JPH0629499B2 - Gravel pile construction method and its equipment - Google Patents
[go: Go Back, main page]

JPH0629499B2 - Gravel pile construction method and its equipment - Google Patents

Gravel pile construction method and its equipment

Info

Publication number
JPH0629499B2
JPH0629499B2 JP5221588A JP5221588A JPH0629499B2 JP H0629499 B2 JPH0629499 B2 JP H0629499B2 JP 5221588 A JP5221588 A JP 5221588A JP 5221588 A JP5221588 A JP 5221588A JP H0629499 B2 JPH0629499 B2 JP H0629499B2
Authority
JP
Japan
Prior art keywords
gravel
tubular bag
casing
tubular
bag body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP5221588A
Other languages
Japanese (ja)
Other versions
JPH01226915A (en
Inventor
中富 栗本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP5221588A priority Critical patent/JPH0629499B2/en
Publication of JPH01226915A publication Critical patent/JPH01226915A/en
Publication of JPH0629499B2 publication Critical patent/JPH0629499B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、軟弱地盤中にグラベル杭(砂、砂利、砕石等
の柱状体)を造成し、このグラベル杭を通して地盤中の
水分を吸い上げ、排出させるグラベル杭造成工法及びそ
の装置に関する。特に本発明は、ケーシングを地盤中に
穿入しつつ、筒状袋体をケーシング内に挿入し、この筒
状袋体にグラベルを充填して袋詰めグラベル杭を形成
し、この袋詰めグラベル杭のみを地盤中に残置埋設する
工法及び装置に関する。
DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention creates a gravel pile (a columnar body of sand, gravel, crushed stone, etc.) in soft ground, and absorbs moisture in the ground through the gravel pile, The present invention relates to a gravel pile construction method for discharging and a device therefor. In particular, the present invention inserts a tubular bag body into the casing while piercing the casing into the ground, fills the tubular bag body with gravel to form a bagging gravel pile, and the bagging gravel pile is provided. The present invention relates to a method and a device for burying only chisel in the ground.

(従来の技術) 従来におけるこの種の工法として特公昭58-39972号公報
に開示されたものがある。これは、砂ホッパーの下部に
垂下連設された砂導入管の外周に、これに沿って下方に
漸次引き出されるよう蛇腹状に収縮して保持させた透水
性の筒状袋体を取付け、そしてこの筒状袋体の下端を緊
縛し、ケーシングを振動打込装置により地盤中に打込み
ながら、砂ホッパー内の砂を砂導入管より筒状袋体に充
填しつつケーシング中に挿入し、而してケーシングを引
き抜いて砂の袋体を地盤中に残置するようにしたもので
ある。
(Prior Art) As a conventional construction method of this type, there is one disclosed in Japanese Patent Publication No. 58-39972. This is attached to the outer periphery of the sand introduction pipe that is hung continuously at the lower part of the sand hopper, and attached with a water-permeable tubular bag that is contracted and held in a bellows shape so that it is gradually pulled out downward along it, and The lower end of this tubular bag is tightly bound, and while the casing is driven into the ground by a vibration driving device, the sand in the sand hopper is inserted into the casing while filling the tubular bag from the sand introduction tube, The casing is pulled out and the sand bag is left in the ground.

(発明が解決しようとする課題) 上記従来工法によれば、長尺状の筒状袋体を砂導入管に
一旦取付けてしまえば、その後の作業が楽で、複数本の
砂杭の造成を連続して行うことができるけれども、この
長尺状筒状袋体の取付けにあたっては砂導入管を機枠を
取り外したり、また砂杭複数本分の長さの筒状袋体を砂
導入管に套嵌し上方へたくし上げて収縮させた状態に保
持しておく必要があるなどその取付作業が甚だ面倒であ
った。
(Problems to be Solved by the Invention) According to the above-mentioned conventional method, once the long tubular bag body is once attached to the sand introducing pipe, the subsequent work is easy and the construction of a plurality of sand piles is possible. Although it can be performed continuously, when installing this long tubular bag, remove the machine frame from the sand introduction pipe, or use a tubular bag with a length for multiple sand piles in the sand introduction pipe. The installation work was extremely troublesome because it was necessary to squeeze it up and keep it in a retracted state.

本発明は、上記のような筒状袋体の面倒な取付作業を不
要としたものであって、グラベルホッパー下部の成形シ
ュートに沿って帯状の透水性シートを筒状袋体に連続的
に成形しつつ下送してケーシング内に挿入するようにし
た工法及び装置を提供することを目的としている。
INDUSTRIAL APPLICABILITY The present invention does not require the troublesome mounting work of the tubular bag as described above, and continuously forms a belt-shaped water-permeable sheet on the tubular bag along the forming chute at the bottom of the gravel hopper. It is an object of the present invention to provide a construction method and a device which are fed down while being inserted into a casing.

(課題を解決するための手段) 上記の目的を達成するために、請求項1に係る本発明の
工法においては、内部に固定ケーシング6が挿入された
回転ケーシング3を回転させつつ地盤W中に穿入しなが
ら、その穿入中に、グラベルホッパー7の下部に垂下連
設された筒状成形シュート8に帯状の透水性シート12を
巻回供給しつつ該シート12の両側重合縁部を縦方向接合
手段16により接合して筒状袋体17を形成し、該筒状袋体
17を、その下端を閉じた状態で下送しつつ固定ケーシン
グ6内に挿入し、グラベルホッパー7内の砂、砂利等の
グラベルGを筒状成形シュート8を介して筒状袋体17内
に充填し、而して両ケーシング3,6が所定深さに達し
且つグラベルGの充填された筒状袋体17の下端部が固定
ケーシング内の下端部に達した後、筒状袋体17の上端部
を筒状成形シュート8の下方で切断して、両ケーシング
3,6を引き抜くようにしたものである。
(Means for Solving the Problem) In order to achieve the above-mentioned object, in the method of the present invention according to claim 1, the rotary casing 3 in which the fixed casing 6 is inserted is rotated and the ground casing W is rotated. During the perforation, while the perforation is being performed, the belt-shaped water-permeable sheet 12 is wound around the cylindrical forming chute 8 that is hung continuously under the gravel hopper 7 and the overlapped edges of the sheet 12 are vertically aligned. The tubular bag body 17 is formed by joining by the direction joining means 16
The lower part 17 of the gravel hopper 7 is inserted into the fixed casing 6 with the lower end closed, and the gravel G such as sand and gravel in the gravel hopper 7 is inserted into the tubular bag body 17 through the tubular forming chute 8. After filling the casings 3 and 6 to a predetermined depth and the lower end of the tubular bag 17 filled with the gravel G reaches the lower end in the fixed casing, the tubular bag 17 is filled. The upper end is cut below the cylindrical forming chute 8 so that both casings 3 and 6 are pulled out.

また、請求項2に係る本発明の工法においては、内部に
固定ケーシング6が挿入された回転ケーシング3を回転
させつつ地盤W中に穿入するに先立ち、グラベルホッパ
ー7の下部に垂下連設された筒状成形シュート8に帯状
の透水性シート12を巻回供給しつつ該シート12の両側重
合縁部を縦方向接合手段16により接合して筒状袋体17を
形成し、該筒状袋体17を下送しつつ固定ケーシング6内
に挿入して、該筒状袋体17の下端を閉塞した後、回転ケ
ーシング3を固定ケーシング6と共に地盤中に穿入し、
而して両ケーシング3,6が所定深さに達した後、グラ
ベルホッパー7内の砂、砂利等のグラベルGを筒状成形
シュート8を介して固定ケーシング6内の筒状袋体17に
充填し、しかる後筒状袋体17を下送しつつ両ケーシング
3,6を引き抜いて、両ケーシング3,6の下方で筒状
袋体17を切断するようにしたものである。
In the method of the present invention according to claim 2, the rotary casing 3 in which the fixed casing 6 is inserted is rotated, and the rotary casing 3 is hung and connected to the lower portion of the gravel hopper 7 before being inserted into the ground W. While the belt-shaped water-permeable sheet 12 is being wound around the cylindrical forming chute 8 and the both side overlapping edges of the sheet 12 are joined by the vertical joining means 16, a tubular bag body 17 is formed. After the body 17 is fed downward, it is inserted into the fixed casing 6 to close the lower end of the tubular bag body 17, and then the rotary casing 3 is inserted into the ground together with the fixed casing 6.
After the casings 3 and 6 reach a predetermined depth, the gravel G such as sand and gravel in the gravel hopper 7 is filled into the tubular bag 17 in the fixed casing 6 through the tubular forming chute 8. After that, both the casings 3 and 6 are pulled out while the tubular bag body 17 is fed downward, and the tubular bag body 17 is cut below the both casings 3 and 6.

更に、請求項1のグラベル杭造成工法を実施するための
装置は、リーダに吊支される機枠1の下部に回転自在に
垂下装備された回転ケーシング3と、この回転ケーシン
グ3を駆動する回転駆動手段5と、上端部が機枠1側に
取付けられていて回転ケーシング3内にその全長に亘っ
て挿入された固定ケーシング6と、機枠1に配備された
グラベルホッパー7と、固定ケーシング6の直上方に位
置するグラベルホッパー7下部に垂下連設された筒状成
形シュート8と、帯状の透水性シート12を筒状成形シュ
ート8の上端部近傍に供給するシート供給手段15と、供
給された透水性シート12を筒状成形シュート8の外面全
周に巻回させると共に該シート12の両側縁部を重合させ
るフォーミングプレート14と、筒状成形シュート8に巻
回される上記シート12の両側縁重合部を接合して筒状袋
体を形成する縦方向接合手段16と、筒状袋体17を固定ケ
ーシング6内に挿入させるべく該筒状袋体17を下向きに
送給する送給手段18と、筒状成形シュート8の下方にお
いてグラベルGの充填された筒状袋体17の上端部を切断
する袋体切断手段と、を具備してなるものである。
Furthermore, the apparatus for carrying out the gravel pile construction method according to claim 1 is a rotary casing 3 rotatably hung under a machine frame 1 suspended by a leader, and a rotary casing for driving the rotary casing 3. Driving means 5, a fixed casing 6 whose upper end is attached to the machine casing 1 side and is inserted into the rotary casing 3 over its entire length, a gravel hopper 7 arranged in the machine casing 1, and a fixed casing 6. , A cylindrical forming chute 8 which is hung and connected to the lower part of the gravel hopper 7, and a sheet supplying means 15 which supplies a strip-shaped water-permeable sheet 12 to the vicinity of the upper end of the cylindrical forming chute 8. Forming plate 14 for winding the water-permeable sheet 12 around the entire outer peripheral surface of the cylindrical forming chute 8 and overlapping both side edges of the sheet 12, and the sheet 12 wound on the cylindrical forming chute 8. Longitudinal joining means 16 that joins both side overlapping portions to form a tubular bag body, and a tubular bag body 17 that is fed downward to insert the tubular bag body 17 into the fixed casing 6. It is provided with means 18 and a bag body cutting means for cutting the upper end portion of the tubular bag body 17 filled with the gravel G below the tubular forming chute 8.

(実施例) 実施例について図面を参照して説明する。(Example) An example will be described with reference to the drawings.

第1図は、請求項1に係る発明(工法)を実施するため
の二連式グラベル杭造成装置を示している。尚、このグ
ラベル杭造成装置は、請求項2に係る発明(工法)も実
施することができるもので、この場合には、後述する熱
溶着切断装置20の使用が不要となる。
FIG. 1 shows a dual gravel pile construction device for carrying out the invention (construction method) according to claim 1. In addition, this gravel pile forming apparatus can also implement the invention (construction method) according to claim 2, and in this case, the use of the heat welding cutting apparatus 20 described later is unnecessary.

この第1図において1はクローラクレーン等に立設され
たリーダ(図示省略)に昇降自在に吊支される機枠で、
この機枠1の下部には、外周面に全長に亘ってスクリュ
ー2を螺設した左右1対の回転ケーシング3,3がそれ
ぞれ回転自在に垂下装備されており、各回転ケーシング
3の下端にはシュー(底蓋)4が開閉自在に装着されて
いる。
In FIG. 1, reference numeral 1 is a machine frame that is suspended and supported by a leader (not shown) installed upright on a crawler crane,
A pair of left and right rotary casings 3, 3 each having a screw 2 screwed on the outer peripheral surface over the entire length are rotatably hung at the lower part of the machine casing 1, and the lower ends of the rotary casings 3 are respectively installed. A shoe (bottom lid) 4 is attached so as to be openable and closable.

上記両回転ケーシング3,3は、機枠1内に配備された
回転駆動機構5,5(第3図参照)によりそれぞれ駆動
されて、互いに反対方向に回転するようになっている。
また、各回転ケーシング3内にはこれより若干径小の固
定ケーシング6が回転ケーシング3の全長に亘って挿入
配備され、この固定ケーシング6の上端部は機枠1に対
し固定してある。
The rotary casings 3 and 3 are driven by rotary drive mechanisms 5 and 5 (see FIG. 3) provided in the machine frame 1 to rotate in opposite directions.
A fixed casing 6 having a diameter slightly smaller than that of the rotary casing 3 is inserted and arranged along the entire length of the rotary casing 3, and an upper end portion of the fixed casing 6 is fixed to the machine casing 1.

7は、機枠1の上部に配設されたグラベルホッパーで、
このグラベルホッパー7の下部には固定ケーシング6,
6のそれぞれ直上方位置に円筒状の成形シュート8,8
が下向き垂直に一体連設されている。また、グラベルホ
ッパー7の内部には各成形シュート8への排出口9を開
閉する開閉弁10が設けられ、各開閉弁10はエアシリンダ
11により駆動される。
7 is a gravel hopper arranged on the upper part of the machine frame 1,
At the bottom of the gravel hopper 7, a fixed casing 6,
Cylindrical forming chutes 8 and 8 are provided at positions directly above, respectively.
Are vertically integrated downwards. Further, inside the gravel hopper 7, an on-off valve 10 for opening and closing the discharge port 9 to each forming chute 8 is provided, and each on-off valve 10 is an air cylinder.
Driven by 11.

12は、機枠1に対し着脱自在に取付けられる巻枠13にロ
ール状に巻かれている帯状透水性シートとしての、塩化
ビニル等熱可塑性プラスチックからなる帯状の網状(ネ
ット状)シートである。このロール巻きされた網状シー
ト12は、第2図に示すように、シート供給手段により各
成形シュート8の上端部近傍に供給されて、フォーミン
グプレート14に導かれ、このフォーミングプレート14に
よって成形シュート8の外周面に巻回されると共に、当
該網状シート12の縦方向両側縁部12a,12aを成形シュ
ート8の外周面上で互いに重合させられつつ円筒状に成
形される。上記シート供給手段は例えば、巻枠13の巻胴
部分を回転させる回転駆動機構(図示せず)及び中間の
案内ローラ15等よりなる。
Reference numeral 12 is a strip-shaped mesh (net-shaped) sheet made of a thermoplastic such as vinyl chloride as a strip-shaped water-permeable sheet wound in a roll shape on a reel 13 which is detachably attached to the machine frame 1. As shown in FIG. 2, the roll-wound mesh sheet 12 is supplied to the vicinity of the upper end of each forming chute 8 by the sheet supplying means and guided to the forming plate 14, and the forming plate 14 forms the forming chute 8. While being wound on the outer peripheral surface of the mesh sheet 12, both side edges 12a, 12a in the longitudinal direction of the mesh sheet 12 are formed on the outer peripheral surface of the forming chute 8 while being overlapped with each other to form a cylindrical shape. The sheet feeding means includes, for example, a rotation driving mechanism (not shown) for rotating the winding drum portion of the winding frame 13, an intermediate guide roller 15, and the like.

16は、各成形シュート8に巻回される網状シート12の重
合された縦方向両側縁部12a,12aを接合する縦方向接
合手段としての縦方向ヒートシーラで、第1図、第2図
に示されるように各成形シュート8の一側面に対し接離
可能に配備されていて、上記重合された両側縁部12a,
12aを熱溶着して筒状袋体17形成するようになってい
る。18は、各成形シュート8で形成される筒状袋体17を
下向きに送給する送給手段としての送りローラで、第2
図で明らかなように成形シュート8下部の両側対向位置
に1対配備されていて形成された筒状袋体17の両側部を
挟持した状態で回転しながらこの袋体17を下送して固定
ケーシング6中に挿入するようになっている。19は各送
りローラ17を駆動するモータである。
Reference numeral 16 denotes a longitudinal heat sealer as a longitudinal joining means for joining the polymerized longitudinal side edges 12a, 12a of the mesh sheet 12 wound around each forming chute 8 and is shown in FIGS. 1 and 2. As shown in FIG.
The cylindrical bag 17 is formed by heat welding the 12a. Reference numeral 18 denotes a feed roller as a feeding means for feeding the tubular bag body 17 formed by each forming chute 8 downward.
As is apparent from the figure, a pair of cylindrical bags 17 are formed at a position opposite to each other on the lower side of the forming chute 8 and are clamped while holding both sides of the cylindrical bag 17, and the bag 17 is fed downward and fixed. It is designed to be inserted into the casing 6. Reference numeral 19 is a motor that drives each feed roller 17.

20は、成形シュート8の下方において筒状袋体17を横方
向に熱溶着と切断を同時に行う熱溶着切断装置で、左右
1対の可動枠20a,20aを有し、一方の可動枠20bに横
方向ヒートシーラ21b及びカッター22bが、他方の可動
枠20aに溶着台21a及びカッター受け22aがそれぞれ配
設されていて、両可動枠20a,20bが対向方向に移動し
て対接することにより筒状袋体17が横方向に熱溶着され
て上部側の袋体17の下端がシールされると同時に、その
シール部の下部が切断されて、切り離された下部側の袋
体17の上端が開口されることになる。
Reference numeral 20 denotes a heat-welding cutting device that simultaneously heat-welds and cuts the tubular bag body 17 laterally below the forming chute 8 and has a pair of left and right movable frames 20a, 20a, and one movable frame 20b. The horizontal heat sealer 21b and the cutter 22b are provided with the welding table 21a and the cutter receiver 22a on the other movable frame 20a, and the movable frames 20a and 20b move in opposite directions and come into contact with each other to form a tubular bag. The body 17 is heat-sealed in the lateral direction to seal the lower end of the upper bag body 17, and at the same time, the lower part of the sealing portion is cut to open the upper end of the separated lower bag body 17. It will be.

前記各回転駆動機構5は、第3図に示すように、回転ケ
ーシング3上端部の前後両側に配設された原動機(図示
省略)の出力軸23,23に小ギヤ24,24を固装し、これら
の小ギヤ24,24を、回転ケーシング3上端部に固装した
大ギヤ25に噛合してなるものである。
As shown in FIG. 3, each rotary drive mechanism 5 has small gears 24, 24 fixed to the output shafts 23, 23 of a prime mover (not shown) disposed on the front and rear sides of the upper end of the rotary casing 3. The small gears 24, 24 are meshed with a large gear 25 fixed to the upper end of the rotary casing 3.

次に、上述したような構成のグラベル杭造成装置を使用
して、請求項1に係る発明を実施する実施例につき具体
的に説明する。
Next, an embodiment for carrying out the invention according to claim 1 will be specifically described by using the gravel pile forming device having the above-described configuration.

先ず、網状シート12がロール巻きされた左右の巻枠13,
13を機枠1の定位置にそれぞれ装着すると共に、各巻枠
13から若干繰り出した網状シート12の先端部を、案内ロ
ーラ15からフォーミングプレート14へ供給し、更にこの
フォーミングプレート14を介して成形シュート8に套嵌
させ、送りローラ18,18にて挟持させておく。それか
ら、回転駆動機構5,5によって回転ケーシグ3,3を
第4図Aの矢印方向に回転させながら地盤W中に穿入し
てゆく。
First, the left and right reels 13 around which the mesh sheet 12 is rolled,
13 are mounted on the machine frame 1 at fixed positions, and
The leading end portion of the mesh sheet 12 slightly fed from 13 is supplied from the guide roller 15 to the forming plate 14, further fitted onto the forming chute 8 via the forming plate 14, and sandwiched by the feed rollers 18, 18. deep. Then, the rotary drive mechanisms 5 and 5 penetrate the ground W while rotating the rotary casings 3 and 3 in the direction of the arrow in FIG. 4A.

一方、各縦方向ヒートシーラ16を成形シュート8に向か
って接近移動させて網状シート12の両側重合縁部をこの
ヒートシーラ16の長さ分だけ溶着接合して筒状袋体17を
形成し、その後ヒートシーラ16を元の位置に退避させる
と共に、その溶着接合により形成された筒状筒体17の長
さにほぼ相当する長さ分だけ筒状袋体17を送りローラ1
8,18により下送する。その後、ヒートシーラ16を再び
成形シュート8に対し接近移動させて同網状シート12の
両側重合縁部を溶着接合する。このような動作を繰り返
すことによって、一連の筒状袋体17をほとんど連続的に
形成しつつ固定ケーシング6中に挿入してゆく(第4図
A参照)。
On the other hand, each longitudinal heat sealer 16 is moved toward the forming chute 8 to weld both overlapping edge portions of the mesh sheet 12 by the length of the heat sealer 16 to form a tubular bag body 17, and then the heat sealer. 16 is retracted to its original position, and the tubular bag body 17 is moved by a length substantially corresponding to the length of the tubular tube body 17 formed by the welding and joining thereof.
Send by 8 and 18. After that, the heat sealer 16 is again moved closer to the forming chute 8 to weld and join the overlapping edge portions on both sides of the reticulated sheet 12. By repeating such an operation, a series of cylindrical bag bodies 17 are formed almost continuously and are inserted into the fixed casing 6 (see FIG. 4A).

尚、最初に形成される筒状袋体17にあっては熱溶着切断
装置20を使用してその袋体17の先端をシールし、そして
固定ケーシング6中への筒状袋体17の挿入を容易且つ確
実に行わせるために、筒状袋体17先端のシール後、開閉
弁10を開いてホッパー7内のグラベルGを第4図Aに示
すように筒状袋体17内に少量投入して重りとする。
In the case of the tubular bag body 17 formed first, the tip of the tubular bag body 17 is sealed by using the heat welding cutting device 20, and the tubular bag body 17 is inserted into the fixed casing 6. In order to perform the operation easily and surely, after sealing the tip of the tubular bag body 17, the on-off valve 10 is opened and a small amount of the gravel G in the hopper 7 is put into the tubular bag body 17 as shown in FIG. 4A. And weight it.

而して、回転ケーシング3が地盤W中の所定深さに達し
且つ筒状袋体17の下端部が固定ケーシング6の下端部に
到達したならば、第4図Bに示すように、開閉弁10,10
を開放作動させて、グラベルホッパー7内のグラベルG
を成形シュート8,8を通して筒状袋体17内に充填し、
グラベルGが満杯状態となったら、開閉弁10,10を閉止
作動させる。
When the rotary casing 3 reaches a predetermined depth in the ground W and the lower end of the tubular bag 17 reaches the lower end of the fixed casing 6, as shown in FIG. 10, 10
The gravel G in the gravel hopper 7 by opening the
Is filled into the cylindrical bag body 17 through the molding chutes 8 and 8.
When the gravel G is full, the on-off valves 10 and 10 are closed.

筒状袋体17内へのグラベルGの充填を終えた後、熱溶着
切断装置20を作動させて、筒状袋体17の上端部を成形シ
ュート8の下方で溶着、切断し、それにより成形シュー
ト8側の筒状袋体17部分の下端部をシールすると同時
に、固定ケーシング6側の筒状袋体17部分を、成形シュ
ート8側の筒状袋体17部分から切り離す。その後、第4
図Cに示すように、回転ケーシング3,3を穿入時とは
逆方向に回転させつつこれらを固定ケーシング6,6と
共に地盤W中から引き抜き、それぞれグラベルGが充填
された袋体17のみを地盤W中に残置せしめてグラベル杭
を造成する(第4図C及びD参照)。
After the filling of the gravel G into the tubular bag body 17 is completed, the heat welding cutting device 20 is operated to weld and cut the upper end portion of the tubular bag body 17 below the forming chute 8 to thereby form At the same time as sealing the lower end of the tubular bag body 17 portion on the chute 8 side, the tubular bag body 17 portion on the fixed casing 6 side is separated from the tubular bag body 17 portion on the forming chute 8 side. Then the 4th
As shown in FIG. C, while rotating the rotating casings 3 and 3 in the direction opposite to that at the time of insertion, they are pulled out together with the fixed casings 6 and 6 from the ground W, and only the bag body 17 filled with the gravel G is removed. A gravel pile is formed by leaving it in the ground W (see FIGS. 4C and 4D).

こうして1つの場所でのグラベル杭の造成を終えたら、
次の所定の場所へ装置全体を移動し、上記同様の一連の
工程を行えばよい。尚、1つの巻枠13にロール巻きされ
ている帯状の網状シート121本で、グラベル杭数10本分
の筒状袋体17を形成することができる。このロール巻き
された1本の網状シート12を使い果たした場合は、古い
巻枠13を取り外して、網状シート12がロール巻きしてあ
る新しい巻枠13を装着し、先端部を案内ローラ15、フォ
ーミングプレート14及び成形シュート8に巻き掛ければ
よく、これらの操作は簡単に行えるものである。
After completing the construction of the gravel pile in one place,
The entire apparatus may be moved to the next predetermined place, and a series of steps similar to the above may be performed. It is possible to form the tubular bag body 17 for ten gravel piles with one strip-shaped mesh sheet 121 that is wound around one reel 13. When this roll-wound mesh sheet 12 is used up, the old winding frame 13 is removed, a new winding frame 13 with the mesh sheet 12 wound in a roll is attached, and the leading end is guided by the guide roller 15 and forming. It suffices to wind it around the plate 14 and the molding chute 8, and these operations can be easily performed.

以上は請求項1に係る発明の実施例の説明であって、回
転ケーシング3を地盤W中に穿入しながら、その穿入中
に、筒状袋体17を形成しつつ固定ケーシング6内に挿入
し、この筒状袋体17の下端部が固定ケーシング6内の下
端部に達し且つ両ケーシング3,6が地盤中の所定深さ
に達した後、筒状袋体17へのグラベルGの充填を行い、
その後、筒状袋体17の上端部を筒状形成シュート8の下
方で切断するようにしているが、請求項2に係る発明の
実施においては、回転ケーシング3を地盤W中に穿入す
るに先立って、筒状袋体17を形成しつつ固定ケーシング
6内の下端部まで挿入して、この筒状袋体17の下端部を
閉塞した後、回転ケーシング3を地盤W中に穿入し、そ
の後、筒状袋体17にグラベルGを充填し、両ケーシング
3,6を引き抜いてから両ケーシング3,6の下方で筒
状袋体17上端部を切断するものである。以下、請求項2
に係る発明の実施例につき第1図を参照して説明する。
The above is the description of the embodiment of the invention according to claim 1, in which the rotary casing 3 is inserted into the ground W, and the tubular bag body 17 is formed in the fixed casing 6 while the rotary casing 3 is being inserted. After being inserted, the lower end of the tubular bag 17 reaches the lower end in the fixed casing 6 and both casings 3, 6 reach a predetermined depth in the ground, and then the gravel G on the tubular bag 17 is inserted. Do the filling,
After that, the upper end of the tubular bag body 17 is cut below the tubular forming chute 8, but in the embodiment of the invention according to claim 2, when the rotary casing 3 is inserted into the ground W, First, the tubular bag 17 is formed and inserted into the lower end of the fixed casing 6 to close the lower end of the tubular bag 17, and then the rotary casing 3 is inserted into the ground W. Thereafter, the tubular bag body 17 is filled with the gravel G, both casings 3 and 6 are pulled out, and the upper end portion of the tubular bag body 17 is cut below the both casings 3 and 6. Hereinafter, claim 2
An embodiment of the present invention will be described with reference to FIG.

すなわち、回転ケーシング3を地盤W中に穿入する前
に、網状シート12を、フォーミングプレート14を介して
成形シュート8に供給し、この網状シート12を送りロー
ラ18,18にて挟持させ、そして縦方向ヒートシーラ16を
成形シュート8に向かって接近移動させて網状シート12
の両側重合縁部をこのヒートシーラ16の長さ分だけ溶着
接合して筒状袋体17を形成し、その後ヒートシーラ16を
元の位置に退避させると共に、その溶着接合により形成
された筒状袋体17の長さにほぼ相当する長さ分だけ筒状
袋体17を送りローラ18,18により下送する。その後、ヒ
ートシーラ16を再び成形シュート8に対し接近移動させ
て同網状シート12の両側重合縁部を溶着接合する。この
ような動作を繰り返すことによって、一連の筒状袋体17
を形成しながら、筒状袋体17を固定ケーシング6中にそ
の下端部まで挿入する。
That is, before the rotary casing 3 is penetrated into the ground W, the mesh sheet 12 is supplied to the forming chute 8 through the forming plate 14, and the mesh sheet 12 is held by the feed rollers 18 and 18, and Move the longitudinal heat sealer 16 toward the forming chute 8 to move the mesh sheet 12
Both sides of the overlapped edges are weld-bonded by the length of the heat sealer 16 to form a tubular bag body 17, and then the heat sealer 16 is retracted to its original position, and the tubular bag body formed by the welding joint. The cylindrical bag body 17 is fed downward by the feed rollers 18 and 18 by a length substantially corresponding to the length of 17. After that, the heat sealer 16 is again moved closer to the forming chute 8 to weld and join the overlapping edge portions on both sides of the reticulated sheet 12. By repeating such an operation, a series of cylindrical bags 17
The tubular bag 17 is inserted into the fixed casing 6 up to the lower end while forming.

そして、筒状袋体17の下端部が固定ケーシング6内の下
端部に達したとき、送りローラ18,18による筒状袋体17
の下送を一旦停止し、この筒状袋体17の下端部を人手に
より紐等で緊縛して閉塞する。
Then, when the lower end portion of the tubular bag body 17 reaches the lower end portion in the fixed casing 6, the tubular bag body 17 formed by the feed rollers 18, 18.
Then, the lower feeding is temporarily stopped, and the lower end portion of the tubular bag body 17 is manually bound with a string or the like to close it.

こうして固定ケーシング6内に挿入された筒状袋体17の
下端部を閉塞した状態から、回転ケーシング3を回転さ
せつつ固定ケーシング6と共に地盤W中に穿入してい
く。
In this way, from the state where the lower end of the tubular bag 17 inserted into the fixed casing 6 is closed, the rotary casing 3 is rotated and penetrated into the ground W together with the fixed casing 6.

而して、両ケーシング3,6を地盤W中の所定深さに達
したならば、開閉弁10,10を開放作動させて、グラベル
ホッパー7内のグラベルGを筒状袋体17内に充填し、グ
ラベルGが満杯状態となったら、開閉弁10,10を閉止作
動させる。
When both casings 3 and 6 reach a predetermined depth in the ground W, the opening / closing valves 10 and 10 are opened to fill the gravel G in the gravel hopper 7 into the tubular bag body 17. When the gravel G is full, the on-off valves 10 and 10 are closed.

上記のようにして筒状袋体17内へのグラベルGの充填を
終えた後、両ケーシング3,6を引き抜いてグラベルG
の充填された筒状袋体17を地盤W中に残置するわけであ
るが、この場合、グラベルGの充填された筒状袋体17部
分は、成形シュート8に套嵌されて送りローラ18,18で
挟持されている袋体17部分とつながっているため、この
ままの状態で両ケーシング3,6を引き抜くと、グラベ
ルGの充填された筒状袋体17部分は、両ケーシング3,
6と共に地上に引き上げられるか、あるいは成形シュー
ト8側の袋体17部分から分断されることになる。
After the filling of the gravel G into the tubular bag 17 is completed as described above, the casings 3 and 6 are pulled out to remove the gravel G.
The tubular bag body 17 filled with the gravel G is left in the ground W. In this case, the tubular bag body 17 portion filled with the gravel G is fitted into the forming chute 8 to feed the roller 18, Since it is connected to the bag body 17 part sandwiched by 18, if both casings 3 and 6 are pulled out in this state, the tubular bag body 17 part filled with gravel G will be
6 will be pulled up to the ground together with 6, or will be separated from the bag body 17 portion on the molding chute 8 side.

したがって、このような筒状袋体17の共上がりや分断を
回避して、グラベルGの充填された筒状袋体17部分のみ
を地盤W中に残すと共に、次の造成作業に備えるため
に、前述した網状シート12からの筒状袋体17の形成作業
を再開して、成形シュート8により形成されてくる筒状
袋体17を、送りローラ18,18によってケーシング3,6
の引き上げ速度とほぼ同じ速度で下方へ送給しつつ、回
転ケーシング3を固定ケーシング6と共に引き抜いてい
く。
Therefore, in order to avoid such rising and division of the tubular bag body 17 and leave only the tubular bag body 17 portion filled with the gravel G in the ground W and prepare for the next construction work, The operation of forming the tubular bag body 17 from the mesh sheet 12 is restarted, and the tubular bag body 17 formed by the forming chute 8 is fed into the casings 3, 6 by the feed rollers 18, 18.
The rotary casing 3 is pulled out together with the fixed casing 6 while feeding downward at a speed substantially the same as the pulling speed.

こうして両ケーシング3,6を地上に引き上げたなら
ば、筒状袋体17の下送を停止し、そして、このグラベル
の充填された筒状袋体17部分の上端部を両ケーシング
3,6の下方でナイフ等により切断する。この場合の切
断作業は、ケーシング3,6の下端が地上の低い位置に
あるため、作業員が地上において容易に行うことができ
る。この筒状袋体17の切断によって、成形シュート8か
ら延びて固定ケーシング6内の下端まで挿入された筒状
袋体17部分と、グラベルGの充填されて地盤W中に残置
された筒状袋体17部分とに分離されることになる。そし
て、固定ケーシング6内に挿入されている筒状袋体17部
分の下端部を紐等で緊縛して閉塞することにより、次の
造成作業に備えることができる。
When both casings 3 and 6 are pulled up to the ground in this way, the lowering of the tubular bag body 17 is stopped, and the upper end portion of the tubular bag body 17 portion filled with this gravel is attached to both casings 3 and 6. Cut with a knife or the like below. Since the lower ends of the casings 3 and 6 are located at a lower position on the ground, the cutting work in this case can be easily performed by the worker on the ground. By cutting the tubular bag body 17, the tubular bag body 17 portion extending from the forming chute 8 and inserted to the lower end in the fixed casing 6, and the tubular bag body filled with the gravel G and left in the ground W. It will be separated into 17 parts of the body. Then, the lower end portion of the cylindrical bag body 17 portion inserted into the fixed casing 6 is tightly bound and closed with a string or the like to prepare for the next construction work.

尚、前述した請求項1に係る発明の実施例ではグラベル
が充填された筒状袋体17の上端部を成形シュート8の下
方において切断するのに熱溶着切断装置20のカッターに
よって自動的に切断するようにしているが、ナイフを用
いて手で切断するようにしてもよく、また切断後の成形
シュート8側の筒状袋体17下端はヒートシーラによるこ
となく、作業員が紐等で緊縛するようにしてもよい。
In the embodiment of the invention according to claim 1 described above, the upper end of the tubular bag body 17 filled with the gravel is automatically cut by the cutter of the heat welding cutting device 20 for cutting below the forming chute 8. However, the lower end of the tubular bag body 17 on the side of the forming chute 8 after cutting may be bound by a worker with a string or the like without using a heat sealer. You may do it.

また、前述した実施例のグラベル杭造成装置において
は、固定ケーシング6を回転ケーシング3に対して全く
移動不能に配備すると共に、この固定ケーシング6の下
端が回転ケーシング3の下端部内に納まるようにしてい
るが、好ましくは第5図及び第6図に例示しているよう
に固定ケーシング6を回転ケーシング3に対し上下動可
能に設けて必要時に固定ケーシング6の下端部を回転ケ
ーシング3下端より突出できるようにすることが望まし
い。
Further, in the gravel pile forming apparatus of the above-described embodiment, the fixed casing 6 is arranged so as to be immovable with respect to the rotary casing 3, and the lower end of the fixed casing 6 is housed in the lower end portion of the rotary casing 3. However, preferably, as illustrated in FIGS. 5 and 6, the fixed casing 6 is provided to be movable up and down with respect to the rotary casing 3 so that the lower end portion of the fixed casing 6 can protrude from the lower end of the rotary casing 3 when necessary. It is desirable to do so.

すなわち、第5図及び第6図に示すように、回転ケーシ
ング3に対し相対回転可能にして且つ上下動可能に嵌挿
した固定ケーシング6の上端部周辺に、機枠1に立設支
持される流体圧シリンダ26を複数配設し、各流体圧シリ
ンダ26のピストンロッド26aを固定ケーシング6に連結
し、而して常時は第5図のように各流体圧シリンダ26の
ピストンロッド26a を伸長位置に保持して、固定ケーシ
ング6の下端が回転ケーシング3の下端部内に納まるよ
うにし、そしてグラベル杭の造成に際し回転ケーシング
3を逆転させつつ引き上げて袋詰めしたグラベル杭を固
定ケーシング6下端から地盤W中に排出させるにあたっ
て、第6図に示すように各流体圧シリンダ26のピストン
ロッド26aを収縮作動させて、固定ケーシング6の下端
部を回転ケーシング3下端より所要長さ突出させるよう
にしたものである。尚、固定ケーシング6下端部の回転
ケーシング3下端からの突出時に、第6図で明らかなよ
うにシュー4が強制開放されることになる。
That is, as shown in FIGS. 5 and 6, the machine casing 1 is erected and supported around the upper end portion of the fixed casing 6 which is inserted into the rotary casing 3 so as to be relatively rotatable and vertically movable. Plural fluid pressure cylinders 26 are provided, and the piston rods 26a of each fluid pressure cylinder 26 are connected to the fixed casing 6. Therefore, as shown in FIG. 5, the piston rods 26a of each fluid pressure cylinder 26 are normally extended. So that the lower end of the fixed casing 6 fits within the lower end of the rotary casing 3 and the rotary casing 3 is reversed while the gravel pile is being constructed, and the gravel pile that has been bagged up is ground from the lower end of the fixed casing 6 to the ground W. When the fluid is discharged into the inside, the piston rod 26a of each fluid pressure cylinder 26 is contracted as shown in FIG. The required length is projected from the end. When the lower end of the fixed casing 6 projects from the lower end of the rotary casing 3, the shoe 4 is forcibly opened, as is apparent from FIG.

上述のように、ケーシング引き抜き時に固定ケーシング
6の下端部を突出させるようにすれば、回転ケーシング
3の下端部周辺の土砂によってシュー4にこれを閉じよ
うとする圧力がかかっても回転ケーシング3下端から突
出した固定ケーシング6によりシュー4は開放状態を維
持することができると共に、固定ケーシング3下端から
排出される袋体17が回転するシュー4が触れることがな
いため、この袋体17がシュー4によって損傷されるおそ
れがない。尚、流体圧シリンダに代えて、エアばね装置
やラック・ピニオン駆動装置を使用してもよい。
As described above, if the lower end of the fixed casing 6 is projected when the casing is pulled out, even if the shoe 4 is pressed by the earth and sand around the lower end of the rotating casing 3 to close it, the lower end of the rotating casing 3 is closed. The shoe 4 can be maintained in an open state by the fixed casing 6 projecting from it, and the bag 17 discharged from the lower end of the fixed casing 3 does not come into contact with the rotating shoe 4. There is no danger of being damaged by. An air spring device or a rack and pinion drive device may be used instead of the fluid pressure cylinder.

また、前述した請求項1及び請求項2に係る発明の実施
例では透水性シートとして網状シート12を用いたが、透
水性を有するものであれば網状シート12以外の布地シー
ト等を用いてもよい。
Although the mesh sheet 12 is used as the water permeable sheet in the above-described embodiments of the inventions according to claims 1 and 2, a cloth sheet other than the mesh sheet 12 may be used as long as it has water permeability. Good.

更に、請求項1に係る発明の実施例においては、成形シ
ュート8上にて成形される帯状の網状シート12の重合さ
れた両側縁部を接合するのにヒートシーラ16を用いて熱
溶着するようにしているが、このようなヒートシーラ以
外に、例えば上記網状シート12の両側縁部を成形シュー
ト8の外周側面にて自動的に縫合しうるミシンのような
接合手段を使用することもできる。このような接合手段
によれば、透水性シートは熱可塑性プラスチック製品以
外のどのような材料からなるものでも使用可能となる。
Further, in the embodiment of the invention according to claim 1, the heat sealer 16 is used to join the polymerized side edges of the strip-shaped mesh sheet 12 formed on the forming chute 8 by heat welding. However, in addition to such a heat sealer, a joining means such as a sewing machine that can automatically sew both side edges of the mesh sheet 12 on the outer peripheral side surface of the forming chute 8 can be used. According to such a joining means, the water-permeable sheet can be made of any material other than thermoplastic products.

更に、前述した請求項1に係る発明の実施例では、筒状
袋体17を固定ケーシング6内にほとんど挿入し終えた段
階でグラベルGをその袋体17内に充填するようにしてい
るが、成形シュート8上での網状シート12の両側縁部の
接合さえ確実に行えるならば、筒状袋体17を固定ケーシ
ング6内へ挿入している間に、筒状袋体17へのグラベル
Gの充填を行ってもよい。
Furthermore, in the above-described embodiment of the invention according to claim 1, the gravel G is filled into the bag body 17 at the stage when the tubular bag body 17 is almost inserted into the fixed casing 6. If it is possible to securely join both side edges of the mesh sheet 12 on the forming chute 8, while the tubular bag body 17 is being inserted into the fixed casing 6, the gravel G on the tubular bag body 17 can be removed. Filling may be performed.

更に、前述した各実施例では2本のグラベル杭を同時に
造成できる2連式のグラベル杭造成装置につき説明した
が、本発明は勿論1連式のものあるいは3連式以上のも
のにも適用可能である。ただし、2連式のものの方が最
も能率良く経済的に造成作業を施工できるものである。
Further, in each of the above-mentioned embodiments, the description has been given of the double-type gravel pile forming apparatus capable of simultaneously forming two gravel piles, but the present invention can be applied to a single-type or triple-type or more. Is. However, the double type is the most efficient and can be economically constructed.

更に前述した請求項1に係る発明の実施例ではロール巻
きした網状シート12を機枠1に装架したが、地上に設置
してもよい。
Furthermore, in the above-described embodiment of the invention according to claim 1, the rolled reticulated sheet 12 is mounted on the machine frame 1, but may be installed on the ground.

(発明の効果) 請求項1に係る発明によれば、回転ケーシングを固定ケ
ーシングと共に地盤中に穿入しながら、その穿入中に、
帯状の透水性シート、成形シュート及び縦方向接合手段
によって筒状袋体に連続的に形成し、該袋体を、その下
端部を閉じた状態で下送しつつ固定ケーシング中に挿入
し、グラベルホッパー内にグラベルを筒状袋体内に充填
し、而して両ケーシングが所定深さに達し且つグラベル
の充填された筒状袋体の下端部が固定ケーシング内の下
端部に達した後、筒状袋体の上端部を筒状成形シュート
の下方で切断して、両ケーシングを引き抜くようにして
いるので、帯状の透水性シートをあらかじめロール巻き
しておいてこのロール状シートを繰り出しながら成形シ
ュートに供給することにより、必要とする任意の長さの
袋詰めグラベル杭を容易に形成できると共に、多数本の
袋詰めグラベル杭の造成作業を効率良く行うことができ
る。特に、透水性シートを使い果たしたときは、従来工
法のように砂導入管を取り外したり新たな袋体を収縮さ
せた状態で保持させるといった面倒な作業を行う必要が
なく、ただ新たな透水性シートの先端部を成形シュート
側に導入してやるだけでよいから、その作業は従来工法
に比べ非常に簡単となって、グラベル杭の造成作業能率
の著しい向上を期することができる、 請求項2に係る発明によれば、ケーシングを地盤中に穿
入する前に、透水性のシートから筒状袋体を形成し、該
筒状袋体を下送しつつ固定ケーシング内に挿入して、該
筒状袋体の下端を閉塞した後、回転ケーシングを固定ケ
ーシングと共に地盤中に穿入し、而して両ケーシングが
所定深さに達した後、グラベルを筒状成形シュートを介
して筒状袋体に充填し、しかる後筒状袋体を下送しつつ
両ケーシングを引き抜いて、両ケーシングの下方で筒状
袋体を切断するので、最初の袋詰めグラベル杭を地盤中
に残置埋設してその箇所での杭造成作業を終えた後、両
ケーシングを地上に引き上げた時には、固定ケーシング
内には筒状袋体が既に挿入されており、したがって直ち
に次のグラベル杭造成作業に移ることができることにな
り、作業能率を一層向上させることができる。
(Effect of the Invention) According to the invention of claim 1, while the rotary casing is being pierced into the ground together with the fixed casing, during the piercing,
A tubular water-permeable sheet, a forming chute and a longitudinal joining means are continuously formed into a tubular bag body, and the bag body is inserted into a fixed casing while being fed downward with its lower end closed, After filling the gravel into the tubular bag inside the hopper, both casings reach a predetermined depth, and the lower end of the tubular bag filled with gravel reaches the lower end in the fixed casing. Since the upper end of the bag is cut below the tubular forming chute and both casings are pulled out, the strip-shaped water-permeable sheet is rolled in advance and the forming chute is fed out from the rolled sheet. By supplying the bagging gravel pile to the bag, it is possible to easily form a bagging gravel pile having a desired length and efficiently construct a large number of bagging gravel piles. In particular, when the water permeable sheet is used up, there is no need to perform the troublesome work of removing the sand introduction tube and holding the new bag in a contracted state as in the conventional method, but just using the new water permeable sheet. Since it is only necessary to introduce the tip part of the above into the forming chute side, the work is much simpler than the conventional method, and it is possible to achieve a marked improvement in the construction work efficiency of the gravel pile. According to the invention, before piercing the casing into the ground, a tubular bag is formed from a water-permeable sheet, and the tubular bag is inserted into the fixed casing while being fed downward, After closing the lower end of the bag body, the rotary casing was pierced into the ground together with the fixed casing, and after both casings reached a predetermined depth, the gravel was put into the tubular bag body through the tubular forming chute. Cylindrical bag filled after filling While lowering the body, pull out both casings and cut the tubular bag body under both casings, so the first bagging gravel pile was buried in the ground and the pile construction work at that location was completed. After that, when both casings are pulled up to the ground, the tubular bag is already inserted in the fixed casing, so that it is possible to immediately move on to the next gravel pile construction work, further improving work efficiency. You can

請求項3に係るグラベル杭造成装置によれば、グラベル
杭造成作業が全て自動的に行えるため、作業の省力化と
作業能率の向上化に大いに貢献することができる。
According to the gravel pile forming apparatus of the third aspect, all the gravel pile forming work can be automatically performed, which can greatly contribute to labor saving of work and improvement of work efficiency.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の実施例を示すグラベル杭造成装置の縦
断面図、第2図は第1図の装置の一部拡大斜視図、第3
図は第1図のIII−III線断面図、第4図A〜Dは本発明
の施工工程を示す説明図、第5図及び第6図は他の実施
例によるグラベル杭造成装置を示すそれぞれ断面説明図
である。 1……機枠、2……スクリュー、3……回転ケーシン
グ、4……シュー、5……回転駆動機構、6……固定ケ
ーシング、7……グラベルホッパー、8……成形シュー
ト、10……開閉弁、12……網状シート(帯状透水性シー
ト)、12a……網状シートの縦方向側縁部、14……フォ
ーミングプレート、16……縦方向ヒートシーラ(縦方向
接合手段)、17……筒状袋体、18……送りローラ(送給
手段)、20……熱溶着切断装置。
FIG. 1 is a longitudinal sectional view of a gravel pile forming apparatus showing an embodiment of the present invention, FIG. 2 is a partially enlarged perspective view of the apparatus of FIG. 1, and FIG.
FIG. 3 is a sectional view taken along the line III-III in FIG. 1, FIGS. 4A to 4D are explanatory views showing a construction process of the present invention, and FIGS. 5 and 6 show a gravel pile forming apparatus according to another embodiment, respectively. FIG. 1 ... Machine frame, 2 ... Screw, 3 ... Rotating casing, 4 ... Shoe, 5 ... Rotation drive mechanism, 6 ... Fixed casing, 7 ... Gravel hopper, 8 ... Forming chute, 10 ... Open / close valve, 12 ... Mesh sheet (band-shaped water permeable sheet), 12a ... Vertical edge of mesh sheet, 14 ... Forming plate, 16 ... Vertical heat sealer (longitudinal joining means), 17 ... Tube Bag, 18 ... Feeding roller (feeding means), 20 ...

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】内部に固定ケーシングが挿入された回転ケ
ーシングを回転させつつ地盤中に穿入しながら、その穿
入中に、グラベルホッパーの下部に垂下連設された筒状
成形シュートに帯状の透水性シートを巻回供給しつつ該
シートの両側重合縁部を縦方向接合手段により接合して
筒状袋体を形成し、該筒状袋体を、その下端を閉じた状
態で下送しつつ固定ケーシング内に挿入し、グラベルホ
ッパー内の砂、砂利等のグラベルを筒状成形シュートを
介して固定ケーシング内の筒状袋体に充填し、而して両
ケーシングが所定深さに達し且つグラベルの充填された
筒状袋体の下端部が固定ケーシング内の下端部に達した
後、筒状袋体の上端部を筒状成形シュートの下方で切断
して、両ケーシングを引き抜くことを特徴とするグラベ
ル杭造成工法。
1. A rotary casing having a fixed casing inserted therein is rotated while being pierced into the ground, and during the piercing, a strip-shaped chute is formed on a cylindrical molding chute that is hung continuously under the gravel hopper. While the water-permeable sheet is being wound and supplied, both side overlapping edges of the sheet are joined by a longitudinal joining means to form a tubular bag body, and the tubular bag body is fed downward with its lower end closed. While inserting into the fixed casing, gravel such as sand and gravel in the gravel hopper is filled into the tubular bag inside the fixed casing through the tubular forming chute, and both casings reach a predetermined depth. After the lower end of the tubular bag filled with gravel reaches the lower end of the fixed casing, the upper end of the tubular bag is cut below the tubular forming chute and both casings are pulled out. Gravel pile construction method.
【請求項2】内部に固定ケーシングが挿入された回転ケ
ーシングを回転させつつ地盤中に穿入するに先立ち、グ
ラベルホッパーの下部に垂下連設された筒状成形シュー
トに帯状の透水性シートを巻回供給しつつ該シートの両
側重合縁部を縦方向接合手段により接合して筒状袋体を
形成し、該筒状袋体を下送しつつ固定ケーシング内にそ
の下端部まで挿入して、該筒状袋体の下端を閉塞した
後、回転ケーシングを固定ケーシングと共に地盤中に穿
入し、而して両ケーシングが所定深さに達した後、グラ
ベルホッパー内の砂、砂利等のグラベルを筒状成形シュ
ートを介して固定ケーシング内の筒状袋体に充填し、し
かる後筒状袋体を下送しつつ両ケーシングを引き抜い
て、両ケーシングの下方で筒状袋体を切断することを特
徴とするグラベル杭造成工法。
2. A belt-shaped water-permeable sheet is wound around a cylindrical forming chute which is hung continuously under the gravel hopper, before being inserted into the ground while rotating a rotating casing having a fixed casing inserted therein. While feeding the sheet, both side overlapping edges of the sheet are joined by a longitudinal joining means to form a tubular bag body, and while the tubular bag body is fed downward, the tubular bag body is inserted to its lower end portion, After closing the lower end of the tubular bag, the rotary casing was pierced into the ground together with the fixed casing, and after both casings reached a predetermined depth, gravel such as sand and gravel in the gravel hopper was removed. Filling the tubular bag inside the fixed casing through the tubular forming chute, then pulling out both casings while lowering the tubular bag, and cutting the tubular bag below both casings. Characteristic gravel pile construction Method.
【請求項3】リーダに吊支される機枠の下部に回転自在
に垂下装備された回転ケーシングと、この回転ケーシン
グを駆動する回転駆動手段と、上端部が機枠側に取付け
られていて回転ケーシグ内にその全長に亘って挿入され
た固定ケーシングと、機枠に配備されたグラベルホッパ
ーと、固定ケーシングの直上方に位置するグラベルホッ
パー下部に垂下連設された筒状成形シュートと、帯状の
透水性シートを筒状成形シュートの上端部近傍に供給す
るシート供給手段と、供給された透水性シートを筒状成
形シュートの外面全周に巻回させると共に該シートの両
側縁部を重合させるフォーミングプレートと、筒状成形
シュートに巻回される上記シートの両側縁重合部を接合
して筒状袋体を形成する縦方向接合手段と、筒状袋体を
固定ケーシング内に挿入させるべく該筒状袋体を下向き
に送給する送給手段と、筒状成形シュートの下方におい
てグラベルの充填された筒状袋体の上端部を切断する袋
体切断手段と、を具備してなる請求項1記載のグラベル
杭造成工法を実施するための装置。
3. A rotating casing, which is rotatably suspended from a lower portion of a machine frame suspended by a reader, a rotation driving means for driving the rotating casing, and an upper end portion attached to the machine frame side for rotation. A fixed casing inserted over the entire length in the casing, a gravel hopper arranged in the machine frame, a cylindrical formed chute continuously connected to the lower portion of the gravel hopper located immediately above the fixed casing, and a belt-like shape. Sheet feeding means for feeding the water-permeable sheet to the vicinity of the upper end of the tubular forming chute, and forming for winding the supplied water-permeable sheet around the entire outer surface of the tubular forming chute and superposing both side edges of the sheet. The plate and the longitudinal joining means for joining both side edge overlapping portions of the sheet wound around the tubular forming chute to form a tubular bag body, and the tubular bag body in the fixed casing. A feed means for feeding the tubular bag downward for insertion, and a bag cutting means for cutting the upper end of the tubular bag filled with gravel below the tubular forming chute. An apparatus for carrying out the gravel pile construction method according to claim 1.
JP5221588A 1988-03-04 1988-03-04 Gravel pile construction method and its equipment Expired - Lifetime JPH0629499B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5221588A JPH0629499B2 (en) 1988-03-04 1988-03-04 Gravel pile construction method and its equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5221588A JPH0629499B2 (en) 1988-03-04 1988-03-04 Gravel pile construction method and its equipment

Publications (2)

Publication Number Publication Date
JPH01226915A JPH01226915A (en) 1989-09-11
JPH0629499B2 true JPH0629499B2 (en) 1994-04-20

Family

ID=12908536

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5221588A Expired - Lifetime JPH0629499B2 (en) 1988-03-04 1988-03-04 Gravel pile construction method and its equipment

Country Status (1)

Country Link
JP (1) JPH0629499B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2789239B2 (en) * 1989-10-25 1998-08-20 不動建設株式会社 Partially covered sand pile construction method

Also Published As

Publication number Publication date
JPH01226915A (en) 1989-09-11

Similar Documents

Publication Publication Date Title
US5771665A (en) Sand bagging system
US5893260A (en) Portable apparatus for forming and filling sandbags
US3791573A (en) Bag construction
DE2404038C2 (en) Device for vacuum packaging a product in a flexible container
US20120132316A1 (en) Mobile Apparatus And Method For Filling An Elongated Bag With Particulate Material
EP1165373A1 (en) Continuous sandbag-forming apparatus and method
JPH0629499B2 (en) Gravel pile construction method and its equipment
US20010032442A1 (en) Mobile automatic sandbagger and method of use
JP3237746B2 (en) Sealing device in packaging equipment
GB2094123A (en) Bags for potting plants and the potting of plants
US20020122695A1 (en) Method and apparatus for consolidating earth strata
US4950106A (en) Method and apparatus for installation of an underground seal beneath a garbage dump
EP0192711B1 (en) Automatic profile web filler
CN216468607U (en) Sludge bagging machine
IL30569A (en) Manufacture of valve bags
GB1465695A (en) Packs and methods of making them
JP3440024B2 (en) Sand pile creation method
JPH03166415A (en) Manufacturing device of drain material
EP0508859B1 (en) Device for splicing an insulating and/or draining apron in a trench
JPH0621450B2 (en) Sand anti-construction method and its equipment
JPH1025725A (en) Sandbag preparation machine
JP3794516B2 (en) Drilling and sheath tube insertion method and apparatus for natural mountain
JPS586010B2 (en) Drain material casting method and its equipment
CN209870816U (en) High efficiency back of body seals automatic packaging machine
JP2008144390A (en) Asbestos pipe cutting heavy equipment attachment, asbestos pipe wrapping device, asbestos pipe compression method, and buried asbestos pipe removal method