Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP2857746B2 - Levee board burying equipment - Google Patents
[go: Go Back, main page]

JP2857746B2 - Levee board burying equipment - Google Patents

Levee board burying equipment

Info

Publication number
JP2857746B2
JP2857746B2 JP8108100A JP10810096A JP2857746B2 JP 2857746 B2 JP2857746 B2 JP 2857746B2 JP 8108100 A JP8108100 A JP 8108100A JP 10810096 A JP10810096 A JP 10810096A JP 2857746 B2 JP2857746 B2 JP 2857746B2
Authority
JP
Japan
Prior art keywords
ridge
board
plate
groove
levee
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP8108100A
Other languages
Japanese (ja)
Other versions
JPH09289801A (en
Inventor
勇 豊島
正道 豊島
隆司 染谷
浩一 桧山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NORINSUISANSHO NOGYO KENKYU SENTAA SHOCHO
Original Assignee
NORINSUISANSHO NOGYO KENKYU SENTAA SHOCHO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NORINSUISANSHO NOGYO KENKYU SENTAA SHOCHO filed Critical NORINSUISANSHO NOGYO KENKYU SENTAA SHOCHO
Priority to JP8108100A priority Critical patent/JP2857746B2/en
Publication of JPH09289801A publication Critical patent/JPH09289801A/en
Application granted granted Critical
Publication of JP2857746B2 publication Critical patent/JP2857746B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Soil Working Implements (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、水田畦畔における
漏水防止,溢水防止や試験研究などで小区画水田の枠を
作成のために、畦畔板を機械的に連続して能率よく埋設
することができる畦畔板埋設装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is to bury a ridge plate mechanically and efficiently in order to create a frame of a small plot paddy field for prevention of water leakage, overflow prevention, test research, etc. in a paddy ridge. The present invention relates to a ridge board burying device capable of performing the above.

【0002】[0002]

【従来の技術】従来、農家の水田における漏水防止,溢
水防止や試験研究圃場における小区画水田の枠作成のた
めに、畦畔板を人手により埋め込む技術が知られてい
る。この作業は重労働であり、また、作業時間も多くか
かるものであった。“ゆとりある米作り”や作業能率の
向上が求められる中で、水稲作における水管理を容易に
する漏水及ぴ溢水対策は重要課題の一つである。
2. Description of the Related Art Conventionally, there has been known a technique of embedding a levee board by hand in order to prevent water leakage and overflow in a paddy field of a farmhouse and to create a frame of a small plot paddy field in a test field. This work was hard work and took a lot of time. With the need for “easy rice production” and improved work efficiency, measures to prevent water leakage and flooding that facilitate water management in paddy rice cultivation are one of the important issues.

【0003】畦畔板の埋設は人力により行われていた
が、最近、この作業を機械化する動きがあり、畦畔周囲
を掘削しつつ畦畔板を埋設する装置も案出され実用化さ
れている。
[0003] The embedding of the ridge plate has been performed manually, but recently there has been a movement to mechanize this work, and a device for burying the levee plate while excavating around the ridge has been devised and put into practical use. I have.

【0004】[0004]

【発明が解決しようとする課題】しかし、上記実用化さ
れているものは、乾田状態で埋め込み溝を作って、そこ
に畦畔板を埋設する方法を採っているため、入水後の湿
田状態では利用できないという問題点があった。一般
に、漏水が判明するのは入水(湛水)・代掻き後であ
り、入水後に漏水対策の必要性が生ずる。
However, in the above-mentioned practically used method, a buried groove is formed in a dry field state and a ridge plate is buried therein. There was a problem that it could not be used. Generally, it is only after water entry (flooding) and scraping that water is found that it is necessary to take measures against water leakage after water entry.

【0005】水田の漏水・溢水対策のための畦畔板埋設
作業の機械化には、軽労化,能率化及び水稲収量の安定
化が図られなければならず、また、試験研究用圃場にお
ける小区画水田作成のための枠(畦畔板)設置作業の機
械化においても軽労化,能率化及び精度の向上が図られ
なければならない。本発明は、上記のような問題点、課
題を解決することを目的になされたものである。
[0005] In order to mechanize the embankment work of ridges to prevent leakage and overflow of paddy fields, it is necessary to reduce the labor, improve efficiency, and stabilize the yield of paddy rice. In the mechanization of the installation work of the frame (leave board) for creating the divided paddy fields, reduction of labor, efficiency, and improvement of accuracy must be achieved. The present invention has been made to solve the above problems and problems.

【0006】[0006]

【課題を解決するための手段】上記の目的を達成するた
めに本発明は、 1.トラクタの後部に三点リンクヒッチを介して畦畔板
埋設装置を装着し、この畦畔板埋設装置は、本体フレー
ムに、トラクタの三点リンクヒッチに連結される三点リ
ンクヒッチ連結部と、下端先端部に掘削刃を有し、後方
に向け箱状に延びる作溝部と、ロール状のプラスチック
製波板や平板からなる畦畔板をその軸心を中心に回転自
在に装填するドラム状の畦畔板装填部と、該畦畔板装填
部から繰り出される畦畔板を上記作溝部により作溝され
た縦溝に誘導する畦畔板誘導部とを設け、上記三点リン
クヒッチ連結部を本体フレームに対して左右スライド固
定可能とし、トラクタに対する畦畔板埋設装置の左右オ
フセット量を調節可能としたことを特徴としている。
In order to achieve the above object, the present invention provides: At the rear of the tractor, a ridge board burying device is mounted via a three-point link hitch, and the ridge board burying device has a three-point link hitch connecting portion connected to the three-point link hitch of the tractor on the main body frame, A drum-shaped groove with a drilling blade at the lower end, extending in a box shape toward the rear, and a roll-shaped plastic corrugated plate or ridge plate made of a flat plate rotatably mounted around its axis. A ridge board loading section, and a ridge board guiding section for guiding the ridge board fed from the ridge board loading section to the vertical groove formed by the groove section are provided, and the three-point link hitch connection section is provided. It is characterized in that it can be fixed to the left and right with respect to the main frame, and the amount of left and right offset of the ridge plate embedding device with respect to the tractor can be adjusted.

【0007】2.上記畦畔板誘導部は、畦畔板装填部か
ら繰り出される畦畔板を作溝部により形成された縦溝に
案内する誘導レール及び埋設深度調節リールからなり、
畦畔板の先端部を埋設始点として縦溝に固定することに
より、畦畔板埋設装置の移動と共に畦畔板を繰り出しな
がら縦溝内に埋設するようにしたことを特徴としてい
る。
[0007] 2. The above-mentioned ridge board guide section comprises a guide rail and a burying depth adjustment reel for guiding the ridge board fed from the ridge board loading section to the vertical groove formed by the groove section,
By fixing the tip of the ridge plate to the vertical groove as the starting point of embedding, the ridge plate is buried in the vertical groove while moving out the ridge plate along with the movement of the ridge plate embedding device.

【0008】3.上記作溝部は、下部先端部に前方に向
け突出する掘削刃と、この掘削刃に続いて後方に延びる
深さ調節可能の箱状体とからなり、該箱状体は畦畔板を
作溝部により形成された縦溝に案内する誘導体を兼ねて
いることを特徴としている。
[0008] 3. The above-mentioned groove portion comprises a cutting edge protruding forward at the lower end portion, and a box-shaped body having a depth adjustable extending rearward following the cutting edge, and the box-shaped member forms a groove plate with a ridge plate. It is also characterized in that it also serves as a derivative for guiding in the vertical groove formed by (1).

【0009】4.上記誘導レールの後端側上部に、埋設
深度調節リールを上下調節可能に設置し、畦畔板の縦溝
への埋設深度を調節可能としたことを特徴としている。
4. A buried depth adjusting reel is installed at the rear end upper portion of the guide rail so as to be vertically adjustable so that the buried depth in the vertical groove of the ridge plate can be adjusted.

【0010】[0010]

【作用】上記の構成により本発明の畦畔板埋設装置にお
いては、以下のような作用を行う。
With the above arrangement, the levee board embedding device of the present invention performs the following operations.

【0011】.畦畔板埋設装置は、本体フレームに、
トラクタの三点リンクヒッチに連結される三点リンクヒ
ッチ連結部と、下端先端部に掘削刃を有し、後方に向け
箱状に延びる作溝部と、ロール状のプラスチック製波板
や平板からなる畦畔板をその軸心を中心に回転自在に装
填するドラム状の畦畔板装填部と、該畦畔板装填部から
繰り出される畦畔板を上記作溝部により作溝された縦溝
に誘導する畦畔板誘導部とを設け、上記三点リンクヒッ
チ連結部を本体フレームに対して左右スライド固定可能
とし、トラクタに対する畦畔板埋設装置の左右オフセッ
ト量を調節可能としたことで、乾田、湛水田を問わず畦
畔板の埋設作業を能率よく、しかも精度よく行う。
[0011] The ridge board burying device is
It consists of a three-point link hitch connecting part that is connected to the three-point link hitch of the tractor, a cutting groove that has a cutting edge at the lower end and extends in a box shape toward the rear, and a roll-shaped plastic corrugated sheet or flat plate A drum-shaped ridge plate loading portion for loading the ridge plate rotatably about its axis, and a ridge plate fed from the ridge plate loading portion to the longitudinal groove formed by the groove portion. By providing a ridge board guiding part to make it possible to slide and fix the three-point link hitch connecting part to the left and right with respect to the main frame, and to be able to adjust the amount of left and right offset of the ridge board burying device with respect to the tractor, Efficient and accurate burial board embedding work regardless of flooded fields.

【0012】.畦畔板誘導部は、畦畔板装填部から繰
り出される畦畔板を作溝部により形成された縦溝に案内
する誘導レール及び埋設深度調節リールからなり、畦畔
板の先端部を埋設始点として縦溝に固定することによ
り、畦畔板埋設装置の移動と共に畦畔板を繰り出しなが
ら縦溝内に埋設するので、作業開始時に縦溝内に畦畔板
の先端部を固定するだけで後は自動的に畦畔板埋設作業
が行われる。
[0012] The ridge board guide section consists of a guide rail that guides the ridge board fed from the ridge board loading section to the vertical groove formed by the groove section and a burying depth adjustment reel, with the tip of the ridge board as the embedding start point. By fixing to the flute, the levee board is buried in the flute while moving out the levee board together with the movement of the ridge board embedding device, so at the start of work just fix the tip of the ridge board in the flute, The levee burial work is automatically performed.

【0013】.作溝部は、下部先端部に前方に向け突
出する掘削刃と、この掘削刃に続いて後方に延びる深さ
調節可能の箱状体とからなり、該箱状体は畦畔板を作溝
部により形成された縦溝に案内する誘導体を兼ねている
ことで、畦畔板装填部から繰り出された畦畔板を作溝部
により形成された縦溝に案内する。また、誘導体は湛水
田における泥土の流入を防ぐ働きをし、湿田状態でも畦
畔板の埋設が可能となる。
[0013] The groove is formed by a digging blade protruding forward at a lower end portion, and a box-shaped body having a depth adjustable extending rearward following the digging blade. By also serving as a guide for guiding the formed flutes, the flutes fed out from the flute board loading unit are guided to the flutes formed by the flutes. In addition, the derivative functions to prevent the inflow of mud in the flooded paddy field, and the levee board can be buried even in the wetland state.

【0014】.誘導レールの後端側上部に、埋設深度
調節リールを上下調節可能に設置し、畦畔板の縦溝への
埋設深度を調節可能としたことで、畦畔板の埋設深度を
所望深さ(15〜30cm)に設定して埋設作業が行
え、作業精度が向上する。
[0014] A buried depth adjustment reel is installed in the upper part of the rear end side of the guide rail so that it can be adjusted up and down, and the burial depth of the levee board can be adjusted to the desired depth ( 15 to 30 cm) to perform burying work, and work accuracy is improved.

【0015】[0015]

【発明の実施の形態】以下、本発明の実施の形態を、図
面を参照して具体的に説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be specifically described below with reference to the drawings.

【0016】畦畔板埋設装置1は、図示しないトラクタ
の後部に設けられている三点リンクヒッチを介して装着
される。この畦畔板埋設装置1は、本体フレーム2に、
トラクタの三点リンクヒッチに連結される連結部として
のトップマスト3とロアリンクヒッチピン4,4とを連
結フレーム5に設けている。このトップマスト3及びロ
アリンクヒッチピン4,4を含む連結フレーム5は、本
体フレーム2に対してスライド固定金具6、7,7によ
り左右にスライドして固定可能であり、トラクタに対す
る畦畔板埋設装置1の左右オフセット量が調節可能であ
る。
The ridge board burying device 1 is mounted via a three-point link hitch provided at the rear of a tractor (not shown). This ridge board burying device 1
The connection frame 5 is provided with a top mast 3 and a lower link hitch pin 4 as a connecting portion connected to the three-point link hitch of the tractor. The connecting frame 5 including the top mast 3 and the lower link hitch pins 4 and 4 can be fixed to the main body frame 2 by sliding to the left and right by slide fixing brackets 6, 7, and 7. The left and right offset amount of 1 can be adjusted.

【0017】本体フレーム2の前部下方には、縦刃部8
の下端に前方に向け突出するように取付けられた掘削刃
8aと、縦刃部8から後方に所定高さで延びる箱状体9
とよりなる作溝部10が設けられている。縦刃部8の上
部後方で箱状体9の上方に位置して、図示しないロール
状のプラスチック製波板や平板からなる畦畔板を、その
軸心を中心ポール11aに挿通して中心ポール11aを
中心に回転自在に装填するドラム状の畦畔板装填部11
を設けている。この畦畔板装填部11の後部には開口部
12が形成され、ここから畦畔板の外周端部が繰り出さ
れる。
A vertical blade portion 8 is provided below a front portion of the main body frame 2.
A cutting edge 8a attached to the lower end of the box so as to protrude forward, and a box-shaped body 9 extending rearward from the vertical blade 8 at a predetermined height.
And a working groove portion 10 comprising: A roll-shaped plastic corrugated plate or a ridge plate made of a flat plate (not shown) is inserted into the center pole 11a through the center pole 11a. Drum-shaped ridge plate loading unit 11 that is rotatably loaded around 11a
Is provided. An opening 12 is formed at the rear of the ridge plate loading section 11, from which the outer peripheral end of the ridge plate is fed.

【0018】畦畔板装填部11の開口部12から繰り出
される畦畔板は、本体フレーム2の一部である縦フレー
ム13に形成したスリット14を通って、箱状体9及び
畦畔板誘導部15を介して上記作溝部10により作溝さ
れた縦溝に誘導される。この畦畔板誘導部15は、上記
箱状体9、スリット14を含めて、誘導レール16及び
畦畔板装填部11から繰り出された畦畔板の上端面に転
接して畦畔板の埋設深さを規制する,前後一対の埋設深
度調節リール17,18からなり、また、上記箱状体9
は畦畔板を作溝部により形成された縦溝に案内する誘導
体を兼ねている。
The ridge plate fed out from the opening 12 of the ridge plate loading section 11 passes through a slit 14 formed in a vertical frame 13 which is a part of the main body frame 2, and guides the box-like body 9 and the ridge plate. It is guided to the longitudinal groove formed by the groove part 10 via the part 15. The ridge plate guiding portion 15 is in contact with the guide rail 16 and the upper end surface of the ridge plate fed out from the ridge plate loading portion 11 including the box-shaped body 9 and the slit 14 to bury the ridge plate. It comprises a pair of front and rear buried depth adjusting reels 17 and 18 for regulating the depth.
Also serves as a guide to guide the ridge plate to the vertical groove formed by the groove.

【0019】上記作溝部10、畦畔板装填部11、縦フ
レーム13、畦畔板誘導部15等は前後に一体的に連結
されており、本体フレーム2に対してスライド固定金具
6a、7aを介して取付けられており、スライド固定金
具6a、7aを緩めて左右にスライドして固定すること
で左右移動可能である。また、作溝部10、畦畔板装填
部11、縦フレーム13、畦畔板誘導部15等を本体フ
レーム2から抜き取って、連結フレーム5の反対側の本
体フレーム2に挿通して取付け、トラクタに対して左右
反対に設置することも可能である。
The groove 10, ridge plate loading portion 11, vertical frame 13, ridge plate guiding portion 15, and the like are integrally connected to each other in the front and rear directions, and slide fixtures 6 a and 7 a are attached to the main body frame 2. It can be moved left and right by loosening the slide fixtures 6a and 7a and sliding it right and left to fix it. In addition, the groove 10, the ridge plate loading portion 11, the vertical frame 13, the ridge plate guiding portion 15, and the like are withdrawn from the main frame 2 and inserted into the main frame 2 on the opposite side of the connecting frame 5, and attached to the tractor. On the other hand, it is also possible to install them on opposite sides.

【0020】ここで、畦畔板埋設の連続作業を開始する
ときは、畦畔板装填部11から畦畔板誘導部15を経て
繰り出された畦畔板の先端部を埋設始点として縦溝に固
定することにより、畦畔板埋設装置1の移動と共に、畦
畔板を畦畔板装填部11から畦畔板誘導部15を経て順
次繰り出しながら縦溝内に埋設する。
Here, when the continuous work of embedding the ridge plate is started, the leading end of the ridge plate fed out from the ridge plate loading portion 11 through the ridge plate guiding portion 15 is inserted into the flute as a starting point of embedding. By fixing, the ridge plate is buried in the vertical groove while being sequentially fed out from the ridge plate loading unit 11 through the ridge plate guiding unit 15 with the movement of the ridge plate embedding device 1.

【0021】上記作溝部10は、縦刃部8、掘削刃8a
及び箱状体9を支持している支持アーム19,20,2
1にそれぞれ複数の上下調節穴19a,20a,21a
を設け、これら上下調節穴19a,20a,21aの一
つを選択してボルト22,23,24により本体フレー
ム2に固定することによって、作溝部10の上下調節が
可能である。
The working groove 10 includes a vertical blade 8 and a digging blade 8a.
And support arms 19, 20, 2 supporting box-like body 9
A plurality of vertical adjustment holes 19a, 20a, 21a
By selecting one of the vertical adjustment holes 19a, 20a, 21a and fixing it to the main body frame 2 with bolts 22, 23, 24, the vertical adjustment of the groove portion 10 is possible.

【0022】また、上記畦畔板誘導部15は、誘導レー
ル16の後端側上部に、埋設深度調節リール17,18
をバネ25,26を介して上下動可能に弾持すると共
に、埋設深度調節リール17,18の支持アーム17
a,18aを本体フレーム2に対して上下調節可能に支
持し、畦畔板の縦溝への埋設深度を調節可能としてい
る。その調節幅は15〜30cmである。埋設深度調節
リール17の左右両側には一対の土寄せ体27が設けら
れている。
The ridge board guiding section 15 is provided on the rear end side of the guiding rail 16 at the buried depth adjusting reels 17 and 18.
Are supported by springs 25 and 26 so as to be vertically movable, and the support arms 17 of the embedded depth adjusting reels 17 and 18 are supported.
The a and 18a are supported on the main body frame 2 so as to be adjustable up and down, so that the depth of embedding in the vertical groove of the levee plate can be adjusted. The adjustment width is 15 to 30 cm. A pair of burrs 27 are provided on both left and right sides of the burying depth adjusting reel 17.

【0023】次に、上記のように構成された畦畔板埋設
装置1の動作について説明する。
Next, the operation of the ridge board burying apparatus 1 configured as described above will be described.

【0024】畦畔板埋設装置1は、トラクタの三点リン
クヒッチにトップマスト3及びロアリンクヒッチピン
4,4を連結して圃場に導入される。圃場は乾田、湛水
田の何れでもよい。作業を開始するに当たって、畦畔板
装填部11に収容されたロール状の畦畔板の外周部の端
部を、開口部12から縦フレーム13のスリット14を
通って、箱状体9及び畦畔板誘導部15により誘導して
繰り出し、その先端部を埋設始点として圃場に掘った縦
溝に固定する。そして、トラクタにより畦畔板埋設装置
1を移動させることにより畦畔板を畦畔板装填部11か
ら順次繰り出しながら、作溝部10により作溝された縦
溝に箱状体9及び畦畔板誘導部15により誘導して埋設
する。
The levee board embedding apparatus 1 is introduced into a field by connecting a top mast 3 and lower link hitch pins 4 and 4 to a three-point link hitch of a tractor. The fields may be dry fields or flooded fields. When starting the work, the end of the outer peripheral portion of the roll-shaped ridge plate accommodated in the ridge plate loading section 11 is passed through the slit 14 of the vertical frame 13 from the opening 12 to form the box-shaped body 9 and the ridge. It is guided and fed out by the shore plate guiding portion 15, and its tip is fixed to a vertical groove dug in a field as a starting point of embedding. By moving the ridge plate embedding device 1 by the tractor, the ridge plate is sequentially fed out from the ridge plate loading unit 11, and the box-like body 9 and the ridge plate guide are guided to the vertical groove formed by the groove portion 10. It is guided by the part 15 and buried.

【0025】トラクタに対する畦畔板埋設装置1のオフ
セット量を調節するときは、スライド固定金具6、7,
7の締め付けを解除し、本体フレーム2に対してトップ
マスト3及びロアリンクヒッチピン4,4を含む連結フ
レーム5を左右に所望量スライドさせてスライド固定金
具6、7,7を固定すればよい。
When adjusting the offset amount of the ridge plate embedding apparatus 1 with respect to the tractor, the slide fixing brackets 6, 7, and
7, the top frame 3 and the connection frame 5 including the lower link hitch pins 4, 4 may be slid left and right by a desired amount with respect to the main body frame 2 to fix the slide fixtures 6, 7, 7.

【0026】作溝部10、畦畔板装填部11、縦フレー
ム13、畦畔板誘導部15等を左右に移動させるとき
は、スライド固定金具6a、7aの締め付けを緩めて本
体フレーム2に対して左右に所望量スライドさせ、締め
付ければよい。また、作溝部10、畦畔板装填部11、
縦フレーム13、畦畔板誘導部15等を左右反対にする
ときは、スライド固定金具6a、7aを緩めて本体フレ
ーム2から抜取り、連結フレーム5の反対側の本体フレ
ーム2にスライド固定金具6a、7aを挿通して締め付
ければよい。
When moving the groove section 10, the ridge plate loading section 11, the vertical frame 13, the ridge plate guide section 15 and the like to the left and right, loosen the tightening of the slide fixing brackets 6a and 7a, and move the It may be slid left and right by a desired amount and tightened. In addition, production groove part 10, ridge board loading part 11,
When the vertical frame 13, the ridge board guiding portion 15, and the like are reversed left and right, the slide fixing brackets 6 a and 7 a are loosened and removed from the main body frame 2, and the slide fixing bracket 6 a is attached to the main body frame 2 on the opposite side of the connection frame 5. 7a may be inserted and tightened.

【0027】作溝部10の作溝深さを調節するときは、
縦刃部8、掘削刃8a及び箱状体9を支持している支持
アーム19,20,21を本体フレーム2に固定してい
るボルト22,23,24を緩めて抜取り、上下調節穴
19a,20a,21aの一つを選択してボルト22,
23,24を挿通して本体フレーム2に固定すればよ
い。
When adjusting the groove depth of the groove portion 10,
The bolts 22, 23, and 24 that fix the support arms 19, 20, and 21 supporting the vertical blade portion 8, the excavating blade 8a, and the box-shaped body 9 to the main body frame 2 are loosened and removed, and the vertical adjustment holes 19a, Select one of the bolts 22,
23 and 24 may be inserted and fixed to the main body frame 2.

【0028】また、畦畔板の縦溝への埋設深度を調節す
るときは、畦畔板誘導部15の埋設深度調節リール1
7,18の支持アーム17a,18aの、本体フレーム
2に対する支持高さを変更することにより、埋設深度調
節リール17,18による畦畔板の縦溝への埋設深度が
変わり、15〜30cmの範囲で埋設深さ調節が行われ
る。なお、縦溝に埋設された畦畔板の両側の土は、土寄
せ体27,27により畦畔板側に寄せられて、畦畔板を
安定よく立設する。
When adjusting the burial board burying depth in the vertical groove, the burying board guiding section 15 of the burying depth adjusting reel 1
By changing the support height of the support arms 17a and 18a of the support arms 17a and 18a with respect to the main body frame 2, the burial depth of the ridge board by the burying depth adjustment reels 17 and 18 in the vertical groove changes, and the range is 15 to 30 cm. The adjustment of the burial depth is performed. In addition, the soil on both sides of the ridge plate buried in the vertical groove is brought to the ridge plate side by the burrs 27, 27, and the ridge plate is stably stood up.

【0029】 [0029]

【0030】.上表に示したように、本発明の畦畔板
埋設装置1を使用した場合、人力の1/24〜45の時
間で済み、極めて迅速に行うことができるのであり、疲
労度も小さいため、漏・溢水防止作業の省力化及び軽労
化に著しく貢献する。また、本発明の装置1のトラクタ
への着脱、深度調節及び運転操作は簡単かつ容易に行う
ことができる。
[0030] As shown in the above table, when the ridge board burying device 1 of the present invention is used, it takes only 1/24 to 45 hours of human power, and can be performed extremely quickly. Significantly contributes to labor saving and light labor of work to prevent leakage and overflow. Further, attachment / detachment of the device 1 of the present invention to / from the tractor, depth adjustment and driving operation can be performed easily and easily.

【0031】.試験圃場における溢水及び漏水の激し
い畦畔沈下水田で実施したところ、十分その性能を発揮
し、従来の手作業による重労働と比較し、極めて能率的
に、かつ容易に埋設することができ、また、その作業時
間を大幅に短縮できた。
[0031] When implemented in a levee subsidence paddy field where floods and leaks were severe in the test field, it exhibited sufficient performance, and compared with conventional manual labor, it was extremely efficient and could be buried easily. The work time was greatly reduced.

【0032】[0032]

【発明の効果】以上説明したように本発明の畦畔板埋設
装置によれば、以下の効果を奏することができる。
As described above, according to the ridge board embedding apparatus of the present invention, the following effects can be obtained.

【0033】.畦畔板埋設装置は、本体フレームに、
トラクタの三点リンクヒッチに連結される三点リンクヒ
ッチ連結部と、下端先端部に掘削刃を有し、後方に向け
箱状に延びる作溝部と、ロール状のプラスチック製波板
や平板からなる畦畔板をその軸心を中心に回転自在に装
填するドラム状の畦畔板装填部と、該畦畔板装填部から
繰り出される畦畔板を上記作溝部により作溝された縦溝
に誘導する畦畔板誘導部とを設け、上記三点リンクヒッ
チ連結部を本体フレームに対して左右スライド固定可能
とし、トラクタに対する畦畔板埋設装置の左右オフセッ
ト量を調節可能としたので、乾田、湛水田を問わず畦畔
板の埋設作業を能率よく、しかも精度よく行うことがで
きる。
[0033] The ridge board burying device is
It consists of a three-point link hitch connecting part that is connected to the three-point link hitch of the tractor, a cutting groove that has a cutting edge at the lower end and extends in a box shape toward the rear, and a roll-shaped plastic corrugated sheet or flat plate A drum-shaped ridge plate loading portion for loading the ridge plate rotatably about its axis, and a ridge plate fed from the ridge plate loading portion to the longitudinal groove formed by the groove portion. The ridge board guiding part is provided, and the three-point link hitch connection part can be slidably fixed to the left and right with respect to the main frame, and the amount of left and right offset of the ridge board embedding device with respect to the tractor can be adjusted. The embedding work of the ridge board can be performed efficiently and accurately regardless of the paddy field.

【0034】.畦畔板誘導部は、畦畔板装填部から繰
り出される畦畔板を作溝部により形成された縦溝に案内
する誘導レール及び埋設深度調節リールからなり、畦畔
板の先端部を埋設始点として縦溝に固定することによ
り、畦畔板埋設装置の移動と共に畦畔板を繰り出しなが
ら縦溝内に埋設するので、作業開始時に縦溝内に畦畔板
の先端部を固定するだけで、以後は自動的に畦畔板埋設
作業を能率よく行うことができる。
[0034] The ridge board guide section consists of a guide rail that guides the ridge board fed from the ridge board loading section to the vertical groove formed by the groove section and a burying depth adjustment reel, with the tip of the ridge board as the embedding start point. By fixing to the flute, the levee board is buried in the flute while moving out the levee board together with the movement of the ridge board embedding device, so at the start of work simply fix the tip of the ridge board in the flute, Can automatically and efficiently perform the embankment work.

【0035】.作溝部は、下部先端部に前方に向け突
出する掘削刃と、この掘削刃に続いて後方に延びる深さ
調節可能の箱状体とからなり、該箱状体は畦畔板を作溝
部により形成された縦溝に案内する誘導体を兼ねている
ので、畦畔板装填部から繰り出された畦畔板を作溝部に
より形成された縦溝に確実に案内することができる。ま
た、誘導体は湛水田における泥土の流入を防ぐ働きを
し、湿田状態でも畦畔板の埋設を能率よく行うことがで
きる。
[0035] The groove is formed by a digging blade protruding forward at a lower end portion, and a box-shaped body having a depth adjustable extending rearward following the digging blade. Since it also serves as a guide for guiding the formed flutes, the flutes fed out from the flute board loading section can be reliably guided to the flutes formed by the flutes. In addition, the derivative functions to prevent the inflow of mud into the flooded paddy field, and the levee board can be buried efficiently even in the wetland state.

【0036】.誘導レールの後端側上部に、埋設深度
調節リールを上下調節可能に設置し、畦畔板の縦溝への
埋設深度を調節可能としたので、畦畔板の埋設深度を所
望深さに設定して埋設作業を行うことができ、作業精度
を向上することができる。本発明の装置を利用すること
により、畦畔板埋設作業を軽作業として、かつ能率的に
行うことができる。また、機械化により、埋設作業が容
易となり、用水の過剰取水の防止による水資源の有効利
用、あるいは農薬や肥料の公共水域への流出防止に役立
てることができる。さらに、水田水位を適正に保つこと
につながり、水稲収量の安定化に寄与することができ
る。
[0036] A buried depth adjustment reel is installed in the upper part on the rear end side of the guide rail so that it can be adjusted up and down, and the buried depth in the flute of the ridge plate can be adjusted. Burying work can be performed, and work accuracy can be improved. By using the apparatus of the present invention, the embedding work of the ridge board can be performed lightly and efficiently. In addition, the mechanization facilitates the burial work, which can be used for effective use of water resources by preventing excessive withdrawal of water or for prevention of outflow of pesticides and fertilizers into public waters. Furthermore, it leads to maintaining the paddy water level appropriately and can contribute to stabilization of rice yield.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による畦畔板埋設装置の正面図である。FIG. 1 is a front view of a ridge board burying device according to the present invention.

【図2】同側面図である。FIG. 2 is a side view of the same.

【図3】同平面図である。FIG. 3 is a plan view of the same.

【符号の説明】[Explanation of symbols]

1 畦畔板埋設装置 2 本体フレーム 3 トップマスト 4 ロアリンクヒッチピン 5 連結フレーム 6,7,6a,7a スライド固定金具 8 縦刃部 8a 掘削刃 9 箱状体 10 作溝部 11 畦畔板装填部 11a 中心ポール 12 開口部 13 縦フレーム 14 スリット 15 畦畔板誘導部 16 畦畔板誘導レール 17,18 畦畔板の埋設深度調節リール 17a,1
8a 支持アーム 19,20,21 支持アーム 19a,20a,21
a 上下調節穴22,23,24 ボルト 25,26 バネ 27 土寄せ体
DESCRIPTION OF SYMBOLS 1 Levee board embedding apparatus 2 Main body frame 3 Top mast 4 Lower link hitch pin 5 Connecting frame 6,7,6a, 7a Slide fixing bracket 8 Vertical blade part 8a Excavating blade 9 Box body 10 Groove part 11 Levee board loading part 11a Center pole 12 Opening 13 Vertical frame 14 Slit 15 Leaf board guiding section 16 Leaf board guiding rail 17, 18 Reel 17a, 1 for burying depth of levee board
8a Support arms 19, 20, 21 Support arms 19a, 20a, 21
a Vertical adjustment holes 22, 23, 24 Bolts 25, 26 Springs 27

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭59−80813(JP,A) 特開 昭53−11702(JP,A) 実開 平2−70620(JP,U) (58)調査した分野(Int.Cl.6,DB名) A01B 35/00 E02F 5/02──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-59-80813 (JP, A) JP-A-53-11702 (JP, A) JP-A-2-70620 (JP, U) (58) Survey Field (Int.Cl. 6 , DB name) A01B 35/00 E02F 5/02

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 トラクタの後部に三点リンクヒッチを介
して畦畔板埋設装置を装着し、この畦畔板埋設装置は、
本体フレームに、トラクタの三点リンクヒッチに連結さ
れる三点リンクヒッチ連結部と、下端先端部に掘削刃を
有し、後方に向け箱状に延びる作溝部と、ロール状のプ
ラスチック製波板や平板からなる畦畔板をその軸心を中
心に回転自在に装填するドラム状の畦畔板装填部と、該
畦畔板装填部から繰り出される畦畔板を上記作溝部によ
り作溝された縦溝に誘導する畦畔板誘導部とを設け、上
記三点リンクヒッチ連結部を本体フレームに対して左右
スライド固定可能とし、トラクタに対する畦畔板埋設装
置の左右オフセット量を調節可能としたことを特徴とす
る畦畔板埋設装置。
1. A ridge board burying device is attached to a rear portion of a tractor via a three-point link hitch,
A three-point link hitch connection part connected to the three-point link hitch of the tractor, a drilling blade at the lower end end, a groove part extending in a box shape toward the rear, and a roll-shaped corrugated plastic plate on the main body frame A ridge plate loading section in the form of a drum for rotatably loading a ridge plate composed of a flat plate and a flat plate around the axis thereof, and a ridge plate fed out from the ridge plate loading portion were formed by the groove portion. A ridge board guide section that guides to the vertical groove is provided, the above-mentioned three-point link hitch connecting section can be slidably fixed to the left and right with respect to the main frame, and the amount of left and right offset of the ridge board burying device with respect to the tractor can be adjusted. A ridge board burying device characterized by the following.
【請求項2】 上記畦畔板誘導部は、畦畔板装填部から
繰り出される畦畔板を作溝部により形成された縦溝に案
内する誘導レール及び埋設深度調節リールからなり、畦
畔板の先端部を埋設始点として縦溝に固定することによ
り、畦畔板埋設装置の移動と共に畦畔板を繰り出しなが
ら縦溝内に埋設するようにしたことを特徴とする請求項
1記載の畦畔板埋設装置。
2. The ridge board guide section comprises a guide rail for guiding the ridge board fed from the ridge board loading section to the vertical groove formed by the groove forming section, and a burying depth adjusting reel. 2. The levee board according to claim 1, wherein the tip is fixed to the flute as a starting point for embedding, so that the levee board is buried in the flute while the levee board is being extended with the movement of the levee board embedding apparatus. Buried equipment.
【請求項3】 上記作溝部は、下部先端部に前方に向け
突出する掘削刃と、この掘削刃に続いて後方に延びる深
さ調節可能の箱状体とからなり、該箱状体は畦畔板を作
溝部により形成された縦溝に案内する誘導体を兼ねてい
ることを特徴とする請求項1又は2記載の畦畔板埋設装
置。
3. The groove portion comprises a cutting edge protruding forward from a lower end portion, and a box-like body having a depth adjustable following the cutting edge and extending rearward. The ridge plate embedding device according to claim 1 or 2, wherein the ridge plate also serves as a dielectric for guiding the ridge plate to the vertical groove formed by the groove portion.
【請求項4】 上記誘導レールの後端側上部に、埋設深
度調節リールを上下調節可能に設置し、畦畔板の縦溝へ
の埋設深度を調節可能としたことを特徴とする請求項
1,2又は3記載の畦畔板埋設装置。
4. A burying depth adjusting reel is installed on the rear end side upper part of the guide rail so as to be vertically adjustable so that the burying depth of the ridge plate in the vertical groove can be adjusted. , 2 or 3.
JP8108100A 1996-04-26 1996-04-26 Levee board burying equipment Expired - Lifetime JP2857746B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8108100A JP2857746B2 (en) 1996-04-26 1996-04-26 Levee board burying equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8108100A JP2857746B2 (en) 1996-04-26 1996-04-26 Levee board burying equipment

Publications (2)

Publication Number Publication Date
JPH09289801A JPH09289801A (en) 1997-11-11
JP2857746B2 true JP2857746B2 (en) 1999-02-17

Family

ID=14475880

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8108100A Expired - Lifetime JP2857746B2 (en) 1996-04-26 1996-04-26 Levee board burying equipment

Country Status (1)

Country Link
JP (1) JP2857746B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006077477A (en) * 2004-09-10 2006-03-23 Sugano Farm Mach Mfg Co Ltd Ditch digging work machine used for forming simple drainage ditch

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5311702A (en) * 1976-07-15 1978-02-02 Kubota Ltd Connecter for tractor and attachment
JPS5980813A (en) * 1982-10-29 1984-05-10 Yasunori Nara Laying work at start-up time of water shield machine
JPH0626099Y2 (en) * 1988-11-14 1994-07-20 誠一 武田 Carrot digger

Also Published As

Publication number Publication date
JPH09289801A (en) 1997-11-11

Similar Documents

Publication Publication Date Title
CN107912107B (en) Ditching, film covering, soil covering and punching compound operation machine for melon in dry pond
US6053665A (en) Silt fence fabric, apparatus and method
US4142817A (en) Plow for use in laying drain-tile
US4832531A (en) Apparatus for laying subterranean plastic tape and pipe
JP2857746B2 (en) Levee board burying equipment
US3659426A (en) Cable laying plow
WO1995020076A1 (en) Pipeline trenching plough
KR102839503B1 (en) Irrigation hose reclamation and Plastic film covering device
GB2033192A (en) Soil Cultivating Device
KR100781988B1 (en) Earthenware
CN219844034U (en) Ditching fertilization earthing all-in-one
CN112177078A (en) Construction device and construction method for irrigation and water conservancy construction
CN217546896U (en) A matching intelligent water and fertilizer first underground deep trenching drip irrigation pipe laying machine
JPS62239913A (en) Deep plowing and dep fertilizing method and apparatus
CN217336394U (en) Farming equipment of ditching of digging
CN113994875A (en) A matching intelligent water and fertilizer first underground deep trenching drip irrigation pipe laying machine
CN222485264U (en) Double-row ridging ditching device
CN222216719U (en) Thin wall drip irrigation tape shallow buried device
CN206118363U (en) Forward type ditching machine frame linking arm
JP3448348B2 (en) Cultivation guide attached to the cultivation board
JPS6231457Y2 (en)
CN120188705A (en) Drip irrigation tape laying device
JP6980308B1 (en) Sugar cane planting method and planting machine
CN219961566U (en) Prevent deeply burying drip irrigation zone laying device of area that turns over
JP2006077477A (en) Ditch digging work machine used for forming simple drainage ditch

Legal Events

Date Code Title Description
S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R370 Written measure of declining of transfer procedure

Free format text: JAPANESE INTERMEDIATE CODE: R370

EXPY Cancellation because of completion of term