JP2700328B2 - Repair method for lining of pipe inner surface - Google Patents
[go: Go Back, main page]

JP2700328B2 - Repair method for lining of pipe inner surface - Google Patents

Repair method for lining of pipe inner surface

Info

Publication number
JP2700328B2
JP2700328B2 JP19112688A JP19112688A JP2700328B2 JP 2700328 B2 JP2700328 B2 JP 2700328B2 JP 19112688 A JP19112688 A JP 19112688A JP 19112688 A JP19112688 A JP 19112688A JP 2700328 B2 JP2700328 B2 JP 2700328B2
Authority
JP
Japan
Prior art keywords
resin
pipe
lining
gas
branch pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP19112688A
Other languages
Japanese (ja)
Other versions
JPH0240266A (en
Inventor
基之 古賀
宣勝 池
Original Assignee
株式会社ハッコー
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ハッコー filed Critical 株式会社ハッコー
Priority to JP19112688A priority Critical patent/JP2700328B2/en
Publication of JPH0240266A publication Critical patent/JPH0240266A/en
Application granted granted Critical
Publication of JP2700328B2 publication Critical patent/JP2700328B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)
  • Coating Apparatus (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION 【産業上の利用分野】[Industrial applications]

本発明は、地下に布設されたガス管,水道管などの既
設配管で、特に、本管あるいは支管と称せられる既設配
管に対し、その管内面に、布設状態のままで均一な樹脂
のライニングを施す管内面のライニング補修工法に関す
るものである。
The present invention relates to existing pipes such as gas pipes and water pipes laid underground, and in particular, to existing pipes referred to as main pipes or branch pipes, on the inner surface of the pipes, uniform resin lining as laid. It relates to a lining repair method for the inner surface of a pipe to be applied.

【従来の技術】[Prior art]

一般に、ガス管,水道管などの地下に布設されている
既設配管は、経年によって、管に腐蝕孔や継手部の弛み
が生じて、漏洩が起るおそれがあることから、その漏洩
予防,保全のため、施工後、所要の時期に、上記既設配
管に対し、その布設状態のまま管内面に対する樹脂ライ
ニングによる補修が行なわれている。 そこで、特開昭63−65983号公報所載のように、既設
配管の一端側の管内に液状樹脂をプラグ状に充填し、所
要の加圧気体でこの樹脂団を移動させながら、管内面に
所要の膜厚のライニングを行なう管内面のライニング補
修工法が提唱された。ここでは、開放された既設配管の
一端にランチャを接続し、上記ランチャに接続された樹
脂タンクからライニング用の樹脂を充填してランチャ内
に樹脂団を形成し、これをランチャの自由端側から供給
した加圧空気で既設配管内へ供給している。そして、既
設配管内で上記加圧空気による圧力で樹脂団が流動し
て、管内面のライニング樹脂が消費されると、再び樹脂
タンクからランチャに樹脂を充填し、ランチャ内に樹脂
団を形成し、再び加圧空気で既設配管内へ供給する。こ
のような作業を繰返して所定長さについて、上記既設配
管の管内面補修を行なうのである。
Generally, existing pipes laid underground, such as gas pipes and water pipes, are likely to leak due to corrosion holes and loosened joints due to aging. Therefore, at a required time after the construction, the existing pipe is repaired by resin lining on the inner surface of the pipe in the laid state. Therefore, as described in JP-A-63-65983, a liquid resin is filled into a pipe at one end of an existing pipe in a plug shape, and the resin group is moved by a required pressurized gas, and the inner surface of the pipe is moved. A lining repair method for the inner surface of the pipe to provide the required lining thickness was proposed. Here, a launcher is connected to one end of an existing pipe that has been opened, and a resin tank is filled with a resin for lining from a resin tank connected to the launcher to form a resin group in the launcher. The supplied pressurized air is supplied into the existing piping. Then, the resin group flows under the pressure of the pressurized air in the existing pipe, and when the lining resin on the inner surface of the pipe is consumed, the resin is again filled into the launcher from the resin tank, and the resin group is formed in the launcher. Then, the air is supplied again into the existing piping with pressurized air. By repeating such operations, the inner surface of the existing pipe is repaired for a predetermined length.

【発明が解決しようとする課題】[Problems to be solved by the invention]

ここで問題になるのは、コンプレッサなどを用いて加
圧空気を生成し、これを使用して既設配管内での樹脂団
を流動させる点で、上記空気がライニング完了時に、上
記既設配管および分岐管内に残り、ガス供給再開の際に
ガス中に混って、爆発などの危険を招くおそれがあるこ
とである。このため、ライニング後のガス供給前に、分
岐管を含む既設配管内の空気を、不活性ガスで置換する
などの掃気作業を加える必要がある場合がある。しかし
このような処置をしても、分岐管の中に不明管などがあ
ると、そこに空気が残留して、ガス供給再開後、需要家
がガスを使用する当初において、空気混りのガスが供給
されるおそれがあり、不都合である。 本発明は、上記事情にもとづいてなされたもので、ラ
イニング補修に際して既設配管およびその補修区間で分
岐管における供給ガスには全て、窒素などの不活性ガス
を用いて、たとえ不明管などがあっても、ガス供給再開
に際して爆発などの空気混入に基く不都合を回避できる
ようにした管内面のライニング補修工法を提供しようと
するものである。
The problem here is that compressed air is generated using a compressor or the like, and this is used to flow the resin group in the existing piping. This may remain in the pipe and become mixed in the gas when the gas supply is restarted, causing a danger such as an explosion. For this reason, before the gas supply after the lining, it may be necessary to perform a scavenging operation such as replacing air in an existing pipe including the branch pipe with an inert gas. However, even if such measures are taken, if there is an unknown pipe etc. in the branch pipe, air will remain there, and after the gas supply is resumed, the gas mixed with air will be May be supplied, which is inconvenient. The present invention has been made based on the above circumstances.When repairing the lining, the supply gas in the existing pipes and the branch pipes in the repair section thereof is all inert gas such as nitrogen, and even if there are unknown pipes or the like. Another object of the present invention is to provide a method for repairing a lining of a pipe inner surface, which can avoid inconveniences due to air mixing such as explosion when restarting gas supply.

【課題を解決するための手段】[Means for Solving the Problems]

このため、本発明では、補修区間の既設配管の両端を
開放し、管内にプラグ状の液状樹脂団を充填し、該樹脂
団の一方側から所要の加圧気体を供給して該樹脂団を移
動させる過程で管内面に所要の膜厚のライニングを行な
う管内面のライニング補修工法において、ライニングを
行なう既設配管からの分岐管には分岐管開放端より所要
圧の不活性ガスを供給しており、また、上記既設配管内
で上記樹脂団を流動させる加圧気体に不活性ガスを用い
ている。
For this reason, in the present invention, both ends of the existing pipe in the repair section are opened, a plug-like liquid resin group is filled in the pipe, and a required pressurized gas is supplied from one side of the resin group to remove the resin group. In the lining repair method for the inner surface of the pipe, in which the inner surface of the pipe is lined to the required thickness in the process of moving, an inert gas of a required pressure is supplied from the open end of the branch pipe to the branch pipe from the existing pipe to be lined. Further, an inert gas is used as a pressurized gas for flowing the resin group in the existing pipe.

【作用】[Action]

したがって、ライニング補修中に既設配管から分岐管
への空気混入がなく、このため、ライニング完了後、掃
気などの手続きなしにガス供給しても、爆発などの危険
は完全に回避できる。また、ボンベを使用した場合に
は、コンプレッサを用いる場合に比較して小型,軽量化
できるので、狭い作業スペースでも支障なく、ライニン
グ作業が実現でき、また、コンプレッサによる場合のよ
うな騒音がない。さらに、加圧気体として不活性ガスを
用いるために、制御系での流量計の計測値に、圧縮空気
の場合のような湿度の影響を与えないので、ライニング
における制御精度を高く維持できる。
Therefore, there is no air from the existing pipe into the branch pipe during the lining repair, and therefore, even if gas is supplied without a procedure such as scavenging after the lining is completed, danger such as explosion can be completely avoided. Further, when a cylinder is used, the size and weight can be reduced as compared with the case where a compressor is used, so that the lining work can be realized without any trouble even in a small work space, and there is no noise as in the case of using a compressor. Furthermore, since the inert gas is used as the pressurized gas, the measured value of the flow meter in the control system is not affected by the humidity as in the case of the compressed air, so that the control accuracy in the lining can be maintained high.

【実 施 例】【Example】

以下、本発明の一実施例を図面を参照して具体的に説
明する。 図において、符号1は本発明の補修工法において使用
される樹脂供給装置であり、2は上記樹脂供給装置1で
既設配管の補修個所へ供給したライニング樹脂を加圧気
体(例えば窒素ガスなどの不活性ガス)で流動させる時
に用いる加圧気体供給装置である。 上記樹脂供給装置1は、樹脂注入器3と、上記樹脂注
入器3の底部に連通する供給管4と、上記供給管4に電
磁開閉弁5を介して連通するランチャ6とを具備してお
り、上記電磁開閉弁5が開放されている時、上記樹脂注
入器3内のライニング樹脂を上記ランチャ6に供給,充
填し、上記ランチャ6内に樹脂団Eを形成するのであ
る。上記樹脂注入器3にはプランジャ3aが設けてあり、
また、頂部には、後述のような手段で、加圧気体(窒素
ガス)が供給されるようになっていて、樹脂の押出しが
できるようにしてある。 このランチャ6に充填されるライニング用樹脂は、例
えば主剤と硬化剤とを調合した常温2液硬化型の樹脂で
あり、このうち主剤は不飽和ポリエステル樹脂,ビニル
エステル樹脂,エポキシ樹脂、ウレタン樹脂などを主成
分とした組成物であり、これに顔料,揺変剤などを添加
してチクソトロピー性を有している(例えば250,000〜3
00,000cpsでTI値が6)。 一方、上記加圧気体供給装置2は、窒素ガスボンベ7,
コック8,三方切換弁9,流量調整弁10および上記ランチャ
6の端に接続される気体供給管11に電磁開閉弁12を取付
けたもので、流量調整弁10に対応して流量計13および圧
力計14,15を具備している。更に要すれば、上記三方切
換弁9を介して上記窒素ガスボンベ7の出口側に連通す
る管路16設めて、加圧気体(窒素ガス)を上記管路16へ
分岐できるようにしてあり、流量調整弁17を介して上述
の樹脂注入器3の頂部に供給できるようにしている。 上記流量計13,圧力計14,15からの出力情報を受けて、
所要のプログラムに従って演算を行ない、上記流量調整
弁10を調節制御するコントロールユニット18が、上記加
圧気体供給装置2に設けてある。 上記コントロールユニット18では、流量調整弁17の開
度調節と、電磁開閉弁5の開放時間から、ランチャ6へ
の充填樹脂量を演算し、メモリに記憶すると共に、電磁
開閉弁5の開放時間、その後の時々刻々の流量計13およ
び圧力計14,15の出力情報とから、予め定めた膜厚での
樹脂ライニングを達成するための樹脂流動速度Vを算出
し、維持するように流量調整弁10の開度を制御する働き
をする。 一方、本発明でライニング補修すべき既設配管は、地
下埋設の支管A(あるいは本管)および一端を地上に突
出されてメータ類に接続されり供内管Bであり、上記供
内管Bは上記支管Aから分岐されている。 そして、ライニング補修は先づ供内管Bについて行な
われ、次いで支管Aについて行なわれるが、それに先立
って、次のような補修のための準備がなされる。すなわ
ち支管Aについては、所定長さの補修区間に区切って、
その両端を開放するため、対応する個所に、第2図に示
すような立坑C,Dを形成し、そこで支管Aの端を切断に
よって開放する。更に、この支管Aに連通する供内管B
については、メータ類を取外し、地上端を開放する。そ
して、支管Aおよび供内管Bに圧力空気を通して内部の
塵埃を除去する。 しかして、先づ、供内管Bの開放端にランチャ6を接
続し、電磁開閉弁5を開いて三方切換弁9を経由して加
圧気体を管路16へと分岐し、流量調節弁17で制御された
流量で押圧力を与えて樹脂注入器3からライニング樹脂
をランチャ6内に供給,充填し、樹脂団を形成する。そ
して、電磁開閉弁6を閉じ、電磁開閉弁12の開放で、流
量調整弁10で調圧された加圧気体(窒素ガス)を上記ラ
ンチャ6を介して上記樹脂団に供給し、これを流動させ
て、上記供内管Bへと送り、管内面に対して所定厚さの
ライニング膜を形成するのである。 このときコントロールユニット18では、先づ、ランチ
ャ6内に加圧気体(窒素ガス)を供給して、樹脂団のチ
クソトロピー性により所要の樹脂搬送速度vを与えて、
所定膜厚のライニングを実現するために、該当供内管B
の管内径,ライニング膜厚,当初の樹脂団の粘性抵抗
(樹脂長lo)から圧力Poを設定する。そして、ランチャ
6内が上記加圧気体(窒素ガス)で充満され、樹脂団が
当該供内管Bに導入されるまでの流量を上記流量計13で
計測し、その積算値Qoを演算すると共に、その時の圧力
がPoになるように圧力計15の値を計測して、上記流量調
整弁10をフィードバック制御する。 加圧気体の積算値がQoになった時点(加圧気体のラン
チャ6内における圧力はPo)から、上記コントロールユ
ニット18は、樹脂が一定速度Vを維持するため、供内管
Bでライニングに消費される単位時間当りの量(樹脂長
で表わせば)dlを考慮して、圧力Poから、時間経過と共
にΔPずつ圧力を低下させつつ、流量Qoに変化量ΔQを
逐次加えるように演算で求めて、その値に整合するよう
に流量計13および圧力計15をチェックし、これによって
上記流量調整弁10をフィードバック制御する。 この場合の時間経過tと、圧力P(=Po−ΔP・t)
との関係は第4図に示される通りである。 供内管Bの内面の樹脂ライニングが管の全長にわたっ
て完了しないうちに樹脂団の樹脂が消費されてしまう
と、その時点で、樹脂団を押圧していた加圧気体は供内
管Bを吹き抜け、支管Aの大気圧まで降下してしまう。
このような圧力の変化は急激に起るので、これをコント
ロールユニット18側でチェックして、今回の樹脂ライニ
ング分についての終了と判定し、この時まで供内管Bに
供給した気体の流入量Q,樹脂ライニングが終了した位置
までの長さl,経過時間toなどをメモリに記憶し、電磁開
閉弁12を閉じる。次いで、上記コントロールユニット18
では、電磁開閉弁5,流量調整弁17を開き、樹脂注入器3
からライニング樹脂をランチャ6内に供給,充填して所
定量の樹脂団をランチャ6内に形成する。そして、上記
電磁開閉弁5,流量調整弁17を閉じ、電磁開閉弁12を開放
して、再び前述と同様に樹脂団Eを速度Vにコントロー
ルしながら、供内管Bをライニングする。 このとき、ライニング樹脂団Eが、前回ライニングし
てある領域を通過する間は、速度Vが維持されている限
り、樹脂団の長さ,換言すれば樹脂量は変化しないの
で、コントロールユニット18によって制御される押圧気
体の圧力も略一定値に保持される。しかして、樹脂団E
が供内管Bの未だライニングされていない位置に到達し
た後は、前述と同様にライニングにより樹脂が消費さ
れ、樹脂団Eの長さが減少し、したがって、押圧気体の
圧力も漸次低下しながらライニングが進行させる。そし
て、樹脂団長が略0になり、押圧気体が吹き抜けて大気
圧まで降下するまでの経過時間は略2toとなり、また、
ライニングの終了位置までの長さも略2lとなる。 このようにして、樹脂の充填と、加圧気体による樹脂
団の押圧で、ライニングを繰返しながら逐次ライニング
長を延長してゆく。 供内管Bのライニングが終了し、樹脂団の長さがまだ
残ったまま支管Aとの接続部(分岐個所)に到達する
と、樹脂団Eは支管A内に流入し、上記樹脂団Eを押圧
していた加圧気体は支管A内に吹き抜ける。このため、
圧力計15の計測値は急激に降下し、略々大気圧になる。
これをコントロールユニット18で判定する。これは予想
される経過時間(n×t)(ここでnは樹脂の充填回
数,tは1回の樹脂団のライニング完了までの時間長)よ
りも短い(n−1)t+t′(但しt′<t)で、上記
のような急激な圧力降下をもたらしたか否かで判断され
る。即ち、押圧力の急激な低下,実経過時間と予測経過
時間との差から、樹脂団が支管A内に到達したのと判定
がなされ、該当する供内管Bについてのライニング補修
を終了するのである。 なお、t′≒tの場合には、測定誤差の問題もあるの
で、更に1回分の樹脂を充填して支管Aへの到達までの
時間を計測するとよい。この誤差範囲は、コントロール
ユニット18で予め設定して置くとよい。即ち、コントロ
ールユニット18は、誤差範囲にあれば再度の樹脂充填を
指令し、誤差範囲になければ終了の指令を出力する。 なお、後に支管A内をライニングする時、支管A内に
残置された樹脂量が不明であると、支管Aのライニング
過程における樹脂団長が変化するので、支管A内の残置
樹脂を支管Aのライニングに先立って除去するか、ある
いはこの残置樹脂をコントロールユニット18のメモリに
記憶させて置いて、支管Aのライニングに際して、その
分岐個所(支管A内における供内管Bとの接続個所)に
樹脂団が到達した時、残置樹脂量を加えた樹脂団の長さ
に補正するように、上記コントロールユニット18で演算
してもよい。 このようにして、供内管Bついての樹脂ライニングを
順次行なった後、第5図に示すように、供内管Bの開放
端には透明管などより構成されるレシーバ21を接続す
る。このレシーバ21には流量調整弁22を介して窒素ガス
などの不活性気体のボンベ23を接続すると共に、上記レ
シーバ21の分岐部21aに絞り弁24を接続し、また、圧力
計25および流量計26を設ける。この状態で、支管Aにつ
いて、第6図に示すように、寸法の合うランチャ6を接
続して、供内管Bの場合と同じように管内面の樹脂ライ
ニングを実現するのである。このとき、供内管B内には
流量調整弁22を介してボンベ23から加圧気体(窒素ガ
ス)が供給されており、絞り弁24は閉じられている。そ
して、例えば支管Aにおいて樹脂団Eを押圧する加圧気
体(窒素ガス)の圧力が1.5kg/cm2とすると、これより
若干低圧の、例えば1.3kg/cm2を上記供内管Bに保持す
る。この場合、支管A内で樹脂団Eを押圧する加圧気体
の圧力は、前述のように、樹脂がライニングのために消
費されて樹脂団長が短くなると、漸次降下されるので、
この情報に基づいて流量調整弁22をコントロールユニッ
ト18で調節して、圧力差が、例えば0.2kg/cm2に維持さ
れるようにコントロールするとよい。 その結果、第7図に示すように支管Aのライニング過
程で、支管Aと供内管Bとの接続個所に樹脂団Eが到達
した時、圧力差分だけの樹脂量(所定量)が供内管Bに
侵入する。このとき、供内管B内の加圧気体(窒素ガ
ス)は侵入樹脂E′で圧縮され、圧力が上昇(支管A側
の押圧のための加圧気体(窒素ガス)圧力相当)する
が、これを圧力計25で検知して、コントロールユニット
18で解析し、指令を出して流量調整弁22を閉じる。 このため、支管A内でライニングのため樹脂が消費さ
れ、樹脂団がなくなって加圧気体が吹き抜けを起すま
で、上記供内管B内には侵入樹脂が保持されるが(第8
図参照)、吹き抜けた時に支管A内の圧力が大気圧に降
下することにより、支管A内に上記侵入樹脂が供内管B
側の気体(窒素ガス)の圧力で排出され、残置される
(第9図参照)。 コントロールユニット18では、供内管Bに侵入した樹
脂量を、その時の気体圧力差,供内管B内径などから演
算し、これによって供内管Bとの接続個所(分岐部)を
通過した後の樹脂団長を補正し、樹脂団の速度Vを一定
に保持する。 供内管Bから侵入樹脂が支管A内に排出されると、コ
ントロールユニット18は、圧力計25の支持圧力の低下で
これを検知し、再び流量調整弁22を開放し、ボンベ23か
ら加圧気体を所要圧力で供内管B内に供給する。このた
め、支管Aに次の樹脂団が充填されて、該当の供内管B
との接続個所を通過する時、再び同量の樹脂が供内管B
内に侵入するので、ライニング未済領域まで樹脂団が加
圧気体(窒素ガス)で送られる過程では、支管A内の樹
脂団の長さは変化しない。 このようにして、支管A内への樹脂の充填,加圧気体
(窒素ガス)による押圧ライニングを繰返し実行して、
最終的に支管Aの他端に設けられたレシーバ27に、ライ
ニング樹脂団が排出されるまで、ライニング作業を継続
する。そして、レシーバ27にライニング樹脂団が到達す
ると、樹脂はレシーバタンク28に受けられ、加圧気体は
吹き抜けを起して大気圧まで降下し、このためコントロ
ールユニット18は、支管Aのライニング作業終了時点を
検知する。 そして最後に、所要量の樹脂団を支管A内に供給,充
填し、加圧気体で樹脂団を押圧すると、最終的に前述と
同様に一定量で、樹脂が供内管Bに侵入する。この時に
はコントロールユニット18は、圧力計25で供内管Bへの
樹脂侵入を検知し、流量調整弁22を閉じた後、所定時間
経過した時点,即ち、支管A内で、樹脂団Eがその該当
する供内管Bとの接続個所を通過した後、絞り弁24を所
定開度で開放するようにコントロールする。 その結果、供内管Bの開放端側の加圧気体(窒素ガ
ス)は、上記絞り弁24を介して徐々に大気中へ放出さ
れ、侵入樹脂は、支管A内の加圧気体に押されて供内管
B内を移行し、この過程でライニング層として消費され
るか、あるいはそのまま押圧されてレシーバ21に到達す
る。この過程で、流量計26は加圧気体の排出量を計測し
ており、コントロールユニット18では、支管A側に供給
する加圧気体(窒素ガス)の流入量を、上記排出量を考
慮して補正する。そして、レシーバ21に侵入樹脂が到達
した段階あるいは支管A側の加圧気体(窒素ガス)がレ
シーバ21内に吹き抜けた段階(侵入樹脂がライニング層
として消費される場合)において、絞り弁24を閉じる。 このようにして、次々に支管Aに連通する供内管Bで
の侵入樹脂の始末が付けられた後、支管A内を通った樹
脂団は、レシーバ27に排出され、これによって仕上げラ
イニングが完了するのである(第10図参照)。 なお、上記実施例において、支管Aの仕上げライニン
グに際しては、第11図に示されるように供内管Bの開放
端にリリーフ弁29を設けて、支管Aとの接続個所を樹脂
団Eが通過する時に侵入した樹脂を、支管A側に与えた
加圧気体およびリリーフ弁29の絞り具合により所要速度
で供内管B内を移動させ、レシーバ21へ送出させるよう
にしてもよい。また、上記リリーフ弁29の代りにレシー
バ21を管体で構成し、端末に絞り用の小孔を穿った形に
して、実質的にリリーフ弁29と同等の機能をはたせるよ
うにしてもよい。 このような作業経過を省みれば明らかなように、供内
管,支管内には最終的に窒素ガスが充満されており、し
たがって、次にガスを供給してガス供給を復旧させる
時、爆発などの危険が全くない。
Hereinafter, an embodiment of the present invention will be specifically described with reference to the drawings. In the drawing, reference numeral 1 denotes a resin supply device used in the repairing method of the present invention, and 2 denotes a lining resin supplied by the resin supply device 1 to a repairing portion of an existing pipe by a pressurized gas (for example, a gas such as nitrogen gas). (Active gas). The resin supply device 1 includes a resin injector 3, a supply pipe 4 communicating with the bottom of the resin injector 3, and a launcher 6 communicating with the supply pipe 4 via an electromagnetic on-off valve 5. When the electromagnetic on-off valve 5 is open, the lining resin in the resin injector 3 is supplied to and charged into the launcher 6 to form a resin group E in the launcher 6. The resin injector 3 is provided with a plunger 3a,
A pressurized gas (nitrogen gas) is supplied to the top by means described later so that the resin can be extruded. The lining resin to be filled in the launcher 6 is, for example, a room-temperature two-component curing resin prepared by mixing a main component and a curing agent, and the main component is an unsaturated polyester resin, vinyl ester resin, epoxy resin, urethane resin, or the like. And a thixotropy (eg, 250,000 to 3
The TI value is 6) at 00,000 cps. On the other hand, the pressurized gas supply device 2 includes a nitrogen gas cylinder 7,
A cock 8, a three-way switching valve 9, a flow control valve 10, and a gas supply pipe 11 connected to the end of the launcher 6 having an electromagnetic on-off valve 12 attached thereto. It has 14,15 in total. If necessary, a pipe 16 communicating with the outlet side of the nitrogen gas cylinder 7 through the three-way switching valve 9 is provided so that a pressurized gas (nitrogen gas) can be branched to the pipe 16. The resin can be supplied to the top of the resin injector 3 via the flow control valve 17. In response to the output information from the flow meter 13, pressure gauges 14, 15,
A control unit 18 that performs calculations according to a required program and controls the flow rate control valve 10 is provided in the pressurized gas supply device 2. The control unit 18 calculates the amount of resin charged into the launcher 6 from the opening adjustment of the flow control valve 17 and the opening time of the electromagnetic on-off valve 5 and stores the calculated amount in the memory. From the output information of the flow meter 13 and the pressure gauges 14 and 15 from time to time, a resin flow velocity V for achieving a resin lining with a predetermined film thickness is calculated, and the flow rate adjusting valve 10 is maintained so as to be maintained. It functions to control the opening of the motor. On the other hand, the existing piping to be repaired in the lining in the present invention is a branch pipe A (or main pipe) buried underground and a pipe B having one end protruding above the ground and connected to meters and the like. It branches off from the branch pipe A. The lining repair is first performed on the inner pipe B and then on the branch pipe A. Prior to this, the following preparations are made for repair. That is, the branch pipe A is divided into repair sections of a predetermined length,
In order to open both ends, shafts C and D as shown in FIG. 2 are formed at corresponding locations, and the ends of the branch pipe A are opened by cutting. Further, the service pipe B communicating with the branch pipe A
For, remove the meters and open the ground end. Then, pressurized air is passed through the branch pipe A and the service pipe B to remove dust inside. Then, first, the launcher 6 is connected to the open end of the service pipe B, the electromagnetic on-off valve 5 is opened, and the pressurized gas is branched to the pipe 16 via the three-way switching valve 9, and the flow control valve is opened. A pressing force is applied at a flow rate controlled by 17 to supply and fill the lining resin into the launcher 6 from the resin injector 3 to form a resin group. Then, when the electromagnetic on-off valve 6 is closed and the electromagnetic on-off valve 12 is opened, the pressurized gas (nitrogen gas) regulated by the flow control valve 10 is supplied to the resin group through the launcher 6 and flows therethrough. Then, the lining film is sent to the service pipe B, and a lining film having a predetermined thickness is formed on the inner surface of the pipe. At this time, the control unit 18 first supplies a pressurized gas (nitrogen gas) into the launcher 6 to give a required resin transport speed v by the thixotropic property of the resin group.
In order to realize the lining of the specified thickness,
The pressure Po is set based on the pipe inner diameter, lining film thickness, and the initial viscous resistance (resin length lo) of the resin group. Then, the flow rate until the inside of the launcher 6 is filled with the pressurized gas (nitrogen gas) and the resin group is introduced into the internal pipe B is measured by the flow meter 13, and the integrated value Qo is calculated. Then, the value of the pressure gauge 15 is measured so that the pressure at that time becomes Po, and the flow rate control valve 10 is feedback-controlled. From the time when the integrated value of the pressurized gas becomes Qo (the pressure of the pressurized gas in the launcher 6 is Po), the control unit 18 starts lining with the internal pipe B to maintain the resin at a constant speed V. In consideration of the amount of consumption per unit time (expressed in resin length) dl, from the pressure Po, the pressure is decreased by ΔP over time, and the amount of change ΔQ is added to the flow rate Qo by calculation. Then, the flow meter 13 and the pressure gauge 15 are checked so as to match the values, and thereby the flow control valve 10 is feedback-controlled. In this case, the elapsed time t and the pressure P (= Po−ΔP · t)
Is as shown in FIG. If the resin of the resin group is consumed before the resin lining on the inner surface of the service tube B is completed over the entire length of the tube, the pressurized gas that has pressed the resin group at that time blows through the service tube B. Then, the pressure drops to the atmospheric pressure of the branch pipe A.
Since such a change in pressure occurs rapidly, the control unit 18 checks the pressure and determines that the current resin lining has been completed, and determines the flow rate of the gas supplied to the service pipe B up to this time. Q, the length l to the position where the resin lining is completed, the elapsed time to, and the like are stored in the memory, and the electromagnetic on-off valve 12 is closed. Next, the control unit 18
Then, open the solenoid on-off valve 5 and the flow control valve 17 and set the resin injector 3
Then, a lining resin is supplied and filled into the launcher 6 to form a predetermined amount of resin group in the launcher 6. Then, the electromagnetic on-off valve 5 and the flow control valve 17 are closed, the electromagnetic on-off valve 12 is opened, and the internal pipe B is lined while controlling the resin group E to the speed V again as described above. At this time, while the lining resin group E passes through the previously lined area, the length of the resin group, in other words, the amount of resin does not change as long as the speed V is maintained. The pressure of the controlled pressurized gas is also maintained at a substantially constant value. Then, Resin Team E
After reaching the position where the inner pipe B has not yet been lined, the resin is consumed by the lining in the same manner as described above, and the length of the resin group E decreases. Therefore, the pressure of the pressurized gas gradually decreases. The lining is advanced. And the elapsed time until the resin group length becomes approximately 0, the pressurized gas blows through and drops to atmospheric pressure is approximately 2 to, and
The length up to the lining end position is also approximately 2 l. In this way, the filling of the resin and the pressing of the resin group by the pressurized gas successively extend the lining length while repeating the lining. When the lining of the service pipe B is completed and the resin group reaches the connection portion (branch point) with the branch pipe A while the length of the resin group still remains, the resin group E flows into the branch pipe A, and the resin group E is removed. The pressurized gas that has been pressed blows into the branch pipe A. For this reason,
The measured value of the pressure gauge 15 drops rapidly, and becomes substantially the atmospheric pressure.
This is determined by the control unit 18. This is (n-1) t + t '(where t is shorter than the expected elapsed time (n × t) (where n is the number of times of filling of the resin, and t is the length of time required to complete the lining of one resin group). '<T), it is determined whether or not the above-mentioned rapid pressure drop has occurred. That is, it is determined that the resin group has reached the inside of the branch pipe A from the sudden decrease in the pressing force and the difference between the actual elapsed time and the predicted elapsed time, and the lining repair for the corresponding internal pipe B is completed. is there. In the case of t '≒ t, there is a problem of a measurement error. Therefore, it is preferable to further fill the resin for one time and measure the time until the resin reaches the branch pipe A. This error range may be set in the control unit 18 in advance. That is, the control unit 18 issues a command for refilling the resin if it is within the error range, and outputs an end command if it is not within the error range. When lining the branch pipe A later, if the amount of resin remaining in the branch pipe A is unknown, the resin group length in the lining process of the branch pipe A changes. Before the lining of the branch pipe A, the resin group is removed at the branching point (connection point with the service pipe B in the branch pipe A). May be calculated by the control unit 18 so as to correct the length of the resin group to which the residual resin amount has been added when. After the resin lining of the service pipe B is sequentially performed in this manner, a receiver 21 composed of a transparent tube or the like is connected to the open end of the service pipe B as shown in FIG. A cylinder 23 of an inert gas such as nitrogen gas is connected to the receiver 21 via a flow control valve 22, a throttle valve 24 is connected to a branch 21a of the receiver 21, and a pressure gauge 25 and a flow meter 26 will be provided. In this state, as shown in FIG. 6, the launcher 6 of the same size is connected to the branch pipe A, and the resin lining of the inner surface of the pipe is realized in the same manner as in the case of the service pipe B. At this time, the pressurized gas (nitrogen gas) is supplied from the cylinder 23 to the inside pipe B via the flow control valve 22, and the throttle valve 24 is closed. For example, if the pressure of the pressurized gas (nitrogen gas) for pressing the resin group E in the branch pipe A is 1.5 kg / cm 2 , a slightly lower pressure, for example, 1.3 kg / cm 2 is held in the internal pipe B. I do. In this case, as described above, the pressure of the pressurized gas pressing the resin group E in the branch pipe A gradually decreases when the resin is consumed for the lining and the resin group length is shortened.
Based on this information, the flow control valve 22 may be adjusted by the control unit 18 so as to control the pressure difference to be maintained at, for example, 0.2 kg / cm 2 . As a result, when the resin group E reaches the connection point between the branch pipe A and the internal pipe B in the lining process of the branch pipe A as shown in FIG. Penetrates tube B. At this time, the pressurized gas (nitrogen gas) in the serving pipe B is compressed by the intruding resin E ', and the pressure increases (equivalent to the pressure of the pressurized gas (nitrogen gas) for pressing the branch pipe A side). This is detected by the pressure gauge 25 and the control unit
Analysis is performed at 18, a command is issued, and the flow control valve 22 is closed. For this reason, the resin is consumed for the lining in the branch pipe A, and the penetrating resin is held in the service pipe B until the resin group disappears and the pressurized gas blows through (No. 8).
When the blow-through, the pressure in the branch pipe A drops to the atmospheric pressure when the blow-through, the intruding resin enters the branch pipe A into the service pipe B.
It is discharged at the pressure of the gas (nitrogen gas) on the side and is left (see FIG. 9). The control unit 18 calculates the amount of resin that has entered the serving pipe B from the gas pressure difference at that time, the inner diameter of the serving pipe B, and the like, and after that, after passing through a connection point (branch portion) with the serving pipe B. And the speed V of the resin group is kept constant. When the penetrating resin is discharged from the service pipe B into the branch pipe A, the control unit 18 detects the decrease in the support pressure of the pressure gauge 25, opens the flow control valve 22 again, and pressurizes the cylinder 23. The gas is supplied into the service pipe B at a required pressure. For this reason, the branch pipe A is filled with the next resin group, and the corresponding service pipe B is filled.
When passing through the connection point with the
The length of the resin group in the branch pipe A does not change in the process of sending the resin group to the unlined area by the pressurized gas (nitrogen gas). In this way, the filling of the resin into the branch pipe A and the press lining by the pressurized gas (nitrogen gas) are repeatedly executed,
The lining operation is continued until the lining resin group is finally discharged to the receiver 27 provided at the other end of the branch pipe A. Then, when the lining resin group reaches the receiver 27, the resin is received in the receiver tank 28, and the pressurized gas blows out and drops to the atmospheric pressure. Is detected. Finally, a required amount of resin group is supplied and filled into the branch pipe A, and when the resin group is pressed with a pressurized gas, the resin finally enters the serving pipe B in a fixed amount as described above. At this time, the control unit 18 detects the resin intrusion into the service pipe B by the pressure gauge 25 and closes the flow control valve 22, and when a predetermined time has elapsed, that is, in the branch pipe A, the resin group E After passing through the connection point with the corresponding service pipe B, the throttle valve 24 is controlled to be opened at a predetermined opening. As a result, the pressurized gas (nitrogen gas) on the open end side of the serving pipe B is gradually released into the atmosphere through the throttle valve 24, and the intruding resin is pushed by the pressurized gas in the branch pipe A. In this process, the gas passes through the service pipe B and is consumed as a lining layer in this process or is pressed as it reaches the receiver 21. In this process, the flow meter 26 measures the discharge amount of the pressurized gas, and the control unit 18 determines the inflow amount of the pressurized gas (nitrogen gas) supplied to the branch pipe A side in consideration of the discharge amount. to correct. The throttle valve 24 is closed when the intruding resin reaches the receiver 21 or when the pressurized gas (nitrogen gas) on the side of the branch pipe A blows into the receiver 21 (when the intruding resin is consumed as a lining layer). . In this way, after the penetrating resin in the service pipe B which is successively connected to the branch pipe A is disposed, the resin group which has passed through the branch pipe A is discharged to the receiver 27, thereby completing the finishing lining. (See Figure 10). In the above embodiment, at the time of the finish lining of the branch pipe A, a relief valve 29 is provided at the open end of the service pipe B as shown in FIG. The resin that has invaded at this time may be moved inside the service pipe B at a required speed by the pressurized gas supplied to the branch pipe A and the degree of restriction of the relief valve 29 and sent to the receiver 21. Further, the receiver 21 may be formed of a tubular body instead of the relief valve 29, and a small hole for squeezing may be formed in the terminal so that the function substantially equivalent to that of the relief valve 29 may be provided. As is clear from such work process, the inside pipe and branch pipe are finally filled with nitrogen gas. Therefore, the next time the gas is supplied and the gas supply is restored, the explosion occurs. There is no danger at all.

【発明の効果】【The invention's effect】

本発明の以上詳述したようになり、既設配管における
樹脂ライニングに際して使用する樹脂押圧用の加圧気体
に、窒素ガスなどの不活性ガスを用いるので、作業過程
で既設配管内に空気が残留することなく、完全に窒素ガ
スなどの不活性ガスで置換されているから、作業終了
後、不活性ガスによる事前の処理を行なわなくても、ガ
ス復旧の作業に入ることが可能であり、たとえ不明管が
その補修区間にあっても、ガス供給再開に際して空気の
混入による爆発などの災害を未然に防止できる。また、
このように不活性ガスを用いる場合、ボンベを使用する
関係から、圧縮空気を加圧気体として用いる場合と異な
り、コンプレッサを作業現場に持込むようなことがな
く、狭い作業現場へのボンベの持込みは容易である。ま
た、コンプレッサを使用しないため騒音がなく、流量計
に対して湿度の影響を与えることがなく、品質が一定し
ていて、コンピュータ制御による加圧気体制御の上で高
い精度が確保できる。
As described in detail above of the present invention, since an inert gas such as nitrogen gas is used as a pressurized gas for resin pressing used at the time of resin lining in an existing pipe, air remains in the existing pipe in a work process. Since the gas is completely replaced by an inert gas such as nitrogen gas, it is possible to start the gas restoration work without performing the pre-treatment with the inert gas after the work is completed. Even when the pipe is in the repair section, disasters such as an explosion due to air mixing can be prevented before restarting gas supply. Also,
In this way, when using an inert gas, unlike the case where compressed air is used as a pressurized gas, the cylinder is not brought into the work site, and the cylinder is brought into a narrow work site unlike the case where compressed air is used as the pressurized gas. Is easy. Further, since the compressor is not used, there is no noise, there is no influence of humidity on the flow meter, the quality is constant, and high accuracy can be secured in controlling the pressurized gas by computer control.

【図面の簡単な説明】 第1図は本発明の一実施例を示す概略構成図、第2図は
補修すべき既設管の状況を示す説明図、第3図は供内管
の樹脂ライニング状況を示す説明図、第4図は樹脂ライ
ニングの繰返し状況を示すタイムチャート、第5図は供
内管の開放端における侵入樹脂対策手段を示す説明図、
第6図は支管の樹脂ライニング状況を示す説明図、第7
図は支管内で樹脂団が供内管への分岐部へ到達した時の
状況を示す説明図、第8図は上記分岐部を樹脂団が通過
した後の状況を示す説明図、第9図は支管内での加圧気
体が吹き抜けた時の状況を示す説明図、第10図は仕上げ
ライニング時の状況を示す説明図、第11図は仕上げライ
ニングの段階で供内管へ侵入した樹脂対策手段の別の例
を示す説明図である。 1……樹脂供給装置、2……加圧気体供給装置、5……
電磁開閉弁、6……ランチャ、7……窒素ガスボンベ、
8……コック、9……三方切換弁、10……流量調整弁、
12……電磁開閉弁、13……流量計、14,15……圧力計、1
7……流量調整弁、18……コントロールユニット、21…
…レシーバ、22……流量調整弁、23……ボンベ、24……
絞り弁、25……圧力計、26……流量計、29……リリーフ
弁。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a schematic configuration diagram showing one embodiment of the present invention, FIG. 2 is an explanatory diagram showing the condition of an existing pipe to be repaired, and FIG. 3 is a resin lining situation of a service pipe. FIG. 4 is a time chart showing the repetition state of the resin lining, FIG. 5 is an explanatory view showing a means for preventing intrusion resin at the open end of the service pipe,
FIG. 6 is an explanatory view showing the situation of resin lining of a branch pipe, and FIG.
FIG. 8 is an explanatory view showing a situation when the resin group reaches the branch to the service pipe in the branch pipe, FIG. 8 is an explanatory view showing a situation after the resin group has passed through the branch, FIG. Is an explanatory view showing the situation when the pressurized gas blows through the branch pipe, FIG. 10 is an explanatory view showing the situation at the time of the finish lining, and FIG. 11 is a countermeasure for the resin entering the internal pipe at the stage of the finish lining It is explanatory drawing which shows another example of a means. 1 ... resin supply device, 2 ... pressurized gas supply device, 5 ...
Solenoid on-off valve, 6 ... launcher, 7 ... nitrogen gas cylinder,
8 ... cock, 9 ... 3-way switching valve, 10 ... flow control valve,
12: solenoid on-off valve, 13: flow meter, 14, 15, pressure gauge, 1
7 ... Flow control valve, 18 ... Control unit, 21 ...
... Receiver, 22 ... Flow control valve, 23 ... Cylinder, 24 ...
Throttle valve, 25 ... Pressure gauge, 26 ... Flow meter, 29 ... Relief valve.

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】補修区間の既設配管の両端を開放し、管内
にプラグ状の液状樹脂団を充填し、該樹脂団の一方側か
ら所要の加圧気体を供給して該樹脂団を移動させる過程
で管内面に所要の膜厚のライニングを行なう管内面のラ
イニング補修工法において、 ライニングを行なう既設配管からの分岐管には分岐管開
放端より所要圧の不活性ガスを供給しており、また、上
記既設配管内で上記樹脂団を流動させる加圧気体に不活
性ガスを用いることを特徴とする管内面のライニング補
修工法。
1. Open both ends of an existing pipe in a repair section, fill a pipe with a liquid resin group in a plug shape, and supply a required pressurized gas from one side of the resin group to move the resin group. In the lining repair method for the inner surface of the pipe, in which the required inner thickness is applied to the inner surface of the pipe in the process, an inert gas at a required pressure is supplied from the open end of the branched pipe to the branch pipe from the existing pipe to be lined. A method for repairing a lining of a pipe inner surface, wherein an inert gas is used as a pressurized gas for flowing the resin group in the existing pipe.
JP19112688A 1988-07-29 1988-07-29 Repair method for lining of pipe inner surface Expired - Lifetime JP2700328B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19112688A JP2700328B2 (en) 1988-07-29 1988-07-29 Repair method for lining of pipe inner surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19112688A JP2700328B2 (en) 1988-07-29 1988-07-29 Repair method for lining of pipe inner surface

Publications (2)

Publication Number Publication Date
JPH0240266A JPH0240266A (en) 1990-02-09
JP2700328B2 true JP2700328B2 (en) 1998-01-21

Family

ID=16269302

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19112688A Expired - Lifetime JP2700328B2 (en) 1988-07-29 1988-07-29 Repair method for lining of pipe inner surface

Country Status (1)

Country Link
JP (1) JP2700328B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0171640B1 (en) * 1994-11-22 1999-03-30 박원배 Agricultural fluorescent film with excellent weatherability and ruins
KR0171639B1 (en) * 1994-11-22 1999-03-30 박원배 Agricultural luminiscent film

Also Published As

Publication number Publication date
JPH0240266A (en) 1990-02-09

Similar Documents

Publication Publication Date Title
US3750711A (en) Method and apparatus for testing for leaks in pipes
US2817230A (en) Leak testing device
US5983948A (en) Method of repairing an existing pipeline including a main pipe and a branch pipe
JP2700328B2 (en) Repair method for lining of pipe inner surface
GB2215806A (en) Lining pipes
JP2007523276A (en) How to advance multiple pipe elements in the ground
KR100898310B1 (en) Maintenance method of buried pipeline using air pressure
JP2700326B2 (en) Repair method for lining of pipe inner surface
JP2700331B2 (en) Control system for pipe lining repair
JP2700325B2 (en) Repair method for lining of pipe inner surface
JP2598303B2 (en) Continuous injection system for lining resin
JPH03196876A (en) Method for repairing lining on inner surface of pipe
JP2598304B2 (en) Continuous injection system for lining resin
JPS6248118B2 (en)
JP2562372Y2 (en) Operation check jig for lining work
JPH0722737B2 (en) Pipe inner surface lining repair method
JPH0722738B2 (en) Pipe inner surface lining repair method
JP2665920B2 (en) Repair method for lining of pipe inner surface
JP3352816B2 (en) Thick film lining method
KR100618665B1 (en) Recording medium recording watertight test method and program used for sewage pipe using air pressure
JPH0729085B2 (en) How to detect the end of resin lining on a branch pipe
JP2665922B2 (en) Repair method for lining of pipe inner surface
JP2766908B2 (en) Pipe lining repair equipment
JP3117895B2 (en) Repair method for existing piping
JP2665921B2 (en) Repair method for lining of pipe inner surface