JP2700326B2 - Repair method for lining of pipe inner surface - Google Patents
[go: Go Back, main page]

JP2700326B2 - Repair method for lining of pipe inner surface - Google Patents

Repair method for lining of pipe inner surface

Info

Publication number
JP2700326B2
JP2700326B2 JP63142504A JP14250488A JP2700326B2 JP 2700326 B2 JP2700326 B2 JP 2700326B2 JP 63142504 A JP63142504 A JP 63142504A JP 14250488 A JP14250488 A JP 14250488A JP 2700326 B2 JP2700326 B2 JP 2700326B2
Authority
JP
Japan
Prior art keywords
resin
pipe
lining
pressurized gas
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP63142504A
Other languages
Japanese (ja)
Other versions
JPH01310776A (en
Inventor
基之 古賀
宣勝 池
Original Assignee
株式会社ハツコー
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ハツコー filed Critical 株式会社ハツコー
Priority to JP63142504A priority Critical patent/JP2700326B2/en
Publication of JPH01310776A publication Critical patent/JPH01310776A/en
Application granted granted Critical
Publication of JP2700326B2 publication Critical patent/JP2700326B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Coating Apparatus (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION 【産業上の利用分野】[Industrial applications]

本発明は、地下に布設されたガス管,水道管などの既
設配管で、特に、本管あるいは支管と称せられる既設配
管に対し、その管内面に、布設状態のままで均一な樹脂
のライニングを施す管内面のライニング補修工法に関す
るものである。
The present invention relates to existing pipes such as gas pipes and water pipes laid underground, and in particular, to existing pipes referred to as main pipes or branch pipes, on the inner surface of the pipes, uniform resin lining as laid. It relates to a lining repair method for the inner surface of a pipe to be applied.

【従来の技術】[Prior art]

一般に、ガス管,水道管などの地下に布設されている
既設配管は、経年によって、管に腐蝕孔や継手部の弛み
が生じて、漏洩が起るおそれがあることから、その漏洩
予防,保全のため、施工後、所要の時期に、上記既設配
管に対し、その布設状態のまま管内面に対する樹脂ライ
ニングによる補修が行なわれている。 そこで、特開昭63−65983号公報所載のように、既設
配管の一端側の管内に液状樹脂をプラグ状に充填し、所
要の加圧気体でこの樹脂団を移動させながら、管内面に
所要の膜厚のライニングを行なう管内面のライニング補
修工法が提唱された。ここでは、開放された既設配管の
一端にランチャを接続し、上記ランチャに接続された樹
脂タンクからライニング用の樹脂を充填してランチャ内
に樹脂団を形成し、これをランチャの自由端側から供給
した加圧気体で既設配管内へ供給している。そして、既
設配管内で上記加圧気体による圧力で樹脂団が流動し
て、管内面のライニングに樹脂が消費されると、再び樹
脂タンクからランチャに樹脂を充填し、ランチャ内に樹
脂団を形成し、再び加圧気体で既設配管内へ供給する。
このような作業を繰返して所定長さについて、上記既設
配管の管内面補修を行なうのである。
Generally, existing pipes laid underground, such as gas pipes and water pipes, are likely to leak due to corrosion holes and loosened joints due to aging. Therefore, at a required time after the construction, the existing pipe is repaired by resin lining on the inner surface of the pipe in the laid state. Therefore, as described in JP-A-63-65983, a liquid resin is filled into a pipe at one end of an existing pipe in a plug shape, and the resin group is moved by a required pressurized gas, and the inner surface of the pipe is moved. A lining repair method for the inner surface of the pipe to provide the required lining thickness was proposed. Here, a launcher is connected to one end of an existing pipe that has been opened, and a resin tank is filled with a resin for lining from a resin tank connected to the launcher to form a resin group in the launcher. The supplied pressurized gas is supplied into the existing piping. Then, the resin group flows under the pressure of the pressurized gas in the existing pipe, and when the resin is consumed by the lining of the pipe inner surface, the resin is again filled into the launcher from the resin tank to form the resin group in the launcher. Then, the pressurized gas is supplied again into the existing pipe.
By repeating such operations, the inner surface of the existing pipe is repaired for a predetermined length.

【発明が解決しようとする課題】[Problems to be solved by the invention]

ここで問題になるのは、既設配管に対して1回に充填
し得る樹脂団の量に実質的な制限があることである。こ
れは、ライニングに用いられる樹脂粘度,チクソトロピ
ー性,ライニング膜厚,加圧気体の圧力値の限界などで
定まる。しかも、次回からの充填で既設配管内にもたら
された樹脂団はライン圧が終了した位置まで送る間、ラ
イニングの時と同じ樹脂速度を維持しなければならな
い。このため、最初の樹脂ライニングに要する時間はt1
であっても、次回はt1+t1=2t1,3回目はt1+t1+t1=3
t1・・・のように、充填回数が増す毎に、所要時間を等
差級数的に増大させるので、結局、所要の補修区間のラ
イニング完成までに要する時間Tは、 T=(n2+n)/2・t1である。 (但し、nはこの間におけるライニング樹脂の充填回
数である) 本発明は、上記事情にもとづいてなされたもので、予
定された補修区間で樹脂団が移動し、ライニングのため
に樹脂が消費される過程で上記樹脂団への樹脂の充填を
行なうことで、加圧気体による樹脂団の押圧移動を継続
することにより、ライニングに要する作業時間を大幅に
低減できるようにした管内面のライニング補修工法を提
供しようとするものである。
The problem here is that there is a substantial limit on the amount of resin group that can be filled into the existing piping at one time. This is determined by the viscosity of the resin used for the lining, the thixotropy, the thickness of the lining, and the limit of the pressure value of the pressurized gas. In addition, the resin group brought into the existing pipe by the next filling must maintain the same resin speed as that at the time of lining, while sending it to the position where the line pressure is finished. Therefore, the time required for the first resin lining is t 1
However, the next time t 1 + t 1 = 2t 1 , the third time t 1 + t 1 + t 1 = 3
Since the required time is increased by an arithmetic progression every time the number of times of filling is increased as in t 1 ..., the time T required to complete the lining of the required repair section is T = (n 2 + n) ) is a / 2 · t 1. (However, n is the number of times the lining resin is filled during this period) The present invention has been made based on the above circumstances, and the resin group moves in a scheduled repair section, and the resin is consumed for lining. By filling the resin group with the resin in the process, the pressing movement of the resin group by the pressurized gas is continued, so that the lining repair method for the inner surface of the pipe which can greatly reduce the working time required for the lining is described. It is something to offer.

【課題を解決するための手段】[Means for Solving the Problems]

このため、本発明では、管内にプラグ状の液状樹脂団
を充填し、該樹脂団の一方側から所要の加圧気体を供給
して該樹脂団を移動させる過程で管内面に膜厚のライニ
ングを行なう管内面のライニング補修工法において、ラ
イニングを行なう既設配管の一端開口部より上記樹脂団
の充填および加圧気体の供給を行なうと共に、ライニン
グについて上記樹脂団の移動中、樹脂の消費される状況
に対応して、上記既設配管より分岐されている分岐管よ
り樹脂の充填を行ないながら加圧気体による樹脂団の押
圧移動を継続するのである。
For this reason, in the present invention, in the process of filling the tube with a plug-shaped liquid resin group and supplying the required pressurized gas from one side of the resin group to move the resin group, a lining with a film thickness is formed on the inner surface of the tube. In the lining repair method on the inner surface of the pipe, the filling of the resin group and the supply of pressurized gas are performed from one end opening of the existing pipe to be lined, and the resin is consumed during the movement of the resin group with respect to the lining. In response to the above, while the resin is filled from the branch pipe branched from the existing pipe, the pressing movement of the resin group by the pressurized gas is continued.

【作用】[Action]

したがって、既設配管へ、一端開口部から最初の樹脂
団の充填がなされてから加圧気体による樹脂団の押圧移
動をはじめると、樹脂がその過程で補充されるので、樹
脂団が消耗して加圧気体が既設配管内で吹き抜けるまで
の時間,距離が大幅に延長され、再び一端開口部から樹
脂団を充填して、再度加圧気体による樹脂団の送り込み
に要する無駄時間が大幅に節減できる。そして、最も効
果的なのは、分岐管からの樹脂団の補充を具合よく行な
うことで、1つの補修区間を一気にライニングすること
である。このようにして、ライニング作業時間の大幅な
短縮が実現できる。また、加圧気体の吹き抜けによるロ
スも減少あるいは回避できる。
Therefore, when the existing pipe is filled with the first resin group from one end opening and then the resin group starts to be pressed and moved by the pressurized gas, the resin is replenished in the process, and the resin group is consumed and added. The time and the distance until the pressurized gas blows through the existing pipe can be greatly extended, and the resin group can be filled again from one end opening, and the waste time required for feeding the resin group again by the pressurized gas can be greatly reduced. The most effective method is to replenish the resin group from the branch pipe in a convenient manner, thereby lining one repair section at a stretch. In this way, the lining operation time can be significantly reduced. Further, the loss due to blow-through of the pressurized gas can be reduced or avoided.

【実施例】【Example】

以下、本発明の一実施例を図面を参照して具体的に説
明する。 図において、符号1は本発明の補修工法において使用
される樹脂供給装置であり、2は上記樹脂供給装置1で
既設配管の補修箇所へ供給したライニング樹脂を加圧気
体(例えば加圧空気)で流動させる時に用いる加圧気体
供給装置である。 上記樹脂供給装置1は、樹脂注入器3と、上記樹脂注
入器3の底部に連通する供給管4と、上記供給管4に電
磁開閉弁5を介して連通するランチャ6とを具備してお
り、上記電磁開閉弁5が開放されている時、上記樹脂注
入器3内のライニング樹脂を上記ランチャ6に供給,充
填し、上記ランチャ6内に樹脂団Eを形成するのであ
る。上記樹脂注入器3にはプランジャ3aが設けてあり、
また、頂部には、後述のような手段で、加圧気体が供給
されるようになっていて、樹脂の押出しができるように
してある。 このランチャ6に充填されるライニング用樹脂は、例
えば主剤と硬化剤とを調合した常温2液硬化型の樹脂で
あり、このうち主剤は不飽和ポリエステル樹脂,ビニル
エステル樹脂,エポキシ樹脂、ウレタン樹脂などを主成
分とした組成物であり、これに顔料,揺変剤などを添加
してチクソトロピー性を有している(例えば250,000〜3
00,000cpsでTI値が6)。 一方、上記加圧気体供給装置2は、コンプレッサ7、
エアタンク8,流量調整弁9,10および上記ランチャ6の端
に接続される気体供給管11に電磁開閉弁12を取付けたも
ので、各流量調整弁9,10に対応して流量計13,14および
圧力計15,16を具備している。更に要すれば、三方切換
弁17を上記コンプレッサ7の出口側に設けて、加圧気体
を管路18へ分岐できるようにしてあり、上記管路18およ
び流量調整弁19を介して上述の樹脂注入器3の頂部に連
通させている。 上記流量計13,14、圧力計15,16からの出力情報を受け
て、所要のプログラムに従って演算を行い、上記流量調
整弁9,10を調節制御するコントロールユニット20が、上
記加圧気体供給装置2に設けてある。 上記コントロールユニット20では、流量調整弁19の開
度調節と、電磁開閉弁5の開放時間から、ランチャ6へ
の充填樹脂量を演算し、メモリに記憶すると共に、電磁
開閉弁5の開放時間、その後の時々刻々の流量計13,14
および圧力計15,16の出力情報とから、予め定めた膜厚
での樹脂ライニングを達成するための樹脂流量速度Vを
算出し、維持するように流量調整弁9,10の開度を制御す
る働きをする。 一方、本発明でライニング補修すべき既設配管は、地
下埋設の支管A(あるいは本管)および一端を地上に突
出されてメータ類に接続される供内管Bであり、上記供
内管Bは上記支管Aから分岐されている。 そして、ライニング補修は先づ供内管Bについて行な
われ、次いで支管Aについて行なわれるが、それに先立
って、次のような補修のための準備がなされる。すなわ
ち支管Aについては、所定長さの補修区間に区切って、
その両端を開放するため、対応する個所に、第2図に示
すような立坑C,Dを形成し、そこで支管Aの端を切断に
よって開放する。更に、この支管Aに連通する供内管B
については、メータ類を取外し、地上端を開放する。そ
して、支管Aおよび供内管Bに圧力空気を通して内部の
塵埃を除去する。 しかして、先づ、供内管Bの開放端にランチャ6を接
続し、電磁開閉弁5を開いて、樹脂注入器3から加圧気
体でライニング樹脂をランチャ6内に供給,充填し、樹
脂団を形成する。そして、電磁開閉弁5を閉じ、電磁開
閉弁12の開放で、調圧された加圧気体を上記ランチャ6
を介して上記樹脂団に供給し、これを流動させて、上記
供内管Bへと送り、管内面に対して所定厚さのライニン
グ膜を形成するのである。 この時、コントロールユニット20では、樹脂の流量調
整弁9,10の開度調節がなされる。 この場合、上記コントロールユニット20の演算基礎は
下記の算式に依存している。 まず、供内管Bに流入した加圧気体の量Q1,圧力P
1(例えば0.6kg/cm2)とすれば、 π/4・D2・l1・P1=Q1・P0 ……(1) の関係にあるので、加圧気体による樹脂団の送り開始の
時刻T1におけるQ1,P0,P1を測定すれば、(1)式よりl1
を知ることができる。なお、ここで、供内管Bに流入し
た気体の量Q1とは流量計13,14の各計測値F1およびF2
差で得られる。この場合、上記流量計13,14に質量流量
計を使用すると、気体の温度の影響がないので、演算し
易い、また、ここでl1は時刻T1における樹脂団の位置、
P0,P1は圧力計15,16の計測値、Dは上記供内管Bのライ
ニング内径である。 同様にして、時刻T2における圧力P2および流入量Q2
計測し、演算して得られる樹脂団の位置をl2とすれば、
樹脂団の流動速度Vは、 V=Δl/Δtとなる。 但し、Δl=l2−l1であり、Δt=T2−T1とする。 したがって、所定時間間隔Δtをコントロールユニッ
ト20内の発振器のクロックで設定し、その都度、流量計
13,14から管内に流入した流入気体量を、また、圧力計1
5,16からそれぞれの圧力を計測し、各瞬時の樹脂流動速
度Vが一定の所定値に保持されるように、流量調整弁9,
10を制御するのである。 供給管B内では、樹脂団の長さは管内面へのライニン
グに消費されるために減少するが、コントロールユニッ
ト20では時間経過に従って消費される樹脂量の演算をし
ており、これに対応して押圧気体の圧力を略直線的に降
下する(第4図参照)ので、樹脂団の流動速度は一定の
値に保持できる。 供内管Bの内面の樹脂ライニングが管の全長にわたっ
て完了しないうちに樹脂団の樹脂が消費されてしまう
と、その時点で、樹脂団を押圧していた加圧気体は供内
管Bを吹き抜け、支管Aの大気圧まで降下してしまう。
このような圧力の変化は急激に起るので、これをコント
ロールユニット20側でチェックして、今回の樹脂ライニ
ング分についての終了と判定し、この時まで供内管Bに
供給した気体の流入量Q,樹脂ライニングが終了した位置
までの長さl,経過時間t0などをメモリに記憶し、電磁開
閉弁12を閉じる。次いで、上記コントロールユニット20
では、電磁開閉弁5,流量調整弁19を開き、樹脂注入器3
からライニング樹脂をランチャ6内に供給,充填して所
定量の樹脂団をランチャ6内に形成する。そして、上記
電磁開閉弁5,流量調整弁19を閉じ、電磁開閉弁12を開放
して、再び前述と同様に樹脂団Eを速度Vにコントロー
ルしながら、供内管Bをライニングする。 このとき、ライニング樹脂団Eが、前回ライニングし
てある領域を通過する間は、速度Vが維持されている限
り、樹脂団の長さ,換言すれば樹脂量は変化しないの
で、コントロールユニット20によって制御される押圧気
体の圧力も略一定値に保持される。しかして、樹脂団E
が供内管Bの未だライニングされていない位置に到達し
た後は、前述と同様にライニングにより樹脂が消費さ
れ、樹脂団Eの長さが減少し、したがって、押圧気体の
圧力も漸次低下しながらライニングが進行される。そし
て、樹脂団長が略0になり、押圧気体が吹き抜けて大気
圧まで降下するまでの経過時間は略2t0となり、また、
ライニングの終了位置までの長さも略2lとなる。 このようにして、樹脂の充填と、加圧気体による樹脂
団の押圧で、ライニングを繰返しながら逐次ライニング
長を延長してゆく。 供内管Bのライニングが終了し、樹脂団の長さがまだ
残ったまま支管Aとの接続部(分岐個所)に到達する
と、樹脂団Eは支管A内に流入し、上記樹脂団Eを押圧
していた加圧気体は支管A内に吹き抜ける。このため、
圧力計16の計測値は急激に降下し、略々大気圧になる。
これをコントロールユニット20で判定する。これは予想
される経過時間(n×t)(ここでnは樹脂の充填回
数,tは1回の樹脂団のライニング完了までの時間長)よ
りも短い(n−1)t+t′(但しt′<t)で、上記
のような急激な圧力降下をもたらしたか否かで判断され
る。即ち、押圧力の急激な低下,実経過時間と予測経過
時間との差から、樹脂団が支管A内に到達したとの判定
がなされ、該当する供給管Bについてのライニング補修
を終了するのである。 なお、t′≒tの場合には、測定誤差の問題もあるの
で、更に1回分の樹脂を充填して支管Aへの到達までの
時間を計測するとよい。この誤差範囲は、コントロール
ユニット20で予め設定して置くとよい。即ち、コントロ
ールユニット20は、誤差範囲にあれば再度の樹脂充填を
指令し、誤差範囲になれば終了の指令を出力する。 なお、コントロールユニット20では、供内管Bから支
管A内に吐出された残置樹脂量およびそれまでの時間を
メモリに記憶しており、上記残置樹脂量について支管A
のライニングに際して、その分岐個所(支管A内におけ
る供内管Bとの接続個所)に樹脂団が到達した時、残置
樹脂量を加えた樹脂団の長さに補正する演算を行なう。 このようにして、供内管Bについての樹脂ライニング
を順次行なった後、第5図に示すように、供内管Bの開
放端にカートリッジ式の充填筒21を接続し、これに、流
量調整弁22を介して圧縮空気などの加圧気体のボンベ23
を接続する。上記充填筒21には、予め所定量のライニン
グ樹脂団が充填してあり、流量調整弁22が開放された
時、の開度に応じた加圧気体の圧力で供内管B内に上記
樹脂団を送り込むようになっている。上記流量調整弁22
と上記充填筒21との間には、質量式流量計24および圧力
計25が設けられ、また、大気に連通する絞り弁26が設け
られていて、上記流量計24,圧力計25からは上記コント
ロールユニット20に情報を与えられるようになってい
る。また、上記コントロールユニット20は、上記流量調
整弁22および絞り弁26の開閉および開度調整のための制
御信号を出力するようになっている。また、コントロー
ルユニット20には、予め支管Aの一端開口部から各供内
管Bへの分岐個所までの距離をメモリに記憶しておく。 この状態で、支管Aの一端開口部について、第6図に
示すように、寸法の合うランチャ6を接続して、供内管
Bの場合と同じように、管内面の樹脂ライニングを実現
するのである。そして、ランチャ6から最初の樹脂団E
を支管A内へ、加圧気体で押圧移動させ、その過程で、
樹脂団Eの移動速度Vに対応したライニング膜厚で支管
Aをライニングする。この場合、消費される樹脂量は、
時間t,距離l,気体流入量Q,圧力Pなどからコントロール
ユニット20で求められているから、ライニング膜厚の一
定化、換言すれば、移動速度Vの一定化は、前述の供内
管Bの場合と同様に制御されている。 一方、上記コントロールユニット20では、上記樹脂団
が該当する供内管Bとを分岐個所に到達する前(これは
各供内管Bでの樹脂供給時間が予めメモリされているの
で、コントロールユニット20側で予めタイミングを取る
ことができる)に、上記流量調整弁22を制御して、充填
筒21からライニング樹脂団を支管A内に補充する。その
経過、先きに供内管Bのライニングに際して支管A内に
残置された樹脂量に上記補充分が加算されて、コントロ
ールユニット20のメモリに記憶される。そして、上記樹
脂団が分岐個所において上記残置樹脂(補充分を含む)
に合流した時点で、その時の樹脂団長Eの補正をコント
ロールユニット20で行ない、樹脂団Eの移動速度Vを、
その後も一定に保持する。なお、上記樹脂団Eが分岐個
所を通過するまでは、支管A側で樹脂団Eを押圧してい
る気体圧力に見合った気体圧力が供内管Bに加わるよう
に、上記圧力計25の情報に基いて、コントロールユニッ
ト20が上記流量調整弁22を制御する。 なお、上記供内管Bの内圧を、支管A内の加圧気体の
圧力相当とする場合には、樹脂が供内管Bに侵入しない
が、例えば−0.2kg/cm2など、支管Aの加圧気体の圧力
より一定の圧力差だけ下廻るように供内管Bの内圧を設
定した時には、第7図に示すように、支管Aのライニン
グ過程で、支管Aと供内管Bとの接続個所に樹脂団Eが
到達した時、圧力差分だけの樹脂量(所定量)が供内管
Bに侵入する。このとき、供内管B内の加圧気体は侵入
樹脂E′で圧縮され、圧力が上昇(支管A側の押圧のた
めの加圧気体圧力相当)するが、これを圧力計25で検知
して、コントロールユニット20で解析し、指令を出して
流量調整弁22を閉じる。 このため、支管A内でライニングのため樹脂が消費さ
れ、樹脂団がなくなって加圧気体が吹き抜けを起すま
で、上記供内管B内には侵入樹脂が保持されるが(第8
図参照)、吹き抜けた時に支管A内の内圧が大気圧に降
下することにより、支管A内に上記侵入樹脂が供内管B
側の気体圧力で排出され、残置される(第9図参照)。 このようにして、支管A内で供内管Bを経由して樹脂
を補充しながら、加圧気体で樹脂団を押圧移動し、ライ
ニングを継続すると、加圧気体の吹き抜けが、例えば全
補修区間について完了するまで起らないことになり、最
も短い時間で支管A内の樹脂ライニングが達成されるこ
とになる。 もし、補修区間の途中で樹脂団が全て消費されて、加
圧気体の吹き抜けが起った場合には、それまでに通過し
た分岐個所に対応する供内管B内の侵入樹脂は、支管A
側が大気圧となるので、供内管Bの内部気圧で支管A内
に排出される。この場合には、供内管Bから侵入樹脂が
支管A内に排出されると、コントロールユニット20は、
圧力計25の支持圧力の低下でこれを検知し、再び流量調
整弁22を開放し、ボンベ23から加圧気体を所要圧力で供
内管B内に供給する。このため、支管Aに次の樹脂が充
填されて、該当の供内管Bとの接続個所を通過する時、
再び同量の樹脂が供内管B内に侵入するので、ライニン
グ未済領域まで樹脂団が加圧気体で送られる過程では、
支管A内の樹脂団の長さは変化しない。 このようにして、支管A内への樹脂の充填,加圧気体
による押圧,ライニングを1回で、あるいは数回繰返し
実行して、最終的に支管Aの他端に設けられたレシーバ
27に、ライニング樹脂団が排出されるまで、ライニング
作業を継続する。そして、レシーバ27にライニング樹脂
団が到達すると、樹脂はレシーバタンク28に受けられ、
加圧気体は吹き抜けを起して大気圧まで降下し、このた
めコントロールユニット20は支管Aのライニング作業終
了時点を検知する。 なお、分岐個所において供内管Bに樹脂が侵入してい
る場合には、支管A内で最終的に加圧気体が吹き抜けた
時に大気圧となり、一定量の残置樹脂が支管Aに残る。
この場合にはコントロールユニット20は、圧力計25で供
内管Bへの樹脂侵入を検知し、流量調整弁22を閉じた
後、所定時間経過した時点,即ち、支管A内で、樹脂団
Eがその該当する供内管Bとの接続個所を通過した後、
絞り弁26を所定開度で開放するようにコントロールす
る。 その結果、供内管Bの開放端側の加圧気体は、上記絞
り弁26を介して徐々に大気中へ放出され、侵入樹脂は、
支管A内の加圧気体に押されて供内管B内を移行し、こ
の過程でライニング層として消費されるか、あるいはそ
のまま押圧されて充填筒21内に到達する。この段階で絞
り弁26を閉じる。 このようにして、次々に支管Aに連通する供内管Bで
の侵入樹脂の始末が付けられた後、支管A内を通った樹
脂団はレシーバ27に排出され、これによって仕上げライ
ニングが完了するのである。 なお、上記実施例では供内管Bに対して、その外部開
放端より樹脂を充填して、先づ供内管Bの樹脂ライニン
グを達成するようにしたが、支管Aの樹脂ライニングの
時、同時に供内管Bへの侵入樹脂でライニングするな
ど、供内管Bの樹脂ライニングを、支管Aの樹脂ライニ
ングに並行して実施するようにしてもよい。なお、この
場合、支管Aから供内管Bへの樹脂量の分配,加圧気体
による樹脂送り速度Vの確保などは、コントロールユニ
ット20における制御で達成するとよい。また、この場合
には、上記供内管Bの開放端にはレシーバおよび上述の
ような絞り弁26などを設けるとよい。 このように、支管Aのライニング過程で、供内管Bな
どの分岐管からライニング樹脂の補充を行なうことで、
支管Aの一端からの樹脂団の補充回数を減らし、あるい
はなくすことができるので、作業時間を大幅に節約でき
ることになる。 ちなみに、支管Aの一端から繰返し樹脂の補充をする
場合には、T=(n2+n)/2・t(ここでtは1回の樹
脂団をライニングに消費する時間,nは初回を含めた補充
回数)であるが、本発明のように例えば補修区間を一気
に継続してライニングする場合で、T=nt(ここでLを
補修区間長,従来方式における1回の樹脂団のライニン
グ長をlとすれば、L/l=n,T=ntとして計算できる)で
あって、非常に短い時間となる。
Hereinafter, an embodiment of the present invention will be specifically described with reference to the drawings. In the figure, reference numeral 1 denotes a resin supply device used in the repair method of the present invention, and 2 denotes a lining resin supplied to a repair portion of an existing pipe by the resin supply device 1 using a pressurized gas (for example, pressurized air). It is a pressurized gas supply device used when flowing. The resin supply device 1 includes a resin injector 3, a supply pipe 4 communicating with the bottom of the resin injector 3, and a launcher 6 communicating with the supply pipe 4 via an electromagnetic on-off valve 5. When the electromagnetic on-off valve 5 is open, the lining resin in the resin injector 3 is supplied to and charged into the launcher 6 to form a resin group E in the launcher 6. The resin injector 3 is provided with a plunger 3a,
Further, a pressurized gas is supplied to the top by means described later so that the resin can be extruded. The lining resin to be filled in the launcher 6 is, for example, a room-temperature two-component curing resin prepared by mixing a main component and a curing agent, and the main component is an unsaturated polyester resin, vinyl ester resin, epoxy resin, urethane resin, or the like. And a thixotropy (eg, 250,000 to 3
The TI value is 6) at 00,000 cps. On the other hand, the pressurized gas supply device 2 includes a compressor 7,
An electromagnetic on-off valve 12 is attached to an air tank 8, flow control valves 9, 10 and a gas supply pipe 11 connected to the end of the launcher 6, and flow meters 13, 14 correspond to the respective flow control valves 9, 10. And pressure gauges 15 and 16. If necessary, a three-way switching valve 17 is provided on the outlet side of the compressor 7 so that the pressurized gas can be branched to the pipe 18. It communicates with the top of the injector 3. The control unit 20, which receives output information from the flow meters 13 and 14 and the pressure gauges 15 and 16 and performs calculations in accordance with a required program and adjusts and controls the flow rate regulating valves 9 and 10, is provided by the pressurized gas supply device. 2. In the control unit 20, the amount of resin charged into the launcher 6 is calculated from the opening degree adjustment of the flow control valve 19 and the opening time of the electromagnetic on-off valve 5, stored in a memory, and the opening time of the electromagnetic on-off valve 5, Subsequent momentary flow meters 13, 14
From the output information of the pressure gauges 15 and 16, a resin flow rate V for achieving resin lining with a predetermined film thickness is calculated, and the opening of the flow control valves 9 and 10 is controlled so as to maintain the resin flow rate V. Work. On the other hand, the existing piping to be repaired in the lining in the present invention is a branch pipe A (or main pipe) buried underground and a service pipe B whose one end is protruded above the ground and connected to meters, and the service pipe B is It branches off from the branch pipe A. The lining repair is first performed on the inner pipe B and then on the branch pipe A. Prior to this, the following preparations are made for repair. That is, the branch pipe A is divided into repair sections of a predetermined length,
In order to open both ends, shafts C and D as shown in FIG. 2 are formed at corresponding locations, and the ends of the branch pipe A are opened by cutting. Further, the service pipe B communicating with the branch pipe A
For, remove the meters and open the ground end. Then, pressurized air is passed through the branch pipe A and the service pipe B to remove dust inside. Then, first, the launcher 6 is connected to the open end of the service pipe B, the electromagnetic on-off valve 5 is opened, and the lining resin is supplied and filled into the launcher 6 with the pressurized gas from the resin injector 3. Form a team. When the electromagnetic on-off valve 5 is closed and the electromagnetic on-off valve 12 is opened, the regulated pressurized gas is supplied to the launcher 6.
The resin is supplied to the resin group through the above, and is made to flow and sent to the inside pipe B to form a lining film having a predetermined thickness on the inner surface of the pipe. At this time, in the control unit 20, the opening degree of the resin flow control valves 9, 10 is adjusted. In this case, the calculation basis of the control unit 20 depends on the following formula. First, the amount Q 1 of the pressurized gas flowing into the service pipe B and the pressure P
If 1 (for example, 0.6 kg / cm 2 ), the relationship of π / 4 · D 2 · l 1 · P 1 = Q 1 · P 0 ... (1) If Q 1 , P 0 , and P 1 at the start time T 1 are measured, l 1 is obtained from the equation (1).
You can know. Here, obtained by difference between the measured values F 1 and F 2 of the flow meter 13, 14 of the amount to Q 1 gas that has flowed into the service pipes B. In this case, by using the mass flowmeter to the flowmeter 13 and 14, since there is no influence of the temperature of the gas, operation is easy, also, where l 1 is the position of the resin group at time T 1,
P 0 and P 1 are the measured values of the pressure gauges 15 and 16, and D is the lining inner diameter of the service pipe B. Similarly, if the pressure P 2 and the inflow amount Q 2 at the time T 2 are measured, and the position of the resin group obtained by calculation is l 2 ,
The flow velocity V of the resin group is V = Δl / Δt. However, Δl = l 2 −l 1 and Δt = T 2 −T 1 . Therefore, the predetermined time interval Δt is set by the clock of the oscillator in the control unit 20, and each time, the flow meter is set.
The amount of gas flowing into the pipe from 13,14
The respective pressures are measured from 5, 16 and the flow rate adjusting valves 9 and 9 are controlled so that the instantaneous resin flow velocity V is maintained at a predetermined value.
It controls ten. In the supply pipe B, the length of the resin group is reduced because it is consumed for lining to the inner surface of the pipe, but the control unit 20 calculates the amount of resin consumed as time passes. As a result, the pressure of the pressurized gas drops substantially linearly (see FIG. 4), so that the flow velocity of the resin group can be maintained at a constant value. If the resin of the resin group is consumed before the resin lining on the inner surface of the service tube B is completed over the entire length of the tube, the pressurized gas that has pressed the resin group at that time blows through the service tube B. Then, the pressure drops to the atmospheric pressure of the branch pipe A.
Since such a change in pressure occurs sharply, the control unit 20 checks the pressure and determines that the current resin lining has been completed, and determines the flow rate of the gas supplied to the service pipe B up to this time. Q, the length l to the position where the resin lining has been completed, and the elapsed time t 0 is stored in the memory, closes the electromagnetic on-off valve 12. Next, the control unit 20
Then, open the solenoid on-off valve 5 and the flow control valve 19 and open the resin injector 3
Then, a lining resin is supplied and filled into the launcher 6 to form a predetermined amount of resin group in the launcher 6. Then, the electromagnetic on-off valve 5 and the flow control valve 19 are closed, the electromagnetic on-off valve 12 is opened, and the internal pipe B is lined while controlling the resin group E to the speed V again as described above. At this time, while the lining resin group E passes through the previously lined area, the length of the resin group, in other words, the amount of resin does not change as long as the speed V is maintained. The pressure of the controlled pressurized gas is also maintained at a substantially constant value. Then, Resin Team E
After reaching the position where the inner pipe B has not yet been lined, the resin is consumed by the lining in the same manner as described above, and the length of the resin group E decreases. Therefore, the pressure of the pressurized gas gradually decreases. Lining proceeds. Then, it becomes substantially the resin chief 0, elapsed time substantially 2t 0 next to blows pressing gas drops to the atmospheric pressure also,
The length up to the lining end position is also approximately 2 l. In this way, the filling of the resin and the pressing of the resin group by the pressurized gas successively extend the lining length while repeating the lining. When the lining of the service pipe B is completed and the resin group reaches the connection portion (branch point) with the branch pipe A while the length of the resin group still remains, the resin group E flows into the branch pipe A, and the resin group E is removed. The pressurized gas that has been pressed blows into the branch pipe A. For this reason,
The measured value of the pressure gauge 16 drops rapidly, and becomes almost atmospheric pressure.
This is determined by the control unit 20. This is (n-1) t + t '(where t is shorter than the expected elapsed time (n × t) (where n is the number of times of filling of the resin, and t is the length of time required to complete the lining of one resin group). '<T), it is determined whether or not the above-mentioned rapid pressure drop has occurred. That is, it is determined that the resin group has reached the inside of the branch pipe A from the sudden decrease in the pressing force and the difference between the actual elapsed time and the predicted elapsed time, and the lining repair for the corresponding supply pipe B is completed. . In the case of t '≒ t, there is a problem of a measurement error. Therefore, it is preferable to further fill the resin for one time and measure the time until the resin reaches the branch pipe A. This error range may be set in advance by the control unit 20. That is, the control unit 20 instructs a refilling of the resin if the error is within the error range, and outputs a termination command if the error is within the error range. In the control unit 20, the amount of residual resin discharged from the service pipe B into the branch pipe A and the time until that time are stored in a memory.
At the time of lining, when the resin group arrives at the branch point (the connection point with the service pipe B in the branch pipe A), an operation for correcting the length of the resin group to the amount of the remaining resin is performed. After the resin lining of the service pipe B is sequentially performed in this way, a cartridge type filling cylinder 21 is connected to the open end of the service pipe B as shown in FIG. A cylinder 23 of a pressurized gas such as compressed air via a valve 22
Connect. The filling cylinder 21 is previously filled with a predetermined amount of a lining resin group, and when the flow control valve 22 is opened, the resin is put into the service pipe B with a pressure of a pressurized gas corresponding to the opening degree. A group is sent. Above flow control valve 22
A mass flow meter 24 and a pressure gauge 25 are provided between the filling cylinder 21 and the filling cylinder 21, and a throttle valve 26 communicating with the atmosphere is provided. Information can be given to the control unit 20. Further, the control unit 20 outputs a control signal for opening and closing the opening and closing of the flow control valve 22 and the throttle valve 26. In the control unit 20, the distance from the one end opening of the branch pipe A to the branch point to each of the service pipes B is stored in a memory in advance. In this state, as shown in FIG. 6, a launcher 6 having the same dimensions is connected to one end opening of the branch pipe A, and the resin lining of the inner surface of the pipe is realized in the same manner as in the case of the internal pipe B. is there. And the first resin group E from launcher 6
Into the branch pipe A by pressurized gas, and in the process,
The branch pipe A is lined with a lining film thickness corresponding to the moving speed V of the resin group E. In this case, the amount of resin consumed is
Since the control unit 20 obtains the time t, the distance l, the gas inflow amount Q, the pressure P, and the like, the constant lining film thickness, in other words, the constant moving speed V is determined by the above-described internal pipe B. Is controlled as in the case of On the other hand, in the control unit 20, before the resin group reaches the corresponding branch pipe B to the branch point (because the resin supply time in each branch pipe B is stored in advance, the control unit 20 The timing can be set in advance on the side), and the flow regulating valve 22 is controlled to replenish the lining resin group from the filling cylinder 21 into the branch pipe A. As the process proceeds, the replenishment amount is added to the amount of resin remaining in the branch pipe A during the lining of the service pipe B first, and is stored in the memory of the control unit 20. And the above resin group is the above-mentioned residual resin (including replenishment part) at a branch point.
At the time of joining, the resin unit length E at that time is corrected by the control unit 20, and the moving speed V of the resin group E is
After that, it is kept constant. Until the resin group E passes through the branch point, the information of the pressure gauge 25 is set so that a gas pressure corresponding to the gas pressure pressing the resin group E on the branch pipe A side is applied to the service pipe B. The control unit 20 controls the flow control valve 22 based on the above. When the internal pressure of the service pipe B is equivalent to the pressure of the pressurized gas in the service pipe A, the resin does not enter the service pipe B, but for example, -0.2 kg / cm 2. When the internal pressure of the internal pipe B is set so as to be lower than the pressure of the pressurized gas by a certain pressure difference, as shown in FIG. When the resin group E reaches the connection point, the amount of resin (predetermined amount) corresponding to the pressure difference enters the service pipe B. At this time, the pressurized gas in the service pipe B is compressed by the intruding resin E ', and the pressure rises (corresponding to the pressurized gas pressure for pressing the branch pipe A side). Then, the control unit 20 performs an analysis, issues a command, and closes the flow rate adjustment valve 22. For this reason, the resin is consumed for the lining in the branch pipe A, and the penetrating resin is held in the service pipe B until the resin group disappears and the pressurized gas blows through (No. 8).
When the blow-through, the internal pressure in the branch pipe A drops to the atmospheric pressure when the blow-through occurs, and the intruding resin enters the branch pipe A into the branch pipe B.
It is discharged at the gas pressure on the side and left (see FIG. 9). In this way, when the resin group is pressed and moved with the pressurized gas while the resin is replenished in the branch pipe A via the service pipe B, and the lining is continued, the blow-through of the pressurized gas may occur, for example, in the entire repair section. And the resin lining in the branch A is achieved in the shortest time. If the resin group is completely consumed in the repair section and a blow-through of the pressurized gas occurs, the intruding resin in the service pipe B corresponding to the branch point that has passed so far is the branch pipe A.
Since the pressure on the side becomes the atmospheric pressure, it is discharged into the branch pipe A at the internal pressure of the service pipe B. In this case, when the intruding resin is discharged from the service pipe B into the branch pipe A, the control unit 20
This is detected by a decrease in the support pressure of the pressure gauge 25, and the flow control valve 22 is opened again to supply the pressurized gas from the cylinder 23 into the service pipe B at a required pressure. For this reason, when the branch pipe A is filled with the next resin and passes through the connection point with the corresponding service pipe B,
Since the same amount of resin enters the service pipe B again, in the process in which the resin group is sent to the lining unfinished area by the pressurized gas,
The length of the resin group in the branch pipe A does not change. In this manner, the filling of the resin into the branch pipe A, the pressing with the pressurized gas, and the lining are performed once or repeatedly several times, and the receiver provided at the other end of the branch pipe A is finally provided.
At 27, the lining work is continued until the lining resin group is discharged. Then, when the lining resin group reaches the receiver 27, the resin is received by the receiver tank 28,
The pressurized gas blows through and drops to atmospheric pressure, so the control unit 20 detects the end of the lining work of the branch pipe A. When the resin has penetrated into the service pipe B at the branching point, the pressure becomes the atmospheric pressure when the pressurized gas finally blows through the branch pipe A, and a certain amount of the residual resin remains in the branch pipe A.
In this case, the control unit 20 detects the intrusion of the resin into the service pipe B by the pressure gauge 25, and closes the flow control valve 22, and when a predetermined time elapses, that is, in the branch pipe A, the resin unit E After passing through the connection point with the corresponding service pipe B,
The throttle valve 26 is controlled to be opened at a predetermined opening. As a result, the pressurized gas on the open end side of the serving pipe B is gradually released to the atmosphere via the throttle valve 26, and
It is pushed by the pressurized gas in the branch pipe A and moves inside the service pipe B, and is consumed as a lining layer in this process, or is pushed as it reaches the filling cylinder 21. At this stage, the throttle valve 26 is closed. In this way, after the penetrating resin in the internal pipe B which is successively connected to the branch pipe A is disposed, the resin group passing through the branch pipe A is discharged to the receiver 27, thereby completing the finish lining. It is. In the above embodiment, the internal pipe B is filled with resin from its outer open end to achieve the resin lining of the internal pipe B first, but at the time of resin lining of the branch pipe A, At the same time, the resin lining of the service pipe B may be performed in parallel with the resin lining of the branch pipe A, for example, by lining with a resin that penetrates the service pipe B. In this case, the distribution of the resin amount from the branch pipe A to the internal pipe B, the securing of the resin feed speed V by the pressurized gas, and the like may be achieved by control in the control unit 20. In this case, a receiver and the above-described throttle valve 26 may be provided at the open end of the internal pipe B. As described above, in the lining process of the branch pipe A, by replenishing the lining resin from the branch pipe such as the internal pipe B,
Since the number of times of refilling the resin group from one end of the branch pipe A can be reduced or eliminated, the working time can be greatly reduced. By the way, when replenishing the resin repeatedly from one end of the branch pipe A, T = (n 2 + n) / 2 · t (where t is the time for consuming one resin group for the lining, and n is the time including the first time) In the case where the repair section is continuously lined at a stretch as in the present invention, for example, T = nt (where L is the repair section length, and the lining length of one resin group in the conventional method is defined as T = nt). (L can be calculated as L / l = n, T = nt), which is a very short time.

【発明の効果】【The invention's effect】

本発明は以上詳述したようになり、既設配管の一端か
ら樹脂の充填,ライニング作業を行なうが、そのライニ
ング過程で、既設配管の分岐管から樹脂の補充を行なう
ことで、長い区間、加圧空気による樹脂団の継続的な移
動が達成でき、ライニング時間が大幅に短縮できるとい
う効果が得られる。
As described in detail above, the present invention performs resin filling and lining work from one end of an existing pipe, and in the lining process, replenishes resin from a branch pipe of the existing pipe so that long sections, pressurization can be performed. The resin group can be continuously moved by air, and the lining time can be greatly reduced.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明の一実施例を示す概略構成図、第2図は
補修すべき既設管の状況を示す説明図、第3図は供内管
の樹脂ライニング状況を示す説明図、第4図は樹脂ライ
ニングの繰返し状況を示すタイムチャート、第5図は供
内管の開放端における侵入樹脂対策手段を示す説明図、
第6図は支管の樹脂ライニング状況を示す説明図、第7
図は支管内で樹脂団が供内管への分岐部へ到達した時の
状況を示す説明図、第8図は上記分岐部を樹脂団が通過
した後の状況を示す説明図、第9図は支管内での加圧気
体が吹き抜けた時の状況を示す説明図、第10図は仕上げ
ライニング時の状況を示す説明図である。 1……樹脂供給装置、2……加圧気体供給装置、5……
電磁開閉弁、6……ランチャ、7……コンプレッサ、8
……エアタンク、9,10……流量調整弁、12……電磁開閉
弁、13,14……流量計、15,16……圧力計、19……流量調
整弁、20……コントロールユニット、21……充填筒、22
……流量調整弁、23……ボンベ、24……流量計、25……
圧力計、26……絞り弁、27……レシーバ、28……レシー
バタンク。
FIG. 1 is a schematic configuration diagram showing one embodiment of the present invention, FIG. 2 is an explanatory diagram showing the condition of an existing pipe to be repaired, FIG. 3 is an explanatory diagram showing the resin lining condition of a service pipe, and FIG. FIG. 5 is a time chart showing the repetition state of the resin lining, FIG. 5 is an explanatory view showing the means for preventing intruded resin at the open end of the service pipe,
FIG. 6 is an explanatory view showing the situation of resin lining of a branch pipe, and FIG.
FIG. 8 is an explanatory view showing a situation when the resin group reaches the branch to the service pipe in the branch pipe, FIG. 8 is an explanatory view showing a situation after the resin group has passed through the branch, FIG. FIG. 10 is an explanatory view showing a situation when pressurized gas blows through the branch pipe, and FIG. 10 is an explanatory view showing a situation at the time of finish lining. 1 ... resin supply device, 2 ... pressurized gas supply device, 5 ...
Solenoid on-off valve, 6 launcher, 7 compressor, 8
…… Air tank, 9,10 …… Flow control valve, 12 …… Electromagnetic on-off valve, 13,14 …… Flow meter, 15,16 …… Pressure gauge, 19 …… Flow control valve, 20 …… Control unit, 21 ... Filling cylinder, 22
…… Flow regulating valve, 23… Cylinder, 24 …… Flow meter, 25 ……
Pressure gauge, 26 ... Throttle valve, 27 ... Receiver, 28 ... Receiver tank.

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】管内にプラグ状の液状樹脂団を充填し、該
樹脂団の一方側から所要の加圧気体を供給して該樹脂団
を移動させる過程で管内面に所要の膜厚のライニングを
行なう管内面のライニング補修工法において、 ライニングを行う既設配管の一端開口部より上記樹脂団
の充填および加圧気体の供給を行うと共に、ライニング
について上記樹脂団の移動中、樹脂の消費される状況に
対応して、上記既設配管より分岐されている分岐管より
樹脂の充填を行いながら加圧気体による上記樹脂団の押
圧移動を継続するようにしたことを特徴とする管内面の
ライニング補修工法。
1. A lining having a required thickness on the inner surface of a pipe in a process of filling a pipe with a liquid resin group in a plug form and supplying a required pressurized gas from one side of the resin group to move the resin group. In the lining repair method for the inner surface of the pipe, the filling of the resin group and the supply of pressurized gas from one end opening of the existing pipe to be lined, and the consumption of resin during the movement of the resin group for the lining A method for repairing a lining of a pipe inner surface, characterized in that, while filling a resin from a branch pipe branched from the existing pipe, pressing and moving of the resin group by a pressurized gas is continued.
JP63142504A 1988-06-08 1988-06-08 Repair method for lining of pipe inner surface Expired - Lifetime JP2700326B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63142504A JP2700326B2 (en) 1988-06-08 1988-06-08 Repair method for lining of pipe inner surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63142504A JP2700326B2 (en) 1988-06-08 1988-06-08 Repair method for lining of pipe inner surface

Publications (2)

Publication Number Publication Date
JPH01310776A JPH01310776A (en) 1989-12-14
JP2700326B2 true JP2700326B2 (en) 1998-01-21

Family

ID=15316879

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63142504A Expired - Lifetime JP2700326B2 (en) 1988-06-08 1988-06-08 Repair method for lining of pipe inner surface

Country Status (1)

Country Link
JP (1) JP2700326B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60168564A (en) * 1984-02-10 1985-09-02 Tokyo Gas Co Ltd Application of lining to inner surface of multi-branched piping

Also Published As

Publication number Publication date
JPH01310776A (en) 1989-12-14

Similar Documents

Publication Publication Date Title
US5089297A (en) Method for repairing interior portions of a pipeline
JP2700326B2 (en) Repair method for lining of pipe inner surface
JP2700325B2 (en) Repair method for lining of pipe inner surface
JP2700328B2 (en) Repair method for lining of pipe inner surface
JPH08291898A (en) Gas supply device
JP2598303B2 (en) Continuous injection system for lining resin
JPH03196877A (en) Method for repairing lining on inner surface of pipe
JPH04209016A (en) Flow rate control system
JPH03196876A (en) Method for repairing lining on inner surface of pipe
JP2700331B2 (en) Control system for pipe lining repair
JP2665920B2 (en) Repair method for lining of pipe inner surface
JPH0722738B2 (en) Pipe inner surface lining repair method
JPH0729085B2 (en) How to detect the end of resin lining on a branch pipe
JP2598304B2 (en) Continuous injection system for lining resin
JPH0979495A (en) Gas supply device
JP2639671B2 (en) Repair method for lining of pipe inner surface
JP2700324B2 (en) Repair method for lining of pipe inner surface
JP2665921B2 (en) Repair method for lining of pipe inner surface
JPH01293167A (en) Method for repairing lining of inner surface of pipe
JPH01207172A (en) Method for lining and repairing inside surface of pipe
JP3352816B2 (en) Thick film lining method
JP2598294B2 (en) Control method of resin pushing dynamic pressure in lining repair method of pipe inner surface
JP2766908B2 (en) Pipe lining repair equipment
JP2562372Y2 (en) Operation check jig for lining work
JPH0546271B2 (en)