JP2789239B2 - Partially covered sand pile construction method - Google Patents
Partially covered sand pile construction methodInfo
- Publication number
- JP2789239B2 JP2789239B2 JP1276104A JP27610489A JP2789239B2 JP 2789239 B2 JP2789239 B2 JP 2789239B2 JP 1276104 A JP1276104 A JP 1276104A JP 27610489 A JP27610489 A JP 27610489A JP 2789239 B2 JP2789239 B2 JP 2789239B2
- Authority
- JP
- Japan
- Prior art keywords
- water
- tube
- holding
- permeable
- sand pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Description
【発明の詳細な説明】 [産業上の利用分野] 本発明は、軟弱地盤中に砂杭を造成するに際して同砂
杭の一部を透水筒で被覆するようにした部分被覆砂杭造
成工法に関する。DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to a method for forming a partially covered sand pile in which a part of the sand pile is covered with a water-permeable cylinder when forming the sand pile in soft ground. .
[従来の技術] この種の部分被覆砂杭造成工法は、特に砂杭に対する
拘束力の弱い層と比較的強い層とが混在する地盤の改良
工法に採用されている。[Prior Art] This kind of partially covered sand pile construction method is employed particularly for an improvement method for a ground in which a layer having a weak binding force to sand piles and a relatively strong layer are mixed.
同工法では、地盤中の軟弱な粘土やシルト等の層(以
下、超軟弱層という)の位置、超軟弱層の厚さに応じて
透水筒を中空管内の所定部に設定しなければならず、従
来、次のような工程が採用されている。In this method, the water-permeable cylinder must be set at a predetermined position in the hollow pipe according to the position of the layer of soft clay or silt in the ground (hereinafter referred to as the ultra-soft layer) and the thickness of the ultra-soft layer. Conventionally, the following steps have been adopted.
中空管下端が地表近くにあるようにして停止させた
後、中空管内に移動可能に吊下げられた案内管を降下さ
せて、同案内管下端部に透水筒の上端部を着脱可能に連
結保持する。その後、前記案内管を引上げて透水筒を中
空管内の所定の位置に吊下げ状態に保持する。After stopping so that the lower end of the hollow tube is near the ground surface, lower the guide tube movably suspended in the hollow tube, and detachably connect the upper end of the water-permeable tube to the lower end of the guide tube. Hold. Thereafter, the guide tube is pulled up to hold the water permeable tube at a predetermined position in the hollow tube in a suspended state.
次に、中空管を地盤中へ貫入させ、その貫入中または
貫入後に同中空管内に砂を投入・充填し、次に杭造成深
さまで貫入された中空管に振動を与えながら同中空管を
地盤中から引抜き、この引抜き過程で地盤中に部分被覆
砂杭を造成する。Next, the hollow pipe is penetrated into the ground, sand is injected and filled in the hollow pipe during or after the penetration, and then the hollow pipe is penetrated to the pile formation depth while applying vibration to the hollow pipe. The pipe is drawn from the ground, and a partially covered sand pile is formed in the ground during the drawing process.
ここで、透水筒は、例えば中空管の引抜き過程に移る
直前や引抜き過程中あるいは引抜いた後に案内管との連
結保持が解除され、地盤中にあって所定箇所に残され
る。この場合、解除作用が的確に行われない場合には、
透水筒が位置ずれして目的とする地盤中の超軟弱層に対
応する砂杭外周を被覆しないことになり、設計通りの改
良効果を得ることができないことになる。Here, the water-permeable cylinder is released from connection with the guide tube immediately before, for example, during the drawing process of the hollow tube, during the drawing process or after the drawing, and is left at a predetermined position in the ground. In this case, if the release action is not performed properly,
The water-permeable cylinder is displaced and does not cover the outer periphery of the sand pile corresponding to the target ultra-soft layer in the ground, so that the designed improvement effect cannot be obtained.
[発明が解決しようとする課題] ところで、案内管に対する透水筒の連結保持は、透水
筒が中空管内に投入される砂の衝撃などを受け下方に引
張られるので、それらの外力に充分に耐え得る強固な連
結保持手段でなければならず、しかも施工過程で透水筒
の保持を確実に離脱する必要がある。[Problems to be Solved by the Invention] By the way, the connection and holding of the water permeable tube to the guide tube are pulled downward by the impact of the sand injected into the hollow tube or the like, so that the water permeable tube can sufficiently withstand these external forces. It must be a strong connection holding means, and it is necessary to reliably release the holding of the water-permeable cylinder during the construction process.
このような観点から特開昭60−242213号に例示される
ような各種の着脱手段が開発されており、前述の相反す
る要求を同時に満足させるようにしている。From this point of view, various attachment / detachment means have been developed as exemplified in Japanese Patent Application Laid-Open No. 60-242213 to satisfy the above conflicting requirements at the same time.
しかし、従来の連結保持は、何れもが取付けと離脱手
段を兼ね備えることを前提としていたので、全体として
複雑な構造となり、コスト高になっている。また、連結
支持力を大きく設定した場合などには離脱作用が設計通
りに行われない虞もあった。However, since the conventional connection and holding are premised on having both the attaching and detaching means, the structure becomes complicated as a whole and the cost is increased. Further, when the connection supporting force is set to be large, there is a possibility that the detachment operation may not be performed as designed.
本出願人は、従来の着脱手段に改良や検討を加えてき
た結果、透水筒を取付ける保持力に対して無関係に離脱
できるよう構成することで、透水筒の連結保持手段を簡
易化でき、しかも容易かつ確実に連結保持を解除できる
ことを見いだし、本発明に至った。The present applicant has made improvements and studies on conventional attachment / detachment means.As a result, the connection / holding means of the water-permeable cylinder can be simplified by being configured to be detachable regardless of the holding force for attaching the water-permeable cylinder, and It has been found that the connection and holding can be released easily and reliably, and the present invention has been achieved.
[課題を解決するための手段] 上記目的を達成するために、本発明は、砂杭造成用中
空管と、前記中空管内にあって長手方向に移動自在に設
けられた案内管と、前記案内管に吊下げ状態に連結保持
される透水筒とを備え、前記中空管を地盤中に貫入する
と共に内部に砂を投入し、その後中空管を引抜くことに
より、前記透水筒によって外周を部分被覆した砂杭を造
成する部分被覆砂杭造成工法において、 前記中空管または前記案内管に付設された切断手段を
有し、前記案内管に連結保持された透水筒の取付け基部
付近を、前記案内管に透水筒を連結保持している保持力
と無関係に前記切断手段の作用により切断して、透水筒
の保持を解除することを特徴とする。[Means for Solving the Problems] In order to achieve the above object, the present invention provides a hollow pipe for sand pile formation, a guide pipe provided in the hollow pipe and provided movably in a longitudinal direction, A water permeable cylinder connected to and held by the guide pipe in a suspended state, wherein the hollow pipe penetrates into the ground, sand is charged into the inside, and then the hollow pipe is pulled out, so that the outer periphery is formed by the water permeable cylinder. In the method of forming a partially covered sand pile for partially covering a sand pile, a cutting means attached to the hollow pipe or the guide pipe is provided, and a vicinity of a mounting base of a water-permeable cylinder connected and held to the guide pipe is provided. In addition, it is characterized in that the guide tube is cut by the action of the cutting means irrespective of the holding force for connecting and holding the water permeable tube to release the holding of the water permeable tube.
[作用] 以上の構成によれば、前記透水筒は、切断手段により
その取付け基部付近を切断されてその連結保持が解除さ
れる。[Operation] According to the above configuration, the vicinity of the mounting base of the water-permeable cylinder is cut by the cutting means, and the connection and holding thereof are released.
このように、本発明では、前記案内管に対する透水筒
の連結保持手段と無関係に設けられた切断手段により、
透水筒の取付け基部付近を切断して連結保持を解除する
ので、連結保持手段の簡素化や保持強度を容易に強化で
き、同時に透水筒の連結保持を必要に応じて確実に解除
することができる。Thus, in the present invention, by the cutting means provided independently of the connection and holding means of the water-permeable cylinder to the guide tube,
Since the connection base is released by cutting the vicinity of the mounting base of the water-permeable cylinder, the connection holding means can be simplified and the holding strength can be easily enhanced, and at the same time, the connection-maintenance of the water-permeable cylinder can be reliably released as necessary. .
ここで、本発明の切断手段としては、刃物による切断
以外に、電熱で焼いたり、ガソリン等を燃焼させて切断
する方法、所定部分だけ溶かして切断する方法なども含
まれる。Here, as the cutting means of the present invention, in addition to cutting with a blade, a method of cutting by burning with electric heat, burning gasoline or the like, a method of melting only a predetermined portion and cutting, and the like are also included.
[実施例] 以下、本発明の実施例について図面を参照しながら説
明する。Example An example of the present invention will be described below with reference to the drawings.
第1図(イ)ないし(ニ)は、本発明を適用した部分
被覆砂杭造成工法における施工工程を示す模式図であ
る。なお、同実施例は、海底地盤を改良することを想定
している。1 (a) to 1 (d) are schematic views showing construction steps in a partially covered sand pile forming method to which the present invention is applied. In addition, this embodiment assumes that the seabed ground is improved.
同図に示す海底地盤は、事前調査により海水Aが面し
ているシルト等の拘束力の微弱な超軟弱層Bと、超軟弱
層Bの下部に位置する軟弱層Cの各深度や厚さ等が判明
している。実施工に際しては、例えば中空管1の打込み
深さ、中空管1内にあって移動自在に設けられた案内管
2の保持位置、透水筒3の長さ、中空管1内にホッパー
4から投入される砂の総量等の施工設計が行われる。The seafloor ground shown in the figure shows the depths and thicknesses of the ultra-soft layer B with weak binding force, such as silt, facing the seawater A and the soft layer C located below the ultra-soft layer B by the preliminary survey. Etc. are known. At the time of implementation, for example, the driving depth of the hollow tube 1, the holding position of the guide tube 2 movably provided in the hollow tube 1, the length of the water-permeable tube 3, the hopper in the hollow tube 1 Construction design such as the total amount of sand input from 4 is performed.
部分被覆砂杭造成工法は、先ず同図(イ)に示す如
く、超軟弱層Bの厚さより所定寸法だけ長めに形成され
た透水筒3を中空管1の下端から巻上げ自在に引出され
た案内管2に連結保持手段5により強固に取付ける。In the partially covered sand pile forming method, first, as shown in FIG. 3A, a water-permeable cylinder 3 formed longer by a predetermined dimension than the thickness of the ultra-soft layer B is drawn out from the lower end of the hollow tube 1 so as to be freely rolled up. It is firmly attached to the guide tube 2 by the connection holding means 5.
そして、巻取り装置6を駆動させワイヤ7を介して案
内管2を吊上げることにより、透水筒3は中空管1内に
あって所定位置に吊下げ状態に保持される。Then, by driving the winding device 6 to lift the guide tube 2 via the wire 7, the water-permeable tube 3 is held in a predetermined position in the hollow tube 1 in a suspended state.
次に、同図(ロ)に示す如く、中空管1を海水A中へ
下降させ、超軟弱層Bおよび軟弱層Cへと貫入操作す
る。この状態では、透水筒3が超軟弱層Bの相当部位に
ほぼ位置している。Next, as shown in FIG. 2B, the hollow pipe 1 is lowered into the seawater A and penetrates into the super soft layer B and the soft layer C. In this state, the water permeable cylinder 3 is located substantially at the corresponding portion of the super soft layer B.
前記砂は、通常の場合に中空管1が杭底深度まで貫入
される過程で投入され、中空管1および透水筒3内に充
填される。(なお、実施工上、この砂の投入により、透
水筒3は下方へ引張られて多少位置移動することが考え
られるが、事前に位置移動相当量上方に位置させておく
こと等で解決される。) その後、同図(ハ)と(ニ)に示す如く、中空管1を
軟弱層C、超軟弱層Bから引抜き操作するが、この引抜
き操作に移行する直前や引抜き過程中あるいは所定長さ
引抜いた時点で透水筒3の連結保持が切断手段8により
解除される。The sand is usually charged in a process in which the hollow tube 1 penetrates to the pile bottom depth, and is filled in the hollow tube 1 and the water-permeable tube 3. (In practice, it is conceivable that, due to the introduction of the sand, the water-permeable cylinder 3 may be pulled downward and slightly moved in position. Then, the hollow tube 1 is pulled out from the soft layer C and the super soft layer B as shown in FIGS. 3 (c) and 3 (d), but immediately before shifting to this drawing operation, during the drawing process, or for a predetermined length. At the time of pulling out, the connection holding of the water permeable cylinder 3 is released by the cutting means 8.
したがって、地盤中には透水筒3で一部を被覆した部
分被覆砂杭9が造成される。この場合、透水筒3は、超
軟弱層Bを貫く杭部分に相当した位置にあり、この杭部
分の保持力を補強するのである。Therefore, a partially covered sand pile 9 partially covered with the water-permeable cylinder 3 is formed in the ground. In this case, the water-permeable cylinder 3 is located at a position corresponding to a pile portion penetrating the ultra-soft layer B, and reinforces the holding force of this pile portion.
第2図(イ),(ロ)は案内管2に対する透水筒3の
取付け基部付近を示したもので、以下、同図により説明
する。FIGS. 2 (a) and 2 (b) show the vicinity of the mounting base of the water permeable tube 3 to the guide tube 2, which will be described below with reference to FIG.
透水筒3は織布、不織布、多孔性プラスチック、網な
どを筒状に形成したものが用いられ、透水筒3の上端部
3aが連結保持手段5により案内管2に取付けられる。The permeable tube 3 is formed of a woven fabric, a non-woven fabric, a porous plastic, a net, or the like in a tubular shape.
3a is attached to the guide tube 2 by the connection holding means 5.
連結保持手段5は、付勢力に抗して縮径される略リン
グ状の固定金具17からなっている。The connection holding means 5 is formed of a substantially ring-shaped fixture 17 whose diameter is reduced against the urging force.
固定金具17は、案内管2内に挿入された透水筒3の上
端部3aを巻付けるとともに、付勢力に抗して案内管2の
下部内壁に押し込めることにより、 同図(イ)の如く案内管2の下部内壁との間に透水筒3
の上端部3aを強固に狭着し、透水筒3を案内管2に連結
保持する構造となっている。The fixing bracket 17 winds the upper end portion 3a of the water-permeable tube 3 inserted into the guide tube 2 and pushes it into the lower inner wall of the guide tube 2 against the urging force, thereby guiding as shown in FIG. Permeable cylinder 3 between the lower inner wall of pipe 2
The upper end portion 3a is tightly tightly attached to connect the water permeable tube 3 to the guide tube 2.
この透水筒3の連結保持は、前述のように所定深度ま
で貫入された中空管1を引抜く前や引抜き過程等で切断
手段8により解除される。切断手段8は、案内管2の下
部に一体的に連結された加熱部10からなっており、透水
筒3の取付け基部付近を加熱して切断するものである。The connection holding of the water-permeable cylinder 3 is released by the cutting means 8 before the hollow tube 1 penetrated to the predetermined depth is drawn out or in the drawing process as described above. The cutting means 8 comprises a heating unit 10 integrally connected to the lower part of the guide tube 2 and heats and cuts the vicinity of the mounting base of the water-permeable tube 3.
つまり、案内管2は不導体で形成されており、内周壁
に設けられた複数のブラケツト2aと案内管2の下部に設
けられた加熱部10を備えている。That is, the guide tube 2 is made of a non-conductive material, and includes a plurality of brackets 2a provided on the inner peripheral wall and a heating unit 10 provided below the guide tube 2.
ブラケット2aは、ワイヤ7の下端部に設けられた連結
具11にロープ12を介在して接合され、案内管2をワイヤ
7の下端部に吊下げている。The bracket 2 a is joined to a connector 11 provided at the lower end of the wire 7 via a rope 12, and suspends the guide tube 2 at the lower end of the wire 7.
加熱部10は、外壁が絶縁層で覆われるとともに、図示
しないが発熱体を内蔵しており、同発熱体に電流を通電
することにより発熱して透水筒3の上端部3aにおける接
触部を焼き、同図(ロ)に示す如く確実に切断するので
ある。この場合、電源は巻取り装置6のものを利用する
ことができ、またリード線13はワイヤ7およびロープ12
に沿って案内管2の下部側に配線され、案内管2の壁内
を通じて前記発熱体と接続している。前記電源は使用す
る透水筒3の材質等に合わせて電力設定されており、ス
イッチ操作部を介して発熱体へ通電できるようになって
いる。The heating section 10 has an outer wall covered with an insulating layer, and has a built-in heating element (not shown). As shown in FIG. In this case, the power source can be that of the winding device 6, and the lead wire 13 is the wire 7 and the rope 12
Along the lower side of the guide tube 2 and is connected to the heating element through the wall of the guide tube 2. The power of the power source is set according to the material of the water-permeable cylinder 3 to be used and the like, and power can be supplied to the heating element via the switch operation unit.
このように、本発明では、切断手段8を連結保持手段
5と無関係に設けることにより、透水筒3の連結保持を
必要に応じて容易かつ確実に解除することができる。し
かも、連結保持手段5としては、従来のように着脱手段
にする必要がないので、選択範囲が広がって簡素化や保
持強度を容易に強化できるのである。Thus, in the present invention, by providing the cutting means 8 independently of the connection and holding means 5, the connection and holding of the water permeable cylinder 3 can be easily and reliably released as needed. Moreover, since the connecting and holding means 5 does not need to be a detachable means as in the related art, the selection range is widened, and simplification and holding strength can be easily enhanced.
第3図(イ),(ロ)は前記切断手段と連結保持手段
の変形例を概略的に示している。FIGS. 3A and 3B schematically show modified examples of the cutting means and the connection holding means.
同図の切断手段18は、中空管1の下端部に設置された
筒状体に出没可能に内設されたカット刃18aを有し、カ
ット刃18aがシリンダ等の適宜な駆動手段により出没さ
れて、透水筒3の取付け基部付近を切断する構造となっ
ている。The cutting means 18 shown in the figure has a cutting blade 18a internally provided so as to be able to protrude and retract from a cylindrical body provided at the lower end of the hollow tube 1, and the cutting blade 18a is protruded and retracted by a suitable driving means such as a cylinder. Then, it is configured to cut the vicinity of the mounting base of the water-permeable cylinder 3.
この場合、カット刃18aは例えば第1図の(ニ)の過
程で突出されることで、第3図(イ)の如く透水筒3の
取付け基部付近の一部を切断する。In this case, the cutting blade 18a is protruded in the process of (d) of FIG. 1, for example, and cuts a part near the mounting base of the water-permeable cylinder 3 as shown in (a) of FIG.
そして、この状態から中空管1をさらに引き上げるこ
とにより、透水筒3は超軟弱層Bの土圧等の抵抗を受け
ているので、同図(ロ)の如く前記切断部から全周にわ
たって強制的に切り裂かれる。Then, by further pulling up the hollow pipe 1 from this state, the water-permeable cylinder 3 receives resistance such as earth pressure of the super soft layer B, and is forced from the cut portion to the entire circumference as shown in FIG. Is severely dissected.
また、同図の連結保持手段15は、自在に縮径される略
リング状の固定金具16からなっている。Further, the connection holding means 15 in the figure comprises a substantially ring-shaped fixing bracket 16 whose diameter is freely reduced.
固定金具16は、案内管2の下部外周に設けられたガイ
ド溝内に透水筒3の上端部3aを介して嵌合され、リング
状の両端部を引張っぱりながら接合する。これにより、
透水筒3は前記ガイド溝内にあって固定金具16により案
内管2に締め付けられて連結保持される。The fixing bracket 16 is fitted into a guide groove provided on the outer periphery of the lower part of the guide tube 2 via the upper end 3a of the water-permeable tube 3, and joins the ring-shaped both ends while pulling them. This allows
The water permeable tube 3 is located in the guide groove and is fastened to the guide tube 2 by a fixing bracket 16 to be connected and held.
このように、本発明の連結保持手段5,15と切断手段8,
18は種々変形することができ、ま切断手段8を案内管2
に配設する以外に、中空管1に配設することもできる。Thus, the connection holding means 5, 15 of the present invention and the cutting means 8,
18 can be variously deformed, and the cutting means 8 is connected to the guide tube 2.
In addition to being disposed in the hollow tube 1, it can be disposed.
なお、本発明の部分被覆砂杭造成工法は、実施例のよ
うな海底地盤改良に限られるものではなく、陸上地盤改
良の場合も同様に適用できるものである。In addition, the partially covered sand pile formation method of the present invention is not limited to seabed ground improvement as in the embodiment, but can be similarly applied to land ground improvement.
[発明の効果] 以上説明したように、本発明に係る部分被覆砂杭造成
工法は、案内管に対する透水筒の連結保持手段と無関係
に切断手段を設けて、透水筒の取付け基部付近を切断し
て連結保持を解除するものであるから、連結保持手段の
簡素化や保持強度を容易に強化でき、同時に透水筒の連
結保持を必要に応じて容易かつ確実に解除することがで
きる。[Effects of the Invention] As described above, in the partially covered sand pile forming method according to the present invention, cutting means is provided independently of the connecting and holding means of the water permeable cylinder to the guide pipe, and the vicinity of the mounting base of the water permeable cylinder is cut. Therefore, the connection holding means can be simplified and the holding strength can be easily enhanced. At the same time, the connection holding of the water-permeable cylinder can be easily and reliably released as required.
したがって、本発明工法は、全体として経済性を損な
うこともなく、透水筒の連結保持に対する解除作用が的
確に行われ、透水筒が位置ずれするという虞もなくなる
ので、この種の部分被覆砂杭造成工法の信頼性をより向
上できる。Therefore, the method of the present invention does not impair the economy as a whole, the release action for the connection and holding of the water-permeable cylinder is performed accurately, and there is no danger that the water-permeable cylinder is displaced. The reliability of the construction method can be further improved.
第1図(イ)ないし(ニ)は本発明を適用した部分被覆
砂杭造成工法における施工工程を示す模式図、第2図
(イ),(ロ)は透水筒の取付け基部付近を示す要部断
面図、第3図は透水筒の連結保持および切断手段の他の
例を示す要部断面図である。 1……中空管 2……案内管 3……透水筒 5,15……連結保持手段 8,18……切断手段 B……超軟弱層 C……軟弱地層FIGS. 1 (a) to 1 (d) are schematic views showing construction steps in a partially covered sand pile forming method to which the present invention is applied, and FIGS. 2 (a) and 2 (b) are views showing a vicinity of a base of a water-permeable cylinder. FIG. 3 is a sectional view of a main part showing another example of a connecting and holding and cutting means for the water-permeable cylinder. DESCRIPTION OF SYMBOLS 1 ... Hollow pipe 2 ... Guide pipe 3 ... Permeable cylinder 5,15 ... Connection holding means 8,18 ... Cutting means B ... Super soft layer C ... Soft ground layer
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平1−226915(JP,A) 特開 昭63−97709(JP,A) (58)調査した分野(Int.Cl.6,DB名) E02D 3/10 104────────────────────────────────────────────────── ─── Continuation of the front page (56) References JP-A-1-226915 (JP, A) JP-A-63-97709 (JP, A) (58) Fields investigated (Int. Cl. 6 , DB name) E02D 3/10 104
Claims (1)
て長手方向に移動自在に設けられた案内管と、前記案内
管に吊下げ状態に連結保持される透水筒とを備え、前記
中空管を地盤中に貫入すると共に内部に砂を投入し、そ
の後中空管を引抜くことにより、前記透水筒によって外
周を部分被覆した砂杭を造成する部分被覆砂杭造成工法
において、 前記中空管または前記案内管に付設された切断手段を有
し、前記案内管に連結保持された透水筒の取付け基部付
近を、前記案内管に透水筒を連結保持している保持力と
無関係に前記切断手段の作用により切断して、透水筒の
保持を解除することを特徴とする部分被覆砂杭造成工
法。1. A hollow pipe for forming a sand pile, a guide pipe provided in the hollow pipe so as to be movable in a longitudinal direction, and a water-permeable cylinder connected to and held by the guide pipe in a suspended state. In the partially covered sand pile forming method, the hollow pipe is penetrated into the ground and sand is charged into the ground, and then the hollow pipe is pulled out. A cutting means attached to the hollow tube or the guide tube, and a vicinity of a mounting base of the water permeable tube connected and held to the guide tube, and a holding force for connecting and holding the water permeable tube to the guide tube. Irrespective of the above, the cutting means is cut by the action of the cutting means to release the holding of the water permeable cylinder, and the partially covered sand pile forming method is provided.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1276104A JP2789239B2 (en) | 1989-10-25 | 1989-10-25 | Partially covered sand pile construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1276104A JP2789239B2 (en) | 1989-10-25 | 1989-10-25 | Partially covered sand pile construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH03166413A JPH03166413A (en) | 1991-07-18 |
| JP2789239B2 true JP2789239B2 (en) | 1998-08-20 |
Family
ID=17564857
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1276104A Expired - Fee Related JP2789239B2 (en) | 1989-10-25 | 1989-10-25 | Partially covered sand pile construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2789239B2 (en) |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS60242213A (en) * | 1984-05-17 | 1985-12-02 | Fudo Constr Co Ltd | Attaching and detaching of guide tube and water-permeable cylinder in forming partly covered sand-drain pile |
| JPH0629499B2 (en) * | 1988-03-04 | 1994-04-20 | 中富 栗本 | Gravel pile construction method and its equipment |
-
1989
- 1989-10-25 JP JP1276104A patent/JP2789239B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH03166413A (en) | 1991-07-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3163207B2 (en) | Device for cutting anchor tension members in place | |
| JP2789239B2 (en) | Partially covered sand pile construction method | |
| JP2645888B2 (en) | Underground anchor installation method | |
| JP2011252370A (en) | Installation method of strain-measuring pipe in face front natural ground | |
| JP3774886B2 (en) | Anchor construction method | |
| JP2019206868A (en) | Micro pile construction method and insertion member for filling grout material used in micro pile construction method | |
| CN217629848U (en) | Protective arm of reinforcement cage of rotary excavating pile | |
| JP4707001B2 (en) | Improvement method of vacuum consolidation of soft ground mixed with permeable layer | |
| CN216948256U (en) | Grouting pipe for post-grouting of anchoring structure | |
| JPH0313628A (en) | Open caisson sinking method and equipment | |
| JPH03235812A (en) | Underground earth removal anchor establishment method | |
| JP2509005B2 (en) | Ground reinforcement method | |
| JPH033773B2 (en) | ||
| JP4405936B2 (en) | Construction method of impermeable wall | |
| JP7287839B2 (en) | Anchor plate, anchor device and soft ground improvement system | |
| JP4785413B2 (en) | Ground improvement drain material placing and cutting device, method and ground improvement construction method | |
| JP4409468B2 (en) | Impermeable wall construction equipment | |
| JP2007262811A (en) | Pile structure and its pile embedding method | |
| JP4561051B2 (en) | Connection structure of steel members and steel pipe concrete | |
| JP2802226B2 (en) | How to install drainage material on the slope ground | |
| JP3069068B2 (en) | Injection forming material for concrete reverse joint | |
| JPH05125727A (en) | Pipe for filling structure | |
| JPS633087B2 (en) | ||
| JPH0673727A (en) | Construction method of pile pile column retaining wall and special H-section steel | |
| GB1589839A (en) | Anchor and method of installation thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| LAPS | Cancellation because of no payment of annual fees |