JP2889798B2 - Raw material transport control system - Google Patents
[go: Go Back, main page]

JP2889798B2 - Raw material transport control system - Google Patents

Raw material transport control system

Info

Publication number
JP2889798B2
JP2889798B2 JP5253370A JP25337093A JP2889798B2 JP 2889798 B2 JP2889798 B2 JP 2889798B2 JP 5253370 A JP5253370 A JP 5253370A JP 25337093 A JP25337093 A JP 25337093A JP 2889798 B2 JP2889798 B2 JP 2889798B2
Authority
JP
Japan
Prior art keywords
work
transport
transfer
job
command
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP5253370A
Other languages
Japanese (ja)
Other versions
JPH07101552A (en
Inventor
島 徹 二 福
田 正 園
井 良 和 冨
部 吉 丸 阿
田 修 司 冨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP5253370A priority Critical patent/JP2889798B2/en
Publication of JPH07101552A publication Critical patent/JPH07101552A/en
Application granted granted Critical
Publication of JP2889798B2 publication Critical patent/JP2889798B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Control By Computers (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、原料ヤードにおける原
料搬送制御に関し、特に、原料ヤードから原料を下工程
工場の原料槽へ搬送し入槽する原料ヤード設備におい
て、搬送系統間で搬送機器を共有しながら複数搬送作業
を同時並行して行う搬送制御に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to raw material transfer control in a raw material yard, and more particularly, to a raw material yard facility for transferring raw materials from a raw material yard to a raw material tank of a lower-stage factory and entering the raw material tank. The present invention relates to transport control for performing a plurality of transport operations concurrently while sharing.

【0002】[0002]

【従来の技術】従来、原料ヤードにおける搬送制御に関
する予定搬送作成の計画作業に関しては、操業者が系統
を選択し、シミュレーションを行い、あるいは計算機シ
ミュレーションにより、輸送量とタイミングを計算し
て、あらかじめ予定搬送作業JOBスケジュールを作成
し、その予定搬送作業を固定的に順番に予定量あるいは
予定終了時刻到達まで制御実行していくという方法がと
られていた。なお、搬送作業JOBというのは、一つの
系統で一つの銘柄のまとまった量を搬送する一連の作業
単位のことと定義する。
2. Description of the Related Art Conventionally, an operator selects a system and simulates a scheduled transfer preparation for a transfer control in a raw material yard, or calculates a transport amount and a timing by a computer simulation, and schedules in advance. A method has been adopted in which a transfer job JOB schedule is created, and the scheduled transfer work is controlled and executed in a fixed order until the scheduled amount or the scheduled end time is reached. Note that the transfer job JOB is defined as a series of work units that transfer a single brand of a given amount in one system.

【0003】この従来の、あらかじめシミュレーション
計算により予定搬送作業JOBスケジュール(系統,輸
送量,開始終了時刻)を作成し、その順番に搬送作業を
制御実行(制御の搬送作業干渉管理は下位制御装置で実
施)するという方法では、実際の原料ヤード設備では搬
送時間にバラツキが多く、設備のトラブルも多いため、
制御実績は予定のタイムスケジュール通りにならず、そ
のため最適搬送量もスケジュール作成時点から変化し、
場合によっては系統間で移動機やベルトコンベア(B
C)の競合が発生し、輸送効率が低下し、毎回予定搬送
作業を見直さなければならず、計算機処理負荷を高め、
オペレータはその都度新しい予定を確認しなければなら
ないという問題があり、また制御用計算機では搬送作業
干渉管理を行っていないため、実績に合わせたプラッキ
ング処理等の柔軟な搬送制御ができなかった。なお、プ
ラッキングとはBC系統の分岐点からの切替作業のこと
である。 原料ヤード搬送制御に関しては、さまざまな
自動制御方法が提案されている。例えば、 特開平3−243508号公報には、知識ベースに基
づいたヤード計画に則した自動制御方法が、 特開平4−89708号公報には、知識ベースに基づ
いた鉱石ヤードの搬送能率を最大とするような自動制御
方法が、 特開平4−89709号公報には、知識ベースに基づ
いた石炭ヤードの搬送能率を最大とするような自動制御
方法が、 特開平4−89709号公報には、槽の原料在庫シミ
ュレーションに基づいた石炭ヤードの自動制御システム
が、また、 特開平3−279124号公報には、ヤード計画を中
心とした搬送作業の競合解消方法が、提示されている。
[0003] This conventional, scheduled transfer work JOB schedule (system, transport amount, start / end time) is created in advance by simulation calculation, and control of the transfer work is performed in that order (transfer work interference management of control is performed by a lower control device). Method), the actual raw material yard equipment has many variations in transport time, and there are many equipment troubles.
The control result does not follow the scheduled time schedule, so the optimal transport amount also changes from the time of schedule creation,
In some cases, mobile units and belt conveyors (B
C), the transportation efficiency is reduced, the scheduled transport work must be reviewed every time, the computer processing load is increased,
There is a problem that the operator has to confirm a new schedule each time, and since the control computer does not manage the transfer work interference, flexible transfer control such as a plucking process according to the actual results cannot be performed. The plucking is a switching operation from a branch point of the BC system. Regarding the raw material yard transfer control, various automatic control methods have been proposed. For example, Japanese Patent Application Laid-Open No. 3-243508 discloses an automatic control method based on a yard plan based on a knowledge base. Japanese Patent Application Laid-Open No. 4-89708 discloses that a transfer efficiency of an ore yard based on a knowledge base is maximized. Japanese Patent Application Laid-Open No. 4-89709 discloses an automatic control method that maximizes the transport efficiency of a coal yard based on a knowledge base. An automatic control system for a coal yard based on the raw material inventory simulation described above, and Japanese Patent Application Laid-Open No. 3-279124 discloses a method for resolving conflicts in transport work centering on yard planning.

【0004】[0004]

【発明が解決しようとする課題】従来の方法において
は、オペレータまたは制御用計算機が予定搬送作業JO
Bスケジュールを搬送系統制御装置にあらかじめ固定的
に設定しているが、搬送系統間で移動機やBCを共有し
ているような原料設備においては、予定搬送作業JOB
スケジュールと実績作業終了時刻がずれた場合、既に系
統制御装置に設定された作業スケジュールが搬送効率の
面から最適ではなくなり、制御用計算機でリアルタイム
に再スケジュールを行うにしても、制御用計算機では搬
送制御実行中の作業干渉管理を搬送系統制御装置に委ね
ているため、設定した予定搬送作業JOBの修正はでき
ず、少なくとも1作業分のタイムラグが発生し、また実
質的には作業毎に必ず予定との誤差が発生する。この誤
差を解消するためには、最適搬送系統を選択し直さざる
を得ずこのため計算機負荷およびオペレータの監視負荷
が増大する。
In the conventional method, an operator or a control computer uses a scheduled transfer operation JO.
Although the B schedule is fixedly set in advance in the transport system control device, in a raw material facility in which mobile units and BCs are shared between the transport systems, the scheduled transport job JOB is performed.
If the schedule and the actual work end time deviate from each other, the work schedule already set in the system controller will not be optimal in terms of transfer efficiency, and even if the control computer reschedules in real time, the control computer Since the work interference management during control execution is entrusted to the transfer system controller, the set scheduled transfer work JOB cannot be modified, and a time lag of at least one work occurs. Error occurs. In order to eliminate this error, the optimum transport system must be selected again, which increases the computer load and the monitoring load of the operator.

【0005】本発明は、搬送機器の干渉を避け、プラッ
キング作業を含めて搬送能率を可及的に高くし、オペレ
ータの監視負荷を可及的に低減することを目的とする。
SUMMARY OF THE INVENTION It is an object of the present invention to avoid the interference of the transfer equipment, to increase the transfer efficiency including the plucking operation as much as possible, and to reduce the monitoring load of the operator as much as possible.

【0006】[0006]

【課題を解決するための手段】複数搬送系統間で移動機
やBCを共有しており、複数搬送作業を同時並行して行
う原料搬送制御において、本発明では、制御用計算機に
あらかじめ複数の予定搬送作業の起点と終点を複数入力
するか、あるいは起点終点の自動選択結果を確認するだ
けで、計算機制御による搬送作業イベントが発生する都
度、複数搬送作業の実績と予定を横断的に俯瞰し、搬送
制御実行中の作業干渉管理を行いながら、リアルタイム
に優先搬送作業を判断し、最適搬送系統を選択し、目標
搬送量を計算する。
According to the present invention, in a raw material transfer control in which a plurality of transfer systems share a mobile unit and a BC and a plurality of transfer operations are performed simultaneously in parallel, the control computer uses a plurality of schedules in advance. Just enter multiple start and end points of the transfer work or check the result of automatic selection of the start and end points. While performing work interference management during transfer control, the priority transfer work is determined in real time, the optimum transfer system is selected, and the target transfer amount is calculated.

【0007】これを実現する本発明の、原料ヤード設備
の原料搬送制御システムは、オペレータの搬送要求情報
として、搬送予定原料の搬送元起点機器名および搬送先
終点機器名をあらかじめ複数取り込む入力手段A;該入力手段Aで取り込まれた、搬送元起点機器名および
搬送先終点機器名 に基づいて、起点毎および系統毎の予
定搬送作業JOB情報を、入力された搬送元起点機器名
および搬送先終点機器名の複数個分計算する手段B; 移動機および搬送系統の搬送作業実績イベントデータ
取り込む入力手段C; 設備故障現況データを取り込む入力手段D;該入力手段Cで取り込まれた、移動機および搬送系統の
搬送作業実績イベントデータ に基づいて、実行中搬送作
業JOBおよび予定搬送作業JOBに関して作業干渉管
理,優先作業判断,次作業開始判断,目標搬送量再計
算,停止判断およびプラッキング判断を行い、系統選
択,作業開始,作業停止,プラッキング指令および在庫
測定指令出力をリアルタイムに移動機および搬送系統制
御装置に出力する手段E;および、 移動機および搬送系統を制御する手段F; を備える。
[0007] The material transfer control system of the material yard equipment of the present invention for realizing this is provided with transfer request information of an operator.
As the input means A incorporate advance a plurality of conveying the original starting point equipment name and transport destination endpoint device name of planned transport material; captured by the input means A, conveying the original origin apparatus name and
Based on the destination end device name , the scheduled transfer work JOB information for each starting point and each system is input to the input source starting device name.
And means for calculating a plurality worth of transport destination endpoint device name B; incorporated in said input means C; input means D capturing equipment failure current state data; input means C capturing transport task performance event data of the mobile station and transport system , Mobile equipment and transport systems
Based on the transfer work actual event data , work interference management, priority work determination, next work start determination, target transfer amount recalculation, stop determination, and plucking determination are performed for the currently-executed transfer work JOB and the scheduled transfer work JOB. Work start, work stop, plucking command and stock
Means E for outputting a measurement command output to the mobile device and the transport system controller in real time; and means F for controlling the mobile device and the transport system.

【0008】[0008]

【作用】この原料搬送制御システムは、複数搬送系統間
で移動機やBCを共有しており、複数搬送作業を同時並
行して行い、原料搬送時間のバラツキが発生し、搬送系
統間で作業干渉が起こったり作業間のプラッキングが可
能な原料ヤード設備に適用すると、制御用計算機にあら
かじめ複数の予定搬送作業の起点と終点を入力するかあ
るいは全く自動的に、搬送作業実績イベント毎に、複数
搬送作業の実績と予定を横断的に俯瞰し、搬送制御実行
中搬送作業および予定搬送作業の作業干渉管理を行いな
がら、リアルタイムに優先搬送作業を判断し、最適搬送
系統を選択し、目標搬送量を計算し、搬送機器の干渉を
避け、プラッキング作業を含め搬送能率を最大にするこ
とができるように、自動的に実行搬送作業JOBを決定
し、指令出力を行い、指令に基づいてリアルタイムに自
動搬送制御を行う。
In this material transport control system, a mobile unit and a BC are shared between a plurality of transport systems, and a plurality of transport operations are performed simultaneously in parallel, resulting in a variation in raw material transport time, and work interference between the transport systems. When the system is applied to a raw material yard facility where the occurrence of occurrences or the inter-operation packing is possible, the start and end points of a plurality of scheduled transportation operations can be input to the control computer in advance or completely automatically, Oversight of the actual results and schedule of the work, and while performing work interference management of the transfer work during the transfer control and the planned transfer work, judge the priority transfer work in real time, select the optimal transfer system, and set the target transfer amount. Calculate, automatically determine the execution transfer job JOB, and output the command so that the transfer efficiency including the plucking work can be maximized, avoiding the interference of the transfer equipment. Performs automatic transfer control in real time based on the command.

【0009】[0009]

【実施例】次に本発明の、鉱石ヤードを対象とした一実
施例を説明する。この一実施例のシステム構成を図1に
示す。図1において、100は原料ヤードプロセス制御
用計算機(原料プロコン)であり、400は原料プロコ
ンと操業者とのI/F(インターフェース)をとりもつ
入出力用CRT端末装置、105はCRTの入出力を制
御する入出力処理機能であり、操業者は、搬送予定原料
の起点/終点(オペレータ要求搬送情報)を入力した
り、搬送作業スケジュールを確認することを、CRT端
末装置400を介して行なうことができる。
Next, an embodiment of the present invention for an ore yard will be described. FIG. 1 shows a system configuration of this embodiment. In FIG. 1, reference numeral 100 denotes a material yard process control computer (raw material process control), 400 denotes an input / output CRT terminal device having an I / F (interface) between the raw material process control and an operator, and 105 denotes a CRT input / output. This is an input / output processing function for controlling, and the operator can input or start the starting point / end point (operator-requested transport information) of the material to be transported or check the transport work schedule via the CRT terminal device 400. it can.

【0010】300は原料ヤードの現場設備機器群のブ
ロック図であり、310が移動機群(受入機および払出
機)、320がコンベア・シャトル・トリッパ群、33
0が秤量機群を示す。200は現場設備機器制御用下位
コントローラであり、現場設備機器300を制御し、そ
の稼働実績および現況を管理する。コントローラ機器
は、移動機群の制御に移動機制御用PC(プログラマブ
ルコントローラ)210、コンベア群の制御にコンベア
制御用PC220により構成される。この現場機器制御
用下位コントローラ200は、搬送作業・秤量実績情
報、設備稼働・故障情報を原料プロコン100にリアル
タイムで送信する。原料プロコン100は実績収集・編
集処理150にて該当情報を受信入力し、操業現況14
0として搬送作業実績,ヤード現況および槽現況情報
を、また、設備現況145として設備稼働現況および設
備故障現況を、データファイルに格納する。
Reference numeral 300 is a block diagram of a group of on-site equipment in a raw material yard, 310 is a group of mobile units (accepting and dispensing machines), 320 is a group of conveyors, shuttles and trippers, 33
0 indicates a weighing machine group. Reference numeral 200 denotes a lower-level controller for controlling the on-site equipment, which controls the on-site equipment 300 and manages the operation results and the current state. The controller device includes a mobile device control PC (programmable controller) 210 for controlling the mobile device group and a conveyor control PC 220 for controlling the conveyor group. The on-site equipment control lower-level controller 200 transmits the transfer work / weighing result information and the equipment operation / failure information to the raw material process controller 100 in real time. The raw material processing computer 100 receives and inputs the relevant information in the performance collection / editing process 150, and the operation status 14
The transfer work result, the yard current state, and the tank current state information are stored in the data file as 0, and the equipment operation current state and the equipment failure current state are stored as the equipment current state 145 in the data file.

【0011】中心機能である搬送作業スケジューラ機能
120および搬送作業モニタ・指令機能130は、上述
した操業者からのオペレータ要求搬送情報110あるい
は槽現況から自動作成される要求搬送情報115に基づ
いて、搬送作業スケジューラ機能120により設備仕様
に合わせた起点・系統毎の複数の搬送作業スケジュール
情報125を作成し、搬送作業モニタ・指令機能130
は搬送作業スケジュール125,操業現況140および
設備現況145の情報およびリアルタイムの起動操業イ
ベントから、複数搬送作業の実績と予定を横断的に俯瞰
し、搬送制御実行中の作業干渉管理135を行いなが
ら、リアルタイムに優先搬送作業を判断し、最適搬送系
統を選択し、目標搬送量を計算し、搬送機器の干渉を避
け、プラッキング作業を含め搬送能率を最大にすること
ができるように、自動的に系統毎搬送作業実行JOBを
決定し、該当情報による系統毎搬送制御指令をリアルタ
イムで現場設備機器制御用下位コントローラ200に出
力すると同時に、該当作業指令情報および搬送作業実J
OBをCRT端末装置400に表示する。
The transport work scheduler function 120 and the transport work monitor / command function 130, which are the core functions, are based on the above-mentioned operator-requested transport information 110 from the operator or the required transport information 115 automatically created from the tank status. The work scheduler function 120 creates a plurality of pieces of transfer work schedule information 125 for each starting point and each system according to the equipment specifications.
From the information of the transfer work schedule 125, the operation status 140 and the equipment status 145, and the real-time start-up operation event, the results and schedules of a plurality of transfer operations are overlooked, and the work interference management 135 during transfer control is performed. Automatically determines the priority transport work in real time, selects the optimal transport system, calculates the target transport amount, avoids interference with transport equipment, and maximizes transport efficiency including plucking work automatically. A job execution execution job is determined, and a system-specific transfer control command based on the relevant information is output in real time to the on-site equipment device control lower-level controller 200.
The OB is displayed on the CRT terminal device 400.

【0012】現場機器制御用コントローラ200は、こ
の系統毎搬送作業実行JOBおよび自動搬送制御指令に
基づいて搬送制御を行い、その搬送作業実績情報を原料
プロコン100に送信する。原料プロコン100では、
該当搬送作業実績情報を基に、搬送作業スケジューラ機
能120および搬送作業モニタ・指令機能130によ
り、リアルタイムに次の搬送作業スケジュール125お
よび搬送作業実行JOBを計算,判定又は決定し、系統
毎搬送制御指令を現場危機制御用下位コントローラ20
0に送信して制御出力を設定する、というサイクルを繰
り返して自動搬送制御を行う。
The on-site equipment control controller 200 performs transport control based on this system-specific transport work execution job and an automatic transport control command, and transmits the transport work result information to the raw material process controller 100. In raw material process control 100,
The next transfer work schedule 125 and transfer work execution JOB are calculated, determined or determined in real time by the transfer work scheduler function 120 and the transfer work monitor / command function 130 based on the corresponding transfer work result information, and the transfer control command for each system is provided. The lower-level controller 20 for on-site crisis control
The automatic transport control is performed by repeating the cycle of transmitting the signal to 0 and setting the control output.

【0013】次に、原料プロコン100の搬送作業スケ
ジューラ機能120と搬送作業モニタ・指令機能130
の処理内容について説明する。図2,図3および図4
は、各処理の入出力データ例であり、図2は図1のオペ
レータ要求搬送情報110あるいは要求搬送情報115
の構成およびデータ項目であり、図3は搬送作業スケジ
ューラ機能の処理概要説明であり、図4は搬送作業スケ
ジューラ機能が出力する搬送作業モニタ・指令機能との
I/Fデータになる搬送作業スケジュールの構成および
データ項目である。
Next, the transfer work scheduler function 120 and the transfer work monitor / command function 130 of the raw material process controller 100 are performed.
The details of the processing will be described. FIG. 2, FIG. 3 and FIG.
2 shows an example of input / output data of each process. FIG. 2 shows the operator requested transfer information 110 or the requested transfer information 115 of FIG.
FIG. 3 is an outline of the process of the transfer work scheduler function, and FIG. 4 is a diagram showing the transfer work schedule which becomes I / F data with the transfer work monitor / command function output by the transfer work scheduler function. Configuration and data items.

【0014】要求搬送情報は図2の通り、搬送作業の起
点機器毎に構成され、通常は起点機器と終点機器あるい
は終点ヤード情報だけで十分であるが、オペレータがB
C系統や輸送量を指定したい場合は反映できるように該
当項目を持つ。具体的には、図3のように、バース受入
搬送作業(アンローダから鉱石ヤード),整粒入槽(ヤ
ードから整粒工場),均鉱積付(ヤードまたは整粒工場
成品槽から均鉱中継槽経由均鉱積付ヤード),均積焼結
入槽(均鉱ヤードから焼結工場),焼結単味入槽(ヤー
ドから焼結工場),焼結鉱高炉入槽(焼結工場から高炉
工場)など、搬送作業毎にその起点,終点は異なり、搬
送作業毎に起点,終点として指定されるデータを規定し
ておく。
As shown in FIG. 2, the requested transport information is configured for each of the starting devices of the transport operation. Normally, only the starting device and the end device or the end yard information are sufficient.
If you want to specify the C system and the transportation amount, you have the corresponding items so that they can be reflected. Specifically, as shown in FIG. 3, the berth receiving / transporting operation (from the unloader to the ore yard), the sieving tank (from the yard to the sizing plant), and the soaking ore loading (from the yard or the sizing plant product tank to the ore relay) Soaking yard with soaking via tank), Soaking sintering tank (from soaking yard to sintering plant), Plain sintering tank (from yard to sintering plant), Sinter ore blast furnace (from sintering plant) (Blast furnace factory), the starting point and the end point are different for each transfer operation, and data specified as the start point and the end point for each transfer operation is defined.

【0015】搬送作業スケジューラ機能は、この最低限
の要求搬送情報を基に、図3にある通り搬送系統(起点
から終点まで設備的に原料を搬送する一連のBC群の単
位)を自動的に設備定数テーブルから選択し、また輸送
量についても入槽先の在庫空き量から計算して、搬送作
業スケジュール情報を起点毎に作成する。
Based on the minimum required transfer information, the transfer operation scheduler function automatically sets a transfer system (a unit of a series of BC groups for transferring materials in a facility from the starting point to the end point) as shown in FIG. The transport work schedule information is created for each starting point by selecting from the equipment constant table and calculating the transport amount from the stock empty amount at the tank destination.

【0016】図4が搬送作業スケジュールの構成例であ
る。ここで搬送作業スケジュールJOBのレベルとし
て、J0,J1,J2,J3,・・・Jm(mは7〜8
程度)という概念を導入することにより、制御用計算機
での搬送作業スケジュール作成とリアルタイム搬送作業
制御指令を一元的に実行することができる。J0は払停
中(起点停止後の搬送系統払停指令出力〜払停完了)、
J1は搬送中(起点運転開始〜起点停止後の払停指令出
力)と、J2は準備中(起点に対する準備指令出力〜B
C系統起動後の起点運転開始)と、J3〜Jmは予定1
〜(m−2)と定義し、J0,J1およびJ2は、現場
設備機器制御用下位コントローラに設定した制御中の搬
送作業JOBであり、J3〜Jmは搬送作業スケジュー
ラで更新可能な搬送作業スケジュールである。
FIG. 4 shows an example of the configuration of the transport work schedule. Here, as the level of the transport work schedule JOB, J0, J1, J2, J3,... Jm (m is 7 to 8)
By introducing the concept of (degree), it is possible to centrally execute the transfer work schedule creation and the real-time transfer work control command in the control computer. J0 is during suspension (output of the transportation system suspension / instruction command after completion of the starting point to completion of suspension),
J1 is during conveyance (start operation from starting operation to output of a stop / pause command after stopping the starting position), and J2 is during preparation (output of preparation command to start position to B
Start operation after starting the C system) and J3 to Jm are scheduled 1
To (m-2), J0, J1, and J2 are transfer work jobs under control set in the lower-level controller for on-site equipment control, and J3 to Jm are transfer work schedules that can be updated by the transfer work scheduler. It is.

【0017】図1に示す搬送作業モニタ・指令機能13
0は、搬送作業スケジューラ機能120が作成した起点
毎のJ3〜Jmに関して、原料ヤードの搬送実績イベン
トが発生した時、全ての起点のJ3搬送作業スケジュー
ルJOBを俯瞰して、全ての搬送制御実行中の作業干渉
管理を行いながら、リアルタイムに優先搬送作業を判断
し、最適搬送系統を選択し、目標搬送量を計算して、該
当系統起点のJ3 JOBをJ2 JOBにシフトすると
同時に、J4以降のスケジュールをそれぞれ1つシフト
アップし、該当J2 JOBの系統に対して起点の準備
指令を出力する。またあるいは搬送実績イベントによっ
ては、起点運転開始であればJ2 JOBをJ1 JOB
へシフトし、起点停止指令後の起点停止であればJ1
JOBをJ0 JOBにシフトしBC搬送系統に払停指
令を出力する。
The transport work monitor / command function 13 shown in FIG.
0 indicates that the J3 to Jm for each starting point created by the transfer work scheduler function 120, when a raw material yard transfer result event has occurred, the J3 transfer work schedule JOB of all the starting points is overlooked, and all transfer controls are being executed. Priority transfer work is determined in real time, the optimal transfer system is selected, the target transfer amount is calculated, the J3 JOB at the start point of the relevant system is shifted to J2 JOB, and at the same time the schedule after J4 is performed. Are shifted up by one, and a start command for the starting point is output to the J2 JOB system. Alternatively, depending on the transfer result event, if the starting operation is started, J2 JOB is changed to J1 JOB.
To J1 if it is the starting stop after the starting stop command.
The job is shifted to J0 JOB and a stop / stop command is output to the BC transport system.

【0018】次に、搬送作業モニタ・指令機能130の
処理に関して、フローチャートで説明するとともに、そ
の中核となる作業干渉管理の方法と優先作業判定につい
て説明する。図5は、搬送作業モニタ・指令機能130
の処理内容を示すフローチャートである。搬送作業モニ
タ・指令機能130の処理の各項目を次に説明する。起
動要因解析処理51は、原料ヤードの全作業のあらゆる
搬送作業実績イベント毎に起点毎に起動され、イベント
要因毎に後の処理内容が分岐するため、最初にイベント
要因の解析判断を行う。イベント要因の発生であると作
業干渉処理20に進み、イベントの終了であると実行中
作業同期54に進む。
Next, the process of the transport work monitor / command function 130 will be described with reference to a flowchart, and the core method of work interference management and priority work determination will be described. FIG. 5 shows a transport operation monitor / command function 130.
5 is a flowchart showing the processing contents of FIG. Each item of the process of the transport operation monitor / command function 130 will be described below. The activation factor analysis processing 51 is activated for each starting point for every transport operation result event of all operations in the raw material yard, and the subsequent processing content branches for each event factor. If the event factor has occurred, the process proceeds to the work interference process 20, and if the event has ended, the process proceeds to the ongoing work synchronization 54.

【0019】作業干渉管理処理53では、実際に搬送設
備が運転されている現況状態を管理する。その次の実行
中作業同期処理54では、制御用計算機で作成した搬送
作業JOBでない搬送作業(JOBなし搬送作業)を行
っている場合、後から入力された予定1(J3)のJO
Bを同期させ、制御用計算機モード運転を開始させる処
理を行い、JOB管理上はJ3 JOBをJ1 JOBへ
シフトさせる。
In the work interference management process 53, the current state of the actual operation of the transport equipment is managed. In the next running work synchronization processing 54, if a transfer work other than the transfer work JOB created by the control computer (a transfer work without JOB) is being performed, the JO of the schedule 1 (J3) input later is executed.
B is synchronized, a process for starting the control computer mode operation is performed, and J3 job is shifted to J1 job in job management.

【0020】プラッキングチェック処理55では、搬送
中(J1)のJOBと、予定1(J3)のJOBとのプ
ラッキング関係を判断して、J3 JOBにマークす
る。
In the plucking check processing 55, the plucking relationship between the JOB being transported (J1) and the JOB of schedule 1 (J3) is determined and marked on the J3 JOB.

【0021】優先判断処理56では、起点毎に並立して
存在するJOB(別起点のJ3)間および同一起点内の
JOB(J3〜Jm)間の優先判断を行う。JOBなし
搬送作業との関係も考慮する。判断結果を後の停止・プ
ラッキング処理58や次JOB開始処理59内で判断に
利用する。
In the priority judging process 56, a priority judgment is made between JOBs (J3 of different origins) which exist side by side for each origin and between JOBs (J3 to Jm) within the same origin. The relationship with the transfer operation without JOB is also considered. The determination result is used in the subsequent stop / placking processing 58 or the next JOB start processing 59 for the determination.

【0022】要因毎制御指令処理57では、イベント要
因毎に対応した個別の処理として、JOBの移行や各指
令の出力を行う。
In the control command processing for each factor 57, as a separate process corresponding to each event factor, the job is shifted and each command is output.

【0023】停止・プラッキング処理58では、搬送中
J1 JOBに対しあらゆる要因を判断し、停止判断ま
たは次JOBとのプラッキング実行判断を行う。例え
ば、終点槽在庫満杯で次にプラッキング可能なJOBが
あればプラッキングを行い、なければ停止を行う。
In the stop / placking process 58, all factors are determined for the J1 JOB during conveyance, and a stop determination or a plucking execution determination with the next JOB is performed. For example, if the end tank is full and there is a next job that can be plucked, plucking is performed, and if not, stop is performed.

【0024】次JOB開始処理59では、予定1(J
3)のJOBが開始可能かどうかの判断を行い、可能の
場合には各準備指令の出力を行い、JOBを準備中(J
2)に移行させる(要因毎制御指令57の出力での起点
準備指令イベントに対応)。上記の停止・プラッキング
処理58との違いは、プラッキングを行わない単独JO
Bを準備中(J2)に移行する機能を持つ点にある。
In the next job start processing 59, schedule 1 (J
It is determined whether or not the job of 3) can be started. If the job can be started, each preparation command is output, and the job is being prepared (J
The process proceeds to 2) (corresponding to the starting point preparation command event at the output of the control command 57 for each factor). The difference from the above stop / placking processing 58 is that a single JO that does not perform plucking
B has the function of shifting to preparation (J2).

【0025】目標搬送量計算処理60では、新たに準備
中(J2)や搬送中(J1)に移行されたJOBの使用
するコンベアスケールに対し、搬送先の在庫量とコンベ
アスケールの位置から目標搬送量を計算する。同時にJ
OBの終了予定時刻の計算も行う。
In the target transfer amount calculation processing 60, the target transfer amount is calculated from the stock amount of the transfer destination and the position of the conveyor scale with respect to the conveyor scale used by the JOB newly prepared (J2) or transferred (J1). Calculate the amount. J at the same time
The calculation of the scheduled end time of the OB is also performed.

【0026】プラッキング先行準処理61では、搬送中
(J1)のJOBと予定1(J3)のJOBとが同種プ
ラッキング(搬送元起点,原料銘柄が同じで、搬送先終
点が違い、搬送作業を連続して行う作業)の関係にあ
り、プラッキングが必要な時、J3 JCBの先行準備
処理を行う。
In the plucking preparatory process 61, the job of the transport (J1) and the job of the schedule 1 (J3) are the same type of plucking (the transport source starting point and the raw material brand are the same, the transport destination end point is different, and the transport operation is continued. When plucking is necessary, the J3 JCB preparatory preparation process is performed.

【0027】搬送作業モニタ・指令機能130(図1)
は、図5のフローのように起点毎のイベントの処理51
〜58を処理した上で、最終的に54〜56−59〜6
1の処理を行い、同一起点JOB間の優先判断を可能と
している。
Transport work monitor / command function 130 (FIG. 1)
Is a process 51 of an event for each starting point as shown in the flow of FIG.
~ 58, and finally 54 ~ 56-59 ~ 6
By performing the processing of No. 1, it is possible to make a priority determination between the same starting jobs.

【0028】次に、図5に示す作業干渉管理処理53の
内容を詳細に説明する。作業干渉管理とは、結局搬送作
業で使用される設備の干渉管理であり、起点,BC系統
および終点に分けることができる。これらに対して、作
業干渉管理を行うために次の5つの用語を使用する。こ
こで、制御用計算機により従来よりきめ細かい管理を行
うために、J2 JOBに対して「使用予約」という概
念を導入する。
Next, the contents of the work interference management processing 53 shown in FIG. 5 will be described in detail. The work interference management is the interference management of the equipment used in the transport work after all, and can be divided into a start point, a BC system, and an end point. For these, the following five terms are used to perform work interference management. Here, the concept of “use reservation” is introduced for J2 JOB in order to perform more detailed management by the control computer than before.

【0029】(1) ハードリザーブ:実際に該当設備を使
用中;(従って搬送系統間で共有されている設備であれ
ば、作業中以外の搬送系統は実行できない。) (2) ハードマスク:他の搬送系統が使用中であり、該当
搬送系統と設備の共有があり競合干渉して使用できない
状態; (3) スケジュールリザーブ:該当設備の使用予約中; (4) スケジュールマスク:他の搬送系統が使用予約中で
あり、該当搬送系統設備と設備の共有があり競合干渉し
て使用できない状態; (5) 払停中:プラッキング系統の払停中(旧)系統; 図6を参照して具体例を説明する。図6は設備の共有が
ある搬送系統の模式的な例であり、起点(例えばリクレ
ーマ)としてAおよびBの2つ、終点(例えば入槽シャ
トル)として1,2および3の3つからなり、BC系統
としては、A1(A〜1),A2(A〜2),B1(B
〜1),B2(B〜2)およびB3(B〜3)の5つか
らなる設備を考える。この場合、BC系統間の設備干渉
関係は固定であり、1ヶ所でもBCを共有していれば競
合干渉関係になり、本例では表1のようになる。
(1) Hard reserve: the corresponding equipment is actually being used; (therefore, if the equipment is shared between the transfer systems, the transfer system other than the work cannot be executed.) (2) Hard mask: other (3) Schedule reserve: Reserved use of the relevant equipment; (4) Schedule mask: Other transport systems are in use. The use reservation is in progress, the equipment is shared with the relevant transport system equipment, and the equipment cannot be used due to competitive interference; (5) Paused: The suspended (old) system of the plucking system; a specific example with reference to FIG. Will be described. FIG. 6 is a schematic example of a transport system with shared facilities, which includes two of A and B as starting points (for example, a reclaimer) and three of 1, 2, and 3 as end points (for example, an entry shuttle). As the BC system, A1 (A-1), A2 (A-2), B1 (B
1), B2 (B-2) and B3 (B-3) are considered. In this case, the equipment interference relationship between the BC systems is fixed, and if at least one location shares a BC, a competitive interference relationship is established.

【0030】[0030]

【表1】 [Table 1]

【0031】この例で、干渉管理の方法を、A1系統か
らA2系統へ同種プラッキング作業を行う場合で具体的
に説明する。
In this example, the interference management method will be specifically described in the case of performing the same type of plucking operation from the A1 system to the A2 system.

【0032】まずA1系統に対し、制御用計算機はA1
系統起点に対し準備指令を出力し、A1は使用予約状態
となり、スケジュルリザーブ(以下SR)になる。同時
に、A1と干渉関係にあるA2,B1およびB2系統
は、スケジュールマスク(以下SM)となり、この状態
ですでにこれらの系統は実行できないように干渉管理さ
れる。次に制御用計算機がA1系統に対して起動指令を
出力して、BC系統が起動され、起点が運転中になった
状態で、A1系統は搬送中(J1)へ移行すると同時に
ハードリザーブ(以下HR)になる。同時に、SRと同
様にA1と干渉関係にあるA2,B1およびB2系統は
ハードマスク(以下HM)になる。
First, for the A1 system, the control computer is A1
A preparation command is output to the system start point, A1 enters a use reservation state, and becomes a schedule reserve (hereinafter, SR). At the same time, the A2, B1 and B2 systems that have an interference relationship with A1 become a schedule mask (hereinafter, SM), and in this state, the interference management is performed so that these systems cannot be executed already. Next, the control computer outputs a start command to the A1 system, the BC system is started, and in a state where the starting point is in operation, the A1 system shifts to transporting (J1), and at the same time, hard reserve (hereinafter referred to as “J1”). HR). At the same time, the A2, B1 and B2 systems that have an interference relationship with A1 similarly to SR become hard masks (hereinafter HM).

【0033】次にA1系統の搬送を所定の目標搬送量だ
け行った後、A2系統へ同種プラッキングを行う場合を
考える。この場合、制御用計算機がA2系統へのプラッ
キング指令を出力して、A2系統が搬送中(J1)にな
ると同時にA1系統は払停中(J0)になる。A2系統
が搬送中になるとHRになり、A2干渉関係にあるA
1,B1およびB2系統はHMになる。
Next, a case is considered in which the same type of plucking is performed on the A2 system after the A1 system is conveyed by a predetermined target conveyance amount. In this case, the control computer outputs a plucking command to the A2 system, so that the A2 system is being transported (J1) and the A1 system is being suspended (J0). When the A2 system is in the process of being transported, it becomes HR, and A
The 1, B1 and B2 systems become HM.

【0034】次に、A1系統が払停完了(J0消滅)に
なるとA1系統としては設備の使用が終了するので払停
中を解除する。同時にA1系統の払停中によりマスクさ
れていた系統のHMを解除する必要がある。HMは複数
の系統から重複してかけられるため、A1系統の干渉定
数にあるA2,B1およびB2それぞれにつき、各干渉
関係系統の状態を参照し、すべてのBC系統がHRでも
払停中でもない時にHMを解除する。この場合A2系統
のHMは解除されるが、B1およびB2はA2によりマ
スクされているためHMを解除することはできない。以
上の処理を表2に示す。
Next, when the suspension of the A1 system is completed (J0 disappearance), the use of the facilities as the A1 system is terminated, and the suspension is canceled. At the same time, it is necessary to release the HM of the system masked during the suspension of the A1 system. Since HM is applied from a plurality of systems redundantly, for each of A2, B1 and B2 in the interference constant of the A1 system, reference is made to the state of each interference-related system, and when all BC systems are not in HR or in suspension. Release HM. In this case, the HM of the A2 system is released, but the HM cannot be released because B1 and B2 are masked by A2. Table 2 shows the above processing.

【0035】[0035]

【表2】 [Table 2]

【0036】次に、図5に示す優先判断処理56の内容
を詳細に説明する。優先判断処理56は、起動イベント
が搬送中JOBの終了(目標搬送量達成)により、該当
起点の次予定1(J3 JOB)に関して行うもので、
図7にその内容を示す。これは、従来行われていた現場
設備機器制御用下位コントローラによる制御では実現で
きずに、制御用計算機で初めて可能になる処理である。
本処理(図7)で手動作業チェック71と開始時刻指定
チェック72は、判断対象のJ3 JOBについてのみ
判断し、以下73〜79の処理は該当J3 JOBと干
渉する可能性のあるBC系統の、J0,J1,J2,J
3 JOBすべてについて判断する。なお73〜79の
処理は、鉄鋼業の原料ヤードで一般的にありうる搬送作
業をカバーする処理例であり、起動毎に全ての処理を実
行する必要はなく、起動イベント毎に実行する処理とし
ない処理を固定的に定めておく。図7のフローチャート
について、各処理ブロックでは以下のようなチェックを
行い、チェックにあてはまる場合はそれぞれ該当J3
JOBに関して、優先大あるいは小を決定する。
Next, the contents of the priority judgment processing 56 shown in FIG. 5 will be described in detail. The priority determination process 56 is performed with respect to the next scheduled 1 (J3 JOB) of the start point when the start event ends the transporting job (attains the target transport amount).
FIG. 7 shows the contents. This is a process that cannot be realized by the control by the lower-level controller for controlling the on-site equipment, which has been conventionally performed, and is first enabled by the control computer.
In this process (FIG. 7), the manual work check 71 and the start time designation check 72 determine only the J3 JOB to be determined, and the following processes 73 to 79 are executed for the BC system which may interfere with the J3 JOB. J0, J1, J2, J
3 Judge for all jobs. Note that the processes 73 to 79 are processing examples covering the transport work that can be generally performed in the raw material yard of the iron and steel industry. The processing not to be performed is fixed. Regarding the flowchart of FIG. 7, the following check is performed in each processing block, and if the check applies, the corresponding J3
For the job, the priority is determined to be large or small.

【0037】手動作業チェック処理71では、該当J3
JOBがキャンセル中か(優先小)、手動運転中か
(優先小)チェックする。それらに該当しない場合は次
の処理(72)に進む。
In the manual work check processing 71, the corresponding J3
It is checked whether the job is being canceled (small priority) or is being operated manually (small priority). If not, the process proceeds to the next process (72).

【0038】開始時刻指定チェック処理72では、該当
J3 JOBに開始時刻指定があり開始時刻を過ぎてい
ない(優先大)かチェックする。過ぎていると次の処理
(73)に進む。
In the start time designation check processing 72, it is checked whether the start time has been designated and the start time has not passed (the priority is large) in the corresponding J3 JOB. If it has passed, the next processing
Proceed to (73).

【0039】実行中作業チェック処理73では、該当起
点にJ0かJ2がある(優先小)か、該当起点にJ1が
あり該当J3JOBと機器構成が違う(優先小)か、該
当J3 JOBのBC系統に干渉がない(優先小)かチ
ェックする。これらに該当しないと次の処理(74)に進
む。
In the ongoing work check process 73, whether the corresponding starting point is J0 or J2 (small priority), the corresponding starting point is J1 and the device configuration is different from the corresponding J3JOB (small priority), or the BC system of the corresponding J3 JOB Check if there is no interference (low priority). Otherwise, the process proceeds to the next process (74).

【0040】プラッキング作業チェック処理74では、
該当J3 JOBにスケジュール干渉があり該当J3 J
OBがプラッキングJOBか、該当J3 JOBにスケ
ジュール干渉がないか、それ以外か(優先小)チェック
し、スケジュ−ル干渉があってプラッキングJOBであ
るときあるいはスケジュ−ル干渉がないときには次の処
理(76)に進む。
In the plucking work check processing 74,
Applicable J3 JOB has schedule interference and applicable J3 J
It is checked whether the OB is a packing job or the corresponding J3 JOB has no schedule interference or other (low priority). If there is a schedule interference and it is a packing job or there is no schedule interference, the next processing ( Go to 76).

【0041】作業優先度指定チェック処理75では、作
業毎に任意に優先度指定が設定できるようにして、該当
J3 JOBにスケジュール干渉がある(優先小)か、
該当J3JOBにスケジュール干渉がなく優先指定が相
手起点JOBより大きいか(次)、相手起点J3は該当
J3JOBより優先指定大で相手起点JOB(J0〜J
2)が優先大でないか(次)、それ以外か(優先小)チ
ェックする。「(優先小)」の判定が成立しなかった場合に
は、次の処理(76)に進む。以下、次の処理に進む状態を
文中に(次)と記す。
In the work priority designation check process 75, the priority designation can be arbitrarily set for each work, and whether or not the J3 JOB has a schedule interference (low priority) is determined.
Whether the corresponding J3JOB has no schedule interference and the priority designation is larger than the partner origination JOB (next), or the partner origination J3 has a priority designation larger than the corresponding J3JOB and the partner origination JOB (J0-J
Check if 2) is not high priority (next) or any other (low priority). When the determination of “(priority small)” is not established, the process proceeds to the next process (76). Hereinafter, the state of proceeding to the next process is described as (next) in the sentence.

【0042】単味在庫量チェック処理76では、該当J
3 JOBと相手起点JOB両方が単味入槽の場合行
い、該当J3 JOBにスケジュール干渉があり相手起
点JOBが停止処理中か(次)、該当J3 JOBにス
ケジュール干渉がなく相手起点JOBより在庫レベルが
低いか(次)、該当J3 JOBにスケジュール干渉が
なく相手起点JOBより在庫レベルは高く相手は優先大
でないか(次)、それ以外か(優先小)チェックする。
In the simple stock amount check processing 76, the corresponding J
3 If both the JOB and the opponent's origin JOB are plain tanks, perform this if the relevant J3 JOB has a schedule interference and the opponent's origin JOB is in the process of being stopped (next), or the J3 JOB has no schedule interference and the inventory level is higher than the opponent's origin JOB Is lower (next), whether the corresponding J3 JOB has no schedule interference and the inventory level is higher than the partner starting JOB, and the other party is not high priority (next) or other (low priority).

【0043】均鉱積付達成度チェック処理76では、該
当J3 JOBと相手起点JOB両方が均鉱槽入槽の場
合行い、該当J3 JOBにスケジュール干渉がなく相
手より積付達成度が低いか(次)、該当J3 JOBに
スケジュール干渉がなく相手起点JOBより積付達成度
が高く優先大でないか(次)、相手J3 JOBにスケ
ジュール干渉があり相手JOBは停止処理中か(次)、
それ以外か(優先小)チェックする。
In the ore-loading achievement check process 76, the process is performed when both the target J3 JOB and the partner starting point JOB are in the soaking tank, and whether the target J3 JOB has no schedule interference and the loading achievement is lower than the partner ( Next), whether the corresponding J3 JOB has no schedule interference and the stowage achievement degree is higher than the other starting JOB and the priority is not large (next), whether the other J3 JOB has schedule interference and the other JOB is in the process of being stopped (next),
Check if it is anything else (small priority).

【0044】均鉱槽在庫量チェック処理78では、該当
J3 JOBの均鉱槽が入槽可能レベル在庫か(次)、
それ以外か(優先小)チェックする。
In the soaking tank stock amount check processing 78, whether or not the soaking tank of the corresponding J3 JOB is at a level that can be entered (next),
Check if it is anything else (small priority).

【0045】ヤード出し優先度指定チェック処理79で
は、相手のJ3 JOBにスケジュール干渉がなく相手
起点J3 JOBよりST優先指定大か(次)、相手起
点J3は該当J3 JOBよりST優先指定大で相手起
点JOBは優先大でないか(次)、該当J3 JOBの
スケジュール干渉は自分のみか(次)、該当J3ヤード
出しJOBよりST優先指定大のヤード出しJOBがあ
るか(優先小)、それ以外か(優先大)チェックする。
In the yarding-out priority designation check processing 79, whether the J3 JOB of the other party has no schedule interference and the ST priority designation is larger than the J3 JOB (next), or the J3 JOB is the ST priority designation larger than the J3 JOB Whether the starting JOB is not high priority (next), whether the J3 JOB is the only one that interferes with the schedule (next), whether there is a yard out job with ST priority designation larger than the corresponding J3 yard out job (low priority), or any other Check (high priority).

【0046】最終的にすべてのチェック(71〜79)で結果
的に判断できなかった場合の該当J3 JOBは(優先
大)とする(80,81)。それぞれの処理毎に上記の優先大
または優先小が確定できればそれを決定判断とし(82)、
確定できない場合は次のブロックのチェック処理を行
う、というフローを繰り返すことにより処理を行う。
Finally, if all the checks (71 to 79) fail to make a judgment, the corresponding J3 JOB is set to (high priority) (80, 81). If the above-mentioned large priority or small priority can be determined for each process, it is determined as a decision judgment (82),
If the determination cannot be made, the process is performed by repeating the flow of checking the next block.

【0047】最後に、制御用計算機100の搬送作業モ
ニタ・指令機能130が下位コントローラ155,20
0に出力する指令の例を述べる。上述したように、本発
明では制御用計算機100が起点/終点/BC系統に対
して都度リアルタイムで制御指令を出力するシステムで
あり、鉄鋼業の原料ヤードにおける原料搬送設備の例で
は、起点としてアンローダ,リクレーマ,スタックリク
レーマ,ブレンディングリクレーマ,高炉庫下ホッパ,
均鉱積付CFW(定量切出装置),焼結工場,整粒工場
出側起点などがあり、終点としてはスタッカ,ブレンデ
ィングスタッカ,ブレンディングホッパ,高炉槽トリッ
パ,焼結槽トリッパ,石炭槽トリッパ,整粒工場原鉱槽
トリッパ等がある。
Finally, the transfer work monitor / command function 130 of the control computer 100 is controlled by the lower controllers 155, 20.
An example of a command to be output to 0 will be described. As described above, in the present invention, the control computer 100 outputs a control command in real time to the start point / end point / BC system each time. In the example of the raw material transporting equipment in the raw material yard of the steel industry, the unloader is used as the starting point. , Reclaimer, stack reclaimer, blending reclaimer, hopper under blast furnace,
There are soot loading CFW (quantitative cutting device), sintering factory, sizing factory exit side starting point, etc. The end points are stacker, blending stacker, blending hopper, blast furnace tank tripper, sintering tank tripper, coal tank tripper, There is a sizing plant original ore tank tripper and the like.

【0048】搬送作業モニタ・指令機能130は、移動
機類の起点/終点に対しては準備指令,起動指令あるい
は停止指令を出力し、フィーダ類に対しては起動指令あ
るいは停止指令を出力し、シャトルトリッパ類に対して
はセット指令あるいはサウンジング在庫測定指令を出力
し、BC系統に対しては選択指令,選択解除指令,起動
指令,プラッキング指令,払停指令あるいはキャンセル
指令を出力する。これらの制御指令の出力タイミング
と、下位コントロ−ラ200から制御用計算機100へ
の実績情報入力タイミングを、図8に示す。
The transport work monitor / command function 130 outputs a preparation command, a start command or a stop command to the starting point / end point of the mobile equipment, and outputs a start command or a stop command to the feeders. A set command or a sounding stock measurement command is output to the shuttle trippers, and a selection command, a deselection command, a start command, a plucking command, a payoff command or a cancel command is output to the BC system. FIG. 8 shows the output timing of these control commands and the timing of input of the performance information from the lower controller 200 to the control computer 100.

【0049】このようにして、図1に示した搬送制御シ
ステムにより、原料ヤードの自動搬送制御を実施するこ
とができる。
In this manner, the transfer control system shown in FIG. 1 enables automatic transfer control of the raw material yard.

【0050】[0050]

【発明の効果】以上のように、鉄鋼石や石炭などの原料
ヤード設備における搬送制御に関して、複数搬送系統間
で移動機やBCを共有しており、複数搬送作業を同時並
行して行う原料搬送制御において、以下のような効果が
得られる。
As described above, with regard to the transport control in the raw material yard equipment for iron ore or coal, the mobile equipment and the BC are shared between the multiple transport systems, and the raw material transport in which the multiple transport operations are performed simultaneously in parallel. In the control, the following effects can be obtained.

【0051】(1) 搬送作業イベントが発生する都度、複
数搬送作業の実績と予定を横断的に俯瞰し、搬送制御実
行中の作業干渉管理を行いながら、リアルタイムに優先
搬送作業を判断して制御指令を行う事により、よりきめ
の細かい制御ができるようになる。
(1) Each time a transfer work event occurs, the results and schedule of a plurality of transfer works are looked down in a cross-sectional view, and while performing work interference management during the execution of transfer control, priority transfer work is judged and controlled in real time. By issuing the command, finer control can be performed.

【0052】(2) 搬送作業イベントが発生する都度、搬
送機器の干渉を避け、プラッキング作業を含め搬送能率
を最大にする最適搬送系統を選択して目標搬送量を計算
するため、搬送作業予定と実績がずれても予定の再立案
をすることなしに、搬送作業効率が最大になる最適制御
が行える。
(2) Each time a transfer work event occurs, a transfer work schedule is selected in order to calculate the target transfer amount by selecting an optimum transfer system that maximizes transfer efficiency, including plucking work, while avoiding interference with transfer equipment. Even if the results are shifted, optimal control that maximizes the transfer work efficiency can be performed without re-planning the schedule.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の一実施例のシステム構成を示すブロ
ック図である。
FIG. 1 is a block diagram illustrating a system configuration according to an embodiment of the present invention.

【図2】 図1に示すプロセス制御用計算機100の中
心機能である搬送作業スケジューラ機能120と搬送作
業モニタ・指令機能130が扱う入出力データ項目およ
び構成例を示すブロック図である。
FIG. 2 is a block diagram showing input / output data items and a configuration example handled by a transfer work scheduler function 120 and a transfer work monitor / command function 130, which are central functions of the process control computer 100 shown in FIG.

【図3】 図1に示すプロセス制御用計算機100の搬
送作業スケジュ−ラ機能120の、処理対象作業,作業
起点/終点および処理内容の関係を示す平面図である。
FIG. 3 is a plan view showing a relationship among work to be processed, work start / end points, and processing contents of a transfer work scheduler function 120 of the process control computer 100 shown in FIG.

【図4】 図1に示すプロセス制御用計算機100の搬
送作業スケジュ−ラ機能120に与えられる情報の構成
を示すブロック図である。
FIG. 4 is a block diagram showing a configuration of information provided to a transfer work scheduler function 120 of the process control computer 100 shown in FIG.

【図5】 図1に示すプロセス制御用計算機100の搬
送作業モニタ・指令機能130の処理内容を示すフロー
チャートである。
5 is a flowchart showing processing contents of a transfer work monitor / command function 130 of the process control computer 100 shown in FIG.

【図6】 図5に示す作業干渉管理処理20を説明する
ための、搬送系統設備の構成概要を示すブロック図であ
る。
FIG. 6 is a block diagram illustrating an outline of a configuration of a transport system facility for explaining a work interference management process 20 illustrated in FIG. 5;

【図7】 図5に示す優先判断処理50の内容を示すフ
ローチャートである。
FIG. 7 is a flowchart showing the contents of a priority determination process 50 shown in FIG.

【図8】 図1に示すプロセス制御用計算機100から
現場設備機器制御用下位コントローラ200に出力する
各制御指令の出力タイミングと、その逆に計算機100
に入力される実績情報の入力タイミングを示すタイムチ
ャートである。
FIG. 8 shows the output timing of each control command output from the process control computer 100 shown in FIG. 1 to the on-site equipment device control lower controller 200, and vice versa.
6 is a time chart showing the input timing of the result information input to the first embodiment.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 阿 部 吉 丸 大分市大字西ノ洲1番地 新日本製鐵株 式会社 大分製鐵所内 (72)発明者 冨 田 修 司 大分市大字西ノ洲1番地 新日本製鐵株 式会社 大分製鐵所内 (56)参考文献 特開 平3−31121(JP,A) (58)調査した分野(Int.Cl.6,DB名) B65G 63/00 ──────────────────────────────────────────────────の Continuing on the front page (72) Inventor Yoshimaru Abe 1, Nishinosu, Oita, Nippon Steel Corporation Inside Oita Works (72) Inventor, Shuji Tomita 1, Nishinosu, Oita, New Japan (56) References JP-A-3-31121 (JP, A) (58) Fields investigated (Int. Cl. 6 , DB name) B65G 63/00

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】オペレータの搬送要求情報として、搬送予
定原料の搬送元起点機器名および搬送先終点機器名をあ
らかじめ複数取り込む入力手段A;該入力手段Aで取り込まれた、搬送元起点機器名および
搬送先終点機器名 に基づいて、起点毎および系統毎の予
定搬送作業JOB情報を、入力された搬送元起点機器名
および搬送先終点機器名の複数個分計算する手段B; 移動機および搬送系統の搬送作業実績イベントデータ
取り込む入力手段C; 設備故障現況データを取り込む入力手段D;該入力手段Cで取り込まれた、移動機および搬送系統の
搬送作業実績イベントデータ に基づいて、実行中搬送作
業JOBおよび予定搬送作業JOBに関して作業干渉管
理,優先作業判断,次作業開始判断,目標搬送量再計
算,停止判断およびプラッキング判断を行い、系統選
択,作業開始,作業停止,プラッキング指令および在庫
測定指令出力をリアルタイムに移動機および搬送系統制
御装置に出力する手段E;および、 移動機および搬送系統を制御する手段F; を備える、原料ヤード設備の原料搬送制御システム。
As 1. A transport request information of the operator, the input unit A pre plurality capturing conveying the original starting point equipment name and transport destination endpoint device name of planned transport material; captured by the input means A, conveying the original origin apparatus name and
Based on the destination end device name , the scheduled transfer work JOB information for each starting point and each system is input to the input source starting device name.
And means for calculating a plurality worth of transport destination endpoint device name B; incorporated in said input means C; input means D capturing equipment failure current state data; input means C capturing transport task performance event data of the mobile station and transport system , Mobile equipment and transport systems
Based on the transfer work actual event data , work interference management, priority work determination, next work start determination, target transfer amount recalculation, stop determination, and plucking determination are performed for the currently-executed transfer work JOB and the scheduled transfer work JOB. Work start, work stop, plucking command and stock
A raw material transport control system for a raw material yard facility, comprising: means E for outputting a measurement command output to a mobile device and a transport system controller in real time; and means F for controlling the mobile device and the transport system.
JP5253370A 1993-10-08 1993-10-08 Raw material transport control system Expired - Lifetime JP2889798B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5253370A JP2889798B2 (en) 1993-10-08 1993-10-08 Raw material transport control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5253370A JP2889798B2 (en) 1993-10-08 1993-10-08 Raw material transport control system

Publications (2)

Publication Number Publication Date
JPH07101552A JPH07101552A (en) 1995-04-18
JP2889798B2 true JP2889798B2 (en) 1999-05-10

Family

ID=17250414

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5253370A Expired - Lifetime JP2889798B2 (en) 1993-10-08 1993-10-08 Raw material transport control system

Country Status (1)

Country Link
JP (1) JP2889798B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4308303B1 (en) * 2008-01-22 2009-08-05 新日本製鐵株式会社 Method, apparatus and program for creating a plan for entering a raw material storage tank
JP7183595B2 (en) * 2018-07-06 2022-12-06 株式会社安川電機 CONTROL SYSTEM, MODEL CONSTRUCTION DEVICE, AND DATA GENERATION METHOD
CN117509068B (en) * 2023-12-18 2025-11-25 宝信软件(山西)有限公司 A data-driven process control method for conveyor belt machines in steel plants

Also Published As

Publication number Publication date
JPH07101552A (en) 1995-04-18

Similar Documents

Publication Publication Date Title
JP7522995B2 (en) Logistics simulator device, operation plan creation method, and steelworks operation method
JPS6067055A (en) Method and device for operation in flow process type production system
JP2889798B2 (en) Raw material transport control system
CN118297510A (en) A task scheduling method and device based on stereoscopic library, and electronic equipment
CN113807620A (en) Intelligent operation method and system for raw material transportation
JPH11129147A (en) Work management system for processing system consisting of many processing steps
JP2878055B2 (en) Raw material transport control system
JPH11236105A (en) Product distribution control method and device
JP2626201B2 (en) Optimal transfer control device for raw material yard
JPH08143134A (en) Sintered ore transportation plan control system
JPH11236116A (en) Material carry control system
JPH0816206A (en) Method and apparatus for determining start order
CN117522289A (en) Inventory management method, apparatus, system, and computer-readable storage medium
JPH06328112A (en) Transfer device operation scheduling device
JP2003303006A (en) Reservation management system for storage and retrieval of materials and works
JPH05218177A (en) Semiconductor fabrication control system
JPH10203780A (en) Coil yard crane group control method
JPH08215994A (en) Scheduler support system and method therof
KR970001319B1 (en) Steel compounding device and method using expert system
JP2518655B2 (en) How to sort goods
JP2800857B2 (en) Automatic sorting and transport equipment
WO2025146800A1 (en) Physical distribution simulator device, method for creating operation plan, program, and method for operating iron mill
JPH11116057A (en) Preparation method of material handling yard
JP3018253B2 (en) Automatic processing system
JPS6337005A (en) Automatic empty tray supply device in automatic warehouse

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19990209