−
5により再計画を要求し、次の蓄熱量の異常対応に備え
る。In this step ST21, the following processing is performed by taking in the operation plan, the heat storage expected amount, the heat storage target, the power demand, the heat load predicted value, the residual heat amount deviation, and using the heat source heat production capacity and the heat storage amount upper and lower limit values as parameters. I do. That is, when it is expected that the predicted heat storage amount at the time when the heat storage target is set deviates from the target by more than the allowable error, the correction is made by adjusting the start and stop times of the current operation plan. In addition, if the abnormal amount cannot be eliminated only by adjusting the start and stop times of the current plan, the start of the current plan will be canceled and the plan will be set according to the operation plan creation process of "when started at a predetermined time". To output the corrected operation plan data and the estimated heat storage amount. 7 and 8 are flowcharts showing this step ST21 in detail.
In FIG. 7, the step ST is the first step for dealing with the abnormal heat storage amount.
21-1 checks the heat storage amount, and step ST21
-2, it is determined whether or not there is a problem with the heat storage, and if there is no problem, prepare for the next abnormality in the amount of heat storage, and if it is determined that there is a problem, the process proceeds to step ST21-3, where the heat storage problem is resolved. Is performed, and the process proceeds to step ST21-4. In step ST21-4, it is determined whether or not the problem has been resolved. If not, step ST21-4
Return to 21-1, and if it has been resolved, step ST21-
Request re-planning according to No. 5, and prepare for the next abnormality in the heat storage amount.
【0042】上記ステップST21−3は、図8に示す
ような蓄熱不具合解消処理が行われる。ステップST2
1−3での蓄熱不具合解消処理は、ステップST21−
3aで修正対象決定と修正対象時間帯決定を行い、ステ
ップST21−3bでは修正可能計画が選択され、ステ
ップST21−3cに進む。このステップST21−3
cでは、修正可能計画があるかどうかを判定し、修正可
能計画がなければ解消失敗として次の蓄熱不具合解消に
備える。また、修正可能計画があると判定されるとステ
ップST21−3dにより修正候補を作成し、ステップ
ST21−3eにて修正候補があるかどうかを判定す
る。このステップST21−3eで修正候補がないと判
定された場合には解消失敗として次の蓄熱不具合解消に
備え、修正候補があると判定されると、ステップST2
1−3fにて採用案を決定し、さらにステップST21
−3gにて単位計画を更新して、次の蓄熱不具合解消に
備える。In step ST21-3, the heat storage defect solving process as shown in FIG. 8 is performed. Step ST2
The heat storage defect resolution process in 1-3 is performed in step ST21-
In 3a, the correction target is determined and the correction target time zone is determined. In step ST21-3b, the modifiable plan is selected, and the process proceeds to step ST21-3c. This step ST21-3
In c, it is determined whether there is a correctable plan, and if there is no correctable plan, it is determined that the solution has failed and the next heat storage failure is resolved. If it is determined that there is a modifiable plan, a correction candidate is created in step ST21-3d, and it is determined in step ST21-3e whether there is a correction candidate. When it is determined in step ST21-3e that there is no correction candidate, it is determined that there is a correction candidate in preparation for the next heat storage defect resolution as a solution failure and step ST2.
The adoption plan is determined in 1-3f, and then step ST21.
Update the unit plan with -3g to prepare for the next heat storage failure.
【0043】このように蓄熱量の異常対応がとられる
と、再び図5に戻りステップST22により再計画要求
があるかどうかを判定し、再計画要求があれば再計画要
求してステップST25により出力ファイルを作成す
る。また、再計画要求がなければ、ステップST23に
より計画の修正があるかどうかを判定し、修正がなけれ
ばステップST25により出力ファイルを作成し、修正
があればステップST24により次のような修正実施判
断を行う。When the abnormality of the heat storage amount is dealt with in this way, returning to FIG. 5 again, it is judged in step ST22 whether there is a re-planning request, and if there is a re-planning request, a re-planning request is made and output in step ST25. Create a file. If there is no re-planning request, it is determined in step ST23 whether or not there is a plan modification. If there is no modification, an output file is created in step ST25. I do.
【0044】即ち、ステップST24では運転計画、現
在時刻から修正案を実際に適用し始めなければならない
時刻が現在時刻よりL時刻以内ならば修正運転計画、蓄
熱予想量等の修正案を出力し、そうでなければしばらく
様子を見る旨のメッセージを出力する。図9はこのステ
ップST24を詳細に示すフローチャートである。図9
において、ステップST24−1では修正実施時刻を計
算してステップST24−2により、 修正実施時刻≦現在時刻+余裕時間 を満たしているかどうかを判定し、満たしていれば修正
を実施し、満たしていなければ修正実施猶予して次の修
正実施判断に備える。 (4)設備情報編集部7での処理That is, in step ST24, if the time at which the operation plan and the correction plan must actually be applied from the current time is within L time from the current time, the correction plan such as the corrected operation plan and the estimated heat storage amount is output. Otherwise, it outputs a message telling you to look at the situation for a while. FIG. 9 is a flowchart showing this step ST24 in detail. FIG.
In step ST24-1, the correction execution time is calculated, and in step ST24-2, it is determined whether the correction execution time ≦ current time + margin time is satisfied, and if it is satisfied, the correction is executed and the correction time must be satisfied. For example, the revision will be postponed in preparation for the next revision decision. (4) Processing in the equipment information editing unit 7
【0045】蓄熱プラントの設備諸元や設備構成に関す
る情報は、入力部を介して設備情報編集部7により編集
され、設備データ記憶部10に設備データとして格納さ
れる。Information relating to equipment specifications and equipment configuration of the heat storage plant is edited by the equipment information editing unit 7 via the input unit and stored in the equipment data storage unit 10 as equipment data.
【0046】また、最近の設備データは、蓄熱プラント
を運用していく際に諸元や構成に変更の可能性のある設
備の情報を運転計画作成部13が利用し易い形に展開し
て格納する。以下に蓄熱槽と熱源機器を例にその展開の
仕方について説明する。As the recent equipment data, information about the equipment whose specifications and configuration may be changed when the heat storage plant is operated is developed and stored in a form that the operation plan creation unit 13 can easily use. To do. The following describes how to develop the heat storage tank and heat source equipment as an example.
【0047】需要家の熱需要量は季節に大きく依存し、
夏には大量の冷水を必要とし、冬は温水を多く使用す
る。このような需要量の変化に対応するため、多くの蓄
熱プラントでは複数の蓄熱槽を備えており、需要量に応
じて冷水蓄熱用の蓄熱槽と温水蓄熱用の蓄熱槽の数を調
整している。これら1つ1つの蓄熱槽を運転計画作成部
13に直接管理させると、季節の変わり目で蓄熱槽の割
当数に変化が生じたときに、運転計画作成の処理を変更
する必要が生じる。The heat demand of the customer greatly depends on the season,
A lot of cold water is needed in summer, and a lot of hot water is used in winter. In order to respond to such changes in demand, many heat storage plants are equipped with multiple heat storage tanks, and the number of heat storage tanks for cold water heat storage and hot water heat storage tanks is adjusted according to the demand. There is. If the operation plan creation unit 13 manages each of these heat storage tanks directly, it becomes necessary to change the operation plan creation process when the number of allocated heat storage tanks changes at the turn of the season.
【0048】これを回避するため、設備情報編集部7は
蓄熱プラントに依存する物理的な蓄熱槽から熱種別毎の
論理的な蓄熱槽を生成する。即ち、冷水蓄熱用に用いら
れているすべての蓄熱槽の諸元を統合し、あたかも一つ
の冷水槽が存在しているかのような論理的冷水槽データ
を生成する。論理的温水槽データを同様に作成すること
により、運転計画作成部13は常に冷水槽1つ、温水槽
1つとみなして運転計画を作成することができる。In order to avoid this, the equipment information editing unit 7 generates a logical heat storage tank for each heat type from a physical heat storage tank that depends on the heat storage plant. That is, the specifications of all heat storage tanks used for cold water heat storage are integrated to generate logical cold water tank data as if one cold water tank exists. By similarly creating the logical hot water tank data, the operation plan creating unit 13 can always consider one cold water tank and one hot water tank to create an operation plan.
【0049】1台の熱源機器を季節によって冷水製造用
としたり、温水製造用としたりすることができる。ま
た、熱回収型のヒートポンプは冷水と温水を同時に製造
できるが、熱回収運転を行なわなければ冷水のみを製造
することになる。このように熱源機器はその運転の仕方
によって一時に製造できる熱の種類が異なる。One heat source device can be used for cold water production or hot water production depending on the season. Further, the heat recovery type heat pump can produce cold water and hot water at the same time, but if the heat recovery operation is not performed, only cold water is produced. As described above, the heat source device has different types of heat that can be produced at one time depending on how it is operated.
【0050】通常、製造できる熱の種類を「モード」と
呼んで、冷水モード、温水モード、熱回収モードとして
いる。設備情報編集部7では、1つの熱源機器の諸元か
らその熱源機器が持ち得るモードを調べ、モード別に論
理的な熱源機器データを作成し、現在のプラント状態で
はどのモードが利用可能であるかの情報を付加して設備
情報データ記憶部に格納する。運転計画作成部13は、
現在作成可能な論理熱源機器を用いて運転計画を作成す
るので、モードの変更が生じたときは設備情報編集部7
により現在利用可能なモードの種類を変更するだけで、
運転計画作成処理を変更することなく、新たなモードに
おける熱源機器の運転計画を作成することができる。Normally, the types of heat that can be produced are called "modes", which are a cold water mode, a hot water mode, and a heat recovery mode. The facility information editing unit 7 checks the modes that one heat source device can have from the specifications of one heat source device, creates logical heat source device data for each mode, and which mode is available in the current plant state. Information is added and stored in the facility information data storage unit. The operation plan creation unit 13
Since the operation plan is created using the logical heat source device that can be created at present, when the mode is changed, the equipment information editing unit 7
By simply changing the type of mode currently available,
It is possible to create an operation plan of the heat source device in the new mode without changing the operation plan creation process.
【0051】このように設備の利用形態や構成が変化し
ても運転計画作成処理をなんら変更することなく、新し
いプラント構成に沿った運転計画を作成できるばかりで
なく、蓄熱プラントが熱を供給している需要家の熱消費
パターンが大きく変化し、新たな熱源機器を追加しない
と賄いきれなくなったときに、新たに追加する熱源の諸
元(機器種別、熱生産能力、消費電力等)と追加後のプ
ラントの構成(熱源と蓄熱槽の接続関係等)を入力する
ことにより、運転計画作成のための処理をなんら変更す
ることなく、新しいプラント構成における熱源機器の運
転計画を作成することができる。As described above, even if the usage pattern or configuration of the equipment changes, the operation plan creation process can be made without any change and the operation plan can be created in accordance with the new plant configuration, and the heat storage plant supplies heat. When the heat consumption pattern of existing consumers has changed significantly and cannot be covered without adding new heat source equipment, the specifications of the new heat source (apparatus type, heat production capacity, power consumption, etc.) are added. By inputting the configuration of the subsequent plant (connection relationship between heat source and heat storage tank, etc.), it is possible to create the operation plan of the heat source equipment in the new plant configuration without changing the process for creating the operation plan. .
【0052】また、蓄熱プラントを新設するときにも、
運転計画作成部13を始めから作り直す必要がなく、新
設設備の設備の諸元とプラント構成を入力するだけで運
転計画を作成することができる。When a new heat storage plant is installed,
It is not necessary to recreate the operation plan creation unit 13 from the beginning, and the operation plan can be created by only inputting the specifications of the new facility and the plant configuration.
【0053】以上は、熱源機器の運転制御装置の各主要
部の作用説明であるが、特に本発明では熱負荷予測値と
現在の蓄熱量、蓄熱槽容量、熱源機器の熱生産能力を用
いて現在時刻以後の熱源機器の運転計画作成部13とは
別途に設備構成の変更に関する情報を受取ると、これを
設備構成データに変更して設備データ記憶部10に格納
し、この設備データ記憶部10に格納された変更後の設
備構成データを運転計画作成部13に与えるようにした
ことにある。したがって、蓄熱プラントの設備の諸元に
変更があったり、蓄熱プラントの構成に変更が生じたり
しても、これらの情報が運転計画作成部13から分離独
立して管理されるため、運転計画作成部13の処理には
何ら手を加えることなく、変更後のプラント構成におけ
る熱源機器の運転計画の作成、プラントの監視が可能と
なる。なお、本発明は熱源機器だけでなく、供給系統の
バルブや送水ポンプ等の制御にも適用可能である。The above is a description of the operation of each main part of the operation control device of the heat source device. In particular, in the present invention, the predicted heat load value, the current heat storage amount, the heat storage tank capacity, and the heat production capacity of the heat source device are used. When the information about the change of the equipment configuration is received separately from the operation plan creation unit 13 of the heat source device after the current time, the information is changed to the equipment configuration data and stored in the equipment data storage unit 10. This is because the changed equipment configuration data stored in (3) is given to the operation plan creation unit 13. Therefore, even if the specifications of the equipment of the heat storage plant are changed or the configuration of the heat storage plant is changed, these pieces of information are managed separately from the operation plan creation unit 13, so that the operation plan creation is performed. It is possible to create an operation plan of the heat source device and monitor the plant in the changed plant configuration without any modification to the processing of the unit 13. The present invention can be applied not only to the heat source device but also to the control of the valve of the supply system, the water pump, and the like.
【0054】[0054]
【発明の効果】以上述べたように本発明によれば、蓄熱
プラントの設備に関する情報が運転計画作成部から分離
独立して管理されるようにしたので、設備の諸元に変更
があったり、蓄熱プラントの構成に変更が生じたりして
も、運転計画作成部の処理には何等手を加えること無く
変更後のプラント構成における熱源機器の運転計画の作
成、プラントの監視を行うことができる熱源機器の運転
制御装置を提供できる。As described above, according to the present invention, the information about the equipment of the heat storage plant is managed separately from the operation plan creation unit, so that the specifications of the equipment may be changed, Even if there is a change in the configuration of the heat storage plant, a heat source that can create an operation plan for the heat source equipment in the changed plant configuration and monitor the plant without any modification to the processing of the operation plan creation unit An operation control device for equipment can be provided.
【図1】本発明による熱源機器の運転制御装置の一実施
例を示すブロック構成図。FIG. 1 is a block diagram showing an embodiment of an operation control device for heat source equipment according to the present invention.
【図2】同実施例における監視部の処理を示すフローチ
ャート。FIG. 2 is a flowchart showing processing of a monitoring unit in the same embodiment.
【図3】図2に続くフローチャート。FIG. 3 is a flowchart following FIG. 2;
【図4】同実施例における運転計画作成部の予定の時刻
に起動された時の処理を示すフローチャート。FIG. 4 is a flowchart showing a process when the operation plan creation unit is activated at a scheduled time in the embodiment.
【図5】同じく運転計画作成部の修正要求があったとき
の全体の処理を示すフローチャート。FIG. 5 is a flowchart showing the entire processing when there is a correction request from the operation plan creation unit.
【図6】図5の故障不動作対応の処理ステップを詳細に
示すフローチャート。FIG. 6 is a flowchart showing in detail the processing steps corresponding to the failure / non-operation of FIG. 5;
【図7】図5の蓄熱量異常対応の処理ステップを詳細に
示すフローチャート。FIG. 7 is a flowchart showing in detail the processing steps for coping with the heat storage amount abnormality in FIG.
【図8】図5の蓄熱不具合解消の処理ステップを詳細に
示すフローチャート。FIG. 8 is a flowchart showing in detail the processing steps for solving the heat storage problem of FIG.
【図9】図5の修正実施判断の処理ステップを詳細に示
すフローチャート。9 is a flowchart showing in detail the processing steps of the correction execution determination of FIG.
【図10】従来の蓄熱冷暖房装置の運転制御装置の構成
例を示すブロック図。FIG. 10 is a block diagram showing a configuration example of an operation control device of a conventional heat storage cooling / heating device.
1……入力装置、2……出力装置、3……マンマシン入
力部、4……マンマシン出力部、5……気象情報記憶
部、6……カレンダ、7……設備情報編集部、8……負
荷予測部、9……負荷予測値記憶部、10……設備デー
タ記憶部、11……プロセス値記憶部、12……監視
部、13……運転計画作成部、14……運転計画記憶
部、15……入力部、16……出力部、17……熱源機
器運転制御装置、18……熱源機器制御装置、19……
蓄熱プラント。1 ... Input device, 2 ... Output device, 3 ... Man-machine input unit, 4 ... Man-machine output unit, 5 ... Weather information storage unit, 6 ... Calendar, 7 ... Facility information editing unit, 8 …… Load prediction unit, 9 …… Load prediction value storage unit, 10 …… Facilities data storage unit, 11 …… Process value storage unit, 12 …… Monitoring unit, 13 …… Operation plan creation unit, 14 …… Operation plan Storage unit, 15 ... Input unit, 16 ... Output unit, 17 ... Heat source device operation control device, 18 ... Heat source device control device, 19 ...
Heat storage plant.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 大林 正樹 東京都千代田区内幸町一丁目1番3号 東京電力株式会社内 (72)発明者 石田 哲郎 東京都千代田区内幸町一丁目1番3号 東京電力株式会社内 (72)発明者 高良 理 東京都府中市東芝町1番地 株式会社東 芝府中工場内 (72)発明者 荒川 卓也 東京都府中市東芝町1番地 株式会社東 芝府中工場内 (72)発明者 野坂 孝雄 東京都府中市東芝町1番地 株式会社東 芝府中工場内 (56)参考文献 特開 平1−137145(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Masaki Obayashi 1-3-3 Uchisaiwaicho, Chiyoda-ku, Tokyo Tokyo Electric Power Company, Inc. (72) Tetsuro Ishida 1-3-1 Uchisaiwaicho, Chiyoda-ku, Tokyo TEPCO Incorporated (72) Inventor Osamu Takara 1st in Toshiba Fuchu, Fuchu, Tokyo (72) Inventor Takuya Arakawa 1st in Toshiba Fuchu, Tokyo Fuchu, Ltd. (72) Inventor Takao Nosaka 1 Toshiba Town, Fuchu-shi, Tokyo Inside Toshiba Fuchu Factory (56) Reference JP-A-1-137145 (JP, A)
Claims (1)
集し、且つ蓄熱プラントにおける熱源機器の発停を制御
する熱源機器制御装置に運転計画データを与えて熱源機
器を運転制御する運転制御装置において、 気温等の気象情報やプラントの設備構成等の情報を入力
するマンマシン入力手段と、前記熱源機器制御装置に収
集されたプロセス量を入力しデータ処理に必要なプロセ
スデータに変換する入力手段と、この入力手段により取
込まれたプロセスデータおよび前記マンマシン入力手段
より入力される気象情報に基づいて予定時間先までの負
荷を予測する負荷予測手段と、前記入力手段より取込ま
れるプロセスデータを監視して前記熱源機器の現在の運
転計画と比較することにより熱の安定供給および前記蓄
熱プラントの運用効率の程度を判定し必要に応じて計画
修正を要求可能な監視手段と、前記マンマシン入力手段
より入力されるプラントの設備構成等の情報から設備情
報を作成する設備情報編集手段と、この設備情報編集手
段により作成された設備情報を格納する設備データ記憶
手段と、予め定められた時刻または前記監視手段によっ
て計画修正の要求を受けると、前記負荷予測手段で予測
された負荷予測値、前記入力手段で取込まれたプロセス
データ、前記設備データ記憶手段に格納された設備情報
および現状の運転計画を用いて予定時間先までの熱源機
器の運転計画を作成する運転計画作成手段と、この運転
計画作成手段で作成された運転計画を前記熱源機器制御
装置に出力する出力手段とを備え、前記設備情報編集手段は、入力された情報のうち、前記
蓄熱槽については、複数の蓄熱槽に関する諸元を統合し
てそれぞれ一つの論理的温水蓄熱槽データ及び論理的冷
水蓄熱槽データを作成し、また複数の熱源機器について
は、それらの諸元から各熱源機器が果たし得る冷水モー
ド・温水モード等のモードを調べ、各熱源機器毎にモー
ド別の論理的な熱源機器データを作成し、これら論理的
な熱源機器データ毎に、プラント状態に対応してどのモ
ードが適用可能かの情報を付加し、これらの各作成デー
タを前記設備データ記憶手段に格納させる機能を有する
ことを特徴とする熱源機器の運転制御装置。1. An operation control device for collecting and controlling a process amount of a heat source plant for cooling and heating, and giving operation plan data to a heat source device control device for controlling start / stop of a heat source device in a heat storage plant to control the operation of the heat source device, Man-machine input means for inputting weather information such as air temperature and information such as plant equipment configuration, and input means for inputting the process amount collected in the heat source equipment control device and converting it into process data necessary for data processing, Load predicting means for predicting the load up to the scheduled time based on the process data taken in by this input means and the weather information inputted by the man-machine input means, and the process data taken in by the input means are monitored. Then, by comparing with the current operation plan of the heat source equipment, the stable supply of heat and the degree of operation efficiency of the heat storage plant can be determined. Monitoring means capable of requesting a plan correction as required, equipment information editing means for creating equipment information from information such as plant equipment configuration input from the man-machine input means, and this equipment information editing means A facility data storage means for storing the created facility information, and a load forecast value predicted by the load forecasting means when the request for plan revision is received by a predetermined time or the monitoring means, and is loaded by the input means. The operation plan creation means for creating an operation plan of the heat source equipment up to the scheduled time using the stored process data, the equipment information stored in the equipment data storage means and the current operation plan, and the operation plan creation means. Output means for outputting the operation plan to the heat source device control device, the facility information editing means, among the input information, the
Regarding the heat storage tank, the specifications for multiple heat storage tanks are integrated.
One logical hot water storage tank data and one logical cold
Create water storage tank data, and also for multiple heat source devices
From these specifications, the cold water mode that each heat source device can play is
Check the mode such as the hot / hot water mode and select the mode for each heat source device.
Create logical heat source device data for each
For each heat source device data, which model
Information on the applicability of the
A heat source device operation control device having a function of storing data in the facility data storage means .
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3247238A JP2501981B2 (en) | 1991-09-26 | 1991-09-26 | Operation control device for heat source equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3247238A JP2501981B2 (en) | 1991-09-26 | 1991-09-26 | Operation control device for heat source equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0588713A JPH0588713A (en) | 1993-04-09 |
| JP2501981B2 true JP2501981B2 (en) | 1996-05-29 |
Family
ID=17160511
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP3247238A Expired - Fee Related JP2501981B2 (en) | 1991-09-26 | 1991-09-26 | Operation control device for heat source equipment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2501981B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3523793B2 (en) | 1998-10-21 | 2004-04-26 | 株式会社東芝 | Plant control device |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH09112999A (en) * | 1995-10-19 | 1997-05-02 | Toshiba Corp | Operation planning device for heat source equipment |
| JP2016067125A (en) * | 2014-09-25 | 2016-04-28 | 株式会社日立製作所 | Energy equipment operation controller and energy equipment operation control method |
| JP7118270B2 (en) * | 2019-06-21 | 2022-08-15 | 三菱電機株式会社 | Air-conditioning system control device, air-conditioning system control method, and air-conditioning system |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS60251336A (en) * | 1984-05-25 | 1985-12-12 | Hitachi Ltd | Optimum control of heat accumulating tank |
| JPS63286645A (en) * | 1987-05-20 | 1988-11-24 | Matsushita Seiko Co Ltd | Controller for power source apparatus |
| JPH07111263B2 (en) * | 1987-11-24 | 1995-11-29 | 伊藤忠商事株式会社 | Optimal operation information output processing method for heat source equipment in buildings |
-
1991
- 1991-09-26 JP JP3247238A patent/JP2501981B2/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3523793B2 (en) | 1998-10-21 | 2004-04-26 | 株式会社東芝 | Plant control device |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0588713A (en) | 1993-04-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20260038060A1 (en) | Methods and systems for meeting rapidly fluctuating power demands using interruptible load and stable power production | |
| US8219439B2 (en) | Electric-power-generating-facility operation management support system, electric-power-generating-facility operation management support method, and program for executing operation management support method on computer | |
| US5481140A (en) | Demand control apparatus and power distribution control system | |
| Paridari et al. | Flexibility prediction, scheduling and control of aggregated TCLs | |
| EP1924896B1 (en) | Predictive contract system and method | |
| JP6108333B2 (en) | Operation management device, operation management method, operation management program | |
| JP2501981B2 (en) | Operation control device for heat source equipment | |
| JP3299531B2 (en) | Power plant | |
| JP2010226865A (en) | General schedule calculation system for multiple power generation shafts and general schedule calculation method | |
| JP3974294B2 (en) | Water and sewage monitoring and control system | |
| JP2909275B2 (en) | Heat source prediction controller | |
| JP2001273008A (en) | Optimal operation control system of cogeneration plant | |
| JP4179293B2 (en) | Generator operation plan creation device and generator operation plan creation program | |
| Vardanyan et al. | Hydropower bidding strategies to day-ahead and real-time markets: different approaches | |
| JP3187118B2 (en) | Heat source equipment operation controller | |
| CN120069210A (en) | Pumped storage unit capacity planning method and device | |
| JPH06313605A (en) | Operation control method and apparatus for heat source device | |
| Uraikul et al. | A mixed-integer optimization model for compressor selection in natural gas pipeline network system operations | |
| JP2501263B2 (en) | Heat load prediction device | |
| AU2007202560B2 (en) | Electric-power-generating-facility operation management support system, electric-power-generating-facility operation management support method, and program for executing operation management support method on computer | |
| JPH07110147A (en) | Driving support equipment for heat manufacturing and heat storage facilities | |
| Musgrave et al. | A Receding Horizon Reinforcement Learning Framework for Campus Chiller Energy Management-A case study from an Australian University | |
| JP6606000B2 (en) | Water operation planning system and water operation planning method | |
| OLSON et al. | A dynamic procedure for the optimal sequencing of plant equipment part I: algorithm fundamentals | |
| Giles et al. | An Introduction to Optimization-Based AGC |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |